EP1621671B1 - A high safety, modular system for provisionally supporting working railway tracks during under-track works. - Google Patents

A high safety, modular system for provisionally supporting working railway tracks during under-track works. Download PDF

Info

Publication number
EP1621671B1
EP1621671B1 EP05380135A EP05380135A EP1621671B1 EP 1621671 B1 EP1621671 B1 EP 1621671B1 EP 05380135 A EP05380135 A EP 05380135A EP 05380135 A EP05380135 A EP 05380135A EP 1621671 B1 EP1621671 B1 EP 1621671B1
Authority
EP
European Patent Office
Prior art keywords
loadbearing
crossbeams
beams
staying
railway track
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Not-in-force
Application number
EP05380135A
Other languages
German (de)
French (fr)
Other versions
EP1621671A3 (en
EP1621671A2 (en
Inventor
Andrés José Ruiz Viedma
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Atros Espana SA
Original Assignee
Atros Espana SA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Atros Espana SA filed Critical Atros Espana SA
Publication of EP1621671A2 publication Critical patent/EP1621671A2/en
Publication of EP1621671A3 publication Critical patent/EP1621671A3/en
Application granted granted Critical
Publication of EP1621671B1 publication Critical patent/EP1621671B1/en
Not-in-force legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/005Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries by forcing prefabricated elements through the ground, e.g. by pushing lining from an access pit
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B1/00Ballastway; Other means for supporting the sleepers or the track; Drainage of the ballastway
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2/00General structure of permanent way
    • E01B2/003Arrangement of tracks on bridges or in tunnels
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B37/00Making, maintaining, renewing, or taking-up the ballastway or the track, not provided for in a single one of groups E01B27/00 - E01B35/00
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2/00General structure of permanent way

Definitions

  • the present invention has as its object a high safety, modular system for provisionally supporting working railway tracks during under-track works, according to the preamble of claim 1.
  • Said modular system provides a given railway track section with added consistency and stability during the works possibly having to be carried out under it, such as an underpass, a tunnel being designed to replace a level crossing, a pedestrian crossing, a ductway passage, etc., in such a way as to allow this railway track to be equally operable for the circulation and transit of trains under the same working conditions it had before the start of the works, with no need for the trains circulating on the railway track to effect a special manoeuvre of some kind while traversing said section or to make important or very limitative speed reductions.
  • the present invention has been accomplished in response to the need to assure the proper stability, consistency and strength of a railway track section during the works possibly being carried out in the ground being situated under that railway track section for the purpose of replacing a level crossing or of carrying out a pedestrian crossing, ductways, new infrastructures, etc.
  • the best known system as shown in ES 2 024 817 , consists in forming rail bundles being parallel to the railway track and inferiorly connected by a tie member or rail section and clamps being made of steel plate with wedges or of two loops being formed with steel rods being upperly welded to a tubular member and thus clamping the rail bundle assembly and the transverse rail.
  • the system uses the used rail but is very hard to implement and requires a great amount of labour as well as long intervals with no train circulation and a very restrictive train speed limitation lasting several weeks, all this resulting in a very cost-intensive system.
  • the modular system of the present invention comprises loadbearing crossbeams that have been formed with a special shape in order to fulfil their function as the members being designed to bear and transmit the loads being imposed by the railway, said crossbeams incorporating special elements being designed to establish a linkage with the longitudinally reinforcing or staying beams, said elements being lowerable in order to thus allow to install said loadbearing crossbeams by simply removing the ballast existing between the crossties of the railway track without affecting the ballast underlying said crossties, so that the function of these latter is not affected during the assembly operations, and they don't need to be replaced with others as in the case of the known systems, it being even possible to immediately replace the ballast between the track crossties and the special crossbeams of the supporting structure without the passage of the trains being affected by this operation in the installation and removal stages, and also without affecting the safety during said passage of the trains or the travelling speed along the line, said loadbearing crossbeams being fit to be used with all types of railway tracks with any track gauge and any
  • the high safety, modular system for provisionally supporting railway tracks during under-track works being the object of the present invention is essentially characterised in that it comprises a plurality of loadbearing crossbeams being arranged in an inferior and transversal arrangement with respect to the railway track rails, said loadbearing crossbeams being parallel to the crossties and arranged at their same level, and a number of pairs of longitudinal staying beams being arranged in a parallel arrangement with respect to the railway track rails in at least the middle area between them and at both their sides, said staying beams resting on the plurality of loadbearing crossbeams and being securely attached to them, said plurality of loadbearing crossbeams being provided with means for securely fastening the railway track tie plates, the plurality of loadbearing crossbeams and the number of pairs of staying beams being joined together by means of steel blocks being lowerable in order to facilitate the assembly and dismantling operations, said blocks being provided with mutually orthogonal, drilled holes being fit to receive respective bolts for the attachment of the
  • the loadbearing crossbeams supporting and fastening the railway track rails have an asymmetric double-T cross-section and are formed by two asymmetric double-T sections having a common lower flange, said loadbearing crossbeams being provided with slots extending through the upper flange for fastening the railway track rail tie plates by means of fasteners, with drilled holes extending through the web for receiving the lower bolt extending through the bearing blocks, with reinforcing members being arranged at the web in the drilled area for absorbing the stresses, and with a housing for the bearing blocks in the lowered position in order to facilitate the introduction of the loadbearing crossbeam from underneath the railway track rails.
  • the longitudinally staying beams consist in sections being arranged by pairs and in a parallel arrangement with respect to the track rails, said staying beams hence consisting in three pairs of sections being situated in the middle area and at both sides of the railway track rails, said sections being provided with drilled holes extending through the web in each pair of sections for receiving the bolts transmitting the stresses between the bearing blocks and the beams.
  • the bearing blocks are parallelepipedic members having a square base and being provided with two mutually orthogonal drilled holes for receiving the connecting bolts, and with an upper tab for properly aligning the flanges of the staying beams.
  • the high safety, modular system for provisionally supporting working railway tracks during under-track works being the object of the present invention has been devised in order to impart an added strength, solidity, consistency and stability to a railway track section having been singled out for carrying out works in the ground being situated underneath said railway track section.
  • the modular system of the invention comprises an assembly of loadbearing crossbeams -VC- being arranged in a transversal and perpendicular arrangement with respect to the railway track rails -V1- and -V2-, said loadbearing crossbeams having been joined with pairs of staying beams -VA- being parallel to the track rails -V1- and -V2-.
  • the joining of the transversal loadbearing crossbeams -VC- with the longitudinal staying beams -VA- is carried out by means of a bearing block set -JN- (see the figures).
  • the loadbearing crossbeams -VC- are positioned as if they were crossties -T- of the original track section, that is to say that they are perpendicular to the track rails - Vl- and -V2-, are situated under them, and are parallel to the crossties -T- and occupy the space existing between the very crossties -T- but with no contact with them, as can be appreciated in Figs. 1 and 2 .
  • the loadbearing crossbeams -VC- consist in composite sections with various types of loadbearing cross-section and with auxiliary arrangements such as oblong holes -1- for fastening the railway track rails -V1-and -V2- by means of the corresponding tie plates -2-, and openings - 3- for fixing the steel blocks -JN- and attaching the pairs of longitudinal staying beams -VA-, -VA- to the loadbearing crossbeams.
  • the loadbearing crossbeams -VC- have an asymmetric double-T under-track cross-section whose central and end sections are formed by two asymmetric double-T shapes having a common lower flange, and they have the drilled holes -1- in the upper flange for fastening the tie plates -2- for the track rails -V1-/-V2- with screws -4-, said drilled holes being oblong holes for allowing to carry out the positioning in the bent track sections and to thus compensate the curvature of the bend, said loadbearing crossbeams also having drilled holes -5- being provided in the web for the introduction of the lower bolt -B'- into the bearing blocks -JN-, and reinforcing members -6- being provided at the web in the area of the drilled hole -5- in order to absorb the shearing stresses, and intermediary sections -7- for the transmission of the stresses through an overlapping arrangement of the webs, said loadbearing crossbeams also having a housing -8- for
  • bearing blocks -JN- consist in a steel member having the shape of a parallelepiped with a square base and being provided with two circular drilled holes -9a- and -9b- being perpendicular to each other, said drilled holes being fit to receive the lower and upper connecting bolts -B'- and -B-, said blocks also having an upper tab -10- for the proper alignment of the flanges of the pair of staying beams -VA-, -VA-, and a drilled hole for fastening the lower bolt by means of a screw.
  • the longitudinal staying beams -VA-, -VA- being arranged in pairs in their turn consist in respective reinforced, industrial sections being arranged in a parallel arrangement with respect to the track rails -V1- and -V2- and in three pairs, i.e.
  • said staying beams -VA- having modular lengths being multiples of a fixed number so as to thus allow to form stiffening members of different lengths with the smallest number of parts being together and arranged in an alternated arrangement between beams so as to thus maintain the biggest loadbearing cross-section for the assembly, a cross-section being reinforced by strips -11- at the flanges in the area of each beam which coincides with the joint with that forming the pair with it, drilled holes in the web of the beams for receiving the bolts -B- and -B'- being provided for transmitting the stresses between the bearing blocks -JN- and the loadbearing crossbeams -VC-, bearing strips on the inner side of the flanges for shortening the working span of the load transmitting bolts, brackets for reinforcing the load transmission area, and clamping screws -12- between the flanges for joining each pair of staying
  • the system assembly and placement process starts with the introduction and placement of the loadbearing crossbeams -VC- from underneath the track rails -V1- and -V2- and in a perpendicular arrangement with respect to these latter and in a parallel arrangement with respect to each other and to the crossties and between the spaces of the crossties -T-, for such a purpose previously removing the ballast existing between the crossties -T- ( Figs.
  • the pairs of staying beams -VA-, -VA- are placed in three pairs in a stable manner and without fastening them on the loadbearing crossbeams -VC-.
  • One of said pairs is placed on the central axis of the railway track and the other two lateral pairs are situated in the outer region adjoining the track rails -V1- and -V2- as can be seen in Figs. 1 , 4, 5 and 6 .
  • Each of the three precited pairs is thereupon longitudinally shifted in parallel with the track rails -V1- and -V2- till finally bringing them to the position where they can be joined to the loadbearing crossbeams -VC- through the intermediary of the bearing blocks -JN- and the bolts -B- and -B'- and screws.
  • the block sets -JN- are placed in an upright position ( Figs. 5, 6 , 8 and 9 ) and the bolts -Bare then passed through them, said bolts also extending through the web of the staying beams -VA- ( Figs. 5 , 7, 8 and 9 ) and thus fixing the relative position between the loadbearing crossbeams -VC- and the staying beams -VA-.
  • the assembly process is followed in reverse order.
  • the clamping screws -12- and the bolts -B-, -B'- between the loadbearing crossbeams - VC- and the staying beams -VA- are firstly removed.
  • the staying beams -VA- are thereupon removed and the block sets -JN- are then lowered in order to remove the loadbearing crossbeams -VC-, and the ballast between the crossties -T- for the track rails -V1- and -V2- is finally reinstalled.
  • the load transmission system is especially designed so that the assembly being made up of all the elements forms a grid being able to support the track rails -V1- and -V2- and transmitting the railway loads to the ground or some intermediary supports and thus allowing to clear an empty space under the track rails -V1- and -V2- as necessary in order to carry out works for creating new infrastructures or maintaining the existing ones.
  • the function of the crossties -T- is not affected during the assembly operations, and they don't need to be replaced with others as in the case of other known systems, it being even possible to immediately reinstall the ballast between the track crossties -T- and the special supporting beams (the loadbearing crossbeams -VC- ) without for such a purpose affecting the passage of the trains in the assembly and disassembly stages or the traversing safety or the travelling speed along the line, the system of the invention being fit to be used with all kinds of railway tracks with any track gauge and any crosstie type and even in bend areas, all elements being easily assemblable and disassemblable as well as reusable thanks to their modular distribution to cope with any track length to be strengthened and supported, the cost for restoring the normal track conditions being hence lower.
  • the crossties do not need to be reinstalled because they remain in position from the start.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Train Traffic Observation, Control, And Security (AREA)
  • Railway Tracks (AREA)
  • Automobile Manufacture Line, Endless Track Vehicle, Trailer (AREA)
  • Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)
  • Chain Conveyers (AREA)
  • Automatic Assembly (AREA)

Abstract

A high safety, modular system for provisionally supporting working railway tracks during under-track works. In order to carry out infrastructures such as underpasses under the railway tracks a number of rails (V1,V2) are arranged in a parallel arrangement with respect to the railway track, said rails (V1,V2) being inferiorly connected to each other by a transversal rail section, this system being nevertheless hard to implement and lacking in solidity. The modular system of the invention comprises a plurality of loadbearing crossbeams (VC) being arranged in an inferior and transversal arrangement with respect to the railway track rails (V1,V2), said loadbearing crossbeams (VC) being parallel to the crossties (T), and a number of pairs of longitudinal staying beams (VA) being arranged in a parallel arrangement with respect to the railway track rails (V1,V2) in the middle area between them and at both their sides, said staying beams (VA) resting on the plurality of loadbearing crossbeams (VC), the loadbearing crossbeams (VC) and the staying beams (VA) being joined together by means of lowerable steel blocks (JN).

Description

    OBJECT OF THE INVENTION
  • The present invention has as its object a high safety, modular system for provisionally supporting working railway tracks during under-track works, according to the preamble of claim 1.
  • FIELD OF THE INVENTION
  • Said modular system provides a given railway track section with added consistency and stability during the works possibly having to be carried out under it, such as an underpass, a tunnel being designed to replace a level crossing, a pedestrian crossing, a ductway passage, etc., in such a way as to allow this railway track to be equally operable for the circulation and transit of trains under the same working conditions it had before the start of the works, with no need for the trains circulating on the railway track to effect a special manoeuvre of some kind while traversing said section or to make important or very limitative speed reductions.
  • The present invention has been accomplished in response to the need to assure the proper stability, consistency and strength of a railway track section during the works possibly being carried out in the ground being situated under that railway track section for the purpose of replacing a level crossing or of carrying out a pedestrian crossing, ductways, new infrastructures, etc.
  • BACKGROUND OF THE INVENTION
  • Along the length of a railway track of any kind it is always necessary to carry out works of some kind in the ground spanning the railway track gauge. This is most usually necessary when setting out to build underpasses under the railway track, to replace a level crossing, to build a drain tunnel inferiorly crossing the railway track, a pedestrian crossing, ductways, etc.
  • As a consequence of that the. train must slow down when traversing said section in order to assure the necessary safety when so doing, taking into account its own weight, the vibrations it generates when passing, etc. On some occasions it is even necessary to discontinue the active use of said section.
  • Different systems have been available so far for carrying out underpasses under the railway track, repairing the ballast bed, and generally carrying out jobs or operations of any kind requiring to leave the railway track rails without a supporting base.
  • The best known system, as shown in ES 2 024 817 , consists in forming rail bundles being parallel to the railway track and inferiorly connected by a tie member or rail section and clamps being made of steel plate with wedges or of two loops being formed with steel rods being upperly welded to a tubular member and thus clamping the rail bundle assembly and the transverse rail. The system uses the used rail but is very hard to implement and requires a great amount of labour as well as long intervals with no train circulation and a very restrictive train speed limitation lasting several weeks, all this resulting in a very cost-intensive system.
  • There are other systems, as known from IT-T0-950 147A , using beams having a given length and thus creating a complete discontinuity between the different modules and thus forcing to create intermediary supports being difficult to execute and maintain, the reinforcements for each rail of the railway track being also independent, the assembly therefore loosing rigidity and hence requiring a bigger number of supporting and joining parts.
  • There are other systems doing without both the longitudinal and transversal reinforcement of the railway track, said systems merely supporting said track by means of a set of hydraulic jacks being mounted on sliding carriages having to be introduced together with the structure of the underpass in a rapid operation, the railway track being hence merely supported on an unstable assembly with unprotected work sides and in a risky situation as regards the safety of the trains.
  • The aforementioned drawbacks have been totally obviated by means of the system of the present invention, said system providing a higher safety for the railway thanks to the higher strength of the system elements and to the higher rigidity and consistency of their mutual assemblage, the railway track with said system being besides in a position to be used with lower limitations as to the speed of the trains, supporting higher dynamic loads and requiring a shorter time for installing and removing the system.
  • The modular system of the present invention comprises loadbearing crossbeams that have been formed with a special shape in order to fulfil their function as the members being designed to bear and transmit the loads being imposed by the railway, said crossbeams incorporating special elements being designed to establish a linkage with the longitudinally reinforcing or staying beams, said elements being lowerable in order to thus allow to install said loadbearing crossbeams by simply removing the ballast existing between the crossties of the railway track without affecting the ballast underlying said crossties, so that the function of these latter is not affected during the assembly operations, and they don't need to be replaced with others as in the case of the known systems, it being even possible to immediately replace the ballast between the track crossties and the special crossbeams of the supporting structure without the passage of the trains being affected by this operation in the installation and removal stages, and also without affecting the safety during said passage of the trains or the travelling speed along the line, said loadbearing crossbeams being fit to be used with all types of railway tracks with any track gauge and any crosstie type and even in bend sections.
  • This is a modular system that can hence be installed to span any track length to be reinforced in such a way that all its elements are reusable, this eliminating the costs being related with the auxiliary works and other elements having to be wrecked or disposed of after having been used.
  • SUMMARY OF THE INVENTION
  • The high safety, modular system for provisionally supporting railway tracks during under-track works being the object of the present invention is essentially characterised in that it comprises a plurality of loadbearing crossbeams being arranged in an inferior and transversal arrangement with respect to the railway track rails, said loadbearing crossbeams being parallel to the crossties and arranged at their same level, and a number of pairs of longitudinal staying beams being arranged in a parallel arrangement with respect to the railway track rails in at least the middle area between them and at both their sides, said staying beams resting on the plurality of loadbearing crossbeams and being securely attached to them, said plurality of loadbearing crossbeams being provided with means for securely fastening the railway track tie plates, the plurality of loadbearing crossbeams and the number of pairs of staying beams being joined together by means of steel blocks being lowerable in order to facilitate the assembly and dismantling operations, said blocks being provided with mutually orthogonal, drilled holes being fit to receive respective bolts for the attachment of the loadbearing crossbeams and the staying beams, the assembly being made up of said plurality of loadbearing crossbeams being arranged in a transversal arrangement with respect to the railway track rails and of longitudinal staying beams making up a grid being able to support the railway track rails and transmitting the railway loads to the ground and/or some intermediary supports.
  • The loadbearing crossbeams supporting and fastening the railway track rails have an asymmetric double-T cross-section and are formed by two asymmetric double-T sections having a common lower flange, said loadbearing crossbeams being provided with slots extending through the upper flange for fastening the railway track rail tie plates by means of fasteners, with drilled holes extending through the web for receiving the lower bolt extending through the bearing blocks, with reinforcing members being arranged at the web in the drilled area for absorbing the stresses, and with a housing for the bearing blocks in the lowered position in order to facilitate the introduction of the loadbearing crossbeam from underneath the railway track rails.
  • The longitudinally staying beams consist in sections being arranged by pairs and in a parallel arrangement with respect to the track rails, said staying beams hence consisting in three pairs of sections being situated in the middle area and at both sides of the railway track rails, said sections being provided with drilled holes extending through the web in each pair of sections for receiving the bolts transmitting the stresses between the bearing blocks and the beams.
  • The bearing blocks are parallelepipedic members having a square base and being provided with two mutually orthogonal drilled holes for receiving the connecting bolts, and with an upper tab for properly aligning the flanges of the staying beams.
  • These and other features will be best made apparent by the following detailed description whose understanding will be made easier by the accompanying three sheets of explanatory drawings showing a practical embodiment being cited only by way of illustrative example not limiting the scope of the present invention.
  • DESCRIPTION OF THE DRAWINGS
    • Fig. 1 is a plan-view illustrating the modular system of the invention once having been joined, assembled and placed at the railway track. Fig. 1A is a larger scale detail view of Fig. 1.
    • Fig. 2 is a side elevational view of Fig. 1.
    • Fig. 3 is a plan-view illustrating the loadbearing crossbeam.
    • Fig. 4 is a transversal view of the railway track illustrating the loadbearing crossbeam in an elevational view with the block sets in a lowered position allowing to introduce said loadbearing crossbeam from underneath the railway track, the former having been positioned under the latter.
    • Fig. 5 is a view being similar to Fig. 4 and illustrating the loadbearing crossbeam being shown in an elevational view and incorporating three pairs of staying beams being bolt-joined by means of the vertically positioned block sets, said loadbearing crossbeam having been positioned under the railway track and having the bolts in their respective places. Fig. 5A is a detail view of the bearing blocks.
    • Fig. 6 is a view being similar to Fig. 5 and illustrating the loadbearing crossbeam being shown in an elevational view, the three pairs of staying beams being shown here having been secured and fastened with the block sets in an upright position, said loadbearing crossbeam having been positioned under the railway track, the bolts having been placed and tightened.
    • Fig. 7 is a perspective and fragmentary view illustrating the modular system of the invention in its assembled state and showing a loadbearing crossbeam and three pairs of fragmentary staying beams with the block sets and the tightening screws.
    • Figs. 8 and 9 are each a fragmentary view with a different perspective angle illustrating the mutual relationship in the arrangement of the staying beams, the loadbearing crossbeams, the block sets and the bolts.
    DETAILED DESCRIPTION OF A PREFERRED EMBODIMENT OF THE INVENTION
  • According to the drawings the high safety, modular system for provisionally supporting working railway tracks during under-track works being the object of the present invention has been devised in order to impart an added strength, solidity, consistency and stability to a railway track section having been singled out for carrying out works in the ground being situated underneath said railway track section.
  • As can be appreciated in Figs. 1 and 2 the modular system of the invention comprises an assembly of loadbearing crossbeams -VC- being arranged in a transversal and perpendicular arrangement with respect to the railway track rails -V1- and -V2-, said loadbearing crossbeams having been joined with pairs of staying beams -VA- being parallel to the track rails -V1- and -V2-. The joining of the transversal loadbearing crossbeams -VC- with the longitudinal staying beams -VA- is carried out by means of a bearing block set -JN- (see the figures).
  • With respect to the train rails -V1- and -V2- the loadbearing crossbeams -VC- are positioned as if they were crossties -T- of the original track section, that is to say that they are perpendicular to the track rails - Vl- and -V2-, are situated under them, and are parallel to the crossties -T- and occupy the space existing between the very crossties -T- but with no contact with them, as can be appreciated in Figs. 1 and 2.
  • The loadbearing crossbeams -VC- consist in composite sections with various types of loadbearing cross-section and with auxiliary arrangements such as oblong holes -1- for fastening the railway track rails -V1-and -V2- by means of the corresponding tie plates -2-, and openings - 3- for fixing the steel blocks -JN- and attaching the pairs of longitudinal staying beams -VA-, -VA- to the loadbearing crossbeams.
  • The loadbearing crossbeams -VC- have an asymmetric double-T under-track cross-section whose central and end sections are formed by two asymmetric double-T shapes having a common lower flange, and they have the drilled holes -1- in the upper flange for fastening the tie plates -2- for the track rails -V1-/-V2- with screws -4-, said drilled holes being oblong holes for allowing to carry out the positioning in the bent track sections and to thus compensate the curvature of the bend, said loadbearing crossbeams also having drilled holes -5- being provided in the web for the introduction of the lower bolt -B'- into the bearing blocks -JN-, and reinforcing members -6- being provided at the web in the area of the drilled hole -5- in order to absorb the shearing stresses, and intermediary sections -7- for the transmission of the stresses through an overlapping arrangement of the webs, said loadbearing crossbeams also having a housing -8- for the bearing block -JN- in the lowered position in order to facilitate the introduction of the loadbearing crossbeams -VC- from underneath the track rails -V1- and -V2-. Said loadbearing crossbeams additionally incorporate a dual electric insulation (not shown) in order to prevent a communication between both track rails.
  • As for the bearing blocks -JN- (see Fig. 5A), they consist in a steel member having the shape of a parallelepiped with a square base and being provided with two circular drilled holes -9a- and -9b- being perpendicular to each other, said drilled holes being fit to receive the lower and upper connecting bolts -B'- and -B-, said blocks also having an upper tab -10- for the proper alignment of the flanges of the pair of staying beams -VA-, -VA-, and a drilled hole for fastening the lower bolt by means of a screw.
  • The longitudinal staying beams -VA-, -VA- being arranged in pairs in their turn consist in respective reinforced, industrial sections being arranged in a parallel arrangement with respect to the track rails -V1- and -V2- and in three pairs, i.e. a central one on the track axis, and two lateral pairs at the sides of the track rails in the outside area, said staying beams -VA- having modular lengths being multiples of a fixed number so as to thus allow to form stiffening members of different lengths with the smallest number of parts being together and arranged in an alternated arrangement between beams so as to thus maintain the biggest loadbearing cross-section for the assembly, a cross-section being reinforced by strips -11- at the flanges in the area of each beam which coincides with the joint with that forming the pair with it, drilled holes in the web of the beams for receiving the bolts -B- and -B'- being provided for transmitting the stresses between the bearing blocks -JN- and the loadbearing crossbeams -VC-, bearing strips on the inner side of the flanges for shortening the working span of the load transmitting bolts, brackets for reinforcing the load transmission area, and clamping screws -12- between the flanges for joining each pair of staying beams thereby counteracting the torsional stresses.
  • These block sets -JN- (Fig. 5A) are fit to join the loadbearing crossbeams -VC- and the pairs of staying beams -VA- together, and they are lowerable as can be seen in Fig. 4 so as to thus allow to pass and place the loadbearing crossbeams -VC- from underneath the train rails -V1- and -V2- and between the crossties -T- (Figs. 1 and 2).
  • As has been said, the system assembly and placement process starts with the introduction and placement of the loadbearing crossbeams -VC- from underneath the track rails -V1- and -V2- and in a perpendicular arrangement with respect to these latter and in a parallel arrangement with respect to each other and to the crossties and between the spaces of the crossties -T-, for such a purpose previously removing the ballast existing between the crossties -T- (Figs. 1 and 2), and with the block sets -JN- previously fit into the housings -8- being provided in the loadbearing crossbeams -VC- and in a lowered position thus allowing to pass said loadbearing crossbeams from underneath the track rails - V1- and -V2- (Fig. 4). Once having been placed the loadbearing crossbeams -VC- are securely attached to the track rails -V1- and -V2- by means of the tie plates -2-.
  • Once having placed the loadbearing crossbeams -VC- and having fastened them to the track rails -V1- and -V2- one proceeds to position the pairs of staying beams -VA-, -VA-. Initially the staying beams -VA- are placed in three pairs in a stable manner and without fastening them on the loadbearing crossbeams -VC-. One of said pairs is placed on the central axis of the railway track and the other two lateral pairs are situated in the outer region adjoining the track rails -V1- and -V2- as can be seen in Figs. 1, 4, 5 and 6. Each of the three precited pairs is thereupon longitudinally shifted in parallel with the track rails -V1- and -V2- till finally bringing them to the position where they can be joined to the loadbearing crossbeams -VC- through the intermediary of the bearing blocks -JN- and the bolts -B- and -B'- and screws.
  • Once already having placed the staying beams -VA- in the position where they can be joined to the loadbearing crossbeams -VC- the block sets -JN- are placed in an upright position (Figs. 5, 6, 8 and 9) and the bolts -Bare then passed through them, said bolts also extending through the web of the staying beams -VA- (Figs. 5, 7, 8 and 9) and thus fixing the relative position between the loadbearing crossbeams -VC- and the staying beams -VA-.
  • Once having fixed the relative position between the loadbearing crossbeams -VC- and the staying beams -VA- with the passage of the bolts -B- one proceeds to securely fasten the staying beams -VA- to the loadbearing crossbeams -VC- by means of the respectively transversal and longitudinal clamping screws -12- and -13-, respectively, as can be appreciated in Figs. 6 and 7, thus then forming the definitive loadbearing configuration of the system of Figs. 1 and 2.
  • For the dismantling process the assembly process is followed in reverse order. The clamping screws -12- and the bolts -B-, -B'- between the loadbearing crossbeams - VC- and the staying beams -VA- are firstly removed. The staying beams -VA- are thereupon removed and the block sets -JN- are then lowered in order to remove the loadbearing crossbeams -VC-, and the ballast between the crossties -T- for the track rails -V1- and -V2- is finally reinstalled.
  • The load transmission system is especially designed so that the assembly being made up of all the elements forms a grid being able to support the track rails -V1- and -V2- and transmitting the railway loads to the ground or some intermediary supports and thus allowing to clear an empty space under the track rails -V1- and -V2- as necessary in order to carry out works for creating new infrastructures or maintaining the existing ones.
  • The function of the crossties -T- is not affected during the assembly operations, and they don't need to be replaced with others as in the case of other known systems, it being even possible to immediately reinstall the ballast between the track crossties -T- and the special supporting beams (the loadbearing crossbeams -VC- ) without for such a purpose affecting the passage of the trains in the assembly and disassembly stages or the traversing safety or the travelling speed along the line, the system of the invention being fit to be used with all kinds of railway tracks with any track gauge and any crosstie type and even in bend areas, all elements being easily assemblable and disassemblable as well as reusable thanks to their modular distribution to cope with any track length to be strengthened and supported, the cost for restoring the normal track conditions being hence lower. The crossties do not need to be reinstalled because they remain in position from the start.
  • With the system of the present invention an inertia increase is obtained in all of the loadbearing sections of the system, this allowing to clear bigger empty spaces under the track for carrying out the works being planed in order to build and maintain infrastructures as necessary, the system also allowing to obtain a more secure fastening between the elements and a better packing of the track and as such acquiring a higher rigidity and consistency, so that the joint cooperation of the elements allows to increase the load distribution thereby reducing the stress concentration as well as the strains.
  • The invention can be put into practice in other embodiments differing only in detail from the one having been described above only by way of example, said other embodiments and modifications falling within the scope of the protection being sought, as described by the appended claims..

Claims (4)

  1. A high safety, modular system for provisionally supporting working railway tracks during under-track works, said modular system being of the type consisting in a number of rails (VA) being parallel to the railway track and inferiorly connected to the railway track rails (V1/V2) by a rail section or transverse loadbearing crossmember (VC), said assembly being made up of the rails and the loadbearing crossmember being solidly held together by means of clamps; said modular system being characterised in that it comprises a plurality of loadbearing crossbeams (VC) being arranged in an inferior and transversal arrangement with respect to the railway track rails (V1, V2), said loadbearing crossbeams being parallel to the crossties (T) and arranged at their same level, and a number of pairs of longitudinal staying beams (VA, VA) being arranged in a parallel arrangement with respect to the railway track rails (V1, V2) in at least the middle area between them and at both their sides, said staying beams resting on the plurality of loadbearing crossbeams (VC) and being securely attached to them, said plurality of loadbearing crossbeams (VC) being provided with means (1, 4) for securely fastening the tie plates (2) for the railway track rails (V1, V2), the plurality of loadbearing crossbeams (VC) and the number of pairs of staying beams (VA, VA) being joined together by means of steel blocks (JN) being lowerable in order to facilitate the assembly and dismantling operations, said blocks being provided with mutually orthogonal, drilled holes (9a, 9b) being fit to receive respective bolts (B', B) for the attachment of the loadbearing crossbeams (VC) and the staying beams (VA), the assembly being made up of said plurality of loadbearing crossbeams (VC) being arranged in a transversal arrangement with respect to the railway track rails (V1, V2) and of longitudinal staying beams (VA, VA) making up a grid being able to support the railway track rails (V1, V2) and transmitting the railway loads to the ground and/or some intermediary supports.
  2. A modular system as per claim 1, characterised in that the loadbearing crossbeams (VC) supporting and fastening the railway track rails (V1, V2) have an asymmetric double-T cross-section and are formed by two asymmetric double-T sections having a common lower flange, said loadbearing crossbeams being provided with slots (1) extending through the upper flange for fastening the tie plates (2) for the railway track rails (V1, V2) by means of fasteners (4), with drilled holes (5) extending through the web for receiving the lower bolt (B') extending through the bearing blocks (JN), with reinforcing members (6) being arranged at the web in the area having the drilled holes (5) for absorbing the stresses, and with a housing (8) for the bearing blocks (JN) in the lowered position in order to facilitate the introduction of the loadbearing crossbeam (VC) from underneath the railway track rails (V1, V2).
  3. A modular system as per claims 1 and 2, characterised in that the longitudinally staying beams (VA, VA) consist in sections being arranged by pairs and in a parallel arrangement with respect to the track rails (V1, V2), said staying beams hence consisting in three pairs of sections being situated in the middle area and at both sides of the railway track rails (V1, V2), said sections being provided with drilled holes extending through the web in each pair of sections for receiving the bolts (B) transmitting the stresses between the bearing blocks (JN) and the beams (VC/VA).
  4. A modular system as per claims 1, 2 and 3, characterised in that the bearing blocks (JN) are parallelepipedic members having a square base and being provided with two mutually orthogonal drilled holes (9a, 9b) for receiving the connecting bolts (B, B'), and with an upper tab (10) for properly aligning the flanges of the staying beams (VA).
EP05380135A 2004-07-29 2005-06-23 A high safety, modular system for provisionally supporting working railway tracks during under-track works. Not-in-force EP1621671B1 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
ES200401870A ES2261024B1 (en) 2004-07-29 2004-07-29 HIGH SECURITY MODULAR SYSTEM FOR PROVISIONAL SUPPORT OF RAILWAYS IN CIRCULATION DURING WORK UNDER VIA.

Publications (3)

Publication Number Publication Date
EP1621671A2 EP1621671A2 (en) 2006-02-01
EP1621671A3 EP1621671A3 (en) 2006-05-24
EP1621671B1 true EP1621671B1 (en) 2008-03-19

Family

ID=35197812

Family Applications (1)

Application Number Title Priority Date Filing Date
EP05380135A Not-in-force EP1621671B1 (en) 2004-07-29 2005-06-23 A high safety, modular system for provisionally supporting working railway tracks during under-track works.

Country Status (5)

Country Link
EP (1) EP1621671B1 (en)
AT (1) ATE389748T1 (en)
DE (1) DE602005005398T2 (en)
ES (2) ES2261024B1 (en)
PT (1) PT1621671E (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102261628B1 (en) * 2021-03-10 2021-06-07 주식회사 브리텍 Rail reinforced smart module and its construction method

Families Citing this family (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2007138123A1 (en) 2006-05-29 2007-12-06 Petrucco, S.A. Support arrangement
ES2361288B1 (en) * 2006-07-13 2012-02-13 Obras, Proyectos, Ecologia Y Medio Ambiente, S.L. (Opema) Mobile bridge for its support or attachment of railway tracks.
ES2370711B1 (en) * 2008-02-26 2012-10-30 Obras Y Proyectos, Ecología Y Medio Ambiente S.L. (Opema) New track attachment for any width of it.
ITUD20080177A1 (en) * 2008-07-28 2010-01-29 Natisone Lavori S R L TEMPORARY BRIDGE FOR THE CONSTRUCTION OF UNDERPASSES AND ITS INSTALLATION PROCEDURE
NO2631424T3 (en) * 2010-10-20 2018-04-28
CN102505585B (en) * 2011-12-07 2013-12-11 山西四建集团有限公司 Construction process of rocket sled
FR3000113B1 (en) * 2012-12-21 2016-05-06 Soc Nat Des Chemins De Fer Francais Sncf SUPPORT STRUCTURE OF A PORTION OF RAILWAY.
FR3002955B1 (en) * 2013-03-07 2016-09-09 Soc Nat Des Chemins De Fer Francais Sncf STIFFENER FOR RAILWAY AND METHOD FOR MANUFACTURING SUCH STIFFENER
AU2018403511A1 (en) * 2018-01-17 2020-07-30 Petrucco, S.A. Modular support structure
CN108239896A (en) * 2018-03-21 2018-07-03 中铁二十三局集团第四工程有限公司 Existing railway Disease Treatment of Foundation Base fixed track usage plan constructing structure and construction method
CN109024109A (en) * 2018-09-28 2018-12-18 中铁磁浮交通投资建设有限公司 The multiple degrees of freedom support of medium-and low-speed maglev bridge big displacement modularization telescopic device
CN109024108B (en) * 2018-09-28 2024-03-15 中铁磁浮交通投资建设有限公司 Modularized track panel of large-displacement telescopic device of medium-low-speed magnetic levitation bridge
CN109024111A (en) * 2018-09-28 2018-12-18 中铁磁浮交通投资建设有限公司 The freely-supported longitudinal beam structure of medium-and low-speed maglev bridge big displacement modularization telescopic device
CN109024110B (en) * 2018-09-28 2024-03-15 中铁磁浮交通投资建设有限公司 X-shaped connecting rod device of middle-low speed magnetic levitation bridge large-displacement telescopic device
CN110230238B (en) * 2019-06-18 2024-04-09 中铁第五勘察设计院集团有限公司 Railway line protection device and protection method
ES2895751A1 (en) * 2020-08-19 2022-02-22 Lopez Oscar Dieguez Mobile Bridge for Senior Or Railroad Range in Great Vanos (Machine-translation by Google Translate, not legally binding)
CN112253844B (en) * 2020-09-29 2022-04-22 北京政平建设投资集团有限公司 Self-monitoring guide rail
CN112921715A (en) * 2021-01-20 2021-06-08 中铁工程设计咨询集团有限公司 Track beam for rubber-tyred tramcar and construction method thereof
CN112921716A (en) * 2021-01-20 2021-06-08 中铁工程设计咨询集团有限公司 Duplex steel rail beam for rubber-tyred tramcars and construction method
CN113174789A (en) * 2021-05-14 2021-07-27 中铁二十四局集团有限公司 Railway fastening rail reinforcing process and equipment
WO2023175205A1 (en) * 2022-03-17 2023-09-21 Oscar Dieguez Lopez Movable bridge for holding up or supporting railways tracks on large spans

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
IT1234182B (en) * 1989-03-03 1992-05-05 Casagrande Spa REVERSE ARCH EXCAVATION PROCESS IN EXISTING GALLERIES AND EQUIPMENT ADOPTING SUCH PROCESS.
IT1255694B (en) * 1992-09-29 1995-11-10 Provisional structure for supporting railway tracks
JP2909814B2 (en) * 1997-09-04 1999-06-23 川崎重工業株式会社 How to update a railway bridge
ES2151364B1 (en) * 1997-10-27 2001-06-16 Alicantina De Construcciones I APEO OF VIA FERREA FOR EXECUTION OF LOWER STEPS.
DE10022311B4 (en) * 1999-05-22 2010-01-28 Ed. Züblin Ag Device for producing slab tracks
DE10033272A1 (en) * 2000-07-10 2002-02-14 Moelders Baugmbh Railway permanent way has a concrete layer to support the sleepers, in one-piece slabs with reinforcement steel fibers, extending over several sleepers for rapid laying with accurate alignment

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102261628B1 (en) * 2021-03-10 2021-06-07 주식회사 브리텍 Rail reinforced smart module and its construction method

Also Published As

Publication number Publication date
ES2261024A1 (en) 2006-11-01
DE602005005398D1 (en) 2008-04-30
EP1621671A3 (en) 2006-05-24
ATE389748T1 (en) 2008-04-15
ES2261024B1 (en) 2007-09-16
EP1621671A2 (en) 2006-02-01
ES2302159T3 (en) 2008-07-01
PT1621671E (en) 2008-05-07
DE602005005398T2 (en) 2009-04-23

Similar Documents

Publication Publication Date Title
EP1621671B1 (en) A high safety, modular system for provisionally supporting working railway tracks during under-track works.
JP4985540B2 (en) Vertical beam system for mobile work vehicles for cantilever installation
JP6180376B2 (en) Main girder provision method in composite girder floor slab replacement method, composite girder floor slab replacement method, and main girder provision structure in composite girder floor slab replacement method
EP2631424B1 (en) Support structure
JP5530149B2 (en) Structure and assembly method of temporary construction girder for railway
KR102096004B1 (en) Built-up railway bridge with eccentric bending web
KR100911451B1 (en) Composite temporary bridge be combind main girder and deck plate construction and method thereof
CN111379424A (en) Anti-overturning device and method for planar structure sliding construction
KR101962788B1 (en) Temporary bridge construction method using steel girder and composite deck-plate and temporary bridge therewith
EA003073B1 (en) Travel way for a guided vehicle, especially a magnetic levitation railway
JP2006214269A (en) Erected girder
US2014430A (en) Overhead railway for suspended cars
JP4287755B2 (en) Joint structure of steel girder and composite deck
JP4136959B2 (en) "How to build underground structures and installation girder"
CN216184761U (en) Adjustable transportation bed-jig of steel case roof beam
KR102000114B1 (en) Modular truss girder for temporary bridge and installation structure thereof
US8459570B2 (en) Supporting arrangement
EP3741957B1 (en) Modular support structure
JP6286737B2 (en) Fixed structure of floor slab panel
DE102006038888B3 (en) Roadway for maglev trains
JP6740846B2 (en) Floor slab replacement structure and floor slab replacement construction method
JP2003027404A (en) Method for constructing under-track structure
EP2282007B1 (en) Supporting arrangement
CN219137423U (en) Steel-concrete combined bridge deck formwork supporting structure
JP7129168B2 (en) Bridge reinforcement structure and method

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A2

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU MC NL PL PT RO SE SI SK TR

AX Request for extension of the european patent

Extension state: AL BA HR LV MK YU

PUAL Search report despatched

Free format text: ORIGINAL CODE: 0009013

AK Designated contracting states

Kind code of ref document: A3

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU MC NL PL PT RO SE SI SK TR

AX Request for extension of the european patent

Extension state: AL BA HR LV MK YU

RIC1 Information provided on ipc code assigned before grant

Ipc: E01B 1/00 20060101AFI20051110BHEP

Ipc: E01B 2/00 20060101ALI20060404BHEP

Ipc: E01B 37/00 20060101ALI20060404BHEP

17P Request for examination filed

Effective date: 20061019

AKX Designation fees paid

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU MC NL PL PT RO SE SI SK TR

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU MC NL PL PT RO SE SI SK TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REF Corresponds to:

Ref document number: 602005005398

Country of ref document: DE

Date of ref document: 20080430

Kind code of ref document: P

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: PT

Ref legal event code: SC4A

Free format text: AVAILABILITY OF NATIONAL TRANSLATION

Effective date: 20080424

REG Reference to a national code

Ref country code: ES

Ref legal event code: FG2A

Ref document number: 2302159

Country of ref document: ES

Kind code of ref document: T3

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080319

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080319

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080319

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080319

ET Fr: translation filed
PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080619

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080319

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080319

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080319

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080719

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080319

Ref country code: MC

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20080630

26N No opposition filed

Effective date: 20081222

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080319

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080619

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080319

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20090630

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20090630

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080920

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20080623

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080319

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080620

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: IE

Payment date: 20120510

Year of fee payment: 8

Ref country code: NL

Payment date: 20120601

Year of fee payment: 8

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 20120618

Year of fee payment: 8

Ref country code: GB

Payment date: 20120615

Year of fee payment: 8

Ref country code: BE

Payment date: 20120511

Year of fee payment: 8

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: IT

Payment date: 20120628

Year of fee payment: 8

Ref country code: DE

Payment date: 20120822

Year of fee payment: 8

Ref country code: ES

Payment date: 20120615

Year of fee payment: 8

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: AT

Payment date: 20120605

Year of fee payment: 8

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: PT

Payment date: 20130527

Year of fee payment: 9

BERE Be: lapsed

Owner name: ATROS ESPANA, S.A.

Effective date: 20130630

REG Reference to a national code

Ref country code: NL

Ref legal event code: V1

Effective date: 20140101

REG Reference to a national code

Ref country code: AT

Ref legal event code: MM01

Ref document number: 389748

Country of ref document: AT

Kind code of ref document: T

Effective date: 20130623

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20130623

REG Reference to a national code

Ref country code: IE

Ref legal event code: MM4A

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 602005005398

Country of ref document: DE

Effective date: 20140101

REG Reference to a national code

Ref country code: FR

Ref legal event code: ST

Effective date: 20140228

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20130630

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20140101

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20130623

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20140101

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20130623

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20130623

Ref country code: AT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20130623

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20130701

REG Reference to a national code

Ref country code: PT

Ref legal event code: MM4A

Free format text: LAPSE DUE TO NON-PAYMENT OF FEES

Effective date: 20141223

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20141223

REG Reference to a national code

Ref country code: ES

Ref legal event code: FD2A

Effective date: 20150724

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: ES

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20140624