EP1936108A2 - Stabilising strut for a ladder or scaffolding - Google Patents

Stabilising strut for a ladder or scaffolding Download PDF

Info

Publication number
EP1936108A2
EP1936108A2 EP07024363A EP07024363A EP1936108A2 EP 1936108 A2 EP1936108 A2 EP 1936108A2 EP 07024363 A EP07024363 A EP 07024363A EP 07024363 A EP07024363 A EP 07024363A EP 1936108 A2 EP1936108 A2 EP 1936108A2
Authority
EP
European Patent Office
Prior art keywords
boom
ladder
strut
sliding sleeves
pivot
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP07024363A
Other languages
German (de)
French (fr)
Other versions
EP1936108B1 (en
EP1936108A3 (en
Inventor
Eberhard Lang
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hymer Leichtmetallbau GmbH and Co KG
Original Assignee
Hymer Leichtmetallbau GmbH and Co KG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hymer Leichtmetallbau GmbH and Co KG filed Critical Hymer Leichtmetallbau GmbH and Co KG
Publication of EP1936108A2 publication Critical patent/EP1936108A2/en
Publication of EP1936108A3 publication Critical patent/EP1936108A3/en
Application granted granted Critical
Publication of EP1936108B1 publication Critical patent/EP1936108B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E06DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS IN GENERAL; LADDERS
    • E06CLADDERS
    • E06C7/00Component parts, supporting parts, or accessories
    • E06C7/42Ladder feet; Supports therefor
    • E06C7/423Ladder stabilising struts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/24Scaffolds primarily resting on the ground comprising essentially special base constructions; comprising essentially special ground-engaging parts, e.g. inclined struts, wheels
    • EFIXED CONSTRUCTIONS
    • E06DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS IN GENERAL; LADDERS
    • E06CLADDERS
    • E06C1/00Ladders in general
    • E06C1/02Ladders in general with rigid longitudinal member or members
    • E06C1/14Ladders capable of standing by themselves
    • E06C1/16Ladders capable of standing by themselves with hinged struts which rest on the ground
    • E06C1/20Ladders capable of standing by themselves with hinged struts which rest on the ground with supporting struts formed as poles
    • E06C1/22Ladders capable of standing by themselves with hinged struts which rest on the ground with supporting struts formed as poles with extensible, e.g. telescopic, ladder parts or struts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/24Scaffolds primarily resting on the ground comprising essentially special base constructions; comprising essentially special ground-engaging parts, e.g. inclined struts, wheels
    • E04G2001/248Inclined struts

Definitions

  • the invention relates to a boom for a ladder or scaffolding according to the preamble of claim 1.
  • pivotable boom - in the form of a rod - to arrange.
  • the invention relates to according to all the above-mentioned ladders and scaffolding, in which it is possible to pivotally attach a lateral boom rod.
  • the boom To move the boom to a working position (spread apart from the ladder or scaffold), the boom must be swung sideways and lengthened to allow a support point on the ground remote from the ladder or scaffolding.
  • the boom If the boom is to be pivoted in and brought into a non-active rest position, then it must be pivoted to the ladder or the scaffold and its length shortened.
  • each one part of the wire hanger is pivotally mounted on the boom and the opposite part of the wire hanger can be suspended or removed from the ladder.
  • the invention is therefore based on the object, a boom for a ladder, a scaffold or the like educate so that it provides both a Schwenkwinkelbegrenzung the boom to the outside and inward, which works much more reliable and easier than the known solutions.
  • the invention is characterized by the technical teaching of claim 1.
  • the pivot limiting for the boom consists in particular two aligned superimposed sliding sleeves, which are penetrated by the boom and which are arranged displaceably on the boom, that in each case a boom strut with one end pivotally connected to the sliding sleeve and with its other end pivotally connected to a ladder part.
  • boom struts are now fixed and no longer removable, each attached to a ladder part and are pivotally mounted there.
  • the respective sliding sleeve is in the upper third of the boom, and the boom struts are arranged approximately parallel to the longitudinal axis of the ladder struts of the ladder part.
  • the boom is pivoted slightly outwards by means of a spring or by manual force.
  • the sliding sleeves fall by gravity down and slide along the longitudinal axis down due to gravity on a dead center on the longitudinal axis of the boom.
  • the swung-out position can only be reversed by moving with hand force on the boom struts or the sliding sleeves against the previous displacement movement of the sliding sleeves up to move these sliding sleeves back over the dead center on the boom and this while the boom in the direction of its rest position against to move and lay the ladder.
  • Such a boom assembly can be attached to any ladder, scaffolding, podium, podium ladder and the like.
  • the invention is therefore not limited to the arrangement of a particular ladder or a particular scaffolding.
  • the invention provides several embodiments, and for such a change in length, it is important that the boom is pulled out to achieve its working position or extended in length to a support length, with the support length can adapt to the level of the ground.
  • the boom At rest, the boom is shortened in length so as not to exceed the outer dimensions of the ladder or ladder parts.
  • variable length devices are z.
  • clamping devices that can change a telescopic boom in length or spring clamps or wedge clamps orJnabsteckvorraumen, so that the boom rod consists of two telescoping telescoping tube parts, the length adjustment by inserting a stake in two oppositely aligned holes arranged in the one another reaching pipe parts is achieved.
  • the boom In addition to the change in length by the intermeshing of telescoping tubes is provided in another embodiment, the boom also foldable or to make variable in length in other ways.
  • a stepladder 1 which consists of two ladder parts 3, 4, which are pivotally connected to each other at its upper portion by a bearing block 7.
  • a pivot bearing 6 for the attachment of the upper end of a boom 5 is shown.
  • FIG. 1 only a single boom 5 shown, although in practice always on both sides of a ladder or scaffolding such a boom 5 is arranged.
  • the ladder is not only on the two pivotally hinged to each other ladder parts 3, 4, but also on the left and right of the ladder parts 3, 4 splayed out boom fifth
  • the invention provides that the boom 5 passes through two sliding sleeves 13, 14, which are thus arranged displaceably and with a corresponding sliding play on the boom 5.
  • the sliding sleeves 13, 14 are preferably designed as pipe clamps, to which the invention is not limited. It is important that the profile of the sliding sleeves 13, 14 is adapted to the profile of the boom 5. Accordingly, the boom 5 could for example also consist of an oval profile or another profile, and the profile of the sliding sleeves 13, 14 would then adapted to this profile.
  • the sliding sleeves are not only arranged longitudinally displaceable on the boom 5, but also rotatable.
  • the profile shape of the sliding sleeves 13, 14 may be adapted to the profile of the boom 5 accordingly.
  • FIG. 1 shows the swung working position of the boom brace.
  • FIG. 2 shows that the two sliding sleeves 13, 14 in the direction of arrow 19 from a raised rest position to the working position FIG. 1 and 2 were moved automatically and gravitationally, according to FIG. 2 the two sliding sleeves 13, 14 have been moved so far in the direction of arrow 19 in the boom that they have overcome a dead center 20 and create below this dead center on a stop rivet 21.
  • Each sliding sleeve 13, 14 is in this case connected to a pivot bearing 17, 18, on which one end of a cantilever strut 11, 12 is pivotally hinged.
  • the other end of the respective cantilever strut 11, 12 is pivotally connected to a pivot hook 16, which is bent and with his bent end engages in a arranged on the inside of the respective conductor part 3, 4 hinge plate 15.
  • the bend of the swivel hook 16 and its pivotable mounting on both sides - on the one hand on the boom strut 11, 12 and on the other hand on the hinge plate 15 - has the purpose that in the pivoted state of the boom 5, when this is approximately parallel to the longitudinal axis of the ladder parts 3, 4 directed , the two boom struts 11, 12 are pivoted in front of the ladder parts 3, 4 and therefore create on the outside of the ladder parts 3, 4 and can not get into the space between the ladder parts 3, 4.
  • FIG. 3 shows as a preferred embodiment, an automatic or at least partially automatic swinging out of the boom under spring force.
  • a biasing spring 8 is arranged, with its one end on the pivot bearing 6 and with its other end 9 on the pivotable Part of the boom 5 supporting load.
  • the invention also relates to a solution in which the biasing spring 8 can be omitted. If the biasing spring 8 is omitted, the necessary pivotal movement in the direction of the arrow 25 must be carried out completely by hand.
  • the sliding sleeve 13 shifts from its rest position 13 'in the direction of arrow 22 (here, for example clockwise), while the sliding sleeve from its rest position 14' in the position 14 in the direction of arrow 23 (here counterclockwise, for example) twisted, so that the Turning directions of the two sliding sleeves 13, 14 are opposite to each other.
  • FIG. 4 shows at the same time that in the rest position, the respective cantilever strut 11 ', 12' is aligned exactly parallel to the longitudinal axis of the conductor parts 3, 4.
  • the previously described overcoming the dead center 20 is according to FIG. 1 defined by the angle 24 between the longitudinal axis of the boom strut 11, 12 and the longitudinal axis of the boom 5 is less than 90 degrees to achieve the desired self-locking.

Abstract

The arm (5) has an upper hinge (6) pivoted away from it laterally for lateral support of the ladder (1) where an end of arm prop (11,12) is connected with the ladder below the upper hinge and the other end of arm prop is connected with the arm pivoted both at ladder and sliding sleeves where the sliding sleeves is engaged through the arm and guided axially in a sliding manner. The material of the sliding sleeves (13,14) is made up of plastic and the material of the arm is made up of metal, particularly aluminum.

Description

Die Erfindung betrifft einen Ausleger für eine Leiter oder ein Arbeitsgerüst nach dem Oberbegriff des Patentanspruches 1.The invention relates to a boom for a ladder or scaffolding according to the preamble of claim 1.

Zur seitlichen Abstützung von Podestleitern, Stehleitern, Plattformleitern, Bockleitern und beliebigen Arbeitsgerüsten ist es bekannt, an jeweils der Seite der Leiter oder des Arbeitsgerüstes einen verschwenkbaren Ausleger - in der Form eine Stabes - schwenkbar anzuordnen.For the lateral support of platform ladders, ladders, platform ladders, ladders and any scaffolds, it is known to pivot on each of the side of the ladder or scaffold a pivotable boom - in the form of a rod - to arrange.

Die Erfindung betrifft dem gemäß alle vorgenannten Leitern und Arbeitsgerüste, bei denen es möglich ist, einen seitlichen Auslegerstab schwenkbar anzubringen.The invention relates to according to all the above-mentioned ladders and scaffolding, in which it is possible to pivotally attach a lateral boom rod.

Hierbei ist es bekannt, den Ausleger am oberen Ende der Leiter oder des Gerüstes in einem Schwenkgelenk anzuordnen und im Übrigen den Ausleger längenveränderbar auszubilden.It is known to arrange the boom at the upper end of the ladder or the frame in a pivot joint and otherwise form the boom variable in length.

Um den Ausleger in eine Arbeitsposition (abgespreizt von der Leiter oder dem Arbeitsgerüst) zu bringen, muss der Ausleger seitlich ausgeschwenkt werden und in seiner Länge verlängert werden, um eine Abstützungspunkt am Erdboden entfernt von der Leiter oder dem Gerüst zu ermöglichen.To move the boom to a working position (spread apart from the ladder or scaffold), the boom must be swung sideways and lengthened to allow a support point on the ground remote from the ladder or scaffolding.

Soll der Ausleger eingeschwenkt werden und in eine nicht-aktive Ruhelage gebracht werden, dann muss er an die Leiter oder das Gerüst herangeschwenkt werden und hierbei seine Länge verkürzt werden.If the boom is to be pivoted in and brought into a non-active rest position, then it must be pivoted to the ladder or the scaffold and its length shortened.

Zur Halterung des Auslegers an der Leiter oder dem Gerüst ist es ferner bekannt, im Abstand vom Schwenkgelenk eine weitere Halterung oder Abstützung vorzusehen, die vermeidet, dass der ausgestellte Ausleger unbeabsichtigt vom Gerüst oder der Leiter wegschwenkt.To support the boom on the ladder or the scaffold, it is also known to provide a further support or support at a distance from the pivot joint, which avoids that the issued boom unintentionally pivots away from the frame or the ladder.

Für diese Abstützung ist es bekannt, Bänder zu verwenden, wobei ein Band beispielsweise an dem einen Leiterteil und das andere Band an dem anderen Leiterteil ansetzt und die beiden Bänder sich etwa in der Mitte des Auslegers treffen und dort mit diesem verbunden sind. Auf diese Weise wird eine Schwenkwinkelbegrenzung des Auslegers erreicht.For this support, it is known to use bands, with one band, for example, on one conductor part and the other band on the other Ladder part attaches and the two bands meet approximately in the middle of the boom and there are connected to this. In this way, a pivoting angle limit of the boom is achieved.

In einer anderen bekannten Ausführungsform ist es vorgesehen, dass statt der Bänder einhängbare Drahtbügel verwendet werden, wobei jeweils der eine Teil des Drahtbügels schwenkbar an dem Ausleger befestigt ist und der gegenüberliegende Teil des Drahtbügels an der Leiter einhängbar oder wegnehmbar ist.In another known embodiment, it is provided that instead of the bands hook-in wire hanger are used, each one part of the wire hanger is pivotally mounted on the boom and the opposite part of the wire hanger can be suspended or removed from the ladder.

Nachteil der verwendeten Bänder ist jedoch, dass sie biegeschlaff sind. Sie schützen den Ausleger doch nur gegen eine Bewegung, die nach außen gerichtet ist, begrenzen die Stützweite nach außen.Disadvantage of the bands used, however, is that they are limp. They protect the boom but only against a movement that is directed outwards, limit the span to the outside.

Sie schützen jedoch nicht dagegen, dass der Ausleger bei der Arbeit mit der Leiter oder dem Arbeitsgerüst langsam nach innen wandert und die Leiter hierdurch instabil wird. In Extremfällen kann es vorkommen, dass die beiden seitlichen Ausleger die Leiter anheben, wobei die Leiterteile dann nicht mehr alle zugleich im Kontakt mit der Aufstellfläche sind.However, they do not protect against the fact that the boom moves slowly inwards when working with the ladder or scaffold and the ladder becomes unstable. In extreme cases, it may happen that the two side arms lift the ladder, whereby the ladder parts are then not all at the same time in contact with the footprint.

Nachteil der bekannten, einhängbaren Streben, welche sowohl die Stützweite nach innen als nach außen begrenzen, ist jedoch, dass sie getrennt eingehängt werden müssen, was einen zusätzlichen Arbeitsgang erfordert. Bei dieser Art der Befestigung besteht die Gefahr, dass der Benutzer die Einhängung der Drahtbügel nicht vornimmt, wodurch der Ausleger nicht fixiert ist, oder es besteht auch die Gefahr, dass die Drahtbügel unbeabsichtigt aushängen, was die Betriebssicherheit beeinträchtigt.Disadvantage of the known, hinged struts, which limit both the span inwards and outwards, however, is that they must be hung separately, which requires an additional operation. In this type of attachment, there is a risk that the user does not make the hanging of the wire hanger, whereby the boom is not fixed, or there is a risk that the wire hanger unintentionally unhook, which affects the reliability.

Im Übrigen besteht bei dieser bekannten Lösung die Gefahr, dass die in der Ruhelage lose am Ausleger herunterbaumelnden Drahtbügel zu Verletzungen führen, außer sie werden noch in einer besonderen Aufnahmevorrichtung festgehalten. Die Einhängung der Drahtbügel in der Ruhelage im Bereich dieser Aufnahmevorrichtung erfordert jedoch wiederum einen weiteren Arbeitsvorgang.Incidentally, there is a risk in this known solution that loose in the rest position herunterbaumelnden on the boom wire hangers lead to injury, unless they are still held in a special recording device. However, the suspension of the wire bracket in the rest position in the region of this recording device in turn requires another operation.

Der Erfindung liegt deshalb die Aufgabe zugrunde, einen Ausleger für eine Leiter, ein Arbeitsgerüst oder dergleichen so weiterzubilden, dass er sowohl eine Schwenkwinkelbegrenzung des Auslegers nach außen als auch nach innen vorsieht, die wesentlich betriebssicherer und einfacher als die bekannten Lösungen arbeitet.The invention is therefore based on the object, a boom for a ladder, a scaffold or the like educate so that it provides both a Schwenkwinkelbegrenzung the boom to the outside and inward, which works much more reliable and easier than the known solutions.

Zur Lösung der gestellten Aufgabe ist die Erfindung durch die technische Lehre des Anspruches 1 gekennzeichnet.To solve the problem, the invention is characterized by the technical teaching of claim 1.

Wesentliches Merkmal der Erfindung ist, dass die Schwenkbegrenzung für den Ausleger aus insbesondere zwei fluchtend übereinander angeordneten Schiebehülsen besteht, die von dem Ausleger durchgriffen sind und die verschiebbar auf dem Ausleger angeordnet sind, dass ferner jeweils eine Auslegerstrebe mit ihrem einen Ende schwenkbar mit der Schiebehülse und mit ihrem anderen Ende schwenkbar mit einem Leiterteil verbunden ist.An essential feature of the invention is that the pivot limiting for the boom consists in particular two aligned superimposed sliding sleeves, which are penetrated by the boom and which are arranged displaceably on the boom, that in each case a boom strut with one end pivotally connected to the sliding sleeve and with its other end pivotally connected to a ladder part.

Mit der gegebenen technischen Lehre ergibt sich nun der wesentliche Vorteil, dass eine feste Auslegerstreben-Anordnung für die Fixierung des Auslegers vorgesehen ist, wie sie in Form von aushängbaren Drahtbügeln bereits schon beim Stand der Technik bekannt war.With the given technical teaching, there is now the significant advantage that a fixed boom strut arrangement is provided for the fixation of the boom, as it was already known in the art in the form of aushängbaren wire hangers.

Wesentlicher Unterschied bei der Erfindung ist jedoch, dass diese Auslegerstreben nun fest und nicht mehr abnehmbar jeweils an einem Leiterteil befestigt sind und dort schwenkbar gelagert sind.The main difference in the invention, however, is that these boom struts are now fixed and no longer removable, each attached to a ladder part and are pivotally mounted there.

Ist der Ausleger in seiner Ruhelage und hierbei an das Leiterteil oder das Gerüst herangeklappt, dann befindet sich die jeweilige Schiebehülse im oberen Drittel des Auslegers, und die Auslegerstreben sind etwa parallel zur Längsachse der Leiterholme des Leiterteils angeordnet.If the boom in its rest position and this folded up on the ladder part or the frame, then the respective sliding sleeve is in the upper third of the boom, and the boom struts are arranged approximately parallel to the longitudinal axis of the ladder struts of the ladder part.

Sobald die Leiter aufgeklappt wird, wird mittels einer Feder oder mittels Handkraft der Ausleger geringfügig nach außen verschwenkt. Hierdurch fallen die Schiebehülsen schwerkraftbedingt nach unten und gleiten entlang der Längsachse schwerkraftbedingt über einen Totpunkt auf der Längsachse des Auslegers herunter.As soon as the ladder is opened, the boom is pivoted slightly outwards by means of a spring or by manual force. As a result, the sliding sleeves fall by gravity down and slide along the longitudinal axis down due to gravity on a dead center on the longitudinal axis of the boom.

Damit ist gewährleistet, dass der Ausleger sich nicht mehr bewegen kann, er verharrt deshalb in seiner ausgeschwenkten Lage.This ensures that the boom can no longer move, so it remains in its swung-out position.

Die ausgeschwenkte Lage kann nur dadurch rückgängig gemacht werden, indem mit Handkraft an den Auslegerstreben oder den Schiebehülsen entgegen der vorherigen Verschiebebewegung der Schiebehülsen nach oben verfahren wird, um diese Schiebehülsen wieder über den Totpunkt am Ausleger hinauszubewegen und hierbei gleichzeitig den Ausleger in Richtung seiner Ruhelage gegen die Leiter zu bewegen und anzulegen.The swung-out position can only be reversed by moving with hand force on the boom struts or the sliding sleeves against the previous displacement movement of the sliding sleeves up to move these sliding sleeves back over the dead center on the boom and this while the boom in the direction of its rest position against to move and lay the ladder.

Es handelt sich also um eine selbsthemmende Anordnung von Auslegerstreben, die mit Hilfe von zwei sich gegeneinander bewegbaren Schiebehülsen auf dem Ausleger verschiebbar angelenkt sind.It is therefore a self-locking arrangement of boom struts, which are articulated by means of two mutually movable sliding sleeves on the boom slidably.

Damit ergibt sich der wesentliche Vorteil, dass nun erstmals eine feste Verbindung zwischen einem Ausleger und einer Leiter und einem Arbeitsgerüst gegeben ist, die nicht ausgehängt werden kann, die nicht verloren geht und die den Ausleger sowohl in Richtung seiner Schwenkstellung nach außen als auch in seiner Schwenkstellung nach innen absolut arretiert.This results in the significant advantage that now for the first time a firm connection between a boom and a ladder and a scaffold is given, which can not be unhooked, which is not lost and the boom both in the direction of its pivotal position to the outside and in his Pivoting position absolutely locked inwards.

Eine solche Auslegeranordnung kann an jeder beliebigen Leiter, jedem beliebigen Arbeitsgerüst, jedem Podest, jeder Podestleiter und dergleichen befestigt werden. Die Erfindung ist deshalb nicht auf die Anordnung an einer bestimmten Leiter oder einem bestimmten Arbeitsgerüst beschränkt.Such a boom assembly can be attached to any ladder, scaffolding, podium, podium ladder and the like. The invention is therefore not limited to the arrangement of a particular ladder or a particular scaffolding.

Es wird noch hinzugefügt, dass es bekannt ist, den Ausleger längenveränderbar zu gestalten. Hierbei sieht die Erfindung mehrere Ausführungsformen vor, und für eine derartige Längenveränderung ist es wichtig, dass der Ausleger zur Erreichung seiner Arbeitsstellung ausgezogen wird oder in seiner Länge auf eine Stützlänge verlängert wird, wobei sich die Stützlänge dem Niveau des Untergrundes anpassen kann.It is also added that it is known to make the boom variable in length. Here, the invention provides several embodiments, and for such a change in length, it is important that the boom is pulled out to achieve its working position or extended in length to a support length, with the support length can adapt to the level of the ground.

In der Ruhestellung wird der Ausleger in seiner Länge verkürzt, um ihn nicht über die Außenabmessungen der Leiter oder Leiterteile hinausstehen zu lassen.At rest, the boom is shortened in length so as not to exceed the outer dimensions of the ladder or ladder parts.

Für diese Längenveränderbarkeit gibt es eine Vielzahl von Ausführungsformen, die in Verbindung mit der erfindungsgemäßen Anlenkung des Auslegers an der Leiter beansprucht werden.For this Längenveränderbarkeit there are a variety of embodiments, which are claimed in connection with the invention articulation of the boom on the ladder.

Derartige längenveränderbare Vorrichtungen sind z. B. Klemmvorrichtungen, die einen teleskopierbaren Ausleger in der Länge verändern können oder Federklemmmechanismen oder Keilklemmvorrichtungen oder auch Längenabsteckvorrichtungen, so dass der Auslegerstab aus zwei ineinander verschiebbaren teleskopierbaren Rohrteilen besteht, wobei die Längeneinstellung durch das Einstecken eines Absteckelementes in zwei gegenüberliegend fluchtend angeordneten Bohrungen von den ineinander greifenden Rohrteilen erreicht wird.Such variable length devices are z. As clamping devices that can change a telescopic boom in length or spring clamps or wedge clamps or Längenabsteckvorrichtungen, so that the boom rod consists of two telescoping telescoping tube parts, the length adjustment by inserting a stake in two oppositely aligned holes arranged in the one another reaching pipe parts is achieved.

Neben der Längenveränderung durch das Ineinandergreifen von teleskopierbaren Rohren ist in einer anderen Ausführungsform vorgesehen, den Ausleger auch klappbar oder in anderer Weise längenveränderbar zu gestalten.In addition to the change in length by the intermeshing of telescoping tubes is provided in another embodiment, the boom also foldable or to make variable in length in other ways.

Der Erfindungsgegenstand der vorliegenden Erfindung ergibt sich nicht nur aus dem Gegenstand der einzelnen Patentansprüche, sondern auch aus der Kombination der einzelnen Patentansprüche untereinander.The subject of the present invention results not only from the subject matter of the individual claims, but also from the combination of the individual claims with each other.

Alle in den Unterlagen, einschließlich der Zusammenfassung offenbarten Angaben und Merkmale, insbesondere die in den Zeichnungen dargestellte räumliche Ausbildung, werden als erfindungswesentlich beansprucht, soweit sie einzeln oder in Kombination gegenüber dem Stand der Technik neu sind.All information and features disclosed in the documents, including the abstract, in particular the spatial design shown in the drawings, are claimed to be essential to the invention insofar as they are novel individually or in combination with respect to the prior art.

Im Folgenden wird die Erfindung anhand von lediglich einen Ausführungsweg darstellenden Zeichnungen näher erläutert. Hierbei gehen aus den Zeichnungen und ihrer Beschreibung weitere erfindungswesentliche Merkmale und Vorteile der Erfindung hervor.In the following the invention will be explained in more detail with reference to drawings showing only one embodiment. Here are from the drawings and their description further features essential to the invention and advantages of the invention.

Es zeigen:

Figur 1:
ausschnittweise, perspektivische Darstellung einer Plattformleiter mit dem erfindungsgemäßen Ausleger in ausgeschwenktem Zustand
Figur 2:
eine vergrößerte Darstellung wie in Figur 1
Figur 3:
eine vergrößerte Darstellung der Anlenkung des Auslegers an dem oberen Leiternteil
Figur 4:
die Ruhestellung der Schiebehülsen der Auslegerstreben, wenn der Ausleger an die Leiter angeschwenkt ist
Show it:
FIG. 1:
partial, perspective view of a platform ladder with the boom according to the invention in swung out state
FIG. 2:
an enlarged view as in FIG. 1
FIG. 3:
an enlarged view of the articulation of the boom on the upper ladder part
FIG. 4:
the rest position of the sliding sleeves of the boom struts when the boom is pivoted to the ladder

Im gezeigten Ausführungsbeispiel wird eine Stehleiter 1 dargestellt, die aus zwei Leiterteilen 3, 4 besteht, die an ihrem oberen Bereich durch einen Lagerbock 7 schwenkbar miteinander verbunden sind.
Im Bereich des Lagerbockes 7 ist hierbei ein Schwenklager 6 für die Befestigung des oberen Endes eines Auslegers 5 dargestellt.
In the embodiment shown, a stepladder 1 is shown, which consists of two ladder parts 3, 4, which are pivotally connected to each other at its upper portion by a bearing block 7.
In the region of the bearing block 7 in this case a pivot bearing 6 for the attachment of the upper end of a boom 5 is shown.

Aus zeichnerischen Gründen ist in der Figur 1 lediglich ein einziger Ausleger 5 dargestellt, obwohl in der Praxis stets an beiden Seiten einer Leiter oder eines Arbeitsgerüstes ein derartiger Ausleger 5 angeordnet ist.For graphic reasons is in the FIG. 1 only a single boom 5 shown, although in practice always on both sides of a ladder or scaffolding such a boom 5 is arranged.

Somit steht die Leiter nicht nur auf den beiden schwenkbar zueinander angelenkten Leiterteilen 3, 4, sondern auch noch auf den links und rechts von den Leiterteilen 3, 4 abgespreizten Auslegern 5.Thus, the ladder is not only on the two pivotally hinged to each other ladder parts 3, 4, but also on the left and right of the ladder parts 3, 4 splayed out boom fifth

Jeder Ausleger ist längenveränderbar. Dies wurde in der allgemeinen Beschreibung vorstehend erläutert.Each boom is variable in length. This has been explained in the general description above.

Um nun den Ausleger von einer eingeschwenkten Ruhelage in eine ausgeschwenkte Arbeitslage zu bringen, ist erfindungsgemäß vorgesehen, dass der Ausleger 5 zwei Schiebehülsen 13, 14 durchgreift, die somit verschiebbar und mit entsprechendem Schiebespiel auf dem Ausleger 5 angeordnet sind.In order to bring the boom from a pivoted rest position into a swung-out working position, the invention provides that the boom 5 passes through two sliding sleeves 13, 14, which are thus arranged displaceably and with a corresponding sliding play on the boom 5.

Selbstverständlich ist zur Lösung der Erfindung nicht notwendig, Schiebehülsen als rundumlaufende, den Ausleger 5 umgreifende Hülsen zu verwenden. Es kann auch vorgesehen werden, dass die Schiebehülsen nur etwa Dreiviertel des Umfang des Auslegers umgreifen oder jedenfalls mehr als die Hälfte.Of course, to solve the invention is not necessary to use sliding sleeves as all-round, the boom 5 embracing sleeves. It can also be provided that the sliding sleeves embrace only about three quarters of the circumference of the boom or anyway more than half.

Die Schiebehülsen 13, 14 sind bevorzugt als Rohrschellen ausgebildet, worauf die Erfindung jedoch nicht beschränkt ist. Wichtig ist, dass das Profil der Schiebehülsen 13, 14 dem Profil des Auslegers 5 angepasst ist. Dementsprechend könnte der Ausleger 5 beispielsweise auch aus einem Ovalprofil oder einem anderen Profil bestehen, und das Profil der Schiebehülsen 13, 14 wäre dann diesem Profil angepasst.The sliding sleeves 13, 14 are preferably designed as pipe clamps, to which the invention is not limited. It is important that the profile of the sliding sleeves 13, 14 is adapted to the profile of the boom 5. Accordingly, the boom 5 could for example also consist of an oval profile or another profile, and the profile of the sliding sleeves 13, 14 would then adapted to this profile.

Voraussetzung für diese Formgebung ist allerdings, dass die Schiebehülsen nicht nur längs verschiebbar auf dem Ausleger 5 angeordnet sind, sondern auch verdrehbar. Zu diesem Zweck kann die Profilform der Schiebehülsen 13, 14 dem Profil des Auslegers 5 entsprechend angepasst sein.However, a prerequisite for this shaping is that the sliding sleeves are not only arranged longitudinally displaceable on the boom 5, but also rotatable. For this purpose, the profile shape of the sliding sleeves 13, 14 may be adapted to the profile of the boom 5 accordingly.

Die Figur 1 zeigt die ausgeschwenkte Arbeitsstellung der Ausleger-Verstrebung. Hierbei ist in Verbindung mit Figur 2 erkennbar, dass die beiden Schiebehülsen 13, 14 in Pfeilrichtung 19 von einer angehobenen Ruhelage in die Arbeitsstellung nach Figur 1 und 2 selbsttätig und schwerkraftbedingt verschoben wurden, wobei gemäß Figur 2 die beiden Schiebehülsen 13, 14 so weit in Pfeilrichtung 19 im Ausleger verschoben wurden, dass sie einen Totpunkt 20 überwunden haben und sich unterhalb dieses Totpunktes an einem Anschlagniet 21 anlegen.The FIG. 1 shows the swung working position of the boom brace. This is in conjunction with FIG. 2 recognizable that the two sliding sleeves 13, 14 in the direction of arrow 19 from a raised rest position to the working position FIG. 1 and 2 were moved automatically and gravitationally, according to FIG. 2 the two sliding sleeves 13, 14 have been moved so far in the direction of arrow 19 in the boom that they have overcome a dead center 20 and create below this dead center on a stop rivet 21.

Jede Schiebehülse 13, 14 ist hierbei mit einem Schwenklager 17, 18 verbunden, an dem schwenkbar das eine Ende jeweils einer Auslegerstrebe 11, 12 angelenkt ist.Each sliding sleeve 13, 14 is in this case connected to a pivot bearing 17, 18, on which one end of a cantilever strut 11, 12 is pivotally hinged.

Das andere Ende der jeweiligen Auslegerstrebe 11, 12 ist hierbei schwenkbar mit einem Schwenkhaken 16 verbunden, der abgekröpft ist und mit seinem abgekröpften Ende in einem an der Innenseite des jeweiligen Leiterteils 3, 4 angeordneten Scharnierplatte 15 eingreift.The other end of the respective cantilever strut 11, 12 is pivotally connected to a pivot hook 16, which is bent and with his bent end engages in a arranged on the inside of the respective conductor part 3, 4 hinge plate 15.

Die Abkröpfung des Schwenkhakens 16 und dessen beidseitige schwenkbare Lagerung - einerseits an der Auslegerstrebe 11, 12 und andererseits an der Scharnierplatte 15 - hat den Zweck, dass im eingeschwenkten Zustand des Auslegers 5, wenn dieser etwa parallel zur Längsachse der Leiterteile 3, 4 gerichtet ist, die beiden Auslegerstreben 11, 12 vor die Leiterteile 3, 4 verschwenkt werden und deshalb an der Außenseite der Leiterteile 3, 4 anlegen und nicht in den Zwischenraum zwischen die Leiterteile 3, 4 gelangen können.The bend of the swivel hook 16 and its pivotable mounting on both sides - on the one hand on the boom strut 11, 12 and on the other hand on the hinge plate 15 - has the purpose that in the pivoted state of the boom 5, when this is approximately parallel to the longitudinal axis of the ladder parts 3, 4 directed , the two boom struts 11, 12 are pivoted in front of the ladder parts 3, 4 and therefore create on the outside of the ladder parts 3, 4 and can not get into the space between the ladder parts 3, 4.

Damit ist gewährleistet, dass die beiden Leiterteile 3, 4 komplett geschlossen werden können, ohne dass sich die Auslegerstreben 11, 12 in diesen Zwischenraum hineindrängen.This ensures that the two conductor parts 3, 4 can be completely closed, without the boom struts 11, 12 push into this space.

Es handelt sich somit um eine Zwangsführung der Auslegerstreben 11, 12 in ihrem Anlenkpunkt an den Leiterteilen 3, 4.
Die Figur 3 zeigt als bevorzugte Ausführungsform eine selbsttätige oder zumindest teilweise selbsttätige Ausschwenkung des Auslegers unter Federkraft.
It is thus a positive guidance of the boom struts 11, 12 in their point of articulation on the ladder parts 3, 4.
The FIG. 3 shows as a preferred embodiment, an automatic or at least partially automatic swinging out of the boom under spring force.

Zu diesem Zweck ist vorgesehen, dass im Bereich des Schwenklagers 6 - welches am Lagerbock 7 der Leiterteile 3, 4 angelenkt ist - eine Vorspannfeder 8 angeordnet ist, die mit ihrem einen Ende am Schwenklager 6 und die sich mit ihrem anderen Ende 9 an dem schwenkbaren Teil des Auslegers 5 lastübertragend abstützt.For this purpose, it is provided that in the region of the pivot bearing 6 - which is hinged to the bearing block 7 of the conductor parts 3, 4 - a biasing spring 8 is arranged, with its one end on the pivot bearing 6 and with its other end 9 on the pivotable Part of the boom 5 supporting load.

Es handelt sich um eine selbsttätige Ausschwenkung des Auslegers 5. Im Ruhezustand sind die beiden Ausleger mit einem Band oder einer anderen Feststellvorrichtung an den Leiterteilen 3, 4 fixiert. Sobald dieses Band oder die Feststellvorrichtung gelöst wurde, wirkt das freie Federende 9 der Vorspannfeder 8 auf den schwenkbaren Teil des Auslegers 5, der somit in Pfeilrichtung 25 nach außen verschwenkt wird.It is an automatic swinging out of the boom 5. At rest, the two arms are fixed to the ladder parts 3, 4 with a tape or other locking device. Once this tape or the locking device has been released, the free spring end 9 of the biasing spring 8 acts on the pivotable part of the boom 5, which is thus pivoted in the direction of arrow 25 to the outside.

Aufgrund dieser Schwenkbewegung fallen die beiden Schiebehülsen 13, 14 - wie dies bezüglich der Schiebehülsen 13' und 14' in Figur 1 gestrichelt angedeutet ist und ihrer oberen angehobenen Lage schwerkraftbedingt in Pfeilrichtung 19 nach unten, wie diese in Figur 1 in ausgezogenen Strichen dargestellt ist.Due to this pivoting movement fall the two sliding sleeves 13, 14 - as with respect to the sliding sleeves 13 'and 14' in FIG. 1 is indicated by dashed lines and their upper raised position due to gravity in the direction of arrow 19 down, like this in FIG. 1 shown in solid lines.

Die Erfindung betrifft selbstverständlich auch eine Lösung, bei der die Vorspannfeder 8 entfallen kann. Entfällt die Vorspannfeder 8, muss die notwendige Schwenkbewegung in Pfeilrichtung 25 vollständig von Hand durchgeführt werden.Of course, the invention also relates to a solution in which the biasing spring 8 can be omitted. If the biasing spring 8 is omitted, the necessary pivotal movement in the direction of the arrow 25 must be carried out completely by hand.

Es wird noch angefügt, dass der Ausleger 5 in der Schwenkachse 10 am Schwenklager 6 schwenkbar gehalten ist.It is also added that the boom 5 is pivotally supported in the pivot axis 10 on the pivot bearing 6.

Beim Verschieben der Schiebehülsen 13, 14 in Pfeilrichtung 19 verdrehen diese sich gleichzeitig auf dem Ausleger 5, was in Figur 4 dargestellt ist.When moving the sliding sleeves 13, 14 in the direction of arrow 19, these rotate at the same time on the boom 5, which in FIG. 4 is shown.

Die Schiebehülse 13 verschiebt sich aus ihrer Ruhelage 13' in der Pfeilrichtung 22 (hier z.B. im Uhrzeigersinn), während sich die Schiebehülse aus ihrer Ruhelage 14' in die Lage 14 in Pfeilrichtung 23 (hier z.B. im Gegen-Uhrzeigersinn) verdreht, so dass die Drehrichtungen der beiden Schiebehülsen 13, 14 zueinander gegenläufig sind.The sliding sleeve 13 shifts from its rest position 13 'in the direction of arrow 22 (here, for example clockwise), while the sliding sleeve from its rest position 14' in the position 14 in the direction of arrow 23 (here counterclockwise, for example) twisted, so that the Turning directions of the two sliding sleeves 13, 14 are opposite to each other.

Die Figur 4 zeigt gleichzeitig, dass in der Ruhelage die jeweilige Auslegerstrebe 11', 12' genau parallel zur Längsachse der Leiterteile 3, 4 ausgerichtet ist.The FIG. 4 shows at the same time that in the rest position, the respective cantilever strut 11 ', 12' is aligned exactly parallel to the longitudinal axis of the conductor parts 3, 4.

Die vorher beschriebene Überwindung des Totpunktes 20 wird gemäß Figur 1 dadurch definiert, dass der Winkel 24 zwischen der Längsachse der Auslegerstrebe 11, 12 und der Längsachse des Auslegers 5 kleiner als 90 Grad ist, um die gewünschte Selbsthemmung zu erreichen.The previously described overcoming the dead center 20 is according to FIG. 1 defined by the angle 24 between the longitudinal axis of the boom strut 11, 12 and the longitudinal axis of the boom 5 is less than 90 degrees to achieve the desired self-locking.

In dieser Stellung ist es nicht mehr möglich, durch Angreifen an dem Ausleger oder der Leiter diesen aus seiner ausgeschwenkten Arbeitslage herauszubringen.In this position, it is no longer possible to bring out by attacking the boom or the ladder from its swung working position.

Selbst beim seitlichen Bewegen der Leiter, bei dem ein Ausleger von der Aufstellfläche abhebt, führt dies nicht dazu, dass dieser seine Arbeitsstellung verlässt. Er bleibt immer in der ausgeschwenkten Arbeitsstellung erhalten. Dies führt deshalb nicht zu einem unerwünschten Wandern des Aufstellpunktes des Auslegers in Richtung auf die Leiter, wodurch die Leiter hochgehoben wird.Even moving the ladder sideways, with a boom lifting off the footprint, will not cause it to leave its working position. He always stays in the swung-out position. Therefore, this does not lead to an undesirable migration of the erection point of the boom in the direction of the ladder, whereby the ladder is lifted.

Mit der Erfindung besteht der Vorteil, dass die Auslegerstreben nun praktisch unlösbar mit den Leiterteilen 3, 4 verbunden sind und es keiner getrennten Bedienung der Auslegerstreben 11, 12 bedarf. Ebenso erfolgt ein selbsttätiges Ausschwenken des Auslegers von der eingeklappten Ruhestellung in die Arbeitsstellung, die federkraftunterstützt ist.With the invention, there is the advantage that the boom struts are now virtually inextricably linked to the ladder parts 3, 4 and there is no need for separate operation of the boom struts 11, 12. Likewise, an automatic pivoting of the boom takes place from the retracted rest position into the working position, which is supported by spring force.

Dies führt zu einer ausgesprochen komfortablen Bedienung einer Leiter oder eines Gerüstes mit seitlich daran befestigten Auslegern 5. Es können deshalb keine Bedienungsfehler mehr bei der Bedienung der Ausleger vorkommen.This leads to a very comfortable operation of a ladder or a scaffold with jibs attached laterally thereto. Therefore, there can be no operating errors in the operation of the boom.

Zeichnungslegendedrawing Legend

11
Stehleiterstepladder
22
Plattformplatform
33
Leiterteilladder section
44
Leiterteilladder section
55
Auslegerboom
66
Schwenklagerpivot bearing
77
Lagerbock (für Leiterteile)Bearing block (for ladder parts)
88th
Vorspannfederbiasing spring
99
EndeThe End
1010
Schwenkachseswivel axis
1111
Auslegerstrebeboom strut
1212
Auslegerstrebeboom strut
1313
Schiebehülsesliding sleeve
1414
Schiebehülsesliding sleeve
1515
Scharnierplattehinge plate
1616
Schwenkhakenswivel hook
1717
Schwenklagerpivot bearing
1818
Schwenklagerpivot bearing
1919
Pfeilrichtungarrow
2020
Totpunktdead
2121
AnschlagnietAnschlagniet
2222
Pfeilrichtungarrow
2323
Pfeilrichtungarrow
2424
Winkel < 90°Angle <90 °
2525
Pfeilrichtungarrow

Claims (12)

Ausleger (5) für eine Leiter (1) oder ein Arbeitsgerüst oder dergleichen, der daran über ein oberes Schwenkgelenk (6, 10) angelenkt ist und zur seitlichen Abstützung der Leiter (1) seitlich davon wegschwenkbar ist, wobei unterhalb des Schwenkgelenks (6, 10) ein Ende mindestens einer Auslegerstrebe (11, 12) mit der Leiter (1) verbunden ist, und das andere Ende der Auslegerstrebe (11, 12) mit dem Ausleger (5) verbunden ist, dadurch gekennzeichnet, dass die Auslegerstrebe (11, 12) sowohl an der Leiter (1), als auch an einer Schiebehülse (13, 14) schwenkbar angelenkt ist, wobei die Schiebehülse (13, 14) vom Ausleger (5) durchgriffen und auf diesem axial verschiebbar geführt ist.A boom (5) for a ladder (1) or scaffolding or the like articulated thereto by an upper pivot (6, 10) and pivotable laterally therefrom for lateral support of the ladder (1), below the pivot (6), 10) one end of at least one cantilever strut (11, 12) is connected to the ladder (1) and the other end of the cantilever strut (11, 12) is connected to the cantilever (5), characterized in that the cantilever strut (11, 12) is articulated pivotably both on the conductor (1), and on a sliding sleeve (13, 14), wherein the sliding sleeve (13, 14) from the boom (5) penetrated and guided on this axially displaceable. Ausleger (5) nach Anspruch 1, dadurch gekennzeichnet, dass im Betriebszustand mit seitlich von der Leiter (1) ausgeklapptem Ausleger (5), sich die Schiebehülse (13, 14) unterhalb eines die Axialverschiebbarkeit der Schiebehülse (13, 14) selbsthemmenden Totpunktes (20) befindet, der horizontal unterhalb des Anlenkpunktes (15, 16) der Auslegerstrebe (11, 12) an der Leiter (1) liegt.Boom (5) according to claim 1, characterized in that in the operating state with the boom (5) laterally folded away from the ladder (5), the sliding sleeve (13, 14) below a Axialverschiebbarkeit the sliding sleeve (13, 14) self-locking dead center ( 20) located horizontally below the pivot point (15, 16) of the boom strut (11, 12) on the conductor (1). Ausleger (5) nach einem der Ansprüche 1 bis 3, dadurch gekennzeichnet, dass zwei auf dem Ausleger (5) fluchtend übereinander angeordnete und axial darauf verschiebbare Schiebehülsen (13, 14) vorgesehen sind, die jeweils mit einer Auslegerstrebe (11, 12) gelenkig verbunden sind.Boom (5) according to one of claims 1 to 3, characterized in that two on the boom (5) arranged one above the other and axially displaceable sliding sleeves (13, 14) are provided, each articulated with a boom strut (11, 12) are connected. Ausleger (5) nach Anspruch 3, dadurch gekennzeichnet, dass die zwei Schiebehülsen (13, 14) gegeneinander verdrehbar miteinander verbunden sind.Boom (5) according to claim 3, characterized in that the two sliding sleeves (13, 14) are mutually rotatably connected to each other. Ausleger (5) nach Anspruch 4, dadurch gekennzeichnet, dass die Verbindung der zwei Schiebehülsen (13, 14) über eine Schnapp-Rast-Verbindung erfolgt.Boom (5) according to claim 4, characterized in that the connection of the two sliding sleeves (13, 14) via a snap-locking connection. Ausleger (5) nach Anspruch 5, dadurch gekennzeichnet, dass die Schnapp-Rast-Verbindung der zwei Schiebehülsen (13, 14) eine mantelseitige, ringsumlaufende Nut-Feder-Verbindung ist.Boom (5) according to claim 5, characterized in that the snap-locking connection of the two sliding sleeves (13, 14) is a shell-side, circumferential groove-spring connection. Ausleger (5) nach einem der Ansprüche 1 bis 6, dadurch gekennzeichnet, dass die Auslegerstrebe (11, 12) fest und nicht abnehmbar an der Leiter (1) befestigt ist.Boom (5) according to one of claims 1 to 6, characterized in that the boom strut (11, 12) fixed and not removable on the ladder (1) is attached. Ausleger (5) nach einem der Ansprüche 1 bis 7, dadurch gekennzeichnet, dass der Ausleger (5) längenveränderbar ausgebildet ist.Boom (5) according to one of claims 1 to 7, characterized in that the boom (5) is designed to be variable in length. Ausleger (5) nach einem der Ansprüche 1 bis 8, dadurch gekennzeichnet, dass das Wegschwenken des Auslegers (5) von der Leiter (1) mindestens anfänglich durch eine vorgespannte Feder (8) erfolgt.Boom (5) according to one of claims 1 to 8, characterized in that the pivoting away of the boom (5) from the conductor (1) at least initially by a prestressed spring (8). Ausleger (5) nach einem der Ansprüche 1 bis 9, dadurch gekennzeichnet, dass das Schwenkgelenk (6, 10) ein Schwenklager (6) aufweist, das an einem Lagerbock (7) befestigt ist, der die gelenkige Verbindung zwischen zwei gegeneinander stellbaren Leiterteilen (3, 4) der als Stehleiter ausgebildeten Leiter (1) bildet.A boom (5) according to any one of claims 1 to 9, characterized in that the pivot joint (6, 10) comprises a pivot bearing (6) which is fixed to a bearing block (7), the articulated connection between two mutually adjustable ladder parts ( 3, 4) formed as a stepladder conductor (1). Ausleger (5) nach einem der Ansprüche 1 bis 10, dadurch gekennzeichnet, dass die Anlenkung der Auslegerstrebe (11, 12) an einem Holm der Leiter (1) bewirkt wird.Boom (5) according to one of claims 1 to 10, characterized in that the articulation of the boom strut (11, 12) on a spar of the ladder (1) is effected. Ausleger (5) nach einem der Ansprüche 1 bis 11, dadurch gekennzeichnet, dass das Material der Schiebehülsen (13, 14) aus Kunststoff und das Material des Auslegers (5) aus Metall, insbesondere Aluminium, ist.Boom (5) according to one of claims 1 to 11, characterized in that the material of the sliding sleeves (13, 14) made of plastic and the material of the boom (5) made of metal, in particular aluminum, is.
EP07024363A 2006-12-21 2007-12-15 Stabilising strut for a ladder or scaffolding Active EP1936108B1 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE102006060730A DE102006060730B4 (en) 2006-12-21 2006-12-21 Boom for a ladder or work scaffold

Publications (3)

Publication Number Publication Date
EP1936108A2 true EP1936108A2 (en) 2008-06-25
EP1936108A3 EP1936108A3 (en) 2010-01-06
EP1936108B1 EP1936108B1 (en) 2011-08-17

Family

ID=39106291

Family Applications (1)

Application Number Title Priority Date Filing Date
EP07024363A Active EP1936108B1 (en) 2006-12-21 2007-12-15 Stabilising strut for a ladder or scaffolding

Country Status (4)

Country Link
EP (1) EP1936108B1 (en)
AT (1) ATE520856T1 (en)
DE (1) DE102006060730B4 (en)
ES (1) ES2371667T3 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018138464A1 (en) * 2017-01-24 2018-08-02 Binks John Vincent Improvements in step ladder stabilisers

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4641729A (en) 1985-10-31 1987-02-10 Beck Andrew C Method and apparatus for stabilizing a ladder
DE10104689A1 (en) 2001-01-29 2001-08-09 Horst Laug Telescopic stabilizer strut for ladders has sleeve, traction and pressure strut, suspension eyelet and hook.

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2997127A (en) * 1959-10-07 1961-08-22 Wojtowicz Michael Stepladder with improved stabilizing legs
US3327810A (en) * 1966-05-10 1967-06-27 Up Right Inc Self-supported ladder
US5511632A (en) * 1994-07-25 1996-04-30 Ermis; Jerry J. Ladder with auxiliary support
DE29821356U1 (en) * 1998-11-30 1999-03-04 Laug Horst Stabilizing supports for fixed and single ladders

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4641729A (en) 1985-10-31 1987-02-10 Beck Andrew C Method and apparatus for stabilizing a ladder
DE10104689A1 (en) 2001-01-29 2001-08-09 Horst Laug Telescopic stabilizer strut for ladders has sleeve, traction and pressure strut, suspension eyelet and hook.

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018138464A1 (en) * 2017-01-24 2018-08-02 Binks John Vincent Improvements in step ladder stabilisers

Also Published As

Publication number Publication date
EP1936108B1 (en) 2011-08-17
DE102006060730B4 (en) 2009-09-24
EP1936108A3 (en) 2010-01-06
ES2371667T3 (en) 2012-01-09
ATE520856T1 (en) 2011-09-15
DE102006060730A1 (en) 2008-07-03

Similar Documents

Publication Publication Date Title
EP1921249B1 (en) Hybrid ladder having a platform
DE2107477B2 (en) AWNING BOX FOR A HINGED ARM AWNING
DE2851987A1 (en) SUPPORTING DEVICE FOR LADDERS
DE202017101917U1 (en) Stand, especially for laptops or notebooks
EP1936108B1 (en) Stabilising strut for a ladder or scaffolding
DE3327025A1 (en) Double ladder
DE2529048A1 (en) SCISSOR STAIRS ARRANGED IN A HATCH
DE202013103014U1 (en) Umbrella with an eccentric umbrella cap
DE202020100570U1 (en) Side trolley and kitchen system with a side trolley
EP1247717B1 (en) Mounting arrangement for a visible signal, especially for a railway signal
DE2343406C3 (en) Uneven bars
DE2357738C2 (en) Bedside table with side swiveling and extending table top
EP3748099B1 (en) Awning
EP3431700B1 (en) Stabilizing device for ladders
EP3293841A1 (en) Pivoting anchor for securing conductors
AT510959B1 (en) WINDOW WITH A WING FLOATED IN A POCKET FRAME
DE202007014823U1 (en) Folding arm
DE202023102628U1 (en) Rear ladder for mounting on a rear wall of a motor vehicle
DE202014104769U1 (en) Lightweight slewing crane system
DE2540400C2 (en) Rack winch
DE102007060974A1 (en) Rod for luggage rack in luggage compartment of vehicle, has rod part and another rod part which are formed as push rod and are connected with each other by swivel joint
DE7714779U1 (en) FOLDING TABLE TENNIS TABLE
DE6920820U (en) FOLDING WARDROBE
DE7800850U1 (en) TILT JOINT FOR A BOX AWNING
WO2002061230A1 (en) Supporting device for laterally stabilising ladders

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A2

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC MT NL PL PT RO SE SI SK TR

AX Request for extension of the european patent

Extension state: AL BA HR MK RS

PUAL Search report despatched

Free format text: ORIGINAL CODE: 0009013

AK Designated contracting states

Kind code of ref document: A3

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC MT NL PL PT RO SE SI SK TR

AX Request for extension of the european patent

Extension state: AL BA HR MK RS

RIC1 Information provided on ipc code assigned before grant

Ipc: E04G 1/24 20060101ALI20091201BHEP

Ipc: E06C 7/42 20060101AFI20080229BHEP

Ipc: E06C 1/22 20060101ALI20091201BHEP

17P Request for examination filed

Effective date: 20100617

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

AKX Designation fees paid

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC MT NL PL PT RO SE SI SK TR

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC MT NL PL PT RO SE SI SK TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

Free format text: NOT ENGLISH

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

Free format text: LANGUAGE OF EP DOCUMENT: GERMAN

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 502007007958

Country of ref document: DE

Effective date: 20111020

REG Reference to a national code

Ref country code: NL

Ref legal event code: VDEP

Effective date: 20110817

REG Reference to a national code

Ref country code: ES

Ref legal event code: FG2A

Ref document number: 2371667

Country of ref document: ES

Kind code of ref document: T3

Effective date: 20120109

LTIE Lt: invalidation of european patent or patent extension

Effective date: 20110817

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20110817

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20110817

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20111219

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20110817

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20110817

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20111217

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20110817

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20110817

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20110817

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20111118

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20110817

REG Reference to a national code

Ref country code: IE

Ref legal event code: FD4D

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20110817

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20110817

Ref country code: IE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20110817

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20110817

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20110817

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20110817

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20110817

BERE Be: lapsed

Owner name: HYMER LEICHTMETALLBAU G.M.B.H. & CO. KG

Effective date: 20111231

26N No opposition filed

Effective date: 20120521

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20111231

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20111215

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 502007007958

Country of ref document: DE

Effective date: 20120521

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20111231

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20111231

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20111215

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20111231

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20110817

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20111215

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20111117

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20110817

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20110817

REG Reference to a national code

Ref country code: AT

Ref legal event code: MM01

Ref document number: 520856

Country of ref document: AT

Kind code of ref document: T

Effective date: 20121215

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20121215

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 9

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 10

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 11

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: ES

Payment date: 20180105

Year of fee payment: 11

REG Reference to a national code

Ref country code: ES

Ref legal event code: FD2A

Effective date: 20200204

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: ES

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20181216

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 20231219

Year of fee payment: 17

Ref country code: DE

Payment date: 20231214

Year of fee payment: 17