Prior art keywords
working fluid
vapour
natural gas
heat exchanger
condenser
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP06352012A
Other languages
German (de)
English (en)
Other versions
EP1860393B1 (fr
Inventor
Vincent Fuchs
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Cryostar SAS
Original Assignee
Cryostar SAS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority to DE602006005229T priority Critical patent/DE602006005229D1/de
Application filed by Cryostar SAS filed Critical Cryostar SAS
Priority to EP06352012A priority patent/EP1860393B1/fr
Priority to AT06352012T priority patent/ATE423298T1/de
Priority to JP2009511608A priority patent/JP5241707B2/ja
Priority to KR1020087028557A priority patent/KR101419069B1/ko
Priority to US12/301,057 priority patent/US20100000253A1/en
Priority to CN2007800184802A priority patent/CN101495828B/zh
Priority to EP07804964A priority patent/EP2024698A2/fr
Priority to PCT/IB2007/002771 priority patent/WO2007144774A2/fr
Publication of EP1860393A1 publication Critical patent/EP1860393A1/fr
Application granted granted Critical
Publication of EP1860393B1 publication Critical patent/EP1860393B1/fr
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25JLIQUEFACTION, SOLIDIFICATION OR SEPARATION OF GASES OR GASEOUS OR LIQUEFIED GASEOUS MIXTURES BY PRESSURE AND COLD TREATMENT OR BY BRINGING THEM INTO THE SUPERCRITICAL STATE
    • F25J1/00Processes or apparatus for liquefying or solidifying gases or gaseous mixtures
    • F25J1/0002Processes or apparatus for liquefying or solidifying gases or gaseous mixtures characterised by the fluid to be liquefied
    • F25J1/0022Hydrocarbons, e.g. natural gas
    • F25J1/0025Boil-off gases "BOG" from storages
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25JLIQUEFACTION, SOLIDIFICATION OR SEPARATION OF GASES OR GASEOUS OR LIQUEFIED GASEOUS MIXTURES BY PRESSURE AND COLD TREATMENT OR BY BRINGING THEM INTO THE SUPERCRITICAL STATE
    • F25J1/00Processes or apparatus for liquefying or solidifying gases or gaseous mixtures
    • F25J1/02Processes or apparatus for liquefying or solidifying gases or gaseous mixtures requiring the use of refrigeration, e.g. of helium or hydrogen ; Details and kind of the refrigeration system used; Integration with other units or processes; Controlling aspects of the process
    • F25J1/0203Processes or apparatus for liquefying or solidifying gases or gaseous mixtures requiring the use of refrigeration, e.g. of helium or hydrogen ; Details and kind of the refrigeration system used; Integration with other units or processes; Controlling aspects of the process using a single-component refrigerant [SCR] fluid in a closed vapor compression cycle
    • F25J1/0204Processes or apparatus for liquefying or solidifying gases or gaseous mixtures requiring the use of refrigeration, e.g. of helium or hydrogen ; Details and kind of the refrigeration system used; Integration with other units or processes; Controlling aspects of the process using a single-component refrigerant [SCR] fluid in a closed vapor compression cycle as a single flow SCR cycle
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C9/00Methods or apparatus for discharging liquefied or solidified gases from vessels not under pressure
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25JLIQUEFACTION, SOLIDIFICATION OR SEPARATION OF GASES OR GASEOUS OR LIQUEFIED GASEOUS MIXTURES BY PRESSURE AND COLD TREATMENT OR BY BRINGING THEM INTO THE SUPERCRITICAL STATE
    • F25J1/00Processes or apparatus for liquefying or solidifying gases or gaseous mixtures
    • F25J1/003Processes or apparatus for liquefying or solidifying gases or gaseous mixtures characterised by the kind of cold generation within the liquefaction unit for compensating heat leaks and liquid production
    • F25J1/0032Processes or apparatus for liquefying or solidifying gases or gaseous mixtures characterised by the kind of cold generation within the liquefaction unit for compensating heat leaks and liquid production using the feed stream itself or separated fractions from it, i.e. "internal refrigeration"
    • F25J1/0045Processes or apparatus for liquefying or solidifying gases or gaseous mixtures characterised by the kind of cold generation within the liquefaction unit for compensating heat leaks and liquid production using the feed stream itself or separated fractions from it, i.e. "internal refrigeration" by vaporising a liquid return stream
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25JLIQUEFACTION, SOLIDIFICATION OR SEPARATION OF GASES OR GASEOUS OR LIQUEFIED GASEOUS MIXTURES BY PRESSURE AND COLD TREATMENT OR BY BRINGING THEM INTO THE SUPERCRITICAL STATE
    • F25J1/00Processes or apparatus for liquefying or solidifying gases or gaseous mixtures
    • F25J1/003Processes or apparatus for liquefying or solidifying gases or gaseous mixtures characterised by the kind of cold generation within the liquefaction unit for compensating heat leaks and liquid production
    • F25J1/0047Processes or apparatus for liquefying or solidifying gases or gaseous mixtures characterised by the kind of cold generation within the liquefaction unit for compensating heat leaks and liquid production using an "external" refrigerant stream in a closed vapor compression cycle
    • F25J1/005Processes or apparatus for liquefying or solidifying gases or gaseous mixtures characterised by the kind of cold generation within the liquefaction unit for compensating heat leaks and liquid production using an "external" refrigerant stream in a closed vapor compression cycle by expansion of a gaseous refrigerant stream with extraction of work
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25JLIQUEFACTION, SOLIDIFICATION OR SEPARATION OF GASES OR GASEOUS OR LIQUEFIED GASEOUS MIXTURES BY PRESSURE AND COLD TREATMENT OR BY BRINGING THEM INTO THE SUPERCRITICAL STATE
    • F25J1/00Processes or apparatus for liquefying or solidifying gases or gaseous mixtures
    • F25J1/006Processes or apparatus for liquefying or solidifying gases or gaseous mixtures characterised by the refrigerant fluid used
    • F25J1/007Primary atmospheric gases, mixtures thereof
    • F25J1/0072Nitrogen
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25JLIQUEFACTION, SOLIDIFICATION OR SEPARATION OF GASES OR GASEOUS OR LIQUEFIED GASEOUS MIXTURES BY PRESSURE AND COLD TREATMENT OR BY BRINGING THEM INTO THE SUPERCRITICAL STATE
    • F25J1/00Processes or apparatus for liquefying or solidifying gases or gaseous mixtures
    • F25J1/02Processes or apparatus for liquefying or solidifying gases or gaseous mixtures requiring the use of refrigeration, e.g. of helium or hydrogen ; Details and kind of the refrigeration system used; Integration with other units or processes; Controlling aspects of the process
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25JLIQUEFACTION, SOLIDIFICATION OR SEPARATION OF GASES OR GASEOUS OR LIQUEFIED GASEOUS MIXTURES BY PRESSURE AND COLD TREATMENT OR BY BRINGING THEM INTO THE SUPERCRITICAL STATE
    • F25J1/00Processes or apparatus for liquefying or solidifying gases or gaseous mixtures
    • F25J1/02Processes or apparatus for liquefying or solidifying gases or gaseous mixtures requiring the use of refrigeration, e.g. of helium or hydrogen ; Details and kind of the refrigeration system used; Integration with other units or processes; Controlling aspects of the process
    • F25J1/0203Processes or apparatus for liquefying or solidifying gases or gaseous mixtures requiring the use of refrigeration, e.g. of helium or hydrogen ; Details and kind of the refrigeration system used; Integration with other units or processes; Controlling aspects of the process using a single-component refrigerant [SCR] fluid in a closed vapor compression cycle
    • F25J1/0208Processes or apparatus for liquefying or solidifying gases or gaseous mixtures requiring the use of refrigeration, e.g. of helium or hydrogen ; Details and kind of the refrigeration system used; Integration with other units or processes; Controlling aspects of the process using a single-component refrigerant [SCR] fluid in a closed vapor compression cycle in combination with an internal quasi-closed refrigeration loop, e.g. with deep flash recycle loop
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25JLIQUEFACTION, SOLIDIFICATION OR SEPARATION OF GASES OR GASEOUS OR LIQUEFIED GASEOUS MIXTURES BY PRESSURE AND COLD TREATMENT OR BY BRINGING THEM INTO THE SUPERCRITICAL STATE
    • F25J1/00Processes or apparatus for liquefying or solidifying gases or gaseous mixtures
    • F25J1/02Processes or apparatus for liquefying or solidifying gases or gaseous mixtures requiring the use of refrigeration, e.g. of helium or hydrogen ; Details and kind of the refrigeration system used; Integration with other units or processes; Controlling aspects of the process
    • F25J1/0243Start-up or control of the process; Details of the apparatus used; Details of the refrigerant compression system used
    • F25J1/0257Construction and layout of liquefaction equipments, e.g. valves, machines
    • F25J1/0262Details of the cold heat exchange system
    • F25J1/0264Arrangement of heat exchanger cores in parallel with different functions, e.g. different cooling streams
    • F25J1/0265Arrangement of heat exchanger cores in parallel with different functions, e.g. different cooling streams comprising cores associated exclusively with the cooling of a refrigerant stream, e.g. for auto-refrigeration or economizer
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25JLIQUEFACTION, SOLIDIFICATION OR SEPARATION OF GASES OR GASEOUS OR LIQUEFIED GASEOUS MIXTURES BY PRESSURE AND COLD TREATMENT OR BY BRINGING THEM INTO THE SUPERCRITICAL STATE
    • F25J1/00Processes or apparatus for liquefying or solidifying gases or gaseous mixtures
    • F25J1/02Processes or apparatus for liquefying or solidifying gases or gaseous mixtures requiring the use of refrigeration, e.g. of helium or hydrogen ; Details and kind of the refrigeration system used; Integration with other units or processes; Controlling aspects of the process
    • F25J1/0243Start-up or control of the process; Details of the apparatus used; Details of the refrigerant compression system used
    • F25J1/0257Construction and layout of liquefaction equipments, e.g. valves, machines
    • F25J1/0275Construction and layout of liquefaction equipments, e.g. valves, machines adapted for special use of the liquefaction unit, e.g. portable or transportable devices
    • F25J1/0277Offshore use, e.g. during shipping
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25JLIQUEFACTION, SOLIDIFICATION OR SEPARATION OF GASES OR GASEOUS OR LIQUEFIED GASEOUS MIXTURES BY PRESSURE AND COLD TREATMENT OR BY BRINGING THEM INTO THE SUPERCRITICAL STATE
    • F25J1/00Processes or apparatus for liquefying or solidifying gases or gaseous mixtures
    • F25J1/02Processes or apparatus for liquefying or solidifying gases or gaseous mixtures requiring the use of refrigeration, e.g. of helium or hydrogen ; Details and kind of the refrigeration system used; Integration with other units or processes; Controlling aspects of the process
    • F25J1/0243Start-up or control of the process; Details of the apparatus used; Details of the refrigerant compression system used
    • F25J1/0279Compression of refrigerant or internal recycle fluid, e.g. kind of compressor, accumulator, suction drum etc.
    • F25J1/0285Combination of different types of drivers mechanically coupled to the same refrigerant compressor, possibly split on multiple compressor casings
    • F25J1/0288Combination of different types of drivers mechanically coupled to the same refrigerant compressor, possibly split on multiple compressor casings using work extraction by mechanical coupling of compression and expansion of the refrigerant, so-called companders
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25JLIQUEFACTION, SOLIDIFICATION OR SEPARATION OF GASES OR GASEOUS OR LIQUEFIED GASEOUS MIXTURES BY PRESSURE AND COLD TREATMENT OR BY BRINGING THEM INTO THE SUPERCRITICAL STATE
    • F25J1/00Processes or apparatus for liquefying or solidifying gases or gaseous mixtures
    • F25J1/02Processes or apparatus for liquefying or solidifying gases or gaseous mixtures requiring the use of refrigeration, e.g. of helium or hydrogen ; Details and kind of the refrigeration system used; Integration with other units or processes; Controlling aspects of the process
    • F25J1/0243Start-up or control of the process; Details of the apparatus used; Details of the refrigerant compression system used
    • F25J1/0279Compression of refrigerant or internal recycle fluid, e.g. kind of compressor, accumulator, suction drum etc.
    • F25J1/0292Refrigerant compression by cold or cryogenic suction of the refrigerant gas
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2221/00Handled fluid, in particular type of fluid
    • F17C2221/03Mixtures
    • F17C2221/032Hydrocarbons
    • F17C2221/033Methane, e.g. natural gas, CNG, LNG, GNL, GNC, PLNG
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2223/00Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel
    • F17C2223/01Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel characterised by the phase
    • F17C2223/0146Two-phase
    • F17C2223/0153Liquefied gas, e.g. LPG, GPL
    • F17C2223/0161Liquefied gas, e.g. LPG, GPL cryogenic, e.g. LNG, GNL, PLNG
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2223/00Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel
    • F17C2223/03Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel characterised by the pressure level
    • F17C2223/033Small pressure, e.g. for liquefied gas
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2250/00Accessories; Control means; Indicating, measuring or monitoring of parameters
    • F17C2250/04Indicating or measuring of parameters as input values
    • F17C2250/0404Parameters indicated or measured
    • F17C2250/0439Temperature
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2265/00Effects achieved by gas storage or gas handling
    • F17C2265/03Treating the boil-off
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2265/00Effects achieved by gas storage or gas handling
    • F17C2265/03Treating the boil-off
    • F17C2265/032Treating the boil-off by recovery
    • F17C2265/033Treating the boil-off by recovery with cooling
    • F17C2265/034Treating the boil-off by recovery with cooling with condensing the gas phase
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2265/00Effects achieved by gas storage or gas handling
    • F17C2265/03Treating the boil-off
    • F17C2265/032Treating the boil-off by recovery
    • F17C2265/037Treating the boil-off by recovery with pressurising
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2270/00Applications
    • F17C2270/01Applications for fluid transport or storage
    • F17C2270/0102Applications for fluid transport or storage on or in the water
    • F17C2270/0105Ships
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25JLIQUEFACTION, SOLIDIFICATION OR SEPARATION OF GASES OR GASEOUS OR LIQUEFIED GASEOUS MIXTURES BY PRESSURE AND COLD TREATMENT OR BY BRINGING THEM INTO THE SUPERCRITICAL STATE
    • F25J2205/00Processes or apparatus using other separation and/or other processing means
    • F25J2205/30Processes or apparatus using other separation and/or other processing means using a washing, e.g. "scrubbing" or bubble column for purification purposes
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25JLIQUEFACTION, SOLIDIFICATION OR SEPARATION OF GASES OR GASEOUS OR LIQUEFIED GASEOUS MIXTURES BY PRESSURE AND COLD TREATMENT OR BY BRINGING THEM INTO THE SUPERCRITICAL STATE
    • F25J2210/00Processes characterised by the type or other details of the feed stream
    • F25J2210/04Mixing or blending of fluids with the feed stream
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25JLIQUEFACTION, SOLIDIFICATION OR SEPARATION OF GASES OR GASEOUS OR LIQUEFIED GASEOUS MIXTURES BY PRESSURE AND COLD TREATMENT OR BY BRINGING THEM INTO THE SUPERCRITICAL STATE
    • F25J2220/00Processes or apparatus involving steps for the removal of impurities
    • F25J2220/60Separating impurities from natural gas, e.g. mercury, cyclic hydrocarbons
    • F25J2220/62Separating low boiling components, e.g. He, H2, N2, Air
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25JLIQUEFACTION, SOLIDIFICATION OR SEPARATION OF GASES OR GASEOUS OR LIQUEFIED GASEOUS MIXTURES BY PRESSURE AND COLD TREATMENT OR BY BRINGING THEM INTO THE SUPERCRITICAL STATE
    • F25J2230/00Processes or apparatus involving steps for increasing the pressure of gaseous process streams
    • F25J2230/04Compressor cooling arrangement, e.g. inter- or after-stage cooling or condensate removal
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25JLIQUEFACTION, SOLIDIFICATION OR SEPARATION OF GASES OR GASEOUS OR LIQUEFIED GASEOUS MIXTURES BY PRESSURE AND COLD TREATMENT OR BY BRINGING THEM INTO THE SUPERCRITICAL STATE
    • F25J2230/00Processes or apparatus involving steps for increasing the pressure of gaseous process streams
    • F25J2230/08Cold compressor, i.e. suction of the gas at cryogenic temperature and generally without afterstage-cooler
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25JLIQUEFACTION, SOLIDIFICATION OR SEPARATION OF GASES OR GASEOUS OR LIQUEFIED GASEOUS MIXTURES BY PRESSURE AND COLD TREATMENT OR BY BRINGING THEM INTO THE SUPERCRITICAL STATE
    • F25J2230/00Processes or apparatus involving steps for increasing the pressure of gaseous process streams
    • F25J2230/60Processes or apparatus involving steps for increasing the pressure of gaseous process streams the fluid being hydrocarbons or a mixture of hydrocarbons
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25JLIQUEFACTION, SOLIDIFICATION OR SEPARATION OF GASES OR GASEOUS OR LIQUEFIED GASEOUS MIXTURES BY PRESSURE AND COLD TREATMENT OR BY BRINGING THEM INTO THE SUPERCRITICAL STATE
    • F25J2245/00Processes or apparatus involving steps for recycling of process streams
    • F25J2245/02Recycle of a stream in general, e.g. a by-pass stream

Definitions

  • This invention relates to a method and apparatus for the reliquefaction of a vapour, particularly a method and apparatus which are operable on board ship to reliquefy natural gas vapour.
  • Natural gas is conventionally transported over large distances in liquefied state.
  • ocean going tankers are used to convey liquefied natural gas from a first location in which the natural gas is liquefied to a second location in which it is vaporised and sent to a gas distribution system.
  • natural gas liquefies at cryogenic temperatures, i.e. temperatures below - 100°C, there will be continuous boil-off of the liquefied natural gas in any practical storage system. Accordingly, apparatus needs to be provided in order to reliquefy the boiled-off vapour.
  • a refrigeration cycle comprising compressing a working fluid in a plurality of compressors, cooling the compressed working fluid by indirect heat exchange, expanding the working fluid, and warming the expanded working fluid in indirect heat exchange with the compressed working fluid, and returning the warmed working fluid to one of the compressors.
  • the natural gas vapour, downstream of a compression stage, is at least partially condensed by indirect heat exchange with the working fluid being warmed.
  • the working fluid is derived from the natural gas itself and therefore an open refrigeration cycle is operated.
  • the expansion of the working fluid is performed by a valve.
  • Partially condensed natural gas is obtained.
  • the partially condensed natural gas is separated into a liquid phase which is returned to storage and a vapour phase which is mixed with natural gas being sent to a burner for combustion.
  • the working fluid is both warmed and cooled in the same heat exchanger so that only one heat exchanger is required.
  • the heat exchanger is located on a first skid-mounted platform and the working fluid compressors on a second skid-mounted platform.
  • WO-A-98/43029 points out that incomplete condensation of the natural gas vapour reduces the power consumed in the refrigeration cycle (in comparison with complete condensation) and suggests that the residual vapour - which is relatively rich in nitrogen - should be vented to the atmosphere. Indeed, the partial condensation disclosed in WO-A-98/43029 follows well known thermodynamic principles which dictate that the condensate yield is purely a function of the pressure and temperature at which the condensation occurs.
  • the liquefied natural gas may be stored at a pressure a little above atmospheric pressure and the boil-off vapour may be partially condensed at a pressure of 4 bar.
  • the resulting partially condensed mixture is typically flashed through an expansion valve into a phase separator to enable the vapour to be vented at atmospheric pressure.
  • the liquid phase entering the expansion valve contains as much as 10 mole per cent of nitrogen at 4 bar, the resulting vapour phase at 1 bar still contains in the order of 50% by volume of methane.
  • some 3000 to 5000 kg of methane may need to be vented daily from the phase separator. Since methane is recognised as a greenhouse gas such a practice would be environmentally unacceptable.
  • EP-A-1 132 698 discloses a method that mitigates the problems that are caused when vapour is returned with condensed natural gas to a liquefied natural gas (LNG) storage tank.
  • LNG liquefied natural gas
  • the nitrogen mole fraction in the liquefied natural gas is less than the nitrogen mole fraction in the boiled-off vapour and even less than that in flash gas formed by the expansion through the valve of the condensed boil-off vapour, dilution of the boiled-off vapour with the liquefied natural gas either upstream or downstream of the condenser, or both, tends to dampen swings in the composition of the vapour phase in the storage tank that would otherwise occur without the mixing of the boiled off vapour or natural gas condensate with the liquefied natural gas from storage.
  • a method of reliquefying vapour boiled off from at least one volume of liquefied natural gas held in at least one storage tank comprising compressing the vapour in first and second vapour compression stages in series, condensing the compressed vapour in a condenser by heat exchange with a working fluid flowing in a main endless working fluid cycle, and returning at least some of the resulting condensate to the said storage tank, wherein in the main working fluid cycle the working fluid is, in sequence, compressed in at least one working fluid compressor, cooled in a first heat exchanger, expanded in an expansion turbine, employed in the condenser to perform the condensation of the natural gas vapour, warmed in the said first heat exchanger in heat exchange with the working fluid being cooled and returned to the said working fluid compressor, characterised in that in the main working fluid cycle intermediate the passage of the working fluid through the condenser and its passage through the first heat exchanger, the working fluid is employed to precool in a second heat exchanger the compressed natural gas vapour downstream of
  • the invention also provides apparatus for reliquefying natural gas vapour comprising at least one storage tank for holding at least one volume of liquefied natural gas, first and second vapour compression stages in series for compressing boiled-off natural gas vapour communicating with at least one vapour space in the said storage tank, a condenser for condensing the compressed vapour having a natural gas inlet communicating with the second vapour compression stage and an outlet communicating with the said storage tank, wherein the condenser is arranged so as to be cooled, in use, by a working fluid, the condenser forming part of an endless main working fluid cycle comprising, in sequence, (a) at least one working fluid compressor for compressing a flow of the working fluid, (b) a cooling path through a first heat exchanger for cooling the working fluid flow, (c) an expansion turbine for expanding the flow of working fluid, (d) the condenser, (e) a warming path through the first heat exchanger for warming the working fluid, and (f) an inlet to the said working fluid compressor,
  • thermodynamic efficiency of operation in comparison with the corresponding methods and apparatuses disclosed in the prior documents mentioned above.
  • the improvement in thermodynamic efficiency can be exploited by means of a reduced power consumption.
  • the proportion of the working fluid that is diverted from the main working fluid cycle to the third heat exchanger is controlled in response to the temperature at the inlet to the second vapour compression stage.
  • the condenser is operated such that sub-cooled liquefied natural gas exits from it.
  • the said storage tank contains only a relatively small amount of liquefied natural gas return of the condensate to the tank has the effect of enriching the boiled-off vapour in nitrogen.
  • the vapour presented to the condenser for condensation may contain an excess of nitrogen with the consequence that not only is the condensate not sub-cooled but it is not even fully condensed.
  • the storage tank contains a liquefied natural gas having a high nitrogen content, for example, one that gives a boil-off gas containing 20 to 40% by volume of nitrogen
  • the condensate which contains uncondensed vapour
  • the storage tank contains a liquefied natural gas having a high nitrogen content, for example, one that gives a boil-off gas containing 20 to 40% by volume of nitrogen
  • the condensate which contains uncondensed vapour
  • the storage tank contains a liquefied natural gas having a high nitrogen content, for example, one that gives a boil-off gas containing 20 to 40% by volume of nitrogen
  • the first and second vapour compression stages are preferably driven by a single plural speed motor.
  • vapour upstream of the first vapour compression stage is precooled by having mixed therewith a stream of condensed natural gas taken from the condenser.
  • flow rate of the stream of condensed natural gas vapour is controlled in response to the temperature at the inlet to the first compression stage.
  • the five thermally-insulated storage tanks 2, 4, 6, 8 and 10 are provided in the hull of a ship or other sea-going vessel (not shown). Two or more of the storage tanks 2, 4, 6, 8 and 10 are provided with a submerged orifice pipe 12 located in its bottom region through which LNG is introduced. For reasons of ease of illustration, the orifice pipes in the tanks 2, 4 and 6 are not shown in the drawing. If only some of the storage tanks are provided with submerged orifice pipes, redistribution of returning LNG to tanks not so provided is by operation of liquid pumps (not shown).
  • the orifice pipe 12 is in normal operation submerged in a volume 16 of LNG. In each of the tanks 2, 4, 6, 8 and 10 there is a vapour space 18 above the volume 16 of LNG therein.
  • each of the tanks has a top outlet 22 for vapour which communicates with a boiled-off gas header 24. Extending from the header 24 is a main pipeline 26 for the boiled-off gas. Located in the pipeline 26 is a mixer 28, in which, in operation, the vapour may be mixed with condensed LNG from a downstream part of the installation. In operation, the condensed LNG evaporates in the boiled-off gas and thereby reduces the temperature of this gas.
  • a sensor 27 is provided downstream of the mixer and generates signals representative of the temperature at the inlet to a first compression stage 40, which signals are relayed to a valve controller 30, which in turn controls the setting of the flow-control valve 32 in a LNG condensate pipeline 34 that terminates in a spray nozzle 36 within the mixer 28.
  • the mixer 28 may thus be operated so as to provide natural gas at a chosen essentially constant cryogenic temperature below, say, minus 100°C to the first compression stage 40.
  • the boiled-off gas flows from the mixer 28 into the first compression stage.
  • the outlet of the first compression stage 40 indirectly communicates with the inlet of a second compression stage 42.
  • the compression stages 40 and 42 are typically driven by a single electric motor 44 through, if desired, an integral gearbox 45.
  • the motor 44 is typically able to be operated at two different speeds.
  • Resulting compressed gas is supplied from the second compression stage 42 to a condenser 46, typically in the form of a plate fin or spirally wound heat exchanger, in which it is condensed and once condensed subjected to subcooling.
  • the resulting sub-cooled condensate flows from the condenser 46 along a pipeline 48 to a condensate return header 50 which feeds the orifice pipes 12 in the bottom regions of the tanks 8 and 10, or if each tank is equipped with the orifice pipe 12, to the tanks 2, 4, 6, 8 and 10.
  • Cooling for the condenser 46 is provided by a working or heat exchange fluid such as nitrogen flowing at a first pressure in an essentially closed refrigeration cycle 60 such as a Brayton cycle.
  • a working or heat exchange fluid such as nitrogen flowing at a first pressure in an essentially closed refrigeration cycle 60 such as a Brayton cycle.
  • nitrogen passing out of the condenser 46 is warmed in heat exchange with returning compressed nitrogen at a second pressure higher than the first in a gas-to-gas heat exchanger 62.
  • the resulting warmed nitrogen flows to a compressor 64 which typically comprises three compression stages 66, 68 and 70 all having rotors (not shown) mounted on an integral gearbox (not shown) or on the same shaft 72 able to be driven by a motor 74 through a gearbox 75.
  • a first intercooler 78 is located downstream of the outlet from the first compression stage 66 and upstream of the inlet to the second compression stage 68.
  • a second intercooler 80 is located downstream of the outlet from the second compression stage 68 and upstream of the inlet to the third compression stage 70.
  • An aftercooler 82 is located downstream of the outlet from the third compression stage 70.
  • the intercoolers 78 and 80 and the aftercooler 82 are typically all cooled by water and are operated so as to remove the heat of compression from the circulating nitrogen in operation of the Brayton cycle.
  • the resulting aftercooled compressed nitrogen flow passes through the heat exchanger 63 as the previously mentioned returning cold nitrogen stream.
  • the compressed nitrogen stream is thus cooled to a lower temperature in the heat exchanger 62.
  • the compressed cooled nitrogen flow passes to an expansion turbine 84 where it is expanded with the performance of extra work.
  • the expansion turbine 84 is typically mounted on the same integral gearbox (not shown) or on the same shaft as the compression stages 66, 68 and 70.
  • the expansion turbine 84 thus helps to drive the compression stages 66, 68 and 70.
  • the expansion of the nitrogen in the turbine 84 generates the refrigeration necessary for the condensation of the natural gas vapour in the condenser 46.
  • the nitrogen thus continuously passes through an endless circuit.
  • a particular feature of the Brayton cycle 60 illustrated in the drawing is that the nitrogen does not pass directly from the condenser 46 to the heat exchanger 62. Instead it passes through a second gas-to-gas countercurrent heat exchanger 86.
  • the purpose of this heat exchanger is to pre-cool the natural gas to a temperature close to its condensation temperature upstream of entering the condenser 46.
  • the natural gas is consequently not only liquefied but also sub-cooled in the condenser 46.
  • the sub-cooling of the liquefied natural gas keeps down the formation of flash gas when the LNG is returned to the tanks.
  • a further feature of the particular form of Brayton cycle 6 shown in the drawings is that a part of the nitrogen is withdrawn from a region of the Brayton cycle downstream of the outlet from the condenser 46 but upstream of the inlet to the second heat exchanger 86 and flows through a third heat exchanger 88 which is located downstream of the first natural gas compression stage 40 but upstream of the second natural gas compression stage 42 and thus serves to remove the heat of compression generated in the natural gas by operation of the first compression stage 40.
  • the nitrogen passing through the third heat exchanger 88 is warmed.
  • the warmed nitrogen flow is returned to the Brayton cycle 60 at a region downstream of the outlet from the second heat exchanger 86 but upstream of the inlet to the warming passages through the first heat exchanger 62.
  • a control valve 90 controls the rate of flow of nitrogen working fluid through the third heat exchanger in response to a temperature sensor (not shown) at the inlet to the second natural gas compression stage 42.
  • the control valve 90 operates to maintain a constant temperature at the inlet to the second natural gas compression stage 42.
  • the temperature at the inlet to the first natural gas compression stage 40 is typically in the order of minus 100°C or even lower.
  • the pressure at the inlet is typically a little above 1 bar.
  • the natural gas typically leaves the first compression stage at a temperature of minus 65°C and a pressure in the order of 2 bar.
  • the gas is typically cooled in the heat exchanger to a temperature in the order of minus 130°C and enters the second natural gas compression stage at this temperature.
  • the natural gas typically leaves the second compression stage 42 at a pressure in the order of 5 bar and a temperature of about minus 75°C.
  • the natural gas is cooled in the second heat exchanger to a temperature at which it will begin to condense.
  • the exact value of this temperature will depend on the composition of the natural gas. The greater the mole fraction of nitrogen in the natural gas, the lower will be the temperature at which it starts to condense.
  • the condenser 46 is not required to desuperheat the natural gas in normal operation, more efficient heat exchange is made possible than in previously known cycles in which the corresponding condenser has been required both to desuperheat and to condense the natural gas. As a result of the intercooling, desuperheating and separate condensing with subcooling, the power consumption of the refrigeration cycle is reduced.
  • the natural gas leaves the condenser 46 as a sub-cooled liquid.
  • its exit temperature is in the order of minus 165°C depending on the composition of the natural gas.
  • One of the advantages of such a low exit temperature is that relatively little, if any, flash gas is formed on reintroduction of the LNG into the tanks 2, 4, 6, 8 and 10 through the orifice pipes 12.
  • any flash gas that is formed may be dissolved or condensed in the liquid before it reaches the surface.
  • the expansion turbine 84 typically has an inlet temperature in the order of minus 104°C, an outlet temperature in the order of minus 168°C, and an outlet pressure in the order of 10 bar. If the composition of the natural gas is, say, 8.5% by volume of nitrogen and 91.5% by volume of methane, this temperature is sufficiently low for the condensate produced in the condenser 46 to have a desired degree of sub-cooling.
  • the ship in which the tanks 2, 4, 6, 8 and 10 are located is required to transport sufficiently less than the maximum amount of LNG for the liquid head in the tanks not to be sufficient to prevent flashing of condensate returned through the orifice pipes 12 or to ensure complete dissolution of fine bubbles of flash gas that are formed in the volumes 16 of LNG.
  • the vapour that flows from the tanks 2, 4, 6, 8 and 10 to the first compression stage 40 is enriched in nitrogen.
  • its condensation temperature at the outlet pressure of the second natural gas vapour compression stage 42 falls. Indeed, when the tanks are relatively lightly laden with LNG the degree of enrichment may become so great that the condenser 46 no longer fully condenses the vapour.
  • the mixture of condensate and uncondensed vapour may be selectively directed through a valve 100 into a phase separator 102. Liquid is withdrawn from the bottom of the phase separator 102 and sent to the conduit 50. Vapour passes from the phase separator 102 to a vent line 104 which leads through a heater 106 to a gas combustion unit 108 so that the natural gas content of the vapour may be burned and the resulting combustion gases vented to the atmosphere.
  • the minimum and maximum flows of natural gas vapour in operation of the apparatus shown in the drawing can vary widely. It is therefore typically preferred to employ two sets of first and second natural gas compression stages 40 and 42, the two sets being in parallel with one another. Thus, there are typically two third heat exchangers 88 in parallel with one another. Whether one or both sets are used depends on the rate of vaporisation of the natural gas in the tanks 2, 4, 6, 8 and 10. Similarly, they may be two or more sets of nitrogen compression stages 66, 68 and 70 in parallel, and two or more expansion turbines 84 in parallel.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • General Chemical & Material Sciences (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Ocean & Marine Engineering (AREA)
  • Filling Or Discharging Of Gas Storage Vessels (AREA)
  • Separation By Low-Temperature Treatments (AREA)
EP06352012A 2006-05-23 2006-05-23 Procédé et dispositif pour reliquéfier un courant de gaz Active EP1860393B1 (fr)

Priority Applications (9)

Application Number Priority Date Filing Date Title
EP06352012A EP1860393B1 (fr) 2006-05-23 2006-05-23 Procédé et dispositif pour reliquéfier un courant de gaz
AT06352012T ATE423298T1 (de) 2006-05-23 2006-05-23 Verfahren und vorrichtung zur rückverflüssigung eines gasstromes
DE602006005229T DE602006005229D1 (de) 2006-05-23 2006-05-23 Verfahren und Vorrichtung zur Rückverflüssigung eines Gasstromes
KR1020087028557A KR101419069B1 (ko) 2006-05-23 2007-05-23 증기의 재액화 방법 및 장치
JP2009511608A JP5241707B2 (ja) 2006-05-23 2007-05-23 蒸気を再液化するための方法と装置
US12/301,057 US20100000253A1 (en) 2006-05-23 2007-05-23 Method and apparatus for the reliquefaction of a vapour
CN2007800184802A CN101495828B (zh) 2006-05-23 2007-05-23 蒸汽再液化的方法和设备
EP07804964A EP2024698A2 (fr) 2006-05-23 2007-05-23 Procédé et dispositif pour reliquéfier un courant de gaz
PCT/IB2007/002771 WO2007144774A2 (fr) 2006-05-23 2007-05-23 Procédé et appareil de reliquéfaction d'une vapeur

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
EP06352012A EP1860393B1 (fr) 2006-05-23 2006-05-23 Procédé et dispositif pour reliquéfier un courant de gaz

Publications (2)

Publication Number Publication Date
EP1860393A1 true EP1860393A1 (fr) 2007-11-28
EP1860393B1 EP1860393B1 (fr) 2009-02-18

Family

ID=37149854

Family Applications (2)

Application Number Title Priority Date Filing Date
EP06352012A Active EP1860393B1 (fr) 2006-05-23 2006-05-23 Procédé et dispositif pour reliquéfier un courant de gaz
EP07804964A Withdrawn EP2024698A2 (fr) 2006-05-23 2007-05-23 Procédé et dispositif pour reliquéfier un courant de gaz

Family Applications After (1)

Application Number Title Priority Date Filing Date
EP07804964A Withdrawn EP2024698A2 (fr) 2006-05-23 2007-05-23 Procédé et dispositif pour reliquéfier un courant de gaz

Country Status (8)

Country Link
US (1) US20100000253A1 (fr)
EP (2) EP1860393B1 (fr)
JP (1) JP5241707B2 (fr)
KR (1) KR101419069B1 (fr)
CN (1) CN101495828B (fr)
AT (1) ATE423298T1 (fr)
DE (1) DE602006005229D1 (fr)
WO (1) WO2007144774A2 (fr)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2014105286A1 (fr) * 2012-12-24 2014-07-03 General Electric Company Systèmes et procédés permettant une nouvelle condensation du gaz d'évaporation
EP2775194A4 (fr) * 2011-10-20 2015-10-28 Mitsubishi Heavy Ind Ltd Dispositif de suppression de hausse de pression pour réservoir de stockage, système de suppression de hausse de pression pourvu de celui-ci, procédé de suppression s'y rapportant, récipient de transport de gaz liquéfié pourvu de celui-ci et installation de stockage de gaz liquéfié pourvue de celui-ci
EP2516918A4 (fr) * 2009-12-22 2017-06-28 Hamworthy Oil & Gas Systems AS Procédé et système de manipulation d'un chargement de gpl chaud
WO2022033714A1 (fr) * 2020-08-12 2022-02-17 Cryostar Sas Système de réfrigération cryogénique simplifiée

Families Citing this family (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NZ582507A (en) * 2007-07-09 2012-08-31 Lng Technology Pty Ltd A method and system for production of liquid natural gas
US20100122542A1 (en) * 2008-11-17 2010-05-20 Daewoo Shipbuilding & Marine Engineering Co., Ltd. Method and apparatus for adjusting heating value of natural gas
DE102010000946B4 (de) 2010-01-15 2022-12-15 Tge Marine Gas Engineering Gmbh Verfahren und Tankanlage für das Verflüssigen von Boil-Off Gas
CN101858683A (zh) * 2010-04-30 2010-10-13 浙江大学 一种利用液氮冷能制取液化天然气的系统
CN101881549B (zh) * 2010-06-25 2014-02-12 华南理工大学 一种液化天然气接收站蒸发气体再冷凝回收系统及其回收方法
CA2723641A1 (fr) * 2010-11-23 2012-05-23 W. Claire Energy Corporation Procede et appareil de compression de gaz naturel humide
KR101302028B1 (ko) * 2011-09-02 2013-09-04 삼성중공업 주식회사 증발가스 재액화 시스템
US9927068B2 (en) * 2011-12-02 2018-03-27 Fluor Technologies Corporation LNG boiloff gas recondensation configurations and methods
KR101784530B1 (ko) 2012-10-18 2017-10-11 현대중공업 주식회사 부유식 액화가스 생산 저장장치
EP2746707B1 (fr) * 2012-12-20 2017-05-17 Cryostar SAS Procédé et appareil de reliquéfaction de gaz naturel
DE102013010414B4 (de) * 2013-06-21 2016-05-12 Tge Marine Gas Engineering Gmbh Rückverflüssigung von Boil-Off-Gasen
KR101459962B1 (ko) 2013-10-31 2014-11-07 현대중공업 주식회사 액화가스 처리 시스템
GB201414893D0 (en) * 2014-08-21 2014-10-08 Liquid Gas Equipment Ltd Method of cooling boil off gas and apparatus therefor
CN104266454A (zh) * 2014-09-05 2015-01-07 西安交通大学 燃气-超临界二氧化碳联合动力的液化天然气生产系统
CN104405599B (zh) * 2014-09-24 2017-02-01 西安交通大学 一种利用太阳能的燃气‑超临界二氧化碳联合动力发电系统
US10449485B2 (en) * 2015-10-09 2019-10-22 Ngk Insulators, Ltd. Method of producing nitrogen-depleted gas, method of producing nitrogen-enriched gas, method of nitrogen separation, and system of nitrogen separation
US10393429B2 (en) * 2016-04-06 2019-08-27 Air Products And Chemicals, Inc. Method of operating natural gas liquefaction facility
WO2017192136A1 (fr) * 2016-05-04 2017-11-09 Innovative Cryogenic Systems, Inc. Installation destinée à alimenter un élément consommateur de gaz en gaz combustible et à liquéfier ledit gaz combustible
CN109563968B (zh) * 2016-05-04 2021-01-15 创新低温系统公司 用于向气体消耗构件供给可燃气体并用于液化所述可燃气体的设备
FR3055692B1 (fr) * 2016-09-06 2018-08-24 L'air Liquide, Societe Anonyme Pour L'etude Et L'exploitation Des Procedes Georges Claude Installation, procede pour stocker et reliquefier un gaz liquefie et vehicule de transport associe
CN106678538A (zh) * 2016-12-31 2017-05-17 中船重工(上海)新能源有限公司 多能互补的液化天然气bog回收方法及其实施装置
FR3066257B1 (fr) * 2018-01-23 2019-09-13 Gaztransport Et Technigaz Pompe a chaleur cryogenique et son utilisation pour le traitement de gaz liquefie
JP6929391B2 (ja) * 2017-06-13 2021-09-01 コリア シップビルディング アンド オフショア エンジニアリング カンパニー リミテッド 蒸発ガス再液化システム及び船舶
RU2753266C1 (ru) * 2018-01-12 2021-08-12 НУОВО ПИНЬОНЕ ТЕКНОЛОДЖИ - С.р.л. Термодинамическая система, содержащая флюид, и способ снижения давления в ней

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3874185A (en) * 1972-12-18 1975-04-01 Linde Ag Process for a more efficient liquefaction of a low-boiling gaseous mixture by closely matching the refrigerant warming curve to the gaseous mixture cooling curve
EP1120615A2 (fr) * 2000-01-26 2001-08-01 Cryostar-France SA Dispositif de recompression de vapeurs sous pression
EP1132698A1 (fr) * 2000-03-09 2001-09-12 Cryostar-France SA Reliquéfaction de vapeur comprimée
WO2005040667A1 (fr) * 2003-10-28 2005-05-06 Moss Maritime As Dispositif pour stocker et transporter du gaz naturel liquefie
WO2005047761A1 (fr) * 2003-11-13 2005-05-26 Hamworthy Kse Gas Systems As Appareil et procede de commande de temperature dans un gaz d'evaporation
WO2005071333A1 (fr) * 2004-01-23 2005-08-04 Hamworthy Kse Gas Systems As Systeme et procede de reliquefaction de vaporisat
WO2006078104A1 (fr) * 2005-01-18 2006-07-27 Daewoo Shipbuilding & Marine Engineering Systeme operationnel d'un navire transporteur de g. n. l., permettant de sous-refroidir et de liquefier les gaz evapores
WO2006098630A1 (fr) * 2005-03-14 2006-09-21 Hamworthy Kse Gas Systems As Systeme et procede pour refroidir un courant de vaporisat

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1472533A (en) * 1973-06-27 1977-05-04 Petrocarbon Dev Ltd Reliquefaction of boil-off gas from a ships cargo of liquefied natural gas
US4525185A (en) * 1983-10-25 1985-06-25 Air Products And Chemicals, Inc. Dual mixed refrigerant natural gas liquefaction with staged compression
US4618310A (en) * 1984-06-07 1986-10-21 Exxon Research & Engineering Co. Method of multi-stage compressor surge control
US4843829A (en) * 1988-11-03 1989-07-04 Air Products And Chemicals, Inc. Reliquefaction of boil-off from liquefied natural gas
JP3908881B2 (ja) * 1999-11-08 2007-04-25 大阪瓦斯株式会社 ボイルオフガスの再液化方法
GB0120661D0 (en) * 2001-08-24 2001-10-17 Cryostar France Sa Natural gas supply apparatus
JP4544885B2 (ja) * 2004-03-22 2010-09-15 三菱重工業株式会社 ガス再液化装置およびガス再液化方法
WO2007011155A1 (fr) * 2005-07-19 2007-01-25 Shinyoung Heavy Industries Co., Ltd. Appareil de reliquéfaction de gaz d’évaporats de gaz naturel liquéfié

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3874185A (en) * 1972-12-18 1975-04-01 Linde Ag Process for a more efficient liquefaction of a low-boiling gaseous mixture by closely matching the refrigerant warming curve to the gaseous mixture cooling curve
EP1120615A2 (fr) * 2000-01-26 2001-08-01 Cryostar-France SA Dispositif de recompression de vapeurs sous pression
EP1132698A1 (fr) * 2000-03-09 2001-09-12 Cryostar-France SA Reliquéfaction de vapeur comprimée
WO2005040667A1 (fr) * 2003-10-28 2005-05-06 Moss Maritime As Dispositif pour stocker et transporter du gaz naturel liquefie
WO2005047761A1 (fr) * 2003-11-13 2005-05-26 Hamworthy Kse Gas Systems As Appareil et procede de commande de temperature dans un gaz d'evaporation
WO2005071333A1 (fr) * 2004-01-23 2005-08-04 Hamworthy Kse Gas Systems As Systeme et procede de reliquefaction de vaporisat
WO2006078104A1 (fr) * 2005-01-18 2006-07-27 Daewoo Shipbuilding & Marine Engineering Systeme operationnel d'un navire transporteur de g. n. l., permettant de sous-refroidir et de liquefier les gaz evapores
WO2006098630A1 (fr) * 2005-03-14 2006-09-21 Hamworthy Kse Gas Systems As Systeme et procede pour refroidir un courant de vaporisat

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2516918A4 (fr) * 2009-12-22 2017-06-28 Hamworthy Oil & Gas Systems AS Procédé et système de manipulation d'un chargement de gpl chaud
EP2775194A4 (fr) * 2011-10-20 2015-10-28 Mitsubishi Heavy Ind Ltd Dispositif de suppression de hausse de pression pour réservoir de stockage, système de suppression de hausse de pression pourvu de celui-ci, procédé de suppression s'y rapportant, récipient de transport de gaz liquéfié pourvu de celui-ci et installation de stockage de gaz liquéfié pourvue de celui-ci
WO2014105286A1 (fr) * 2012-12-24 2014-07-03 General Electric Company Systèmes et procédés permettant une nouvelle condensation du gaz d'évaporation
WO2022033714A1 (fr) * 2020-08-12 2022-02-17 Cryostar Sas Système de réfrigération cryogénique simplifiée

Also Published As

Publication number Publication date
JP2009538405A (ja) 2009-11-05
CN101495828A (zh) 2009-07-29
EP2024698A2 (fr) 2009-02-18
DE602006005229D1 (de) 2009-04-02
EP1860393B1 (fr) 2009-02-18
CN101495828B (zh) 2011-10-19
KR101419069B1 (ko) 2014-07-11
US20100000253A1 (en) 2010-01-07
KR20090020574A (ko) 2009-02-26
WO2007144774A3 (fr) 2008-10-16
WO2007144774A2 (fr) 2007-12-21
ATE423298T1 (de) 2009-03-15
JP5241707B2 (ja) 2013-07-17

Similar Documents

Publication Publication Date Title
EP1860393B1 (fr) Procédé et dispositif pour reliquéfier un courant de gaz
EP1132698B1 (fr) Reliquéfaction de vapeur comprimée
US10030815B2 (en) Method and apparatus for reliquefying natural gas
AU2018218196B2 (en) Pre-cooling of natural gas by high pressure compression and expansion
RU2141611C1 (ru) Способ сжижения
EP1120615B1 (fr) Dispositif de recompression de vapeurs sous pression
US20140083132A1 (en) Process for liquefaction of natural gas
EP1913117A1 (fr) Appareil de reliquéfaction de gaz d évaporats de gaz naturel liquéfié
CA3056587C (fr) Methode de cascade arctique pour liquefaction de gaz naturel dans un cycle haute pression avec un prerefroidissement par l'ethane et un sous-refroidissement par l'azote, et une plante pour sa mise en oeuvre
KR100747372B1 (ko) 증발가스의 재액화 장치 및 재액화 방법
RU2719258C2 (ru) Система и способ обработки газа, полученного при испарении криогенной жидкости
WO2007148122A2 (fr) Production de gnl
JP2024535276A (ja) 蒸発ガス再液化システム及びそれを含む船舶
KR100747371B1 (ko) 증발가스 재액화 장치 및 그 장착 방법
KR101714675B1 (ko) 저장탱크를 포함하는 선박
US20220099365A1 (en) Method of Cooling Boil-Off Gas and Apparatus Therefor
KR20190078919A (ko) 선박용 증발가스 재액화 시스템 및 방법

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC NL PL PT RO SE SI SK TR

AX Request for extension of the european patent

Extension state: AL BA HR MK YU

17P Request for examination filed

Effective date: 20080515

AKX Designation fees paid

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC NL PL PT RO SE SI SK TR

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC NL PL PT RO SE SI SK TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REF Corresponds to:

Ref document number: 602006005229

Country of ref document: DE

Date of ref document: 20090402

Kind code of ref document: P

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20090218

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20090218

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20090218

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20090529

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20090218

NLV1 Nl: lapsed or annulled due to failure to fulfill the requirements of art. 29p and 29m of the patents act
PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20090218

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20090518

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20090218

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20090218

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20090618

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20090218

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20090218

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20090727

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20090218

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20090218

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20090218

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20090218

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20090531

26N No opposition filed

Effective date: 20091119

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20090518

REG Reference to a national code

Ref country code: IE

Ref legal event code: MM4A

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20090523

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20091201

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20090519

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20100523

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20100531

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20100531

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20090218

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20090523

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20090819

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20100523

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20090218

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20090218

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 11

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 12

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 13

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 20240522

Year of fee payment: 19