EP2400111A1 - Fabrication d'un matériau d'hydrocarbures à partir d'une couche de sable pétrolifère - Google Patents

Fabrication d'un matériau d'hydrocarbures à partir d'une couche de sable pétrolifère Download PDF

Info

Publication number
EP2400111A1
EP2400111A1 EP10167158A EP10167158A EP2400111A1 EP 2400111 A1 EP2400111 A1 EP 2400111A1 EP 10167158 A EP10167158 A EP 10167158A EP 10167158 A EP10167158 A EP 10167158A EP 2400111 A1 EP2400111 A1 EP 2400111A1
Authority
EP
European Patent Office
Prior art keywords
borehole
cavity
injection
discharge
fluid
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP10167158A
Other languages
German (de)
English (en)
Inventor
Bruno Best
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shell Internationale Research Maatschappij BV
Original Assignee
Shell Internationale Research Maatschappij BV
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shell Internationale Research Maatschappij BV filed Critical Shell Internationale Research Maatschappij BV
Priority to EP10167158A priority Critical patent/EP2400111A1/fr
Priority to US13/166,475 priority patent/US20110315379A1/en
Priority to CA2744024A priority patent/CA2744024A1/fr
Publication of EP2400111A1 publication Critical patent/EP2400111A1/fr
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/29Obtaining a slurry of minerals, e.g. by using nozzles
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/30Specific pattern of wells, e.g. optimising the spacing of wells
    • E21B43/305Specific pattern of wells, e.g. optimising the spacing of wells comprising at least one inclined or horizontal well
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • E21C41/24Methods of underground mining; Layouts therefor for oil-bearing deposits
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F15/00Methods or devices for placing filling-up materials in underground workings
    • E21F15/08Filling-up hydraulically or pneumatically

Definitions

  • the present invention relates to a method of producing hydrocarbon material from a layer of oil sand located in an earth formation.
  • oil sand Hydrocarbons from oil sand layers can in principle be recovered by mining. As some oil sands layers occur at relatively shallow depths, typically between 0 to 200 meters, it is common practice to produce oil from these layers by surface mining whereby the overburden layer is removed using draglines and/or shovels and trucks. The produced oil sand is transported to one or more processing facilities for separation of hydrocarbon fluid from the sand slurries. However, for oil sands layers at greater depths, removal of the overburden is costly and has a significant impact on the environment. Therefore alternative methods for producing oil sands have been proposed.
  • a slurry of fluid and oil sands is formed in the cavity as a result of the fluid jetting operation.
  • Slurry is withdrawn through the borehole, and a stable cavern is formed containing caved oil sands, water, and possibly injected air.
  • the cavern is used as a primary fractionator, in which bitumen rises to the top and sand sinks to the bottom.
  • a second horizontal borehole is provided above the first borehole, to an upper part of the cavity, to withdraw water and oil. Once the bitumen is removed, thickened tailings recovered from the portion of the oil sands slurry that was sent to surface for processing are placed back via the second borehole in the upper part of the cavern.
  • FIG. 2008/064305 Another method is disclosed in WO 2008/064305 , in which horizontal boreholes extending from a main access tunnel are used to recover oil sands.
  • Figure 6 of this publication discloses two horizontal boreholes, one above the other.
  • the lower borehole is a production well, through which a hydraulic mining bit is operated to create a mined volume that enlarges upwardly, until it reaches the level of an upper sand injection well, at which point mining is stopped and sand is injected from the upper well.
  • the sand injection well can also be used to create a small mined volume at its toe, above and separate from the mined volume at the toe of the production well.
  • the upper mined volume can then be filled with sand slurry and pressurized, to assist the hydraulic mining process being applied from below.
  • the lower production and upper sand slurry injection well can also be operated simultaneously, wherein the sand slurry injection well sticks out into the cavity and sprays a stream of tailings slurry into the cavity.
  • hydrocarbon-containing slurry that is formed in a lower part of the cavity by the erosive action of the fluid jetting means and under the influence of gravity, can be effectively removed via the discharge borehole arranged below the fluid injection borehole, i.e. in a lower part of the cavity.
  • pressure in the cavity is lower than the bubble point pressure in the pristine oil sands layer before the cavity is created therein, in particular 50% or less of the pristine pressure, more in particular 20% or less.
  • Oil sands layers can have gas present, e.g. methane. The gas can e.g. be adsorbed or dissolved. Lowering the pressure below the pressure at which gas can be released from pores in the sand matrix (which pressure is referred to as bubble point pressure) can lead to damage to the sand matrix, and to the loss of strength of the oil sands, at the walls of the cavity. Removal of material by a hydraulic jet becomes much easier, and the disintegrated oil sand will sink to the bottom of the cavity.
  • fluid is also injected into the cavity via the discharge borehole.
  • a particular purpose of this is for stirring or mobilizing the slurry and breaking of any larger lumps of material in the area of the cavity from which the slurry is withdrawn via the discharge borehole.
  • no injection or discharge borehole in fluid communication with the cavity is operated, which borehole is a vertical or near-vertical borehole.
  • Near-vertical means that the average angle between the vertical and the borehole from surface to cavity is less than 45 degrees.
  • the discharge borehole is provided with a liner of a length adapted to be changed
  • the injection borehole is provided with injection tubular of a length adapted to be changed, and wherein both the lengths of the liner and of the injection tubular are changed in correspondence with the extension of the cavity.
  • the tubular can for example be a fluid injection tubular or a liner.
  • the length of such a tubular can be changed by a shortening device.
  • the step of shortening the liner can comprise operating a cutting device to cut the liner.
  • the liner can also be shortened by the action of a fluid jet, or by any other means, e.g. by milling, explosives, or a laser. Shortening can be done by removing coarse discrete pieces of the liner, such as at suitable time intervals, or by producing small chips of the liner material.
  • the liner is suitably made from a suitable material for shortening.
  • the liner can be made of metals softer than steel, e.g. aluminium.
  • the liner is made of a non-metal material, and in particular the liner can be made of a plastics material, such as a material comprising 50 wt% or more of a polymer.
  • the discharge borehole is provided with a pump for pumping the slurry via the discharge borehole to the processing facility, preferably the pump is sealed relative to an inner surface of the liner.
  • the pump can be axially movable through the discharge borehole, and moved in correspondence with changing the length of the liner.
  • the pump can e.g. be driven by electricity, but also by a stream of fluid pumped through a conduit extending through the discharge borehole. In the latter case, at least a portion of said stream of fluid is suitably injected into the slurry of fluid and oil sands present in the cavity, e.g. for stirring.
  • the method can further comprise inserting a stream of refill material into the cavity.
  • the stream of refill material can comprise tailings that are separated in and transported from the processing facility to the cavity.
  • a refill borehole having a refill borehole section extending in a refill borehole direction deviating less than 45 degrees from the extension direction is provided.
  • the refill borehole section is arranged below the discharge borehole section, in particular near or at the lower end of the cavity or just below, e.g. 0-10 m below. There it is nearly unaffected by a (partial) collapse of the cavity. Refill material can be pumped with excess pressure in to the cavity in a controlled way from below.
  • inserting a stream of refill material into the cavity comprises providing the refill borehole section with a casing.
  • the casing protects against collapse of the borehole. After extending the cavity for a selected length, the casing is perforated within that length, and refill material is pumped through the perforations.
  • an earth formation 1 containing an oil sands layer 2 located between an overburden layer 4 above the oil sands layer 2 and an underburden layer, shown as a layer of rock material 6, such as limestone, below the oil sands layer 2.
  • Earth formation below the oil sands layer is referred to as underburden.
  • the oil sands layer 2 has respective upper and lower boundaries 20, 22 extending generally horizontally in this example.
  • An overburden can for example be between 50 and 1000 m thick, in particular between 100 and 800m.
  • the layer of oil sands extends in an extension direction 21, in particular a non-vertical extension direction, in this example horizontally between an overburden and an underburden.
  • the layer of oil sands has a thickness defining a thickness direction 21a, which is in this example vertical.
  • the extension direction 21 is different from, often perpendicular to, the thickness direction, and is in this example in the horizontal plane.
  • the layer extends more in the extension direction than its thickness, typically for more than twice its thickness, such as for more that 5 or 10 times its thickness, or even more. It will typically extend for less than 10000 times its thickness.
  • the thickness can for example be between 1 m and 500 m, in particular between 5 m and 200 m, such as between 10 and 100 m, and may vary along the extension direction. It will be understood that the layer can extend along a flat or curved plane.
  • An injection borehole 8 is provided which in this example is a deviated borehole extending from an injection station 10 at the earth surface 11 to a cavity 12 formed in the layer of oil sands 2.
  • the cavity has an upper portion 12a containing gas (e.g. CO2, methane, air, and/or H2S) and a lower portion 12b containing a mixture (referred to hereinafter as "slurry") 13 of fluid (preferably water) and oil sands particles comprising hydrocarbon material and sand, which may partly or fully separate in the slurry.
  • a deviated discharge borehole 14 extends from a production station 15 at the earth surface to the cavity 12 whereby the production station 15 is horizontally spaced from the injection station 10 and debouches into the lower cavity portion 12b at some distance above the bottom of the cavity.
  • the injection borehole 8 and the discharge borehole 14 each have an upper section 16, 16a extending downwardly, such as substantially vertically from surface, and a non-vertical lower section 18, 18a.
  • the expression lower borehole section is used for a borehole section that is further away from surface along the borehole trajectory than an upper borehole section.
  • the lower borehole section 18 of the discharge borehole extends in a discharge borehole direction, below the injection borehole section 18a of the injection borehole 8, extending in an injection borehole direction.
  • Each of the injection and discharge borehole directions is a selected direction within the layer 2, in this example an azimuthal direction from the cavity 12.
  • the intersection between the lower borehole section 18a of the injection borehole 8 and the cavity 12 defines a front surface 23 of the cavity 12.
  • Each of these selected directions suitably is a direction within the layer.
  • the lower sections of the injection and discharge boreholes each deviate less than 45 degrees from the extension direction 21, wherein the angle is preferably counted in a vertical plane through the extension direction.
  • These borehole sections preferably extend substantially parallel to the upper boundary 20 and/or lower boundary 22 of the oil sands layer 2.
  • the selected direction substantially coincides with the extension direction, so that the cavity is extended within the layer, substantially parallel with its upper and/or lower boundary, for more than the layer thickness, such as for between 2 and 5000 times the layer thickness.
  • the expression "substantially parallel” herein accounts for the precision with which deviated boreholes can be drilled in an underground layer.
  • the lower sections 18, 18a extend substantially horizontally.
  • the expression "direction" is used herein to refer to a direction without specifying the sense of direction, unless otherwise indicated.
  • the extension direction may deviate somewhat from the horizontal plane due to geological circumstances, as can the directions of the lower sections 18, 18a in the practice of directional drilling. It is desired to arrange the lower sections such that they extend for a substantial length within the oil sands layer, such as for between 50 and 5000 m, in particular between 100 and 2000 m.
  • the injection and discharge borehole sections preferably deviate less than 30 degrees from the extension direction, more preferably less than 15 degrees. It can alternatively be said that the injection and discharge borehole sections preferably are substantially horizontal borehole sections.
  • a substantially horizontal borehole section deviates 30 degrees or less from the horizontal plane, more preferably 15 degrees or less.
  • the selected direction can be at least 45 degrees away from the thickness direction, in particular at least 45 degrees away from the vertical. All angles specified herein are to be understood as absolute (positive) values, unless otherwise specified. It will be understood that when the cavity is extended along the injection and/or discharge borehole directions that deviate by a certain angle from the extension direction, the cavity is at the same time extended in the extension direction.
  • the expression "extending below" in relation to two borehole sections is used to refer to the situation that one borehole section extends at a greater vertical depth than the other.
  • the two borehole sections extend substantially along the same trajectory in a vertical projection onto the earth's surface, which can for example mean that the horizontal deviation in such projection is 50 m or less, preferably 10 m or less, more preferably 5 m or less, such as 2 m or less.
  • the vertical distance between the discharge borehole section and the injection borehole section thereabove is suitably in the range of 1-100 m, preferably between 2 and 50 m, such as between 5 and 30 m.
  • the upper borehole sections 16, 16a are each provided with a conventional casing (or liner) 24, 24a, whereas the lower borehole sections 18, 18a are each provided with a liner 26,26a, e.g. of plastics material, for example glass fibre reinforced plastic.
  • the liner 26 extends a minimal distance into the cavity 12.
  • a jet pump 28 is positioned in the liner 26 in a manner that the jet pump 28 is sealed relative to the inner surface of the liner 26 and is axially movable through liner 26.
  • a fluid conduit 30 for driving the jet pump 28 extends from the production station 15 through the casing 24 and the liner 26 to the jet pump 28.
  • the jet pump 28 When driven by fluid, such as water, pumped through the fluid conduit 30, the jet pump 28 is arranged to pump the slurry 13 of fluid and particles from the lower cavity portion 12b, via the annular space between the fluid conduit 30 on one hand and the liner 26 and casing 24 on the other hand, to the production station 15.
  • the jet pump 28 is thereto provided with one or more flow channels 32 ( Fig. 2 ) allowing the slurry to flow in axial direction through the jet pump 28.
  • the fluid conduit 30 extends further from the jet pump 28 through liner 26 to the cavity 12.
  • a lower end part 34 of the fluid conduit 30 is provided with a shortening device, in this embodiment cutter 36, for shortening the liner 26, one or more nozzles 38 for initially forming the cavity 12 and/or for stirring the slurry present in the cavity 12, and a bit or mill 39 for crushing lumps of rock material that may be present in the cavity 12.
  • Conduit 30 can be rotatable.
  • the discharge borehole can also be set up for operation in 'reverse circulation', where driving fluid for the jet pump is pumped from surface via the annulus, and slurry is pumped via an inner tubular like reference numeral 30.
  • Liner 26 and jet-pump 28 are suitably designed to withstand the pressure of driving fluid, e.g. a plastic liner of sufficient strength can be used.
  • An advantage of this reverse circulation operation is that there is no wear of the slurry in the annulus. Also the slurry travelling inside a slowly rotating production pipe will not be able to settle down.
  • An injection string 40 for injecting fluid into the cavity 12 extends from the injection station 10 via the injection borehole 8 into the cavity 12, the injection string 40 having a lower end provided with fluid jetting means in the form of fluid jetting head 41 comprising jetting nozzles 42, the fluid jetting head being located in the upper portion 12a of cavity 12.
  • An annular seal 43 (e.g. such as used in a rotating head) is arranged in an upper part of the first injection borehole 8 to seal the annular space formed between the injection string 40 and the wall or casing of the first injection borehole 8.
  • the injection string 40 can also be provided with a shortening device (not shown) for shortening the liner 26a extending into the cavity 12, which can be similar to the shortening device 36 of the conduit 30.
  • Injection string 40 can be rotatable.
  • a refill borehole 108 which in this example is also a deviated borehole extending from a refill station 110 at the earth's surface 11 to the lower end of the cavity 12.
  • the refill borehole 108 has an upper section 116 extending downwardly, such as substantially vertically, and a lower section 118.
  • the lower borehole section 118 extends below lower non-vertical section 116 of the discharge borehole 14, such as between 1 and 20 m below the lower section in particular between 2 and 10 m, preferably substantially parallel therewith.
  • the lower borehole section preferably extends substantially along the lower boundary 22, such as within 5 meters from the boundary, preferably within 1 m from the boundary.
  • the refill borehole 108 on this embodiment is provided with casing 124, preferably a steel casing, and with an injection string 148 for refill material, which can be rotatable.
  • the injection string is optional; the injection borehole could alternatively be arranged without such string, so that the injection slurry is passed through the casing.
  • the refill borehole section preferably deviates less than 30 degrees from the extension direction, more preferably less than 15 degrees. It can alternatively be said that the refill borehole section preferably is a substantially horizontal borehole section.
  • Figure 1 shows the invention with several of the components at a stage of normal operation after some time of operation.
  • the cavity 12 is being extended by operating the fluid jetting means using nozzles 42 via the injection borehole to jet a stream of fluid against a wall of the cavity, in particular the front surface 23, starting from an initial cavity 12' in an azimuthal direction, along the parallel lower borehole sections 18 and 18a.
  • the initial cavity 12' that was created in the layer of oil sands 2 is indicated with a dashed line.
  • the jetting fluid is a low solids fluid, i.e. it contains substantially no solids, such as less than 10 wt% or less than 1 wt% of solids. Water is a suitable jetting fluid.
  • the water can contain one or more additives such as a surfactant, but this is not required.
  • Reference to water herein is to a fluid that contains at least 80 wt%, preferably at least 90 wt% of pure water.
  • the temperature of the jetting fluid (water) can be selected or modified such as by heating. For example, water at a temperature of 25 °C or above, or 40 °C or above, can be used.
  • the front surface 23 of the cavity has been moving in the extension direction, with the sense of direction generally uphole, defined by the injection borehole's sense of direction towards surface.
  • the lower borehole sections 18, 18a have become shorter compared to an initial length indicated at 18' and 18a'.
  • the liners 26 and 26a have been shortened at the side of the cavity 12 in correspondence with shortening of the lower borehole sections 18,18a.
  • the fluid conduit 30 with the jet pump 28 connected thereto has been pulled upward through discharge borehole 14 over a distance about equal to the reduction in length of liner 26, and likewise the injection string 40 has been retracted, so that the nozzles stay in sufficient proximity to the front wall 23 so that the fluid jetting is effective to extend the cavity.
  • the nozzles are at a distance of between 0.5 m and 15 m from the wall against which the fluid jet is exerted.
  • the injection borehole 8 and the discharge borehole 14, and preferably the refill borehole that will be discussed later, are drilled into the oil sands layer 2 using one or more conventional drilling rigs, and completed as needed, such as with the casings 24, 24a and liners 26,26a.
  • the injection station 10 and the production station 15 are installed at their respective positions as indicated in Fig. 1 .
  • the initial cavity is created.
  • the fluid conduit 30 with the jet pump 28 connected thereto is lowered through the discharge borehole 14 until end part 34 of the fluid conduit 30 extends just beyond the far end of the liner 26.
  • Water at high pressure is then pumped from the production station 15 into the fluid conduit 30 so that the pumped water is jetted through the nozzles 38 to impact the formation at the end of the liner 26 with great force.
  • the discharge borehole is operated in reverse circulation as discussed above.
  • the fluid conduit 30 is simultaneously rotated about its longitudinal axis to induce the bit or mill 39 to crush the rock formation.
  • the oil sands layer 2 is gradually excavated so that the cavity 12' and the slurry 13 of water and oil sand particles are initially formed.
  • the jet pump 28 is operated to pump the slurry 13 from the cavity 12' via the flow channels 32 of the jet pump 28 and via the annular space 27 between the fluid conduit 30 and the liner 26/casing 24, to the production station 15.
  • the initial cavity 12' is created by fluid jetting via the injection borehole, optionally using equipment and operation similar to what was described above for the discharge borehole.
  • the cavity 12' is initiated by underreaming, via injection borehole 8 or discharge borehole 14, or even from a separate borehole (not shown) such as from a vertical borehole above the cavity.
  • the injection string 40 is operated via the first injection borehole 8.
  • Fluid preferably water
  • Fluid is pumped at high pressure, such as between 10 and 500 bar, in particular between 100 and 200 bar from the injection station 10 into the injection string 40.
  • the pumped water is jetted through the jetting nozzles 42 and impacts the wall of the cavity 12 with great force.
  • the oil sands layer 2 is further excavated and the slurry 13 of water and oil sand particles is continuously formed in the cavity 12.
  • the size of the cavity increases as jetting of water through the nozzles 42 continues.
  • Water is pumped at a suitable pressure from production station 15 into the fluid conduit 30 to operate the jet pump 28.
  • the jet pump 28 withdraws the slurry of fluid and particles from the lower cavity portion 12b, via the annular space between the fluid conduit 30 and the liner 26 or casing 24, and the flow channels 32 of the jet pump 28, to the production station 15.
  • Arrows 115 ( Fig. 2 ) indicate the direction of flow of water pumped through fluid conduit 30, and arrows 116 indicate the direction of flow of the slurry of water and oil sand through said annular space and channels 32.
  • pumping of the slurry of fluid and particles from the cavity 12 to the production station 15 can be enhanced by maintaining a suitable elevated pressure in the cavity 12.
  • the pressure can be adjusted by influx and/or outflux of gas, taking into account gas that is released from the matrix below the bubble point.
  • the pressure in cavity 12 is kept lower than the pressure in the pristine oil sands layer 2 before the cavity 12, 12' is created therein, such as at or below 90%, or at or below 80%, of the hydrostatic pressure in the pristine oil sand layer.
  • the pressure can be 5 bar below the bubble point pressure, or lower. At lower pressure, the gas contained in the oil sands layer can be released, and the sands matrix loses strength and is jetted away into a slurry relatively easily.
  • a portion of the water pumped through fluid conduit 30 is injected/jetted into the lower cavity portion 12b through nozzles 38 in order to achieve some stirring of the slurry 13 in the cavity 12, simultaneously with fluid jetting via the injection borehole.
  • Jetting of water through nozzles 42 is continued so as to extend the cavity 12 in the azimuthal direction of the lower borehole section 18 whereby the front surface 23 of the cavity moves in said azimuthal direction.
  • a portion 117 of the liner 26 ( Fig. 2 ) gradually becomes protruding into the cavity 12.
  • the cutter 36 is operated to cut the protruding liner portion 117 at time intervals selected in accordance with the speed of movement of the front surface 23 in the azimuthal direction.
  • the fluid conduit 30 is moved upwardly in correspondence with shortening of the liner 26 whereby the jet pump 28 slides along the inner surface of the liner 26.
  • the fluid conduit 30 is rotated to induce bit 39 to crush rock particles that may be present in the cavity 12.
  • the portion of the liner 26a of the injection borehole section 18a protruding into the cavity is can be shortened using a cutter (not shown).
  • the liner 26 and/or 26 a can be shortened in another way, such as by using a fluid jet.
  • the amount of fluid flowing through the injection nozzles 42 can typically be in the range of 50-5000 1/min, in particular between 100 and 1000 1/min, such as between 200 and 800 1/min.
  • the amount of fluid flowing through the nozzles 38 can be in the same range as the amount of water injection through the injection borehole.
  • An aqueous slurry that is formed and produced during operation can have a density of between 1100 and 1600 kg/m3.
  • the pristine oil sand may for example contain between 1 and 50 wt% of hydrocarbons, based on total oil sand including hydrocarbons, in particular between 2 and 30 wt%, such as between 5 and 20 wt%.
  • the width of the cavity in the horizontal plane perpendicular to the direction of the injection borehole 8 depends on the precise orientation and operation of the nozzles, and is typically in the range of 1-50 m, such as between 10 and 40 m.
  • the jetting nozzles can be arranged to jet in a fixed direction against a front, side, rear, upper, and/or lower wall of the cavity, or can be movable such as rotatable.
  • the growth of the cavity in the extension direction can for example be in the range of between 10 cm/day to 10 m/day, so for example the liners need to be shortened by approximately 1 m/day.
  • the hydrocarbon material from the oil sand layer can be produced in a continuous process, by simultaneous operation of the injection and discharge borehole sections, and over an extended length, such as for 20 m or more, 50 m or more, 100 m or more, even 500 m or more, and for extended periods of time, such as for a day or more, a week or more, a month or more, even a year or more.
  • each additional injection borehole can be substantially similar to injection borehole 8 as described above, with a non-vertical lower section extending substantially above the non-vertical lower section 18a, the injection borehole 8 thus extending below additional injection boreholes. This may be useful when the vertical thickness of the oil sands layer 2 is 30 m or more, or 50 m or more.
  • tailings are produced to surface, which are separated from hydrocarbon material and water, and it is typically desired to reinject tailings for disposal, and to avoid or reduce subsidence.
  • the refill borehole is provided.
  • the slurry 13 of water and oil sand is transported from the production station 15 to a separation plant (not shown) for separating hydrocarbon material and tailings from the slurry.
  • the hydrocarbon material is recovered as product and optionally subject to further transport, purification, separation, treatment and/or processing to further products.
  • the production station 15 and the separation plant can be integrated in a single unit.
  • the production station and optionally the separation plant form part of a production facility.
  • at least part of the tailings is used to refill the cavity 12.
  • the tailings can comprise solids like sand and/or clay.
  • tailings are pumped into the rear portion of cavity 12 (such as beginning at the initial cavity 12') via the injection string 148.
  • a cement plug 150 is provided, and then perforations 154 are created in the casing at the desired locations, through which tailings are pumped into the cavity.
  • the rear portion of cavity 12 is gradually filled with the body of tailings 149.
  • any reference to "the cavity” is meant to include the upper cavity portion 12a, the lower cavity portion 12b, the initial cavity 12', and the rear portion filled with refill material such as tailings or tailings.
  • Refilling from below is advantageous for a controlled refill operation. It will be preferred to maintain a certain distance between the front surface 23, where the fluid jet impacts and slurry is discharged, and the area of refill. E.g., the distance along the extension direction can be 20 m or more, preferably 50 m or more, such as 100m or more. Refilling from above would require a casing/lining to extend without proper support in the cavity for such a distance, whereas it is likely for the cavity to at least partially collapse. Reference is made in this regard to Figure 8 of WO 2008/064305 , showing such an undesirable operation.
  • FIG. 3 showing schematically an alternative example of operating the present invention.
  • the operation is started as described above with reference to Figures 1 and 2 .
  • the extension of a cavity in the extension direction 21 is stopped at a certain moment, such as when a certain horizontal length of the cavity is reached, or when the constitution of the oil sands layer changes.
  • the tubulars 30,40 are retracted a certain distance in the injection and discharge boreholes, such as by 1 to 100 m, preferably 5-50 m, e.g. 20 m, before a further cavity is created.
  • the liners 26,26a can e.g. be retracted as well or can be cut off and abandoned.
  • Cement plugs are suitably set in between cavities along the pathway of the injection and discharge boreholes.
  • pillars 170 are created between cavities to prevent or minimize subsidence, and/or to avoid producing areas that do not contain sufficient hydrocarbons or are otherwise not interesting to produce.
  • Figure 3 shows a first cavity 12a that is fully produced and refilled with tailings 149; a second cavity 12b created and produced after the first cavity 12a, and being refilled with tailings 149; and a third cavity 12c in production, substantially as described with reference to Figures 1 and 2 .
  • an assembly comprising a cooperating injection borehole and discharge borehole, injection, production, refill station and one or more cavities created along these boreholes is referred to as a production unit.
  • a production field comprises one or more production units.
  • An injection, production and/ or refill station can include a drilling rig.
  • FIG. 4 there is schematically shown a top view at surface of a layout of a production field 201 for recovering hydrocarbons from an underground oil sands layer.
  • the Figure shows a plurality of production units 210, 212, 214, 216, 218, 220, 222, 224, 226, 228, 230, 232, 234, 236, 238, 240, 242, 244, 246, 248 in four field sections 251,252,253,254 on either side of a backbone 260.
  • Each production unit can be substantially similar to and operated as described hereinbefore with reference to Figs. 1-3 , and has an injection borehole above a discharge borehole above a refill borehole, overlapping in the top view.
  • the production units are in different stages of operation.
  • the solid lines, e.g. 270, indicate a section of a production unit that is producing hydrocarbons (slurry) to a separation plant 275, whereas the dashed lines, e.g. 280, indicate an area that has already been produced and is abandoned, or refilled.
  • Units 218, 228, 230 and 240 were the first units to produce and have already stopped production.
  • Units 210,220,238 and 246 just started production. Remaining units are in an intermediate stage. At 282, boreholes for a future production unit are being drilled.
  • the area 285 that is generally defined by the dashed lines can be referred to as reclaimed area of the production field, and the area 288 generally defined by solid lines can be referred to as producing area of the production field 201. It shall be clear that only one, two or three of the field sections 251-254 may be arranged, or may be developed at different periods in time, and that more or less production units than shown can be provided in a field section.
  • the backbone provides for transport of fluids (slurry, tailings) between the production units and the separation plant 275 via suitable pipelines/conduits. It concentrates the surface equipment in a relatively narrow surface area or streak, for easy accessibility and minimum surface impact. This area is moreover typically not or only modestly affected by subsidence.
  • the backbone can be between 0.1 and 50 km long, preferably between 0.5 and 20 km, and may grow in the lifetime of a field, which is suitably developed starting with production units close to the separation plant 275.
  • the lateral spacing between production units can be between 10 m and 500 m, preferably between 20 m and 100 m. They can in particular be arranged such that the cavities along adjacent production units join or overlap, or remain separate.
  • Each production unit may have a length of between 50 and 5000 m, in particular between 100 and 2000 m. Areas where it is not desired or possible to produce oil sand can be avoided in the layout.
  • hydrocarbon fluid is produced from the oil sands layer without removing the overburden layer.
  • the cavities are refilled with tailings from the produced slurries of water and oil tailings after cleaning at the separation plant.
  • a binding material like cement is mixed into the tailings.
  • the discharge borehole is provided with a single pump (jet pump 28) for pumping the slurry of fluid and oil sand particles via the discharge borehole to the production station at surface.
  • a single pump may not suffice to pump the slurry to surface at an efficient flow rate.
  • one or more additional pumps can be applied in the discharge borehole.
  • the upper section of the discharge borehole can be provided with a single-stage or multi-stage centrifugal pump driven by a hydraulic or electric motor, to pump the slurry to surface.
  • Such additional pump can be positioned, for example, in the lower end part of the casing provided in the discharge borehole, just above the liner.
  • an additional jet pump or gas lift can be applied.
  • various boreholes extend from surface locations mutually spaced in horizontal direction.
  • the boreholes can extend as deviated boreholes from a fewer or a single surface location, or as branch boreholes of a multilateral borehole.
  • Such arrangement can be attractive in applications whereby the surface area is difficult accessible, for example if the oil sands layer is located below a body of water or a swamp area.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Geochemistry & Mineralogy (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • Physics & Mathematics (AREA)
  • Chemical & Material Sciences (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Remote Sensing (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
EP10167158A 2010-06-24 2010-06-24 Fabrication d'un matériau d'hydrocarbures à partir d'une couche de sable pétrolifère Withdrawn EP2400111A1 (fr)

Priority Applications (3)

Application Number Priority Date Filing Date Title
EP10167158A EP2400111A1 (fr) 2010-06-24 2010-06-24 Fabrication d'un matériau d'hydrocarbures à partir d'une couche de sable pétrolifère
US13/166,475 US20110315379A1 (en) 2010-06-24 2011-06-22 Producing hydrocarbon material from a layer of oil sand
CA2744024A CA2744024A1 (fr) 2010-06-24 2011-06-22 Production de matiere hydrocarbonee a partir d'une couche de sable bitumineux

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
EP10167158A EP2400111A1 (fr) 2010-06-24 2010-06-24 Fabrication d'un matériau d'hydrocarbures à partir d'une couche de sable pétrolifère

Publications (1)

Publication Number Publication Date
EP2400111A1 true EP2400111A1 (fr) 2011-12-28

Family

ID=42558492

Family Applications (1)

Application Number Title Priority Date Filing Date
EP10167158A Withdrawn EP2400111A1 (fr) 2010-06-24 2010-06-24 Fabrication d'un matériau d'hydrocarbures à partir d'une couche de sable pétrolifère

Country Status (3)

Country Link
US (1) US20110315379A1 (fr)
EP (1) EP2400111A1 (fr)
CA (1) CA2744024A1 (fr)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2501940C1 (ru) * 2012-05-02 2013-12-20 Общество с ограниченной ответственностью "ЛУКОЙЛ-Инжиниринг" (ООО "ЛУКОЙЛ-Инжиниринг") Способ добычи нефти из пласта с аномально низким пластовым давлением
WO2013062871A3 (fr) * 2011-10-27 2014-03-20 PCS Phosphate Company, Inc. Système et procédé d'exploitation de trou de mine horizontal
RU2515776C1 (ru) * 2013-01-25 2014-05-20 Ефим Вульфович Крейнин Способ эффективной разработки газовых месторождений в низкопроницаемых породах
WO2014109626A1 (fr) * 2013-01-14 2014-07-17 Geo Estratos, S.A. De C.V. Procédé de détermination de la direction de perforation d'un puits de pétrole horizontal dans un gisement naturellement fracturé
CN110242254A (zh) * 2018-08-24 2019-09-17 北京奥瑞安能源技术开发有限公司 一种煤层气开采方法

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114247331B (zh) * 2022-01-19 2024-02-09 中煤科工集团西安研究院有限公司 一种顶板水平井末端双料混合装置、系统及随充凝固方法

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2682396A (en) * 1948-09-17 1954-06-29 Potash Company Method for mining soluble ores
US3302720A (en) * 1957-06-17 1967-02-07 Orpha B Brandon Energy wave fractureing of formations
GB1461473A (en) * 1973-01-15 1977-01-13 Akzona Inc Bedded underground salt deposit solution mining method
US4035023A (en) * 1975-07-15 1977-07-12 Freeport Minerals Company Apparatus and process for hydraulic mining
US4076311A (en) * 1975-01-29 1978-02-28 Johns Robert W Hydraulic mining from tunnel by reciprocated pipes
US4289354A (en) * 1979-02-23 1981-09-15 Edwin G. Higgins, Jr. Borehole mining of solid mineral resources
US6688702B1 (en) * 2002-12-16 2004-02-10 Grigori A. Abramov Borehole mining method
WO2008064305A2 (fr) 2006-11-22 2008-05-29 Osum Oil Sands Corp. Récupération de bitume par excavation hydraulique
WO2010000729A1 (fr) 2008-07-02 2010-01-07 Shell Internationale Research Maatschappij B.V. Production de fluide hydrocarbure à partir d’une couche de sable pétrolifère
WO2010000736A1 (fr) 2008-07-02 2010-01-07 Shell Internationale Research Maatschappij B.V. Procédé de production de fluide hydrocarbure à partir d’une couche de sable pétrolifère

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4221433A (en) * 1978-07-20 1980-09-09 Occidental Minerals Corporation Retrogressively in-situ ore body chemical mining system and method
US4536035A (en) * 1984-06-15 1985-08-20 The United States Of America As Represented By The United States Department Of Energy Hydraulic mining method
US6454010B1 (en) * 2000-06-01 2002-09-24 Pan Canadian Petroleum Limited Well production apparatus and method
US8235110B2 (en) * 2006-12-13 2012-08-07 Gushor Inc. Preconditioning an oilfield reservoir
US7647966B2 (en) * 2007-08-01 2010-01-19 Halliburton Energy Services, Inc. Method for drainage of heavy oil reservoir via horizontal wellbore

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2682396A (en) * 1948-09-17 1954-06-29 Potash Company Method for mining soluble ores
US3302720A (en) * 1957-06-17 1967-02-07 Orpha B Brandon Energy wave fractureing of formations
GB1461473A (en) * 1973-01-15 1977-01-13 Akzona Inc Bedded underground salt deposit solution mining method
US4076311A (en) * 1975-01-29 1978-02-28 Johns Robert W Hydraulic mining from tunnel by reciprocated pipes
US4035023A (en) * 1975-07-15 1977-07-12 Freeport Minerals Company Apparatus and process for hydraulic mining
US4289354A (en) * 1979-02-23 1981-09-15 Edwin G. Higgins, Jr. Borehole mining of solid mineral resources
US6688702B1 (en) * 2002-12-16 2004-02-10 Grigori A. Abramov Borehole mining method
WO2008064305A2 (fr) 2006-11-22 2008-05-29 Osum Oil Sands Corp. Récupération de bitume par excavation hydraulique
WO2010000729A1 (fr) 2008-07-02 2010-01-07 Shell Internationale Research Maatschappij B.V. Production de fluide hydrocarbure à partir d’une couche de sable pétrolifère
WO2010000736A1 (fr) 2008-07-02 2010-01-07 Shell Internationale Research Maatschappij B.V. Procédé de production de fluide hydrocarbure à partir d’une couche de sable pétrolifère

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
CANADIAN INSTITUTE OF MINING & METALLURGY, vol. 94, no. 1054, 2001, pages 63 - 66
TANNANT D D ET AL: "Hydraulic underground mining of oil sands - the next big step", CIM BULLETIN, MONTREAL, CA, vol. 94, no. 1054, 1 January 2001 (2001-01-01), pages 63 - 66, XP009108611, ISSN: 0317-0926 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013062871A3 (fr) * 2011-10-27 2014-03-20 PCS Phosphate Company, Inc. Système et procédé d'exploitation de trou de mine horizontal
RU2501940C1 (ru) * 2012-05-02 2013-12-20 Общество с ограниченной ответственностью "ЛУКОЙЛ-Инжиниринг" (ООО "ЛУКОЙЛ-Инжиниринг") Способ добычи нефти из пласта с аномально низким пластовым давлением
WO2014109626A1 (fr) * 2013-01-14 2014-07-17 Geo Estratos, S.A. De C.V. Procédé de détermination de la direction de perforation d'un puits de pétrole horizontal dans un gisement naturellement fracturé
RU2515776C1 (ru) * 2013-01-25 2014-05-20 Ефим Вульфович Крейнин Способ эффективной разработки газовых месторождений в низкопроницаемых породах
CN110242254A (zh) * 2018-08-24 2019-09-17 北京奥瑞安能源技术开发有限公司 一种煤层气开采方法
CN110242254B (zh) * 2018-08-24 2021-08-20 北京奥瑞安能源技术开发有限公司 一种煤层气开采方法

Also Published As

Publication number Publication date
US20110315379A1 (en) 2011-12-29
CA2744024A1 (fr) 2011-12-24

Similar Documents

Publication Publication Date Title
US8313152B2 (en) Recovery of bitumen by hydraulic excavation
CA2614569C (fr) Procede permettant d'accroitre la permeabilite d'un reservoir
RU2287666C2 (ru) Регулирование использования сопутствующих продуктов из подземных зон
US4452491A (en) Recovery of hydrocarbons from deep underground deposits of tar sands
EP2321497B1 (fr) Systèmes et procédés d'extraction par solution avec sous-cavage circulant
US20140117739A1 (en) Mining Method for Gassy and Low Permeability Coal Seams
US20130043031A1 (en) Manifold string for selectivity controlling flowing fluid streams of varying velocities in wells from a single main bore
CA2752461C (fr) Systeme et procedes de recuperation de fluide souterrain a permeabilite amelioree
US20110315379A1 (en) Producing hydrocarbon material from a layer of oil sand
US3439953A (en) Apparatus for and method of mining a subterranean ore deposit
US20110120704A1 (en) Producing hydrocarbon fluid from a layer of oil sand
CN112253070A (zh) 厚煤层顶底部联动水平井分段造缝洗煤消突方法
US20110315397A1 (en) Producing hydrocarbon material from a layer of oil sand
US5249844A (en) Borehole mining process for recovery for petroleum from unconsolidated heavy oil formations
US20110114311A1 (en) Method of producing hydrocarbon fluid from a layer of oil sand
US20130106166A1 (en) Horizontal Borehole Mining System and Method
US20130127231A1 (en) Hydraulic Mining System for Tabular Orebodies Utilising Directional Drilling
US11732567B2 (en) Apparatus and methods for hydrocarbon recovery
CN113605874B (zh) 一种碎软煤层顶底板双层水平井煤层气抽采的方法
RU2754232C1 (ru) Способ сооружения подземного тоннельного резервуара в пласте каменной соли ограниченной мощности
CA1067819A (fr) Appareillage pour le forage et l'extraction
CA2820932A1 (fr) Procede de recuperation d'hydrocarbures a partir d'un reservoir souterrain
RU2180699C1 (ru) Способ вскрытия продуктивного пласта текучего полезного ископаемого
CN117090570A (zh) 基于钻井式构造软煤的煤炭煤层气综合开采方法及系统

Legal Events

Date Code Title Description
AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME RS

PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN

18D Application deemed to be withdrawn

Effective date: 20120629