EP2125483A2 - Fahrzeugerkennungssystem - Google Patents
FahrzeugerkennungssystemInfo
- Publication number
- EP2125483A2 EP2125483A2 EP08727699A EP08727699A EP2125483A2 EP 2125483 A2 EP2125483 A2 EP 2125483A2 EP 08727699 A EP08727699 A EP 08727699A EP 08727699 A EP08727699 A EP 08727699A EP 2125483 A2 EP2125483 A2 EP 2125483A2
- Authority
- EP
- European Patent Office
- Prior art keywords
- sensor
- vital
- data
- processing device
- vehicle
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L27/00—Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
- B61L27/30—Trackside multiple control systems, e.g. switch-over between different systems
Definitions
- the present invention relates to systems for detecting and processing information generated by moving objects. More specifically, various embodiments of the application relate to systems and methods for detecting and processing information generated by on-track vehicles including locomotives, train cars of all types and railroad maintenance and inspection vehicles.
- Active warning devices can be a warning bell, flashing red lights, swinging red lights, gate arms that obstruct roadway vehicle lanes, solid or flashing yellow advance warning lights in combination with statutory crossbuck signs, number of tracks signs, railroad advance warning signs, various informational signs, and pavement markings.
- Conventional railway systems often employ a method which uses track rails as part of a signal transmission path to detect the existence of a train within a defined length or configuration of track, commonly referred to as track circuits.
- the track rails within the track circuit are often an inherent element of the design of the circuit because they provide the current path necessary to discriminate the condition of the track circuit which is the basis of train detection.
- a conventional track circuit is often based upon a series battery circuit.
- a battery commonly referred to as a track battery
- a relay commonly referred to as a track relay
- Current from the track battery flows through one rail of the track circuit, through the coil of the track relay and back to the track battery through the other rail of the track circuit.
- the track relay will be energized.
- an energized track relay corresponds to the unoccupied state of the system in which a train is not present within the track circuit.
- the series track battery-track rails-track relay circuit becomes a parallel circuit in which the wheels and axles of the train provide a parallel path for current flow between the two track rails of the circuit.
- Most current flows in this new circuit path because its resistance is very low compared to the track relay resistance.
- the track relay cannot be energized if a train occupies the rails between the track battery and the track relay.
- a significant advantage of this system is that if the current path between the track battery and the track relay is opened, the track relay will not be energized.
- the track battery/relay circuit is often the basic functional unit for railroad signal system design.
- the energy state of track relays provides the fundamental input to the logical devices that control automatic signal systems, including wayside train signal, crossing signal, and interlocking operation.
- Previously known methods for detecting trains that approach highway-rail grade crossings monitor and compare track circuit impedance to a known audio frequency signal.
- the signal is continuously monitored by the train detection unit which is tuned to an unoccupied track (normal state) during installation.
- Signal strength and phase within certain limits produce an energized output that corresponds to an unoccupied track circuit.
- a train occupying the track circuit changes the impedance of the circuit.
- the change vector for a moving train correlates to position of the leading or trailing wheels and axle of the train in the track circuit, train direction and speed.
- the most advanced of such devices are capable of providing a "constant warning time" control for highway grade crossing signal operation.
- One of the advantages of this method at its most advanced application is the ability to cause crossing signals to operate for a predetermined time prior to the arrival of a train at a crossing roadway regardless of train speed.
- This device may provide multiple, independently programmable outputs which may be used control separate and independent systems. One output can be programmed to control the actual operation of the railroad crossing signal and the second output can be programmed to provide the appropriate input to a separate traffic light system that governs motor vehicle movement at an intersection near the railroad crossing.
- a vehicle detection system detects roadway vehicles and an action is taken. Often the action taken is to adjust the frequency of intersection light operation in response to changing traffic patterns. It is common that roadway conditions can change dramatically as a result of a traffic accident, draw-bridge operation, or a train passing. As a result the rate of speed for the roadway vehicles is dramatically reduced, and often stopped. The slow rate of speed and common stoppage of traffic commonly is not accurately detected by certain magnetic field detectors.
- Figure 1 is a conceptual schematic of the present invention for a highway-railroad grade warning device control system in accordance with at least one embodiment of the present invention.
- Figure 2 is a block diagram of a sensor node in accordance with at least one embodiment of the present invention.
- FIG. 3 is a block diagram of a control processor in accordance with at least one embodiment of the present invention.
- Figure 4 is a flow chart identifying steps in a method for sensing, processing and transmitting data by the sensor node to the control processor in accordance with at least one embodiment of the present invention.
- Figure 5 is a flow chart identifying the steps in a method for processing the data transmitted by the sensor nodes in accordance with at least one embodiment of the present invention.
- Figure 6 is a flow chart identifying the steps in a method for the control processor health checks in accordance with at least one embodiment of the present invention.
- FIG. 1 An embodiment of a vehicle detection system 10 is represented in Figure 1.
- the system 10 includes sensor devices 12, 14, 16, 18, each sensor device 12, 14, 16, 18 has a pair of sensor nodes 24, 26, and a control processor 28.
- Each of the sensor nodes 24, 26 is placed in proximity to the railway track 20, which crosses a roadway 22. Data from the sensor nodes 24, 26 is communicated through wireless transmission and reception with the control processor 28.
- the wireless connection 28 can be chosen from a variety of wireless protocols, by example, 900 MHZ radio signals.
- the system 10 is not limited to a specific number of sensor nodes 24, 26. Sensor nodes need not be paired as in this embodiment, and devices 12, 14, 16, 18 can alternatively have more than 2 sensor nodes 24, 26.
- the sensor devices 12, 14, 16, 18 include one or multiple sensor elements 30, an amplifier module 32, and analog to digital converter 34, a microprocessor module 36, a bias compensation module 38 and a radio module 40.
- the sensor devices 12, 14, 16, 18 can be single or multi-dimensional.
- One or more sensor nodes 24, 26 can be connected to the sensor device 12, 14, 16, 18.
- the sensor nodes 24, 26 receive data and transmit the data to the sensor devices 12, 14, 16, 18.
- the radio 40 sends data from the sensor device 12, 14, 16, 18 to the control processor 28.
- the microprocessor module 36 receives digital data from the analog to digital converter 34 and encodes the data in packets for transmission by the radio 40.
- the sensor element 30 provides a continuous signal to the amplifier module 32 which filters and amplifies the analog waveform for processing by the analog to digital converter 34.
- the microprocessor 36 also continuously receives data from the bias compensation module 38 and controls elements of a resistive network to maintain optimum bias for the sensor element 30.
- Data Conditioning enhances the signal to noise ratio of the sensor output by various filtering techniques such as Kalman, Infinite Impulse Response, and Finite Impulse Response filters.
- the Kalman filter is an advanced filtering technique that enhances the signal to noise ratio and eliminates unexpected signal variation.
- the filtered signal can also be amplified.
- the combination of sensor node 24, 26 and sensor device 12, 14, 16, 18 can be referred to as a sensor.
- the sensor devices 12, 14, 16, 18 and control processor 28 can be placed at locations a significant distance from power lines, making it inconvenient for traditional power sources.
- a fuel cell system (not shown) can be connected to the paired sensors 12, 14, 16, 18 and control processor 28 to provide operating power.
- a photo voltaic system may be substituted for the fuel cell system.
- other sources of power can be used to provide power to the paired sensors 12, 14, 16, 18 and control processor 28.
- the control processor 28 includes vital processing module 42, communication module 50, vital I/O modules 48, user interface module 44, diagnostic testing and data logging module 52, and remote operations module 46.
- the vital processing module 42 can be a central processing unit (CPU) that may be selected from a variety of suitable CPUs known in the art. Alternatively, module 42 can be two or more redundant CPUs.
- the communications module 50 receives data transmitted from the sensor devices 12, 14, 16, 18, exchanges data with VPU module 42, and with warning system peripheral devices (not shown).
- the vital I/O module 48 provides a vital interface control of conventional railroad signal relays or control devices that can be connected to the control processor 28.
- the diagnostic testing and data logging module 52 can provide a variety of user interface options, including, by example, RS232, USB, Ethernet, and wireless technologies, to facilitate user access to control processor 28 to enter site specific information, select appropriate user variable values, perform set-up and diagnostic testing and to review or download data log files. Data can be saved on dedicated hard drive, flash memory module, CD ROM drive or other devices appropriate to the intended environment.
- the user interface module 44 can be a software module that provides configuration options, firmware update, device programming and debugging.
- the remote operations module 46 can provide the interfaces for remote communications with the system 10, using cellular or satellite channels. The module 46 can provide, for example, remote status checking, alarm notification, limited configuration and data transfer.
- the communication module 50, remote operations module 46 and user interface module 44 provide communications security and adaptability to a variety of communications protocols that can be executed by the system 10.
- the sensor nodes 24, 26 are configured to respond to the presence of vehicles.
- the Earth's magnetic field is used as a magnetic background or "reference" point which stays substantially constant when the sensor nodes are installed in a fixed arrangement. Adjustments can be made in the event substantial constant magnetic offsetting, other than the Earth's magnetic field, occur near the sensor nodes 24, 26.
- Vehicles which are constructed of, or contain, hard and/or soft-iron materials affect the earth's magnetic flux.
- Hard-iron sources are materials that possess flux concentration abilities and can have remnant flux generation abilities.
- Soft-iron materials are often considered to be ferrous materials that concentrate magnetic flux into material and do not have any remnant flux generated within the material.
- the sensor element 30 will encounter a relatively small (in the range of milligauss) Earth field bias along with relatively large (in the range of 3-4 gauss) spikes as typical vehicles come into range of the sensing element.
- the change in the magnetic field causes the three dimensional sensor element to produce an output along the three dimensions of space that correspond to the amount and rate of change of field monitored by the sensor element 30.
- the waveforms generated along the three axes are determined by the magnetic characteristics of the vehicle sensed.
- the sensor nodes 24, 26 can be configured to generate data which corresponds to the direction of a moving vehicle.
- the system can utilize one or more sensors in order to obtain vehicle direction data. With a single sensor element configuration, as a vehicle approaches the sensor the flux density changes and the sensor output is proportional to the change.
- the sensor output waveform is substantially a mirror image for the same vehicle moving in the opposite directions.
- the configuration of system 10 at a particular installation may depend on, but not limited to, sensor node 24, 26 depth, pair spacing, and positioning distance from the railroad track. These parameters influence the three dimensional waveform data generated by sensor nodes 24, 26.
- the system 10, once configured, can obtain information pertaining to the passing vehicle such as vehicle speed, direction, length or size of the vehicle.
- the system 10 can detect, distinguish between and identify vehicles.
- the sensor element output data from a locomotive engine will be significantly different from a rail car, and type of rail car, such as a box car or tank car will generate detectably different sensor element output data.
- the sensor nodes 24, 26 are typically placed a relatively small distance from one another.
- a range of 10-20 meters or alternatively 5-12 meters is suitable. The distance can be user determined based upon a variety of variables including the type and use of the vehicle detection system 10.
- a suitable sensor node 24, 26 placement can also be about one foot to several meters distance from each other. Further distances between sensors can provide additional advantages, including increased calculation data for analyzing vehicle travel and position. Often a vehicle in motion will create the same signature, merely displaced in time.
- a multi-sensor configuration 12, 14, 16, 18 generates a multiplicity of sensor node 24, 26 data that can be analyzed to produce a multidimensional representation of the magnetic fields at specific locations within and at the limits of the system 10 detection zone.
- Such analysis enables criteria to be established which correspond to each of the possible on-track vehicle events that can occur within the detection zone of on-track vehicles.
- the events of interest include on-track vehicles moving in one direction or the other, stopping and reversing direction within the zone, stopping within the zone, speed of movement including speed changes within the zone.
- Number, placement and configuration of sensor nodes 24, 26 determine the resolution detail of the detection zone representation possible for a particular system 10. The level of resolution required depends upon the accuracy needed to determine specific events within specified timeframes.
- system 10 layout is a signal engineering design task and is based upon the identified requirements of the specific location where system 10 is to be installed.
- the data is analyzed vitally by the system 10 for the purpose of detecting oncoming trains in advance of their travel through grade crossings.
- the analysis and subsequent decisions and inferences made from vital data processing ensure proper and safe operation of the railroad crossings.
- the system 10 is initialized at step 54.
- the sensor nodes 24, 26 produce a signal at step 56 whenever any on-track vehicle is within range.
- the sensor nodes 24, 26 apply the signal to a low pass noise filter and adjust the dynamic range through a low noise instrumentation amplifier at step 58.
- the resulting waveform is processed by high precision analog to digital converters at step 60.
- the digitized waveform is organized into fixed length data frames containing sensor ID, packet length, and CRC checksum by a microprocessor at step 62.
- the data packets are transmitted to the control processor at step 64.
- the control processor 28 is initialized at step 66 and receives the data at step 68.
- the processor 28 decodes, and filters data transmitted by the sensor nodes 24, 26 at step 70. Waveform data from all of the sensor nodes 24, 26 is compared and processed by a detection algorithm at step 72, in order to determine classification, speed and direction of the sensed vehicle. In the event that the detected data satisfies, at step 74, criteria requiring warning system activation, the normal output of the vital output controller is de-energized at step 76. The output of the vital output controller is energized if there are no on-track vehicles present and the system reverts back to the ready state after step 66. This is often referred to as the normal state of the system. The de-energized output of the vital output controller 76 corresponds to an alarm state and will result when event criteria for on-track vehicles within the detection zone are satisfied or from internal faults of any element of the system 10.
- the warning sequence execution includes the step of removing a normally high output signal from the control interface with the crossing warning device (not shown).
- the crossing warning devices for any on-track vehicle approaching or occupying the crossing roadway are activated.
- On-track vehicles moving away from the crossing roadway or stopped on the approach to the crossing roadway will not typically cause the crossing warning devices to activate.
- the warning device can be any combination of active railroad crossing signals.
- the on-track vehicle must be within the sensing field of a sensor node to be detected.
- the data received at step 68 from each of the sensor nodes placed for a specific detection zone is processed at step 70 via detection algorithm to determine presence location and speed of an on- track vehicle and the necessary state of the vital output controller 76.
- the algorithm results that correspond to an on-track vehicle moving toward the crossing zone, where the arrival is predicted within a user specified time, cause the normally energized vital output controller output to be de- energized.
- control processor 28 will interrupt the vital output controller 76, causing the crossing signals to activate. This feature maintains a fail safe system and therefore the default position for the system is the warning signal activation, which will occur if any part of the system 10 fails to operate within preset parameters. [0032] Referring to FIG. 6, the control processor 28 performs a health check protocol at regular intervals to assure the system is operating properly. The health check protocol is utilized at step 78.
- the processor module is comprised of redundant microprocessors and associated hardware. Each of the processors monitor the heartbeat of the other processors at step 82. All microprocessor heartbeats must agree or the vital output is disabled at step 86.
- the vital output controller 84 is comprised of redundant microprocessors, associated hardware and relay driver circuits. The microprocessors each monitor the heartbeat of the other processors at step 84. All microprocessor heartbeats must agree or the vital output is disabled at step 86.
- the microprocessor heartbeat can be the clock signal. If all health check requirements are satisfied and the data processing algorithm result is consistent with no current or pending on-track vehicle occupancy of the grade crossing, the vital output of the control processor is enabled at step 88. Alternatively, the time interval range can be about 2-10 seconds.
- At least two sensor nodes 24, 26 are positioned in close proximity to one another and strategically placed with respect to the grade crossing and warning device. Transmission of the data from the sensor nodes 24, 26 can be performed through a variety of known technologies.
- One exemplary manner of transmission includes short-range spread spectrum radio 40. Radio signal transmission is preferably at about 900 MHZ.
- a secure radio signal transmission link can be provided for increased security.
- Waveform data transmitted from the sensor nodes 24, 26 are analyzed through advanced processing techniques. Specific placement of the sensor nodes 24, 26 with respect to the railroad track or roadway affects the waveform detail produced by the sensor node. Sensitivity of the sensor node is determined by inherent characteristics of the physical sensor, the configuration of the resistive bridge element and by the voltage applied.
- the system 10 contains more than one sensor node 24, 26 placed between railroad crossings, it is possible for the sensor devices 12, 14, 16, 18 to function with respect to greater than one grade crossing control device. Since the system 10 is capable of detecting direction of travel, a train traveling in either direction with respect to the sensor nodes 24, 26 can be detected and analyzed. [0036]
- the information acquired by the sensor nodes 24, 26 can include a variety of information depending upon the type and calibration of the sensor nodes 24, 26. Suitable sensor nodes include the AMR sensors manufactured by Honeywell. Alternatively, one suitable type of sensor node 24, 26 is a 3M Canoga ® Model C924TE microloop detector. The 3M Canoga detector detects vehicle presence and movement through an inductive loop.
- the sensor nodes 24, 26 are configured to reduce the incidence of falsing due to environmental, component, or supply voltage variations. Incorrect detection of vehicles is referred to as falsing.
- the sensor nodes 24, 26 dynamically update the 'bias' value of the sensor element by detecting the proper bias and changing the existing bias value when a user defined threshold results. Through dynamic bias updating the system more accurately maintains the distance between the bias value and the detection threshold value. Without dynamic bias update there is an increased risk that the detection threshold value will result in either false positive or false negative detection.
- the sensor node 24, 26 is comprised of the sensor element 30, amplifier 32, biasing element 38, microprocessor 36, and analog to digital converter 34.
- the microprocessor 36 controls the feedback and compensation circuits 38 necessary to maintain the optimum detection condition of the sensor.
- the biasing element 38 is typically a negative magnetic flux generating coil that allows minute discrimination of changes in the bias voltage applied to the sensor element 30 by the microprocessor 36.
- the microprocessor 36 adjusts the voltage to this coil to provide dynamic compensation 36, 38.
- the sensor element 30 output waveform is amplified 32 and applied to an analog to digital converter 34 and the result is encoded into packets by the microprocessor 36 for transmission by the sensor node radio 40.
- the automatic bias compensation circuits 36, 38 enable the sensor element 30 to operate in its optimum range when placed into environments where there are extreme variations of temperature, humidity, and flux density.
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Train Traffic Observation, Control, And Security (AREA)
- Measuring And Recording Apparatus For Diagnosis (AREA)
- Electrotherapy Devices (AREA)
- Electric Propulsion And Braking For Vehicles (AREA)
- Measurement Of Velocity Or Position Using Acoustic Or Ultrasonic Waves (AREA)
Applications Claiming Priority (5)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US87160906P | 2006-12-22 | 2006-12-22 | |
US88493007P | 2007-01-15 | 2007-01-15 | |
US11/964,606 US8028961B2 (en) | 2006-12-22 | 2007-12-26 | Vital solid state controller |
PCT/US2007/088849 WO2008080169A1 (en) | 2006-12-22 | 2007-12-26 | Vital solid state controller |
PCT/US2008/051099 WO2008080175A2 (en) | 2006-12-22 | 2008-01-15 | Vehicle detection system |
Publications (3)
Publication Number | Publication Date |
---|---|
EP2125483A2 true EP2125483A2 (de) | 2009-12-02 |
EP2125483A4 EP2125483A4 (de) | 2011-01-12 |
EP2125483B1 EP2125483B1 (de) | 2012-03-14 |
Family
ID=39562964
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP07866027.1A Not-in-force EP2125482B1 (de) | 2006-12-22 | 2007-12-26 | Vitale festkörpersteuerung |
EP08727699A Not-in-force EP2125483B1 (de) | 2006-12-22 | 2008-01-15 | Fahrzeugdetektionssystem und -methode |
Family Applications Before (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP07866027.1A Not-in-force EP2125482B1 (de) | 2006-12-22 | 2007-12-26 | Vitale festkörpersteuerung |
Country Status (4)
Country | Link |
---|---|
EP (2) | EP2125482B1 (de) |
AT (1) | ATE549228T1 (de) |
CA (2) | CA2710038C (de) |
WO (1) | WO2008080169A1 (de) |
Families Citing this family (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8028961B2 (en) | 2006-12-22 | 2011-10-04 | Central Signal, Llc | Vital solid state controller |
ITTO20090172A1 (it) * | 2009-03-09 | 2010-09-10 | Ansaldo Sts Spa | Sistema di supporto alla protezione del personale di manutenzione su linee, in particolare su linee ferroviare, e relativo metodo |
WO2011153115A2 (en) | 2010-05-31 | 2011-12-08 | Central Signal, Llc | Roadway detection |
US8668170B2 (en) | 2011-06-27 | 2014-03-11 | Thales Canada Inc. | Railway signaling system with redundant controllers |
CN104571008A (zh) * | 2014-11-20 | 2015-04-29 | 杭州电子科技大学 | 一种印制电路板曝光机用的带安全功能的并行控制方法 |
WO2019081326A1 (de) * | 2017-10-26 | 2019-05-02 | Siemens Mobility GmbH | Konzept zum betreiben eines schienenfahrzeugs |
CN109677468A (zh) * | 2019-03-04 | 2019-04-26 | 中车青岛四方车辆研究所有限公司 | 列车用逻辑控制单元及逻辑控制方法 |
CN112596480B (zh) * | 2020-12-09 | 2022-08-30 | 亚太森博(广东)纸业有限公司 | 一种双回路控制装置、方法及系统 |
CN114179860A (zh) * | 2021-12-28 | 2022-03-15 | 交控科技股份有限公司 | 用于列车控制的融合单元、列车控制管理系统及列车 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040261533A1 (en) * | 2003-06-27 | 2004-12-30 | General Electric Company | Rail and train monitoring system and method |
US20050237215A1 (en) * | 2004-04-23 | 2005-10-27 | General Electric Company | System and method for monitoring alignment of a signal lamp |
EP1832849A2 (de) * | 2006-03-09 | 2007-09-12 | Lenord, Bauer & Co. GmbH | Umdrehungszähler |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3810119A (en) * | 1971-05-04 | 1974-05-07 | Us Navy | Processor synchronization scheme |
DE19532640C2 (de) * | 1995-08-23 | 2000-11-30 | Siemens Ag | Einrichtung zur einkanaligen Übertragung von aus zwei Datenquellen stammenden Daten |
US7075427B1 (en) * | 1996-01-12 | 2006-07-11 | Eva Signal Corporation | Traffic warning system |
US6457682B2 (en) * | 1999-12-07 | 2002-10-01 | Railroad Controls Llc | Automated railroad crossing warning system |
US20020185571A1 (en) * | 2001-05-01 | 2002-12-12 | Bryant Jackie D. | Automated railroad crossing gate management system |
DE102004035901B4 (de) * | 2004-07-19 | 2016-02-04 | Siemens Aktiengesellschaft | Einrichtung zum Steuern eines sicherheitskritischen Prozesses |
DE202005020802U1 (de) * | 2004-11-15 | 2007-03-15 | Abb As | Steuersystem für Schienenfahrzeuge |
-
2007
- 2007-12-26 WO PCT/US2007/088849 patent/WO2008080169A1/en active Application Filing
- 2007-12-26 CA CA2710038A patent/CA2710038C/en not_active Expired - Fee Related
- 2007-12-26 EP EP07866027.1A patent/EP2125482B1/de not_active Not-in-force
-
2008
- 2008-01-15 EP EP08727699A patent/EP2125483B1/de not_active Not-in-force
- 2008-01-15 AT AT08727699T patent/ATE549228T1/de active
- 2008-01-15 CA CA2710041A patent/CA2710041C/en not_active Expired - Fee Related
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040261533A1 (en) * | 2003-06-27 | 2004-12-30 | General Electric Company | Rail and train monitoring system and method |
US20050237215A1 (en) * | 2004-04-23 | 2005-10-27 | General Electric Company | System and method for monitoring alignment of a signal lamp |
EP1832849A2 (de) * | 2006-03-09 | 2007-09-12 | Lenord, Bauer & Co. GmbH | Umdrehungszähler |
Non-Patent Citations (1)
Title |
---|
See also references of WO2008080175A2 * |
Also Published As
Publication number | Publication date |
---|---|
CA2710038A1 (en) | 2008-07-03 |
EP2125483B1 (de) | 2012-03-14 |
EP2125482B1 (de) | 2014-05-14 |
CA2710038C (en) | 2015-11-10 |
EP2125483A4 (de) | 2011-01-12 |
EP2125482A4 (de) | 2011-01-19 |
ATE549228T1 (de) | 2012-03-15 |
WO2008080169A1 (en) | 2008-07-03 |
CA2710041A1 (en) | 2009-07-03 |
CA2710041C (en) | 2016-06-07 |
EP2125482A1 (de) | 2009-12-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8888052B2 (en) | Vehicle detection system | |
CA2710041C (en) | Vehicle detection system | |
AU2014405896B2 (en) | Broken rail detection system for railway systems | |
EP0002609A1 (de) | Anlagesteuervorrichtung | |
AU2021204799B2 (en) | Speed proving method and apparatus | |
US20040046546A1 (en) | Mobile detection system | |
AU2013101775A4 (en) | Vehicle Detection System | |
BR112014023802B1 (pt) | Método para uma previsão de cruzamento e sistema de cruzamento | |
US20040049327A1 (en) | Radio based automatic train control system using universal code | |
Dhande et al. | Unmanned level crossing controller and rail track broken detection system using IR sensors and Internet of Things technology | |
WO2008080175A2 (en) | Vehicle detection system | |
US10988151B2 (en) | System and method for controlling a level crossing of a railway track | |
WO2018222200A1 (en) | Advanced preemption | |
CA3006822C (en) | Wireless crossing warning activation and monitoring | |
JP4011204B2 (ja) | 踏切制御システム | |
US20230166780A1 (en) | System and method for virtual block operational status control with long block time delay | |
AU2019100656A4 (en) | Speed Proving Method and Apparatus | |
RU190672U1 (ru) | Поездной приемный блок для системы автоматической сигнализации | |
Vignesh et al. | REALIZATION AND FORESTALLING OF FLAWS AND RUINING IN RAILWAY NETWORK BY MCEC | |
BRPI0307168B1 (pt) | sistema de controle de tráfego de um veículo de transporte coletivo em uma via de guiamento | |
PALSHIKAR | MAKING UNMANNED RAILWAY CROSSINGS SAFE | |
KR20240008032A (ko) | 고신뢰 부정출발 방지시스템 및 그 방법 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 20090722 |
|
AK | Designated contracting states |
Kind code of ref document: A2 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MT NL NO PL PT RO SE SI SK TR |
|
DAX | Request for extension of the european patent (deleted) | ||
A4 | Supplementary search report drawn up and despatched |
Effective date: 20101214 |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
RIC1 | Information provided on ipc code assigned before grant |
Ipc: B61L 29/30 20060101AFI20110711BHEP Ipc: B61L 29/24 20060101ALI20110711BHEP |
|
RTI1 | Title (correction) |
Free format text: VEHICLE DETECTION SYSTEM AND METHOD |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MT NL NO PL PT RO SE SI SK TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: REF Ref document number: 549228 Country of ref document: AT Kind code of ref document: T Effective date: 20120315 Ref country code: CH Ref legal event code: EP |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602008014110 Country of ref document: DE Effective date: 20120510 |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: VDEP Effective date: 20120314 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20120614 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20120314 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20120314 |
|
LTIE | Lt: invalidation of european patent or patent extension |
Effective date: 20120314 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20120615 Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20120314 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20120314 |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MK05 Ref document number: 549228 Country of ref document: AT Kind code of ref document: T Effective date: 20120314 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20120314 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20120314 Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20120314 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20120314 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20120314 Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20120314 Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20120314 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20120314 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20120714 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20120716 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20120314 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20120314 Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20120314 Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20120314 |
|
26N | No opposition filed |
Effective date: 20121217 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 602008014110 Country of ref document: DE Effective date: 20121217 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20120625 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20120614 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20130131 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: MM4A |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20130131 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20130131 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20130115 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20120314 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20120314 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20130115 Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO Effective date: 20080115 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 9 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 10 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 11 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20190329 Year of fee payment: 12 Ref country code: GB Payment date: 20190123 Year of fee payment: 12 Ref country code: IT Payment date: 20190121 Year of fee payment: 12 Ref country code: FR Payment date: 20190123 Year of fee payment: 12 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R119 Ref document number: 602008014110 Country of ref document: DE |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20200115 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20200115 Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20200801 Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20200131 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20200115 |