EP1985764A1 - Method for constructing an immersed tunnel and tunnel obtained by said method - Google Patents

Method for constructing an immersed tunnel and tunnel obtained by said method Download PDF

Info

Publication number
EP1985764A1
EP1985764A1 EP07106719A EP07106719A EP1985764A1 EP 1985764 A1 EP1985764 A1 EP 1985764A1 EP 07106719 A EP07106719 A EP 07106719A EP 07106719 A EP07106719 A EP 07106719A EP 1985764 A1 EP1985764 A1 EP 1985764A1
Authority
EP
European Patent Office
Prior art keywords
tunnel
mentioned
segments
formwork
formwork structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP07106719A
Other languages
German (de)
French (fr)
Inventor
Guido Peri
Carlo Valagussa
Letizia Zanelotti
Adriano Ruggero Fava
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Alpina SpA
Original Assignee
Alpina SpA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Alpina SpA filed Critical Alpina SpA
Priority to EP07106719A priority Critical patent/EP1985764A1/en
Publication of EP1985764A1 publication Critical patent/EP1985764A1/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/063Tunnels submerged into, or built in, open water
    • E02D29/073Tunnels or shuttering therefor assembled from sections individually sunk onto, or laid on, the water-bed, e.g. in a preformed trench

Definitions

  • the present invention relates to a method for constructing an immersed tunnel.
  • the invention further extends to the immersed tunnel constructed by this method.
  • the field of the invention is that of road and railway tunnels, for traversing and the like, constructed immersed in water or in water-bearing ground, such as loose ground entirely permeated by groundwater or tunnels crossing under sea channels, rivers or expanses of water in general.
  • the main drawback is represented by the need to dry out the laying site, i.e. an operation which, in addition to not always being feasible, implies major works in relation to the containment of both the ground and the water.
  • the invention has the further purpose of providing a tunnel of the aforementioned type in which the preparation of prefabricated segments outside the installation trench of the artefact is not provided.
  • the tunnel of the invention offers the advantage of being able to be laid in an immersed state, i.e. directly in its place of installation. In this manner, all the traditional problems related to the dredging of the tunnel laying site are overcome.
  • the invention offers the advantage of not requiring either the transportation of heavy artefacts, which are thus difficult to handle, nor the immersed assembly of prefabricated tunnel segments, nor the preventive preparation of definitive sealing joints between the various segments.
  • the tunnel of the invention is indicated as a whole by numeral 1 in figure 1 . It essentially consists of a liner 4 resting on bed 2 of a basin covered by water or by ground water 3. Tunnel 1, once laid, could be even entirely covered by the ground forming the mentioned bed 2, and is in any case incorporated in underwater concrete casting 5 shown in figure 2 .
  • the latter figure shows tubular formwork structure 6, which consists in a plurality of shaped transversal segments shaped as the crown and the tunnel invert of the internal section of tunnel 1, the mentioned segments being reciprocally connected at corresponding joint and sealing sections 15, 17 ( figure 6 ). Structure 6 is completed with a final internal reinforced concrete lining 7 and with the finishes 8 of the roadway within the tunnel itself.
  • the trench prepared along the route of the tunnel to be constructed, following its future longitudinal profile, is made leaving the water of the channel or river to the crossed or the groundwater in site.
  • the side walls of the trench are supported by means of diaphragm walls, either prefabricated or made directly onsite, also with the construction of natural sloping terraces, supported by vertical elements, providing these are compatible with the temporary occupation constraints of the construction site ground.
  • the initial step of laying tunnel 1 in figure 1 provides for the immersion, directly in the water 3 of the basin of installation of the same, of the first open-ended tubular segment 9 forming tubular formwork structure 6 (e.g. having a length of 10-12 m).
  • the operation is preferably performed by means of a crane 10 mounted on an appropriate floating barge (not shown).
  • Appropriate supports e.g. metallic poles regularly driven into the bed of the trench) ensure the laying linearity and geometric correctness.
  • the second segment 12 equal to the previous one is arranged by the side in the manner shown in figure 5 .
  • the mentioned segments 9 and 12 are fastened head-to-head, at their shaped section 13, as shown in greater detail in figure 6 .
  • the first segment 9 of the tunnel provides, at its head or end 14, a groove 15 comprising a lead-in 16 for a corresponding rib 17 provided on head 18 of second segment 12.
  • the descent or immersion of this segment 12 also allows the desired fastening and dimensional mating with the mentioned first segment 9.
  • the joint is consolidated by means of a seal 19 of injectable, expanding material (e.g.
  • the single segments forming tubular structure 6 could be equipped with the mentioned internal lining 7 even before being immersed in water.
  • the position of rib 17 and seal 19 could be reversed with respect to that shown in figure 6 .
  • Other technical solutions could be in any case adopted to reciprocally seal and fasten the various segments forming the mentioned structure 6.
  • tubular structure 6 may further occur by longitudinally sliding the various segments, with gradual immersion of the same joined one to the other. In this manner, structure 6 will continue to elongate as the laying of the mentioned segments progresses, maintaining its "tail” at the natural surface line while its "head” advances towards the valley point of the trench.
  • the sliding of the various segments is obtained at runways made of prefabricated concrete elements, on which the necessary metallic equipment for the sliding of tubular structure 6 is mounted.
  • the latter is further preferably formed by metallic material for railway tunnels, road tunnels and the like; alternatively, it may be formed by resin for containing cables, liquids, and the like.
  • the invention is not restricted only to the underwater tunnel illustrated in the figures, but may be extended both to even only partially immersed tunnels or tunnels laid in loose ground, and tunnels formed by several formwork structures 6 arranged side by side and embedded in the concrete casting 5 itself (e.g. double barrel tunnels).

Landscapes

  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Lining And Supports For Tunnels (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

An immersed tunnel of the type comprising a formwork structure (6), an underwater concrete casting (5) which externally surrounds said structure (6) and internal finishes (8), in which the mentioned formwork structure (6) consists of a plurality of open-ended segments (9, 12) allowing the entrance of water present at the laying site of said tunnel.
In relation to the above-described known art, the tunnel of the invention offers the advantage of being able to be laid in an immersed state, i.e. directly in its place of installation. In this manner, all the traditional problems related to the dredging of the tunnel laying site are overcome.

Description

  • The present invention relates to a method for constructing an immersed tunnel. The invention further extends to the immersed tunnel constructed by this method.
  • The field of the invention is that of road and railway tunnels, for traversing and the like, constructed immersed in water or in water-bearing ground, such as loose ground entirely permeated by groundwater or tunnels crossing under sea channels, rivers or expanses of water in general.
  • In constructions of this type, it is known to lay the tunnel either after dredging the place of installation of the same (when this is possible), or by making the preparation of the tunnel in a dry environment, i.e. outside the final site, precede the laying of the same with subsequent installation of the artefact.
  • In the first solution, the main drawback is represented by the need to dry out the laying site, i.e. an operation which, in addition to not always being feasible, implies major works in relation to the containment of both the ground and the water.
  • On the other hand, the installation of a prefabricated reinforced concrete tunnel has disadvantages related both to the transferring of the construction to its site of use and to the need to install the various tunnel segments in immersed position, appropriately and reciprocally centred and constantly maintained in sealed closed state. To these, there is added the non-negligible problem of installing in its site a heavy, very large artefact which tends by its own nature to float.
  • It is the main object of the present invention to provide an immersed tunnel which, unlike the above-described known structures, does not require the preventive dredging of the installation site of the same and in which the immersion in water of the tunnel segments does not imply any step of floating.
  • The invention has the further purpose of providing a tunnel of the aforementioned type in which the preparation of prefabricated segments outside the installation trench of the artefact is not provided.
  • These and other objects are achieved by the method and the tunnel of claims 1 and 13, respectively. Preferred modes of obtaining the immersion result from the remaining claims.
  • In relation to the above-described known art, the tunnel of the invention offers the advantage of being able to be laid in an immersed state, i.e. directly in its place of installation. In this manner, all the traditional problems related to the dredging of the tunnel laying site are overcome.
  • Compared to the traditional prefabricated segment technology, the invention offers the advantage of not requiring either the transportation of heavy artefacts, which are thus difficult to handle, nor the immersed assembly of prefabricated tunnel segments, nor the preventive preparation of definitive sealing joints between the various segments.
  • These and other objects are achieved by the method and the tunnel of the present invention depicted by way of non-limitative example in the figures of the accompanying drawings, in which:
    • figure 1 shows a longitudinal section of an example of immersed tunnel according to the invention;
    • figure 2 shows a cross section A-A of the tunnel in figure 1;
    • figure 3 shows the initial step of immersing the first segment of the tubular formwork structure of the tunnel in figure 1;
    • figure 4 shows the step of laying the segment in figure 3;
    • figure 5 shows a side view of the step of immersing the second segment of the tunnel in figure 1;
    • figure 6 shows the enlarged detail of the connection section of the segments in figure 5; and
    • figure 7 shows a cross section of the step of underwater concrete casting of the tunnel in figure 1.
  • The tunnel of the invention is indicated as a whole by numeral 1 in figure 1. It essentially consists of a liner 4 resting on bed 2 of a basin covered by water or by ground water 3. Tunnel 1, once laid, could be even entirely covered by the ground forming the mentioned bed 2, and is in any case incorporated in underwater concrete casting 5 shown in figure 2. Specifically, the latter figure shows tubular formwork structure 6, which consists in a plurality of shaped transversal segments shaped as the crown and the tunnel invert of the internal section of tunnel 1, the mentioned segments being reciprocally connected at corresponding joint and sealing sections 15, 17 (figure 6). Structure 6 is completed with a final internal reinforced concrete lining 7 and with the finishes 8 of the roadway within the tunnel itself.
  • The trench, prepared along the route of the tunnel to be constructed, following its future longitudinal profile, is made leaving the water of the channel or river to the crossed or the groundwater in site. The side walls of the trench are supported by means of diaphragm walls, either prefabricated or made directly onsite, also with the construction of natural sloping terraces, supported by vertical elements, providing these are compatible with the temporary occupation constraints of the construction site ground.
  • The initial step of laying tunnel 1 in figure 1 provides for the immersion, directly in the water 3 of the basin of installation of the same, of the first open-ended tubular segment 9 forming tubular formwork structure 6 (e.g. having a length of 10-12 m). The operation is preferably performed by means of a crane 10 mounted on an appropriate floating barge (not shown). This segment 9, once immersed, rests on ground bed 2, filling itself with water 3 and maintaining its shape also in virtue of the presence of internal structural contrasts 11. Appropriate supports (e.g. metallic poles regularly driven into the bed of the trench) ensure the laying linearity and geometric correctness.
  • Having thus laid segment 9, the second segment 12 equal to the previous one is arranged by the side in the manner shown in figure 5. During this step, the mentioned segments 9 and 12 are fastened head-to-head, at their shaped section 13, as shown in greater detail in figure 6. As shown in this figure, the first segment 9 of the tunnel provides, at its head or end 14, a groove 15 comprising a lead-in 16 for a corresponding rib 17 provided on head 18 of second segment 12. In this manner, the descent or immersion of this segment 12 (arrows in figures 5 and 6) also allows the desired fastening and dimensional mating with the mentioned first segment 9. Finally, the joint is consolidated by means of a seal 19 of injectable, expanding material (e.g. rubber or acrylic resins), preassembled in the mentioned head 14 of segment 9 and the tightness of which is ensured by the geometric fixity of the mentioned segments 9 and 12, obtained by means of rib 17 and groove 15. The laying of the remaining segments of the tubular formwork structure 6 of the tunnel is completed by proceeding with this procedure.
  • Having completed the route of the immersed tunnel, there is thus obtained a tubular structure 6, as long as the entire tunnel segment, which forms a proper formwork on which there is made an underwater concrete casting 5, laterally delimited by the containment walls of the trench, to cover the entire structure 6. Concrete casting 5 provides the structural and hydraulic requirements needed for the subsequent finishing operations of the artefact, while the mentioned structure 6 determines a "negative", "disposable" formwork of the casting, leaving inside the latter a free volume, although still full of water at this step, for the construction of the tunnel.
  • From this point onwards, the water contained inside tunnel structure 6 is emptied by means of a pumping operation performed on the tunnel ends. Concrete casting 5, along with tubular structure 6, forms a provisional structure which, once the water is emptied, supports the positive buoyancy and the load of the infill ground.
  • The final structural support and water infiltration barrier functions are thus entrusted, during the step of use, to a definitive lining consisting of a reinforced concrete casting 7 performed from within, after removing structural contrasts 11 and by means of the use of a normal tunnel formwork, using tubular steel structure 6 as an external containment wall of the casting itself. Finally, finishes 8 are made within the structure thus obtained.
  • Changes may be made to the invention described and illustrated above to make variants which are however comprised in the scope of protection of the following claims.
  • Thus, for example, the single segments forming tubular structure 6 could be equipped with the mentioned internal lining 7 even before being immersed in water. The position of rib 17 and seal 19 could be reversed with respect to that shown in figure 6. Other technical solutions could be in any case adopted to reciprocally seal and fasten the various segments forming the mentioned structure 6.
  • The installation of tubular structure 6 may further occur by longitudinally sliding the various segments, with gradual immersion of the same joined one to the other. In this manner, structure 6 will continue to elongate as the laying of the mentioned segments progresses, maintaining its "tail" at the natural surface line while its "head" advances towards the valley point of the trench. The sliding of the various segments is obtained at runways made of prefabricated concrete elements, on which the necessary metallic equipment for the sliding of tubular structure 6 is mounted. The latter is further preferably formed by metallic material for railway tunnels, road tunnels and the like; alternatively, it may be formed by resin for containing cables, liquids, and the like.
  • Finally, the invention is not restricted only to the underwater tunnel illustrated in the figures, but may be extended both to even only partially immersed tunnels or tunnels laid in loose ground, and tunnels formed by several formwork structures 6 arranged side by side and embedded in the concrete casting 5 itself (e.g. double barrel tunnels).

Claims (20)

  1. A method for constructing an immersed tunnel, characterised in that the entire installation of the tunnel is completely performed in immersed state, i.e. directly in the place of installation of the tunnel itself.
  2. A method according to claim 1, characterised in that it provides the formation of a formwork structure (6) of said tunnel, this formation being made by gradual immersion and reciprocal engagement in water of a plurality of open-ended tunnel segments.
  3. A method according to claim 2, characterised in that the mentioned structure (6) determines a "negative", "disposal" formwork for the subsequent underwater concrete casting (5), outside and about the formwork itself still full of water.
  4. A method according to claim 3, characterised in that it provides the emptying of the water contained within said formwork structure (6) after the mentioned underwater concrete casting (5).
  5. A method according to claim 4, characterised in that it further provides the formation of a lining, within the mentioned formwork structure (6) emptied of the water, consisting of a reinforced concrete casting (6) using the structure (6) itself as external containment wall of the casting itself.
  6. A method according to claim 5, characterised in that the tunnel finishes (8) are made within said structure (6) thus obtained.
  7. A method for the construction of an immersed tunnel, characterised in that it provides:
    - the formation of a laying site of said tunnel,
    - the construction of a formwork structure (6),
    - the casting (5) of an underwater concrete about the mentioned structure (6), wherein all the mentioned operations are performed in an immersed state, i.e. directly in the place of installation of said tunnel and with the open structure (6) allowing the entrance of water inside.
  8. A method according to claim 7, characterised in that it contemplates the gradual immersion and the laying of a plurality of open-ended, reciprocally sealed segments forming said formwork structure (6) to complete the entire development of the mentioned formwork structure (6).
  9. A method according to claim 8, characterised in that it provides the immersion and the laying, from the top, of a formation first segment (9) of said formwork structure (6), the immersion and the laying of a second segment (12) of the same structure (6), with the concurrent fastening and sealed dimensional mating of the mentioned components (9, 12), the operation being continued until the entire development of said formwork structure (6) is completed.
  10. A method according to claim 8, characterised in that it contemplates the immersion and the laying, by longitudinal sliding, of said segments forming the mentioned formwork structure (6), with gradual immersion of the same joined in sequence one to the other.
  11. A method according to claim 8, characterised in that it further provides the making of a lining (7) inside said segments, preceded by the emptying of the water (3) from the mentioned formwork structure (6).
  12. A method according to claim 8, characterised in that the single segments which form said tubular structure (6) are equipped with an internal lining (7) even before being immersed.
  13. An immersed tunnel, of the type comprising a formwork structure (6), an underwater concrete casting (5) which externally surrounds said structure (6) and internal finishes (8), characterised in that it is constructed with the method according to one or more of the preceding claims.
  14. A tunnel according to claim 13, characterised in that the mentioned formwork structure (6) consists of a plurality of open-ended segments (9, 12) allowing the entrance of water present in the laying site of said tunnel.
  15. A tunnel according to claim 14, characterised in that said segments (9, 12) are provided, at their heads (14, 18), with shaped sections (13) suitable for obtaining the fastening and sealed dimensional mating of the segments themselves.
  16. A tunnel according to claim 15, characterised in that said shaped sections (13) comprise a groove (15) on the mentioned head (14) of said element (9), integrated with a fastening and sliding lead-in (16) with a corresponding rib (17) provided on the head (18) of the contiguous segment (12).
  17. A tunnel according to claims 15 or 16, characterised in that the shaped section (13) of one of said segments (9, 12) further comprises a seal (19) of the injectable type.
  18. A tunnel according to claim 13, characterised in that said formwork structure (6) is a metallic material tubular structure for railway tunnels, road tunnels and the like.
  19. A tunnel according to claim 13, characterised in that said formwork structure (6) is a resin tubular structure for the containment of cables, liquids and the like.
  20. A tunnel according to one or more of the preceding claims, characterised in that it is a single or double barrel tunnel.
EP07106719A 2007-04-23 2007-04-23 Method for constructing an immersed tunnel and tunnel obtained by said method Withdrawn EP1985764A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
EP07106719A EP1985764A1 (en) 2007-04-23 2007-04-23 Method for constructing an immersed tunnel and tunnel obtained by said method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
EP07106719A EP1985764A1 (en) 2007-04-23 2007-04-23 Method for constructing an immersed tunnel and tunnel obtained by said method

Publications (1)

Publication Number Publication Date
EP1985764A1 true EP1985764A1 (en) 2008-10-29

Family

ID=38613259

Family Applications (1)

Application Number Title Priority Date Filing Date
EP07106719A Withdrawn EP1985764A1 (en) 2007-04-23 2007-04-23 Method for constructing an immersed tunnel and tunnel obtained by said method

Country Status (1)

Country Link
EP (1) EP1985764A1 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103061329A (en) * 2012-08-28 2013-04-24 中铁十八局集团有限公司 Underwater grouting grout based on soft-base large immersed tunnel foundation and grouting process thereof
CN103266625A (en) * 2013-05-31 2013-08-28 中海石油(中国)有限公司番禺作业公司 Gravity base structure seabed base disc
CN103455660A (en) * 2013-07-24 2013-12-18 中交公路规划设计院有限公司 Method for analyzing stiffness influence lines of shear of shear keys of joints of immersed tube tunnel
CN104947714A (en) * 2015-04-24 2015-09-30 中国交通建设股份有限公司 End sealing door structure for immersed tube tunnel
CN110359471A (en) * 2019-08-16 2019-10-22 安徽建筑大学 Subaqueous tunnel highly permeable sandy soil layer impermeabilisation destroys structure and construction method
CN114960757A (en) * 2021-02-26 2022-08-30 宝山钢铁股份有限公司 Net-hanging masking type tunnel under still water surface and construction method thereof

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1909002A1 (en) * 1969-02-22 1970-09-10 Rinker Pedro Erwin Tunnel part for underwater tunnels
DE1658713A1 (en) * 1967-03-08 1970-11-05 Beton & Monierbau Ag Method and device for producing an underwater tunnel
WO2004113621A1 (en) * 2003-06-20 2004-12-29 Taisei Corporation Method of constructing underwater tunnel

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1658713A1 (en) * 1967-03-08 1970-11-05 Beton & Monierbau Ag Method and device for producing an underwater tunnel
DE1909002A1 (en) * 1969-02-22 1970-09-10 Rinker Pedro Erwin Tunnel part for underwater tunnels
WO2004113621A1 (en) * 2003-06-20 2004-12-29 Taisei Corporation Method of constructing underwater tunnel

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
MOLENAAR V L: "APPLICATIONS OF IMMERSION TECHNOLOGIES IN UNDERWATER CONSTRUCTION", TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, ELSEVIER SCIENCE PUBLISHING, NEW YORK,NY, US, vol. 3, no. 4 INDEX, January 1988 (1988-01-01), pages 353 - 361, XP000002613, ISSN: 0886-7798 *
RASMUSSEN N ET AL: "CHAPTER 9 CATALOQUE OF IMMERSED TUNNELS", TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, ELSEVIER SCIENCE PUBLISHING, NEW YORK,NY, US, vol. 12, no. 2, April 1997 (1997-04-01), pages 163 - 316, XP000688754, ISSN: 0886-7798 *

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103061329A (en) * 2012-08-28 2013-04-24 中铁十八局集团有限公司 Underwater grouting grout based on soft-base large immersed tunnel foundation and grouting process thereof
CN103061329B (en) * 2012-08-28 2015-01-07 中铁十八局集团有限公司 Underwater grouting grout based on soft-base large immersed tunnel foundation and grouting process thereof
CN103266625A (en) * 2013-05-31 2013-08-28 中海石油(中国)有限公司番禺作业公司 Gravity base structure seabed base disc
CN103266625B (en) * 2013-05-31 2015-04-22 中海石油(中国)有限公司番禺作业公司 Gravity base structure seabed base disc
CN103455660A (en) * 2013-07-24 2013-12-18 中交公路规划设计院有限公司 Method for analyzing stiffness influence lines of shear of shear keys of joints of immersed tube tunnel
CN103455660B (en) * 2013-07-24 2016-06-29 中交公路规划设计院有限公司 A kind of stiffness effect provision of on-line analysis methodology of Joints in Immersed Tunnel shear connector shearing
CN104947714A (en) * 2015-04-24 2015-09-30 中国交通建设股份有限公司 End sealing door structure for immersed tube tunnel
CN110359471A (en) * 2019-08-16 2019-10-22 安徽建筑大学 Subaqueous tunnel highly permeable sandy soil layer impermeabilisation destroys structure and construction method
CN110359471B (en) * 2019-08-16 2024-04-26 安徽建筑大学 Anti-seepage damage structure of strong water-permeable sandy soil layer of underwater tunnel and construction method
CN114960757A (en) * 2021-02-26 2022-08-30 宝山钢铁股份有限公司 Net-hanging masking type tunnel under still water surface and construction method thereof
CN114960757B (en) * 2021-02-26 2024-03-08 宝山钢铁股份有限公司 Calm subsurface net hanging masking type tunnel and construction method thereof

Similar Documents

Publication Publication Date Title
CN101148890B (en) Bridge caisson composite pile foundation and reverse construction method thereof
CN109555540B (en) Tunnel type prestressed pipe curtain structure and construction method
EP1985764A1 (en) Method for constructing an immersed tunnel and tunnel obtained by said method
CN103741714A (en) Full-cover excavation top-down construction method for underground engineering
CN103821219A (en) Top pipe construction modification inspection well construction method
US20160376762A1 (en) Construction method for planting hollow columns in a seabed of a marine environment for supporting waterborne structures thereon
CN105003270A (en) Underwater tunnel construction method suitable for ultra-shallow earthing conditions
CN209339169U (en) A kind of precipitation well in foundation pit plugging device
CN107091101A (en) Mine shield handing-over tunnel folded type joint design and construction method in the middle part of marine site
CN108915726A (en) Use the seamless tunnel structure and its construction method of ECC late poured band
CN108118690A (en) A kind of integral hoisting formula coercion underground continuous wall structure and its prefabricated and construction method
CN109914474A (en) A kind of pipe gallery U-type groove, which is excavated, presses push construction method
CN105040707B (en) Combine the construction method of close pile deep foundation pit support building enclosure
CN112012763B (en) Construction method of double-layer primary support multi-arch tunnel structure
CN112012762B (en) Construction method of double-layer secondary lining multi-arch tunnel structure
KR101029311B1 (en) Non-excavation laying method for pipeline and tunnel using temporary composite pipe
JP3645773B2 (en) Wastewater treatment method for underground wall and underground wall constructed by this method
KR100931918B1 (en) Underwater tunnelling method for using inner and outer water pressure of structure
CN207727603U (en) Big cushion cap deep basal pit formwork supporting system
CN216615981U (en) Basement outer wall post-cast strip precast slab reinforced structure
JP6584979B2 (en) Construction method of underground tank structure, underground tank structure
CN114457853A (en) Construction method of recyclable semi-rigid connected underground continuous wall
CN210140780U (en) Anti-clogging ecological permeable box culvert
CN109763518A (en) A kind of construction method of basement post-pouring zone
CN110159272A (en) The construction method of large span city tunnel with box top board structure

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC MT NL PL PT RO SE SI SK TR

AX Request for extension of the european patent

Extension state: AL BA HR MK RS

AKX Designation fees paid
REG Reference to a national code

Ref country code: DE

Ref legal event code: 8566

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN

18D Application deemed to be withdrawn

Effective date: 20090504