EP1887139A1 - Method of removing a tight cable, associated system and devices - Google Patents

Method of removing a tight cable, associated system and devices Download PDF

Info

Publication number
EP1887139A1
EP1887139A1 EP07111874A EP07111874A EP1887139A1 EP 1887139 A1 EP1887139 A1 EP 1887139A1 EP 07111874 A EP07111874 A EP 07111874A EP 07111874 A EP07111874 A EP 07111874A EP 1887139 A1 EP1887139 A1 EP 1887139A1
Authority
EP
European Patent Office
Prior art keywords
cable
cradles
bridging device
current
current portion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP07111874A
Other languages
German (de)
French (fr)
Other versions
EP1887139B1 (en
Inventor
Sébastien PETIT
Guy Sevoz
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Soletanche Freyssinet SA
Original Assignee
Freyssinet SAS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Freyssinet SAS filed Critical Freyssinet SAS
Publication of EP1887139A1 publication Critical patent/EP1887139A1/en
Application granted granted Critical
Publication of EP1887139B1 publication Critical patent/EP1887139B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D22/00Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/16Suspension cables; Cable clamps for suspension cables ; Pre- or post-stressed cables
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10TECHNICAL SUBJECTS COVERED BY FORMER USPC
    • Y10TTECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION
    • Y10T29/00Metal working
    • Y10T29/49Method of mechanical manufacture
    • Y10T29/49815Disassembling
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10TECHNICAL SUBJECTS COVERED BY FORMER USPC
    • Y10TTECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION
    • Y10T29/00Metal working
    • Y10T29/49Method of mechanical manufacture
    • Y10T29/49815Disassembling
    • Y10T29/49822Disassembling by applying force
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10TECHNICAL SUBJECTS COVERED BY FORMER USPC
    • Y10TTECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION
    • Y10T29/00Metal working
    • Y10T29/49Method of mechanical manufacture
    • Y10T29/49815Disassembling
    • Y10T29/49822Disassembling by applying force
    • Y10T29/49824Disassembling by applying force to elastically deform work part or connector

Definitions

  • the supports 18 advantageously form cradles receiving the current part of the cable 1 as illustrated in FIG. 8. They are held by one or more cables 20 situated higher than the cable 1, to which they are connected by means of lines 17 by example. In the example illustrated in FIG. 8, the cradles 18 are thus suspended to rest on two cables 20 located on either side of the cable 1.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)
  • Flexible Shafts (AREA)
  • Transmission Of Braking Force In Braking Systems (AREA)
  • Cable Accessories (AREA)
  • Processing Of Terminals (AREA)

Abstract

The method involves extending a cable (1) in a manner that a part of the cable is liberated from anchoring points. The part is liberated from another part of the points. The part is supported and evacuated remote from the anchoring points, where the part is sectioned during its evacuation. The part is supported using a support (18) arranged to raise the part and is maintained using a crane or scaffolding tower type auxiliary structure. An independent claim is also included for a system for dismounting a cable stretched between anchoring points on a structure.

Description

La présente invention concerne le démontage d'un câble tendu entre deux points d'ancrage sur une structure.The present invention relates to the dismantling of a cable stretched between two anchor points on a structure.

Un tel démontage est souvent considéré comme problématique, en particulier lorsque aucun dispositif spécifique n'a été prévu lors de la conception initiale de la structure auquel le câble participe.Such disassembly is often considered problematic, especially when no specific device has been provided during the initial design of the structure in which the cable participates.

Tout d'abord, le fait que le câble soit tendu entre des points d'ancrage empêche de le libérer simplement de la structure.First, the fact that the cable is stretched between anchor points prevents it from simply releasing it from the structure.

Ensuite, même une fois que le câble a été libéré de la structure, il est encore susceptible d'endommager cette dernière. Si la structure est en service, comme dans le cas d'un pont dont le tablier est soumis à une circulation automobile par exemple, le démontage du câble peut en outre entraîner une interruption de service relativement longue.Then, even once the cable has been released from the structure, it is still likely to damage the structure. If the structure is in use, as in the case of a bridge whose apron is subjected to traffic for example, disassembly of the cable may also cause a relatively long service interruption.

Un but de la présente invention est de permettre un démontage de câble plus aisé.An object of the present invention is to allow easier cable disassembly.

L'invention propose ainsi un procédé de démontage d'un câble tendu entre un premier et un deuxième points d'ancrage sur une structure comprenant les étapes suivantes :

  • libérer une partie courante du câble desdits premier et deuxième points d'ancrage;
  • supporter ladite partie courante du câble ; et
  • évacuer ladite partie courante du câble à distance d'un au moins desdits premier et deuxième points d'ancrage.
The invention thus proposes a method of disassembling a cable stretched between a first and a second anchorage point on a structure comprising the following steps:
  • releasing a running portion of the cable from said first and second anchor points;
  • supporting said current portion of the cable; and
  • discharging said current portion of the cable away from at least one of said first and second anchor points.

Selon ce procédé, le support et l'évacuation de ladite partie courante du câble sont effectués à l'aide d'une pluralité d'appuis répartis le long de ladite partie courante du câble et formant des berceaux pour ladite partie courante du câble, maintenus chacun par au moins un autre câble situé plus haut que ledit câble, les berceaux étant reliés les uns aux autres et étant montés de façon à pouvoir se déplacer le long dudit autre câble.According to this method, the support and the evacuation of said current part of the cable are carried out using a plurality of supports distributed along said current part of the cable and forming cradles for said current portion of the cable, maintained each by at least one other cable located higher than said cable, the cradles being connected to each other and being mounted so as to be able to move along said other cable.

Avantageusement, la libération de la partie courante du câble desdits premier et deuxième points d'ancrage comprend une détension du câble de façon que la partie courante du câble soit libérée d'un desdits premier et deuxième points d'ancrage et une libération de ladite partie courante du câble de l'autre desdits premier et deuxième points d'ancrage.Advantageously, the release of the current portion of the cable of said first and second anchor points comprises a release of the cable so that the current portion of the cable is released from one of said first and second anchor points and a release of said portion cable of the other of said first and second anchor points.

Une telle détension préalable du câble permet une libération d'une grande partie de celui-ci, sans danger pour l'environnement immédiat du câble, et le support de la partie courante du câble permet en outre d'éviter d'endommager la structure auquel le câble participe.Such pre-tensioning of the cable makes it possible to release a large part of it, without endangering the immediate environment of the cable, and the support of the current part of the cable also makes it possible to avoid damaging the structure to which the cable participates.

L'invention propose aussi un dispositif d'appui pour un câble tendu entre un premier et un deuxième points d'ancrage sur une structure. Ce dispositif d'appui comprend :

  • une pluralité de berceaux aptes à être répartis le long d'une partie courante du câble pour constituer des appuis pour ladite partie courante du câble ;
  • des moyens pour que chaque berceau de la pluralité repose sur au moins un autre câble situé plus haut que ledit câble et puisse se déplacer le long dudit autre câble ; et
  • des moyens reliant les berceaux les uns aux autres.
The invention also proposes a support device for a cable stretched between a first and a second anchoring point on a structure. This support device comprises:
  • a plurality of cradles adapted to be distributed along a current portion of the cable to form supports for said current portion of the cable;
  • means for each cradle of the plurality to rest on at least one other cable located higher than said cable and to move along said other cable; and
  • means connecting the cradles to each other.

L'invention propose en outre un système de démontage d'un câble tendu entre un premier et un deuxième points d'ancrage sur une structure. Ce système inclut un dispositif d'appui comprenant :

  • une pluralité de berceaux aptes à être répartis le long d'une partie courante du câble pour constituer des appuis pour ladite partie courante du câble ;
  • des moyens pour que chaque berceau de la pluralité repose sur au moins un autre câble situé plus haut que ledit câble et puisse se déplacer le long dudit autre câble ; et
  • des moyens reliant les berceaux les uns aux autres,
et un dispositif de pontage pour détendre le câble tendu, le dispositif de pontage comprenant :
  • deux colliers aptes à être positionnés autour du câble de façon à assurer un contact sensiblement sans glissement le long du câble ;
  • des barres de traction reliant lesdits colliers ;
  • des moyens de réglage de l'effort de traction transitant dans les barres de traction ; et
  • des moyens de surveillance de l'effort de traction transitant dans les barres de traction.
The invention further proposes a system for dismounting a cable stretched between a first and a second anchor point on a structure. This system includes a support device comprising:
  • a plurality of cradles adapted to be distributed along a current portion of the cable to form supports for said current portion of the cable;
  • means for each cradle of the plurality to rest on at least one other cable located higher than said cable and to move along said other cable; and
  • means connecting the cradles to each other,
and a bridging device for expanding the tensioned cable, the bridging device comprising:
  • two collars adapted to be positioned around the cable so as to ensure a substantially non-slip contact along the cable;
  • pull bars connecting said collars;
  • means for adjusting the traction force transiting the traction bars; and
  • means for monitoring the traction force passing through the drawbars.

D'autres particularités et avantages de la présente invention apparaîtront dans la description ci-après d'exemples de réalisation non limitatifs, en référence aux dessins annexés, dans lesquels :

  • la figure 1 est un schéma représentant un exemple de câble tendu à démonter ;
  • la figure 2 est un schéma illustrant des dispositifs de pontage utilisés pour détendre le câble de la figure 1 ;
  • les figures 3 à 5 sont des schémas montrant des étapes successives de la détension d'un câble selon un mode de réalisation avantageux de l'invention ;
  • la figure 6 est un schéma montrant un mode de support du câble de la figure 1 une fois détendu ;
  • la figure 7 est un schéma montrant un autre mode de support du câble de la figure 1 une fois détendu ;
  • la figure 8 est une vue transversale d'une partie du dispositif d'appui utilisé selon le mode de support de la figure 7 ;
  • la figure 9 est un schéma montrant une étape intermédiaire de l'évacuation du câble de la figure 1 selon un mode de réalisation avantageux de l'invention.
Other features and advantages of the present invention will become apparent in the following description of nonlimiting exemplary embodiments, with reference to the appended drawings, in which:
  • Figure 1 is a diagram showing an example of tensioned cable to be dismantled;
  • Figure 2 is a diagram illustrating bridging devices used to relax the cable of Figure 1;
  • Figures 3 to 5 are diagrams showing successive steps of the detension of a cable according to an advantageous embodiment of the invention;
  • Fig. 6 is a diagram showing a support mode of the cable of Fig. 1 when relaxed;
  • Figure 7 is a diagram showing another support mode of the cable of Figure 1 when relaxed;
  • Figure 8 is a transverse view of a portion of the support device used according to the support mode of Figure 7;
  • Figure 9 is a diagram showing an intermediate step of the evacuation of the cable of Figure 1 according to an advantageous embodiment of the invention.

L'invention est ci-après décrite dans l'exemple non limitatif d'un câble de hauban. Elle s'applique toutefois également à tout autre type de câble tendu entre deux points d'ancrage sur une structure (câble porteur d'un pont suspendu, câble de précontrainte, etc.).The invention is hereinafter described in the nonlimiting example of a stay cable. However, it also applies to any other type of cable stretched between two anchor points on a structure (cable carrying a suspension bridge, prestressing cable, etc.).

La figure 1 montre un câble de hauban 1 tendu entre deux points d'ancrage sur un pont à hauban 2. Le premier point d'ancrage 5 est situé sur un pylône 3 du pont 2, tandis que le deuxième point d'ancrage 6 est situé sur le tablier 4 du pont 2.FIG. 1 shows a stay cable 1 stretched between two anchoring points on a cable-stayed bridge 2. The first anchoring point 5 is located on a pylon 3 of the deck 2, while the second anchoring point 6 is located on deck 4 of deck 2.

Bien que cela n'aie pas été représenté sur la figure 1, d'autres câbles sensiblement parallèles au câble 1 peuvent être tendus entre des points d'ancrage correspondants sur le pont 2.Although this has not been shown in FIG. 1, other cables substantially parallel to the cable 1 can be stretched between corresponding anchoring points on the bridge 2.

La présente invention vise à démonter le câble 1 sans endommager ni le pont 2, ni les éventuels autres câbles ancrés sur le pont 2.The present invention aims to dismantle the cable 1 without damaging either the bridge 2 or any other cables anchored on the bridge 2.

A cet effet, on peut détendre le câble 1 de façon qu'une partie courante de ce câble soit libérée de l'ancrage 5 et/ou de l'ancrage 6 qui le liaient à la structure 2.For this purpose, it is possible to relax the cable 1 so that a current part of this cable is released from the anchor 5 and / or the anchor 6 which binds it to the structure 2.

On rappelle que la libération d'un élément structurel linéaire composé d'un ou plusieurs brins métalliques et fortement tendu entre deux points considérés comme relativement fixes, comme c'est le cas du câble 1 de la figure 1, est souvent problématique, notamment lorsque aucun dispositif spécifique n'a été prévu lors de la conception initiale.It is recalled that the release of a linear structural element composed of one or more metal strands and stretched between two points considered relatively fixed, as is the case of the cable 1 of FIG. 1, is often problematic, especially when no specific device was planned during initial design.

En particulier, une réduction de la section résistante d'un tel câble par découpe, sans prendre de précautions particulières, ferait augmenter les contraintes dans la section restante jusqu'à atteindre la contrainte de rupture de la matière. La rupture en résultant serait brutale et produirait des effets dynamiques néfastes, puisque la brusque libération de l'énergie emmagasinée dans le câble pourrait entraîner des déformations rapides, importantes et incontrôlées ("effet de fouet"), extrêmement dangereuses pour l'environnement immédiat du câble, c'est-à-dire pour la structure auquel le câble participe, mais aussi pour le personnel chargé de la découpe du câble.In particular, a reduction of the resistant section of such a cable by cutting, without taking special precautions, would increase the stresses in the remaining section until the breaking stress of the material. The resulting fracture would be abrupt and produce harmful dynamic effects, since the sudden release of stored energy in the cable could lead to rapid, large and uncontrolled deformations ("whipping effect"), extremely dangerous for the immediate environment of the cable. cable, that is to say for the structure in which the cable participates, but also for the staff responsible for cutting the cable.

Une détension du câble 1 permet avantageusement de limiter ces inconvénients. Elle peut par exemple être réalisée en plaçant, à proximité du point d'ancrage haut 5 et/ou du point d'ancrage bas 6 du câble 1, un dispositif de pontage 7 capable de reprendre l'effort de traction du câble sur une portion de celui-ci (voir figure 2).A detension of the cable 1 advantageously makes it possible to limit these disadvantages. It can for example be achieved by placing, near the top anchoring point 5 and / or the lower anchoring point 6 of the cable 1, a bridging device 7 capable of taking up the pulling force of the cable on a portion of it (see Figure 2).

Comme cela apparaît sur les figures 3 à 5, ce dispositif de pontage 7 peut comprendre deux colliers de serrage 12 positionnés autour du câble 1 pour assurer une connexion structurelle avec celui-ci. Chacun de ces colliers 12 a de préférence la capacité de supporter l'effort de traction F du câble 1 sensiblement sans glissement le long de celui-ci. En particulier, si le câble 1 est muni d'une gaine entourant les brins métalliques qui le constituent, cette gaine sera avantageusement retirée au droit des colliers 12.As shown in FIGS. 3 to 5, this bridging device 7 may comprise two clamps 12 positioned around the cable 1 to provide a structural connection therewith. Each of these collars 12 preferably has the capacity to withstand the tensile force F of the cable 1 substantially without sliding along it. In particular, if the cable 1 is provided with a sheath surrounding the metal strands that constitute it, this sheath will advantageously be removed at the right of the collars 12.

En outre, dans l'exemple illustré sur les figures 3 à 5, des barres de traction 13 relient les colliers 12 afin de réaliser le pontage proprement dit. Ces barres de traction sont avantageusement au nombre de deux au moins et sont de préférence disposées de manière que leur centre de gravité se situe sensiblement au même endroit que celui du câble 1 à détendre. Elles sont choisies pour être capables de supporter l'effort de traction F auquel le câble 1 est initialement soumis.In addition, in the example illustrated in FIGS. 3 to 5, pull bars 13 connect the collars 12 in order to carry out the actual bridging. These drawbars are preferably at least two in number and are preferably arranged so that their center of gravity is substantially at the same location as that of the cable 1 to be relaxed. They are chosen to be able to withstand the tensile force F to which the cable 1 is initially subjected.

Dans l'exemple illustré sur les figures 3 à 5, des moyens de réglage 14 de l'effort de traction transitant dans les barres de traction 13 ont été représentés. Ces moyens de réglage 14 peuvent par exemple comprendre des vérins.In the example illustrated in FIGS. 3 to 5, adjustment means 14 for the traction force passing through the traction bars 13 have been represented. These adjustment means 14 may for example comprise cylinders.

En outre, des moyens de surveillance (ou monitoring) 15 de l'effort de traction transitant dans les barres de traction peuvent aussi être utilisés. Sur les figures, les moyens de réglage 14 et les moyens de surveillance 15 de l'effort de traction ont été représentés à proximité d'extrémités opposées des barres de traction 13. On comprendra toutefois que de tels moyens peuvent être positionnés différemment, par exemple du même côté des barres de traction.In addition, means of monitoring (or monitoring) 15 the traction force transiting in the drawbars can also be used. In the figures, the adjustment means 14 and the means 15 for monitoring the tensile force have been shown near opposite ends of the pull rods 13. However, it will be understood that such means can be positioned differently, for example on the same side of the drawbars.

Dans l'étape illustrée à la figure 3, le câble 1 est soumis à l'effort de traction F qui correspond à la tension initiale du câble sur l'ensemble de sa longueur comprise entre les ancrages 5 et 6. A ce stade, l'effort de traction dans le dispositif de pontage est nul ou quasi nul.In the step illustrated in Figure 3, the cable 1 is subjected to the tensile force F which corresponds to the initial tension of the cable over its entire length between the anchors 5 and 6. At this point, the tensile force in the bridging device is zero or almost zero.

Par la suite, les barres de traction 13 du dispositif de pontage 7 sont mises en tension - ce qui est symbolisé sur la figure 4 par la tension f - jusqu'à ce que la somme de leurs tensions atteigne une valeur supérieure ou égale à une valeur supposée de l'effort de traction F du câble 1. Bien sûr, si la valeur de l'effort de traction F est connue, les barres de traction 13 pourront être mises en tension pour atteindre précisément cette valeur.Subsequently, the traction bars 13 of the bridging device 7 are put into tension - which is symbolized in FIG. 4 by the voltage f - until the sum of their voltages reaches a value greater than or equal to assumed value of the tensile force F of the cable 1. Of course, if the value the tensile force F is known, the pull rods 13 can be tensioned to reach precisely this value.

A l'issue de cette opération, l'effort F a été totalement transféré de la portion considérée 11 du câble 1 au dispositif de pontage 7 correspondant. La portion 11 du câble est alors soumise à un effort quasiment nul.At the end of this operation, the force F has been totally transferred from the portion considered 11 of the cable 1 to the corresponding bridging device 7. The portion 11 of the cable is then subjected to almost no effort.

De ce fait, ladite portion 11 du câble placée entre les colliers de serrage 12 peut alors être sectionnée sans danger, comme illustré sur la figure 5. Le sectionnement de la portion 11 du câble en deux sous-portions 11 a et 11 b peut être réalisé de différentes façons, par exemple par découpe successive de chaque brin du câble 1 ou par chauffage localisé et intensif de cette portion de câble jusqu'à la rupture.Therefore, said portion 11 of the cable placed between the clamps 12 can then be cut safely, as shown in Figure 5. The sectioning of the portion 11 of the cable in two sub-portions 11a and 11b can be realized in different ways, for example by successive cutting of each strand of the cable 1 or localized and intensive heating of this cable portion to rupture.

Lors de l'étape de sectionnement du câble, on peut avantageusement vérifier à l'aide des moyens de surveillance 15 que l'effort de traction dans le dispositif de pontage varie relativement peu. Ceci garantit en effet que le dispositif de pontage a bien repris localement l'intégralité de l'effort de traction F auquel le câble 1 était initialement soumis.During the step of severing the cable, it can advantageously be verified by means of monitoring means 15 that the tensile force in the bridging device varies relatively little. This ensures that the bridging device has taken locally all the traction force F to which the cable 1 was initially subjected.

Une fois le câble 1 sectionné, l'effort de traction dans le dispositif de pontage peut être relâché progressivement jusqu'à annulation à l'aide des moyens de réglage 14. Cela a pour conséquence de détendre le câble 1 dans son ensemble. Les moyens de surveillance 15 de l'effort de traction peuvent avantageusement être utilisés pour contrôler cette opération.Once the cable 1 is cut, the tensile force in the bridging device can be released gradually until canceled by means of adjustment means 14. This has the effect of relaxing the cable 1 as a whole. The means 15 for monitoring the traction force can advantageously be used to control this operation.

On comprendra ainsi que le câble 1 a été détendu sans qu'aucune variation brutale d'effort n'ait été rencontrée, puisque le sectionnement du câble s'est déroulé dans une portion où son état de contrainte était quasi nul.It will thus be understood that the cable 1 has been relaxed without any sudden variation of effort has been encountered, since the sectioning of the cable has taken place in a portion where its state of stress was almost zero.

A l'issue des opérations avantageuses décrites ci-dessus, la partie courante du câble 1 est libérée de l'ancrage haut 5 et/ou de l'ancrage bas 6. Lorsque la détension a été réalisée à proximité d'un seul des points d'ancrage, par exemple le point d'ancrage bas 6 qui est le plus accessible, on libère ensuite la partie courante du câble de l'autre point d'ancrage, par exemple le point d'ancrage 5. Cette deuxième libération peut être réalisée par exemple en sectionnant simplement ladite portion de câble à proximité de l'autre point d'ancrage. Aucun dispositif de pontage n'est nécessaire pour cette découpe qui ne représente aucun danger, le câble ayant déjà été détendu. En variante, la libération de la partie courante du câble de l'autre point d'ancrage pourrait résulter d'un retrait du câble dudit autre ancrage. La partie courante du câble est alors totalement libérée des ancrages haut 5 et bas 6 (comme symbolisé par les croix à proximité de ces ancrages sur les figures 6 et 7).At the end of the advantageous operations described above, the current portion of the cable 1 is released from the top anchor 5 and / or the bottom anchor 6. When the detension has been performed near a single point anchoring, for example the lower anchor point 6 which is the most accessible, then releases the current portion of the cable from the other anchor point, for example the anchor point 5. This second release can be for example by simply cutting said portion of cable near the other anchor point. No bridging device is needed for this cutting which is safe, as the cable has already been relaxed. Alternatively, the release of the current portion of the cable from the other anchor point could result from a withdrawal of the cable from said other anchor. The current part of the cable is then completely released from the top 5 and bottom anchors 6 (as symbolized by the crosses near these anchors in FIGS. 6 and 7).

La partie courante du câble 1 est alors supportée pour ne pas s'affaisser sous l'effet de son propre poids, ce qui risquerait d'endommager le tablier 4 du pont 2 et les éventuels autres câbles situés sous le câble 1.The current part of the cable 1 is then supported so as not to collapse under the effect of its own weight, which could damage the deck 4 of the bridge 2 and any other cables located under the cable 1.

Dans un exemple illustré sur la figure 6, la partie courante du câble 1, une fois détendue, est supportée à l'aide d'un appui 10 sur lequel elle repose en partie, cet appui 10 étant lui-même maintenu par une structure auxiliaire 15 de type grue ou tour d'échafaudage par exemple. Ainsi, la partie courante du câble est soulevée localement au niveau de l'appui 10, ce qui assure son maintien en attente de son évacuation.In an example illustrated in FIG. 6, the current part of the cable 1, once relaxed, is supported by means of a support 10 on which it rests in part, this support 10 being itself held by an auxiliary structure 15 type crane or tower scaffold for example. Thus, the current portion of the cable is lifted locally at the support 10, which ensures its maintenance pending its evacuation.

La figure 7 illustre un autre exemple dans lequel une pluralité d'appuis 18 supportent la partie courante du câble 1 en attente de son évacuation. Ces appuis 18 sont avantageusement répartis, éventuellement de façon uniforme, sur toute la longueur de la partie courante du câble 1.Figure 7 illustrates another example in which a plurality of supports 18 support the current part of the cable 1 waiting for its evacuation. These supports 18 are advantageously distributed, possibly uniformly, over the entire length of the running portion of the cable 1.

Les appuis 18 forment avantageusement des berceaux recevant la partie courante du câble 1 comme illustré sur la figure 8. Ils sont maintenus par un ou plusieurs câbles 20 situés plus haut que le câble 1, auxquels ils sont reliés par l'intermédiaire de suspentes 17 par exemple. Dans l'exemple illustré sur la figure 8, les berceaux 18 sont ainsi suspendus pour reposer sur deux câbles 20 situés de part et d'autre du câble 1.The supports 18 advantageously form cradles receiving the current part of the cable 1 as illustrated in FIG. 8. They are held by one or more cables 20 situated higher than the cable 1, to which they are connected by means of lines 17 by example. In the example illustrated in FIG. 8, the cradles 18 are thus suspended to rest on two cables 20 located on either side of the cable 1.

Les berceaux 18 sont avantageusement reliés les uns aux autres et montés de façon à pouvoir se déplacer le long des câbles 20. Dans l'exemple illustré, ce déplacement est assuré par des rouleaux 16 auxquels les suspentes 17 sont reliées et qui sont capables de rouler sur les câbles 20.The cradles 18 are advantageously connected to each other and mounted so as to be able to move along the cables 20. In the illustrated example, this displacement is ensured by rollers 16 to which the lines 17 are connected and which are capable of rolling. on the cables 20.

Les câbles 20 qui assurent le maintien des berceaux 18 peuvent être des câbles constitutifs de la structure 2, par exemple des câbles à hauban tendus de façon permanente entre le pylône 3 et le tablier 4 du pont 2, à l'instar du câble 1.The cables 20 which maintain the cradles 18 may be constituent cables of the structure 2, for example cables with cable stayed permanently between the pylon 3 and the deck 4 of the bridge 2, like the cable 1.

En variante, ces câbles 20 peuvent être montés provisoirement sur la structure 2 pour permettre le support du câble 1 à démonter. Dans ce cas, les câbles 20 pourront être ancrés dans des blocs d'ancrage reliés provisoirement au pylône 3 et au tablier 4, plutôt que directement dans le pylône 3 et le tablier 4. Ces blocs d'ancrage sont alors placés à proximité des points d'ancrage 5 et 6 du câble 1. Ainsi, les câbles provisoires 20 peuvent être retirés de la structure 2, une fois le câble 1 démonté.Alternatively, these cables 20 may be temporarily mounted on the structure 2 to allow the support of the cable 1 to be disassembled. In this case, the cables 20 may be anchored in anchor blocks temporarily connected to the pylon 3 and the deck 4, rather than directly in the pylon 3 and the deck 4. These anchor blocks are then placed near the points anchoring 5 and 6 of the cable 1. Thus, the temporary cables 20 can be removed from the structure 2, once the cable 1 disassembled.

Lorsque le dispositif d'appui décrit en référence aux figures 7 et 8 est utilisé, la séquence de démontage du câble 1 détendu peut alors se dérouler de la manière suivante.When the support device described with reference to FIGS. 7 and 8 is used, the disassembling sequence of the relaxed cable 1 can then proceed in the following manner.

On laisse descendre progressivement l'ensemble composé de la partie courante du câble 1 et des berceaux 18 sur lesquels cette partie du câble 1 repose. La descente progressive est avantageusement réalisée en utilisant des moyens de retenue 19 capables de retenir la partie courante du câble 1, comme cela est illustré à la figure 9. Un câble à débit contrôlé relié au câble 1 peut par exemple constituer de tels moyens de retenue 19. En variante ou en complément, des moyens de retenue peuvent être disposés pour contrôler la descente des berceaux 18.The set composed of the current part of the cable 1 and the cradles 18 on which this part of the cable 1 rests is progressively lowered. The progressive descent is advantageously carried out using retaining means 19 capable of holding the current part of the cable 1, as illustrated in FIG. 9. A controlled flow cable connected to the cable 1 may for example constitute such retaining means. 19. Alternatively or in addition, retaining means may be arranged to control the descent of the cradles 18.

Lors de la descente, les rouleaux 16 roulent sur les câbles 20, ce qui entraîne les berceaux 18 et la partie courante du câble 1 qu'ils supportent vers le tablier 4 du pont 2. On assure ainsi l'évacuation de la partie courante du câble 1 à distance de l'ancrage haut 5 par lequel le câble 1 était initialement fixé au pylône 3 du pont 2.During the descent, the rollers 16 roll on the cables 20, which causes the cradles 18 and the running part of the cable 1 that they support towards the deck 4 of the deck 2. This ensures the evacuation of the current portion of the cable 1 away from the high anchor 5 by which the cable 1 was initially attached to the pylon 3 of the bridge 2.

On notera par ailleurs que les parties du câble 1 restées fixées aux ancrages haut 5 et bas 6, après libération de la partie courante du câble 1, seront avantageusement retirées de leurs ancrages respectifs pour être évacuées.Note also that the parts of the cable 1 remained attached to the top 5 and bottom anchors 6, after release of the current portion of the cable 1, will be advantageously removed from their respective anchors to be evacuated.

De façon avantageuse, la partie courante du câble 1 peut être sectionnée au cours de son évacuation. Cela peut être réalisé en découpant le câble 1 en éléments de longueur réduite, de préférence facilement transportables par la route, au fur et à mesure de la descente du câble vers le tablier 4 du pont 2.Advantageously, the current part of the cable 1 can be cut during its evacuation. This can be done by cutting the cable 1 into elements of reduced length, preferably easily transportable by road, as the cable is lowered to the deck 4 of the bridge 2.

La figure 9 illustre une étape intermédiaire du démontage du câble 1, dans laquelle un nouvel élément 21 a été obtenu par découpe de la portion du câble 1 venant d'arriver à proximité du tablier 4. Les éléments 22 représentent, quant à eux, des éléments du câble 1 précédemment découpés et regroupés sensiblement au même endroit en vue de leur éventuelle évacuation définitive à distance du pont 2.FIG. 9 illustrates an intermediate step of disassembling the cable 1, in which a new element 21 has been obtained by cutting off the portion of the cable 1 that has just reached the apron 4. The elements 22 represent, in turn, elements of the cable 1 previously cut and grouped substantially in the same place for possible final evacuation at a distance from the bridge 2.

Le procédé de démontage est ensuite poursuivi de la même manière jusqu'à ce que la partie courante du câble 1 ait été totalement descendue jusqu'au tablier 4 du pont 2 et éventuellement découpée en éléments de longueur réduite 22. Les éléments 22 obtenus peuvent alors être évacués à distance du pont 2.The disassembly process is then continued in the same manner until the current portion of the cable 1 has been fully lowered to the deck 4 of the bridge 2 and possibly cut into elements of reduced length 22. The elements 22 obtained can then be evacuated at a distance from bridge 2.

A l'issue de ces opérations tous les appuis 18, les suspentes 17 et les rouleaux 16 sont regroupés à proximité du tablier 4 du pont 2. Ils peuvent alors être récupérés pour servir lors du démontage d'un autre câble. Lorsque les câbles 20 sont provisoires, ils peuvent à leur tour être retirés de leurs ancrages.At the end of these operations all the supports 18, the lines 17 and the rollers 16 are grouped near the deck 4 of the bridge 2. They can then be recovered to serve during the disassembly of another cable. When the cables 20 are temporary, they can in turn be removed from their anchors.

On obtient ainsi un démontage aisé du câble 1, qui n'endommage pas la structure 2, ni les éventuels autres haubans de la nappe à laquelle le câble 1 appartient. En outre, la gêne de la circulation sur le pont 2 est minimisée lors du démontage du câble 1. Par ailleurs, le démontage peut être réalisé sans qu'aucun moyen n'ait été prévu à cet effet lors de la conception de la structure 2.This results in easy disassembly of the cable 1, which does not damage the structure 2, or any other shrouds of the sheet to which the cable 1 belongs. In addition, the discomfort of the traffic on the bridge 2 is minimized during the dismantling of the cable 1. Moreover, the dismantling can be carried out without any means having been provided for this purpose during the design of the structure 2 .

On notera en particulier que le dispositif d'appui décrit en référence aux figures 7 à 9 est particulièrement avantageux puisqu'il comprend des moyens légers capables de contribuer au support et également à l'évacuation d'une grande partie du câble, en dépit de la masse importante de ce câble et de la grande hauteur de l'ancrage haut 5 auquel le câble 1 était initialement fixé.It will be noted in particular that the support device described with reference to FIGS. 7 to 9 is particularly advantageous since it comprises light means capable of contributing to the support and also to the evacuation of a large part of the cable, in spite of the large mass of this cable and the high height of the high anchor 5 to which the cable 1 was initially fixed.

Claims (14)

Procédé de démontage d'un câble (1) tendu entre un premier (5) et un deuxième (6) points d'ancrage sur une structure (2), comprenant les étapes suivantes : - libérer une partie courante du câble desdits premier et deuxième points d'ancrage; - supporter ladite partie courante du câble ; et - évacuer ladite partie courante du câble à distance d'un au moins desdits premier et deuxième points d'ancrage, dans lequel le support et l'évacuation de ladite partie courante du câble (1) sont effectués à l'aide d'une pluralité d'appuis (18) répartis le long de ladite partie courante du câble et formant des berceaux pour ladite partie courante du câble, maintenus chacun par au moins un autre câble (20) situé plus haut que ledit câble, les berceaux (18) étant reliés les uns aux autres et étant montés de façon à pouvoir se déplacer le long dudit autre câble (20).A method of disassembling a cable (1) stretched between a first (5) and a second (6) anchor point on a structure (2), comprising the steps of: - Release a current portion of the cable of said first and second anchor points; - support said current portion of the cable; and - evacuate said current portion of the cable away from at least one of said first and second anchor points, wherein the support and the evacuation of said current part of the cable (1) are effected by means of a plurality of supports (18) distributed along said current part of the cable and forming cradles for said current part. of the cable, each held by at least one other cable (20) located higher than said cable, the cradles (18) being connected to each other and being mounted so as to be able to move along said other cable (20). Procédé selon la revendication 1, dans lequel ledit autre câble (20) est tendu entre des points d'ancrage sur ladite structure.The method of claim 1, wherein said other cable (20) is stretched between anchor points on said structure. Procédé selon la revendication 2, dans lequel ledit autre câble (20) est ancré provisoirement à proximité desdits premier (5) et deuxième (6) points d'ancrage, dans le but de maintenir les berceaux (18).The method of claim 2, wherein said other cable (20) is provisionally anchored near said first (5) and second (6) anchor points for the purpose of maintaining the cradles (18). Procédé selon l'une quelconque des revendications précédentes, dans lequel le déplacement des berceaux (18) le long dudit autre câble (20) est assuré à l'aide de rouleaux (16).A method according to any one of the preceding claims, wherein the movement of cradles (18) along said other cable (20) is provided by rollers (16). Procédé selon l'une quelconque des revendications précédentes, dans lequel le premier point d'ancrage (5) est situé plus haut que le deuxième point d'ancrage (6) et dans lequel l'évacuation de ladite partie courante du câble (1) à distance d'un au moins desdits premier et deuxième points d'ancrage comprend la descente de ladite partie courante du câble sensiblement jusqu'à hauteur du deuxième point d'ancrage, la descente de ladite partie courante du câble étant contrôlée à l'aide de moyens de retenue (19) de ladite partie courante du câble et/ou des berceaux.A method as claimed in any one of the preceding claims, wherein the first anchor point (5) is located higher than the second anchor point (6) and wherein the discharge of said running portion of the cable (1) remote from at least one of said first and second anchor points comprises lowering said current portion of the cable substantially up to the height of the second anchor point, the descent of said current portion of the cable being controlled by means of retaining means (19) of said current portion of the cable and / or cradles. Procédé selon l'une quelconque des revendications précédentes, dans lequel ladite partie courante du câble (1) est sectionnée au cours de son évacuation.A method as claimed in any one of the preceding claims, wherein said current portion of the cable (1) is severed during its evacuation. Procédé selon l'une quelconque des revendications précédentes, dans lequel la libération de la partie courante du câble desdits premier et deuxième points d'ancrage comprend une détension du câble de façon que la partie courante du câble soit libérée d'un desdits premier et deuxième points d'ancrage et une libération de ladite partie courante du câble de l'autre desdits premier et deuxième points d'ancrage.A method as claimed in any one of the preceding claims, wherein releasing the running portion of the cable from said first and second anchor points comprises detenting the cable so that the running portion of the cable is released from one of said first and second anchoring points and releasing said current portion of the cable from the other of said first and second anchor points. Procédé selon la revendication 7, dans lequel la détension du câble (1) comprend les étapes suivantes, réalisées à proximité du premier (5) et/ou du deuxième points (6) d'ancrage : - placer sur une portion (11) du câble un dispositif de pontage (7) capable de reprendre l'effort de traction (F) du câble sur ladite portion ; - mettre en tension le dispositif de pontage jusqu'à une valeur supérieure ou égale à une valeur supposée de l'effort de traction du câble, de façon à annuler l'effort de traction du câble sur ladite portion ; et - sectionner ladite portion du câble. The method of claim 7, wherein the detension of the cable (1) comprises the following steps, performed near the first (5) and / or the second anchoring points (6): - Place on a portion (11) of the cable a bridging device (7) capable of taking up the tensile force (F) of the cable on said portion; - Tensioning the bridging device to a value greater than or equal to an assumed value of the tensile force of the cable, so as to cancel the tensile force of the cable on said portion; and - Cut off said portion of the cable. Procédé selon la revendication 8, dans lequel la tension est ensuite annulée dans le dispositif de pontage (7).The method of claim 8, wherein the voltage is then canceled in the bridging device (7). Procédé selon la revendication 8 ou 9, dans lequel le placement du dispositif de pontage (7) comprend le positionnement de deux colliers (12) du dispositif de pontage autour du câble de façon à assurer un contact sensiblement sans glissement des colliers le long du câble et dans lequel la mise en tension du dispositif de pontage comprend la mise en tension de barres de traction (13) du dispositif de pontage reliant lesdits colliers.A method according to claim 8 or 9, wherein the placement of the bridging device (7) comprises positioning two collars (12) of the bridging device around the cable so as to provide substantially non-slip contact of the collars along the cable and wherein the tensioning of the bridging device comprises tensioning traction rods (13) of the bridging device connecting said collars. Procédé selon l'une quelconque des revendications 8 à 10, dans lequel l'effort de traction dans le dispositif de pontage est contrôlé à l'aide d'un moyen de surveillance (15) lors de la mise en tension du dispositif de pontage et/ou lors du sectionnement de ladite portion du câble.A method according to any one of claims 8 to 10, wherein the tensile force in the bridging device is controlled by means of a monitoring means (15) when the bridging device is tensioned and / or during the cutting of said portion of the cable. Procédé selon l'une quelconque des revendications précédentes, dans lequel ledit câble (1) est un câble de hauban.A method as claimed in any one of the preceding claims, wherein said cable (1) is a stay cable. Dispositif d'appui pour un câble (1) tendu entre un premier (5) et un deuxième (6) points d'ancrage sur une structure (2), le dispositif d'appui comprenant : - une pluralité de berceaux (18) aptes à être répartis le long d'une partie courante du câble (1) pour constituer des appuis pour ladite partie courante du câble ; - des moyens pour que chaque berceau de la pluralité repose sur au moins un autre câble (20) situé plus haut que ledit câble et puisse se déplacer le long dudit autre câble ; et - des moyens reliant les berceaux les uns aux autres. Support device for a cable (1) stretched between a first (5) and a second (6) anchoring point on a structure (2), the support device comprising: - A plurality of cradles (18) adapted to be distributed along a current portion of the cable (1) to form supports for said current portion of the cable; - means for each cradle of the plurality rests on at least one other cable (20) located higher than said cable and can move along said other cable; and - Means connecting the cradles to each other. Système de démontage d'un câble (1) tendu entre un premier (5) et un deuxième (6) points d'ancrage sur une structure (2), incluant un dispositif d'appui comprenant : - une pluralité de berceaux (18) aptes à être répartis le long d'une partie courante du câble (1) pour constituer des appuis pour ladite partie courante du câble ; - des moyens pour que chaque berceau de la pluralité repose sur au moins un autre câble (20) situé plus haut que ledit câble et puisse se déplacer le long dudit autre câble ; et - des moyens reliant les berceaux les uns aux autres, et un dispositif de pontage (7) pour détendre le câble (1) tendu, le dispositif de pontage comprenant : - deux colliers (12) aptes à être positionnés autour du câble de façon à assurer un contact sensiblement sans glissement le long du câble ; - des barres de traction (13) reliant lesdits colliers ; - des moyens de réglage (14) de l'effort de traction transitant dans les barres de traction ; et - des moyens de surveillance (15) de l'effort de traction transitant dans les barres de traction. System for dismounting a cable (1) stretched between a first (5) and a second (6) anchoring point on a structure (2), including a support device comprising: - A plurality of cradles (18) adapted to be distributed along a current portion of the cable (1) to form supports for said current portion of the cable; - means for each cradle of the plurality rests on at least one other cable (20) located higher than said cable and can move along said other cable; and means connecting the cradles to one another, and a bridging device (7) for expanding the tensioned cable (1), the bridging device comprising: - Two collars (12) adapted to be positioned around the cable so as to ensure substantially no sliding contact along the cable; - Traction rods (13) connecting said collars; - Adjustment means (14) of the traction force passing through the traction bars; and - Monitoring means (15) of the traction force passing through the drawbars.
EP07111874A 2006-08-02 2007-07-05 Method of removing a tight cable, associated system and device Active EP1887139B1 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
FR0607078A FR2904637A1 (en) 2006-08-02 2006-08-02 METHOD FOR DISASSEMBLING A TENSILE CABLE, SYSTEM AND ASSOCIATED DEVICES

Publications (2)

Publication Number Publication Date
EP1887139A1 true EP1887139A1 (en) 2008-02-13
EP1887139B1 EP1887139B1 (en) 2011-11-16

Family

ID=37890554

Family Applications (1)

Application Number Title Priority Date Filing Date
EP07111874A Active EP1887139B1 (en) 2006-08-02 2007-07-05 Method of removing a tight cable, associated system and device

Country Status (7)

Country Link
US (1) US8959742B2 (en)
EP (1) EP1887139B1 (en)
AT (1) ATE533895T1 (en)
CA (1) CA2593867C (en)
ES (1) ES2377716T3 (en)
FR (1) FR2904637A1 (en)
MY (1) MY148421A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104750908A (en) * 2015-01-22 2015-07-01 山东建筑大学 Method and device for obtaining tower crane cargo boom prestress
WO2019238996A1 (en) * 2018-06-12 2019-12-19 Fcc Construccion, S.A.. System and method for destressing braces by incorporation of, or substitution by, improved filler material
WO2021198536A1 (en) 2020-07-15 2021-10-07 Soletanche Freyssinet Bridging devices and systems, and methods for implementing same
FR3112561A1 (en) 2020-07-15 2022-01-21 Soletanche Freyssinet Bridging device and method for stress relief and cutting
FR3115302A1 (en) * 2020-10-21 2022-04-22 Soletanche Freyssinet Device for absorbing the energy released by the detensioning of a structural cable
FR3119403A1 (en) 2021-01-29 2022-08-05 Soletanche Freyssinet Bridging system and implementation method
FR3121456A1 (en) 2021-04-06 2022-10-07 Soletanche Freyssinet METHOD FOR REMOVING A REINFORCEMENT FROM A STRUCTURAL CABLE AND ASSOCIATED SYSTEM

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8714410B2 (en) 2009-11-16 2014-05-06 Carrier Corporation Dispenser with aligned spinner motor and valve assembly for dispensing flowable product
CN103452043B (en) * 2012-06-04 2015-06-17 中铁工程设计咨询集团有限公司 Maintenance system of cable-stayed bridge solid pylon and application of maintenance system
JP6132142B2 (en) * 2013-05-14 2017-05-24 清水建設株式会社 Relieving tension of PC cable
CN104452594B (en) * 2014-11-05 2016-08-10 武汉二航路桥特种工程有限责任公司 Many fulcrums dragline method changes rope device
DE102017201907A1 (en) 2017-02-07 2018-08-09 Dywidag-Systems International Gmbh Method and device for relaxing a tensioning element
DE102017127276A1 (en) 2017-08-30 2019-02-28 Taiwan Semiconductor Manufacturing Co., Ltd. STANDARD CELLS AND ADAPTATIONS FROM THEREOF WITHIN A STANDARD CELL LIBRARY
DE102019102688A1 (en) * 2019-02-04 2020-08-06 Wobben Properties Gmbh Device and method for relaxing a tension cord
CN112664032B (en) * 2019-10-16 2022-12-09 北京金风科创风电设备有限公司 Stay cable anchoring device, stay cable type tower and wind generating set
CN113481890B (en) * 2021-07-20 2022-12-23 重庆万桥交通科技发展有限公司 Stay cable anchor ring dismounting device
FR3135283B1 (en) * 2022-05-05 2024-04-05 Ixo Method for local recovery of the tension of a prestressing cable and bridging system for a prestressing cable implementing this process
CN114892994B (en) * 2022-07-14 2022-10-04 北京市建筑工程研究院有限责任公司 Dismounting device and method suitable for prestressed inhaul cable

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6080609A (en) * 1983-10-12 1985-05-08 株式会社神戸製鋼所 Disassembling of cat walk floor assembly
FR2745829A1 (en) * 1996-03-08 1997-09-12 Baudin Chateauneuf Replacement of cable used for suspension or guy wire
FR2818676A1 (en) * 2000-12-27 2002-06-28 Freyssinet Int Stup Pre-stressing cable dismantling procedure uses energy dissipation apparatus to restrict speed of cable when cut between anchor and retaining member

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3381527A (en) * 1965-11-18 1968-05-07 Nasa Usa Tension measurement device
US6655641B2 (en) * 1999-12-14 2003-12-02 Yury Sherman System for supporting substantially rigid linear structures

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6080609A (en) * 1983-10-12 1985-05-08 株式会社神戸製鋼所 Disassembling of cat walk floor assembly
FR2745829A1 (en) * 1996-03-08 1997-09-12 Baudin Chateauneuf Replacement of cable used for suspension or guy wire
FR2818676A1 (en) * 2000-12-27 2002-06-28 Freyssinet Int Stup Pre-stressing cable dismantling procedure uses energy dissipation apparatus to restrict speed of cable when cut between anchor and retaining member

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
PETRANGELI M ET AL: "REHABILITATION OF SIDI M'CID SUSPENSION BRIDGE, ALGERIA", STRUCTURAL ENGINEERING INTERNATIONAL, IABSE, ZURICH, CH, vol. 10, no. 4, November 2000 (2000-11-01), pages 254 - 258, XP000970363, ISSN: 1016-8664 *
POUS P ET AL: "LA RENOVATION DU PONT DE TANCARVILLE", TRAVAUX, EDITIONS SCIENCE ET INDUSTRIE, PARIS, FR, no. 752, April 1999 (1999-04-01), pages 44 - 49, XP000828889, ISSN: 0041-1906 *

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104750908A (en) * 2015-01-22 2015-07-01 山东建筑大学 Method and device for obtaining tower crane cargo boom prestress
CN104750908B (en) * 2015-01-22 2021-03-05 山东建筑大学 Method and device for acquiring prestress of tower crane boom
WO2019238996A1 (en) * 2018-06-12 2019-12-19 Fcc Construccion, S.A.. System and method for destressing braces by incorporation of, or substitution by, improved filler material
WO2021198536A1 (en) 2020-07-15 2021-10-07 Soletanche Freyssinet Bridging devices and systems, and methods for implementing same
EP3936738A1 (en) 2020-07-15 2022-01-12 Soletanche Freyssinet Cable drain wire
FR3112561A1 (en) 2020-07-15 2022-01-21 Soletanche Freyssinet Bridging device and method for stress relief and cutting
EP3936738B1 (en) 2020-07-15 2023-02-15 Soletanche Freyssinet Cable drain wire
FR3115302A1 (en) * 2020-10-21 2022-04-22 Soletanche Freyssinet Device for absorbing the energy released by the detensioning of a structural cable
WO2022084139A1 (en) * 2020-10-21 2022-04-28 Soletanche Freyssinet Device for absorbing the energy released by the detensioning of a structural cable
FR3119403A1 (en) 2021-01-29 2022-08-05 Soletanche Freyssinet Bridging system and implementation method
FR3121456A1 (en) 2021-04-06 2022-10-07 Soletanche Freyssinet METHOD FOR REMOVING A REINFORCEMENT FROM A STRUCTURAL CABLE AND ASSOCIATED SYSTEM

Also Published As

Publication number Publication date
ATE533895T1 (en) 2011-12-15
ES2377716T3 (en) 2012-03-30
CA2593867A1 (en) 2008-02-02
US8959742B2 (en) 2015-02-24
FR2904637A1 (en) 2008-02-08
MY148421A (en) 2013-04-30
US20080028724A1 (en) 2008-02-07
CA2593867C (en) 2014-12-09
EP1887139B1 (en) 2011-11-16

Similar Documents

Publication Publication Date Title
EP1887139B1 (en) Method of removing a tight cable, associated system and device
EP2319764B1 (en) System of tie rods enabling shock-free holding and release of space appendages
EP1936071B1 (en) Method of replacing a post and installation comprising a post
CA3071452A1 (en) Improved assembly comprising a structural cable and a saddle
EP0616079B1 (en) Process and apparatus for placing parallel wire strands in cable-stayed bridges
EP2754778A1 (en) Primary support beam with adjustable length
EP3049580A1 (en) Anchoring device and method
CA2870389A1 (en) Preheating connector
FR2967180A1 (en) Cladding plates raising and presenting device for use in building construction site, has cable comprising strands that are connected separately at set of ends to winch, and another set of ends connected to last element of mast
EP3563067B1 (en) Banding device
EP3175057B1 (en) A pre-tensioned bearing structure
EP2585625B1 (en) Short-circuiting-shim-extracting device for switching on an electrolytic cell for producing aluminum
EP1932983A1 (en) Support assembly for a roof element, shelter including such a support assembly and method for assembling such a shelter
FR2765249A1 (en) METHOD FOR LAYING A TUBE SHAFT ON A TENSIONED MEMBRAGE AND DEVICE FOR SPACING A TUBE SHAPE
EP2213609A1 (en) Foldable boom for tower crane
EP2350325B1 (en) Device for distributing a material in a molten state
EP2609265B1 (en) Automated dismountable tilting mast including elements that can be assembled without tools
FR2750146A1 (en) Installation or dismantling of bridge decks by pushing deck into position
FR2955135A1 (en) Post e.g. vertical central post, for light shelter, has joint that is arranged such that joint is removable, where lower end of post is articulated around transversal axis on mounting ring using joint
FR3002511A1 (en) Transport station e.g. station of departure or inbound of ski lift installation for skiers, has metal reinforcement that supports mechanism, and textile fabric supported and set in tension by metal reinforcement
WO2017178488A1 (en) Installation for assembling/dismantling a flexible water-pumping pipe
FR2642455A1 (en) Method for putting the inner ring of a cable framework into position
FR2654163A1 (en) Tubular element with a preferred breakage zone and method for fixing it to a support allowing it to be replaced easily and quickly
WO2021240089A1 (en) Method and system for tensioning a hyperstatic system
EP2757200A2 (en) Apparatus for extracting or recessing in the floor an object such as a pile or a tube and corresponding method

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC MT NL PL PT RO SE SI SK TR

AX Request for extension of the european patent

Extension state: AL BA HR MK YU

17P Request for examination filed

Effective date: 20080417

AKX Designation fees paid

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC MT NL PL PT RO SE SI SK TR

RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: SOLETANCHE

RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: SOLETANCHE FREYSSINET

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

RTI1 Title (correction)

Free format text: METHOD OF REMOVING A TIGHT CABLE, ASSOCIATED SYSTEM AND DEVICE

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC MT NL PL PT RO SE SI SK TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

Free format text: NOT ENGLISH

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

Free format text: LANGUAGE OF EP DOCUMENT: FRENCH

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602007018719

Country of ref document: DE

Effective date: 20120209

REG Reference to a national code

Ref country code: CH

Ref legal event code: NV

Representative=s name: ISLER & PEDRAZZINI AG

REG Reference to a national code

Ref country code: NL

Ref legal event code: VDEP

Effective date: 20111116

REG Reference to a national code

Ref country code: ES

Ref legal event code: FG2A

Ref document number: 2377716

Country of ref document: ES

Kind code of ref document: T3

Effective date: 20120330

LTIE Lt: invalidation of european patent or patent extension

Effective date: 20111116

REG Reference to a national code

Ref country code: GR

Ref legal event code: EP

Ref document number: 20120400376

Country of ref document: GR

Effective date: 20120322

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20111116

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120316

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20111116

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120316

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20111116

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20111116

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20111116

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20111116

REG Reference to a national code

Ref country code: IE

Ref legal event code: FD4D

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20111116

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20111116

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20111116

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20111116

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20111116

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120216

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20111116

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20111116

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 533895

Country of ref document: AT

Kind code of ref document: T

Effective date: 20111116

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed

Effective date: 20120817

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602007018719

Country of ref document: DE

Effective date: 20120817

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20111116

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20120731

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20120705

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20120705

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20111116

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20111116

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20111116

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20120705

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20070705

REG Reference to a national code

Ref country code: FR

Ref legal event code: CA

Effective date: 20150112

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 9

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 10

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 11

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 12

P01 Opt-out of the competence of the unified patent court (upc) registered

Effective date: 20230526

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 20230621

Year of fee payment: 17

Ref country code: CZ

Payment date: 20230623

Year of fee payment: 17

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GR

Payment date: 20230622

Year of fee payment: 17

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: BE

Payment date: 20230622

Year of fee payment: 17

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: ES

Payment date: 20230801

Year of fee payment: 17

Ref country code: CH

Payment date: 20230801

Year of fee payment: 17

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20230620

Year of fee payment: 17