EP2474704A1 - Monitoring the operation of a subsea hydrocarbon production control system - Google Patents

Monitoring the operation of a subsea hydrocarbon production control system Download PDF

Info

Publication number
EP2474704A1
EP2474704A1 EP11150315A EP11150315A EP2474704A1 EP 2474704 A1 EP2474704 A1 EP 2474704A1 EP 11150315 A EP11150315 A EP 11150315A EP 11150315 A EP11150315 A EP 11150315A EP 2474704 A1 EP2474704 A1 EP 2474704A1
Authority
EP
European Patent Office
Prior art keywords
subsea
fail
monitoring
safe
indication
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP11150315A
Other languages
German (de)
French (fr)
Other versions
EP2474704B1 (en
Inventor
Naresh Kunchakoori
Gopalakrishna Gudivada
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Baker Hughes International Treasury Services Ltd
Original Assignee
Vetco Gray Controls Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Vetco Gray Controls Ltd filed Critical Vetco Gray Controls Ltd
Priority to EP11150315.7A priority Critical patent/EP2474704B1/en
Priority to MYPI2011006200 priority patent/MY152950A/en
Priority to AU2011265528A priority patent/AU2011265528B2/en
Priority to SG2012000188A priority patent/SG182906A1/en
Priority to BR102012000058-0A priority patent/BR102012000058B1/en
Priority to CN2012100141693A priority patent/CN102591274A/en
Publication of EP2474704A1 publication Critical patent/EP2474704A1/en
Application granted granted Critical
Publication of EP2474704B1 publication Critical patent/EP2474704B1/en
Not-in-force legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • E—FIXED CONSTRUCTIONS
    • E21—EARTH OR ROCK DRILLING; MINING
    • E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00—Sealing or packing boreholes or wells
    • E21B33/02—Surface sealing or packing
    • E21B33/03—Well heads; Setting-up thereof
    • E21B33/035—Well heads; Setting-up thereof specially adapted for underwater installations
    • E21B33/0355—Control systems, e.g. hydraulic, pneumatic, electric, acoustic, for submerged well heads

Definitions

  • the present invention relates to monitoring the operation of a subsea hydrocarbon production control system.
  • a shutdown philosophy is employed in the design of production control systems for subsea oil and gas wells, to ensure the protection of personnel, environment and equipment from the consequences that may occur as a result of abnormal operational conditions, accidental release of hydrocarbons or other accidents. This usually entails the inclusion of production shutdown and emergency shutdown mechanisms being built into the system, so that the system fails to a safe condition.
  • Examples of fail-safe shutdowns resulting from subsea failures, where relevant status information cannot be obtained using the existing system functionality, are those which occur between a well Christmas tree and the power distribution and protection module (PDPM) which is installed subsea and is the main subsea interface with Christmas trees providing electrical power, hydraulic power and communications to each Christmas tree.
  • PDPM power distribution and protection module
  • a method of monitoring the operation of a subsea hydrocarbon production control system comprising monitoring at least one subsea device of the system and, if the device fails to a fail-safe condition, sending an indication of that by wireless.
  • a subsea hydrocarbon production control system comprising means for monitoring at least one subsea device of the system and means for, if the device fails to a fail-safe condition, sending an indication of that by wireless.
  • said indication is sent to a fail-safe monitoring unit, which could be a subsea unit.
  • such a subsea unit is in a subsea power distribution and protection module.
  • the at least one device comprises at least one of a valve and an actuating mechanism for a valve.
  • the indication could be sent from fail-safe monitoring means at a tree of the system with which the device is associated.
  • the system has at least one further such tree from which, if a device associated with it, fails to a fail-safe condition, an indication to that effect is sent by wireless from fail-safe monitoring means of the further tree.
  • An embodiment of the invention to be described below entails including a separate, independent, dedicated, health monitoring module on a Christmas tree, for monitoring the status of all actuators and valves installed on the Christmas tree and wellhead.
  • the system has its own dedicated subsea wireless communication link capable of communicating information to a wireless receiving system on the PDPM and on other Christmas trees. Thus, in the event of failure of the normal communication links, the wireless channel is available.
  • the module is provided with its own battery back-up to provide power in the event of power supply failure.
  • the module sits alongside the normal process and control equipment in the Christmas tree mounted subsea control module (SCM) and can also be used to enhance the fail-safe decision making process in the SCM, by providing additional confirmation of the state of actuators and valves. If a shutdown should occur, but an indication that a device has gone to a fail-safe condition is not received, then this is an indication of a problem.
  • SCM subsea control module
  • the module can also form part of the normal decision making process by adding some intelligence to process the critical data which is related to a fail-safe condition.
  • Fig. 1 illustrates an implementation of the invention.
  • a master control station (MCS) 1 installed topside, provides the operator interface with subsea equipment and displays the current state of the various equipments and sensor information, enabling the operator to control the system.
  • the MCS 1 collates data such as the operational state of all subsea valves and data relating to the state of production fluids across an entire oilfield.
  • the MCS 1 interfaces with the subsea installed power distribution and protection module (PDPM) 2 which feeds electric power on lines 3, hydraulic power on lines 4, and communication on a line 5 to a plurality of Christmas trees 6, only two (A and B) being shown.
  • PDPM power distribution and protection module
  • Each Christmas tree 6 includes a subsea control module (SCM) 7 which controls all the Christmas tree processes by providing hydraulic power to actuate valves mounted on the Christmas tree and at the wellhead. It also receives process instrumentation signals from sensors mounted on the Christmas tree and at the wellhead. These are received and processed in a subsea electronics module (SEM) 8 housed within the SCM 7 and communicated via the system communication link to the PDPM 2, and then topside. Failure of the communications link between a Christmas tree 6 and the PDPM 2 will result in no valve and other status data being available from that tree.
  • SCM subsea control module
  • SEM subsea electronics module
  • a dedicated fail-safe monitoring module 9 is at each tree 6, which module provides data on the health of the valves, as well as their actuating mechanisms.
  • the module 9 includes its own interfacing, signal conditioning and processing and have its own dedicated sensors.
  • a back-up battery 10 is built-in so that the module can still operate in the event of electrical power failure. Health monitoring of the module 9 would form part of the normal equipment condition monitoring checks and the battery would be kept charged from the normal power supplies.
  • the production control system is provided with its own subsea wireless communication arrangement to communicate with the PDPM 2, so that in the event of a normal communication channel failure (copper wire, communications-on-power or fibre-optic) it has an alternative independent communication link. More particularly, at each tree 6, there is an RF antenna 11 for sending data to an RF antenna 12 at the PDPM 2 and thence to a fail-safe monitoring unit 13 in the PDPM 2. Thus, each Christmas tree 6 in the overall production well complex has its own SCM 7 and failsafe monitoring module 9 with a subsea wireless link 14. This enables individual Christmas trees to communicate with the PDPM and each other, providing alternative routes for valve and other status information to reach topside.
  • Fig. 2 illustrates an example of a configuration in which the fail-safe monitoring module 9 with its fail-safe monitoring (FSM) dedicated sensor package 15 is used in conjunction with the SEM 8 and its sensor package 16.
  • FSM fail-safe monitoring
  • a check can be made against the output from the fail-safe monitoring module 9 to see if this has also triggered a fail-safe mechanism as a result of the data from its dedicated sensor package.
  • a fail-safe mechanism gets executed if either or both the SEM and the fail-safe monitoring system takes the decision to trigger a fail-safe mechanism. This also adds redundancy to the system.
  • the invention can utilise a wireless communication system between topside and subsurface equipment that forms part of the latest hydrocarbon production control system.
  • a rapid response to dangerous situations can save lives, significantly reduce environmental pollution and thereby reduce the cost of rectifying situations which arise.

Landscapes

  • Geology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • Physics & Mathematics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Testing And Monitoring For Control Systems (AREA)
  • Safety Devices In Control Systems (AREA)
  • Arrangements For Transmission Of Measured Signals (AREA)
  • Selective Calling Equipment (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

A method of monitoring the operation of a subsea hydrocarbon production control system comprises monitoring at least one subsea device of the system and, if the device fails to a fail-safe condition, sending an indication of that by wireless.

Description

    Field of the Invention
  • The present invention relates to monitoring the operation of a subsea hydrocarbon production control system.
  • Background of the Invention
  • A shutdown philosophy is employed in the design of production control systems for subsea oil and gas wells, to ensure the protection of personnel, environment and equipment from the consequences that may occur as a result of abnormal operational conditions, accidental release of hydrocarbons or other accidents. This usually entails the inclusion of production shutdown and emergency shutdown mechanisms being built into the system, so that the system fails to a safe condition.
  • In this respect it is important that the status of all subsea valves and their actuators, which form part of the production control system, are known at all times but, more essentially, after a fail-safe shutdown has occurred. However, situations can arise where this information is not available and where this knowledge is critical for eliminating the problem (such as oil spilling out of a well or pipeline). Recent events in the Gulf of Mexico have demonstrated this need.
  • Examples of fail-safe shutdowns resulting from subsea failures, where relevant status information cannot be obtained using the existing system functionality, are those which occur between a well Christmas tree and the power distribution and protection module (PDPM) which is installed subsea and is the main subsea interface with Christmas trees providing electrical power, hydraulic power and communications to each Christmas tree. Such failures include:
    • failure in communications between a Christmas tree and the PDPM;
    • failure of the power line between a Christmas tree and PDPM;
    • failure in the hydraulic line between a Christmas tree and the PDPM; and
    • a combination of the above three failures.
  • Other situations are possible. A failure in any of these links will result in no information being available topside on valve status.
  • In all these situations, flow control valves and protective valves go into a fail-safe condition, but there is no means of verifying the actual status of the valves because communication is not possible between the Christmas tree concerned and the PDPM. A means of overcoming this would significantly improve the functional safety of hydrocarbon production control systems.
  • As prior art, there may be mentioned WO 2009/122168 ; the Internet article "To the last drop", pages 63-66, XP002532134 (www.abb.com/abbreview ); WO 2005/078233 ; US 2006/0159524 A1 ; US 2003/0098799 A1 ; US 2004/0124994 A1 ; US-A-6 798 338 ; GB-A-2 377 131 ; WO 2006/134331 ; GB-A-2 163 029 ; and Ram Somaraju, et al, "Frequency, Temperature and Salinity Variation of the Permittivity of Seawater", Vol. 54, No. 11, November 2006, IEEE Transactions on Antennas and Propagation, IEEEE Service Center, Piscataway, NJ, US, pages 3441-3448, XP011150333 ISSN: 0018-926X.
  • Summary of the Invention
  • According to the present invention from one aspect, there is provided a method of monitoring the operation of a subsea hydrocarbon production control system, the method comprising monitoring at least one subsea device of the system and, if the device fails to a fail-safe condition, sending an indication of that by wireless.
  • According to the present invention from another aspect, there is provided a subsea hydrocarbon production control system, comprising means for monitoring at least one subsea device of the system and means for, if the device fails to a fail-safe condition, sending an indication of that by wireless.
  • Typically, said indication is sent to a fail-safe monitoring unit, which could be a subsea unit.
  • Typically, such a subsea unit is in a subsea power distribution and protection module.
  • Typically, the at least one device comprises at least one of a valve and an actuating mechanism for a valve.
  • The indication could be sent from fail-safe monitoring means at a tree of the system with which the device is associated. Typically, the system has at least one further such tree from which, if a device associated with it, fails to a fail-safe condition, an indication to that effect is sent by wireless from fail-safe monitoring means of the further tree.
  • An embodiment of the invention to be described below entails including a separate, independent, dedicated, health monitoring module on a Christmas tree, for monitoring the status of all actuators and valves installed on the Christmas tree and wellhead. The system has its own dedicated subsea wireless communication link capable of communicating information to a wireless receiving system on the PDPM and on other Christmas trees. Thus, in the event of failure of the normal communication links, the wireless channel is available. The module is provided with its own battery back-up to provide power in the event of power supply failure. The module sits alongside the normal process and control equipment in the Christmas tree mounted subsea control module (SCM) and can also be used to enhance the fail-safe decision making process in the SCM, by providing additional confirmation of the state of actuators and valves. If a shutdown should occur, but an indication that a device has gone to a fail-safe condition is not received, then this is an indication of a problem.
  • The module can also form part of the normal decision making process by adding some intelligence to process the critical data which is related to a fail-safe condition.
  • Addition of the module also adds redundancy to the system.
  • Brief Description of the Drawings
    • Fig. 1 is a schematic diagram of an embodiment of the invention; and
    • Fig. 2 is a block diagram of a modification which can be made to Fig. 1.
    Description of Embodiments of the Invention.
  • Fig. 1 illustrates an implementation of the invention. In a conventional production control system, a master control station (MCS) 1, installed topside, provides the operator interface with subsea equipment and displays the current state of the various equipments and sensor information, enabling the operator to control the system. The MCS 1 collates data such as the operational state of all subsea valves and data relating to the state of production fluids across an entire oilfield. The MCS 1 interfaces with the subsea installed power distribution and protection module (PDPM) 2 which feeds electric power on lines 3, hydraulic power on lines 4, and communication on a line 5 to a plurality of Christmas trees 6, only two (A and B) being shown.
  • Each Christmas tree 6 includes a subsea control module (SCM) 7 which controls all the Christmas tree processes by providing hydraulic power to actuate valves mounted on the Christmas tree and at the wellhead. It also receives process instrumentation signals from sensors mounted on the Christmas tree and at the wellhead. These are received and processed in a subsea electronics module (SEM) 8 housed within the SCM 7 and communicated via the system communication link to the PDPM 2, and then topside. Failure of the communications link between a Christmas tree 6 and the PDPM 2 will result in no valve and other status data being available from that tree.
  • In accordance with the embodiment of the invention, a dedicated fail-safe monitoring module 9 is at each tree 6, which module provides data on the health of the valves, as well as their actuating mechanisms. The module 9 includes its own interfacing, signal conditioning and processing and have its own dedicated sensors. A back-up battery 10 is built-in so that the module can still operate in the event of electrical power failure. Health monitoring of the module 9 would form part of the normal equipment condition monitoring checks and the battery would be kept charged from the normal power supplies.
  • The production control system is provided with its own subsea wireless communication arrangement to communicate with the PDPM 2, so that in the event of a normal communication channel failure (copper wire, communications-on-power or fibre-optic) it has an alternative independent communication link. More particularly, at each tree 6, there is an RF antenna 11 for sending data to an RF antenna 12 at the PDPM 2 and thence to a fail-safe monitoring unit 13 in the PDPM 2. Thus, each Christmas tree 6 in the overall production well complex has its own SCM 7 and failsafe monitoring module 9 with a subsea wireless link 14. This enables individual Christmas trees to communicate with the PDPM and each other, providing alternative routes for valve and other status information to reach topside.
  • Fig. 2 illustrates an example of a configuration in which the fail-safe monitoring module 9 with its fail-safe monitoring (FSM) dedicated sensor package 15 is used in conjunction with the SEM 8 and its sensor package 16. When the sensor signals feeding the SEM 8 result in it triggering the fail-safe mechanism, a check can be made against the output from the fail-safe monitoring module 9 to see if this has also triggered a fail-safe mechanism as a result of the data from its dedicated sensor package. A fail-safe mechanism gets executed if either or both the SEM and the fail-safe monitoring system takes the decision to trigger a fail-safe mechanism. This also adds redundancy to the system.
  • Advantages of using the Invention
  • The invention can utilise a wireless communication system between topside and subsurface equipment that forms part of the latest hydrocarbon production control system.
  • There is no need to rely on hardwired communication systems using communications-on-power techniques or separate wired communication cables. The availability of subsea status information can provide immediate confirmation of a fail-safe situation and enable a rapid response to be achieved to a developing situation.
  • A rapid response to dangerous situations can save lives, significantly reduce environmental pollution and thereby reduce the cost of rectifying situations which arise.

Claims (14)

  1. A method of monitoring the operation of a subsea hydrocarbon production control system, the method comprising monitoring at least one subsea device of the system and, if the device fails to a fail-safe condition, sending an indication of that by wireless.
  2. A method according to claim 1, wherein said indication is sent to a fail-safe monitoring unit.
  3. A method according to claim 2, wherein said unit is a subsea unit.
  4. A method according to claim 3, wherein said subsea unit is in a subsea power distribution and protection module.
  5. A method according to any preceding claim, wherein the at least one device comprises at least one of a valve and an actuating mechanism for a valve.
  6. A method according to any preceding claim, wherein the indication is sent from fail-safe monitoring means at a tree of the system with which the device is associated.
  7. A method according to claim 6, wherein the system has at least one further such tree from which, if a device associated with it, fails to a fail-safe condition, an indication to that effect is sent by wireless from fail-safe monitoring means of the further tree.
  8. A subsea hydrocarbon production control system, comprising means for monitoring at least one subsea device of the system and means for, if the device fails to a fail-safe condition, sending an indication of that by wireless.
  9. A system according to claim 8, wherein, in use of the system, said indication is sent to a fail-safe monitoring unit of the system.
  10. A system according to claim 9, wherein said unit is a subsea unit.
  11. A system according to claim 10, wherein said subsea unit is in a subsea power distribution and protection module.
  12. A system according to any of claims 8 to 11, wherein the at least one device comprises at least one of a valve or an actuating mechanism for a valve.
  13. A system according to any of claims 9 to 12, wherein, in use of the system, the indication is sent from fail-safe monitoring means at a tree of the system with which the device is associated.
  14. A system according to claim 13, wherein the system has at least one further such tree from which, if a device associated with it, fails to a fail-safe condition, an indication to that effect is sent by wireless from fail-safe monitoring means of the further tree.
EP11150315.7A 2011-01-06 2011-01-06 Monitoring the operation of a subsea hydrocarbon production control system Not-in-force EP2474704B1 (en)

Priority Applications (6)

Application Number Priority Date Filing Date Title
EP11150315.7A EP2474704B1 (en) 2011-01-06 2011-01-06 Monitoring the operation of a subsea hydrocarbon production control system
MYPI2011006200 MY152950A (en) 2011-01-06 2011-12-21 Monitoring the operation of a subsea hydrocarbon production control system
AU2011265528A AU2011265528B2 (en) 2011-01-06 2011-12-23 Monitoring the operation of a subsea hydrocarbon production control system
SG2012000188A SG182906A1 (en) 2011-01-06 2012-01-03 Monitoring the operation of a subsea hydrocarbon production control system
BR102012000058-0A BR102012000058B1 (en) 2011-01-06 2012-01-03 METHOD OF MONITORING THE OPERATION OF A SUBMARINE HYDROCARBONIDE PRODUCTION CONTROL SYSTEM AND SUBMARINE HYDROCARBON PRODUCTION CONTROL SYSTEM
CN2012100141693A CN102591274A (en) 2011-01-06 2012-01-06 Monitoring the operation of a subsea hydrocarbon production control system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
EP11150315.7A EP2474704B1 (en) 2011-01-06 2011-01-06 Monitoring the operation of a subsea hydrocarbon production control system

Publications (2)

Publication Number Publication Date
EP2474704A1 true EP2474704A1 (en) 2012-07-11
EP2474704B1 EP2474704B1 (en) 2013-09-04

Family

ID=43983362

Family Applications (1)

Application Number Title Priority Date Filing Date
EP11150315.7A Not-in-force EP2474704B1 (en) 2011-01-06 2011-01-06 Monitoring the operation of a subsea hydrocarbon production control system

Country Status (6)

Country Link
EP (1) EP2474704B1 (en)
CN (1) CN102591274A (en)
AU (1) AU2011265528B2 (en)
BR (1) BR102012000058B1 (en)
MY (1) MY152950A (en)
SG (1) SG182906A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10221680B2 (en) 2015-03-17 2019-03-05 Ge Oil & Gas Uk Limited Underwater hydrocarbon extraction facility
CN118275153A (en) * 2024-05-30 2024-07-02 威飞海洋装备制造有限公司 Shallow water injection tree test system and method based on hydraulic power

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3416566A (en) * 1966-11-07 1968-12-17 Acf Ind Inc Valve operating mechanism
GB2163029A (en) 1984-08-06 1986-02-12 Peter James Raynor Inductive communication system
GB2377131A (en) 2001-04-23 2002-12-31 Schlumberger Holdings Subsea communications
US20030098799A1 (en) 2001-11-28 2003-05-29 Zimmerman Thomas H. Wireless communication system and method
US20040124994A1 (en) 2002-10-07 2004-07-01 Baker Hughes Incorporated High data rate borehole telemetry system
US6798338B1 (en) 1999-02-08 2004-09-28 Baker Hughes Incorporated RF communication with downhole equipment
WO2005078233A1 (en) 2004-02-18 2005-08-25 Fmc Kongsberg Subsea As Power generation system
US20060159524A1 (en) 2005-01-17 2006-07-20 Thompson James N Method and apparatus for deployment of ocean bottom seismometers
WO2006134331A1 (en) 2005-06-13 2006-12-21 Wireless Fibre Systems Ltd Underwater communications system
US20090212969A1 (en) * 2008-02-26 2009-08-27 Vecto Gray Inc. Underwater Communications Using RF
WO2009122168A1 (en) 2008-04-04 2009-10-08 Vetco Gray Controls Limited Communication system for a hydrocarbon extraction plant

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201322951Y (en) * 2008-11-06 2009-10-07 刘健 GPS sea chest valve operation monitoring system
CN101793036B (en) * 2010-01-28 2011-11-30 中国海洋石油总公司 Pile shoe damage and water inflow monitoring device of multifunctional self-elevating supporting platform for ocean oil field

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3416566A (en) * 1966-11-07 1968-12-17 Acf Ind Inc Valve operating mechanism
GB2163029A (en) 1984-08-06 1986-02-12 Peter James Raynor Inductive communication system
US6798338B1 (en) 1999-02-08 2004-09-28 Baker Hughes Incorporated RF communication with downhole equipment
GB2377131A (en) 2001-04-23 2002-12-31 Schlumberger Holdings Subsea communications
US20030098799A1 (en) 2001-11-28 2003-05-29 Zimmerman Thomas H. Wireless communication system and method
US20040124994A1 (en) 2002-10-07 2004-07-01 Baker Hughes Incorporated High data rate borehole telemetry system
WO2005078233A1 (en) 2004-02-18 2005-08-25 Fmc Kongsberg Subsea As Power generation system
US20060159524A1 (en) 2005-01-17 2006-07-20 Thompson James N Method and apparatus for deployment of ocean bottom seismometers
WO2006134331A1 (en) 2005-06-13 2006-12-21 Wireless Fibre Systems Ltd Underwater communications system
US20090212969A1 (en) * 2008-02-26 2009-08-27 Vecto Gray Inc. Underwater Communications Using RF
WO2009122168A1 (en) 2008-04-04 2009-10-08 Vetco Gray Controls Limited Communication system for a hydrocarbon extraction plant

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
IEEE TRANSACTIONS ON ANTENNAS AND PROPAGATION, pages 3441 - 3448
RAM SOMARAJU ET AL., FREQUENCY, TEMPERATURE AND SALINITY VARIATION OF THE PERMITTIVITY OF SEAWATER, vol. 54, no. 11, November 2006 (2006-11-01)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10221680B2 (en) 2015-03-17 2019-03-05 Ge Oil & Gas Uk Limited Underwater hydrocarbon extraction facility
CN118275153A (en) * 2024-05-30 2024-07-02 威飞海洋装备制造有限公司 Shallow water injection tree test system and method based on hydraulic power

Also Published As

Publication number Publication date
BR102012000058A2 (en) 2015-06-02
CN102591274A (en) 2012-07-18
BR102012000058A8 (en) 2016-04-12
EP2474704B1 (en) 2013-09-04
SG182906A1 (en) 2012-08-30
AU2011265528A1 (en) 2012-07-26
AU2011265528B2 (en) 2017-02-02
MY152950A (en) 2014-12-15
BR102012000058B1 (en) 2020-03-31

Similar Documents

Publication Publication Date Title
US11180967B2 (en) Blowout preventer control system and methods for controlling a blowout preventer
US10196871B2 (en) Sil rated system for blowout preventer control
US9650869B2 (en) Well shut in device
US9803448B2 (en) SIL rated system for blowout preventer control
CN102985318A (en) System and method for subsea power distribution network
US20130199854A1 (en) Safety Protection Apparatus for Personnel on Oil Drilling Derricks
WO2011072145A2 (en) Dual path subsea control system
EP2818628B1 (en) Monitoring a hydraulic fluid filter
US20130332079A1 (en) Monitoring environmental conditions of an underwater installation
CH709735B1 (en) Safety system for an aircraft and method of communication through the security system.
CN106164787A (en) Method and apparatus for safe shutdown electrical load
EP2474704B1 (en) Monitoring the operation of a subsea hydrocarbon production control system
US10221680B2 (en) Underwater hydrocarbon extraction facility
US20130169448A1 (en) Monitoring the operation of a subsea hydrocarbon production control system
KR102455750B1 (en) SIL rated system for blowout arrester control
GB2459488A (en) Wired communication with acoustic communication backup
US9397759B2 (en) Acoustic frequency interrogation and data system
US11613954B2 (en) Subsea safety node
EP3530872A1 (en) Integrated controls for subsea landing string, blow out preventer, lower marine riser package
CN110552932A (en) Device and method for monitoring running state of motor of submarine crusher and crusher
CN208623311U (en) Multi-point emergency cut-off or warning device in drilling well site
Pye Development Trends In Subsea Well Head Control Systems, The Safety Implications.

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

17P Request for examination filed

Effective date: 20130108

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

INTG Intention to grant announced

Effective date: 20130326

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 630661

Country of ref document: AT

Kind code of ref document: T

Effective date: 20130915

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602011002871

Country of ref document: DE

Effective date: 20131031

REG Reference to a national code

Ref country code: NO

Ref legal event code: T2

Effective date: 20130904

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 630661

Country of ref document: AT

Kind code of ref document: T

Effective date: 20130904

REG Reference to a national code

Ref country code: NL

Ref legal event code: VDEP

Effective date: 20130904

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130904

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130904

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130904

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130904

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130904

REG Reference to a national code

Ref country code: NL

Ref legal event code: VDEP

Effective date: 20130904

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG4D

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20131205

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130904

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130904

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130904

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130904

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130904

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130904

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130904

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20140104

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130904

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130904

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130904

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130904

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602011002871

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20140106

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed

Effective date: 20140605

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20140106

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130904

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602011002871

Country of ref document: DE

Effective date: 20140605

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130904

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20140131

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20140131

REG Reference to a national code

Ref country code: IE

Ref legal event code: MM4A

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 5

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20140106

REG Reference to a national code

Ref country code: DE

Ref legal event code: R082

Ref document number: 602011002871

Country of ref document: DE

Representative=s name: RUEGER | ABEL PATENT- UND RECHTSANWAELTE, DE

Ref country code: DE

Ref legal event code: R082

Ref document number: 602011002871

Country of ref document: DE

Representative=s name: RUEGER, BARTHELT & ABEL PATENTANWAELTE, DE

Ref country code: DE

Ref legal event code: R082

Ref document number: 602011002871

Country of ref document: DE

Representative=s name: RUEGER ABEL PATENT- UND RECHTSANWAELTE, DE

Ref country code: DE

Ref legal event code: R082

Ref document number: 602011002871

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130904

REG Reference to a national code

Ref country code: DE

Ref legal event code: R082

Ref document number: 602011002871

Country of ref document: DE

Representative=s name: RUEGER | ABEL PATENT- UND RECHTSANWAELTE, DE

Ref country code: DE

Ref legal event code: R082

Ref document number: 602011002871

Country of ref document: DE

Representative=s name: RUEGER, BARTHELT & ABEL PATENTANWAELTE, DE

Ref country code: DE

Ref legal event code: R081

Ref document number: 602011002871

Country of ref document: DE

Owner name: GE OIL & GAS UK LTD., GB

Free format text: FORMER OWNER: VETCO GRAY CONTROLS LIMITED, BRISTOL, NAILSEA, GB

Ref country code: DE

Ref legal event code: R082

Ref document number: 602011002871

Country of ref document: DE

Representative=s name: RUEGER ABEL PATENT- UND RECHTSANWAELTE, DE

REG Reference to a national code

Ref country code: GB

Ref legal event code: 732E

Free format text: REGISTERED BETWEEN 20150611 AND 20150617

REG Reference to a national code

Ref country code: NO

Ref legal event code: CHAD

Owner name: GE OIL & GAS UK LIMITED, GB

REG Reference to a national code

Ref country code: FR

Ref legal event code: TP

Owner name: GE OIL & GAS UK LIMITED, GB

Effective date: 20151116

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 6

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130904

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130904

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: RS

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20130904

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130904

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130904

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20110106

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 7

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 8

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130904

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130904

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20231219

Year of fee payment: 14

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: NO

Payment date: 20231221

Year of fee payment: 14

Ref country code: FR

Payment date: 20231219

Year of fee payment: 14

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20231219

Year of fee payment: 14

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 602011002871

Country of ref document: DE

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20250106

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20250801

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NO

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20250131

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20250106

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20250131