EP2131976B1 - Bearing structure for continuous casting machine - Google Patents

Bearing structure for continuous casting machine Download PDF

Info

Publication number
EP2131976B1
EP2131976B1 EP08717112A EP08717112A EP2131976B1 EP 2131976 B1 EP2131976 B1 EP 2131976B1 EP 08717112 A EP08717112 A EP 08717112A EP 08717112 A EP08717112 A EP 08717112A EP 2131976 B1 EP2131976 B1 EP 2131976B1
Authority
EP
European Patent Office
Prior art keywords
bearing structure
casting
covers
curve
bearing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Not-in-force
Application number
EP08717112A
Other languages
German (de)
French (fr)
Other versions
EP2131976A1 (en
Inventor
Daniele Andreatta
Alfredo Poloni
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Danieli and C Officine Meccaniche SpA
Original Assignee
Danieli and C Officine Meccaniche SpA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Danieli and C Officine Meccaniche SpA filed Critical Danieli and C Officine Meccaniche SpA
Publication of EP2131976A1 publication Critical patent/EP2131976A1/en
Application granted granted Critical
Publication of EP2131976B1 publication Critical patent/EP2131976B1/en
Not-in-force legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D11/00Continuous casting of metals, i.e. casting in indefinite lengths
    • B22D11/14Plants for continuous casting
    • B22D11/142Plants for continuous casting for curved casting

Definitions

  • the present invention concerns a bearing structure for a continuous casting machine.
  • the invention concerns a monolithic and integrated bearing structure, particularly suitable to be used for the installation of a compact curved continuous casting machine, in particular for the continuous casting of billets and blooms, for example but not only, for commercial steels, but also for quality steels.
  • the monolithic and integrated bearing structure according to the present invention allows to install a single line and/or multi-line continuous casting machine, considerably reducing and simplifying the assembly operations in loco, drastically reducing times required for start-up, and also the costs of initial investment.
  • the bearing structure according to the invention ensures an easier access for operators to the casting line, for example for maintenance operations, and guarantees greater operating safety for said operators.
  • the general structure of a continuous casting machine for billets or blooms comprising in its essential elements an ingot mold with a square or rectangular section, the foot rolls and a curved removal and guide line, associated with a secondary cooling system.
  • a straightening device Downstream of the removal and guide line there is normally a straightening device, the function of which is to dispose the cast billet or bloom flat, in order to accompany it towards the equipment located downstream, for example shearing means, removal and parking means for the dummy bar, the accumulation and heating systems and/or the rolling train.
  • Examples of said curved continuous casting machines are shown for example in JP 59110453 and CH 597944 .
  • connection systems and the auxiliary and accessory equipment are positioned in places which on the one hand do not interfere with the daily operations of the casting machine and are adequately protected, and on the other hand are easily and quickly accessible and maintainable in the event of problems and break-downs.
  • Still another problem is the difficult access for operators to the individual segments of the line, for example to make inspections, maintenance, replacement of components, or to solve problems of blockages or other type.
  • Purpose of the present invention is to achieve plants for rolling billets or blooms of the compact type, with pre-assembled components, also of the structural type, already complete with pre-tested plant engineering, with shorter assembly time, also suitable to be installed in limited spaces.
  • purpose of the present invention is therefore to solve these problems, proposing a solution able to drastically reduce the works of civil engineering needed for the installation of a continuous casting machine in a plant, the design and need for labor to perform the connections to the user machines, the volumes of transport and loading/unloading the components, and all the other works required to install the continuous casting machine.
  • the purpose set forth above is obtained by using a monolithic and integrated structure, made of metal sheet, substantially closed and self-supporting, which has a seating suitable for the assembly of an ingot mold and which accommodates both the containing and guiding rolls disposed along the curvilinear path of the cast product, and also the secondary cooling system.
  • the bearing structure is advantageously made from workings on machine tools which allow to obtain limited tolerances in the construction of the components.
  • the monolithic bearing structure according to the invention does not require expensive works of civil engineering, such as the traditional foundations for the machines, but simply a plane supporting surface on which it can be anchored.
  • the whole bearing structure is anchored to the ground by means of at least a metal plate, which functions as a base, incorporated into the floor and made solid therewith, for example, but not necessarily, by means of threaded bars or tie rods. This allows to reduce the installation times and initial investment costs.
  • At least the upper portion of the casting curve is easily accessible by means of a series of opening covers that allow selective opening to adjacent individual segments of the casting line.
  • the covers have a box-like structure, substantially U-shaped, conformed so as to be disposed, in the closed position, as close as possible to the casting line, almost so as to surround it; in the zones where it is connected to the containing structure of the cast product, leakages of water are prevented by using, for example, suitable labyrinth seals.
  • the covers can be opened in an upward direction, so as to allow operators access to the line from both sides of the line.
  • the covers can be opened in a lateral direction.
  • the opening/closing of the covers is performed in sequence, to prevent the ends of two adjacent covers from overlapping.
  • opening covers allows to considerably facilitate, for the staff, all the interventions of checking and ordinary (daily) maintenance, checking the insertion of the dummy bar when casting is started, the management of possible problems, such as leakage of liquid steel due to the breakage of the skin, and other: all this promotes greater rapidity in operations and greater safety for the workers.
  • inside the covers at least the upper containing and guiding rolls for the billet/bloom are assembled.
  • the spray nozzles of the secondary cooling system are assembled inside the covers.
  • the covers are advantageously cooled by suitable means, for example sprays, or by means of a water jacket structure with an independent circuit, and they are driven to open/close for example by means of hydraulic actuators or jacks.
  • the monolithic casting structure advantageously provides on the outside all the necessary drive and command elements, such as for example the rapid attachments for water and electricity, the system for lubricating the bearings, the piping, etc. These elements are easily and quickly interfaced with the appropriate service lines of the plant (electricity, water plant, oil plant, air plant, etc.).
  • the upper part of the casting line it is provided to suck in the water vapors generated by the process, with a suitable aspirator; the suction is facilitated thanks to the limited size of the casting chamber, and the fact that the closed monolithic structure produces a "chimney effect".
  • the plant according to the present invention allows to considerably simplify the works of civil engineering for installation, since it does not require complex foundations and does not require the traditional bearing structure made of reinforced concrete and network of girders to support the various planes of the structure.
  • the bearing structure according to the invention has limited weight and size and, since it is made largely of modular elements, it is easy to transport.
  • the continuous casting machine thus made allows to use adjacent casting lines in parallel, if it is desired to increase productivity.
  • a bearing structure 10 for a curved continuous casting machine is disposed upstream of a straightening unit 11, a device 12 to insert, remove and park a dummy bar 13, and shears 14.
  • the bearing structure 10 according to the invention in this case is disposed in cooperation with a bridge 15, defining the casting plane 17, having a width advantageously equal to that of a bay of the shed of the plant where the casting machine is installed.
  • an intermediate plane 16 is provided, where all the auxiliary services are accommodated, such as for example the oil-dynamic units, the electric panels, the regulation valves, the piping, the collectors.
  • the casting plane 17 is advantageously not bulky and can have a very rational disposition of the auxiliary devices.
  • the bearing structure 10 in this case is anchored to the ground by means of a metal plate 21, functioning as a base, incorporated into the floor.
  • a column element 20 is attached on the metal plate 21, defining a structure which in this case is quadrangular, consisting in this case of four metal beams 22, for example H beams or other type ( figs. 1 and 2 ).
  • a flange 23 is assembled which defines a seating or base, in which an ingot mold 24 is housed and assembled.
  • the flange is advantageously of the inter-changeable type so as to allow the assembly of an ingot mold 24 different in the event of a change in format of the billet/bloom 26.
  • the lateral and bottom panels 25 define a seating for the housing and assembly at least of the lower rolls and the nozzles of the secondary cooling system.
  • a series of opening covers 28 are hinged, by means of respective assembly plates 27, substantially U-shaped, which open laterally in the case shown in fig. 4 , whereas in the case shown in fig. 6 they open upwards with respect to the casting line.
  • the covers 28 may be driven to open by means of respective hydraulic or pneumatic jacks 36, which allows selective access to respective segments of the line for a worker 29, also thanks to the presence of a system of stairs 30 that develops adjacent to the panels 25, in order to carry out inspection or maintenance operations, and in the event of incidents such as blockages or break-outs.
  • the U-shaped surrounding box-like structure of the covers 28 allows to reduce to a minimum indispensable the size of the casting chamber downstream of the ingot mold 24, thus giving a better thermodynamic control of the conditions of progressive solidification of the billet-bloom 26, and an easier control to prevent leakages of the cooling water.
  • the first segment of the casting line downstream of the ingot mold 24 comprises a substantially closed chamber 37, which may or may not comprise the column element 20, and which allows easy access to the operators.
  • the closed chamber 37 allows to control the cooling system better and more easily during casting and is less subject to reverberation by the billet/bloom 26 since the walls are more distant therefrom compared with the solution with covers 28.
  • the subsequent part of the casting curve provides the opening covers 28, as in the solutions previously described.
  • both the upper rolls 32 to contain and guide the billet/bloom 26 are advantageously assembled, and also the nozzles 42 of the secondary cooling system. Thanks to this system of pre-assembly, at the moment the covers 28 are installed, and when they close, the curved removal and guide line of the billet/bloom 26 is already completely configured, without needing alignments and further adjustments.
  • only one of the roll units, the upper or the lower, is motorized, while the other is idle.
  • both the roll units are motorized. According to another variant, both the roll units are idle.
  • the base plate 33 of the column element 20 has rapid attachment means 34, accessible from outside, for connection to the service sources, for example water, air, electricity, possible oil plant, piping and other.
  • the rapid attachment means 34 can be used to activate the necessary connections in an extremely rapid and simple manner, without requiring specialized labor and without needing complex positioning which can oblige the workers to perform complex and dangerous operations.
  • the rapid attachment means 34 is connected, inside the column element 20, with pipes and cables, indicated in their entirety by the reference number 35, which serve to deliver water, electricity and other to the delivery points distributed inside the bearing structure 10.
  • the water used for the secondary cooling is conveyed and channeled, together with the scale, along a slide advantageously made with the bottom panels 25 of the casting curve, and subsequently discharged from the lower end of the curve into the so-called "flushing", that is, the water treatment plant of the works.
  • the casting curve is made without the bottom panels and the lateral panels extend to the ground so as to constitute two continuous lateral walls.
  • the cooling water is not conveyed along the curve, but falls directly to floor level, where it is collected in the flushing.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Metal Rolling (AREA)
  • Continuous Casting (AREA)
  • Mounting Of Bearings Or Others (AREA)
  • Casting Devices For Molds (AREA)
  • Sliding-Contact Bearings (AREA)

Abstract

A bearing structure for a curved continuous casting machine includes a monolithic and integrated structure, made of metal sheet, substantially closed and self-bearing, having at the upper part a seating or base suitable for the assembly of an ingot mold and accommodating along the casting curve both the rolls for containing and guiding the cast product, and also at least part of a secondary cooling system.

Description

    FIELD OF THE INVENTION
  • The present invention concerns a bearing structure for a continuous casting machine.
  • More particularly, the invention concerns a monolithic and integrated bearing structure, particularly suitable to be used for the installation of a compact curved continuous casting machine, in particular for the continuous casting of billets and blooms, for example but not only, for commercial steels, but also for quality steels.
  • The monolithic and integrated bearing structure according to the present invention allows to install a single line and/or multi-line continuous casting machine, considerably reducing and simplifying the assembly operations in loco, drastically reducing times required for start-up, and also the costs of initial investment.
  • Furthermore, the bearing structure according to the invention ensures an easier access for operators to the casting line, for example for maintenance operations, and guarantees greater operating safety for said operators.
  • BACKGROUND OF THE INVENTION
  • The general structure of a continuous casting machine for billets or blooms is known, comprising in its essential elements an ingot mold with a square or rectangular section, the foot rolls and a curved removal and guide line, associated with a secondary cooling system.
  • Downstream of the removal and guide line there is normally a straightening device, the function of which is to dispose the cast billet or bloom flat, in order to accompany it towards the equipment located downstream, for example shearing means, removal and parking means for the dummy bar, the accumulation and heating systems and/or the rolling train.
  • Examples of said curved continuous casting machines are shown for example in JP 59110453 and CH 597944 .
  • It is known that the installation of a curved continuous casting machine normally requires expensive civil engineering works, such as excavations, foundations for machines, concrete casts, bearing columns, reinforced concrete beams and more, all of which makes the installation times extremely long, and initial investment costs extremely high.
  • Moreover, known solutions require a long time, and a specialized work force, to make the connections to the user machines on site, for example to connect the pipes to feed water, air, piping, electric connections and other.
  • Furthermore, to make said connections requires a precise and expensive initial planning step, so that all the connection systems and the auxiliary and accessory equipment are positioned in places which on the one hand do not interfere with the daily operations of the casting machine and are adequately protected, and on the other hand are easily and quickly accessible and maintainable in the event of problems and break-downs.
  • Another problem in known solutions is the huge need for space in the shed for the installation of the usual continuous casting machines, which moreover are normally located on different planes. Another problem is the expense of the transport in loco of the components of the continuous casting machine.
  • Still another problem is the difficult access for operators to the individual segments of the line, for example to make inspections, maintenance, replacement of components, or to solve problems of blockages or other type.
  • Purpose of the present invention is to achieve plants for rolling billets or blooms of the compact type, with pre-assembled components, also of the structural type, already complete with pre-tested plant engineering, with shorter assembly time, also suitable to be installed in limited spaces.
  • In the light of the above, purpose of the present invention is therefore to solve these problems, proposing a solution able to drastically reduce the works of civil engineering needed for the installation of a continuous casting machine in a plant, the design and need for labor to perform the connections to the user machines, the volumes of transport and loading/unloading the components, and all the other works required to install the continuous casting machine.
  • The Applicant has devised, tested and embodied the present invention to obtain this purpose, and other benefits and advantages as shown hereafter, including for example greater safety for the workers.
  • SUMMARY OF THE INVENTION
  • The present invention is set forth and characterized in the independent claim, while the dependent claims describe other characteristics of the invention or variants to the main inventive idea.
  • In accordance with the present invention, the purpose set forth above is obtained by using a monolithic and integrated structure, made of metal sheet, substantially closed and self-supporting, which has a seating suitable for the assembly of an ingot mold and which accommodates both the containing and guiding rolls disposed along the curvilinear path of the cast product, and also the secondary cooling system.
  • The bearing structure is advantageously made from workings on machine tools which allow to obtain limited tolerances in the construction of the components.
  • With the bearing structure according to the invention, during the assembly step of the casting line, it is possible to obtain immediately a perfect alignment of the containing and guiding rolls of the cast product, so that it is no longer necessary to perform all the operations that normally, in conventional assembly operations, are actuated to effect said alignment subsequent to installation.
  • Moreover, the monolithic bearing structure according to the invention does not require expensive works of civil engineering, such as the traditional foundations for the machines, but simply a plane supporting surface on which it can be anchored.
  • In an advantageous embodiment of the invention, the whole bearing structure is anchored to the ground by means of at least a metal plate, which functions as a base, incorporated into the floor and made solid therewith, for example, but not necessarily, by means of threaded bars or tie rods. This allows to reduce the installation times and initial investment costs.
  • In a preferential embodiment of the invention, at least the upper portion of the casting curve is easily accessible by means of a series of opening covers that allow selective opening to adjacent individual segments of the casting line.
  • The covers have a box-like structure, substantially U-shaped, conformed so as to be disposed, in the closed position, as close as possible to the casting line, almost so as to surround it; in the zones where it is connected to the containing structure of the cast product, leakages of water are prevented by using, for example, suitable labyrinth seals.
  • In this way, we obtain a great overall saving of space around the continuous casting machine, so that the size of the compartment containing the billet/bloom along the casting curve is reduced to a minimum. Moreover, even in the open position the covers do not need big spaces around the casting machine in order to be moved.
  • In a preferential embodiment of the invention, the covers can be opened in an upward direction, so as to allow operators access to the line from both sides of the line.
  • According to a variant, the covers can be opened in a lateral direction. In this case, the opening/closing of the covers is performed in sequence, to prevent the ends of two adjacent covers from overlapping.
  • The presence of opening covers allows to considerably facilitate, for the staff, all the interventions of checking and ordinary (daily) maintenance, checking the insertion of the dummy bar when casting is started, the management of possible problems, such as leakage of liquid steel due to the breakage of the skin, and other: all this promotes greater rapidity in operations and greater safety for the workers.
  • In one embodiment of the invention, inside the covers at least the upper containing and guiding rolls for the billet/bloom are assembled.
  • According to a variant, inside the box-like containing structure of the cast product support means, alignment means and/or command means of the lower rolls are assembled.
  • According to another variant, the spray nozzles of the secondary cooling system are assembled inside the covers.
  • Thanks to this pre-assembly of functional elements of the casting line, when the covers are closed, all the relative equipment assembled inside is already in the position of use, therefore without requiring further steps of adjustment or tuning, both in terms of geometry and alignment, all of which guarantees greater efficiency of the process.
  • The covers are advantageously cooled by suitable means, for example sprays, or by means of a water jacket structure with an independent circuit, and they are driven to open/close for example by means of hydraulic actuators or jacks.
  • As mentioned above, the monolithic casting structure advantageously provides on the outside all the necessary drive and command elements, such as for example the rapid attachments for water and electricity, the system for lubricating the bearings, the piping, etc. These elements are easily and quickly interfaced with the appropriate service lines of the plant (electricity, water plant, oil plant, air plant, etc.).
  • In a preferential embodiment, in the upper part of the casting line, it is provided to suck in the water vapors generated by the process, with a suitable aspirator; the suction is facilitated thanks to the limited size of the casting chamber, and the fact that the closed monolithic structure produces a "chimney effect".
  • The plant according to the present invention allows to considerably simplify the works of civil engineering for installation, since it does not require complex foundations and does not require the traditional bearing structure made of reinforced concrete and network of girders to support the various planes of the structure.
  • The bearing structure according to the invention has limited weight and size and, since it is made largely of modular elements, it is easy to transport.
  • The presence inside and/or outside the monolithic structure of all the drive and command devices allows rapid installation and rapid start-up of the plant.
  • Thanks to all these details indicated above, the continuous casting machine thus made allows to use adjacent casting lines in parallel, if it is desired to increase productivity.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • These and other characteristics of the present invention will become apparent from the following description of a preferential form of embodiment, given as a non-restrictive example with reference to the attached drawings wherein:
    • fig. 1 is a perspective view of a bearing structure for a continuous casting machine according to the present invention;
    • figs. 2 and 3 show respectively a lateral view and a view from the rear of the bearing structure in fig. 1;
    • fig. 4 is a perspective view of the bearing structure in fig. 1 in which the covers with lateral opening can be seen;
    • fig. 4a shows an enlarged detail of fig. 4;
    • figs. 5 and 6 show, respectively with a perspective view and a lateral view, the bearing structure in fig. 4 in which the covers open upwards;
    • fig. 7 shows a continuous casting machine that uses a bearing structure according to the present invention inserted upstream of a partly shown segment of line; and
    • fig. 8 is a perspective view of another form of embodiment of the bearing structure according to the invention.
    DETAILED DESCRIPTION OF SOME PREFERENTIAL FORMS OF EMBODIMENT
  • With reference to the attached drawings, and particularly fig. 7, a bearing structure 10 for a curved continuous casting machine according to the present invention is disposed upstream of a straightening unit 11, a device 12 to insert, remove and park a dummy bar 13, and shears 14.
  • Downstream of the shears 14, and not shown here, there may be a heating furnace present and a rolling train directly connected with the product arriving from the casting machine in the case of an application to a production plant of the endless type.
  • The bearing structure 10 according to the invention in this case is disposed in cooperation with a bridge 15, defining the casting plane 17, having a width advantageously equal to that of a bay of the shed of the plant where the casting machine is installed.
  • With this configuration it is possible to create a passage space at the side of the casting line, which allows the workers and the equipment to have access upstream and downstream of the plant, thus allowing a greater integration of the areas.
  • Under the casting plane 17 an intermediate plane 16 is provided, where all the auxiliary services are accommodated, such as for example the oil-dynamic units, the electric panels, the regulation valves, the piping, the collectors.
  • The casting plane 17 is advantageously not bulky and can have a very rational disposition of the auxiliary devices.
  • The bearing structure 10 in this case is anchored to the ground by means of a metal plate 21, functioning as a base, incorporated into the floor. A column element 20 is attached on the metal plate 21, defining a structure which in this case is quadrangular, consisting in this case of four metal beams 22, for example H beams or other type (figs. 1 and 2).
  • At the top end of the column element 20, inside a containing frame 18, a flange 23 is assembled which defines a seating or base, in which an ingot mold 24 is housed and assembled.
  • The flange is advantageously of the inter-changeable type so as to allow the assembly of an ingot mold 24 different in the event of a change in format of the billet/bloom 26.
  • From the column element 20 a series of lateral and bottom panels 25, made of metal sheet, attached one to the other in sequence, branch off towards the bottom and towards the base; they define a box-like structure which houses and defines the curved removal and guide line of the billet/bloom 26.
  • The lateral and bottom panels 25 define a seating for the housing and assembly at least of the lower rolls and the nozzles of the secondary cooling system.
  • On the lateral panels 25 a series of opening covers 28 are hinged, by means of respective assembly plates 27, substantially U-shaped, which open laterally in the case shown in fig. 4, whereas in the case shown in fig. 6 they open upwards with respect to the casting line.
  • The covers 28 may be driven to open by means of respective hydraulic or pneumatic jacks 36, which allows selective access to respective segments of the line for a worker 29, also thanks to the presence of a system of stairs 30 that develops adjacent to the panels 25, in order to carry out inspection or maintenance operations, and in the event of incidents such as blockages or break-outs.
  • The U-shaped surrounding box-like structure of the covers 28 allows to reduce to a minimum indispensable the size of the casting chamber downstream of the ingot mold 24, thus giving a better thermodynamic control of the conditions of progressive solidification of the billet-bloom 26, and an easier control to prevent leakages of the cooling water.
  • When the covers 28 open from above as in the case shown in fig. 4, where the covers 28 can be seen progressively closing from the bottom of the casting line, the opening and closing of the covers 28 is performed sequentially so that there is no overlapping of the adjacent ends.
  • According to the variant shown in fig. 8, the first segment of the casting line downstream of the ingot mold 24 comprises a substantially closed chamber 37, which may or may not comprise the column element 20, and which allows easy access to the operators. The closed chamber 37 allows to control the cooling system better and more easily during casting and is less subject to reverberation by the billet/bloom 26 since the walls are more distant therefrom compared with the solution with covers 28. The subsequent part of the casting curve, on the contrary, provides the opening covers 28, as in the solutions previously described.
  • Inside the covers 28, as shown in detail in fig. 4a, both the upper rolls 32 to contain and guide the billet/bloom 26 are advantageously assembled, and also the nozzles 42 of the secondary cooling system. Thanks to this system of pre-assembly, at the moment the covers 28 are installed, and when they close, the curved removal and guide line of the billet/bloom 26 is already completely configured, without needing alignments and further adjustments.
  • In a first embodiment of the invention, only one of the roll units, the upper or the lower, is motorized, while the other is idle.
  • According to a variant, both the roll units are motorized. According to another variant, both the roll units are idle.
  • In the preferential embodiment shown in figs. 2 and 8, the base plate 33 of the column element 20 has rapid attachment means 34, accessible from outside, for connection to the service sources, for example water, air, electricity, possible oil plant, piping and other.
  • The rapid attachment means 34 can be used to activate the necessary connections in an extremely rapid and simple manner, without requiring specialized labor and without needing complex positioning which can oblige the workers to perform complex and dangerous operations. The rapid attachment means 34 is connected, inside the column element 20, with pipes and cables, indicated in their entirety by the reference number 35, which serve to deliver water, electricity and other to the delivery points distributed inside the bearing structure 10.
  • The water used for the secondary cooling is conveyed and channeled, together with the scale, along a slide advantageously made with the bottom panels 25 of the casting curve, and subsequently discharged from the lower end of the curve into the so-called "flushing", that is, the water treatment plant of the works.
  • According to a variant, the casting curve is made without the bottom panels and the lateral panels extend to the ground so as to constitute two continuous lateral walls. In this case, the cooling water is not conveyed along the curve, but falls directly to floor level, where it is collected in the flushing.
  • Modifications and variants may be made to the present invention, all of which shall come within the field of protection defined by the attached claims.

Claims (14)

  1. Bearing structure for a curved continuous casting machine, characterized in that it comprises a monolithic and integrated structure, made of metal sheet, substantially closed and self-bearing, having at the upper part a seating or base (23) suitable for the assembly of an ingot mold (24) and accommodating along the casting curve both the rolls for containing and guiding the cast product (26), and also at least part of the secondary cooling system (42).
  2. Bearing structure as in claim 1, characterized in that it has a metal plate (21) functioning as a base and able to be incorporated into the floor.
  3. Bearing structure as in claim 1 or 2, characterized in that it has a plurality of lateral and bottom panels (25) defining a body supporting at least the lower rolls (32) containing and guiding the casting line.
  4. Bearing structure as in claim 1 or 2, characterized in that, at least in correspondence with the lower portion of the casting curve, it has a plurality of opening covers (28) able to allow access to the relative segments of the casting curve.
  5. Bearing structure as in claim 4, characterized in that said opening covers (28) have a substantially U-shaped structure surrounding the relative segment of the casting curve.
  6. Bearing structure as in claim 4, characterized in that said covers (28) open in an upward direction with respect to the casting line.
  7. Bearing structure as in claim 4, characterized in that said covers (28) open in a lateral direction with respect to the casting line.
  8. Bearing structure as in claim 4, characterized in that inside said covers (28) at least the upper rolls (32) for containing and guiding the casting line are assembled.
  9. Bearing structure as in claim 4, characterized in that inside said covers (28) at least part of the nozzles (42) of the secondary cooling system of the casting line are assembled.
  10. Bearing structure as in any claim hereinbefore, characterized in that it provides rapid attachment means (34, 35) for connection to a source of electric and/or water feed.
  11. Bearing structure as in any claim hereinbefore, characterized in that it provides inside it rapid connection means (34, 35) and interconnection means to feed the lubrication systems.
  12. Bearing structure as in any claim hereinbefore, characterized in that it comprises a substantially closed chamber (37) disposed immediately downstream from the exit of the ingot-mold (24) and covering at least the upper segment of the casting curve.
  13. Bearing structure as in any claim hereinbefore, able to be installed in a shed of a production plant, characterized in that it is located in cooperation with a bridge (15), defining the casting plane (17), having a width substantially equal to that of a bay of said shed.
  14. Bearing structure as in claim 13, characterized in that below the casting plane (17) the bridge (15) comprises at least an intermediate plane for accommodating at least part of the services auxiliary to casting.
EP08717112A 2007-03-02 2008-02-26 Bearing structure for continuous casting machine Not-in-force EP2131976B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
IT000047A ITUD20070047A1 (en) 2007-03-02 2007-03-02 SUPPORTING STRUCTURE FOR CONTINUOUS CASTING MACHINE
PCT/EP2008/052278 WO2008107339A1 (en) 2007-03-02 2008-02-26 Bearing structure for continuous casting machine

Publications (2)

Publication Number Publication Date
EP2131976A1 EP2131976A1 (en) 2009-12-16
EP2131976B1 true EP2131976B1 (en) 2010-12-08

Family

ID=38565510

Family Applications (1)

Application Number Title Priority Date Filing Date
EP08717112A Not-in-force EP2131976B1 (en) 2007-03-02 2008-02-26 Bearing structure for continuous casting machine

Country Status (7)

Country Link
US (1) US20100038049A1 (en)
EP (1) EP2131976B1 (en)
CN (1) CN101622089B (en)
AT (1) ATE490829T1 (en)
DE (1) DE602008003907D1 (en)
IT (1) ITUD20070047A1 (en)
WO (1) WO2008107339A1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103286284B (en) * 2013-05-30 2015-02-11 莱芜钢铁集团有限公司 Continuous bloom caster and overall online quick arc-alignment method thereof

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3447591A (en) * 1964-03-06 1969-06-03 United States Steel Corp Apparatus for bending a casting having a liquid core
AT289318B (en) * 1968-05-04 1971-04-13 Schloemann Ag Arch guide for strands emerging from continuous casting molds
CH597944A5 (en) * 1976-03-05 1978-04-14 Concast Ag Continuous casting plant for steel
AT359226B (en) * 1979-03-07 1980-10-27 Voest Alpine Ag SUPPORT AND LEADERSHIP FOR AN ARC CONTINUOUS CASTING SYSTEM
FR2529118A1 (en) * 1982-06-29 1983-12-30 Fives Cail Babcock DEVICE FOR PLACING AND DISASSEMBLING GUIDE ROLLER CAGES IN A CURVED CONTINUOUS CASTING SYSTEM
US5579569A (en) * 1992-05-12 1996-12-03 Tippins Incorporated Slab container
FR2737859B1 (en) * 1995-08-18 1997-09-12 Usinor Sacilor SUPPORT DEVICE FOR A SIDE FACE OF A CONTINUOUS CASTING PLANT OF METAL BANDS BETWEEN CYLINDERS
CN2573118Y (en) * 2002-10-13 2003-09-17 戴光荣 Support idler roller of continuous casting two cooling zones

Also Published As

Publication number Publication date
DE602008003907D1 (en) 2011-01-20
CN101622089A (en) 2010-01-06
ATE490829T1 (en) 2010-12-15
US20100038049A1 (en) 2010-02-18
ITUD20070047A1 (en) 2008-09-03
EP2131976A1 (en) 2009-12-16
CN101622089B (en) 2012-01-18
WO2008107339A1 (en) 2008-09-12

Similar Documents

Publication Publication Date Title
CA2803119C (en) Roller device for forming strand-guiding segment
EP2131976B1 (en) Bearing structure for continuous casting machine
US7784316B2 (en) Method for the insertion of machine units into a production line
US20100319190A1 (en) Device for mounting and functional verification of roll fittings in rolling mill stands or rolling mill trains such as, e.g., tandem rolling mill trains
US4953614A (en) Modular continuous caster
US3794107A (en) Plural segmented guiding assembly for a continuous casting
US9700938B2 (en) Casting/rolling installation and method for dismantling and installing rolls in a reducing stand of the casting/rolling installation
ZA200608593B (en) Device for the support and oscillation of a continuous casting mould for casting liquid metal, particularly liquid steel
JPS60118361A (en) Device for supporting and guiding round billet in continuous casting
EP1100634A2 (en) System of supply, discharge and distribution lines for notably liquid operating media in rolling stands
EP1715966B1 (en) Platform for industrial installations, particularly for high-pressure descalers, emergency shears and pendulum shears in rolling trains or the like
US4532981A (en) Continuous casting plant
JPH08168859A (en) Device for cooling roll segment in continuous casting apparatus
US8100166B2 (en) Continuous casting plant and method of operating a continuous casting plant
US4033558A (en) Apparatus for cutting a steel strand located in a supporting guide arrangement of a continuous casting installation
JPS62267048A (en) Horizontal continuous casting apparatus
RU1249780C (en) Method of secondary cooling of continuous cast blanks by water-air mixture
RU2129934C1 (en) Plant for continuous metal casting with curvilinear technological axis
CN101394959A (en) Continuous casting plant and method of operating a continuous casting plant
SU519274A1 (en) Installation of multi-semicontinuous steel casting
JPH08112647A (en) Continuous casting apparatus
SU928717A1 (en) Multistrand continuous caster of billets
RU2033304C1 (en) Metal continuous casting plant
JPS6013578Y2 (en) Split type ingot guide roll in continuous casting equipment
US20180043426A1 (en) Roller device

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20091001

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MT NL NO PL PT RO SE SI SK TR

DAX Request for extension of the european patent (deleted)
GRAJ Information related to disapproval of communication of intention to grant by the applicant or resumption of examination proceedings by the epo deleted

Free format text: ORIGINAL CODE: EPIDOSDIGR1

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

RIN1 Information on inventor provided before grant (corrected)

Inventor name: POLONI, ALFREDO

Inventor name: ANDREATTA, DANIELE

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MT NL NO PL PT RO SE SI SK TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REF Corresponds to:

Ref document number: 602008003907

Country of ref document: DE

Date of ref document: 20110120

Kind code of ref document: P

REG Reference to a national code

Ref country code: NL

Ref legal event code: VDEP

Effective date: 20101208

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20110308

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20101208

LTIE Lt: invalidation of european patent or patent extension

Effective date: 20101208

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20101208

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20101208

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20101208

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20101208

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20101208

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20101208

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20110308

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20101208

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20101208

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20110408

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20101208

Ref country code: BE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20101208

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20110309

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20110408

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20110319

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20101208

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20101208

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20101208

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20101208

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20110228

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20101208

26N No opposition filed

Effective date: 20110909

REG Reference to a national code

Ref country code: IE

Ref legal event code: MM4A

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20101208

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602008003907

Country of ref document: DE

Effective date: 20110909

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20110226

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20120226

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20120226

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20110226

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20101208

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20101208

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 8

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: CH

Payment date: 20150126

Year of fee payment: 8

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 20150220

Year of fee payment: 8

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20160229

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20160229

REG Reference to a national code

Ref country code: FR

Ref legal event code: ST

Effective date: 20161028

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20160229

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20200121

Year of fee payment: 13

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: IT

Payment date: 20210120

Year of fee payment: 14

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 602008003907

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210901

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220226