EP1725806A1 - Station zum einfüllen von kohlendioxid in einen mobilen tank - Google Patents

Station zum einfüllen von kohlendioxid in einen mobilen tank

Info

Publication number
EP1725806A1
EP1725806A1 EP04816576A EP04816576A EP1725806A1 EP 1725806 A1 EP1725806 A1 EP 1725806A1 EP 04816576 A EP04816576 A EP 04816576A EP 04816576 A EP04816576 A EP 04816576A EP 1725806 A1 EP1725806 A1 EP 1725806A1
Authority
EP
European Patent Office
Prior art keywords
carbon dioxide
mobile tank
filling
pressure
filling station
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP04816576A
Other languages
English (en)
French (fr)
Inventor
Carinne Kempen
Serge Morel-Jean
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
LAir Liquide SA pour lEtude et lExploitation des Procedes Georges Claude
Original Assignee
Air Liquide SA
LAir Liquide SA a Directoire et Conseil de Surveillance pour lEtude et lExploitation des Procedes Georges Claude
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Air Liquide SA, LAir Liquide SA a Directoire et Conseil de Surveillance pour lEtude et lExploitation des Procedes Georges Claude filed Critical Air Liquide SA
Publication of EP1725806A1 publication Critical patent/EP1725806A1/de
Withdrawn legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C5/00Methods or apparatus for filling containers with liquefied, solidified, or compressed gases under pressures
    • F17C5/02Methods or apparatus for filling containers with liquefied, solidified, or compressed gases under pressures for filling with liquefied gases
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16DCOUPLINGS FOR TRANSMITTING ROTATION; CLUTCHES; BRAKES
    • F16D11/00Clutches in which the members have interengaging parts
    • F16D11/08Clutches in which the members have interengaging parts actuated by moving a non-rotating part axially
    • F16D11/10Clutches in which the members have interengaging parts actuated by moving a non-rotating part axially with clutching members movable only axially
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16DCOUPLINGS FOR TRANSMITTING ROTATION; CLUTCHES; BRAKES
    • F16D21/00Systems comprising a plurality of actuated clutches
    • F16D21/02Systems comprising a plurality of actuated clutches for interconnecting three or more shafts or other transmission members in different ways
    • F16D21/04Systems comprising a plurality of actuated clutches for interconnecting three or more shafts or other transmission members in different ways with a shaft carrying a number of rotatable transmission members, e.g. gears, each of which can be connected to the shaft by a clutching member or members between the shaft and the hub of the transmission member
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16DCOUPLINGS FOR TRANSMITTING ROTATION; CLUTCHES; BRAKES
    • F16D21/00Systems comprising a plurality of actuated clutches
    • F16D21/02Systems comprising a plurality of actuated clutches for interconnecting three or more shafts or other transmission members in different ways
    • F16D21/06Systems comprising a plurality of actuated clutches for interconnecting three or more shafts or other transmission members in different ways at least two driving shafts or two driven shafts being concentric
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C13/00Details of vessels or of the filling or discharging of vessels
    • F17C13/02Special adaptations of indicating, measuring, or monitoring equipment
    • F17C13/025Special adaptations of indicating, measuring, or monitoring equipment having the pressure as the parameter
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C7/00Methods or apparatus for discharging liquefied, solidified, or compressed gases from pressure vessels, not covered by another subclass
    • F17C7/02Discharging liquefied gases
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60KARRANGEMENT OR MOUNTING OF PROPULSION UNITS OR OF TRANSMISSIONS IN VEHICLES; ARRANGEMENT OR MOUNTING OF PLURAL DIVERSE PRIME-MOVERS IN VEHICLES; AUXILIARY DRIVES FOR VEHICLES; INSTRUMENTATION OR DASHBOARDS FOR VEHICLES; ARRANGEMENTS IN CONNECTION WITH COOLING, AIR INTAKE, GAS EXHAUST OR FUEL SUPPLY OF PROPULSION UNITS IN VEHICLES
    • B60K1/00Arrangement or mounting of electrical propulsion units
    • B60K1/02Arrangement or mounting of electrical propulsion units comprising more than one electric motor
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2205/00Vessel construction, in particular mounting arrangements, attachments or identifications means
    • F17C2205/03Fluid connections, filters, valves, closure means or other attachments
    • F17C2205/0302Fittings, valves, filters, or components in connection with the gas storage device
    • F17C2205/037Quick connecting means, e.g. couplings
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2205/00Vessel construction, in particular mounting arrangements, attachments or identifications means
    • F17C2205/05Vessel or content identifications, e.g. labels
    • F17C2205/055Vessel or content identifications, e.g. labels by magnetic means
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2221/00Handled fluid, in particular type of fluid
    • F17C2221/01Pure fluids
    • F17C2221/013Carbone dioxide
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2223/00Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel
    • F17C2223/01Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel characterised by the phase
    • F17C2223/0146Two-phase
    • F17C2223/0153Liquefied gas, e.g. LPG, GPL
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2223/00Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel
    • F17C2223/03Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel characterised by the pressure level
    • F17C2223/035High pressure (>10 bar)
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2223/00Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel
    • F17C2223/04Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel characterised by other properties of handled fluid before transfer
    • F17C2223/042Localisation of the removal point
    • F17C2223/043Localisation of the removal point in the gas
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2223/00Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel
    • F17C2223/04Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel characterised by other properties of handled fluid before transfer
    • F17C2223/042Localisation of the removal point
    • F17C2223/046Localisation of the removal point in the liquid
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2225/00Handled fluid after transfer, i.e. state of fluid after transfer from the vessel
    • F17C2225/01Handled fluid after transfer, i.e. state of fluid after transfer from the vessel characterised by the phase
    • F17C2225/0146Two-phase
    • F17C2225/0153Liquefied gas, e.g. LPG, GPL
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2225/00Handled fluid after transfer, i.e. state of fluid after transfer from the vessel
    • F17C2225/03Handled fluid after transfer, i.e. state of fluid after transfer from the vessel characterised by the pressure level
    • F17C2225/035High pressure, i.e. between 10 and 80 bars
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2225/00Handled fluid after transfer, i.e. state of fluid after transfer from the vessel
    • F17C2225/04Handled fluid after transfer, i.e. state of fluid after transfer from the vessel characterised by other properties of handled fluid after transfer
    • F17C2225/042Localisation of the filling point
    • F17C2225/043Localisation of the filling point in the gas
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2225/00Handled fluid after transfer, i.e. state of fluid after transfer from the vessel
    • F17C2225/04Handled fluid after transfer, i.e. state of fluid after transfer from the vessel characterised by other properties of handled fluid after transfer
    • F17C2225/042Localisation of the filling point
    • F17C2225/046Localisation of the filling point in the liquid
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2227/00Transfer of fluids, i.e. method or means for transferring the fluid; Heat exchange with the fluid
    • F17C2227/04Methods for emptying or filling
    • F17C2227/044Methods for emptying or filling by purging
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2250/00Accessories; Control means; Indicating, measuring or monitoring of parameters
    • F17C2250/01Intermediate tanks
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2250/00Accessories; Control means; Indicating, measuring or monitoring of parameters
    • F17C2250/03Control means
    • F17C2250/032Control means using computers
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2250/00Accessories; Control means; Indicating, measuring or monitoring of parameters
    • F17C2250/04Indicating or measuring of parameters as input values
    • F17C2250/0404Parameters indicated or measured
    • F17C2250/0421Mass or weight of the content of the vessel
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2250/00Accessories; Control means; Indicating, measuring or monitoring of parameters
    • F17C2250/04Indicating or measuring of parameters as input values
    • F17C2250/0404Parameters indicated or measured
    • F17C2250/043Pressure
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2250/00Accessories; Control means; Indicating, measuring or monitoring of parameters
    • F17C2250/04Indicating or measuring of parameters as input values
    • F17C2250/0404Parameters indicated or measured
    • F17C2250/0443Flow or movement of content
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2265/00Effects achieved by gas storage or gas handling
    • F17C2265/03Treating the boil-off
    • F17C2265/031Treating the boil-off by discharge
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2270/00Applications
    • F17C2270/01Applications for fluid transport or storage
    • F17C2270/0134Applications for fluid transport or storage placed above the ground
    • F17C2270/0136Terminals
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2270/00Applications
    • F17C2270/01Applications for fluid transport or storage
    • F17C2270/0165Applications for fluid transport or storage on the road
    • F17C2270/0168Applications for fluid transport or storage on the road by vehicles
    • F17C2270/0171Trucks
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25DREFRIGERATORS; COLD ROOMS; ICE-BOXES; COOLING OR FREEZING APPARATUS NOT OTHERWISE PROVIDED FOR
    • F25D3/00Devices using other cold materials; Devices using cold-storage bodies
    • F25D3/12Devices using other cold materials; Devices using cold-storage bodies using solidified gases, e.g. carbon-dioxide snow

Definitions

  • the present invention relates to a filling station for liquid carbon dioxide to a mobile tank.
  • the invention finds a particularly advantageous application in the field of supplying liquid carbon dioxide (CO 2 ) for mobile tanks supplying the refrigeration units installed on isothermal trucks and requiring a rapid descent in temperature so as not to interrupt the chain of cold.
  • CO 2 liquid carbon dioxide
  • this prior pressure relief causes vaporization of the liquid carbon dioxide.
  • the filling time of the mobile tank is, in general, directly dependent on the pressure difference between the pressure in the mobile tank and the supply pressure of LCO2 in the storage tank.
  • the prior pressure relief therefore has the effect of slowing the transfer time from LCO2 to the mobile tank.
  • the smaller the pressure difference the longer the filling time.
  • the filling time is a key factor for the transport customer.
  • the driver of the vehicle transporting the mobile tank must connect two hoses to connect the LCO2 power transfer line and the gas vent, and open two manual valves located on the mobile tank before filling, this which is time and reliability constraining.
  • the equipment which has just been described with reference to the state of the art does not allow rapid transfer of the LCO 2 or an estimation of the degassing losses.
  • a constant concern of customers is to reduce the total filling time of the mobile tank to gain productivity and to know precisely the actual consumption of LC0 2 as well as the vaporization losses during filling.
  • this known equipment mainly consists of pressure reducers, which do not provide a high reliability of the overall installation, nor the possibility of managing the alarms and faults that may occur.
  • a first technical problem to be solved by the object of the present invention is to provide a filling station for liquid carbon dioxide to a mobile tank, comprising a storage tank for liquid carbon dioxide and a transfer line capable of bringing said liquid carbon dioxide from the storage tank to the mobile tank, which would make it possible to obtain a rapid transfer of LCO 2 from the storage tank to the mobile tank, and this in an automated, reliable and simple manner for the user who 'is the transporter whose transfer of LCO 2 is not the main job.
  • the solution to the first technical problem posed consists, according to the present invention, in that said filling station comprises a circulation line of carbon dioxide gas capable of maintaining downstream of the mobile tank a set pressure higher than the solidification temperature of the carbon dioxide.
  • the filling station object of the invention, makes it possible to obtain a high pressure difference between the liquid carbon dioxide storage tank and the gaseous vent of the mobile tank, hence a rapid transfer speed of the quantity of CO 2 required.
  • said gaseous carbon dioxide circulation line comprises a gas discharge valve controlled to open when the pressure downstream of the mobile tank is greater than said set value.
  • the invention preferably provides that said gas discharge valve is controlled by a pressure transmitter sensor.
  • a second technical problem which the present invention proposes to solve is to measure the quantity of carbon dioxide vaporized, lost during filling, so that it can be counted and deducted from the quantity of liquid CO 2 transferred, thus offering the customer better precision in knowing the actual volume transferred.
  • the invention recommends that the said gaseous carbon dioxide circulation line also comprises a buffer capacity connected to the said evacuation valve and capable of storing the carbon dioxide evacuated from the mobile tank during filling.
  • said buffer capacity comprises means for measuring the volume of carbon dioxide evacuated from the mobile tank during filling.
  • the measurement of the volume of carbon dioxide evacuated from the mobile tank during filling is carried out on the basis of the pressure difference in the buffer capacity between the start and the end of filling.
  • the buffer capacity therefore performs the functions of temporarily storing the quantity of the gaseous CO 2 vent, of measuring it, then of discharging it into the atmosphere in a delayed manner.
  • FIG. 1 is shown schematically a filling station of liquid carbon dioxide to a mobile tank 20.
  • This station comprises a tank 10 for storing liquid CO 2 , the storage pressure of which can vary between 14 and 20 bars.
  • a transfer line 100 is provided for bringing the liquid CO 2 from the storage tank 10 to the mobile tank 20 under a pressure of the same order of magnitude as the storage pressure increased by the hydrostatic height of the LCO 2 storage which allows the sub- cooling of the transferred LCO 2 and limits the inputs heat in the transfer line 100 and the flexible hoses 110, 210 for respective connection to the mobile tank 20 of the transfer line 100 and the line 200 for circulation of gaseous CO 2 .
  • the operation of the filling station in FIG. 1 is as follows.
  • the driver of the vehicle transporting the mobile tank 20 identifies himself at a recognition terminal 2, for example by introducing a magnetic card and validating a personal code.
  • the recognition terminal 2 also includes a modem for a telephone line ensuring the remote transmission of information to the customer.
  • the driver then connects the two hoses 110 and 210 to the mobile tank 20 and opens the two manual valves 120, 220 placed on this tank.
  • Terminal 2 for recognition gives authorization for filling with liquid CO2.
  • the filling valve 130 for supplying LCO 2 is authorized to open.
  • a second step of pressurizing the hose 210 and the mobile tank 20 The pressure in the mobile tank 20 is not directly measured, but the pressure transmitter sensor 230 measures the pressure downstream of the mobile tank 20 and the flexible 240.
  • this pressure is less than the CO 2 solidification pressure, this means that the mobile tank 20 is empty.
  • the mobile tank pressurization valve 240 opens 20 until the pressure measured by the pressure transmitter 230 exceeds the solidification pressure of the CO 2, i.e. 5.18 bars, until reaching a set pressure. which can typically be 8 bars. Filling with liquid is not authorized as long as the risk of carbon dioxide snow formation exists, a phenomenon always present with a pressure lower than the solidification pressure of CO 2 . Then, if the pressures measured by the pressure transmitter 230 and another transmitter 140 disposed on the transfer line 100 are both greater than the CO 2 solidification pressure, the passage to the filling step is authorized. Otherwise, the automat of distributor 1 generates a fault signal after a time delay and the driver is notified of the incident.
  • the distributor 1 includes the automation part of control / command, in particular the indicators and the emergency stop as well as the connection of the hoses after use.
  • the filling valve 130 for supplying LCO 2 opens, while the valve 240 for pressurizing the mobile tank 20 is closed.
  • the valve 250 for evacuating the gas phase from the mobile tank 20 to the atmosphere is controlled to open by the pressure transmitter 230 as soon as the pressure measured by said transmitter 230 downstream from the mobile tank 20 is greater than the pressure set point, around 8 bars as we have seen. Since the filling step is rapid at the start and then slowed down towards the end of filling, the CO 2 flow rate of the gas phase varies in the same proportions.
  • valve 250 for evacuating the gaseous phase of the mobile tank 20 is doubled, the two valves being open at the start of filling, then only one towards the end of filling.
  • the valve 250 for evacuating the gas phase is a proportional valve controlled by PID (Proportional Integral Derivative) regulation from the pressure transmitter 230 which opens as a function of the quantity of gas to be evacuated. The liquid filling step continues until the flow of PID (Proportional Integral Derivative) regulation from the pressure transmitter 230 which opens as a function of the quantity of gas to be evacuated. The liquid filling step continues until the flow of PID (Proportional Integral Derivative) regulation from the pressure transmitter 230 which opens as a function of the quantity of gas to be evacuated. The liquid filling step continues until the flow of
  • the variation in flow rate is calculated by the distributor 1 automaton, typically by calculating the slope of the flow rate. If this variation becomes small, the distributor 1's automaton closes the filling 130 and evacuation 250 valves.
  • the driver is warned that he can close the two manual valves 120, 220 placed on the mobile tank 20.
  • the driver presses a purge push button which activates the opening of the solenoid valves 150, 260 of the hose purge 110, 210 until the pressure measured by the pressure transmitters 140 and 230 respectively in each flexible reaches a pressure close to but above atmospheric pressure.
  • the driver can then disconnect the hoses 110, 210 without danger, since the risk of sudden vaporization of CO2 and burns is eliminated.
  • An emergency stop is placed on the distributor 1 which, if activated, puts all the valves in the safety position.
  • the valves 170, 280 on the hoses 210, 220 open to depressurize them, if the driver has not pressed the purge push button.
  • the amount of LCO 2 transferred into the mobile tank 20 is calculated between the start and the end of filling by weighing difference of a system 11 of scales placed under the storage tank 10 measuring the weight of LCO 2 contained in the tank 10 and precise enough to calculate the amount of LCO transferred. It will be observed that in the filling station of FIG.
  • FIG. 2 illustrates a second embodiment of a filling station which differs from the filling station of FIG.
  • the filling station of Figure 2 operates as follows. The step of identifying the driver and connecting the hoses 110, 210 is carried out as for the station in FIG. 1. If the filling authorization is given by the recognition terminal 2, then follows a setting step. buffer capacity pressure 30. The pressurizing valve 240 for inflating the buffer capacity
  • the pressure transmitter 31 in the capacity 30 opens until the pressure measured by the pressure transmitter 31 in the capacity 30 reaches a set value between 6 and 20 bars, typically 8 bars, greater than the solidification pressure of the CO 2 of 5.18 bars. If the pressure does not reach the desired value, the PLC of dispenser 1 generates a fault after a delay, and the next step cannot start. This step is generally not carried out until the first start of the installation when the buffer capacity 30 is empty. Thereafter, the pressure transmitter 31 verifies that the pressure reaches the chosen nominal set value. If the automat of the distributor 1 gives the authorization, the second step of pressurizing the flexible 210 and the mobile tank 20 can take place. Similarly to the embodiment of FIG.
  • the pressure in the mobile tank 20 is not directly measured, but the pressure transmitter 230 measures the pressure downstream from the mobile tank 20 and the hose 210. If this pressure is lower than the CO 2 solidification pressure, this means that the mobile tank 20 is empty.
  • the valve 270 for pressurizing the mobile tank 20 opens until the pressure measured by the pressure transmitter 230 exceeds the solidification pressure of CO 2 . Liquid filling is not authorized as long as the risk of carbon dioxide snow formation in the mobile tank exists. Then, if the pressures measured by the pressure transmitters 140, 230 are both greater than the solidification pressure of the
  • the automat of distributor 1 you can go to the liquid filling step. Otherwise, the automat of distributor 1 generates a fault after a time delay and the driver is notified of the incident. If the liquid filling step is authorized, the filling valve 130 for supplying LCO 2 opens. The discharge valve 270 is controlled to open as soon as the pressure downstream of the mobile tank 20 measured by the pressure transmitter 230 is greater than the set pressure in the buffer capacity 30 measured by the pressure transmitter 31. Buffer capacity 30 recovers the gas phase generated by the transfer of LCO 2 during filling of the mobile tank. As in the case of the station in FIG. 1, the flow of LCO 2 transferred slows down as the mobile tank 30 is filled. indicating the end of filling.
  • the variation in flow rate is also calculated by the distributor 1 automaton, for example by calculating the slope of the flow rate. If this variation becomes small, the distributor 1's automaton closes the filling 130 and evacuation 270 valves. The driver is warned of the end of filling, he can therefore close the two manual valves 120, 220 placed on the tank 20
  • the driver presses a purge push button which actuates the opening of the solenoid valves 150, 260 for purging the hoses 110, 210, until the pressure measured respectively by the pressure transmitters 140 and 230 in each hose reaches a pressure close to but greater than atmospheric pressure.
  • the driver can then disconnect the hoses 110, 210 without danger, since the risk of sudden vaporization of C02 and burns is eliminated.
  • the depressurization of the buffer capacity 30 can then take place.
  • the distributor automaton 1 authorizes the solenoid valve 250 for depressurizing the buffer capacity 30 to open.
  • the depressurization solenoid valve 250 opens until the pressure measured by the pressure transmitter 31 in the capacity 30 reaches the initial set value set during the pressurization step. ** An emergency stop is placed on valve 1 which, if activated, puts all the valves in the safety position.
  • the valves 170, 280 on the hoses 210, 220 open to depressurize them, if the driver has not pressed the purge push button.
  • a valve 32 protects the buffer capacity 30 if the pressure is too high.
  • the amount of LCO 2 transferred into the mobile tank 20 is calculated between the start and the end of filling by weighing difference of the weighing system 11.
  • the quantity of CO 2 vaporized and recovered in the buffer capacity 30 is estimated by theoretical calculation of the pressure difference measured by the transmitter 31 between the start and the end of filling. Information from the delivered quantity transmitted to the customer via terminal 2 takes into account the loss of gaseous CO 2 .
  • the buffer capacity 30 has a double function: - pressurizing the mobile tank 20 at a pressure higher than the solidification pressure of CO 2 before filling it. This avoids the formation of carbon dioxide snow which would prevent any filling of the mobile tank 20 if it were frozen. - recover and temporarily store the vent of gaseous CO 2 vaporized during filling of the mobile tank 20, with estimation of this stored quantity.
  • the quantity of CO 2 vaporized is then evacuated in a delayed manner and independent of the filling phase, for example at the end of filling, thus making it possible to deflate the buffer capacity 30 to the desired pressure at a defined flow rate to avoid noise. generated by the deflation phase.
  • the volume of the buffer capacity 30 depends on the volume of the mobile tank 20 and is between 1 to 4 times the volume of the mobile tank 20, typically from 2 to 3.
  • This design also makes it possible to leave the line 100 of transfer in LCO 2 under pressure without the need to purge the hoses 110, 210.
  • the purge forces it to relax at atmospheric pressure and therefore risks causing the formation of carbon dioxide snow which occurs at a pressure below 5.18 bar.
  • the filling station is always ready to start without having to wait for the natural sublimation of carbon dioxide snow. This ensures a higher filling rate of tanks.
  • the pressure in the hose 110 is controlled by the pressure transmitter 140 which opens the purge valve 150 to release the overpressure due to the vaporization of the trapped liquid and prevent the pressure from reaching the set pressure of the safety valve 170 .
  • the pressure in the hose 210 is controlled by the pressure transmitter 230 which opens the purge valve 260 to discharge overpressure and prevent the pressure from reaching the set pressure of the safety valve 280.
  • This also has the advantage of eliminating the manual valves 120, 220 of the mobile tank 20 and simplifying the maneuvers for the driver. It is possible to install a single connection 330 to the mobile tank

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Filling Or Discharging Of Gas Storage Vessels (AREA)
EP04816576A 2004-01-09 2005-01-03 Station zum einfüllen von kohlendioxid in einen mobilen tank Withdrawn EP1725806A1 (de)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
FR0450054A FR2865018B1 (fr) 2004-01-09 2004-01-09 Station de remplissage de dioxyde de carbone liquide vers un reservoir mobile
PCT/FR2004/050723 WO2005075882A1 (fr) 2004-01-09 2005-01-03 Station de remplissage de dioxyde de carbone liquide vers un reservoir mobile

Publications (1)

Publication Number Publication Date
EP1725806A1 true EP1725806A1 (de) 2006-11-29

Family

ID=34685047

Family Applications (1)

Application Number Title Priority Date Filing Date
EP04816576A Withdrawn EP1725806A1 (de) 2004-01-09 2005-01-03 Station zum einfüllen von kohlendioxid in einen mobilen tank

Country Status (3)

Country Link
EP (1) EP1725806A1 (de)
FR (1) FR2865018B1 (de)
WO (1) WO2005075882A1 (de)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102005044534B3 (de) 2005-09-17 2007-06-06 Astrium Gmbh Treibstofftank für kryogene Flüssigkeiten
EP1813855A1 (de) * 2006-01-27 2007-08-01 L'AIR LIQUIDE, Société Anonyme pour l'Etude et l'Exploitation des Procédés Georges Claude Verfahren und Vorrichtung zur Befüllung eines Behälters unter Hochdruck mit flüssigem Gas anhand hydrostatischem Duck
JP4197020B2 (ja) * 2006-08-10 2008-12-17 ダイキン工業株式会社 二酸化炭素を冷媒として用いる冷凍装置における冷媒充填方法
JP5243982B2 (ja) * 2009-01-30 2013-07-24 トキコテクノ株式会社 液化ガス供給システム
FR2962518A1 (fr) * 2010-07-06 2012-01-13 Air Liquide Appareil integre de liquefaction de dioxyde de carbone et de stockage de dioxyde de carbone liquide et procede de regulation en pression de stockage d’un tel appareil
DE102015003340B4 (de) 2015-03-14 2017-02-02 Messer France S.A.S Verfahren und Vorrichtung zum Befüllen eines mobilen Tanks mit flüssigem Kohlendioxid
CN113266761B (zh) * 2021-06-04 2023-09-05 惠州凯美特气体有限公司 液态二氧化碳充装方法及系统

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3797263A (en) * 1972-01-07 1974-03-19 Parker Hannifin Corp Dewar filling, purging, and draining system
US4211085A (en) * 1976-11-01 1980-07-08 Lewis Tyree Jr Systems for supplying tanks with cryogen
US4592205A (en) * 1985-01-14 1986-06-03 Mg Industries Low pressure cryogenic liquid delivery system
JPH01501811A (ja) * 1986-11-19 1989-06-22 パブーガス・インターナシヨナル・プロプライアタリイ・リミテツド 液体二酸化炭素の貯蔵及び輸送装置
US5916246A (en) * 1997-10-23 1999-06-29 Thermo King Corporation System and method for transferring liquid carbon dioxide from a high pressure storage tank to a lower pressure transportable tank
DE10142757C1 (de) * 2001-08-31 2003-04-17 Messer Griesheim Gmbh Betankungseinrichtung und Verfahren zur Betankung von kryokraftstoffbetriebenen Fahrzeugen
DE10142758C1 (de) * 2001-08-31 2003-04-17 Messer Griesheim Gmbh Vorrichtung und Verfahren zum Betanken von mit kryogenem Kraftstoff betriebenen Fahrzeugen

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See references of WO2005075882A1 *

Also Published As

Publication number Publication date
FR2865018B1 (fr) 2006-06-23
WO2005075882A8 (fr) 2006-11-16
WO2005075882A1 (fr) 2005-08-18
FR2865018A1 (fr) 2005-07-15

Similar Documents

Publication Publication Date Title
CA2635970C (fr) Procede et dispositif de remplissage de conteneurs de gaz sous pression
EP2923142B1 (de) Verfahren und vorrichtung zur füllung eines behälters mit flüssiggas
EP1789722A2 (de) Station zum einfüllen von kohlendioxid in einen mobilen tank
JPH06510011A (ja) 天然ガスを供給するための改良された方法及び装置
FR2628835A1 (de)
EP3271636A1 (de) Verfahren und vorrichtung zur befüllung von behältern
DK201970671A1 (en) A hydrogen refueling station and method for refueling a hydrogen vehicle
CA2887105A1 (fr) Procede et dispositif de remplissage d'un reservoir de gaz liquefie
WO2005075882A1 (fr) Station de remplissage de dioxyde de carbone liquide vers un reservoir mobile
EP3690303A1 (de) Verfahren und eine vorrichtung zum füllen eines flüssiggastanks
EP3003546B1 (de) Raffinerie und/oder petrochemischer reaktor mit steuerungsystem für die abgabevorrichtung zum laden mit festen teilchen
EP3359867B2 (de) Verfahren zur zuführung einer kryogenen flüssigkeit und einrichtung zur umsetzung des besagten verfahrens
FR3101930A1 (fr) Système de gestion d’un réservoir de Gaz Naturel Liquéfié (GNL) pour véhicule ou unité mobile.
EP0949448A1 (de) Anlage und Verfahren zum Abfüllen von Flaschen
EP3702661B1 (de) Verfahren und vorrichtung zum füllen von tanks mit unter unter druck stehendem gas
EP0617247A1 (de) Vorrichtung zur Rückführung einer kryogenen Flüssigkeit und ihre Anwendung in einem Warengefiergerät
FR2896229A1 (fr) Systeme de conditionnement en fluide de reservoirs reutilisables
EP3578869B1 (de) Verwaltungssverfahren eines verteilungssystems eines gewünschten fluids
WO2014091143A2 (fr) Distributeur pneumatique de freinage pour vehicule ferroviaire
FR3041624A1 (fr) Procede et station automatises de distribution gravimetrique de gaz condense a l’etat liquide
EP3232113A1 (de) Automatisiertes verfahren und automatisierte station zur gravimetrischen verteilung von kondensiertem gas in flüssigzustand
FR2696437A1 (fr) Procédé et installation de chargement d'un récipient en air liquide.
FR2989147A1 (fr) Procede et dispositif de remplissage d'un reservoir de gaz sous pression
EP2928740B1 (de) Pneumatischer bremsdruckverteiler für ein schienenfahrzeug
FR2846938A1 (fr) Procede et dispositif permettant de maintenir le pression statique gazeuse a l'interieur d'un aerostat

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20060809

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU MC NL PL PT RO SE SI SK TR

AX Request for extension of the european patent

Extension state: AL BA HR LV MK YU

RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: L'AIR LIQUIDE, SOCIETE ANONYME POUR L'ETUDE ET L'E

RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: L'AIR LIQUIDE, SOCIETE ANONYME POUR L'ETUDE ET L'E

17Q First examination report despatched

Effective date: 20080807

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN

18D Application deemed to be withdrawn

Effective date: 20090218