EP2345143B1 - Apparatus for improved burst mode during power conversion - Google Patents

Apparatus for improved burst mode during power conversion Download PDF

Info

Publication number
EP2345143B1
EP2345143B1 EP09819937.5A EP09819937A EP2345143B1 EP 2345143 B1 EP2345143 B1 EP 2345143B1 EP 09819937 A EP09819937 A EP 09819937A EP 2345143 B1 EP2345143 B1 EP 2345143B1
Authority
EP
European Patent Office
Prior art keywords
power
voltage
module
during
input
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
EP09819937.5A
Other languages
German (de)
English (en)
French (fr)
Other versions
EP2345143A2 (en
EP2345143A4 (en
Inventor
Martin Fornage
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Enphase Energy Inc
Original Assignee
Enphase Energy Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=42098691&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=EP2345143(B1) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by Enphase Energy Inc filed Critical Enphase Energy Inc
Priority to EP16200745.4A priority Critical patent/EP3157156A1/en
Publication of EP2345143A2 publication Critical patent/EP2345143A2/en
Publication of EP2345143A4 publication Critical patent/EP2345143A4/en
Application granted granted Critical
Publication of EP2345143B1 publication Critical patent/EP2345143B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/34Parallel operation in networks using both storage and other dc sources, e.g. providing buffering
    • H02J7/35Parallel operation in networks using both storage and other dc sources, e.g. providing buffering with light sensitive cells
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05FSYSTEMS FOR REGULATING ELECTRIC OR MAGNETIC VARIABLES
    • G05F1/00Automatic systems in which deviations of an electric quantity from one or more predetermined values are detected at the output of the system and fed back to a device within the system to restore the detected quantity to its predetermined value or values, i.e. retroactive systems
    • G05F1/66Regulating electric power
    • G05F1/67Regulating electric power to the maximum power available from a generator, e.g. from solar cell
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/381Dispersed generators
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02MAPPARATUS FOR CONVERSION BETWEEN AC AND AC, BETWEEN AC AND DC, OR BETWEEN DC AND DC, AND FOR USE WITH MAINS OR SIMILAR POWER SUPPLY SYSTEMS; CONVERSION OF DC OR AC INPUT POWER INTO SURGE OUTPUT POWER; CONTROL OR REGULATION THEREOF
    • H02M7/00Conversion of ac power input into dc power output; Conversion of dc power input into ac power output
    • H02M7/42Conversion of dc power input into ac power output without possibility of reversal
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02MAPPARATUS FOR CONVERSION BETWEEN AC AND AC, BETWEEN AC AND DC, OR BETWEEN DC AND DC, AND FOR USE WITH MAINS OR SIMILAR POWER SUPPLY SYSTEMS; CONVERSION OF DC OR AC INPUT POWER INTO SURGE OUTPUT POWER; CONTROL OR REGULATION THEREOF
    • H02M7/00Conversion of ac power input into dc power output; Conversion of dc power input into ac power output
    • H02M7/42Conversion of dc power input into ac power output without possibility of reversal
    • H02M7/44Conversion of dc power input into ac power output without possibility of reversal by static converters
    • H02M7/48Conversion of dc power input into ac power output without possibility of reversal by static converters using discharge tubes with control electrode or semiconductor devices with control electrode
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2300/00Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation
    • H02J2300/20The dispersed energy generation being of renewable origin
    • H02J2300/22The renewable source being solar energy
    • H02J2300/24The renewable source being solar energy of photovoltaic origin
    • H02J2300/26The renewable source being solar energy of photovoltaic origin involving maximum power point tracking control for photovoltaic sources
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy
    • Y02E10/56Power conversion systems, e.g. maximum power point trackers

Definitions

  • Embodiments of the present disclosure generally relate to power conversion and, more particularly, to a method and apparatus for improved burst mode operation.
  • PV photovoltaic
  • AC alternating current
  • DG distributed generation
  • PV modules have a nonlinear relationship between the current (I) and voltage (V) that they produce.
  • a maximum power point (MPP) on an I-V curve for a PV module identifies the optimal operating point of the PV module; when operating at this point, the PV module generates the maximum possible output power for a given temperature and solar irradiance. Therefore, in order to optimize power drawn from a PV module, a power conversion device coupled to the PV module, such as an inverter or a micro-inverter, generally employs a maximum power point tracking (MPPT) technique to ensure that the PV module is operated at the current and voltage levels corresponding to its MPP.
  • MPPT acts to rapidly adjust the PV module operating current and voltage levels in response to changes in solar irradiance and/or temperature such that the PV module can continue to operate at the MPP.
  • a power conversion device coupled to the PV module will suffer from a lower efficiency until the MPP is achieved. Additionally, a power conversion device coupled to a PV module generally will suffer from a lower efficiency when the PV module is operating at a low power, e.g., low irradiance.
  • a PV module and an associated inverter may operate so inefficiently that is it best for overall system efficiency to deactivate the PV module and/or its inverter until solar irradiance increases.
  • M. Jantsch / C.W.G. Verhoeve, AC PV Module Inverters With Full Sine Wave Burst Operation Mode For Improved Efficiency Of Grid Connected Systems At Low Irradiance, 14th European Photovoltaic Solar Energy Conference, Barcelona, Spain, 30 June - 4 July 1997, vol. CONF 14, 30 June 1997, pages 1344-1347 relates to grid connected PV systems and describes a burst operation mode of one-phase PV inverters, highlighting the issue of buffering storage in one-phase PV inverters.
  • EP 2 042 965 A2 describes a method and apparatus for power conversion with MPP tracking and burst mode capability
  • EP 2 042 964 A2 describes a similar method and apparatus.
  • WO 2007/007360 A2 US 2004/0264225 A1 , US 2008/0143188 A1 , US 2005/0254191 A1 , US 2004/0207366 A1 , and N. Mutoh / T. Inoue, A Controlling Method for Charging Photovoltaic Generation Power Obtained by a MPPT Control Method to Series Connected Ultra-Electric Double Layer Capacitors, Industry Applications Conference, 2004, 39th IAS Annual Meeting Conference Record of the 2004 IEEE, vol. 4, p. 2264-2271 , also relate to power conversion from PV modules.
  • an apparatus configured for converting DC input power generated by a PV module to AC output power.
  • the apparatus comprises means for storing energy from a DC input current; means for converting the DC input current to AC output current; means for causing (i) the energy to be stored in the means for storing the energy during at least one storage period, wherein the AC output current is not generated during the at least one storage period, and (ii) the energy to be drawn from the means for storing the energy during at least one burst period in order to converge towards a maximum power point (MPP), wherein the AC output current is greater than the DC input current during the at least one burst period; a first means for determining the MPP and operating the means for converting the DC input current to the AC output current proximate the MPP; and a second means for determining a difference in a first power measurement and a second power measurement, producing an error signal indicative of the difference, and coupling the error signal to the first means to adjust at least one operating parameter of the means for
  • MPP maximum power point
  • FIG. 1 is a block diagram of a system 100 for distributed generation (DG) in accordance with one or more embodiments of the present invention. This diagram only portrays one variation of the myriad of possible system configurations.
  • the present invention can function in a variety of distributed power generation environments and systems.
  • the system 100 comprises a plurality of inverters 102 1 , 102 2 ... 102 n , collectively referred to as inverters 102, a plurality of PV modules 104 1 , 1042... 104 n , collectively referred to as PV modules 104, an AC bus 106, and a load center 108.
  • Each inverter 102 1 , 102 2 ... 102 n is coupled to a PV module 104 1 , 1042.. . 104 n , respectively.
  • a DC-DC converter may be coupled between each PV module 104 and each inverter 102 (e.g., one converter per PV module 104).
  • multiple PV modules 104 may be coupled to a single inverter 102 (i.e., a centralized inverter); in some embodiments, a DC-DC converter may be coupled between the PV modules 104 and the centralized inverter.
  • Each inverter 102 employs an MPPT technique to operate the subtending PV module 104 at its MPP such that the PV module 104 generates an optimal power output for a given temperature and solar irradiation.
  • the inverters 102 are coupled to the AC bus 106, which in turn is coupled to the load center 108.
  • the load center 108 houses connections between incoming power lines from a commercial power grid distribution system and the AC bus 106.
  • the inverters 102 convert DC power generated by the PV modules 104 into AC power, and meter out AC current that is in-phase with the AC commercial power grid voltage.
  • the system 100 couples the generated AC power to the commercial power grid via the load center 108.
  • the inverters 102 employ a "burst mode" during initial operation.
  • burst mode the inverters 102 store energy over one or more AC grid voltage cycles ("energy storage periods") and subsequently “burst” the stored energy to the commercial power grid (“burst periods").
  • the length of the energy storage periods is determined such that a ripple voltage overriding the PV module output voltage remains below a desired ripple voltage threshold.
  • the burst mode facilitates a rapid convergence to the MPP utilizing an MPPT technique described below.
  • the inverters 102 deactivate the burst mode and operate in a continuous mode, utilizing the MPPT technique to remain proximate to the MPP.
  • the solar irradiance and/or temperature changes to a level such that the output power from the PV modules 104 drops below a burst mode threshold, one or more of the inverters 102 switch back to burst mode.
  • FIG. 2 is a block diagram of an inverter 102 in accordance with one or more embodiments of the present invention.
  • the inverter 102 comprises an I-V monitoring circuit 204, an input capacitor 220, a DC-AC inverter 208, a DC voltage controller 210, an MPPT controller 212, a burst mode controller 224, and a conversion control module 214.
  • the inverter 102 is coupled to the PV module 104 and to the commercial power grid.
  • the I-V monitoring circuit 204 is coupled to the PV module 104, the input capacitor 220, and the burst mode controller 224.
  • the burst mode controller 224 is further coupled to the DC voltage controller 210, the MPPT controller 212, and the conversion control module 214. Additionally, the MPPT controller 212 is coupled to the DC voltage controller 210, and the DC voltage controller 210 is coupled to the conversion control module 214.
  • the DC voltage controller 210 functions to bias the PV module 104 at a DC voltage set point (i.e., a desired PV module operating voltage), while the MPPT controller 212 drives such DC voltage set point to correspond to the MPP voltage.
  • the burst mode controller 224 functions to switch the inverter 102 between continuous mode and burst mode, and additionally measures input power from the PV module 104 that is utilized by the MPPT controller 212 in determining the DC voltage setpoint.
  • the I-V monitoring circuit 204 monitors the instantaneous input voltage and current, V in and I in , respectively, from the PV module 104.
  • the input capacitor 220 in addition to being coupled to the I-V monitoring circuit 204, is coupled to the DC-AC inverter 208, and the DC-AC inverter 208 is further coupled to the DC voltage controller 210, the conversion control module 214, and the commercial power grid.
  • a current I cap flows through the input capacitor 220, and a current I inv flows to the DC-AC inverter 208.
  • the conversion control module 214 receives a reference signal from the commercial power grid, and provides the control signals for the DC-AC inverter 208 to convert the received DC current, I inv , to a required AC output current, I req .
  • a reference signal from the commercial power grid
  • the AC output current I req from the DC-AC inverter 208 is coupled to the commercial power grid such that it is in-phase with the commercial AC current.
  • the DC voltage controller 210 employs a first feedback loop (an "inner" loop) 216 to bias the PV module 104 at the DC voltage setpoint by modulating the current I in drawn from the PV module 104.
  • the first feedback loop 216 comprises the I-V monitoring circuit 204, the burst mode controller 224, the MPPT controller 212, the DC voltage controller 210, and the DC-AC inverter 208.
  • the DC voltage controller 210 receives a signal indicative of the PV module DC (i.e., average) input voltage V DC from the burst mode controller 224, and receives the DC voltage setpoint from the MPPT controller 212.
  • the first feedback loop 216 drives the DC-AC inverter 208 to generate I req such that the appropriate current I in is drawn from the PV module 104 to bias the PV module 104 at the DC voltage setpoint.
  • the first feedback loop 216 iteratively computes a difference between the average PV module operating voltage and a DC voltage setpoint for the PV module 104, and accordingly adjusts the current I in drawn from the PV module 104 such that the PV module 104 is biased at the DC voltage setpoint (i.e., at an operating current and voltage that approximately corresponds to the MPP).
  • the MPPT controller 212 employs a second feedback loop 218 (an "outer" loop) to adjust the DC voltage setpoint such that it corresponds to the MPP voltage.
  • the second feedback loop 218 comprises the I-V monitoring circuit 204, the burst mode controller 224, the MPPT controller 212, and the DC voltage controller 210.
  • the burst mode controller 224 receives signals indicative of the instantaneous PV module input current and voltage, I in and V in , respectively, through the I-V monitoring circuit 204, and computes the instantaneous input power, P in , from the PV module 104.
  • the burst mode controller 224 further processes the input power P in , as described in greater detail below, to obtain a first and a second power measurement and provides such power measurements to the MPPT controller 212.
  • the MPPT controller 212 determines a power difference between the first and second power measurements; based on the difference, the MPPT controller 212 determines whether the PV module operating voltage must be increased or decreased to reach the MPP, modifies the DC voltage setpoint accordingly, and supplies the new DC voltage setpoint to the DC voltage controller 210. Additionally, a power difference of zero indicates that the PV module 104 is currently biased at the MPP, and the MPPT controller 212 supplies the corresponding DC voltage setpoint to the DC voltage controller 210.
  • the second feedback loop 218 thus iteratively determines whether the PV module 104 is operating proximate the MPP and, in the case where the PV module 104 is not operating proximate the MPP, modifies at least one operating parameter within the first feedback loop 216 to achieve the MPP (i.e., the outer loop "fine tunes" the setting established by the inner loop).
  • the burst mode controller 224 Upon initial operation or sufficiently low output power from the PV module 104, the burst mode controller 224 operates the inverter 102 in burst mode, wherein during energy storage periods (e.g., one or more AC grid voltage cycles of 16.67 msec), the input capacitor 220 stores energy that is subsequently supplied to the DC-AC inverter 208 during a burst period. During burst mode, the burst mode controller 224 drives the DC voltage controller 210 such that the output current generated by the inverter 102, I req , is a "burst mode current", I B .
  • energy storage periods e.g., one or more AC grid voltage cycles of 16.67 msec
  • the burst mode controller 224 drives the DC voltage controller 210 such that the output current generated by the inverter 102, I req , is a "burst mode current", I B .
  • the burst mode controller 224 operates the inverter 102 in continuous mode. If the PV module output power subsequently drops below the burst mode threshold, the burst mode controller 224 switches the inverter 102 back to burst mode operation.
  • the DC-AC inverter 208 is driven such that no output current is generated by the inverter 102 (i.e., I B is zero). During such periods, current is precluded from flowing to the DC-AC inverter 208, thereby causing current generated by the PV module 104 to charge the input capacitor 220.
  • the inverter 102 remains in an energy storage period for a number of AC grid voltage cycles, N off , as determined by the burst mode controller 224, before beginning a burst period of one AC grid voltage cycle.
  • the burst mode controller 224 causes the DC voltage controller 210 to drive the DC-AC inverter 208 such that the burst current I B is generated in accordance with the energy that has been stored in the input capacitor 220 during the previous energy storage period.
  • the inverter output current during a burst period, I B is greater than the inverter output current during continuous mode, I req , for a given level of solar irradiance and temperature.
  • I B I req *(N off +1).
  • a ripple voltage (“burst mode ripple voltage”, or V r ) overrides the average voltage across the input capacitor 220, and results in a corresponding burst mode ripple voltage overriding the PV module DC voltage, V DC .
  • V r ripple voltage
  • the PV module operating voltage fluctuates in accordance with the magnitude of the burst mode ripple voltage V r ; the greater the burst mode ripple voltage V r , the greater the PV module operating voltage excursion. Such a fluctuation in the PV module operating voltage results in reduced efficiency of the inverter 102.
  • the magnitude of the burst mode ripple voltage V r varies in accordance with the length of time the input capacitor 220 charges and discharges; i.e., with the energy storage and burst periods.
  • the burst mode controller 224 controls the energy storage period, i.e., the number of AC grid voltage cycles of the energy storage period, N off , such that the burst mode ripple voltage V r remains below a pre-determined threshold, thereby improving the efficiency of the inverter 102 during burst mode operation.
  • the inverter 102 When operating in continuous mode, the inverter 102 continually generates output power in-phase with the AC grid power (i.e., during each AC grid voltage cycle). As such, the inverter output power oscillates between zero output power at the AC grid voltage zero-crossings and peak output power at the AC grid voltage peak positive and negative amplitudes.
  • the inverter output power When the inverter output power is set at zero, current from the PV module 104 is precluded from flowing to the DC-AC inverter 208 and therefore charges the input capacitor 220.
  • the inverter output power When the inverter output power is set at peak, energy stored in the input capacitor 220 is utilized, in addition to the instantaneous power from the PV module 104, to generate a peak inverter output power of twice the average PV module output power.
  • the charging and discharging of the input capacitor 220 during continuous mode provides an AC component overriding the average power provided by the PV module 104.
  • the ripple voltage caused by the charging and discharging of the input capacitor 220 provides an opportunity for maximum power point tracking.
  • the ripple voltage across the PV module 104 varies above and below an average (i.e., DC) PV module voltage
  • the PV module output power varies in accordance with the ripple voltage. If the PV module 104 produces more power when operating above its DC voltage than when operating below its DC voltage, then the PV module DC voltage is below the MPP and must be increased to reach the MPP. If the PV module 104 produces more power when operating below its DC voltage than when operating above its DC voltage, then the PV module DC voltage is above the MPP and must be decreased to reach the MPP.
  • the difference between the average power produced by the PV module 104 when it is operating above its DC voltage and when it is operating below its DC voltage indicates in which direction the PV module DC voltage must be shifted to achieve the MPP. Additionally, if the difference is zero, the PV module 104 is biased at the MPP. In some embodiments, such a power difference may be determined based on the PV module output power during certain phases of the AC grid voltage, as further described below.
  • FIG. 3 is a block diagram of a burst mode controller 224 in accordance with one or more embodiments of the present invention.
  • the burst mode controller 224 comprises a multiplier 302, an operating mode module 304, and a power measurement module 306.
  • the multiplier 302 receives signals indicative of the instantaneous input current and voltage from the PV module 104, I in and V in , respectively, through the I-V monitoring circuit 204, and generates an output signal indicative of the instantaneous input power from PV module 104, P in .
  • the output of the multiplier 302 is coupled to the power measurement module 306 and to the operating mode module 304; additionally, the power measurement module 306 receives inputs of I in and V in .
  • the operating mode module 304 is further coupled to the DC voltage controller 210, and receives a signal indicative of an estimated PV module input current, I est , from the DC voltage controller 210.
  • the I est is an estimated input current to be drawn from the PV module 104 that will result in biasing the PV module 104 at a desired DC voltage setpoint.
  • the operating mode module 304 is also coupled to the power measurement module 306, and additionally receives an input signal of a burst mode power threshold, P B .
  • the operating mode module 304 compares the PV module input power P in to the burst mode threshold P B . If the inverter 102 is operating in continuous mode and P in is less that P B , the operating mode module 304 switches the inverter 102 to burst mode; once P in is greater than P B , the operating mode module 304 switches the inverter 102 back to continuous mode.
  • the power measurement module 306 receives an input indicative of the AC grid voltage phase from the conversion control module 214, for example, from a phase lock loop of the conversion control module 214.
  • the power measurement module 306 integrates the PV module input power P in during certain portions of the AC grid voltage cycle to obtain a first power "bin", PB 1 , and a second power "bin", PB 2 .
  • the PV module input voltage V in is integrated over a portion of the AC grid voltage cycle to obtain a DC voltage bin, V DC B, where V DC B is utilized to determine a DC (i.e., average) PV module input voltage, V DC .
  • the power measurement module 306 integrates P in during a 90°-180° phase of the AC grid voltage cycle to obtain PB 1 , and integrates P in during a 180°-270° phase of the same AC grid voltage cycle to obtain PB 2 .
  • the PV module input voltage V in is integrated over the entire 90°-270° phase to obtain V DC B.
  • the power bins and the average PV module input voltage are determined as described further below.
  • the first and second power measurements are supplied to the MPPT controller 212 for determining whether the PV module 104 is operating at, above, or below the MPP, and any required shift in the DC voltage setpoint to achieve the MPP.
  • the power measurement module 306 determines a PV module DC voltage, V DC , based on V DC B.
  • the power measurement module 306 supplies V DC to the DC voltage controller 210 for determining I req .
  • the new DC voltage setpoint and the required output current I req are applied during the next AC grid voltage cycle.
  • the operating mode module 304 determines a maximum number of AC grid voltage cycles, N off , for an energy storage period such that the burst mode ripple voltage V r will remain below a pre-determined threshold.
  • N off is computed as follows: Noff ⁇ / Pin * T C * Vdc * Vr
  • C is the capacitance of the input capacitor 220
  • V DC is the PV module DC voltage
  • V r is the burst mode ripple voltage
  • P in is the input power from the PV module 104
  • T is the AC grid voltage cycle period.
  • the power measurement module 306 integrates the PV module input power P in over certain portions of the AC grid voltage cycle during an energy storage period to obtain PB 1 and PB 2 .
  • the N off AC grid cycles of the energy storage period are partitioned into two equal portions - a "first half" of the energy storage period and a "second half" of the energy storage period, where the first half occurs prior to the second half.
  • the first half comprises the AC grid voltage cycle from 0°-180°
  • the second half comprises the same AC grid voltage cycle from 180°-360°.
  • the first half comprises the entire first AC grid voltage cycle
  • the second half comprises the entire second AC grid voltage cycle.
  • the first and second halves are analogously defined.
  • the power measurement module 306 integrates the PV module input power P in during any of the 90°-270° AC grid voltage phase periods occurring within the first half of the energy storage period.
  • the power measurement module 306 integrates the PV module input power P in during any of the 90°-270° AC grid voltage phase periods occurring within the second half of the energy storage period.
  • the power measurement module 306 integrates the PV module input voltage V in over each 90°-270° phase during the entire energy storage period, along with the 90°-270° phase during the subsequent burst period, to obtain V DC B.
  • the measured power bins PB 1 and PB 2 are then used by the power measurement module 306 to determine the first and second power measurements, P 1 and P 2 , respectively.
  • the power measurement module 306 determines V DC based on V DC B.
  • the first and second power measurements P 1 and P 2 are supplied to the MPPT controller 212 and V DC is supplied to the DC voltage controller 210 for the appropriate MPPT and inverter output current processing.
  • the output of such processing i.e., the new DC voltage setpoint and the required output current from the inverter 102, are applied to the burst period following the next energy storage period.
  • I in is the input current from the PV module 104
  • F grid is the frequency of the grid voltage. If the capacitance is below a capacitance threshold, the power measurement module 306 may provide an output alarm to indicate the condition.
  • Figure 4 is a plurality of waveforms 400 depicting collection periods of PV module power and voltage measurements during burst mode in accordance with one or more embodiments of the present invention.
  • the waveform 402 corresponds to a computed energy storage period of one AC grid voltage cycle.
  • T 1 a first AC grid voltage cycle
  • the power bins PB 1 and PB 2 are obtained by integrating the PV module input power P in during the 90°-180° and 180°-270° phases of the AC grid voltage, respectively, and the PV module input voltage V in is integrated during the entire 90°-270° period to obtain the DC voltage bin V DC B.
  • P 1 is set to PB 1
  • P 2 is set to PB 2
  • the average DC voltage V DC is computed from V DC B.
  • the power and voltage measurements P B1 , PB 2 , and V DC are utilized to determine the inverter operating parameters for the next AC grid voltage cycle in which the inverter generates output power.
  • the inverter switches to burst mode and enters an energy storage period.
  • the inverter generates no output power during such a period.
  • the power bin PB 1 is obtained by integrating the PV module input power P in during the 90°-270° phase within the first half of the energy storage period (i.e., the 90°-180° phase of T 2 ), and the power bin PB 2 is obtained by integrating the PV module input power P in during the 90°-270° phase within the second half of the energy storage period (i.e., the 180°-270° phase of T 2 ).
  • the PV module input voltage V in is integrated during the entire 90°-270° period of T 2 and to obtain the voltage bin V DC B.
  • the inverter begins a burst period and begins generating output power.
  • the operating parameters determined during T 1 are adjusted accordingly to drive the inverter to generate the burst mode current, I B .
  • the PV module input voltage V in is integrated during the entire 90°-270° period of T 3 and added to the voltage bin V DC B.
  • P 1 is set to PB 1
  • P 2 is set to PB 2
  • V DC is computed from V DC B.
  • the power and voltage measurements P 1 , P 2 , and V DC are utilized to determine the inverter operating parameters for the next AC grid voltage cycle in which the inverter generates output power.
  • the inverter begins an energy storage period. Analogous to the operation during T 2 , PB 1 , PB 2 , and V DC B are obtained. At time T 5 , the inverter begins a burst period. The operating parameters determined during T 3 are adjusted accordingly to drive the inverter to generate the burst mode current, I B . Analogous to the operation during T 3 , the PV module input voltage V in is integrated during the entire 90°-270° period of T 5 and added to the voltage bin V DC B. P 1 is set to PB 1 and P 2 is set to PB 2 , and V DC is computed from V DC B. The power and voltage measurements P 1 , P 2 , and V DC are utilized to determine the inverter operating parameters for the next AC grid voltage cycle in which the inverter generates output power.
  • the waveform 404 corresponds to a computed energy storage period of two AC grid voltage cycles.
  • a first AC grid voltage cycle T 1 an inverter is operating in continuous mode.
  • the power bins PB 1 and PB 2 are obtained by integrating the PV module input power P in during the 90°-180° and 180°-270° phases of the AC grid voltage, respectively, and the PV module input voltage V in is integrated during the entire 90°-270° period to obtain the DC voltage bin V DC B.
  • P 1 is set to PB 1
  • P 2 is set to PB 2
  • the average DC voltage V DC is computed from V DC B.
  • the power and voltage measurements P 1 , P 2 , and V DC are utilized to determine the inverter operating parameters for the next AC grid voltage cycle in which the inverter generates output power.
  • the inverter switches to burst mode and enters an energy storage period of two AC grid voltage cycles.
  • the inverter generates no output power during such a period.
  • the power bin PB 1 is obtained by integrating P in during the portions of the 90°-270° phases occurring within the first half of the energy storage period (i.e., the 90°-270° phase of T 2 ), and the power bin PB 2 is obtained by integrating P in during portions of the 90°-270° phases occurring within the second half of the energy storage period (i.e., the 90°-270° phase of T 3 ).
  • the PV module input voltage V in is integrated during each 90°-270° period of the energy storage period, i.e., the 90°-270° phase periods of T 2 and T 3 to obtain the voltage bin V DC B.
  • the inverter begins a burst period and begins generating output power.
  • the operating parameters determined during T 1 are adjusted accordingly to drive the inverter to generate the burst mode current, I B .
  • the PV module input voltage V in is integrated during the entire 90°-270° period of T 4 and added to the voltage bin V DC B.
  • P 1 is set to PB 1 /2
  • P 2 is set to PB 2 /2
  • V DC is computed from V DC B.
  • the power and voltage measurements P 1 , P 2 , and V DC are utilized to determine the inverter operating parameters for the next AC grid voltage cycle in which the inverter generates output power.
  • the inverter begins an energy storage period. Analogous to the operation during T 2 and T 3 , PB 1 , PB 2 , and V DC B are obtained. At time T 7 , the inverter begins a burst period. The operating parameters determined during T 4 are adjusted accordingly to drive the inverter to generate the burst mode current, I B . Analogous to the operation during T 2 and T 3 , the PV module input voltage V in is integrated during the entire 90°-270° period of T 7 and added to the voltage bin V DC B. P 1 is set to PB 1 /2, P 2 is set to PB 2 /2, and V DC is computed from V DC B. The power and voltage measurements P 1 , P 2 , and V DC are utilized to determine the inverter operating parameters for the next AC grid voltage cycle in which the inverter generates output power.
  • the waveform 406 corresponds to a computed energy storage period of three AC grid voltage cycles.
  • a first AC grid voltage cycle T 1 an inverter is operating in continuous mode.
  • the power bins PB 1 and PB 2 are obtained by integrating the PV module input power P in during the 90°-180° and 180°-270° phases of the AC grid voltage, respectively, and the PV module input voltage V in is integrated during the entire 90°-270° period to obtain the DC voltage bin V DC B.
  • P 1 is set to PB 1
  • P 2 is set to PB 2
  • the average DC voltage V DC is computed from V DC B.
  • the power and voltage measurements P 1 , P 2 , and V DC are utilized to determine the inverter operating parameters for the next AC grid voltage cycle in which the inverter generates output power.
  • the inverter switches to burst mode and enters an energy storage period of three AC grid voltage cycles.
  • the inverter generates no output power during such a period.
  • the power bin PB 1 is obtained by integrating P in during the portions of the 90°-270° phases occurring within the first half of the energy storage period (i.e., the 90°-270° phase of T 2 and the 90°-180° phase of T 3 ), and the power bin PB 2 is obtained by integrating P in during portions of the 90°-270° phases occurring within the second half of the energy storage period (i.e., the 180°-270° phase of T 3 and the 90°-270° phase of T 4 ).
  • the PV module input voltage V in is integrated during each 90°-270° period of the energy storage period, i.e., the 90°-270° phase periods of T 2 , T 3 , and T 4 to obtain the voltage bin V DC B.
  • the inverter begins a burst period and begins generating output power.
  • the operating parameters determined during T 1 are adjusted accordingly to drive the inverter to generate the burst mode current, I B .
  • the PV module input voltage V in is integrated during the entire 90°-270° phase and added to the voltage bin V DC B.
  • P 1 is set to PB 1 /3
  • P 2 is set to PB 2 /3
  • V DC is computed from V DC B.
  • the power and voltage measurements P 1 , P 2 , and V DC are utilized to determine the inverter operating parameters for the next AC grid voltage cycle in which the inverter generates output power.
  • FIG. 5 is a block diagram 500 of a DC voltage controller 210 in accordance with one or more embodiments of the present invention.
  • the DC voltage controller 210 comprises an adder/subtractor 502, a proportional-integral (PI) controller 504, a gain module 506, and a burst mode adjustment module 508.
  • the DC voltage controller 210 utilizes the first feedback loop 216 to control the current supplied to the DC-AC inverter 208 such that the PV module 104 is biased at the DC voltage setpoint.
  • the adder/subtractor 502 receives a signal indicative of the PV module DC voltage, V DC , from the burst mode controller 224, and a signal indicative of the DC voltage setpoint from the MPPT controller 212.
  • the output of the adder/subtractor 502 couples a difference between V DC and the DC voltage setpoint to the PI controller 504.
  • the PI controller 504 acts to correct the difference by estimating an input current, I est , to be drawn from the PV module 104 that will result in biasing the PV module 104 at the DC voltage setpoint.
  • the output of the PI controller 504 is coupled to the gain module 506 and provides a signal indicative of I est to the gain module 506.
  • the gain module 506 further receives an input of the AC grid voltage amplitude, V AC, from the conversion control module 214, and V DC from the burst mode controller 224, and determines the required output current from the inverter, I req , to draw I est from the PV module 104.
  • eff is an efficiency rating of the inverter.
  • the output of the gain module 506 is coupled to the burst mode adjustment module 508.
  • the burst mode adjustment module 508 adjusts the required inverter output current I req during burst mode such that it corresponds to the burst mode output current, I B , in accordance with a control signal received from the burst mode controller 224.
  • the output of the burst mode adjustment module 508 is coupled to the DC-AC inverter 208 and drives the DC-AC to generate an output current I req during continuous mode and an output current I B during burst mode.
  • FIG. 6 is a block diagram of an MPPT controller 212 in accordance with one or more embodiments of the present invention.
  • the MPPT controller 212 comprises a power difference module 602, an integrator 604, and an adder 608.
  • the MPPT controller 212 utilizes the second feedback loop 218 to determine a DC voltage setpoint for the PV module 104 corresponding to the MPP voltage.
  • the power difference module 602 receives signals indicative of the first and second power measurements, P 1 and P 2 , from the burst mode controller 224.
  • the power difference module 602 computes a power difference between P 1 and P 2 and utilizes the power difference to determine an error signal, ⁇ .
  • the power difference is computed as (P 2 -P 1 )/(P 2 +P 1 ).
  • the error signal ⁇ from the power difference module 602 is coupled to the integrator 604.
  • the integrator 604 integrates the error signal ⁇ and couples the integrated error signal to the adder 608.
  • the adder 608 additionally receives an input of a nominal voltage, V nom , where V nom is an initial estimate of the MPP voltage.
  • the integrated error signal acts to "fine tune" the nominal voltage such that the DC voltage setpoint (i.e., the sum of the integrated error and the nominal voltage) corresponds to the MPP voltage.
  • the DC voltage setpoint is then supplied to the DC voltage controller 210 in order to drive the PV module 104 to operate at the DC voltage setpoint.
  • FIG. 7 is a flow diagram of a method 700 for operating an inverter in burst mode in accordance with one or more embodiments of the present invention.
  • a power conversion device such as a DC-AC inverter
  • DC-AC inverter is coupled to the PV module and converts DC power from the PV module to AC power, where such AC power is coupled to a commercial power grid.
  • multiple PV modules may be coupled to a single centralized DC-AC inverter; alternatively, individual PV modules may be coupled to individual DC-AC inverters (e.g., one PV module per DC-AC inverter).
  • a DC-DC converter may be coupled between the PV module or PV modules and the DC-AC inverter.
  • the method 700 begins at step 702 and proceeds to step 704.
  • the inverter operates in continuous mode and generates an output current, I req , such that the PV module is biased proximate the MPP voltage.
  • I req an output current
  • P 1 and P 2 a first and a second power measurement of the input power from the PV module, P 1 and P 2 , respectively, are obtained.
  • P in may be sampled during such phases to obtain the first and second power measurements; for example, P in may be sampled at a rate of 256 times the commercial power grid frequency.
  • the first and second power measurements may be obtained during different phases of an AC grid waveform cycle.
  • an average, or DC, voltage from the PV module V DC .
  • the voltage V in from the PV module is integrated during the 90°-270° phase of the AC grid voltage to obtain a DC voltage "bin", V DC B.
  • V DC is then computed based on V DC B.
  • the method 700 proceeds to step 710, where P 1 , P 2 , and V DC are utilized to determine a DC voltage setpoint for the PV module such that the DC voltage setpoint corresponds to the MPP voltage.
  • P 1 , P 2 , and V DC are utilized to determine a DC voltage setpoint for the PV module such that the DC voltage setpoint corresponds to the MPP voltage.
  • a required inverter output current, I req that will result in the PV module being biased at the desired DC voltage setpoint is determined.
  • Steps 704 through 712 of the method 700 comprise an outer feedback loop that determines whether the PV module is currently biased at the MPP voltage, and, if necessary, adjusts the DC voltage setpoint to achieve the MPP.
  • step 714 a determination is made whether the PV module input power exceeds a burst mode threshold. If the condition at step 714 is met, the method 700 returns to step 704 and the inverter continues to operate in continuous mode. If the condition at step 714 is not met, the method 700 proceeds to step 716.
  • a maximum number of AC grid voltage cycles, N off , for energy storage periods is determined based on a burst mode ripple voltage threshold.
  • a burst mode ripple voltage threshold of 10% of the PV module DC voltage V DC is utilized.
  • the inverter switches to burst mode, and begins an energy storage period of N off AC voltage grid cycles. During the energy storage period, the inverter does not produce any output power, and power generated by the PV module is stored in the inverter.
  • the first and second power bins, PB 1 and PB 2 are collected, along with the DC voltage bin, V DC B.
  • the N off AC grid cycles are partitioned into two equal portions - a "first half" of the N off AC voltage grid cycles and a "second half" of the N off AC voltage grid cycles, where the first half occurs prior to the second half.
  • PB 1 is obtained by integrating the PV module input power P in during any of the 90°-270° AC grid voltage phase periods occurring within the first half
  • PB 2 is obtained by integrating the PV module input power P in during any of the 90°-270° AC grid voltage phase periods occurring within the second half.
  • the PV module input voltage V in may be integrated over each 90°-270° phase during the energy storage period to obtain V DC B.
  • the method 700 proceeds to step 724.
  • a burst period is activated and the inverter begins to generate output power.
  • the burst period comprises a single AC grid voltage cycle.
  • the required output current I req determined in step 712 is adjusted such that the inverter generates a burst current, I B , in accordance with the amount of energy stored during the energy storage period.
  • Ig I req *(N off +1).
  • an input voltage from the PV module is measured and added to the DC voltage bin V DC B; in some embodiments, the PV module input voltage Vin is integrated over the 90°-270° phase of the AC grid voltage cycle and added to V DC B.
  • the DC voltage setpoint for the PV module is determined based on P 1 , P 2 , and V DC .
  • the required inverter output current, I req that will result in the PV module being biased at the desired DC voltage setpoint is determined.
  • step 736 a determination is made whether operation of the inverter should continue. If the condition at step 736 is met, the method 700 returns to step 714; if the conditions at step 736 is not met, the method 700 proceeds to step 738 where it ends.

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Sustainable Development (AREA)
  • Sustainable Energy (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • General Physics & Mathematics (AREA)
  • Radar, Positioning & Navigation (AREA)
  • Automation & Control Theory (AREA)
  • Inverter Devices (AREA)
  • Control Of Electrical Variables (AREA)
  • Dc-Dc Converters (AREA)
  • Rectifiers (AREA)
EP09819937.5A 2008-10-10 2009-10-09 Apparatus for improved burst mode during power conversion Active EP2345143B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
EP16200745.4A EP3157156A1 (en) 2008-10-10 2009-10-09 Method and apparatus for improved burst mode during power conversion

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US12/249,533 US7768155B2 (en) 2008-10-10 2008-10-10 Method and apparatus for improved burst mode during power conversion
PCT/US2009/060148 WO2010042806A2 (en) 2008-10-10 2009-10-09 Method and apparatus for improved burst mode during power conversion

Related Child Applications (1)

Application Number Title Priority Date Filing Date
EP16200745.4A Division EP3157156A1 (en) 2008-10-10 2009-10-09 Method and apparatus for improved burst mode during power conversion

Publications (3)

Publication Number Publication Date
EP2345143A2 EP2345143A2 (en) 2011-07-20
EP2345143A4 EP2345143A4 (en) 2012-05-09
EP2345143B1 true EP2345143B1 (en) 2016-12-21

Family

ID=42098691

Family Applications (2)

Application Number Title Priority Date Filing Date
EP09819937.5A Active EP2345143B1 (en) 2008-10-10 2009-10-09 Apparatus for improved burst mode during power conversion
EP16200745.4A Withdrawn EP3157156A1 (en) 2008-10-10 2009-10-09 Method and apparatus for improved burst mode during power conversion

Family Applications After (1)

Application Number Title Priority Date Filing Date
EP16200745.4A Withdrawn EP3157156A1 (en) 2008-10-10 2009-10-09 Method and apparatus for improved burst mode during power conversion

Country Status (7)

Country Link
US (5) US7768155B2 (ko)
EP (2) EP2345143B1 (ko)
JP (1) JP5773368B2 (ko)
KR (1) KR101663957B1 (ko)
AU (1) AU2009302200B2 (ko)
CA (1) CA2739814A1 (ko)
WO (1) WO2010042806A2 (ko)

Families Citing this family (96)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8405367B2 (en) 2006-01-13 2013-03-26 Enecsys Limited Power conditioning units
GB2434490B (en) 2006-01-13 2009-04-01 Enecsys Ltd Power conditioning unit
US7839025B2 (en) * 2006-11-27 2010-11-23 Xslent Energy Technologies, Llc Power extractor detecting a power change
US9431828B2 (en) 2006-11-27 2016-08-30 Xslent Energy Technologies Multi-source, multi-load systems with a power extractor
US7960870B2 (en) * 2006-11-27 2011-06-14 Xslent Energy Technologies, Llc Power extractor for impedance matching
US7994657B2 (en) * 2006-12-22 2011-08-09 Solarbridge Technologies, Inc. Modular system for unattended energy generation and storage
EP2162304A1 (en) 2007-07-03 2010-03-17 Continental Automotive Systems US, Inc. Universal tire pressure monitoring sensor
US7986539B2 (en) * 2007-09-26 2011-07-26 Enphase Energy, Inc. Method and apparatus for maximum power point tracking in power conversion based on dual feedback loops and power ripples
US7755916B2 (en) 2007-10-11 2010-07-13 Solarbridge Technologies, Inc. Methods for minimizing double-frequency ripple power in single-phase power conditioners
CA2737134C (en) 2007-10-15 2017-10-10 Ampt, Llc Systems for highly efficient solar power
US7919953B2 (en) 2007-10-23 2011-04-05 Ampt, Llc Solar power capacitor alternative switch circuitry system for enhanced capacitor life
KR100993108B1 (ko) * 2008-05-30 2010-11-08 군산대학교산학협력단 전력품질개선 및 절전기능을 갖는 계통연계형 태양광발전시스템
US7768155B2 (en) 2008-10-10 2010-08-03 Enphase Energy, Inc. Method and apparatus for improved burst mode during power conversion
US8693228B2 (en) 2009-02-19 2014-04-08 Stefan Matan Power transfer management for local power sources of a grid-tied load
CA2757331A1 (en) * 2009-04-01 2010-10-07 Nextronex Inc. A grid tie solar system and a method
SG175717A1 (en) 2009-04-17 2011-12-29 Ampt Llc Methods and apparatus for adaptive operation of solar power systems
US8482947B2 (en) 2009-07-31 2013-07-09 Solarbridge Technologies, Inc. Apparatus and method for controlling DC-AC power conversion
US8099197B2 (en) * 2009-08-18 2012-01-17 Enphase Energy, Inc. Method and system for distributed energy generator message aggregation
US8207637B2 (en) 2009-10-09 2012-06-26 Solarbridge Technologies, Inc. System and apparatus for interconnecting an array of power generating assemblies
US8462518B2 (en) * 2009-10-12 2013-06-11 Solarbridge Technologies, Inc. Power inverter docking system for photovoltaic modules
US9466737B2 (en) 2009-10-19 2016-10-11 Ampt, Llc Solar panel string converter topology
US7855906B2 (en) * 2009-10-26 2010-12-21 General Electric Company DC bus voltage control for two stage solar converter
US8824178B1 (en) 2009-12-31 2014-09-02 Solarbridge Technologies, Inc. Parallel power converter topology
US8975783B2 (en) * 2010-01-20 2015-03-10 Draker, Inc. Dual-loop dynamic fast-tracking MPPT control method, device, and system
KR20130033344A (ko) 2010-01-25 2013-04-03 엔페이즈 에너지, 인코포레이티드 분산된 전력원들을 상호접속시키기 위한 방법 및 장치
US9806445B2 (en) 2010-01-25 2017-10-31 Enphase Energy, Inc. Method and apparatus for interconnecting distributed power sources
US9142960B2 (en) * 2010-02-03 2015-09-22 Draker, Inc. Constraint weighted regulation of DC/DC converters
ES2696985T3 (es) * 2010-04-07 2019-01-21 Sma Solar Technology Ag Método para gestionar un inversor
CA2796987C (en) * 2010-04-26 2015-12-01 Queen's University At Kingston Maximum power point tracking for a power generator
WO2011139833A2 (en) 2010-04-29 2011-11-10 Enphase Energy, Inc. Method and apparatus for distributed power generation
GB2482653B (en) 2010-06-07 2012-08-29 Enecsys Ltd Solar photovoltaic systems
US8395919B2 (en) * 2010-07-29 2013-03-12 General Electric Company Photovoltaic inverter system and method of starting same at high open-circuit voltage
USD666974S1 (en) 2010-09-24 2012-09-11 Solarbridge Technologies, Inc. Y-junction interconnect module
US20120075898A1 (en) * 2010-09-28 2012-03-29 Astec International Limited Photovoltaic Power Converters and Closed Loop Maximum Power Point Tracking
US8503200B2 (en) 2010-10-11 2013-08-06 Solarbridge Technologies, Inc. Quadrature-corrected feedforward control apparatus and method for DC-AC power conversion
US9160408B2 (en) 2010-10-11 2015-10-13 Sunpower Corporation System and method for establishing communication with an array of inverters
US8279649B2 (en) 2010-10-11 2012-10-02 Solarbridge Technologies, Inc. Apparatus and method for controlling a power inverter
CN101976852A (zh) * 2010-11-02 2011-02-16 深圳市合兴加能科技有限公司 光伏电源系统结构及其方法
US9467063B2 (en) 2010-11-29 2016-10-11 Sunpower Corporation Technologies for interleaved control of an inverter array
US8842454B2 (en) 2010-11-29 2014-09-23 Solarbridge Technologies, Inc. Inverter array with localized inverter control
EP2469696B1 (en) * 2010-12-23 2018-10-24 Nxp B.V. A controller for a resonant converter
GB2496140B (en) 2011-11-01 2016-05-04 Solarcity Corp Photovoltaic power conditioning units
US8751092B2 (en) 2011-01-13 2014-06-10 Continental Automotive Systems, Inc. Protocol protection
GB2485423B (en) 2011-01-18 2014-06-04 Enecsys Ltd Solar photovoltaic systems
US8716999B2 (en) 2011-02-10 2014-05-06 Draker, Inc. Dynamic frequency and pulse-width modulation of dual-mode switching power controllers in photovoltaic arrays
EP2533127A1 (en) * 2011-04-19 2012-12-12 Mitsubishi Electric R&D Centre Europe B.V. Apparatus for obtaining information enabling the determination of a characteristic like the maximum power point of a power source
US8599587B2 (en) 2011-04-27 2013-12-03 Solarbridge Technologies, Inc. Modular photovoltaic power supply assembly
US9065354B2 (en) 2011-04-27 2015-06-23 Sunpower Corporation Multi-stage power inverter for power bus communication
US8611107B2 (en) 2011-04-27 2013-12-17 Solarbridge Technologies, Inc. Method and system for controlling a multi-stage power inverter
JP2014520302A (ja) * 2011-05-06 2014-08-21 サンエジソン・リミテッド・ライアビリティ・カンパニー 制御ハブを含むソーラー電力システム
US9343906B2 (en) * 2011-06-03 2016-05-17 Schneider Electric Solar Inverters Usa, Inc. High dynamic DC-voltage controller for photovoltaic inverter
US8922185B2 (en) 2011-07-11 2014-12-30 Solarbridge Technologies, Inc. Device and method for global maximum power point tracking
US9774189B2 (en) * 2011-07-18 2017-09-26 Enphase Energy, Inc. Method and apparatus for multi-phase power conversion having modified burst current
US9676238B2 (en) 2011-08-09 2017-06-13 Continental Automotive Systems, Inc. Tire pressure monitor system apparatus and method
US9024743B2 (en) 2011-08-09 2015-05-05 Continental Automotive System, Inc. Apparatus and method for activating a localization process for a tire pressure monitor
EP2741929B1 (en) * 2011-08-09 2015-11-18 Continental Automotive Systems, Inc. Protocol arrangement in a tire pressure monitoring system
US8502655B2 (en) 2011-08-09 2013-08-06 Continental Automotive Systems, Inc. Protocol misinterpretation avoidance apparatus and method for a tire pressure monitoring system
WO2013022435A1 (en) 2011-08-09 2013-02-14 Continental Automotive Systems, Inc. Tire pressure monitoring apparatus and method
US8284574B2 (en) 2011-10-17 2012-10-09 Solarbridge Technologies, Inc. Method and apparatus for controlling an inverter using pulse mode control
GB2496139B (en) 2011-11-01 2016-05-04 Solarcity Corp Photovoltaic power conditioning units
GB2497275A (en) 2011-11-25 2013-06-12 Enecsys Ltd Modular adjustable power factor renewable energy inverter system
JP5929258B2 (ja) 2012-02-01 2016-06-01 ソニー株式会社 電力供給システムおよび電源装置
USD707632S1 (en) 2012-06-07 2014-06-24 Enphase Energy, Inc. Trunk connector
USD708143S1 (en) 2012-06-07 2014-07-01 Enphase Energy, Inc. Drop cable connector
DE102012210207A1 (de) * 2012-06-18 2013-12-19 Ge Energy Power Conversion Gmbh Verfahren und eine Vorrichtung zum Einspeisen von elektrischer Leistung in ein elektrisches Energieversorgungsnetz
US9276635B2 (en) 2012-06-29 2016-03-01 Sunpower Corporation Device, system, and method for communicating with a power inverter using power line communications
AU2013315830A1 (en) 2012-09-11 2015-01-22 Enphase Energy, Inc. Method and apparatus for bidirectional power production in a power module
US9411389B2 (en) * 2012-10-09 2016-08-09 Nec Corporation Distributed generation control for microgrid during islanding
US9685887B2 (en) 2012-10-12 2017-06-20 Younicos Inc. Controlling power conversion systems
CN103051240A (zh) * 2013-01-11 2013-04-17 天津理工大学 一种基于stc单片机的逆变器spwm控制方法
US20140214230A1 (en) * 2013-01-28 2014-07-31 General Electric Company Systems and methods for maximum power point tracking in a micro inverter
US9584044B2 (en) 2013-03-15 2017-02-28 Sunpower Corporation Technologies for converter topologies
US9397497B2 (en) 2013-03-15 2016-07-19 Ampt, Llc High efficiency interleaved solar power supply system
US9564835B2 (en) 2013-03-15 2017-02-07 Sunpower Corporation Inverter communications using output signal
US10193347B2 (en) * 2013-03-29 2019-01-29 Enphase Energy, Inc. Method and apparatus for improved burst mode during power conversion
KR101434098B1 (ko) 2013-04-08 2014-08-25 삼성전기주식회사 태양광 전력 공급 장치
US9882507B2 (en) 2013-04-16 2018-01-30 Solarcity Corporation Power factor adjustment in multi-phase power system
JP5618023B1 (ja) * 2013-06-11 2014-11-05 住友電気工業株式会社 インバータ装置
US9557367B2 (en) * 2013-08-14 2017-01-31 Enphase Energy, Inc. Method and apparatus for monitoring maximum power point tracking
CN103441526B (zh) * 2013-08-14 2015-04-01 华北电力大学(保定) 一种并网不上网的小型光伏发电系统及控制方法
US10135247B2 (en) 2013-10-17 2018-11-20 General Electric Company Methods and systems for integrated Volt/VAr control in electric network
DE102013112538B4 (de) * 2013-11-14 2018-04-05 Sma Solar Technology Ag Verfahren und Wechselrichter zum Bestimmen von Kapazitätswerten von Kapazitäten einer Energieversorgungsanlage
US9446636B2 (en) 2014-02-26 2016-09-20 Continental Automotive Systems, Inc. Pressure check tool and method of operating the same
US9450515B2 (en) * 2014-02-26 2016-09-20 Fsp Technology Inc. Method for controlling inverter apparatus by detecting primary-side output and inverter apparatus thereof
TWI514746B (zh) 2014-04-03 2015-12-21 Ind Tech Res Inst 能源電力調節裝置與其控制方法
CN105024542A (zh) * 2014-04-16 2015-11-04 张云山 太阳能升压转换器及其控制方法
TWI533579B (zh) 2014-10-01 2016-05-11 財團法人工業技術研究院 換流器輸出功率調節方法
JP6303970B2 (ja) 2014-10-17 2018-04-04 住友電気工業株式会社 変換装置
US9517664B2 (en) 2015-02-20 2016-12-13 Continental Automotive Systems, Inc. RF transmission method and apparatus in a tire pressure monitoring system
DE102016213290A1 (de) 2015-08-03 2017-02-09 Continental Automotive Systems, Inc. Vorrichtung, System und Verfahren zum Konfigurieren eines Reifeninformationssensors mit einem Übertragungsprotokoll auf der Basis von Fahrzeugtriggerkenngrößen
TWI559668B (zh) 2015-10-07 2016-11-21 財團法人工業技術研究院 直流轉交流轉換器的控制方法
WO2018049277A1 (en) * 2016-09-09 2018-03-15 UltraSolar Technology, Inc. Systems, methods and devices for applying high frequency, electric pulses to semiconductor materials, including photovoltaic cells
US10488879B2 (en) 2017-03-09 2019-11-26 Ecole Polytechnique Federale De Lausanne (Epfl) Device and method for performing maximum power point tracking for photovoltaic devices in presence of hysteresis
US10536002B2 (en) * 2017-05-12 2020-01-14 Futurewei Technologies, Inc. Power systems with inverter input voltage control
CN111917124B (zh) * 2019-05-07 2022-05-10 昱能科技股份有限公司 一种太阳能光伏并网逆变器的控制装置及方法
CN113422424B (zh) * 2021-08-25 2021-11-30 绵阳天仪空间科技有限公司 一种卫星供电系统

Family Cites Families (42)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4375662A (en) * 1979-11-26 1983-03-01 Exxon Research And Engineering Co. Method of and apparatus for enabling output power of solar panel to be maximized
US4404472A (en) * 1981-12-28 1983-09-13 General Electric Company Maximum power control for a solar array connected to a load
US4649334A (en) * 1984-10-18 1987-03-10 Kabushiki Kaisha Toshiba Method of and system for controlling a photovoltaic power system
PT101508B (pt) 1993-04-30 1999-12-31 Yazaki Corp Aparelho para guarnecimento de pontas de fio
JP2830894B2 (ja) 1993-07-08 1998-12-02 矢崎総業株式会社 ハーネスサブアッシーの製造方法
JP2810630B2 (ja) * 1993-11-16 1998-10-15 キヤノン株式会社 太陽電池の電力制御装置、電力制御システム、電力制御方法及び電圧電流出力特性の測定方法
US5604430A (en) * 1994-10-11 1997-02-18 Trw Inc. Solar array maximum power tracker with arcjet load
JP4353446B2 (ja) * 1999-06-17 2009-10-28 関西電力株式会社 直流電力出力装置および太陽光発電システム
JP3427021B2 (ja) * 1999-09-02 2003-07-14 三洋電機株式会社 系統連系インバータ
US6351400B1 (en) * 2000-01-18 2002-02-26 Eviropower Corporation Method and apparatus for a solar power conditioner
JP3950278B2 (ja) 2000-03-14 2007-07-25 矢崎総業株式会社 ワイヤハーネス製造装置
JP4170565B2 (ja) * 2000-06-30 2008-10-22 株式会社ダイヘン 電力変動平滑化装置及びそれを備えた分散電源システムの制御方法
JP2002165357A (ja) * 2000-11-27 2002-06-07 Canon Inc 電力変換装置およびその制御方法、および発電システム
FR2819653B1 (fr) * 2001-01-16 2003-04-11 Centre Nat Rech Scient Commande d'un convertisseur de puissance pour une recherche automatique du point de puissance maximale
JP3394996B2 (ja) * 2001-03-09 2003-04-07 独立行政法人産業技術総合研究所 最大電力動作点追尾方法及びその装置
US6809942B2 (en) * 2001-06-29 2004-10-26 Sanyo Electric Co., Ltd. System interconnection electric power generator and control method therefor
FR2843464B1 (fr) * 2002-08-09 2006-09-08 Cit Alcatel Circuit de conditionnement d'une source au point de puissance maximum
FR2844890B1 (fr) * 2002-09-19 2005-01-14 Cit Alcatel Circuit de conditionnement pour une source de puissance au point de puissance maximum, generateur solaire et procede de conditionnement
US6914418B2 (en) * 2003-04-21 2005-07-05 Phoenixtec Power Co., Ltd. Multi-mode renewable power converter system
US7256566B2 (en) * 2003-05-02 2007-08-14 Ballard Power Systems Corporation Method and apparatus for determining a maximum power point of photovoltaic cells
US7091707B2 (en) * 2003-09-29 2006-08-15 Xantrex Technology, Inc. Method and apparatus for controlling power drawn from an energy converter
KR200349431Y1 (ko) 2004-01-28 2004-05-04 이등로 전기플러그 잠금장치
US7248946B2 (en) * 2004-05-11 2007-07-24 Advanced Energy Conversion, Llc Inverter control methodology for distributed generation sources connected to a utility grid
US20060001406A1 (en) * 2004-07-01 2006-01-05 Stefan Matan Power extractor circuit
US7193872B2 (en) * 2005-01-28 2007-03-20 Kasemsan Siri Solar array inverter with maximum power tracking
ITSA20050014A1 (it) * 2005-07-13 2007-01-14 Univ Degli Studi Salerno Dispositivo invertitore a singolo stadio, e relativo metodo di controllo, per convertitori di potenza da sorgenti di energia, in particolare sorgenti fotovoltaiche.
US7319313B2 (en) 2005-08-10 2008-01-15 Xantrex Technology, Inc. Photovoltaic DC-to-AC power converter and control method
JP4588623B2 (ja) * 2005-12-16 2010-12-01 関西電力株式会社 電源装置
AU2007229854B2 (en) * 2006-03-23 2011-02-03 Enphase Energy, Inc. Method and apparatus for converting direct current to alternating current
US7479774B2 (en) * 2006-04-07 2009-01-20 Yuan Ze University High-performance solar photovoltaic (PV) energy conversion system
US20080111517A1 (en) * 2006-11-15 2008-05-15 Pfeifer John E Charge Controller for DC-DC Power Conversion
US7839025B2 (en) 2006-11-27 2010-11-23 Xslent Energy Technologies, Llc Power extractor detecting a power change
US9088178B2 (en) * 2006-12-06 2015-07-21 Solaredge Technologies Ltd Distributed power harvesting systems using DC power sources
US7994657B2 (en) 2006-12-22 2011-08-09 Solarbridge Technologies, Inc. Modular system for unattended energy generation and storage
US7681090B2 (en) * 2007-01-25 2010-03-16 Solarbridge Technologies, Inc. Ripple correlation control based on limited sampling
EP1995656A1 (de) * 2007-05-23 2008-11-26 SMA Solar Technology AG Verfahren zur Leistungsanpassung
US7986122B2 (en) * 2007-09-26 2011-07-26 Enphase Energy, Inc. Method and apparatus for power conversion with maximum power point tracking and burst mode capability
US7986539B2 (en) * 2007-09-26 2011-07-26 Enphase Energy, Inc. Method and apparatus for maximum power point tracking in power conversion based on dual feedback loops and power ripples
CA2737134C (en) * 2007-10-15 2017-10-10 Ampt, Llc Systems for highly efficient solar power
WO2009120695A1 (en) * 2008-03-25 2009-10-01 Delta Electronics, Inc. A power converter system that operates efficiently over a range of load conditions
US7768155B2 (en) * 2008-10-10 2010-08-03 Enphase Energy, Inc. Method and apparatus for improved burst mode during power conversion
JP5402255B2 (ja) 2009-05-29 2014-01-29 住友電装株式会社 ワイヤーハーネスの製造方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
JANTSCH M ET AL: "AC PV MODULE INVERTERS WITH FULL SINE WAVE BURST OPERATION MODE FOR IMPROVED EFFICIENCY OF GRID CONNECTED SYSTEMS AT LOW IRRADIANCE", 14TH. E.C. PHOTOVOLTAIC SOLAR ENERGY CONFERENCE. BARCELONA, SPAIN, JUNE 30 - JULY 4, 1997; [PROCEEDINGS OF THE INTERNATIONAL PHOTOVOLTAIC SOLAR ENERGY CONFERENCE], BEDFORD : H. C. STEPHENS & ASSOCIATES, GB, vol. CONF. 14, 30 June 1997 (1997-06-30), pages 1344 - 1347, XP001136312, ISBN: 978-1-901675-03-0 *

Also Published As

Publication number Publication date
AU2009302200B2 (en) 2015-12-10
EP2345143A2 (en) 2011-07-20
JP5773368B2 (ja) 2015-09-02
WO2010042806A3 (en) 2010-07-22
AU2009302200A1 (en) 2010-04-15
US20100309695A1 (en) 2010-12-09
WO2010042806A2 (en) 2010-04-15
KR20110069858A (ko) 2011-06-23
US20110292701A1 (en) 2011-12-01
JP2012505630A (ja) 2012-03-01
US9461561B2 (en) 2016-10-04
EP3157156A1 (en) 2017-04-19
EP2345143A4 (en) 2012-05-09
KR101663957B1 (ko) 2016-10-12
US8492932B1 (en) 2013-07-23
US8319378B2 (en) 2012-11-27
US20130301322A1 (en) 2013-11-14
US8035257B2 (en) 2011-10-11
US7768155B2 (en) 2010-08-03
CA2739814A1 (en) 2010-04-15
US20100091532A1 (en) 2010-04-15

Similar Documents

Publication Publication Date Title
EP2345143B1 (en) Apparatus for improved burst mode during power conversion
US7986539B2 (en) Method and apparatus for maximum power point tracking in power conversion based on dual feedback loops and power ripples
US7986122B2 (en) Method and apparatus for power conversion with maximum power point tracking and burst mode capability
US11791633B2 (en) Systems and methods for increasing output current quality, output power, and reliability of grid-interactive inverters
US10193347B2 (en) Method and apparatus for improved burst mode during power conversion
US9450405B2 (en) Method and apparatus for reactive power capable inverters

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20110506

AK Designated contracting states

Kind code of ref document: A2

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK SM TR

AX Request for extension of the european patent

Extension state: AL BA RS

DAX Request for extension of the european patent (deleted)
A4 Supplementary search report drawn up and despatched

Effective date: 20120412

RIC1 Information provided on ipc code assigned before grant

Ipc: G05F 1/67 20060101ALI20120404BHEP

Ipc: H02M 7/48 20070101AFI20120404BHEP

Ipc: H02J 7/35 20060101ALI20120404BHEP

RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: ENPHASE ENERGY, INC.

17Q First examination report despatched

Effective date: 20130121

RIN1 Information on inventor provided before grant (corrected)

Inventor name: FORNAGE, MARTIN

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

INTG Intention to grant announced

Effective date: 20160714

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 856253

Country of ref document: AT

Kind code of ref document: T

Effective date: 20170115

RIN2 Information on inventor provided after grant (corrected)

Inventor name: FORNAGE, MARTIN

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602009043286

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20161221

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG4D

REG Reference to a national code

Ref country code: NL

Ref legal event code: MP

Effective date: 20161221

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170322

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20161221

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170321

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20161221

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 856253

Country of ref document: AT

Kind code of ref document: T

Effective date: 20161221

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20161221

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20161221

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20161221

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20161221

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20161221

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20161221

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170421

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20161221

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20161221

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20161221

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20161221

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170321

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20161221

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20161221

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20161221

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170421

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602009043286

Country of ref document: DE

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 9

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed

Effective date: 20170922

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20161221

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20161221

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20161221

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

REG Reference to a national code

Ref country code: IE

Ref legal event code: MM4A

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20171009

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20171031

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20171031

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20171009

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 10

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20171009

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20091009

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CY

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20161221

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20161221

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20161221

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20230914

Year of fee payment: 15

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 20230921

Year of fee payment: 15

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20230912

Year of fee payment: 15