EP1675693B1 - Rolling mill for hot-rolling metal, in particular, aluminium in addition to hot-rolling method - Google Patents

Rolling mill for hot-rolling metal, in particular, aluminium in addition to hot-rolling method Download PDF

Info

Publication number
EP1675693B1
EP1675693B1 EP04765624A EP04765624A EP1675693B1 EP 1675693 B1 EP1675693 B1 EP 1675693B1 EP 04765624 A EP04765624 A EP 04765624A EP 04765624 A EP04765624 A EP 04765624A EP 1675693 B1 EP1675693 B1 EP 1675693B1
Authority
EP
European Patent Office
Prior art keywords
rolling
train
finishing
stands
tandem
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
EP04765624A
Other languages
German (de)
French (fr)
Other versions
EP1675693A1 (en
Inventor
Michael Breuer
Paul Selbach
Hartmut Hof
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SMS Siemag AG
Original Assignee
SMS Demag AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SMS Demag AG filed Critical SMS Demag AG
Priority to PL04765624T priority Critical patent/PL1675693T3/en
Publication of EP1675693A1 publication Critical patent/EP1675693A1/en
Application granted granted Critical
Publication of EP1675693B1 publication Critical patent/EP1675693B1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B1/00Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations
    • B21B1/22Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations for rolling plates, strips, bands or sheets of indefinite length
    • B21B1/24Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations for rolling plates, strips, bands or sheets of indefinite length in a continuous or semi-continuous process
    • B21B1/26Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations for rolling plates, strips, bands or sheets of indefinite length in a continuous or semi-continuous process by hot-rolling, e.g. Steckel hot mill
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B1/00Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations
    • B21B1/22Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations for rolling plates, strips, bands or sheets of indefinite length
    • B21B1/30Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations for rolling plates, strips, bands or sheets of indefinite length in a non-continuous process
    • B21B1/32Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations for rolling plates, strips, bands or sheets of indefinite length in a non-continuous process in reversing single stand mills, e.g. with intermediate storage reels for accumulating work
    • B21B1/34Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations for rolling plates, strips, bands or sheets of indefinite length in a non-continuous process in reversing single stand mills, e.g. with intermediate storage reels for accumulating work by hot-rolling
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B3/00Rolling materials of special alloys so far as the composition of the alloy requires or permits special rolling methods or sequences ; Rolling of aluminium, copper, zinc or other non-ferrous metals
    • B21B3/02Rolling special iron alloys, e.g. stainless steel
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B31/00Rolling stand structures; Mounting, adjusting, or interchanging rolls, roll mountings, or stand frames
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B37/00Control devices or methods specially adapted for metal-rolling mills or the work produced thereby
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B39/00Arrangements for moving, supporting, or positioning work, or controlling its movement, combined with or arranged in, or specially adapted for use in connection with, metal-rolling mills
    • B21B39/02Feeding or supporting work; Braking or tensioning arrangements, e.g. threading arrangements
    • B21B39/12Arrangement or installation of roller tables in relation to a roll stand
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B13/00Metal-rolling stands, i.e. an assembly composed of a stand frame, rolls, and accessories
    • B21B13/02Metal-rolling stands, i.e. an assembly composed of a stand frame, rolls, and accessories with axes of rolls arranged horizontally
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B3/00Rolling materials of special alloys so far as the composition of the alloy requires or permits special rolling methods or sequences ; Rolling of aluminium, copper, zinc or other non-ferrous metals
    • B21B2003/001Aluminium or its alloys
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B13/00Metal-rolling stands, i.e. an assembly composed of a stand frame, rolls, and accessories
    • B21B13/02Metal-rolling stands, i.e. an assembly composed of a stand frame, rolls, and accessories with axes of rolls arranged horizontally
    • B21B2013/025Quarto, four-high stands
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B15/00Arrangements for performing additional metal-working operations specially combined with or arranged in, or specially adapted for use in connection with, metal-rolling mills
    • B21B15/0007Cutting or shearing the product
    • B21B2015/0014Cutting or shearing the product transversely to the rolling direction
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B15/00Arrangements for performing additional metal-working operations specially combined with or arranged in, or specially adapted for use in connection with, metal-rolling mills
    • B21B15/0007Cutting or shearing the product
    • B21B2015/0021Cutting or shearing the product in the rolling direction

Definitions

  • the invention relates to a rolling mill for hot rolling of metal, in particular of aluminum, with a hot strip mill with a roughing mill and a finishing train and a corresponding hot rolling process.
  • An apparatus and a method according to the preambles of claims 1 and 4 are made US-A-5,931,040 known.
  • An aluminum ingot 117 is brought to rolling temperature in furnaces 120, 121-for example hearth or pusher furnaces-and pre-rolled in the single-stand roughing stand 108 of the roughing train 104 after passing through an upsetting stand 107.
  • the rough-rolling product is interspersed with a first scissors 122.
  • the board 119 is pimped at the end and end of the board, between these two cropping shears 122, 125 a certain distance is present.
  • the finish-rolled strip 113 in the finish rolling mill runs along edgers 126 and is reeled up by means of drive rollers 127 from a reeling device 114.
  • Such a plant with furnace area 102 and rolling mills 103 can have enormous lengths.
  • the length x of a furnace area 102 may be 130 m
  • the distance between the roughing stand 108 and the first stand 111 of the finishing train may be 240 m, for example, the distances influencing the achievable coil sizes.
  • the run takes place of the rolling stock through the rolling mill plant with the help of extensive transport and leadership facilities, such as roller tables.
  • Such rolling mills tend to work more economically with larger coil dimensions.
  • the basic idea of the invention is that the compact construction of the rolling mill or of the hot strip mill is created jointly by the consistent use of tandem rolling in the rough rolling mill, in the finishing train or in the rough rolling mill and finishing train.
  • the roughing train alone and / or the finishing train alone or the roughing and finishing train together are tandem mills, ie plant sections in which the mills stand in tandem (tandem arrangement). Due to the resulting compact construction significant parts of the otherwise necessary roller tables can be omitted, thereby reducing the investment costs.
  • the proposed layout is not only suitable for new buildings, but also for modernization of existing plants.
  • it is achieved by tandem rolling in the roughing and / or finishing mill that smaller plants on which previously only smaller tonnages and smaller coils were produced, their further processing is partially uneconomical, can be converted so that the length of the roller tables remains the same Bund weights (tape lengths) can be increased, which increases productivity.
  • Fig. 1 shows the new compact hot rolling mill layout 1 for aluminum.
  • the comparison with the layout 100 according to the prior art according to Fig. 3 illustrates the compactness of the system according to the invention.
  • the plant also consists of a furnace area 2 and the rolling mill 3 with a roughing and a finishing train (4, 5).

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Metal Rolling (AREA)

Description

Die Erfindung betrifft ein Walzwerk zum Warmwalzen von Metall, insbesondere von Aluminium, mit einer Warmbandstraße mit einer Vorwalzstraße und einer Fertigwalzstraße sowie ein entsprechendes Warmwalzverfahren. Eine Vorrichtung sowie ein Verfahren gemäß den Oberbegriffen der Ansprüche 1 bzw. 4 sind aus US-A-5 931 040 bekannt.The invention relates to a rolling mill for hot rolling of metal, in particular of aluminum, with a hot strip mill with a roughing mill and a finishing train and a corresponding hot rolling process. An apparatus and a method according to the preambles of claims 1 and 4 are made US-A-5,931,040 known.

Es ist bekannt, Aluminium in Warmbandstraßen auszuwalzen. Das klassische bzw. herkömmliche Layout 100 für ein solches Warmwalzwerk, das beispielhaft mit Fig. 3 dargestellt ist, setzt sich aus den wesentlichen Bearbeitungsstationen Ofenbereich 102, Walzstraße 103 und ggf. Zurichtung (Adjustage) zusammen.It is known to roll aluminum in hot strip mills. The classic or conventional layout 100 for such a hot rolling mill, the exemplary with Fig. 3 is composed of the essential processing stations furnace area 102, rolling mill 103 and possibly finishing (finishing) together.

Ein Aluminium-Barren 117 wird in Öfen 120, 121 - beispielsweise Herd- oder Stoßöfen - auf Walztemperatur gebracht und in dem eingerüstigen Vorwalzgerüst 108 der Vorwalzstraße 104 nach Durchlaufen eines Stauchgerüstes 107 vorgewalzt. Während des Vorwalzens wird das Vorwalzprodukt mit einer ersten Schere 122 zwischen geschopft. Vor dem Einlauf in die Fertigwalzstraße, die sich - wie hier nur beispielhaft gezeigt - aus vier Gerüsten 111, 112, 123, 124 zusammensetzt, wird die Platine 119 am Platinenende und -anfang geschopft, wobei zwischen diesen beiden Schopfscheren 122, 125 ein bestimmter Abstand vorliegt. Das in der Fertigwalzstraße fertig gewalzte Band 113 läuft entlang von Besäumscheren 126 und wird über Treiberrollen 127 von einer Haspeleinrichtung 114 aufgecoilt.An aluminum ingot 117 is brought to rolling temperature in furnaces 120, 121-for example hearth or pusher furnaces-and pre-rolled in the single-stand roughing stand 108 of the roughing train 104 after passing through an upsetting stand 107. During pre-rolling, the rough-rolling product is interspersed with a first scissors 122. Before the entry into the finishing train, which - as shown here only by way of example - composed of four scaffolds 111, 112, 123, 124, the board 119 is pimped at the end and end of the board, between these two cropping shears 122, 125 a certain distance is present. The finish-rolled strip 113 in the finish rolling mill runs along edgers 126 and is reeled up by means of drive rollers 127 from a reeling device 114.

Eine solche Anlage mit Ofenbereich 102 und Walzstraßen 103 kann enorme Baulängen aufweisen. So kann die Länge x eines Ofenbereiches 102 beispielsweise 130 m sein und der Abstand zwischen dem Vorwalzgerüst 108 und dem ersten Gerüst 111 der Fertigwalzstraße beispielsweise 240 m, wobei die Abstände die erzielbaren Coilgrößen beeinflussen. Hierbei erfolgt der Durchlauf des Walzgutes durch die Walzwerksanlage mit Hilfe umfangreicher Transport- und Führungseinrichtungen, wie Rollgänge. Tendenziell arbeiten derartige Walzanlagen wirtschaftlicher mit größeren Coilabmessungen.Such a plant with furnace area 102 and rolling mills 103 can have enormous lengths. For example, the length x of a furnace area 102 may be 130 m, and the distance between the roughing stand 108 and the first stand 111 of the finishing train may be 240 m, for example, the distances influencing the achievable coil sizes. Here, the run takes place of the rolling stock through the rolling mill plant with the help of extensive transport and leadership facilities, such as roller tables. Such rolling mills tend to work more economically with larger coil dimensions.

Anlagen von derartigen Baulängen sind mit hohen Investitionen verbunden und benötigen viel Baufläche. Des weiteren sind die weitläufigen Rollgänge zum Transport des Walzguts ebenfalls investitionsreich.Systems of such lengths are associated with high investment and require a lot of construction space. Furthermore, the extensive roller tables for transporting the rolling stock are also rich in investment.

Ausgehend hiervon liegt der Erfindung die Aufgabe zugrunde, ein von seiner Bauweise kompakteres Walzwerk zum Warmwalzen von Metall, insbesondere von Aluminium, zu schaffen, wobei die Transportzwischenräume zwischen den einzelnen Bearbeitungsstationen (Ofenbereich, Vorwalzen, Fertigwalzen) reduziert sind. Gleichzeitig soll ein Warmwalzverfahren geschaffen werden, das ein Walzen von Band auf Endwalzdicke bei kompakter Bauweise des Walzwerks mit hoher Wirtschaftlichkeit erlaubt.Proceeding from this, the present invention seeks to provide a more compact in its design mill for hot rolling of metal, especially aluminum, with the transport spaces between the individual processing stations (furnace area, roughing, finish rolling) are reduced. At the same time, a hot rolling process is to be created which allows rolling from strip to final roll thickness with a compact design of the rolling mill with high efficiency.

Diese Aufgabe wird durch ein Walzwerk mit den Merkmalen des Anspruchs 1 und ein Verfahren mit den Merkmalen des Anspruchs 4 gelöst. Vorteilhafte Weiterentwicklungen sind in den Unteransprüchen beschrieben.This object is achieved by a rolling mill with the features of claim 1 and a method having the features of claim 4. Advantageous developments are described in the subclaims.

Grundgedanke der Erfindung ist, dass der kompakte Aufbau des Walzwerks bzw. der Warmbandstraße durch die konsequente Nutzung von Tandemwalzungen in der Vorwalzstraße, in der Fertigstraße oder in der Vorwalzstraße und Fertigwalzstraße gemeinsam entsteht. Die Vorwalzstraße alleine und/oder die Fertigwalzstraße alleine oder die Vorwalz- und Fertigstraße gemeinsam sind Tandemstraßen, d. h. Anlagebereiche, bei der die Walzgerüste hintereinander (Tandem-Anordnung) stehen. Aufgrund des dadurch entstehenden kompakten Baus können erhebliche Teile der sonst notwendigen Rollgänge entfallen, wobei sich die Investitionskosten reduzieren.The basic idea of the invention is that the compact construction of the rolling mill or of the hot strip mill is created jointly by the consistent use of tandem rolling in the rough rolling mill, in the finishing train or in the rough rolling mill and finishing train. The roughing train alone and / or the finishing train alone or the roughing and finishing train together are tandem mills, ie plant sections in which the mills stand in tandem (tandem arrangement). Due to the resulting compact construction significant parts of the otherwise necessary roller tables can be omitted, thereby reducing the investment costs.

Nach der Erfindung wird vorgeschlagen, dass die Vorwalzstraße als Tandemstraße ausgebildet ist, wobei sie zwei hintereinander angeordnete Vorwalzgerüste umfassen kann. Diese Vorwalzstraße arbeitet vorzugsweise reversierend.According to the invention, it is proposed that the rough rolling mill is designed as a tandem mill, wherein it may comprise two rolling mills arranged one behind the other. This roughing mill is preferably reversing.

Ebenfalls kann die Vorwalzstraße eingerüstig sein. Sie arbeitet dann mit der Fertigstraße im Tandembetrieb. Der Abstand zwischen der Vorwalz- und der Fertigwalzstraße ist so gewählt, dass alle Gerüste gleichzeitig walzen können.Likewise, the roughing mill can be one-armed. She then works with the finishing train in tandem operation. The distance between the pre-rolling and finish-rolling lines is selected so that all stands can roll at the same time.

Zudem wird vorgeschlagen, dass die Fertigwalzstraße zwei Haspeleinrichtungen aufweist und die Fertigwalzstraße im Tandembetrieb betrieben wird.In addition, it is proposed that the finishing train has two reels and the finishing train is operated in tandem.

Das vorgeschlagene Layout ist nicht nur für Neubauten, sondern auch für Modernisierungen bestehender Anlagen geeignet. Insbesondere wird durch das Tandemwalzen in der Vor- und/oder Fertigstraße erreicht, dass kleinere Anlagen, auf denen bisher nur geringere Tonnagen und kleinere Coils produziert wurden, deren Weiterverarbeitung teilweise unwirtschaftlich ist, so umgerüstet werden können, dass bei gleich bleibender Länge der Rollgänge die Bundgewichte (Bandlängen) vergrößert werden können, was die Produktivität erhöht.The proposed layout is not only suitable for new buildings, but also for modernization of existing plants. In particular, it is achieved by tandem rolling in the roughing and / or finishing mill that smaller plants on which previously only smaller tonnages and smaller coils were produced, their further processing is partially uneconomical, can be converted so that the length of the roller tables remains the same Bund weights (tape lengths) can be increased, which increases productivity.

Bei einem bevorzugten Layout sind in der Vorwalzstraße zwei Vorwalzgerüste und in der Fertigwalzstraße zwei Fertigwalzgerüste vorgesehen, die jeweils im Tandembetrieb arbeiten. Insgesamt kann bei diesem Layout mit vier Gerüsten gegenüber dem klassischen Layout mit fünf Gerüsten ein Walzgerüst eingespart werden. Zudem können die beiden Vorwalzgerüste nach dem neuen Layout als kostensparende Duo-Gerüste ausgeführt werden, während die Fertigwalzgerüste Vierwalzen (Quarto-)-gerüste sind.In a preferred layout, two roughing stands are provided in the rough rolling mill and two finishing rolling stands in the finishing mill, each operating in tandem operation. Overall, a roll stand can be saved in this layout with four stands compared to the classic layout with five stands. In addition, the two roughing mills can be designed as cost-saving duo-scaffolds according to the new layout, while the finishing mills are four-high (quarto) scaffolding.

Weitere Einzelheiten und Vorteile der Erfindung ergeben sich aus den Unteransprüchen und aus der nachfolgenden Beschreibung, in der die in den Figuren dargestellte Ausführungsform der Erfindung näher erläutert werden. Es zeigen:

Fig. 1
das kompakte Anlagen-Layout des Walzwerks zum Walzen von Aluminium nach der Erfindung;
Fig. 2
die Durchführung des Walzverfahrens in einem Walzwerk nach der Erfindung;
Fig. 3
zum Vergleich das Anlagen-Layout einer herkömmlichen Warmbandstraße für Aluminium.
Further details and advantages of the invention will become apparent from the subclaims and from the following description in which the embodiment of the invention shown in the figures are explained in more detail. Show it:
Fig. 1
the compact plant layout of the rolling mill for rolling aluminum according to the invention;
Fig. 2
the performance of the rolling process in a rolling mill according to the invention;
Fig. 3
For comparison, the layout of a conventional hot strip mill for aluminum.

Fig. 1 zeigt das neue kompakte Warmwalzwerk-Layout 1 für Aluminium. Die Gegenüberstellung zum Layout 100 nach dem Stand der Technik gemäß Fig. 3 verdeutlicht die Kompaktheit der Anlage nach der Erfindung. Die Anlage besteht ebenfalls aus einem Ofenbereich 2 und der Walzstraße 3 mit einer Vorwalz- und einer Fertigwalzstraße (4, 5). Fig. 1 shows the new compact hot rolling mill layout 1 for aluminum. The comparison with the layout 100 according to the prior art according to Fig. 3 illustrates the compactness of the system according to the invention. The plant also consists of a furnace area 2 and the rolling mill 3 with a roughing and a finishing train (4, 5).

In Transportrichtung hinter dem Ofenbereich 2 sind eine schwere Schopfschere 6 und ein Stauchgerüst 7 angeordnet. Die Vorwalzstraße 4 setzt sich bei der gezeigten Ausführungsform aus zwei hintereinander angeordneten Vorwalzgerüsten 8, 9 zusammen, die im Tandembetrieb reversierend arbeiten. Es folgt eine fliegende Schere 10 zur Vorbereitung des Fertigwalzens. Das Fertigwalzen wird in der Fertigwalzstraße 5 durchgeführt, die aus zwei nah aneinander angeordneten Quarto-Gerüsten 11, 12 besteht, wobei das Band 13 reversierend gewalzt werden kann. Hierzu ist neben einer zweiten Haspeleinrichtung 14 hinter der Fertigwalzstraße 5 noch eine erste Haspeleinrichtung 15 vor der Fertigwalzstraße 5 angeordnet. Mit 16 ist eine Besäumschere bezeichnet.In the transport direction behind the furnace area 2 a heavy cropping shear 6 and a compression frame 7 are arranged. In the embodiment shown, the roughing train 4 is composed of two rough rolling stands 8, 9 arranged one behind the other, which work reversibly in tandem operation. This is followed by flying shears 10 to prepare for finish rolling. The finish rolling is carried out in the finishing train 5, which consists of two closely arranged quarto stands 11, 12, wherein the belt 13 can be reversibly rolled. For this purpose, in addition to a second reeling device 14 behind the finishing train 5, a first reeling device 15 is arranged in front of the finishing train 5. 16 denotes a trimming scissors.

Gegenüber der bekannten Anlage ist die Baulänge der erfindungsgemäßen Anlage nach Fig. 1 deutlich verkürzt, was insbesondere den Abstand zwischen dem Ende der Vorwalzstraße 4 und dem ersten Gerüst 11 der Fertigwalzstraße 5 betrifft. Die vorgeschlagene Anlage ist sehr kompakt, wobei gleichzeitig die Produktion hoher Bundgewichte möglich ist. Im Vergleich zur herkömmlichen Anlage (Fig. 3) ist nur noch eine - fliegende - Schere 10 zwischen der Vorwalz- und der Fertigwalzstraße 4, 5 angeordnet.Compared with the known system, the length of the system according to the invention is after Fig. 1 significantly shortened, which concerns in particular the distance between the end of the rough rolling 4 and the first stand 11 of the finishing train 5. The proposed system is very compact, while at the same time the production of high bundle weights is possible. Compared to the conventional system ( Fig. 3 ) is only one - flying - scissors 10 between the roughing and finish rolling 4, 5 arranged.

Das Verfahren selbst wird mit Hilfe der Fig. 2 verdeutlicht. Zum Warmwalzvorgang wird ein warmer Aluminium-Barren 17 auf einen Rollgang 18 aufgelegt und in die Vorwalz-Trandemstraße 4 transportiert und dort reversierend in den beiden Vorwalzgerüsten 8, 9 im Tandembetrieb ausgewalzt, beispielsweise dreimal hin- und zurück, wie durch die Pfeile a gezeigt und mit Walzschritt l bezeichnet. Das Bandende wird mittels der schweren Schere 6 zwischen geschopft. Nach ausrechenden Reversiervorgängen kann die jetzt vorliegende Platine 19 direkt in das Fertigwalzgerüst 5 transportiert werden unter gleichzeitiger Beteiligung aller Gerüste. Es findet demnach ein Tandembetrieb in allen Gerüsten der Vorwalz- und Fertigwalzgerüst statt. Die Platine 19 wird durch ein Tandemwalzen in den Gerüsten 11, 12 der Fertigwalzstraße 5 zum Band 13 fertig gewalzt (Walzschritt II).The process itself is using the Fig. 2 clarified. For hot rolling a hot aluminum ingot 17 is placed on a roller table 18 and transported in the roughing Trandemstraße 4 and there reversing in the two roughing stands 8, 9 rolled out in tandem, for example, three times back and forth, as shown by the arrows a and denoted by rolling step l. The end of the tape is stuffed by means of heavy scissors 6 between. After ausrechenden Reversiervorgängen the now present board 19 can be transported directly into the finishing mill 5 with the simultaneous participation of all scaffolding. Accordingly, a tandem operation takes place in all the stands of the roughing and finish rolling stand. The board 19 is rolled by tandem rolling in the stands 11, 12 of the finishing train 5 to the belt 13 (rolling step II).

Nach einer anderen Verfahrensvariante (IIb) wird das Vorwalzprodukt durch Tandemwalzen in Fertigwalzgerüsten 11, 12 zwischen den beiden Haspeleinrichtungen 14, 15 reversierend ausgewalzt. Das Band 13 wird nach dem ersten Walzvorgang unter gleichzeitiger Beteiligung der beiden Fertigwalzgerüste 11, 12 mit der zweiten Haspeleinrichtung 14 aufgewickelt. Das Bandende wird mit einer fliegenden Schere 10 geschopft. Anschließend wird die Umlaufrichtung der jeweiligen Ober- und Unterwalzen der Gerüste 11, 12 geändert (Pfeil b) und das Band 13 erneut in die Fertigwalzgerüste 11, 12 eingezogen. Das Band 13 wird von der ersten Haspeleinrichtung 15 aufgehaspelt und gleichzeitig von der zweiten Haspeleinrichtung 14 abgewickelt und anschließend wieder umgekehrt (Pfeil c). Der Reversiervorgang kann entsprechend der gewünschten Enddicke des Bandes 13 wiederholt werden.According to another variant of the method (IIb), the rough rolling product is rolled reversibly by tandem rolling in finish rolling stands 11, 12 between the two reeling devices 14, 15. The strip 13 is wound after the first rolling operation with simultaneous participation of the two finishing stands 11, 12 with the second coiler 14. The end of the tape is stuffed with flying scissors 10. Subsequently, the direction of rotation of the respective upper and lower rollers of the stands 11, 12 is changed (arrow b) and the belt 13 again retracted into the finishing mills 11, 12. The tape 13 is unwound from the first coiler 15 and simultaneously unwound from the second coiler 14 and then reversed again (arrow c). The reversing process can be repeated according to the desired final thickness of the strip 13.

Durch die Nutzung der Tandemwalzungen in einer Warmbandstraße für Aluminium kann insbesondere erreicht werden, dass bisher unwirtschaftlich arbeitende kompakte Anlagen ihre Produktivität und Wirtschaftlichkeit wesentlich steigern können.By using the tandem rolling in a hot strip mill for aluminum can be achieved in particular that previously uneconomical working compact plants can increase their productivity and efficiency significantly.

BezugszeichenlisteLIST OF REFERENCE NUMBERS

1.1.
Warmwalzwerk-LayoutHot rolling mill layout
2.Second
Ofenbereichfurnace area
3.Third
Walzstraße bzw. WarmbandstraßeRolling train or hot strip mill
4.4th
Vorwalzstraßeroughing
5.5th
FertigwalzstraßeFinishing mill
6.6th
schwere Schopfschereheavy cropping shear
7.7th
Stauchgerüstedger
8.8th.
Vorwalzgerüst, Duo-GerüstPre-rolling stand, Duo-framework
9.9th
Vorwalzgerüst, Duo-GerüstPre-rolling stand, Duo-framework
10.10th
fliegende Schereflying scissors
11.11th
Fertigwalzgerüst, Quarto-GerüstFinish rolling stand, Quarto scaffolding
12.12th
Fertigwalzgerüst, Quarto-GerüstFinish rolling stand, Quarto scaffolding
13.13th
Bandtape
14.14th
zweite Haspeleinrichtungsecond reel device
15.15th
erste Haspeleinrichtungfirst reel device
16.16th
Besäumscheretrimming shears
17.17th
Barren, VorproduktIngots, precursor
18.18th
Rollgangroller table
19.19th
Platine, vorgewalztes ProduktBoard, pre-rolled product
100100
herkömmliches Warmwalzwerk-Layoutconventional hot rolling mill layout
102102
Ofenbereichfurnace area
103103
Walzstraßerolling train
104104
Vorwalzstraßeroughing
107107
Stauchgerüstedger
108108
Vorwalzgerüstroughing
111-112111-112
GerüsteScaffolding
113113
Bandtape
114114
Haspeleinrichtungcoiler
117117
Aluminium-BarrenAluminum ingots
119119
Platinecircuit board
120120
Ofenoven
121121
Ofenoven
122122
Schopfscherecrop shear
123123
Gerüstframework
124124
Gerüstframework
125125
leichte Schopfscherelight crop shear
126126
Besäumscherentrimming shears
127127
Treiberrollendriver rolls
x, y, zx, y, z
Abständedistances
a, b, ca, b, c
Pfeilearrows
II
Vorwalzen im TandembetriebPre-rolling in tandem operation
IIII
Fertigwalzen im Tandembetrieb mit allen GerüstenFinish rolling in tandem with all scaffolding
IIaIIa
reversierendes Fertigwalzen im Tandembetrieb zwischen zwei Haspeleinrichtungenreversing finish rolling in tandem operation between two reels

Claims (6)

  1. Rolling mill (1) for hot rolling metal, particularly aluminium, with a hot strip train (3) with a pre-rolling train (4) and a finishing rolling train (5), wherein the pre-rolling train (4) is constructed as a tandem train in which the rolling stock is rolled in tandem operation with participation in common of at least two pre-rolling stands (8, 9) arranged in succession, that the finishing rolling train (5) as tandem train comprises at least two finishing rolling stands (11, 12) arranged in succession, by which in tandem operation there is rolling with simultaneous participation of the respective finishing rolling stands (11, 12), that as seen in rolling direction a respective coiler (15, 14) is arranged in front of and behind the finishing rolling train (5), and that the pre-rolling tandem train (4) operates in reversing manner, characterised in that the pre-rolling train (4) together with the finishing train (5) operates as tandem train, wherein there is rolling in tandem operation with participation in common of the stands of the pre-rolling and finishing train, and that the finishing rolling train (5) operates in reversing manner.
  2. Rolling mill according to claim 1, characterised in that the pre-rolling tandem train (4) comprises respective two-roll stands (two-high stands) (8, 9).
  3. Rolling mill according to claim 1 or 2, with the following layout:
    - oven area (2) for feeding heat to a pre-product prior to the shaping,
    - heavy-duty cutting shears (6),
    - edging stand (7),
    - two pre-rolling stands (8, 9) which are arranged in succession and which, in tandem operation, operate in reversing manner,
    - flying shears (10),
    - a first coiler (15),
    - two finishing rolling stands (11, 12) which are arranged in succession and which, in tandem operation, operate in reversing manner and
    - a second coiler (14).
  4. Method of hot rolling metal, particularly aluminium, wherein the pre-rolling product, particularly an aluminium bar (17), is pre-rolled and subsequently rolled to finished state in a hot strip train (3) by a pre-rolling and a finish rolling train (4, 5), that the pre-product is pre-rolled in the pre-rolling train (4) itself, which is equipped as a tandem train with at least two pre-rolling stand (8, 9) arranged in succession, in tandem operation with participation in common of the respective pre-rolling stands, and that the pre-rolled rolling product (19) is rolled to finished state in the finishing rolling train (5), which is equipped as a tandem train with at least two finishing stands (11, 12) arranged in succession, particularly in a rolling mill (1) according to any one of claims 1 to 5, characterised in that the rolling product is rolled in the pre-rolling train (4) and the finishing rolling train (5) together in tandem operation and that the rolling out of the pre-product in the preliminary stands (8, 9) as well as the subsequent rolling to finished state in reversing manner is carried out in tandem operation of the finishing rolling train (5).
  5. Method according to claim 4, characterised by rolling out the pre-product in the preliminary stands (8, 9) as well as entry of the rolling product into the finishing rolling train (5) with simultaneous participation of all stands of the pre-rolling and finishing rolling trains (4, 5) (step IIa).
  6. Method according to claim 5, characterised by the following steps:
    - transport of a hot pre-product (17), particularly an aluminium bar, into a pre-rolling tandem train (4),
    - pre-rolling in reversing manner by the pre-rolling stands (8, 9) in tandem operation (step I),
    - intermediate cutting of the pre-rolling product (19), particularly of the aluminium plate, by means of heavy-duty shears (6),
    - rolling out to a predetermined pre-rolling thickness of the pre-rolling product (19),
    - cutting of the pre-rolling product (19) by flying shears (10),
    - winding up the strip (13), which has run through the finishing train (5) operating in tandem operation, by a second downstream coiler (14),
    - reversing the direction of movement of the rolling stands (11, 12) and repeated drawing of the strip (13) into the finishing rolling train (5),
    - winding up on an upstream coiler (15) with simultaneous unwinding from the second coiler (14) and
    - single or multiple performance of the rolling step in the finishing rolling train (step IIb).
EP04765624A 2003-10-24 2004-09-25 Rolling mill for hot-rolling metal, in particular, aluminium in addition to hot-rolling method Expired - Lifetime EP1675693B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PL04765624T PL1675693T3 (en) 2003-10-24 2004-09-25 Rolling mill for hot-rolling metal, in particular, aluminium in addition to hot-rolling method

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE10349950A DE10349950A1 (en) 2003-10-24 2003-10-24 Rolling mill for warm rolling of metals, including a hot strip roll chain, and blooming and finishing roll chains useful in rolling Al
PCT/EP2004/010794 WO2005049241A1 (en) 2003-10-24 2004-09-25 Rolling mill for hot-rolling metal, in particular, aluminium in addition to hot-rolling method

Publications (2)

Publication Number Publication Date
EP1675693A1 EP1675693A1 (en) 2006-07-05
EP1675693B1 true EP1675693B1 (en) 2009-03-25

Family

ID=34485077

Family Applications (1)

Application Number Title Priority Date Filing Date
EP04765624A Expired - Lifetime EP1675693B1 (en) 2003-10-24 2004-09-25 Rolling mill for hot-rolling metal, in particular, aluminium in addition to hot-rolling method

Country Status (20)

Country Link
US (1) US8356503B2 (en)
EP (1) EP1675693B1 (en)
JP (1) JP2007508941A (en)
KR (1) KR20060089738A (en)
CN (1) CN1871076B (en)
AR (1) AR046555A1 (en)
AT (1) ATE426468T1 (en)
AU (1) AU2004291230B2 (en)
BR (1) BRPI0415543B1 (en)
CA (1) CA2541406A1 (en)
DE (2) DE10349950A1 (en)
EG (1) EG24287A (en)
ES (1) ES2324868T3 (en)
MX (1) MXPA06004519A (en)
PL (1) PL1675693T3 (en)
RU (1) RU2357813C2 (en)
TW (1) TW200523044A (en)
UA (1) UA90097C2 (en)
WO (1) WO2005049241A1 (en)
ZA (1) ZA200602501B (en)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101007315B (en) * 2007-01-18 2010-10-06 湖南华菱涟源钢铁有限公司 Slotless rolling process of full horizontal rolling mill
CN100479943C (en) * 2007-06-08 2009-04-22 西南铝业(集团)有限责任公司 Aluminium base material hot continuous rolling process used in PS plate
DE102008009902A1 (en) * 2008-02-19 2009-08-27 Sms Demag Ag Rolling device, in particular push roll stand
ITMI20110202U1 (en) 2010-06-15 2011-12-16 Leonid M Koganov HOT LAMINATION TRAIN
DE102013221710A1 (en) * 2013-10-25 2015-04-30 Sms Siemag Aktiengesellschaft Aluminum hot strip rolling mill and method for hot rolling an aluminum hot strip
CN103722010A (en) * 2013-12-24 2014-04-16 河南万达铝业有限公司 Hot continuous rolling production line
DE102016205221A1 (en) * 2016-03-30 2017-10-05 Sms Group Gmbh Apparatus and method for plating a hot slab
CN107030109B (en) * 2017-06-16 2018-12-14 江苏国铝高科铝业有限公司 A kind of single reversing hot mill with coilers located on each side of the mill cold burden band load test run method
KR102179876B1 (en) * 2020-09-02 2020-11-17 (주) 영승알미늄 aluminum plate rolling machine
KR102605792B1 (en) * 2022-08-25 2023-11-29 (주)알루텍 manufacturing method of aluminium 5052 plates
CN118023294A (en) * 2022-11-11 2024-05-14 达涅利机械设备股份公司 Method for retrofitting a plant for producing flat rolled products

Family Cites Families (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3514984A (en) * 1968-01-16 1970-06-02 Westinghouse Electric Corp Apparatus for controlling the flow of a cooling medium onto workpieces
JPS53131263A (en) * 1977-04-22 1978-11-15 Hitachi Ltd Reversible type rolling equipment and its control method
US4308739A (en) * 1980-01-28 1982-01-05 Tippins Machinery Company, Inc. Method for modernizing a hot strip mill
US4348882A (en) * 1980-01-28 1982-09-14 Tippins Machinery Company, Inc. Hot rolling strip
NL8103411A (en) * 1981-07-17 1983-02-16 Multinorm Bv MOWER.
US4433566A (en) * 1981-09-29 1984-02-28 Tippins Machinery Company, Inc. Close coupled reversing rougher and finishing train and method of rolling
US4430874A (en) * 1981-09-29 1984-02-14 Tippins Machinery Company, Inc. Vertical coiler furnace and method of rolling
AT380188B (en) * 1982-03-05 1986-04-25 Voest Alpine Ag PLANT FOR THE HOT ROLLING OF TAPE OR TABLED ROLLED GOODS
US4522050A (en) * 1983-01-14 1985-06-11 Tippins Machinery Company, Inc. Three stand mini mill method and apparatus
US4503697A (en) * 1983-01-25 1985-03-12 Tippins Machinery Company, Inc. Method for hot rolling slabs
DE4009860C2 (en) * 1990-03-28 1999-11-18 Schloemann Siemag Ag Process and plant for the production of hot-rolled steel strip, in particular for stainless steels, from strip-shaped continuous material
EP0484882B1 (en) * 1990-11-08 1996-02-07 Hitachi, Ltd. Continuous hot strip rolling system and method thereof
EP0535767B1 (en) * 1991-10-02 1996-02-07 MANNESMANN Aktiengesellschaft Rolling train for rolling section beams
JP3182820B2 (en) * 1991-12-13 2001-07-03 株式会社日立製作所 Hot rolling equipment
JP3146786B2 (en) * 1993-09-20 2001-03-19 株式会社日立製作所 Hot rolling equipment and hot rolling method
DE19540978A1 (en) * 1995-11-03 1997-05-07 Schloemann Siemag Ag Production plant for the continuous or discontinuous rolling out of hot strip
DE19549208A1 (en) * 1995-12-30 1997-07-03 Schloemann Siemag Ag Process and plant for hot rolling strips
EP0896840B1 (en) * 1996-04-03 2002-08-28 Hitachi, Ltd. Rolling mill and rolling method and rolling equipment
US6286354B1 (en) * 1996-04-03 2001-09-11 Hitachi, Ltd. Rolling mill and rolling method and rolling equipment
US5931040A (en) * 1996-11-19 1999-08-03 Hitachi, Ltd. Rough rolling mill train
DE19721866B4 (en) * 1997-05-16 2006-03-16 Mannesmann Ag Process for the production of hot-rolled Al-tape and apparatus for carrying out the method
US6182490B1 (en) * 1999-03-19 2001-02-06 Danieli Technology Inc. Super thin strip hot rolling

Also Published As

Publication number Publication date
ES2324868T3 (en) 2009-08-18
EP1675693A1 (en) 2006-07-05
AR046555A1 (en) 2005-12-14
AU2004291230A1 (en) 2005-06-02
CN1871076B (en) 2011-03-23
RU2006117792A (en) 2007-12-10
EG24287A (en) 2009-01-05
TW200523044A (en) 2005-07-16
US8356503B2 (en) 2013-01-22
US20070051153A1 (en) 2007-03-08
KR20060089738A (en) 2006-08-09
CA2541406A1 (en) 2005-06-02
JP2007508941A (en) 2007-04-12
ATE426468T1 (en) 2009-04-15
RU2357813C2 (en) 2009-06-10
DE10349950A1 (en) 2005-05-25
ZA200602501B (en) 2007-05-30
PL1675693T3 (en) 2009-08-31
DE502004009234D1 (en) 2009-05-07
BRPI0415543B1 (en) 2015-11-10
WO2005049241A1 (en) 2005-06-02
AU2004291230B2 (en) 2010-03-04
MXPA06004519A (en) 2006-07-06
CN1871076A (en) 2006-11-29
BRPI0415543A (en) 2006-12-26
UA90097C2 (en) 2010-04-12

Similar Documents

Publication Publication Date Title
DE69116981T2 (en) Continuous hot strip rolling system
DE2256024A1 (en) PROCESS FOR ROLLING HOT METAL WORKS
EP0256409B2 (en) Method of producing sections
DE3241745A1 (en) METHOD FOR PRODUCING HOT-ROLLED STEEL STRIP FROM CONTINUOUSLY PRE-MATERIAL IN IMMEDIATELY FOLLOWING STEPS
DD207666A5 (en) PLANT FOR HOT ROLLING OF BELT OR TABLE FROZEN ROLLING
WO1999030847A1 (en) Method and installation for the continuous production of hot-rolled, thin flat products
DE19905286A1 (en) Working method and system for flexible and economical pickling and cold rolling of metal strips
EP1675693B1 (en) Rolling mill for hot-rolling metal, in particular, aluminium in addition to hot-rolling method
DE3730471A1 (en) COMPACT ROLLING MILL AND WORKING METHOD FOR ROLLING MOLDED STEEL
DE4041206C2 (en) Process and plant for the production of hot-rolled steel strip, in particular for stainless steels from continuously cast primary material
DE19935647C2 (en) Process for rolling heated metallic material and plant for carrying out the process
DE69204545T2 (en) Process for the production of profiles and / or bars in the cold state.
DE2437684C2 (en) Rolling mill for the production of wire and ribbed steel
DE3803592A1 (en) METHOD AND PLANT FOR ROLLING TUBES PRESENTED ON A BELT CASTING PLANT
EP3691803B1 (en) Multi-flexible rolling mill
EP0560115B1 (en) Method and rolling mill for precision rolling wire or stock having a circular cross-section
DE2553088A1 (en) Hot rolling steel slabs into bars and sections - using initial roll stand providing very high redn at low speed
DE19512953A1 (en) Method and device for producing hot-rolled steel strip
DE102006013607B4 (en) Method for producing a magnesium strip
DE3030382A1 (en) METHOD AND DEVICE FOR HOT ROLLING METAL WORKPIECES TO STRIP OR PLATES
DE4436453C2 (en) Process and plant for processing cast metal strips
EP0870554B1 (en) Rolling train for rolling flat steel
EP1059125A2 (en) Method for the manufacture of metal strip
WO2000012235A1 (en) Method and device for producing hot-rolled wide strip, notably from thin slabs
DE10025080A1 (en) Method of making metal tape

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20060202

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LI LU MC NL PL PT RO SE SI SK TR

DAX Request for extension of the european patent (deleted)
17Q First examination report despatched

Effective date: 20070307

GRAJ Information related to disapproval of communication of intention to grant by the applicant or resumption of examination proceedings by the epo deleted

Free format text: ORIGINAL CODE: EPIDOSDIGR1

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LI LU MC NL PL PT RO SE SI SK TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

Free format text: NOT ENGLISH

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

Free format text: LANGUAGE OF EP DOCUMENT: GERMAN

REF Corresponds to:

Ref document number: 502004009234

Country of ref document: DE

Date of ref document: 20090507

Kind code of ref document: P

REG Reference to a national code

Ref country code: SE

Ref legal event code: TRGR

RAP2 Party data changed (patent owner data changed or rights of a patent transferred)

Owner name: SMS SIEMAG AG

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20090325

NLT2 Nl: modifications (of names), taken from the european patent patent bulletin

Owner name: SMS SIEMAG AG

Effective date: 20090617

REG Reference to a national code

Ref country code: ES

Ref legal event code: FG2A

Ref document number: 2324868

Country of ref document: ES

Kind code of ref document: T3

REG Reference to a national code

Ref country code: HU

Ref legal event code: AG4A

Ref document number: E005370

Country of ref document: HU

REG Reference to a national code

Ref country code: PL

Ref legal event code: T3

REG Reference to a national code

Ref country code: IE

Ref legal event code: FD4D

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20090901

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20090325

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20090325

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20090325

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20090325

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20090625

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed

Effective date: 20091229

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20090930

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20090930

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20090930

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20090626

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20090325

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20090925

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20090325

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20090325

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FI

Payment date: 20130911

Year of fee payment: 10

Ref country code: CZ

Payment date: 20130918

Year of fee payment: 10

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CZ

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20140925

Ref country code: FI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20140925

REG Reference to a national code

Ref country code: DE

Ref legal event code: R082

Ref document number: 502004009234

Country of ref document: DE

Representative=s name: HEMMERICH & KOLLEGEN, DE

Ref country code: DE

Ref legal event code: R081

Ref document number: 502004009234

Country of ref document: DE

Owner name: SMS GROUP GMBH, DE

Free format text: FORMER OWNER: SMS SIEMAG AKTIENGESELLSCHAFT, 40237 DUESSELDORF, DE

PGRI Patent reinstated in contracting state [announced from national office to epo]

Ref country code: IT

Effective date: 20151204

REG Reference to a national code

Ref country code: SK

Ref legal event code: TC4A

Ref document number: E 5954

Country of ref document: SK

Owner name: SMS GROUP GMBH, DUESSELDORF, DE

Effective date: 20160209

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 13

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 14

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 15

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: SK

Payment date: 20200924

Year of fee payment: 17

Ref country code: FR

Payment date: 20200914

Year of fee payment: 17

Ref country code: DE

Payment date: 20200925

Year of fee payment: 17

Ref country code: GB

Payment date: 20200922

Year of fee payment: 17

Ref country code: NL

Payment date: 20200925

Year of fee payment: 17

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: AT

Payment date: 20200921

Year of fee payment: 17

Ref country code: IT

Payment date: 20200922

Year of fee payment: 17

Ref country code: SE

Payment date: 20200925

Year of fee payment: 17

Ref country code: PL

Payment date: 20200921

Year of fee payment: 17

Ref country code: BE

Payment date: 20200925

Year of fee payment: 17

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: ES

Payment date: 20201120

Year of fee payment: 17

Ref country code: HU

Payment date: 20201021

Year of fee payment: 17

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 502004009234

Country of ref document: DE

REG Reference to a national code

Ref country code: SE

Ref legal event code: EUG

REG Reference to a national code

Ref country code: NL

Ref legal event code: MM

Effective date: 20211001

REG Reference to a national code

Ref country code: SK

Ref legal event code: MM4A

Ref document number: E 5954

Country of ref document: SK

Effective date: 20210925

REG Reference to a national code

Ref country code: AT

Ref legal event code: MM01

Ref document number: 426468

Country of ref document: AT

Kind code of ref document: T

Effective date: 20210925

REG Reference to a national code

Ref country code: BE

Ref legal event code: MM

Effective date: 20210930

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20210925

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20211001

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SK

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210925

Ref country code: SE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210926

Ref country code: HU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210926

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210925

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210930

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220401

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210930

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210925

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210925

REG Reference to a national code

Ref country code: ES

Ref legal event code: FD2A

Effective date: 20221031

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: ES

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210926

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PL

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210925