EP2279309A1 - Method of cladding with tiles for floors, walls, ceilings and the like - Google Patents
Method of cladding with tiles for floors, walls, ceilings and the likeInfo
- Publication number
- EP2279309A1 EP2279309A1 EP09729058A EP09729058A EP2279309A1 EP 2279309 A1 EP2279309 A1 EP 2279309A1 EP 09729058 A EP09729058 A EP 09729058A EP 09729058 A EP09729058 A EP 09729058A EP 2279309 A1 EP2279309 A1 EP 2279309A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- tiles
- stage
- plan
- cut
- cutting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F21/00—Implements for finishing work on buildings
- E04F21/20—Implements for finishing work on buildings for laying flooring
- E04F21/22—Implements for finishing work on buildings for laying flooring of single elements, e.g. flooring cramps ; flexible webs
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B44—DECORATIVE ARTS
- B44C—PRODUCING DECORATIVE EFFECTS; MOSAICS; TARSIA WORK; PAPERHANGING
- B44C1/00—Processes, not specifically provided for elsewhere, for producing decorative surface effects
- B44C1/28—Uniting ornamental elements on a support, e.g. mosaics
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F13/00—Coverings or linings, e.g. for walls or ceilings
- E04F13/07—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
- E04F13/08—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F15/00—Flooring
- E04F15/02—Flooring or floor layers composed of a number of similar elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F21/00—Implements for finishing work on buildings
- E04F21/0076—Implements for finishing work on buildings for marking and cutting tiles
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F21/00—Implements for finishing work on buildings
- E04F21/18—Implements for finishing work on buildings for setting wall or ceiling slabs or plates
- E04F21/1838—Implements for finishing work on buildings for setting wall or ceiling slabs or plates for setting a plurality of similar elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F21/00—Implements for finishing work on buildings
- E04F21/18—Implements for finishing work on buildings for setting wall or ceiling slabs or plates
- E04F21/1838—Implements for finishing work on buildings for setting wall or ceiling slabs or plates for setting a plurality of similar elements
- E04F21/1844—Implements for finishing work on buildings for setting wall or ceiling slabs or plates for setting a plurality of similar elements by applying them one by one
Definitions
- the present invention relates to a method of cladding with tiles for floors, walls, ceilings and the like.
- the cladding can be applied to different types of surfaces, such as flat surfaces, undulated or mixed surfaces, whether horizontal, vertical or at an incline.
- a tile is a unit of cladding of whatever material it might be made, such as ceramics, carpeting, stone, compound materials, plastic or wood, among others.
- a peripheral tile is taken to mean one that abuts with an object such as a wall or door frame, and will have to be cut in order to adapt it to the perimeter of said object.
- a whole tile is taken to mean one that does not need cutting.
- a cladding is a layer or cover made with a number of tiles with which a surface such as a floor, wall, ceiling or the like is protected or adorned.
- a tiler is an operative entrusted with cladding a surface with tiles.
- a high-precision measurement is taken to mean one that achieves a tolerance of the order of one millimetre .
- Telemetry is a system for measuring distances by means of a telemeter, that is, by means of an electronic optical device that permits remote measurement of lengths.
- Scanning is taken to mean the action of examining or sweeping over a space, in this case by means of a telemeter, for the purpose of taking the measurements or a room or lobby for subsequent processing thereof.
- Home automation is taken to mean a set of systems that automate the various facilities to be found in a dwelling.
- Matching is taken to refer to the action of combining or relating with each other the measurements obtained in the various rooms or areas in order to draw up a final plan of the whole.
- Referencing is taken to mean the action of numbering or coding the tiles in order to facilitate the subsequent laying or placement thereof.
- the operative or tiler takes the measurements of the space to be tiled and cuts the tile using any method valid for the purpose. This is more laborious than it might seem, however. There follows, by way of example, a list of all the simple operations said tiler carries out in order to lay a peripheral tile attached using mortar:
- the list of operations is almost identical, although for approximately one third of them the bending down action of the tiler is replaced by the action of climbing a ladder, while for another third he must also bend down, and for the remaining third he lays them from a standing position. All these operations involve a high cost in terms of time, energy consumption, physical exertion of the tiler, quite apart from the risk of accident involved in using a machine for cutting tiles.
- the object of the method of the present invention for cladding with tiles for floors, walls, ceilings and the like is to solve the disadvantages presented by the methods known in the prior art, while providing a number of advantages that will be described below.
- the method of the present invention for cladding with tiles for floors, walls, ceilings and the like is of the type that consists in carrying out the following stages: a) taking high-precision measurements of the surface to be clad; b) drawing up a hand-drawn or computerised plan of the entire surface to be clad, based on the measurements taken; c) determining the size, shape, dimensions, orientation and position of at least each of the peripheral tiles that have to be cut; d) cutting the peripheral tiles, in accordance with a certain shape and dimensions, in a place other than the premises to be clad, and equipped for carrying out said cutting; e) transporting the tiles to the zone to be clad; and f) final laying of the tiles without need to cut any of them in situ.
- the method of the invention for cladding with tiles is thus based on a precise taking of measurements of the area to be clad in order to be able to cut beforehand all the tiles that in general so require, and particularly the peripheral tiles, at a fixed facility away from the premises and duly designed for the purpose and preferably automatic, thereby achieving better, ergonomic production conditions.
- a hand-drawn or computerised grid layout arrangement is made to represent the tiles as a whole on said plan, and a specific and unique position is assigned to each of the peripheral tiles unit-by-unit or by groups of identical tiles.
- the distribution diagram is drawn up with the help of a software application that optimises the position of the grid of tiles on the plan in order to minimise the number of tiles to be cut, of the tiles to be used, of the total length of tile to be cut and/or of materials and operating costs.
- stage c) the order of laying of the tiles is determined in order to facilitate and ensure the correct final finish.
- a guide-plan is printed to assist in proper and orderly laying.
- a referencing of the pertinent position and orientation of each of the cut tiles is carried out in order to facilitate their subsequent laying.
- the taking of measurements of stage a) is carried out using an automatic, semi-automatic or manual system of telemetry.
- a telemeter specially designed to scan the outline of door frames, said telemeter including a fixed guide upon which it can slide and rotate gradually, with said guide being arranged around the frame and preferably centred and at a certain distance from it, so that the position and orientation of the telemeter is known at all times as it moves on the guide .
- the fixed guide includes a circumferential profile.
- the taking of measurements of stage a) is carried out by means of an optical recognition system.
- the degree of precision in the taking of measurements must be of the order of a millimetre, whereas the current ways of taking measurements in the sector involve lower average degrees of precision.
- the drawing up of the plan of stage b) is carried out by means of a computerised system for processing the measurements taken in stage a) .
- stage d) of cutting is carried out on a numerically controlled precision cutting table, with or without referencing of each of the tiles processed.
- Figure 1 is a plan view of a dwelling whose floor is to be clad by means of the method of the invention, showing a skeleton plan of elements placed on the floor in order to proceed to take measurements;
- Figure 2 is a plan view of a first room in the dwelling, in which has been placed a telemeter that rotates about itself in order to carry out telemetric scanning of the room;
- Figure 3 is a plan view of the section of a door frame, where a telemeter has been placed that travels on a circumferential guide around it in order to carry out scanning of the frame profile;
- Figure 4 shows a plan of the room or hall, with the grid representing the tiles as a whole placed in non- optimised position, in that many tiles have to be cut;
- Figure 5 shows a plan of the room or hall, with the same grid as Figure 4 but arranged in an optimised manner
- Figure 6 shows a plan of the dwelling indicating the order of laying of the initial tiles in order to ensure from the outset a correct final finish.
- the measurements of the surface to be tiled are taken.
- the taking of measurements in this case has to be more precise than is usual in the sector, that is, of the order of a millimetre.
- a skeleton outline of square elements 2 is provided, all of them exactly the same and easy to combine with one another.
- Said elements 2 are located along the main axis of the dwelling 1, in the corridor 3 in this example, branching out perpendicularly therefrom with their corresponding axes towards each area to be measured (halls, bedrooms, etc) .
- the axes are then aligned properly by doubling the precision, with further elements 2 where necessary, especially on the perpendicular branchlines .
- the corresponding elements A to N (shown in grey in Figure 1) are then defined and placed on a virtual plane, from which the respective halls or simple spaces will be scanned. If so wished, all of these points, centres of the respective systems of polar coordinates, can also be located telemetrically by means of a triangulation procedure, in order to increase the precision.
- a polar telemeter 4 is then mounted successively on each of the predetermined elements A to N in order to take the measurements of the various spaces or room areas ( Figure 1 shows the telemeter on element M) , and the reference of the point is detected and fixed as described, or else triangulated with another element close to the central axis.
- the entire room space 5 is scanned degree by degree, from 0° to 360°, as can be appreciated from Figure 2, thus providing with high precision the real perimeter 6 of the space 5 that is being scanned.
- the data gathered is then entered into a suitable computer drawing program which interprets them and integrates them into the place that is being drawn.
- the telemeter 4 is taken down and set up in the following room space, and so on until the process has been completed. In less than three hours the entire dwelling 1 has been scanned and the plan completed.
- the doors are then taken off and all their frame outlines scanned in detail, placing them on the virtual general plan, whether by deduction, triangulation, or predetermination by means of the geometrical elements A to N of the position from which the scanning is carried out.
- Figure 3 shows a telemeter 4a that is specially designed to scan the outline of door frames 7.
- the telemeter 4a does not rotate about itself, but instead rotates about an axis located outside itself, preferably to the interior of the frame, and sliding in its turn through a fixed guide 8 of circumferential profile, said guide 8 being mounted around the frame 7 and at a certain distance from it, so that the telemeter allows the outline of the frame 7 to be measured as it is moving and rotating about said guide 8.
- Said Figure 3 also shows the corresponding tile 9 cut and placed as it would be left once laid later on.
- a manual or computerised layout arrangement is made of a grid 11 or network representing the tiles 9 as a whole on said plan 10, and a specific unique position is assigned for each one of the tiles 9.
- This layout arrangement can be made manually or with the help of a software application that optimises the position of the grid 11 of tiles 9 on the plan 10 in order to minimise the number of tiles to be cut 9a, of the tiles to be used 9,9a, of the total length of tile to be cut 9a and/or of the cost of materials and of the operation.
- Figure 4 shows said grid 11 arranged in a non- optimum position, since there are many peripheral tiles 9a (shown in grey) to be cut;
- Figure 5, shows the same grid 11, but set in a better position, with a substantial saving of tiles 9 to be used and f tiles 9a to be cut. This is followed by determining the size, shape, dimensions, orientation and position of at least each of the peripheral tiles 9a that have to be cut.
- Procedure can also be made to determine the order of laying of tiles 9 in order to facilitate and ensure a correct final finish.
- Figure 6 shows with numbers the order for laying of the initial tiles 9, such that in each room space at least one row of tiles 9 will be laid until a back wall is reached. As a result, at the time of laying, if these first tiles 9 have no error of final finish, the rest of the tiles are very unlikely to have any error either.
- the cutting of the peripheral tiles 9a will be carried out in accordance with the shape and dimensions that have been determined and in a place set up for the purpose and different from the dwelling 1 to be tiled, which place may be at the factory itself, at the warehouse of the distributor and/or in a vehicle set up for the purpose. This operation will be carried out on a numerically controlled precision cutting table, with or without referencing of each of the tiles processed.
- each of the cut tiles 9a it is preferable to carry out a referencing of the corresponding position and orientation of each of the cut tiles 9a in order to facilitate their subsequent laying. It is likewise advisable to reference all the other tiles 9 as well as the peripheral tiles 9a, also to make their laying easier.
- the tiles 9,9a are then transported to the dwelling in question, and finally they are laid, preferably in the pre-established order and without the need to cut any of them in situ.
- Allowance is also made for the possibility of selling the materials and the service in advance, preferably by telematic means.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Floor Finish (AREA)
- Finishing Walls (AREA)
Abstract
Description
Claims
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
ES200800978A ES2352022B1 (en) | 2008-04-01 | 2008-04-01 | COATING PROCESS WITH TILES FOR SOILS, WALLS, CEILINGS OR SIMILAR. |
PCT/IB2009/051285 WO2009122332A1 (en) | 2008-04-01 | 2009-03-27 | Method of cladding with tiles for floors, walls, ceilings and the like |
Publications (2)
Publication Number | Publication Date |
---|---|
EP2279309A1 true EP2279309A1 (en) | 2011-02-02 |
EP2279309B1 EP2279309B1 (en) | 2013-07-10 |
Family
ID=40750925
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP09729058.9A Not-in-force EP2279309B1 (en) | 2008-04-01 | 2009-03-27 | Method of cladding with tiles for floors, walls, ceilings and the like |
Country Status (3)
Country | Link |
---|---|
EP (1) | EP2279309B1 (en) |
ES (2) | ES2352022B1 (en) |
WO (1) | WO2009122332A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP3246174A1 (en) * | 2016-05-19 | 2017-11-22 | tilo GmbH | Digitized layout |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
BE1024775B1 (en) | 2016-12-01 | 2018-07-02 | Unilin Bvba | Set of floor panels and method for assembling them. |
DE102017115233A1 (en) * | 2017-07-07 | 2019-01-10 | Homag Gmbh | Method and system for producing customer-specific installable panels |
BE1026326B1 (en) * | 2018-05-31 | 2020-01-13 | Unilin Bvba | Method for assembling a set of floor panels. |
CN109488004A (en) * | 2018-11-08 | 2019-03-19 | 广东省第建筑工程有限公司 | A kind of smooth concrete surface ceramic tile ungauged regions sticking construction method |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4311464A (en) * | 1980-07-14 | 1982-01-19 | Michael Cancelliere | Grid system for laying out and/or precutting tiles or the like |
US4659409A (en) * | 1985-09-06 | 1987-04-21 | Hafiz Arafat | Method and means for preparing floor covering using a template |
DE19544713A1 (en) * | 1995-11-30 | 1997-06-05 | Henrich Gernot Dipl Ing | Cutting and installing insulation or cladding panels for walls of buildings |
US6119565A (en) * | 1997-06-13 | 2000-09-19 | Jere M. L'Heureux | Apparatus and method for electronically measuring and cutting floor coverings |
DE10038886A1 (en) * | 2000-08-09 | 2002-02-21 | Joerg R Bauer | Computerized system optimizing quantities and laying-plan for wall and floor tiling panels, inputs dimensions to determine numbers of panels and special shapes |
PL1637665T3 (en) * | 2004-09-15 | 2008-03-31 | Intellectual Capital And Asset Man Gmbh | Method of insulating buildings |
-
2008
- 2008-04-01 ES ES200800978A patent/ES2352022B1/en not_active Expired - Fee Related
-
2009
- 2009-03-27 WO PCT/IB2009/051285 patent/WO2009122332A1/en active Application Filing
- 2009-03-27 ES ES09729058T patent/ES2428099T3/en active Active
- 2009-03-27 EP EP09729058.9A patent/EP2279309B1/en not_active Not-in-force
Non-Patent Citations (1)
Title |
---|
See references of WO2009122332A1 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP3246174A1 (en) * | 2016-05-19 | 2017-11-22 | tilo GmbH | Digitized layout |
Also Published As
Publication number | Publication date |
---|---|
ES2352022A1 (en) | 2011-02-15 |
ES2352022B1 (en) | 2011-12-30 |
ES2428099T3 (en) | 2013-11-05 |
EP2279309B1 (en) | 2013-07-10 |
WO2009122332A1 (en) | 2009-10-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US5950319A (en) | Reference marking on construction materials | |
EP2279309B1 (en) | Method of cladding with tiles for floors, walls, ceilings and the like | |
KR101798165B1 (en) | System and method for facilitate construction using an augmented realty | |
US20220259865A1 (en) | System and method for automating construction and installation of surfaces in construction | |
KR20200131835A (en) | Systems and methods for automatic layout of buildings | |
Langdon | Spon's Architects' and Builders' Price Book 2004 | |
KR20190039012A (en) | Analysis device for constructing frame of building for calculating number of worker and method for the same | |
Iturralde et al. | Matching kit interface for building refurbishment processes with 2D modules | |
KR20230169923A (en) | An apparatus and method for analyzing a working area and route of form worker and rebar worker at a housing construction | |
Lee et al. | Willis's elements of quantity surveying | |
JP7349370B2 (en) | Floor material pre-cutting system, floor material pre-cutting method, and program | |
US8922758B2 (en) | Stud mapping and layout method | |
EP3802989B1 (en) | Method for composing a set of floor panels | |
CN112982913A (en) | Ceramic tile batch processing accurate typesetting and positioning construction process based on Internet of things | |
Liu et al. | A brief review on robotic floor-tiling | |
DE202014006594U1 (en) | Device for laying out a predetermined area | |
Root et al. | Case Study: Off-site manufacturing of EIFS Panelized Wall Assemblies to Gain Efficiency in Construction Sequencing | |
RU2382858C1 (en) | Device for hand brick masonwork | |
Heineck et al. | Transparency in building construction: a case study | |
JP7289175B1 (en) | architectural system | |
Lehtinen et al. | Outlines of two masonry robot systems | |
KR20190038985A (en) | Method of structural work zoning and construction sequence for minimizing of daily labour attendance | |
CN214942053U (en) | Horizontal correction tool for mounting decoration panel material | |
US20240181644A1 (en) | Systems, methods and devices for processing and handling plasterboard | |
Mitchell et al. | Technology assessment of automation trends in the modular home industry |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 20101025 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK TR |
|
AX | Request for extension of the european patent |
Extension state: AL BA RS |
|
DAX | Request for extension of the european patent (deleted) | ||
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP Ref country code: AT Ref legal event code: REF Ref document number: 621074 Country of ref document: AT Kind code of ref document: T Effective date: 20130715 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602009017030 Country of ref document: DE Effective date: 20130912 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130710 |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: FG2A Ref document number: 2428099 Country of ref document: ES Kind code of ref document: T3 Effective date: 20131105 |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MK05 Ref document number: 621074 Country of ref document: AT Kind code of ref document: T Effective date: 20130710 |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: VDEP Effective date: 20130710 |
|
REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG4D |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130710 Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130918 Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130710 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130710 Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20131010 Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20131111 Ref country code: BE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130710 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130710 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20131110 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20131011 Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130710 Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130710 Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130710 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130710 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130710 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130710 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130710 Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130710 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130710 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130710 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130710 |
|
26N | No opposition filed |
Effective date: 20140411 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 602009017030 Country of ref document: DE Effective date: 20140411 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20140327 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20140327 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: MM4A |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20140327 Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20140331 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20140331 Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20140327 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 20140930 Year of fee payment: 6 Ref country code: DE Payment date: 20140930 Year of fee payment: 6 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R119 Ref document number: 602009017030 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: ST Effective date: 20151130 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20151001 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20150331 Ref country code: MT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130710 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130710 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130710 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130710 Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO Effective date: 20090327 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130710 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: ES Payment date: 20210406 Year of fee payment: 13 |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: FD2A Effective date: 20230509 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: ES Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20220328 |