EP2103882A1 - Heizer - Google Patents

Heizer Download PDF

Info

Publication number
EP2103882A1
EP2103882A1 EP08005307A EP08005307A EP2103882A1 EP 2103882 A1 EP2103882 A1 EP 2103882A1 EP 08005307 A EP08005307 A EP 08005307A EP 08005307 A EP08005307 A EP 08005307A EP 2103882 A1 EP2103882 A1 EP 2103882A1
Authority
EP
European Patent Office
Prior art keywords
heater
housing
heating element
thermal
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP08005307A
Other languages
English (en)
French (fr)
Other versions
EP2103882B1 (de
Inventor
Mathieu Ghesquière
Laurent Van Thournout
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Daikin Europe NV
Daikin Industries Ltd
Original Assignee
Daikin Europe NV
Daikin Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Daikin Europe NV, Daikin Industries Ltd filed Critical Daikin Europe NV
Priority to EP08005307.7A priority Critical patent/EP2103882B1/de
Publication of EP2103882A1 publication Critical patent/EP2103882A1/de
Application granted granted Critical
Publication of EP2103882B1 publication Critical patent/EP2103882B1/de
Not-in-force legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H9/00Details
    • F24H9/20Arrangement or mounting of control or safety devices
    • F24H9/2007Arrangement or mounting of control or safety devices for water heaters
    • F24H9/2014Arrangement or mounting of control or safety devices for water heaters using electrical energy supply
    • F24H9/2028Continuous-flow heaters
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D15/00Other domestic- or space-heating systems
    • F24D15/04Other domestic- or space-heating systems using heat pumps
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H15/00Control of fluid heaters
    • F24H15/10Control of fluid heaters characterised by the purpose of the control
    • F24H15/128Preventing overheating
    • F24H15/132Preventing the operation of water heaters with low water levels, e.g. dry-firing
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H15/00Control of fluid heaters
    • F24H15/20Control of fluid heaters characterised by control inputs
    • F24H15/25Temperature of the heat-generating means in the heater
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H15/00Control of fluid heaters
    • F24H15/30Control of fluid heaters characterised by control outputs; characterised by the components to be controlled
    • F24H15/355Control of heat-generating means in heaters
    • F24H15/37Control of heat-generating means in heaters of electric heaters

Definitions

  • the present invention is concerned with a heater for heating a thermal distribution fluid.
  • the heater includes a housing containing a heating element, which operates to heat the thermal distribution fluid as it follows a flow path from an inlet to the housing and an outlet from it.
  • Room heating systems are in use all over the world to provide warmth to residential, commercial and industrial buildings.
  • Known in such room heating systems are heaters as described above for heating a thermal distribution fluid as it circulates around a network of pipes to give off heat in heating units such as radiators and under-floor heating.
  • the thermal distribution fluid is water.
  • a heater to which the present invention is particularly concerned is a backup heater in a heat pump based room heating system.
  • a heat pump based room heating system is discussed below with reference to figure 1 .
  • the backup heater is able to provide a heat boost to the water.
  • the backup heater may, for example, be a backup heater with an electric heating element.
  • the present invention is particularly suited to a backup heater as given above, it is envisaged that the invention, which is about to be revealed, is applicable to all kinds of thermal distribution fluid heaters.
  • the invention would have application with a conventional boiler.
  • the present invention provides a heater for a room heating system.
  • the heater comprises a heating element and a housing for the heating element.
  • the heater includes an inlet for a thermal distribution liquid into the housing and an outlet for the liquid from the housing.
  • the housing is arranged to contain the liquid as it follows a flow path from the inlet to the outlet over the heating element.
  • the housing is adapted to be mounted in a predetermined orientation to provide a top side and a bottom side of the housing.
  • a first thermal cut off is positioned substantially at or below the top of the heating element when the housing is in the predetermined orientation.
  • the present invention offers an improved safety feature. Air does not conduct heat as well as a liquid thermal distribution medium. Accordingly, if air accumulates and the thermal cut off device is exposed to it, the thermal cut off device will not operate appropriately.
  • the first thermal cut off device maintains the operating temperature of the housing of the backup heater below a desired maximum and is ideally positioned at a point where the fluid following the flow path is heated to its maximum. Further, any air pockets above the heating element will also be above the first thermal cut off device and thus will not interfere with the thermal distribution liquid temperature detection.
  • the thermal cut off device may be of the type to provide a control signal when a predetermined maximum temperature is reached.
  • a control system can be configured to respond to the control signal by switching off the heating element.
  • the first thermal cut off device senses a temperature of the housing of the backup heater.
  • the first thermal cut off device may have its temperature sensing element in contact with the housing, preferably the outside of the housing.
  • the first thermal cut off device may be mounted to the housing, preferably the outside of the housing. Sensing the temperature of the housing is a relatively reliable method.
  • the heater comprises a second thermal cut off positioned above the top of the heating element when the housing is in the predetermined orientation, preferably with its temperature responsive element, in proper operation, positioned in the flow path of the thermal distribution liquid. If a condition is reached when the heating element becomes exposed to air in the housing, then a serious fault condition is arrived at. In this case, severe heating can occur as the thermal distribution liquid does not dissipate the heat, which means that the heater can damagingly overheat. The second thermal cut off device will thus activate immediately when the heating element becomes exposed or if there is a fault with the first thermal cut off device. A reliable safety mechanism is provided by this combination of first and second cut off devices where the first has its temperature responsive element contacting the housing and the second has its temperature responsive element positioned in the flow path.
  • the second thermal cut off device is preferably a thermal fuse as a fuse must be replaced once it has tripped, rather than be simply reset. The need to replace the fuse gives notice that a serious fault condition occurred, thereby avoiding damage or further damage being done to the heater.
  • the second thermal cut off has a higher cut off temperature than the first thermal cut off. This ensures that the second thermal cut off is especially effectively used in emergency cases and not during normal temperature fluctuations, for example, or because of control lag in the control system.
  • the first thermal cut off may be a manual re-settable thermostat.
  • the heater could comprise a gas release valve at a position where the air accumulates when the heater is in the predetermined orientation. The user could thus release the gas, replace the tripped thermal fuse and reset the first thermal cut off to get the heater back safely running.
  • the housing has a longitudinally extending side wall extending between opposed ends and the predetermined orientation is where the longitudinal axis is substantially horizontal.
  • the long side wall means that a lengthy volume is available for the collection of gases. This allows a relatively large amount of air to build up in the housing before the heating element is exposed.
  • the first and second thermal cut offs being positioned as they are means that the heater will continue to operate normally even with this air pocket until it becomes so large that the heating element is exposed. At this time, the heating element is switched off and a gas release action must be performed. The frequency of the gas release operation can thus be reduced.
  • a gas release valve is connected at a centre of a top of the sidewall, which is the most suitable place for releasing the gas.
  • a heater as described above may be particularly suitable for use as a backup heater in an indoor unit for a room heating system powered by a heat pump.
  • the present invention also provides an indoor unit for a room heating system comprising a heat pump having refrigerant piping circulating a refrigerant, an indoor piping circulating a thermal distribution fluid and a heat exchanger for exchanging heat between the refrigerant in the refrigerant piping and the thermal distribution fluid in the indoor piping.
  • the indoor unit comprises the heat exchanger and the heater described above.
  • the heater is preferably mounted in the predetermined, preferably horizontal, orientation discussed above.
  • the heater is mounted at a top part of the indoor unit.
  • This top mounting is made more feasible by downward extension of inlet and outlet pipes connected to the inlet and outlet connections.
  • the top mounting can be particularly advantageous for collecting air trapped in the piping.
  • the indoor unit is mounted with respect to the indoor piping such that the heater forms an uppermost component connected by the indoor piping.
  • FIG. 1 shows an exemplary room heating system 2.
  • the system comprises an indoor unit 4, an outdoor unit 6, refrigerant piping 8 and room heating piping 10.
  • the outdoor unit 6 is a heat pump of the known kind, and is briefly discussed in the context of the present room heating system below with reference to figure 11 .
  • the shown outdoor unit 6 is an air heat pump for extracting heat energy from the air, but may also be an under-soil heat pump for extracting under-soil heat energy or other types of heat pump known to the skilled reader.
  • the outdoor unit 6 comprises an evaporator 64, a four way valve 66, a compressor 68 and an expansion device 70, which is an electric valve.
  • the indoor unit 4 comprises inter alia a pump 74 for circulating the water in the piping 10 and a condenser 72. These components form a heat pump.
  • the evaporator 64, the four way valve 66, the compressor 68, the expansion device 70 and the condenser 72 are connected in this order by a refrigerant piping 8 ( figure 1 ) circulating a refrigerant.
  • the circulation of the refrigerant is forced by the compressor 68. In a heating mode, the refrigerant circulates clockwise in figure 11 .
  • Liquid refrigerant leaves the condenser 72 at a first temperature T1 and passes through the expansion device 70, where the pressure of the refrigerant is reduced and the refrigerant is barely liquid. Afterwards, the refrigerant passes the evaporator 64 and is evaporated by heat from the outside atmosphere. After leaving the evaporator 64, the refrigerant passes through the compressor 68, where the pressure is increased. The refrigerant is at a temperature T2 at this point, which is greater than T1. Finally, the refrigerant is condensed in the condenser 72 by transferring heat from the refrigerant to water in the indoor piping 10 ( figure 1 ) connected to the indoor unit 4.
  • heat is transferred to the water from the refrigerant.
  • a pump 74 in the indoor unit 4 downstream of the backup heater 14 circulates the heated water which downstream of the pump 74 passes through a backup heater 14, discussed in more detail below, and then around the indoor piping 10 circuit.
  • Refrigerant piping 8 in which refrigerant material circulates, is connected between the indoor unit 4 and the outdoor unit 6.
  • the room heating piping 10 shown is an under-floor arrangement, whereby heat is transferred from the water in the piping 10 up through the flooring and into a room space being heated.
  • the room heating piping 10 may be arranged to be connected to wall mounted radiators (not shown) instead of or as well as arranged in an under-floor heating arrangement.
  • the indoor unit 4 includes a heat exchanger to transfer heat from the refrigerant in the refrigerant piping 8 to water circulating in the room heating piping 10.
  • sanitary hot water tank 12 for heating sanitary water.
  • the sanitary hot water tank 12 is not particularly relevant to an understanding of the present invention and thus will not be described further.
  • the outdoor unit 6 a heat pump, extracts low temperature energy from the environment and increases its temperature for heating purposes in a manner known to the skilled reader.
  • the upgraded heat is then transmitted via the refrigerant to a heat exchanger in the indoor unit 4.
  • the heat exchanger transfers the heat in the refrigerant to the water circulated in the room heating piping 10, which forms the under-floor heating arrangement and which may also be connected to heating radiators and the sanitary hot water tank 12.
  • Heat pumps operate more efficiently when the temperature differential between the heated refrigerant and the temperature of the environment from which the heat pump is extracting heat energy is kept small. It is known in the art to provide a backup heater so that the temperature differential can be kept small and the heat pump kept efficient, while still providing heating capacity to match the year round heating requirements of the room heating system 2.
  • the heat pump is, for example, sized to provide 90 to 95 % of the annual heating requirement, with the remaining 5 to 10 % provided by a small electric backup heater.
  • the backup heater may be sized to cover 60 % of the heating demand for the coldest day of the year. The present invention is concerned with such a backup heater, which is discussed fully below.
  • the backup heater 14 includes a tubular outer housing 16 ( figure 3 ) closed at each end by a first end plate 24 and an opposed second end plate 26, which can be seen in figure 4 .
  • the backup heater 14 of figure 2 includes a thermally insulative outer cladding (not labelled, but shaded in black) about the outer housing 16 and the end plates 24, 26.
  • the backup heater 14 includes a water inlet connection 18 and a water outlet connection 20.
  • the outer housing 16 and the end plates 24, 26 enclose a space that will, in use, be filled with water flowing between the inlet connection 18 and the outlet connection 20.
  • An electric heating element 22 occupies the space ( figure 4 ).
  • the electric heating element 22 comprises one or more resistance heating filaments that become hot as electricity flows through them.
  • the filaments are attached at both ends to the first end plate 24.
  • the power cable 23 to the heating element 22 passes through the first end plate 24 and electrical circuitry connecting the heating element 22 to the power supply takes place in the first end plate 24.
  • the first end plate 24 is deeper than the second end plate 26 in an axial direction so as to enclose the power circuitry for the heating elements and also to provide support for the heating element 22 attached to it.
  • Each filament extends from the first end plate 24 almost all the way to the opposed second end plate 26.
  • the filaments turn when in the proximity of the second end plate 26 and extend back to the first plate 24, where it either terminates at the first end plate 24 or where a further turn takes place. There can be a number of such turns to define a wave-like pattern as the heating filament extends from one end of the space inside the outer housing 16 and between the end plates 24, 26 to the other end.
  • the backup heater 14 includes a mounting bracket 28 connected to each end plate 24, 26.
  • the mounting brackets are for mounting the backup heater 14 to the indoor unit 4, as will be discussed more fully below.
  • the backup heater also includes a handling bar 30 connected at opposed ends to an end plate 24, 26.
  • the handling bar 30 is positioned on the other side of the outer housing 16 to the mounting brackets 28 and is spaced radially from the outer housing 14. The handling bar 30 is useful for ease of assembly when mounting the backup heater 14 to the indoor unit 4.
  • a water flow path 32 will be defined between the inlet connection 18 and the outlet connection 20 when the backup heater 14 is in operation. It is desirable to have a flow path 32 that extends over as much as possible of a surface area of the heating element 22 so as to ensure adequate heating.
  • the inlet connection 18 and the outlet connection 20 are positioned at longitudinal opposite ends of the outer housing 16, adjacent respective first and second end plates 24, 26 for this reason.
  • the inlet and outlet connection 18, 20 at a bottom of the outer housing 16. Top and bottom are used herein with respect to a top of the backup heater 14 and a bottom of it when it is properly horizontally mounted in the indoor unit 4. Alternatively, one can define bottom as where the inlet and outlet connections 18, 20 are and term top accordingly. Having the inlet and outlet connection 18, 20 at the bottom of the outer housing 16, however, provides a direct flow path from the inlet connection 18 to the outlet connection 20 that runs only or mostly along the bottom of the space enclosed by the outer housing 16 and the two end plates 24, 26. The upper part of the heating element 22 would not be optimally used to heat the water flowing between the inlet connection 18 and the outlet connection 20 in such a construction.
  • the inlet and outlet connection 18, 20 are both provided in a bottom of the outer housing 16, but they are radially offset from one another by an amount of, for example 35° to 45°, as can be seen for example in figures 3, 4 and 7 .
  • the outlet connection 20 is provided at a bottom most position in the outer housing 16 and the inlet connection 18 is radially offset from this. This radial offset means that a more curved or spiral flow path will be provided between the inlet and outlet connection 18, 20, which can provide a more efficient heating of the water.
  • the backup heater 14 includes a baffle plate 34 that blocks a direct flow path between the inlet connection 18 and the outlet connection 20 along the bottom of the space.
  • the baffle plate 34 redirects the flow path 32 so that the water must flow over the top of it and thus to the top of the space enclosed by the backup heater 14 in order to reach the outlet connection 20.
  • the baffle plate 34 is spaced a small distance from the second end plate 26 of the backup heater 14 and mostly extends in a radial plane.
  • the baffle plate 34 extends almost to the top of the space defined within the outer housing 16 and the end plates 24 and 26. A gap is thus defined between the top of the baffle plate 34 and the inner surface of a top of the outer housing 16.
  • the baffle plate 34 has an outer periphery generally mating with an inner surface of the outer housing 16 so that water flow between the baffle plate 34 and the outer housing 16 is negligible or eliminated entirely.
  • the baffle plate 34 includes an upper portion 38 extending in a generally radial plane and a bottom portion 36 that is bent to extend axially in the direction of the inlet connection 18 and downwardly to intersect with the inner surface of the bottom of the outer housing 16 between the outlet connection 20 and the inlet connection 18.
  • the upper portion 38 extends in a radial plane that intersects the outlet connection 18 or is even beyond the outlet connection 18, closer to the second end plate 26.
  • the upper portion 38 faces and is in close proximity to the turns in the filaments of the heating element 22.
  • the bottom portion 36 is bent so as to extend to an inner surface of the outer housing 16 at a point between the inlet connection 18 and the outlet connection 20. The bend is such that while the upper portion 38 faces the heating element 22, the bottom portion 36 extends underneath it.
  • the bottom portion 36 extending axially toward the inlet connection 18 and downwardly to contact the inner surface of a bottom of the outer housing 16 in combination with the outer periphery of the bottom portion mating with the inner surface of the outer housing 16 results in the bottom portion 36 having the shown shape.
  • the bottom portion 36 tapers to a tip 40.
  • the tip 40 contacts the inner surface of the outer housing 16 at the bottom most point.
  • a baffle plate 34 without the bend and extending only in a radial plane would define a large space between it and the second end plate 26. This would mean that the longitudinal extent of the backup heater 14 occupied by the heating element would be limited.
  • the above described structure for the baffle plate 34 means that the heating element 22 can occupy an increased longitudinal extent of the backup heater 14, while still providing a flow path 32, and further that flow path 32 is a sufficiently large flow path, to the outlet connection 20.
  • the bottom portion 36 provides an expanded volume as the water flows to the outlet connection 20 as compared to if the baffle plate 34 extended all the way to the bottom in its radial plane.
  • This expanded volume as the water reaches the bottom of the backup heater 14 in the proximity of the outlet connection 20 means that pressure changes in the water, which would be undesirable, are avoided.
  • the angle between the upper portion 38 of the baffle plate and the lower portion 36 should be selected so as to minimise such undesirable pressure changes.
  • the water flow path 32 ( still referring to figure 4 , between the inlet connection 18 and the outlet connection 20 thus passes through the gap over the baffle plate 34 and to the outlet connection 20.
  • the water flow path 32 also includes a spiral element to it as provided by the radially offset inlet and outlet connections 18, 20. Good heating efficiency is ensured by such a flow path 32.
  • the water flow path 32 after passing over the baffle plate 34, flows in a space between the baffle plate 34 and the second end plate 26.
  • the flow path 32 beyond the bend in the baffle plate 34 turns to conform to the bottom portion of the baffle plate and thus passes to the outlet connection 20.
  • a draining process may need to be performed on the backup heater 14, for example after a production test has been run.
  • Water to be drained can pass over the top of the baffle plate 34 and out of the outlet connection 20 to drain some of it. A lot of the water will also pass through the inlet connection 18 during draining. There will, however, be an amount of water that could become trapped in the bottom most portion of the outer housing 16 and can not pass through the inlet connection 18 because the inlet connection 18 is radially offset from the bottom most portion. This body of water will also be prevented from passing to the outlet connection 20 by the presence of the baffle plate 34 blocking a flow path between the inlet and outlet connection 18, 20 along the bottom of the outer housing 16.
  • the trapped water 62 can be viewed in figure 5 by a shaded region and where the level of the trapped water 62 is shown by the dark line 60 extending from the baffle plate 34 to the first end plate 24.
  • the water level line 60 passes horizontally along the bottom at a height where the water level no longer communicates with the opening to the inlet connection 18.
  • the baffle plate 34 includes a drain passage 42 through it, which is positioned at or adjacent the tip 40 of the bottom portion 36.
  • the drain passage 42 is sufficiently small that it provides a negligible flow path in use to the outlet connection 20 as compared to the flow path 32 over the top of the baffle plate 34.
  • the drain passage 42 ensures that the body of trapped water 62 in draining of the backup heater 14 has a way out.
  • a backup heater 14 full of water can drain water from the inlet and outlet connections 18, 20.
  • the outlet connection 20 flow will drop to a negligible amount relative to the flow out of the inlet connection 18 once the water level drops below the top 54 of the baffle plate 34.
  • the inlet connection 18 will continue to drain water from the backup heater 14 until the level drops below a lip of the inlet connection 18. It is at this point that the flow through the drain passage 42 to the outlet connection 20 becomes significant and finishes the draining of the backup heater 14.
  • the top 54 of the baffle plate 34 is shown.
  • the top 54 extends to a radial height greater than a top of the heating element 22, but not so far as the top of the backup heater 14 so that the gap discussed above is still provided. If the backup heater 14 is horizontally mounted and the water contained in the space provided by the outer housing 16 and the end plates 24, 26 was slowly drained, the baffle plate should be revealed before the heating element 22.
  • the backup heater 14 includes a flow switch 55 on the outlet connection 20 side of the baffle plate 14. A tip of the flow switch 55 is shown by the shaded box in figure 8 .
  • the flow switch 55 may be arranged below the top 54 of the baffle plate and spaced from it, meaning it would be hidden from view by the baffle plate 34 in figure 8 . If the water level in the backup heater 14 drops below the top 54 of the baffle plate 34 a reduced or absent water flow condition will be detected by the flow switch 55. A control system can react to the detected faulty flow condition by cutting the power to the heating element 22. The relative positioning between the top 54 of the baffle plate 34 and the top of the heating element 22 means that the power is cut before a heating element, which is still on, is exposed by the dropping water level. This could damage the backup heater 14.
  • the top 54 of the baffle plate 34 is shown as being flat. That is, the top 54 would be parallel with the water level in the backup heater 14 when the backup heater 14 is horizontally mounted. This means that the flow to the outlet connection 20 stops, rather than gradually reduces as would be the case with a curved top 54 to the baffle plate 34.
  • the flow switch 55 can thus be of a relatively reduced sensitivity and still detect the dangerous water level condition immediately.
  • the backup heater 14 is mounted at the top of the indoor unit 4.
  • the indoor unit 4 is mounted such that the backup heater 14 is the topmost water containing component connected by the water piping 10 in the room heating system 2 for reasons that will become clear in the following.
  • It is mounted horizontally, that is with its longitudinal axis in line with the horizontal, which can also be seen with reference to figure 2 .
  • the horizontal mounting is such that the outlet connection 20 is positioned at a radial bottom of the backup heater 14.
  • the backup heater 14 includes a number of safety connections through the outer housing 16 and these can be seen with reference to figure 2 .
  • the mounting brackets 18 are used to mount the backup heater 14 to the indoor unit 4 and the handling bar 30 makes the mounting process easier to manage.
  • a connection for a system safety valve 46 is also provided, which is in liquid communication with the water in the backup heater 14.
  • the connection for the safety valve 46 is positioned at the top of the outer housing 16, longitudinally positioned adjacent the outlet connection 20 on the inlet connection 18 side of the outlet connection 20.
  • the valve 46 is of a known type, whereby once the pressure in the room heating system 2 reaches a certain degree that is predetermined to be unsafe, the valve opens and releases water and/or steam from the backup heater 14 and thus the system 2.
  • the valve 46 is in communication with an outlet pipe 50 that transports the released fluid to a collection drain (not shown).
  • the backup heater 14 also includes a connection 50 for a pipe 54 leading to an expansion vessel (not shown).
  • the connection 50 is provided between the inlet and outlet connections 18, 20 and in a lower half of the outer housing 16, radially just above the inlet connection 18.
  • the connection 50 is in liquid communication with the water in the backup heater 14.
  • An expansion vessel is known to the skilled reader. Briefly, an expansion vessel includes some means to accommodate volume changes in the water in the room heating system 2.
  • the expansion vessel can be a pressurised container including a flexible membrane providing a dividing line between a water side and a gas side in the container. The volume of the water can increase with increased temperature and the membrane will move against the gas to accommodate the volume change. The expansion vessel thus avoids large pressure increases.
  • the backup heater 14 also includes a gas release valve 48.
  • Gas can become trapped in a water based room heating system 2.
  • the gas can cause inefficient heating as it does not conduct heat as readily as liquid. It can also cause undesirable knocking noises in the piping 10 of the room heating system 2.
  • the backup heater 14 is mounted as a top water containing component connected by the piping 10 in the room heating system 2, as discussed above. Gas will naturally rise in the room heating system 2 and so will make its way eventually into the backup heater 14.
  • the gas release valve 48 allows the gas to be released from the room heating system 2 at a central point.
  • the gas release valve 48 is mounted at the top of the outer housing 16 at a longitudinal centre and the backup heater 14 is mounted horizontally. Like in a spirit level, the gas bubble in a backup heater so arranged will collect in the position of the gas release valve 48 and so all gas can be released.
  • All of the safety connections 46, 48, 50 discussed above extend into a space contained by the backup heater 14 so that they communicate with the water therein. They extend through the tubular outer housing 16, where there is more space than at the end plates 24, 26.
  • the backup heater 14 includes further important safety devices.
  • the backup heater 14 includes a thermal fuse 56 and a thermal cut off device such as a thermostat 58, as can be seen in figure 9 and 10 .
  • the thermostat 58 is positioned at the top of the heating element 22 with respect to the horizontal, which means it is just below the top 54 of the baffle plate 34.
  • the thermal fuse 56 is positioned above this point, above the top of the heating element 22.
  • the thermostat 58 includes a thermistor attached to the outer housing 16.
  • the thermistor is axially located at about the end of the heating element 22 adjacent the second end plate 26.
  • the thermostat 58 contacts the tubular outer housing 16 so that its thermistor can sense the temperature of the housing 16 and provide a control signal in response to the sensed temperature.
  • the thermal fuse 56 includes a fuse element that melts once it is exposed to a predetermined maximum temperature. The thermal fuse 56 must be replaced once this occurs.
  • the thermal fuse 56 extends through the second end plate 26 to an axial position extending a small way past the end of the heating element 22 adjacent the second end plate 26.
  • the thermal fuse 56 thus extends to an axial position beyond the axial position of the thermostat 58.
  • the fuse element extends correspondingly inside the thermal fuse 56.
  • the thermal fuse 56 lies in the flow path 32 as it passes through the gap between the top 54 of the baffle plate 34 and the top of the outer housing 16.
  • a control system is responsive to the temperature detected by the thermostat 58 and cuts the power to the heating element 22 if it goes above a predetermined safe limit. An air pocket will not cause system failure unless it exposes the heating element 22. The air pocket will, however, be at a lower temperature than the water. The positioning of the thermostat at the height of the heating element ensures that the housing temperature is sensed for as long as feasible before the heating element is exposed by the air pocket.
  • the temperature that the thermal fuse 56 is subjected to could breach the maximum temperature safety limit.
  • the thermal fuse 56 offers an immediate response to such a condition and is connected to the power supply to the heating element 22 so that the power supply is cut off in such an instance.
  • the thermal fuse 56 will also be called into play in the case of malfunction of the thermostat 58.
  • thermal fuse 56 in addition to a flow switch 55 and the thermostat 58 is that a further layer of safety response is provided.
  • a temperature safety layer that is internal to the housing 16 and a temperature safety layer responsive to the housing temperature provides an effective safety response combination.
  • Another advantage of the use of a thermal fuse is that if it is ever required, a fault in the backup heater 14 could very well be the problem. Simply resetting a flow switch or thermostat 58 would not solve the problem and may cause damage to the backup heater 14.
  • An expired thermal fuse 56 on the other hand, will not work again and will need to be replaced. The replacement would generally be performed by a maintenance professional and the expired thermal fuse 56 would signify to the professional that the cause of the fault needs to be investigated before the thermal fuse 56 is replaced.
  • the water travels around the piping 10 in the room heating system 2, releasing its heat to the room.
  • the water enters a heat exchanger contained in the indoor unit 4 to collect heat provided by the outdoor unit 6, which is a heat pump.
  • the water thus heated passes through the inlet connection 18 to the internal space of the backup heater 14 and passes out of the outlet connection 20 via a flow path 32.
  • the flow path 32 has a twist induced in it by the radial offset between the inlet connection 18 and the outlet connection 20.
  • the flow path 32 passes over the top of the baffle plate 34 and behind it towards the outlet connection 20.
  • the flow path 32 to the outlet connection 20 then turns under the heating element 22 as directed by the bottom portion 36 of the baffle plate 34.
  • the heating element 22 may or may not be switched on to provide a heat boost to the water.
  • the turning on of the heating element 22 will be managed by a control system depending on whether peak demand conditions require it.
  • the heated water then passes back into the piping 10 to fuel radiator or the under-floor heating 10.
  • any gas in the room heating system 2 will creep to the top most water containing component connected by the piping 10, namely the backup heater 14. This will be periodically released by a user or by a maintenance professional by operating the gas release valve 48. Changes in temperature in the water will result in volume changes that are accommodated by the expansion vessel. Specifically, the excess volume can pass from the backup heater 14 through the connection 50 to the expansion vessel via the pipe 54. In the case of a malfunction, the pressure of the water in the room heating system could become dangerously high. In this situation, the system safety valve 46 will open to release enough water from the backup heater 14 to bring the pressure back down to a safe operating level. The released water will drain through the drain pipe 50.
  • dangerous temperature safety devices will also be operative in the case of water level drop. So, if the water level drops below the top 54 of the baffle plate 34 for any reason, for example because of excess gas accumulation in the top of the backup heater 14, the flow to the outlet connection 20 will cease. The flow switch 55 will recognise this and cut power to the heating element 22. The knowledgeable user, perhaps assisted by an instruction manual, could for example suspect the cause of the problem as excess gas build up and release it with the gas release valve 48.
  • the thermostat 58 in normal operation of the backup heater 14, will provide a signal corresponding to a sensed temperature to a control system.
  • the control system will keep the temperature of the housing of the backup heater 14 below an upper temperature limit based on a control algorithm.
  • the thermostat 58 may not be operating correctly or the water level may have dropped to expose the heating element 22.
  • the thermal fuse will respond to cut the power to the heating element 22 to prevent temperatures being reached that could damage the backup heater 14 or other components of the room heating system 2.

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Steam Or Hot-Water Central Heating Systems (AREA)
  • Heat-Pump Type And Storage Water Heaters (AREA)
EP08005307.7A 2008-03-20 2008-03-20 Heizer Not-in-force EP2103882B1 (de)

Priority Applications (1)

Application Number Priority Date Filing Date Title
EP08005307.7A EP2103882B1 (de) 2008-03-20 2008-03-20 Heizer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
EP08005307.7A EP2103882B1 (de) 2008-03-20 2008-03-20 Heizer

Publications (2)

Publication Number Publication Date
EP2103882A1 true EP2103882A1 (de) 2009-09-23
EP2103882B1 EP2103882B1 (de) 2013-05-22

Family

ID=39711925

Family Applications (1)

Application Number Title Priority Date Filing Date
EP08005307.7A Not-in-force EP2103882B1 (de) 2008-03-20 2008-03-20 Heizer

Country Status (1)

Country Link
EP (1) EP2103882B1 (de)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109945287A (zh) * 2019-03-11 2019-06-28 河南三元光电科技有限公司 一种壁挂式暖风机

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4454725A (en) * 1982-09-29 1984-06-19 Carrier Corporation Method and apparatus for integrating a supplemental heat source with staged compressors in a heat pump
EP0943877A2 (de) * 1998-03-18 1999-09-22 Alley Enterprises Limited Brauchwassererhitzer
EP1669688A1 (de) * 2003-08-05 2006-06-14 Matsushita Electric Industrial Co., Ltd. Fluidheizvorrichtung und diese verwendende reinigungsvorrichtung
EP1840485A2 (de) * 2006-03-27 2007-10-03 Groupe Gecko Alliance Inc. Durchflussdetektor für eine Badeeinheit

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19535891C2 (de) * 1995-09-27 1998-12-03 Karl Merk Elektrische Heizzentrale
NO330762B1 (no) * 2006-08-28 2011-07-04 Ctc Ferrofil As Varmeakkumulator

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4454725A (en) * 1982-09-29 1984-06-19 Carrier Corporation Method and apparatus for integrating a supplemental heat source with staged compressors in a heat pump
EP0943877A2 (de) * 1998-03-18 1999-09-22 Alley Enterprises Limited Brauchwassererhitzer
EP1669688A1 (de) * 2003-08-05 2006-06-14 Matsushita Electric Industrial Co., Ltd. Fluidheizvorrichtung und diese verwendende reinigungsvorrichtung
EP1840485A2 (de) * 2006-03-27 2007-10-03 Groupe Gecko Alliance Inc. Durchflussdetektor für eine Badeeinheit

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109945287A (zh) * 2019-03-11 2019-06-28 河南三元光电科技有限公司 一种壁挂式暖风机
CN109945287B (zh) * 2019-03-11 2024-02-27 河南三元光电科技有限公司 一种壁挂式暖风机

Also Published As

Publication number Publication date
EP2103882B1 (de) 2013-05-22

Similar Documents

Publication Publication Date Title
EP2103879B1 (de) Heizer
US6390806B1 (en) Pneumatic system for flame rollout and draft safeguard protection
US4363221A (en) Water heating system having a heat pump
US4567351A (en) Electric space heater employing a vaporizable heat exchange fluid
KR100752048B1 (ko) 열교환기의 동파방지 시스템
CA2675212A1 (en) Solar heating system with back-up electric heating
US7007858B2 (en) Compact boiler with tankless heater for providing heat and domestic hot water and method of operation
US20060213210A1 (en) Low-cost heat pump water heater
US20100037889A1 (en) Solar heating system with back-up heating
US9074383B2 (en) Flow control and improved heat rise control device for water heaters
EP3869118A1 (de) Elektrischer wassererhitzer
US4671212A (en) Gas fired heat exchanger for hot water with bimetallic scouring baffle
EP2103882B1 (de) Heizer
EP2103886B1 (de) Heizer
US4513585A (en) Hot water system using a compressor
KR20120061199A (ko) 보조탱크가 구비된 열교환장치
US4424934A (en) Hot water heating system
JP2002071213A (ja) 給湯装置用給水予熱器、給湯装置及び給湯装置のフロントカバー
EP1915120A1 (de) Dampferzeuger
CN111306799B (zh) 冷凝式壁挂炉、水封组件、冷凝水堵塞故障检测方法
US4206874A (en) Heating
CN111365900A (zh) 换热装置及空调系统
CN220567342U (zh) 电热循环设备以及电热循环取暖装置
WO1998020286A1 (en) Heating apparatus
CN212006302U (zh) 换热装置及空调系统

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MT NL NO PL PT RO SE SI SK TR

AX Request for extension of the european patent

Extension state: AL BA MK RS

17P Request for examination filed

Effective date: 20100323

AKX Designation fees paid

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MT NL NO PL PT RO SE SI SK TR

17Q First examination report despatched

Effective date: 20100602

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MT NL NO PL PT RO SE SI SK TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 613427

Country of ref document: AT

Kind code of ref document: T

Effective date: 20130615

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602008024678

Country of ref document: DE

Effective date: 20130718

REG Reference to a national code

Ref country code: SE

Ref legal event code: TRGR

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 613427

Country of ref document: AT

Kind code of ref document: T

Effective date: 20130522

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG4D

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130823

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130822

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130923

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130522

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130522

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130922

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130902

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130522

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130522

REG Reference to a national code

Ref country code: NL

Ref legal event code: VDEP

Effective date: 20130522

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130822

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130522

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130522

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130522

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130522

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130522

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130522

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130522

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130522

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130522

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed

Effective date: 20140225

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602008024678

Country of ref document: DE

Effective date: 20140225

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20140320

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

REG Reference to a national code

Ref country code: IE

Ref legal event code: MM4A

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20140331

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20140331

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20140320

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 9

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130522

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130522

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130522

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130522

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20080320

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 10

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 11

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 20210210

Year of fee payment: 14

Ref country code: CZ

Payment date: 20210225

Year of fee payment: 14

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20210310

Year of fee payment: 14

Ref country code: GB

Payment date: 20210310

Year of fee payment: 14

Ref country code: SE

Payment date: 20210311

Year of fee payment: 14

Ref country code: BE

Payment date: 20210217

Year of fee payment: 14

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 602008024678

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CZ

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220320

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20220320

REG Reference to a national code

Ref country code: BE

Ref legal event code: MM

Effective date: 20220331

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220321

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220320

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220331

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20221001

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220331