EP1707686A1 - Procédé de formation de structures etagées et construcion ainsi obtenues - Google Patents
Procédé de formation de structures etagées et construcion ainsi obtenues Download PDFInfo
- Publication number
- EP1707686A1 EP1707686A1 EP05290598A EP05290598A EP1707686A1 EP 1707686 A1 EP1707686 A1 EP 1707686A1 EP 05290598 A EP05290598 A EP 05290598A EP 05290598 A EP05290598 A EP 05290598A EP 1707686 A1 EP1707686 A1 EP 1707686A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- facing
- sloped surface
- panel
- construction work
- anchoring locations
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 title claims description 22
- 238000000034 method Methods 0.000 title claims description 13
- 238000004873 anchoring Methods 0.000 claims abstract description 25
- 239000000463 material Substances 0.000 claims abstract description 19
- 239000004575 stone Substances 0.000 claims description 15
- 239000002689 soil Substances 0.000 claims description 9
- 239000004746 geotextile Substances 0.000 claims description 2
- 238000012423 maintenance Methods 0.000 claims description 2
- 230000002787 reinforcement Effects 0.000 description 3
- 238000005192 partition Methods 0.000 description 2
- 230000000717 retained effect Effects 0.000 description 2
- 239000003351 stiffener Substances 0.000 description 2
- 239000008187 granular material Substances 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/20—Securing of slopes or inclines
Definitions
- the present invention relates to the construction of facing structures for civil engineering works.
- facings consisting of wire mesh panels, with stones retained and left apparent by the wire mesh panels.
- This type of facing is appreciated because of its relatively light weight and of its aesthetics. It can also be adapted to allow the growth of vegetation on the facing.
- This sort of wire mesh facing is applicable to retaining walls.
- a fill made of earth, sand, rocks or another granular material is stabilized by reinforcements which extend within the fill volume. Some of the reinforcements are connected to the facing which prevents the fill material from falling apart.
- the stepped facing is used to cover a pre-existing, self-supporting foundation base, rather than stabilized soil which has to be retained by the facing. In such a case, it is generally not possible to connect the facing elements to reinforcements extending into the underlying base.
- An object of the present invention is to overcome that difficulty.
- the method comprises the steps of:
- the support members are used to hang the stepped facing structure to the sloped base.
- the plurality of anchoring locations allow a distribution of the load along the slope. They can also be used to transport materials up or down during the construction work.
- the support members can be in the form of ladders applied against the foundation base and attached by means of bolts or other types of connectors.
- the method makes it possible to easily erect a stepped facing wall even where the sloped underlying surface is hard and smooth.
- the construction of a step of the facing structure comprises:
- the facing structure comprises support members attached to the base, extending parallel to the sloped surface and defining anchoring locations spaced along the upward direction of the sloped surface, and a plurality of steps arranged along the sloped surface. At least one of the steps comprises a facing panel, at least one link member having a rear end held at one of said anchoring locations and a front end connected to a raised portion of the facing panel, and fill material between the sloped surface and the facing panel.
- Figure 1 shows a construction work which can be erected in accordance with the invention.
- the base to be covered is not made of stabilized soil or the like, but consists of a hard concrete foundation 1.
- the foundation base 1 has a sloped upper surface 2 to be covered by a facing made of stones and wire mesh panels.
- the facing has a stepped configuration, which gives a special appearance to the overall structure. It also provides horizontal terraces 3 along the facing, where trees or other plants 4 can be grown for ornamental purposes. Recesses 5 are provided in the stone fill on such terraces 3 for receiving earth or soil material enabling plants to be grown.
- the first step consists in attaching support members 6 to the foundation base 1 (figure 2).
- the attachment can be made by means of bolts 7 distributed on the surface 2 of the base. The quantity and dimensions of the bolts are calculated to withstand the weight of the facing once completed.
- the support members 6 applied against the base surface 2 define a number of anchoring locations that will be used to position and hold the facing elements.
- the support members 6 are in the form of ladders. Each has a pair of uprights 8 and a series of transverse rods 9 fixed to the two uprights 8. Each ladder-shaped member is positioned on the base 1 with its uprights 8 laid along the upward direction of the sloped surface 2, so as to cover substantially the whole height of the base. Hence, the transverse rods 9 define the anchoring locations spaced along the upward direction of the sloped surface. Ladder members 6 are placed parallel to each other along the horizontal direction, with a typical mutual spacing of one or a few meters.
- the ladder-shaped support members 6 are usable to transport loads up or down the sloped surface.
- transverse rods 9 of a support member 6 receive hooked ends of connecting members 10, 11 a, 12a which can be put in place as soon as the support member 6 has been attached to the sloped surface 2, as shown in figure 2, or later.
- the lower ends of the ladder uprights 8 are bent in the form of hooks 15 (figure 2).
- the hooks 5 receive the lower edge of the lower wire mesh facing panel 16, as shown in figure 4.
- the lowest connecting member 10 hanged to the ladder rods 9 is lifted and its end remote from the rod 9, which is also bent, is hooked around one of the wires of the raised mesh panel 16.
- the connecting member 10 thus forms an elongated link which holds the wire mesh panel 16 in a vertical position as the stone fill 20 is poured between the panel 16 and the sloped surface 2.
- Wire mesh partitions are arranged parallel to the plane of figures 4-6 to delimit laterally the volume receiving the stone fill 20.
- the first step of the facing is completed by positioning another wire mesh panel 11 b horizontally over the upper level of the fill.
- the front end of the panel 11 b is bent in order to hook around the upper edge of the vertical panel.
- the panel 11 b is lowered as indicated by the arrow in figure 4.
- the cover panel 11 b is made from high tensile strength wire mesh in order to create a stable base for the next row of facing panels.
- the second step of the facing has a vertical front panel 17 which belongs to an L-shaped wire mesh element which also has a base portion 18 folded perpendicularly to be laid on the upper side 11 b of the underlying step.
- a stiffener link 19 is connected to the base portion 18 and the front panel 17 to maintain the 90° angle between them.
- the next connecting member 12a is lowered and another connecting member is installed with a hooked-end gripping the wire mesh of the raised panel 17 and an opposite end joined to the free end of the connecting member 12a.
- These two connecting members are then welded together to form an elongated link 12 having the suitable length as shown in figure 5.
- Several such links 12 are made along the structure, and lateral partitions (not shown) are installed.
- the stone fill of the second step can be introduced. Once the appropriate fill level is reached, the upper panel 11 of the step can be brought, assembled and fixed as described with reference to figure 4.
- each facing panel 16, 17 stabilizes it during the installation of the stones.
- the additional cover connection 11 at the top of the facing panel minimizes the deformation of the structure while the next step is being built.
- the above-described process of erecting a facing step can be iterated up to the upper level of the wall.
- intermediate steps 21 can be added between the thus formed main steps as shown in figure 1.
- Such intermediate steps 21 can be made by assembling wire mesh panels in the corners between adjacent steps, or by installing prefabricated wire mesh boxes (gabions).
- such intermediate steps 21 have a reduced length perpendicularly to the plane of figure 1 (e.g. between 1 and 2 meters), and are used to provide stairs for allowing maintenance personnel to easily climb up or down the structure.
- a remarkable feature of the above-described process of erecting the facing steps is that it is very easy to modulate the width of the terraces 3 between adjacent steps.
- Such terrace width modulation can be required by the architect. It suffices that the links 11, 12 held at anchoring locations at a common vertical level have a variable length along the work, i.e. in the direction perpendicular to the plane of figures 4-6.
- the process is very flexible regarding the position of the individual steps.
- the width of the terraces can be varied at will to accommodate the wishes of the architect of the structure.
- the facing panel 17 is designed so that it can be put in place in various positions on top of the underlying cover element 11 b.
- Figure 6 illustrates how a recess 5 filled with soil material 25 can be provided on a terrace 3 between two adjacent steps.
- the step where the recess is made is prepared as indicated previously, by installing the L-shaped wire mesh element comprising the front panel 17, assembling elongated links 12, and pouring stones 20.
- the fill is introduced up to the top of the step, leaving a ditch to form recess 5.
- a wire mesh edge element 26 is hooked to the upper edge of the front panel 17.
- the edge element 26 has a bent shape as shown in the cross-sectional view of figure 6, so that its front part defines the edge of the terrace 3 and is bent rear part forms the front wall of the recess 5.
- the L-shaped wire mesh element 17-18 for the next step, with its stiffeners 19, is laid on the current upper level of the fill, whereby the bottom of the next facing panel 17 defines the rear wall of the recess 5. Additional stones are introduced to maintain the new L-shaped element 17-18 in place. It is possible to fold back one or more of the next connecting members 12a and to assemble them to form elongated links for holding the next facing panel 17 while more stones are introduced.
- a geotextile liner 27 is placed into the recess 5 before it is filled with the soil material 25.
- the liner 27 separates the soil material 25 from the stones 20. It prevents the soil material from leaking through the stones while allowing the flow of water.
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Revetment (AREA)
Priority Applications (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| EP20050290598 EP1707686B1 (fr) | 2005-03-17 | 2005-03-17 | Procédé de formation de structures etagées et construcion ainsi obtenues |
| DE200560007575 DE602005007575D1 (de) | 2005-03-17 | 2005-03-17 | Verfahren zur Herstellung einer stufenförmigen Böschung und eine so hergestellte Konstruktion |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| EP20050290598 EP1707686B1 (fr) | 2005-03-17 | 2005-03-17 | Procédé de formation de structures etagées et construcion ainsi obtenues |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| EP1707686A1 true EP1707686A1 (fr) | 2006-10-04 |
| EP1707686B1 EP1707686B1 (fr) | 2008-06-18 |
Family
ID=34942018
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| EP20050290598 Expired - Lifetime EP1707686B1 (fr) | 2005-03-17 | 2005-03-17 | Procédé de formation de structures etagées et construcion ainsi obtenues |
Country Status (2)
| Country | Link |
|---|---|
| EP (1) | EP1707686B1 (fr) |
| DE (1) | DE602005007575D1 (fr) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP2112276A1 (fr) * | 2008-04-21 | 2009-10-28 | Politechnika Lubelska | Procedée de controller l'érosion d'un talus |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO1996004430A1 (fr) * | 1994-08-04 | 1996-02-15 | Peter Steiner | Dispositif de maintien pour parement d'une paroi raide, pouvant etre recouvert de verdure, et son procede de mise en place |
| WO1996017134A1 (fr) * | 1994-11-29 | 1996-06-06 | Phi Group Limited | Procede et dispositif permettant le developpement d'une vegetation sur une surface en pente |
| JPH11323943A (ja) * | 1998-05-19 | 1999-11-26 | Tenryu Ind Co Ltd | 法面、壁面、岸面等の保護緑化構造 |
| JP2000204573A (ja) * | 1999-01-14 | 2000-07-25 | San Buresu:Kk | 擁壁形成用ユニット並びにこのユニットを用いた擁壁及び擁壁の構築方法 |
-
2005
- 2005-03-17 DE DE200560007575 patent/DE602005007575D1/de not_active Expired - Lifetime
- 2005-03-17 EP EP20050290598 patent/EP1707686B1/fr not_active Expired - Lifetime
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO1996004430A1 (fr) * | 1994-08-04 | 1996-02-15 | Peter Steiner | Dispositif de maintien pour parement d'une paroi raide, pouvant etre recouvert de verdure, et son procede de mise en place |
| WO1996017134A1 (fr) * | 1994-11-29 | 1996-06-06 | Phi Group Limited | Procede et dispositif permettant le developpement d'une vegetation sur une surface en pente |
| JPH11323943A (ja) * | 1998-05-19 | 1999-11-26 | Tenryu Ind Co Ltd | 法面、壁面、岸面等の保護緑化構造 |
| JP2000204573A (ja) * | 1999-01-14 | 2000-07-25 | San Buresu:Kk | 擁壁形成用ユニット並びにこのユニットを用いた擁壁及び擁壁の構築方法 |
Non-Patent Citations (2)
| Title |
|---|
| PATENT ABSTRACTS OF JAPAN vol. 2000, no. 02 29 February 2000 (2000-02-29) * |
| PATENT ABSTRACTS OF JAPAN vol. 2000, no. 10 17 November 2000 (2000-11-17) * |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP2112276A1 (fr) * | 2008-04-21 | 2009-10-28 | Politechnika Lubelska | Procedée de controller l'érosion d'un talus |
Also Published As
| Publication number | Publication date |
|---|---|
| EP1707686B1 (fr) | 2008-06-18 |
| DE602005007575D1 (de) | 2008-07-31 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US4653962A (en) | Retaining wall construction and method of manufacture | |
| US6675547B1 (en) | Method for forming a head wall from an anchor pile and reinforcing member for said anchor pile structure | |
| JP2016515173A (ja) | プレキャストコンクリート擁壁 | |
| US9080303B2 (en) | Reinforced soil structure | |
| KR101103142B1 (ko) | 옹벽구조체 및 그 시공방법 | |
| KR101071572B1 (ko) | 철망을 이용한 녹화 보강토 옹벽 구조 및 그 시공방법 | |
| US20070286688A1 (en) | Retaining wall having modular panels | |
| KR102259659B1 (ko) | L형 앵커체와 스트립바를 이용한 장식석 옹벽구조물 및 그 시공방법 | |
| KR20110031861A (ko) | 보강토 옹벽블록 및 그 시공 방법 | |
| EP1707686B1 (fr) | Procédé de formation de structures etagées et construcion ainsi obtenues | |
| WO1996033314A1 (fr) | Procede de construction d'un talus consolide | |
| CN210263127U (zh) | 一种用于加筋土挡墙的面板模块单元及加筋土挡墙 | |
| KR100603141B1 (ko) | 녹화용 조립식 보강토 옹벽과 이 옹벽의 시공방법 및보수방법 | |
| JP3611967B2 (ja) | 法面構造およびその構築方法 | |
| KR200307195Y1 (ko) | 자체 지지구조를 가지는 옹벽블럭 | |
| KR101125072B1 (ko) | 경관을 고려한 보강토 옹벽공법 | |
| US6341922B1 (en) | Cellular construction, in particular supporting or sound insulating construction capable of being greened, and process for producing the same | |
| KR100764019B1 (ko) | 식생 가능한 토사벽 설치구조 및 이의 시공방법 | |
| KR102834953B1 (ko) | 사면 보강 구조체 및 이를 이용한 수목장 조성 공법 | |
| KR100885909B1 (ko) | 토목 섬유망을 이용한 자립식 가시설 옹벽 및 이 시공 방법 | |
| KR100660989B1 (ko) | 절취경사면 보강공법 및 그 구조물 | |
| KR20080112634A (ko) | 절토사면 지지용 구조체 | |
| JP3710434B2 (ja) | 拡幅道路 | |
| KR102249603B1 (ko) | 옹벽 시공방법 | |
| JP2767233B2 (ja) | 新規な型枠及び新規な型枠を用いた擁壁等の構築構造並びに新規な型枠を用いた擁壁等の構築方法 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
| 17P | Request for examination filed |
Effective date: 20051229 |
|
| AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU MC NL PL PT RO SE SI SK TR |
|
| AX | Request for extension of the european patent |
Extension state: AL BA HR LV MK YU |
|
| AKX | Designation fees paid |
Designated state(s): BE DE FR GB IE NL |
|
| RAP1 | Party data changed (applicant data changed or rights of an application transferred) |
Owner name: TERRE ARMEE INTERNATIONALE |
|
| GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
| GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
| GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
| AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): BE DE FR GB IE NL |
|
| REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
| REF | Corresponds to: |
Ref document number: 602005007575 Country of ref document: DE Date of ref document: 20080731 Kind code of ref document: P |
|
| REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
| PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
| 26N | No opposition filed |
Effective date: 20090319 |
|
| REG | Reference to a national code |
Ref country code: FR Ref legal event code: CA Effective date: 20150112 |
|
| REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 11 |
|
| REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 12 |
|
| REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 13 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 20170221 Year of fee payment: 13 Ref country code: DE Payment date: 20170222 Year of fee payment: 13 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: BE Payment date: 20170223 Year of fee payment: 13 Ref country code: GB Payment date: 20170224 Year of fee payment: 13 Ref country code: IE Payment date: 20170222 Year of fee payment: 13 Ref country code: NL Payment date: 20170221 Year of fee payment: 13 |
|
| REG | Reference to a national code |
Ref country code: DE Ref legal event code: R119 Ref document number: 602005007575 Country of ref document: DE |
|
| REG | Reference to a national code |
Ref country code: NL Ref legal event code: MM Effective date: 20180401 |
|
| GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20180317 |
|
| REG | Reference to a national code |
Ref country code: BE Ref legal event code: MM Effective date: 20180331 |
|
| REG | Reference to a national code |
Ref country code: IE Ref legal event code: MM4A |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180401 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20181002 Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180317 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180317 Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180331 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180331 |