EP1540127B1 - Offshore platform with vertically-restrained buoy and well deck - Google Patents
Offshore platform with vertically-restrained buoy and well deck Download PDFInfo
- Publication number
- EP1540127B1 EP1540127B1 EP03784895A EP03784895A EP1540127B1 EP 1540127 B1 EP1540127 B1 EP 1540127B1 EP 03784895 A EP03784895 A EP 03784895A EP 03784895 A EP03784895 A EP 03784895A EP 1540127 B1 EP1540127 B1 EP 1540127B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- tendon
- deck
- risers
- riser
- buoyancy apparatus
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 210000002435 tendon Anatomy 0.000 claims abstract description 137
- 238000007667 floating Methods 0.000 claims abstract description 35
- 238000005553 drilling Methods 0.000 claims abstract description 24
- 238000004519 manufacturing process Methods 0.000 claims abstract description 24
- PEDCQBHIVMGVHV-UHFFFAOYSA-N Glycerine Chemical compound OCC(O)CO PEDCQBHIVMGVHV-UHFFFAOYSA-N 0.000 claims description 3
- 239000003209 petroleum derivative Substances 0.000 abstract description 4
- 239000003208 petroleum Substances 0.000 abstract 1
- 238000013461 design Methods 0.000 description 16
- 230000033001 locomotion Effects 0.000 description 16
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 11
- 230000000712 assembly Effects 0.000 description 8
- 238000000429 assembly Methods 0.000 description 8
- 239000010779 crude oil Substances 0.000 description 6
- 230000009471 action Effects 0.000 description 5
- 230000008901 benefit Effects 0.000 description 5
- 230000008878 coupling Effects 0.000 description 4
- 238000010168 coupling process Methods 0.000 description 4
- 238000005859 coupling reaction Methods 0.000 description 4
- 238000000034 method Methods 0.000 description 4
- 238000012545 processing Methods 0.000 description 4
- 125000006850 spacer group Chemical group 0.000 description 4
- 230000000694 effects Effects 0.000 description 3
- 230000007613 environmental effect Effects 0.000 description 3
- 239000007789 gas Substances 0.000 description 3
- 239000003921 oil Substances 0.000 description 3
- 238000009844 basic oxygen steelmaking Methods 0.000 description 2
- 238000005260 corrosion Methods 0.000 description 2
- 230000007797 corrosion Effects 0.000 description 2
- 125000004122 cyclic group Chemical group 0.000 description 2
- 239000007788 liquid Substances 0.000 description 2
- VNWKTOKETHGBQD-UHFFFAOYSA-N methane Chemical compound C VNWKTOKETHGBQD-UHFFFAOYSA-N 0.000 description 2
- 230000000452 restraining effect Effects 0.000 description 2
- 238000000926 separation method Methods 0.000 description 2
- 230000003068 static effect Effects 0.000 description 2
- 238000003466 welding Methods 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000001413 cellular effect Effects 0.000 description 1
- 210000003850 cellular structure Anatomy 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000007423 decrease Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000005284 excitation Effects 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 239000003112 inhibitor Substances 0.000 description 1
- 230000003993 interaction Effects 0.000 description 1
- 238000002955 isolation Methods 0.000 description 1
- 230000007246 mechanism Effects 0.000 description 1
- 239000003345 natural gas Substances 0.000 description 1
- 230000002093 peripheral effect Effects 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 238000005086 pumping Methods 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 238000011144 upstream manufacturing Methods 0.000 description 1
- 239000011800 void material Substances 0.000 description 1
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B21/00—Tying-up; Shifting, towing, or pushing equipment; Anchoring
- B63B21/50—Anchoring arrangements or methods for special vessels, e.g. for floating drilling platforms or dredgers
- B63B21/502—Anchoring arrangements or methods for special vessels, e.g. for floating drilling platforms or dredgers by means of tension legs
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B35/00—Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
- B63B35/44—Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices
- B63B35/4406—Articulated towers, i.e. substantially floating structures comprising a slender tower-like hull anchored relative to the marine bed by means of a single articulation, e.g. using an articulated bearing
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B35/00—Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
- B63B35/44—Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices
- B63B35/4413—Floating drilling platforms, e.g. carrying water-oil separating devices
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B17/00—Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
- E21B17/01—Risers
- E21B17/012—Risers with buoyancy elements
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B17/00—Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
- E21B17/20—Flexible or articulated drilling pipes, e.g. flexible or articulated rods, pipes or cables
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B19/00—Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
- E21B19/002—Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables specially adapted for underwater drilling
- E21B19/004—Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables specially adapted for underwater drilling supporting a riser from a drilling or production platform
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B35/00—Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
- B63B35/44—Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices
- B63B2035/442—Spar-type semi-submersible structures, i.e. shaped as single slender, e.g. substantially cylindrical or trussed vertical bodies
Definitions
- the present invention relates to offshore platforms, and specifically to offshore platforms designed for dry tree applications. More particularly, the present invention relates to a new production and/or drilling riser system used in deep draft dry tree offshore platforms.
- Conventional dry tree offshore platforms are low heave floating platforms, such as spars, TLPs (Tension Leg Platforms), and deep draft semi-submersible platforms. These platforms are able to support a plurality of vertical production and/or drilling risers. These platforms can comprise a well deck, where the surface trees (arranged on top of the riser) will be located, and a production deck where the petroleum product (e.g., crude oil or natural gas) will be distributed to a processing facility to separate water, oil and gas. These two decks are part of the hull of the offshore platform.
- vertical risers running from the well head to the well deck are supported by a tensioning apparatus. These vertical risers are called Top Tensioned Risers (TTRs).
- TTRs Top Tensioned Risers
- FIG. 10A There are two conventional designs for applying tension to the TTRs respectively illustrated in Figures 10A and 10B.
- the first design shown in Figure 10A, uses one or more passive buoyancy cans 10 to independently support a riser 12.
- Figure 10A shows a top tensioned riser arrangement 12 with buoyancy cans 10, of a type that is mainly employed on spar-type floating platforms, as disclosed and claimed in US 4,702,321 - Horton.
- Each riser 10 extends vertically from a wellhead 14 on the seabed to the top of a well deck 18 of the offshore platform. The riser passes from the well head 14 through a keel joint 20 into the center well 22 of the buoyancy cans 10.
- the riser 12 passes through a stem pipe 24 that passes through the center of the buoyancy cans 10.
- the stem pipe 24 extends above the buoyancy cans 10 and supports the well deck 18 to which the riser 12 and a surface tree 26 are attached.
- the buoyancy cans 10 and the stem pipe 24 are guided at several locations in the center well 22 by a plurality of riser guides 28. Because the risers 12 are independently supported by the buoyancy cans 10 (relative to the hull), the hull is able to move up and down relative to the risers 12, and thus the risers 12 are isolated from the heave motions of the offshore platform.
- the buoyancy cans 10 need to provide enough buoyancy to support the required top tension in the risers 12, as well as the combined weight of the cans 10, the stem pipe 24, and the surface tree 26. With increased depth, the buoyancy required to support the riser system will correspondingly increase, requiring larger buoyancy cans 10. Consequently, the size of the center well 22 will increase proportionately. Designing and manufacturing individual buoyancy cans 10 for each riser 12 is also costly.
- the second conventional design uses an active hydraulic tensioning mechanism to independently support the risers 12.
- Each riser 12 extends vertically from the wellhead 14 to the production deck 32 of the offshore platform.
- the riser 12 is supported by active hydraulic cylinders 30 connected to the well deck 18 of the offshore platform, allowing the hull to move up and down relative to the risers 12 and thus partially isolating the risers 12 from the heave motions of the hull.
- a surface tree 26 is connected to the top of the riser 12.
- the required tension and stroke increase in magnitude, the size of the hydraulic cylinders 30 correspondingly increases and may become prohibitively expensive. Furthermore, the loads have to be supported by the offshore platform.
- riser tensioning systems similar to the above-described designs can be used, although designs employing hydraulic tensioners are more common.
- the tensioning device allows the isolation of the risers from the heave motions of the offshore platform.
- the well deck as well as the production deck will move up and down relative to the surface trees. Consequently, in order to absorb these motions, high pressure flexible jumpers 34 ( Figures 10A and 10B) are required to connect each surface tree in the well deck area to a manifold (not shown) on the production deck 32 which carries the liquid petroleum product to a processing facility to separate water, oil and gas.
- the high pressure flexible jumpers 32 are expensive compared to rigid piping and can lead to design problems, especially in high pressure / high temperature environments.
- the prior art proposes to connect all the TTRs to a single (independent from the work platform) buoyancy apparatus in order to create a small well deck TLP to receive the riser.
- the small well deck TLP is anchored with tendons connected to the outer periphery of the buoyancy apparatus.
- the small well deck TLP has a low natural period in the range of 2-3 seconds, and will have the same problems as the conventional TLP (e.g., high cost, springing and ringing problems).
- the tendons will have to be designed to limit the horizontal motion of the small well deck TLP.
- the present invention addresses the problems just described with a riser system according to claim 1 and proposes a new passive tensioning system for top-tensioned risers in dry tree floating platforms, most advantageously spars and deep draft semi-submersible platforms.
- the present invention provides for tensioning all the risers with a single buoyancy apparatus, which can be a large single buoyancy can or a multi cellular buoyancy apparatus.
- a "deep draft" semi-submersible floating platform is defined as a low-heave platform having a draft of at least about 150 ft. (45m), and able to guide or receive top-tensioned risers.
- a first unique feature of the present invention is that, contrary to prior art (where the well deck is supported by the offshore platform), the single buoyancy apparatus includes the well deck arranged on its top surface. Since the risers are connected to the same buoyancy apparatus, they act as a single riser system, and surface trees on top of the risers can be rigidly attached on top of the buoyancy apparatus. Consequently, all the surface trees can be connected to a manifold on the well deck (not the production deck) with rigid piping.
- the crude oil will be choked down in the entry of the manifold, and, contrary to the prior art, one or just a few low pressure flexible jumper(s) (or rigid articulated arms) can be used to carry the liquid petroleum product (e.g., crude oil) to the processing equipment on the production deck.
- the use of a small number (as low as one) of low pressure flexible jumpers or articulated rigid arms will considerably reduce the cost of the riser system as well as the required deck room.
- a second unique feature is the use of concentric tendons attached at the well deck (or top of the single buoyancy apparatus) on the center line of the single buoyancy apparatus. When one tendon is used, it will be connected to the well deck on the centerline of the buoyancy apparatus. When more tendons are used, their centroid will be close to the vertical centerline of the apparatus.
- the use of central tendons limits the over-stressing of the risers and the requirement for a reinforced wellhead foundation, as tension loads will be withstood principally by the tendons themselves and their foundation.
- the use of concentric tendons will provide much flexibility in the design of the tendons to achieve the required dynamic behavior.
- Three factors are important in the design of the tendons: (1) The tendons must be strong enough to withstand the maximum static and dynamic loads imparted to them by the spar. (2) The buoyancy apparatus must impart sufficient upward tension at the top of the tendons to prevent them from going slack at the base. (3) The tendons must have sufficient axial stiffness to keep the riser system from going into resonance due to cyclic wave forces.
- the present invention avoids the need to have several tendons arranged in the outer periphery of the buoy, and thus reduces the cost of the riser system and simplifies the resolution of the problems of riser and riser/tendon collisions.
- Figure 1 shows a cross-sectional view of one exemplary embodiment of a floating platform in which the risers are supported by a single buoyancy system and are coupled to a central tendon assembly for restraining the vertical motion of a single buoyancy system;
- Figure 2 shows a cross sectional view of the floating platform in which the risers are supported by a single buoyancy system, vertically restrained by central tendons, the riser being independent from the central tendon;
- Figure 3 shows a cross sectional view of the floating platform in which the risers are supported by a single buoyancy system
- Figure 4 shows a cross-sectional view of the floating platform in which the single buoyancy system also supports the drilling rig and its associated equipment;
- Figure 5 shows a top view of the well deck arrangement
- Figure 6A is an elevational view, partially in axial cross-section, showing one exemplary embodiment of the tendon riser arrangement
- Figure 6B is a cross-sectional view taken along line 6B - 6B of Figure 6A;
- FIG. 7 shows another exemplary embodiment for the single buoyancy system wherein the buoyancy system comprises a plurality of vertical tubes closely spaced and connected together through elongated vertical webs;
- Figure 8 shows the use of the invention in a deep draft semi-submersible platform
- Figure 9 shows one exemplary embodiment of the well deck arrangement on top of the buoyancy system.
- FIGS 10A and 10B show prior art riser systems.
- Figure 1 shows one exemplary embodiment of the invention used in a spar type floating platform 100.
- Figure 1 shows the spar type platform 100 having a spar hull 102 defining a center well 1 04.
- a vertically restrained buoyancy apparatus 106 is guided in at least two locations (upper and lower) within the center well 104 of the spar hull 102.
- This specific spar type platform 100 comprises an upper hull and a lower hull.
- the upper hull and the lower hull share the continuous hollow center well 104, which surrounds and guides the center well buoyancy apparatus 106.
- the upper hull includes a cellular structure comprising several compartments 108 for buoyancy purpose (void tanks and variable ballast tanks).
- the lower hull includes a sleeve 110 with a fixed ballast 112 near the bottom of the lower hull to lower the center of gravity and thus improve the stability of the platform 100.
- the spar type platform 100 supports a work platform 114 comprising a production deck 116, compartments 118 for crew quarters and utilities, and a drilling deck 120 for drilling equipment, such as a drilling rig 122.
- the floating platform 100 is moored with lateral mooring lines 124 in a taut leg mooring configuration or catenary mooring configuration.
- the lateral mooring lines 124 are designed to limit the horizontal movement of the floating platform 100 relative to seabed wellheads to specified limits to prevent the risers (described below) from being over stressed.
- the buoyancy apparatus 106 can be a single large buoyancy can or a multi-cellular buoyancy system (described below and shown in Figure 7).
- the center well buoyancy apparatus 106 is itself free floating within the center well 104. Because the spar hull 102 and the center well 104 are each free-floating, the spar hull 102 moves to accommodate the environmental forces acting on it, and thus moves with respect to the vertically restrained center well buoyancy apparatus 106.
- the spar hull 102 heave motion is decoupled from the center well buoyancy apparatus 106.
- at least first and second pluralities of guides 128 are provided in the center well 104 at selected, axially-spaced locations, and at least at upper and lower locations, to guide the buoyancy apparatus 106 within the center well 104.
- the buoyancy apparatus 106 and the guides 128 are in actual physical contact.
- the guides 128 advantageously include compliant pads (such as elastomeric pads) (not shown) that are positioned to be compressed against the buoyancy apparatus 106.
- a unique feature of this invention is that a well deck 130 is positioned on top of the buoyancy apparatus 106, and all the risers 126 extend from the well deck 130 to wellheads 132 on the seabed.
- At least one central tendon assembly 134 secures the buoyancy apparatus 106 to the seabed.
- the tendon assembly 134 is attached at its upper end to the center of the well deck 130, and it extends down along the centerline of the buoyancy apparatus 126 to a tendon foundation in the seabed.
- the tendon foundation is of conventional design, described more fully below, comprising a caisson pile 138 anchored in the seabed, and a connective sleeve 140 connecting the tendon assembly 134 to the caisson pile 138.
- the advantage of using a central tendon assembly 134 is that it can be designed (in terms of the physical characteristics of the tendons the tendon foundation) to withstand most of the tension load, thereby reducing the tension loads in the risers 126.
- the requirement for reinforced foundations for the wellhead 132 will be further reduced, which is particularly advantageous in ultra deep water where the tension requirement can be quite critical.
- the tendon assembly 134 may be designed specifically as a tendon, or it may be designed as a riser that functions as a tendon with a reinforced wellhead foundation.
- the tendon assembly 134 and a plurality of surrounding risers 126 are coupled together with a plurality of vertically-spaced riser spacers or guides 144, only one of which is shown in the drawings.
- the coupling of the risers 126 with the tendon assembly 134 helps prevent the risers 126 and the tendon assembly 134 from clashing or colliding with one another due to floating platform movement.
- the upper portions of the risers 126 are uncoupled from the tendon assembly 134 within the upper portion of the center well 104, to allow the connection of each riser 126 to a respective surface tree 170, and the connection of tendon assembly 134 to a tendon socket or slot 146 ( Figure 5) in the well deck 130.
- the bottom portions of the risers 126 are uncoupled from the tendon assembly 134 to allow the connection of the risers 126 to their respective wellheads 132 and the connection of the tendon assembly to the tendon foundation.
- Figure 2 shows another exemplary embodiment of the invention used in a spar type floating platform 200, which includes risers 226 that are uncoupled from a tendon assembly 234.
- This embodiment provides a simplified riser and tendon construction (no need of riser spacers or guides), but the risers 226 and the tendon assembly 234 will have to be sufficiently spaced and will have to be tensioned sufficiently to avoid any collision between the risers 226 themselves and between the risers 226 and the tendon assembly 234. Accordingly, this embodiment requires a center well 204 that must be larger than that of the embodiment of Figure 1.
- Figure 3 shows another exemplary embodiment of the invention used in a spar type floating platform 300.
- this particular embodiment there is no specific tendon used for vertically restraining the single buoyancy apparatus 306.
- this embodiment employs risers 326 and wellhead foundations 346 that are designed to vertically restrain the center well buoyancy apparatus 306.
- FIG. 4 shows another exemplary embodiment of the invention used in a spar type floating platform 400.
- This particular embodiment employs a center well buoyancy apparatus 406 that, in addition to a well deck 430, supports a drilling deck 420 with a drilling rig 422 and its associated equipment (drilling and work over), while the work platform supported by the floating structure comprises a production deck 416 with compartments 418 for crew quarters and utilities.
- the decks 416, 420 are conventional decks used on floating structures such as spars, TLPs or deep draft semi-submersible platforms. As the buoyancy apparatus 406 is vertically restrained, the drilling and work over operations will be less weather dependant.
- the embodiment of Figure 4 employs risers 426 and tendons 442 that are coupled; however, the risers and the tendons can be uncoupled as shown in Figure 2, or the buoyancy apparatus can be vertically restrained by the riser itself, as shown in Figure 3.
- the embodiment of Figure 4 does, however, require additional buoyancy to support the extra weight of the drilling/work over equipment.
- the tendons and/or the risers are secured to the seabed at one end (wellhead or tendon foundation), and to the well deck on the center well buoyancy apparatus at the other end.
- FIG. 5 shows a horizontal cross sectional view of an example of a well deck assembly 500.
- the well deck assembly includes a well deck 130 having a tendon socket or slot 146 in its center to receive a tendon assembly 134.
- Around the tendon slot 146 are several riser sockets or slots 548.
- the moon pools 552 also provide space for performing drilling and work over operations or for running equipment down to the seabed.
- the center well buoyancy apparatus 106 is guided with a plurality of guides 128 (four guides, in this example), arranged around its perimeter.
- the number of guides 128 may be varied from as few as two to five or more, depending on the loads they are to absorb.
- FIG. 1 to 5 only one tendon assembly 134 attached to the well deck 130 and extending down the centerline of the buoyancy apparatus 106 is shown. However, in other embodiments, there may be more than one tendon assembly aligned and/or parallel with the vertical centerline of the buoyancy apparatus. The various other embodiments may employ multiple tendon assemblies (not illustrated), closely arranged around the central tendon assembly.
- the tendon assembly 134 is secured to the seabed by a caisson pile 138, which is alternatively called an anchor caisson or a suction pile.
- the caisson pile 138 secures the tendon assembly 134 to the seabed.
- the tendon assembly 134 may optionally be connected to the caisson pile by the tendon connection sleeve 140, which is located in the center of the caisson pile 138, through which the bottom end of the tendon assembly 134 is fixed to the seabed.
- Radial plates 154 connect the tendon assembly 134 to the interior wall of the connection sleeve 140.
- the caisson pile 138 is pushed into the seabed by pumping water out of its interior. As water is pumped out, the ambient external water pressure pushes the caisson pile 138 down into the seabed. In other embodiments, the caisson pile 138 is pushed into the seabed by means of submersible pumps (not shown), airlifts (not shown), or any other method that may suggest itself to those of ordinary skill in the art. With the caisson pile 138 firmly anchored in the seabed, the tendon connection sleeve 140 connects the tendon assembly 134 to the caisson pile 138, thereby securing the tendon assembly 134 to the seabed.
- At least one of the tubular tendon elements 136 of the tendon assembly 134 is drilled into the seabed and anchored therein by cement. This increases the pull-out resistance of the tendon assembly 134.
- the tendon connection sleeve 140 is extended out of the bottom of the caisson pile 138, thereby providing a connector through which the tendon elements 136 are drilled and connected.
- tendon assembly 134 may be secured to the seabed by any other method that may suggest itself to those of ordinary skill in the art.
- Figures 6A and 6B show the structural details of one exemplary embodiment of a tendon assembly 134.
- the tendon assembly 134 comprises multiple (at least two) concentric tubular tendon elements 136.
- the concentric tubular elements 136 are secured to the well deck 130 on the vertical centerline of the center well buoyancy apparatus 106, and they extend down to an anchor assembly at the seabed, as discussed above.
- the use of concentric tubular tendon elements 136 provides great flexibility in the design of the tendons to achieve the required dynamic behavior.
- the tendon assemblies 134 must be strong enough to withstand the maximum static and dynamic loads imparted on them by the buoyancy apparatus 106.
- the buoyancy apparatus 106 must impart sufficient upward tension at the top of the tendon assemblies 134 to prevent them from going slack at the bottom.
- the tendon assemblies 134 must have sufficient axial stiffness to keep the riser/tendon assembly system from going into resonance due to cyclic wave forces.
- the tubular tendon elements 136 may further comprise conventional oilfield casing joints with a flanged coupling 156.
- the casing joints are of various sizes, depending on the required tensile loads. These loads vary on a case-by-case basis, as will occur to those of ordinary skill in the art.
- the tendon assembly 134 is installed in sections, in a section-by-section sequence, using the drilling rig 122 on the platform. Each section is installed on the deck and lowered using the rig, and the sections are connected using the flanged couplings 156.
- the advantages of installing the tendon assembly 134 in sections in this manner using the platform's own drilling rig will be readily apparent to those skilled in the art.
- FIG 6B shows a cross section of the tendon assembly 134 of Figure 6A, showing one of the riser guides or spacers 144, which is also shown in Figure 6A.
- Each of the riser guides 144 couples each tendon assembly 134 to the adjacent risers 126.
- the riser guides 144 separate the risers 126 from one another and from the central tendon assembly 134, thereby preventing the risers 126 and the tendon assembly 134 from clashing or colliding with each other.
- Each of the riser guides 144 comprises a central tendon conduit 158, through which the tendon assembly 134 passes, and a plurality of riser conduits 160 through which the risers 126 pass.
- the riser guides 144 are secured to the tendon assembly 134, and they may or may not be secured to the risers 126. As mentioned above, in the preferred embodiments of the invention, there are several vertically-spaced riser guides or spacers 144, separated by a vertical distance of about 15 ft. (4.5m) to about 70 ft. (21m), depending on the design parameters of the particular platform.
- the tendon conduit 158 and the riser conduits 160 are rigidly connected and separated by a web of separation members 162. By rigidly separating the riser conduits 160 and the central tendon conduit 158, the risers 126 passing through the riser conduits 160 are separated from the central tendon 134 assembly passing through the tendon conduit 158. This prevents the risers 126 and the tendon assembly 134 from clashing or colliding below the keel of the platform due to waves, currents, and floating platform motion, which can occur even when it is subjected to light ocean currents. In other embodiments (e.g., that of Figure 2), the risers are not coupled to the tendon assembly by means such as the riser guides 144.
- riser types may be used to connect the wellhead to the platform.
- the various types of risers include those used for drilling, production, and workover, as will occur to those skilled in the pertinent arts.
- the risers are drilling risers used with full sub-sea blow-out preventor (BOP) stacks, pressure risers with surface BOPs, and those used with split BOPs (e.g., a surface BOP for well control and a limited function BOP on the seabed).
- BOP blow-out preventor
- Still further embodiments may employ production risers and workover risers used with surface trees, sub-sea trees, split trees, wet trees, dry trees, or any other type of tree that may suggest itself to those skilled in the pertinent arts.
- the platform is designed for vertical entry into the well.
- the platform may be designed for any other directional entry into the well.
- the spring characteristics of the risers and/or tendons when acting together, have to be such that the riser system does not respond significantly to the waves, taking into account the mass of the system and the draft of the floating platform.
- a plurality of risers and/or tendons will act together with a spring characteristic and a strength characteristic for the group of risers and/or tendons. Said differently, the risers and /or tendons act as a system, and their structural and spring properties achieve a uniform behavior for the group of riser and/or tendons.
- One of the key aspects of this invention is the interaction between the risers or of the risers with the tendons when subjected to the movement of the floating support.
- the distance between the wellhead on the seabed and the riser slot at the keel increases for the upstream riser and decreases for the downstream riser. Should a tendon be used, these distances will be also different.
- the spring characteristics in consideration of the hydrodynamic and gravitational forces, have to be selected so that the riser system will act in unison, and the separation between the risers will be maintained to avoid clashing and collisions as the floating platform moves.
- Figures 1-4 illustrate the use of the present invention in a spar type floating platform.
- the invention may be applied to any deep draft floating platform, such as for example, conventional deep draft submersible platforms or self-installing deep draft submersible platforms.
- FIG 8 shows the use of the present invention in a deep draft semi-submersible platform 600.
- a vertically restrained buoy 606 which supports a plurality of top-tensioned risers (TTRs) 608, is guided within the hull of the deep draft semi-submersible platform 600 by a lower guide assembly 610 provided in the base 612 of the floating platform 600, and an upper guide assembly 614 provided in a work deck 616 supported by the hull.
- the single buoy 606 supports only a well deck 618 and the TTRs 608.
- the buoy 606 can be designed to support the drilling deck and the drilling equipment as shown in Figure 4 for a spar-type platform.
- the buoy 606 is vertically restrained by the TTRs 608 only (as shown in Figure 3 for a spar-type platform).
- a tendon assembly coupled or uncoupled with the riser can be used to vertically restrain the buoy 606.
- this vertically restrained buoy 606 will not be protected by a center well in the splash zone, and will be subjected to wave and current action which can lead to VIV problems.
- the tension of the riser system can be designed to limit the VIV problem, or VIV strakes (not shown) can be provided on the outer periphery of the buoy 606.
- the vertically restrained buoy is guided by guide assemblies provided in the floating platform in at least two locations (upper and lower), whether the platform is a spar-type platform or a deep draft semi-submersible platform. While the floating platform is pitching, the contact loads between the buoy and the guide assemblies provide to the floating platform a restoring moment. This restoring moment allows an improvement (reducing the pitch angle) in the pitch motion of the floating structure. Indeed, this resulting moment is proportional to the weight of the risers supported by the buoy (which can be quite important, especially in deeper water).
- FIG. 7 shows another embodiment of the vertically restrained buoy.
- the vertically restrained buoy comprises a single, large buoyancy can.
- the buoy must be divided into compartments by a plurality of internal lateral bulkheads, thereby increasing the cost of manufacturing the buoy.
- the intersections between the risers and the bulkheads must be sealed by welding using a heavy welding procedure.
- a vertically restrained buoyancy apparatus 700 comprises an assembly of a plurality of vertical tubes 702 closely spaced and connected together by vertically-elongated webs 704. This arrangement provides a high degree of compartmentalization with few bulkheads and thus at a reduced cost.
- the risers 126 can be arranged around the vertical tubes 702 (i.e. in the interstices defined in between the vertical tubes) and will not have to cross through any buoyancy compartment, thereby avoiding the problem of sealing the intersections of the risers with the bulkheads.
- the well deck is supported directly by the vertically restrained buoy, the surface trees are attached on the well deck, and there are no relative motions between the surface trees and the well deck.
- high pressure flexible jumpers can be used to connect each sub-sea tree to the production deck manifold.
- the single buoyancy apparatus 106 includes the well deck 130 arranged on its top surface. Since the risers 126 are connected to the same buoyancy apparatus 106, they act as a single riser system, and surface trees 170 connected to upper ends of the risers 126 can be rigidly attached to the top of the buoyancy apparatus 106.
- all the surface trees 170 can be connected to a manifold 172 situated on the well deck 130 (rather than the production deck) with rigid piping 174.
- the crude oil will be choked down by a pressure-reduction choke 176 in the inlet of the manifold 172, and, contrary to the prior art, as few as one low pressure flexible jumper 178 (or, alternatively an articulated rigid arm, not shown) can be used to carry the crude oil to the processing equipment on the production deck 116.
- the use of just one flexible jumper 178, or perhaps a few flexible jumpers (or articulated rigid arms) will considerably reduce the cost of the riser system as well as the required deck room.
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Ocean & Marine Engineering (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Structural Engineering (AREA)
- Civil Engineering (AREA)
- Architecture (AREA)
- Earth Drilling (AREA)
Abstract
Description
- This application claims the benefit, under 35 U.S.C. Section 119(e), of co-pending Provisional Application No. 60/478,914, filed June 16, 2003, and it is a continuation-in-part of co-pending Application Serial No 10/213,967, filed August 7, 2002, the disclosures of which are incorporated herein by reference.
- The present invention relates to offshore platforms, and specifically to offshore platforms designed for dry tree applications. More particularly, the present invention relates to a new production and/or drilling riser system used in deep draft dry tree offshore platforms.
- Conventional dry tree offshore platforms are low heave floating platforms, such as spars, TLPs (Tension Leg Platforms), and deep draft semi-submersible platforms. These platforms are able to support a plurality of vertical production and/or drilling risers. These platforms can comprise a well deck, where the surface trees (arranged on top of the riser) will be located, and a production deck where the petroleum product (e.g., crude oil or natural gas) will be distributed to a processing facility to separate water, oil and gas. These two decks are part of the hull of the offshore platform. In a conventional dry tree offshore platform, vertical risers running from the well head to the well deck are supported by a tensioning apparatus. These vertical risers are called Top Tensioned Risers (TTRs).
- Offshore environmental conditions are often harsh. Actions of wind, waves and currents can have significant effects on an offshore structure, especially in the uppermost layer of the sea, between the surface and a depth of about 150 - 300 ft. (about 45m to about 90m), which is called the "near surface wave action zone". These actions attenuate with the water depth. In TLPs or semi-submersible platforms, the vertical risers are subjected to the effects of waves and currents in the splash zone, which puts strain on the risers and can lead to VIV (Vortex Induced Vibrations), thereby requiring expensive VIV strakes to be installed on each riser. In spar platforms, the vertical risers are protected from the effects of waves and currents in the splash zone by a center well.
- There are two conventional designs for applying tension to the TTRs respectively illustrated in Figures 10A and 10B. The first design, shown in Figure 10A, uses one or more passive buoyancy cans 10 to independently support a
riser 12. Figure 10A shows a top tensionedriser arrangement 12 with buoyancy cans 10, of a type that is mainly employed on spar-type floating platforms, as disclosed and claimed in US 4,702,321 - Horton. Each riser 10 extends vertically from awellhead 14 on the seabed to the top of a welldeck 18 of the offshore platform. The riser passes from thewell head 14 through akeel joint 20 into the center well 22 of the buoyancy cans 10. Inside the center well 22, theriser 12 passes through astem pipe 24 that passes through the center of the buoyancy cans 10. Thestem pipe 24 extends above the buoyancy cans 10 and supports thewell deck 18 to which theriser 12 and asurface tree 26 are attached. The buoyancy cans 10 and thestem pipe 24 are guided at several locations in the center well 22 by a plurality ofriser guides 28. Because therisers 12 are independently supported by the buoyancy cans 10 (relative to the hull), the hull is able to move up and down relative to therisers 12, and thus therisers 12 are isolated from the heave motions of the offshore platform. The buoyancy cans 10 need to provide enough buoyancy to support the required top tension in therisers 12, as well as the combined weight of the cans 10, thestem pipe 24, and thesurface tree 26. With increased depth, the buoyancy required to support the riser system will correspondingly increase, requiring larger buoyancy cans 10. Consequently, the size of the center well 22 will increase proportionately. Designing and manufacturing individual buoyancy cans 10 for eachriser 12 is also costly. - The second conventional design, shown in Figure 10B, uses an active hydraulic tensioning mechanism to independently support the
risers 12. Eachriser 12 extends vertically from thewellhead 14 to theproduction deck 32 of the offshore platform. Theriser 12 is supported by activehydraulic cylinders 30 connected to thewell deck 18 of the offshore platform, allowing the hull to move up and down relative to therisers 12 and thus partially isolating therisers 12 from the heave motions of the hull. Asurface tree 26 is connected to the top of theriser 12. As the required tension and stroke increase in magnitude, the size of thehydraulic cylinders 30 correspondingly increases and may become prohibitively expensive. Furthermore, the loads have to be supported by the offshore platform. - For TLPs and deep draft semi-submersible platforms, riser tensioning systems similar to the above-described designs can be used, although designs employing hydraulic tensioners are more common.
- In both designs, the tensioning device allows the isolation of the risers from the heave motions of the offshore platform. However, as each riser is independently supported, the well deck as well as the production deck will move up and down relative to the surface trees. Consequently, in order to absorb these motions, high pressure flexible jumpers 34 (Figures 10A and 10B) are required to connect each surface tree in the well deck area to a manifold (not shown) on the
production deck 32 which carries the liquid petroleum product to a processing facility to separate water, oil and gas. The high pressureflexible jumpers 32 are expensive compared to rigid piping and can lead to design problems, especially in high pressure / high temperature environments. - The prior art, as exemplified in US 5,439,321, US 4,995,762 and US 4,913,238, proposes to connect all the TTRs to a single (independent from the work platform) buoyancy apparatus in order to create a small well deck TLP to receive the riser. The small well deck TLP is anchored with tendons connected to the outer periphery of the buoyancy apparatus. The small well deck TLP has a low natural period in the range of 2-3 seconds, and will have the same problems as the conventional TLP (e.g., high cost, springing and ringing problems). Furthermore, as the small well deck TLP is completely independent from the work platform, the tendons will have to be designed to limit the horizontal motion of the small well deck TLP. These concepts will require at least four tendons arranged on the outer periphery of the small well deck TLP, and risers will be arranged in between these tendons. In addition to the cost of these tendons, one must solve the problem of collision between the risers themselves, and between the risers and tendons, by providing sufficient spacing between the several risers, and between the risers and the tendons. This leads either to a large buoy to accommodate several risers, or a small number of risers supporting by the small well deck TLP. Furthermore, high pressure jumpers are still required to connect each surface tree to the manifold of the production deck. U.S. 5 439 321 discloses an interruptive mobile production system having the features recited in the preamble of the appended claim 1.
- The present invention addresses the problems just described with a riser system according to claim 1 and proposes a new passive tensioning system for top-tensioned risers in dry tree floating platforms, most advantageously spars and deep draft semi-submersible platforms. Rather than tensioning independently each vertical riser with individual buoyancy cans or individual hydraulic tensioners, the present invention provides for tensioning all the risers with a single buoyancy apparatus, which can be a large single buoyancy can or a multi cellular buoyancy apparatus. For the purposes of this description, a "deep draft" semi-submersible floating platform is defined as a low-heave platform having a draft of at least about 150 ft. (45m), and able to guide or receive top-tensioned risers.
- A first unique feature of the present invention is that, contrary to prior art (where the well deck is supported by the offshore platform), the single buoyancy apparatus includes the well deck arranged on its top surface. Since the risers are connected to the same buoyancy apparatus, they act as a single riser system, and surface trees on top of the risers can be rigidly attached on top of the buoyancy apparatus. Consequently, all the surface trees can be connected to a manifold on the well deck (not the production deck) with rigid piping. The crude oil will be choked down in the entry of the manifold, and, contrary to the prior art, one or just a few low pressure flexible jumper(s) (or rigid articulated arms) can be used to carry the liquid petroleum product (e.g., crude oil) to the processing equipment on the production deck. The use of a small number (as low as one) of low pressure flexible jumpers or articulated rigid arms will considerably reduce the cost of the riser system as well as the required deck room.
- A second unique feature is the use of concentric tendons attached at the well deck (or top of the single buoyancy apparatus) on the center line of the single buoyancy apparatus. When one tendon is used, it will be connected to the well deck on the centerline of the buoyancy apparatus. When more tendons are used, their centroid will be close to the vertical centerline of the apparatus. The use of central tendons limits the over-stressing of the risers and the requirement for a reinforced wellhead foundation, as tension loads will be withstood principally by the tendons themselves and their foundation.
- The use of concentric tendons will provide much flexibility in the design of the tendons to achieve the required dynamic behavior. Three factors are important in the design of the tendons: (1) The tendons must be strong enough to withstand the maximum static and dynamic loads imparted to them by the spar. (2) The buoyancy apparatus must impart sufficient upward tension at the top of the tendons to prevent them from going slack at the base. (3) The tendons must have sufficient axial stiffness to keep the riser system from going into resonance due to cyclic wave forces.
- Contrary to the prior art, the present invention avoids the need to have several tendons arranged in the outer periphery of the buoy, and thus reduces the cost of the riser system and simplifies the resolution of the problems of riser and riser/tendon collisions.
- Figure 1 shows a cross-sectional view of one exemplary embodiment of a floating platform in which the risers are supported by a single buoyancy system and are coupled to a central tendon assembly for restraining the vertical motion of a single buoyancy system;
- Figure 2 shows a cross sectional view of the floating platform in which the risers are supported by a single buoyancy system, vertically restrained by central tendons, the riser being independent from the central tendon;
- Figure 3 shows a cross sectional view of the floating platform in which the risers are supported by a single buoyancy system;
- Figure 4 shows a cross-sectional view of the floating platform in which the single buoyancy system also supports the drilling rig and its associated equipment;
- Figure 5 shows a top view of the well deck arrangement;
- Figure 6A is an elevational view, partially in axial cross-section, showing one exemplary embodiment of the tendon riser arrangement;
- Figure 6B is a cross-sectional view taken along
line 6B - 6B of Figure 6A; - Figure 7 shows another exemplary embodiment for the single buoyancy system wherein the buoyancy system comprises a plurality of vertical tubes closely spaced and connected together through elongated vertical webs;
- Figure 8 shows the use of the invention in a deep draft semi-submersible platform;
- Figure 9 shows one exemplary embodiment of the well deck arrangement on top of the buoyancy system; and
- Figures 10A and 10B show prior art riser systems.
- Figure 1 shows one exemplary embodiment of the invention used in a spar type floating platform 100. Figure 1 shows the spar type platform 100 having a
spar hull 102 defining a center well 1 04. A vertically restrainedbuoyancy apparatus 106 is guided in at least two locations (upper and lower) within the center well 104 of thespar hull 102. This specific spar type platform 100 comprises an upper hull and a lower hull. The upper hull and the lower hull share the continuous hollow center well 104, which surrounds and guides the center wellbuoyancy apparatus 106. The upper hull includes a cellular structure comprisingseveral compartments 108 for buoyancy purpose (void tanks and variable ballast tanks). The lower hull includes asleeve 110 with a fixedballast 112 near the bottom of the lower hull to lower the center of gravity and thus improve the stability of the platform 100. The spar type platform 100 supports awork platform 114 comprising aproduction deck 116,compartments 118 for crew quarters and utilities, and adrilling deck 120 for drilling equipment, such as adrilling rig 122. The floating platform 100 is moored withlateral mooring lines 124 in a taut leg mooring configuration or catenary mooring configuration. Thelateral mooring lines 124 are designed to limit the horizontal movement of the floating platform 100 relative to seabed wellheads to specified limits to prevent the risers (described below) from being over stressed. - Turning now to the riser system, plural top-tensioned
risers 126 are tensioned by asingle buoyancy apparatus 106 guided in the center well 104 of thespar hull 102. Thebuoyancy apparatus 106 can be a single large buoyancy can or a multi-cellular buoyancy system (described below and shown in Figure 7). Although thespar hull 102 constrains the center wellbuoyancy apparatus 106, the center wellbuoyancy apparatus 106 is itself free floating within the center well 104. Because thespar hull 102 and the center well 104 are each free-floating, thespar hull 102 moves to accommodate the environmental forces acting on it, and thus moves with respect to the vertically restrained center wellbuoyancy apparatus 106. Thus thespar hull 102 heave motion is decoupled from the center wellbuoyancy apparatus 106. This isolates therisers 126 that are supported by the center wellbuoyancy apparatus 106 from the heave motion of the spar type platform 100 due to waves and currents. Furthermore, at least first and second pluralities ofguides 128 are provided in the center well 104 at selected, axially-spaced locations, and at least at upper and lower locations, to guide thebuoyancy apparatus 106 within the center well 104. By reducing the peripheral gap between thespar hull 102 and thebuoyancy apparatus 106, theguides 128 significantly reduce the impact loads between thehull 102 and thebuoyancy apparatus 106 due to wave and current actions on the outer hull. Preferably, thebuoyancy apparatus 106 and theguides 128 are in actual physical contact. To absorb, and thereby further reduce, the impact loads, theguides 128 advantageously include compliant pads (such as elastomeric pads) (not shown) that are positioned to be compressed against thebuoyancy apparatus 106. - A unique feature of this invention is that a
well deck 130 is positioned on top of thebuoyancy apparatus 106, and all therisers 126 extend from thewell deck 130 towellheads 132 on the seabed. - In this specific embodiment, at least one
central tendon assembly 134, comprising at least two concentric tubular tendon elements 136 (Figures 6A, 6B), secures thebuoyancy apparatus 106 to the seabed. As shown in Figure 1, thetendon assembly 134 is attached at its upper end to the center of thewell deck 130, and it extends down along the centerline of thebuoyancy apparatus 126 to a tendon foundation in the seabed. The tendon foundation is of conventional design, described more fully below, comprising acaisson pile 138 anchored in the seabed, and aconnective sleeve 140 connecting thetendon assembly 134 to thecaisson pile 138. The advantage of using acentral tendon assembly 134 is that it can be designed (in terms of the physical characteristics of the tendons the tendon foundation) to withstand most of the tension load, thereby reducing the tension loads in therisers 126. Thus, the requirement for reinforced foundations for thewellhead 132 will be further reduced, which is particularly advantageous in ultra deep water where the tension requirement can be quite critical. - As shown in Figures 6A and 6B, the
tendon assembly 134 may be designed specifically as a tendon, or it may be designed as a riser that functions as a tendon with a reinforced wellhead foundation. In this embodiment, thetendon assembly 134 and a plurality of surroundingrisers 126 are coupled together with a plurality of vertically-spaced riser spacers or guides 144, only one of which is shown in the drawings. The coupling of therisers 126 with thetendon assembly 134 helps prevent therisers 126 and thetendon assembly 134 from clashing or colliding with one another due to floating platform movement. It will not be necessary to space the several tendon assemblies from each other to avoid colliding, and a smaller center well 104 can be used which will significantly reduce the cost of theriser assembly 134 as well as the cost of the floating platform 100. Furthermore, the tension factor required for therisers 126 will be smaller, because the risk of colliding is reduced, thus reducing the size of thebuoyancy apparatus 126. The coupling of therisers 126 with thetendon assembly 134, as well as the design of thetendon assembly 134 and theriser 126, will be explained in further detail below. - As shown in Figure 1, the upper portions of the
risers 126 are uncoupled from thetendon assembly 134 within the upper portion of the center well 104, to allow the connection of eachriser 126 to arespective surface tree 170, and the connection oftendon assembly 134 to a tendon socket or slot 146 (Figure 5) in thewell deck 130. Similarly, the bottom portions of therisers 126 are uncoupled from thetendon assembly 134 to allow the connection of therisers 126 to theirrespective wellheads 132 and the connection of the tendon assembly to the tendon foundation. - Figure 2 shows another exemplary embodiment of the invention used in a spar
type floating platform 200, which includesrisers 226 that are uncoupled from atendon assembly 234. This embodiment provides a simplified riser and tendon construction (no need of riser spacers or guides), but therisers 226 and thetendon assembly 234 will have to be sufficiently spaced and will have to be tensioned sufficiently to avoid any collision between therisers 226 themselves and between therisers 226 and thetendon assembly 234. Accordingly, this embodiment requires a center well 204 that must be larger than that of the embodiment of Figure 1. - Figure 3 shows another exemplary embodiment of the invention used in a spar
type floating platform 300. In this particular embodiment, there is no specific tendon used for vertically restraining thesingle buoyancy apparatus 306. Instead, this embodiment employsrisers 326 andwellhead foundations 346 that are designed to vertically restrain the center wellbuoyancy apparatus 306. - Figure 4 shows another exemplary embodiment of the invention used in a spar
type floating platform 400. This particular embodiment employs a center wellbuoyancy apparatus 406 that, in addition to awell deck 430, supports adrilling deck 420 with adrilling rig 422 and its associated equipment (drilling and work over), while the work platform supported by the floating structure comprises aproduction deck 416 withcompartments 418 for crew quarters and utilities. Thedecks buoyancy apparatus 406 is vertically restrained, the drilling and work over operations will be less weather dependant. - In some embodiments, because there will be no relative vertical motion between the drilling riser and the drilling rig, there will be no requirement for a slip joint arranged on the drilling riser to absorb these vertical motions. The embodiment of Figure 4 employs
risers 426 andtendons 442 that are coupled; however, the risers and the tendons can be uncoupled as shown in Figure 2, or the buoyancy apparatus can be vertically restrained by the riser itself, as shown in Figure 3. The embodiment of Figure 4 does, however, require additional buoyancy to support the extra weight of the drilling/work over equipment. - As illustrated in Figures 1-4, the tendons and/or the risers are secured to the seabed at one end (wellhead or tendon foundation), and to the well deck on the center well buoyancy apparatus at the other end.
- Figure 5 shows a horizontal cross sectional view of an example of a
well deck assembly 500. The well deck assembly includes awell deck 130 having a tendon socket orslot 146 in its center to receive atendon assembly 134. Around thetendon slot 146 are several riser sockets orslots 548. There is a space that serves as a tendon riser center well 550 around thetendon socket 146 to provide space for running equipment down to the seabed (for example landing bases, blow-out preventers, or any other equipment that will occur to those of ordinary skill in the art). On either side of the tendon riser center well 550 is a drilling well ormoon pool 552. The moon pools 552 also provide space for performing drilling and work over operations or for running equipment down to the seabed. As shown in Figure 5, the center wellbuoyancy apparatus 106 is guided with a plurality of guides 128 (four guides, in this example), arranged around its perimeter. The number ofguides 128 may be varied from as few as two to five or more, depending on the loads they are to absorb. - In Figures 1 to 5, only one
tendon assembly 134 attached to thewell deck 130 and extending down the centerline of thebuoyancy apparatus 106 is shown. However, in other embodiments, there may be more than one tendon assembly aligned and/or parallel with the vertical centerline of the buoyancy apparatus. The various other embodiments may employ multiple tendon assemblies (not illustrated), closely arranged around the central tendon assembly. - As further shown in Figures 1-4, the
tendon assembly 134 is secured to the seabed by acaisson pile 138, which is alternatively called an anchor caisson or a suction pile. Thecaisson pile 138 secures thetendon assembly 134 to the seabed. As shown in Figure 1, thetendon assembly 134 may optionally be connected to the caisson pile by thetendon connection sleeve 140, which is located in the center of thecaisson pile 138, through which the bottom end of thetendon assembly 134 is fixed to the seabed.Radial plates 154 connect thetendon assembly 134 to the interior wall of theconnection sleeve 140. - To install the
caisson pile 138, in one embodiment, thecaisson pile 138 is pushed into the seabed by pumping water out of its interior. As water is pumped out, the ambient external water pressure pushes thecaisson pile 138 down into the seabed. In other embodiments, thecaisson pile 138 is pushed into the seabed by means of submersible pumps (not shown), airlifts (not shown), or any other method that may suggest itself to those of ordinary skill in the art. With thecaisson pile 138 firmly anchored in the seabed, thetendon connection sleeve 140 connects thetendon assembly 134 to thecaisson pile 138, thereby securing thetendon assembly 134 to the seabed. - In still another embodiment, at least one of the
tubular tendon elements 136 of thetendon assembly 134 is drilled into the seabed and anchored therein by cement. This increases the pull-out resistance of thetendon assembly 134. Thetendon connection sleeve 140 is extended out of the bottom of thecaisson pile 138, thereby providing a connector through which thetendon elements 136 are drilled and connected. - It will be appreciated that the
tendon assembly 134 may be secured to the seabed by any other method that may suggest itself to those of ordinary skill in the art. - Figures 6A and 6B show the structural details of one exemplary embodiment of a
tendon assembly 134. Thetendon assembly 134 comprises multiple (at least two) concentrictubular tendon elements 136. The concentrictubular elements 136 are secured to thewell deck 130 on the vertical centerline of the center wellbuoyancy apparatus 106, and they extend down to an anchor assembly at the seabed, as discussed above. The use of concentrictubular tendon elements 136 provides great flexibility in the design of the tendons to achieve the required dynamic behavior. - Three factors are important in the design of the tendon assemblies 134: (1) The
tendon assemblies 134 must be strong enough to withstand the maximum static and dynamic loads imparted on them by thebuoyancy apparatus 106. (2) Thebuoyancy apparatus 106 must impart sufficient upward tension at the top of thetendon assemblies 134 to prevent them from going slack at the bottom. (3) Thetendon assemblies 134 must have sufficient axial stiffness to keep the riser/tendon assembly system from going into resonance due to cyclic wave forces. By varying the number of concentrictubular tendon elements 136, both the strength and spring characteristics are varied to meet specific design requirements on a case-by-case basis, as will occur to those of ordinary skill in the art. - There are other benefits stemming from the above-described concentric tendon design. For example, corrosion and fatigue are minimized by the use of corrosion inhibitors in the annular spaces defined between the concentric
tubular elements 136. Furthermore, the use of multipletubular tendon elements 136 provides redundancy compared to prior art tendons, should one of thetubular elements 136 fail. Another benefit is that the annular spaces can be pressurized to detect cracks and to check joint integrity. - As best shown in Figure 6A, the
tubular tendon elements 136 may further comprise conventional oilfield casing joints with aflanged coupling 156. In various embodiments, the casing joints are of various sizes, depending on the required tensile loads. These loads vary on a case-by-case basis, as will occur to those of ordinary skill in the art. - In one embodiment, the
tendon assembly 134 is installed in sections, in a section-by-section sequence, using thedrilling rig 122 on the platform. Each section is installed on the deck and lowered using the rig, and the sections are connected using theflanged couplings 156. The advantages of installing thetendon assembly 134 in sections in this manner using the platform's own drilling rig will be readily apparent to those skilled in the art. - Figure 6B shows a cross section of the
tendon assembly 134 of Figure 6A, showing one of the riser guides orspacers 144, which is also shown in Figure 6A. Each of the riser guides 144 couples eachtendon assembly 134 to theadjacent risers 126. The riser guides 144 separate therisers 126 from one another and from thecentral tendon assembly 134, thereby preventing therisers 126 and thetendon assembly 134 from clashing or colliding with each other. Each of the riser guides 144 comprises acentral tendon conduit 158, through which thetendon assembly 134 passes, and a plurality ofriser conduits 160 through which therisers 126 pass. The riser guides 144 are secured to thetendon assembly 134, and they may or may not be secured to therisers 126. As mentioned above, in the preferred embodiments of the invention, there are several vertically-spaced riser guides orspacers 144, separated by a vertical distance of about 15 ft. (4.5m) to about 70 ft. (21m), depending on the design parameters of the particular platform. - The
tendon conduit 158 and theriser conduits 160 are rigidly connected and separated by a web ofseparation members 162. By rigidly separating theriser conduits 160 and thecentral tendon conduit 158, therisers 126 passing through theriser conduits 160 are separated from thecentral tendon 134 assembly passing through thetendon conduit 158. This prevents therisers 126 and thetendon assembly 134 from clashing or colliding below the keel of the platform due to waves, currents, and floating platform motion, which can occur even when it is subjected to light ocean currents. In other embodiments (e.g., that of Figure 2), the risers are not coupled to the tendon assembly by means such as the riser guides 144. - In the various embodiments of the present invention, a wide range of riser types may be used to connect the wellhead to the platform. The various types of risers include those used for drilling, production, and workover, as will occur to those skilled in the pertinent arts. For example, in alternative embodiments, the risers are drilling risers used with full sub-sea blow-out preventor (BOP) stacks, pressure risers with surface BOPs, and those used with split BOPs (e.g., a surface BOP for well control and a limited function BOP on the seabed). Still further embodiments may employ production risers and workover risers used with surface trees, sub-sea trees, split trees, wet trees, dry trees, or any other type of tree that may suggest itself to those skilled in the pertinent arts. In still another embodiment, the platform is designed for vertical entry into the well. Alternatively, the platform may be designed for any other directional entry into the well.
- The spring characteristics of the risers and/or tendons, when acting together, have to be such that the riser system does not respond significantly to the waves, taking into account the mass of the system and the draft of the floating platform. A plurality of risers and/or tendons will act together with a spring characteristic and a strength characteristic for the group of risers and/or tendons. Said differently, the risers and /or tendons act as a system, and their structural and spring properties achieve a uniform behavior for the group of riser and/or tendons.
- One of the key aspects of this invention is the interaction between the risers or of the risers with the tendons when subjected to the movement of the floating support. As an example, when the floating platform is subjected to environmental forces, the distance between the wellhead on the seabed and the riser slot at the keel increases for the upstream riser and decreases for the downstream riser. Should a tendon be used, these distances will be also different. This means that the spring characteristics, in consideration of the hydrodynamic and gravitational forces, have to be selected so that the riser system will act in unison, and the separation between the risers will be maintained to avoid clashing and collisions as the floating platform moves.
- Reference is again made to Figures 1-4. As the riser system is protected by the center well of the spar platform, the riser system will be excited only at the keel of the spar (for example, at about 500 ft or about 150m of water depth). Because the influence of waves and currents is minimized at this water depth and the area of excitation is small, the natural period of the riser assembly when the tendons and/or risers are connected does not need to be as short as the period of a conventional TLP and thus can be designed to be above the 2 to 3 second range. Thus, the requirement for axial stiffness will be reduced, and the tendon will require considerably less steel than a comparable tendon for conventional TLP.
- Figures 1-4 illustrate the use of the present invention in a spar type floating platform. However, the invention may be applied to any deep draft floating platform, such as for example, conventional deep draft submersible platforms or self-installing deep draft submersible platforms.
- Figure 8 shows the use of the present invention in a deep draft
semi-submersible platform 600. As shown, a vertically restrainedbuoy 606, which supports a plurality of top-tensioned risers (TTRs) 608, is guided within the hull of the deep draftsemi-submersible platform 600 by alower guide assembly 610 provided in thebase 612 of the floatingplatform 600, and anupper guide assembly 614 provided in awork deck 616 supported by the hull. In this specific example, thesingle buoy 606 supports only awell deck 618 and theTTRs 608. However thebuoy 606 can be designed to support the drilling deck and the drilling equipment as shown in Figure 4 for a spar-type platform. In this example, thebuoy 606 is vertically restrained by theTTRs 608 only (as shown in Figure 3 for a spar-type platform). Alternatively, however a tendon assembly coupled or uncoupled with the riser can be used to vertically restrain thebuoy 606. As opposed to a spar type platform, this vertically restrainedbuoy 606 will not be protected by a center well in the splash zone, and will be subjected to wave and current action which can lead to VIV problems. Since the diameter of the vertically restrainedbuoy 606 is large compared to ariser 608, the tension of the riser system can be designed to limit the VIV problem, or VIV strakes (not shown) can be provided on the outer periphery of thebuoy 606. - Turning now to another feature of this invention, the vertically restrained buoy is guided by guide assemblies provided in the floating platform in at least two locations (upper and lower), whether the platform is a spar-type platform or a deep draft semi-submersible platform. While the floating platform is pitching, the contact loads between the buoy and the guide assemblies provide to the floating platform a restoring moment. This restoring moment allows an improvement (reducing the pitch angle) in the pitch motion of the floating structure. Indeed, this resulting moment is proportional to the weight of the risers supported by the buoy (which can be quite important, especially in deeper water).
- Figure 7 shows another embodiment of the vertically restrained buoy. In all the embodiments already described, the vertically restrained buoy comprises a single, large buoyancy can. To achieve a high degree of compartmentalization, the buoy must be divided into compartments by a plurality of internal lateral bulkheads, thereby increasing the cost of manufacturing the buoy. Furthermore, because the risers and/or tendons pass through the buoy, the intersections between the risers and the bulkheads must be sealed by welding using a heavy welding procedure. In the embodiment shown in Figure 7, a vertically restrained
buoyancy apparatus 700 comprises an assembly of a plurality ofvertical tubes 702 closely spaced and connected together by vertically-elongated webs 704. This arrangement provides a high degree of compartmentalization with few bulkheads and thus at a reduced cost. Furthermore, therisers 126 can be arranged around the vertical tubes 702 (i.e. in the interstices defined in between the vertical tubes) and will not have to cross through any buoyancy compartment, thereby avoiding the problem of sealing the intersections of the risers with the bulkheads. - In all the described embodiments, the well deck is supported directly by the vertically restrained buoy, the surface trees are attached on the well deck, and there are no relative motions between the surface trees and the well deck. To carry the crude oil to the production deck and the process equipment to separate oil, water and gas, high pressure flexible jumpers can be used to connect each sub-sea tree to the production deck manifold. However, a unique feature of the present invention, shown in Figure 9, is that contrary to the prior art (where the well deck is supported by the offshore platform), the
single buoyancy apparatus 106 includes thewell deck 130 arranged on its top surface. Since therisers 126 are connected to thesame buoyancy apparatus 106, they act as a single riser system, andsurface trees 170 connected to upper ends of therisers 126 can be rigidly attached to the top of thebuoyancy apparatus 106. - Consequently, all the
surface trees 170 can be connected to a manifold 172 situated on the well deck 130 (rather than the production deck) withrigid piping 174. The crude oil will be choked down by a pressure-reduction choke 176 in the inlet of the manifold 172, and, contrary to the prior art, as few as one low pressure flexible jumper 178 (or, alternatively an articulated rigid arm, not shown) can be used to carry the crude oil to the processing equipment on theproduction deck 116. The use of just oneflexible jumper 178, or perhaps a few flexible jumpers (or articulated rigid arms) will considerably reduce the cost of the riser system as well as the required deck room.
Claims (12)
- A riser system for use in a deep draft floating platform, the riser system comprising:(a) a buoyancy apparatus (106) having an upper portion and a lower portion guided within the floating platform, the buoyancy apparatus having an upper surface on which is mounted a deck (130) ; and(b) at least two vertical risers (126) supported by the buoyancy apparatus and attached to the deck (130) and extending down through the buoyancy apparatus for connection to a seabed wellhead (132);the riser being characterized by:at least one tendon assembly (134) securing the buoyancy apparatus (106) to the seabed;wherein the tendon assembly (134) comprises at least two concentric tubular tendon elements (136); andwherein the tendon assembly (134) is attached to the deck (130) and extends along the vertical centerline of the buoyancy apparatus (106).
- The riser system of Claim 1, wherein the tension loads are absorbed principally by the tendon assembly (134).
- The riser system of Claim 1, wherein the platform includes a drilling deck (120) supported by the buoyancy apparatus (106).
- The riser system of Claim 1, wherein the risers are coupled to the tendon assembly (134).
- The riser system of Claim 1, wherein the risers and the tendon assembly (134) are uncoupled.
- The riser system of Claim 1, wherein the platform includes a surface tree (170) on the deck (130).
- The riser system of Claim 6, wherein the platform includes a manifold (172) on a production deck, and a jumper (178) fluidly connecting the surface tree (170) to the manifold.
- The riser system of Claim 1, wherein the buoyancy apparatus includes a moon pool.
- The riser system of Claim 1, wherein the buoyancy apparatus comprises a single elongate tubular buoy.
- The riser system of Claim 1, wherein the buoyancy apparatus comprises a plurality of interconnected elongate tubular buoys.
- The riser system of Claim 1, wherein each of the tubular tendon elements comprises a plurality of sections connected with casing joints.
- The riser system of Claim 1, wherein the tendon assembly comprises a riser specifically designed to function as a tendon.
Applications Claiming Priority (7)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US10/213,967 US6854933B2 (en) | 2002-08-07 | 2002-08-07 | Vertically restrained centerwell SPAR |
US213967 | 2002-08-07 | ||
US47891403P | 2003-06-16 | 2003-06-16 | |
US478914P | 2003-06-16 | ||
US616399 | 2003-07-09 | ||
US10/616,399 US20040052586A1 (en) | 2002-08-07 | 2003-07-09 | Offshore platform with vertically-restrained buoy and well deck |
PCT/US2003/024320 WO2004015239A2 (en) | 2002-08-07 | 2003-08-05 | Offshore platform with vertically-restrained buoy and well deck |
Publications (2)
Publication Number | Publication Date |
---|---|
EP1540127A2 EP1540127A2 (en) | 2005-06-15 |
EP1540127B1 true EP1540127B1 (en) | 2006-11-22 |
Family
ID=31721404
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP03784895A Expired - Lifetime EP1540127B1 (en) | 2002-08-07 | 2003-08-05 | Offshore platform with vertically-restrained buoy and well deck |
Country Status (7)
Country | Link |
---|---|
US (1) | US20040052586A1 (en) |
EP (1) | EP1540127B1 (en) |
AU (1) | AU2003257153A1 (en) |
BR (1) | BR0313324B1 (en) |
DK (1) | DK1540127T3 (en) |
OA (1) | OA12898A (en) |
WO (1) | WO2004015239A2 (en) |
Families Citing this family (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2881171B1 (en) * | 2005-01-21 | 2008-07-18 | D2M Consultants S A Sa | PIPELINE GUIDANCE STRUCTURE CONNECTING THE MARINE BOTTOM TO A FLOATING SUPPORT |
WO2008012358A1 (en) * | 2006-07-27 | 2008-01-31 | Single Buoy Moorings Inc. | Deep water hydrocarbon transfer system |
NO329333B1 (en) * | 2008-12-15 | 2010-09-27 | Moss Maritime As | Apparatus and method of overhauling hydrocarbon wells at sea using coil tubes, as well as using the apparatus and method |
US8443896B2 (en) | 2009-06-04 | 2013-05-21 | Diamond Offshore Drilling, Inc. | Riser floatation with anti-vibration strakes |
CN102050212B (en) * | 2009-11-04 | 2013-03-06 | 烟台来福士海洋工程有限公司 | Guiding device for folding structures |
MY187310A (en) * | 2010-04-26 | 2021-09-21 | Aker Solutions Inc | Dry-tree semi-submersible production and drilling unit |
US9422027B2 (en) | 2010-04-28 | 2016-08-23 | Floatec, Llc | Spar hull centerwell arrangement |
US8764346B1 (en) * | 2010-06-07 | 2014-07-01 | Nagan Srinivasan | Tension-based tension leg platform |
EP2616626B1 (en) | 2010-09-13 | 2018-01-03 | Magnuson Patents, LLC | Multi-operational multi-drilling system |
KR20120045858A (en) * | 2010-11-01 | 2012-05-09 | 대우조선해양 주식회사 | Drill ship for polar region |
KR20120048097A (en) * | 2010-11-05 | 2012-05-15 | 대우조선해양 주식회사 | Drill ship for polar region |
US8770131B2 (en) * | 2010-11-24 | 2014-07-08 | Floatec, Llc | Spar hull centerwell arrangement |
KR101600155B1 (en) | 2011-10-05 | 2016-03-04 | 씨호스 이퀴프먼트 코포레이션 | Method for drilling a plurality of subsea wells from a stationary floating vessel, an offshore drilling vessel, a drilling riser transport system, and an offshore vessel |
US9133670B2 (en) * | 2012-07-26 | 2015-09-15 | Cameron International Corporation | System for conveying fluid from an offshore well |
WO2015168432A1 (en) * | 2014-04-30 | 2015-11-05 | Seahorse Equipment Corp | Bundled, articulated riser system for fpso vessel |
EP3642445B1 (en) * | 2017-06-21 | 2023-12-06 | Horton Do Brasil Tecnologia Offshore, LTDA. | Offshore production systems with top tensioned tendons for supporting electrical power transmission |
US12077251B1 (en) | 2019-11-21 | 2024-09-03 | NuEnergy Partners, LP | Offshore platform tendon support system |
US12049286B1 (en) | 2019-11-21 | 2024-07-30 | NuEnergy Partners, LP | Tendon support buoyancy system and method |
US11591051B1 (en) | 2019-11-21 | 2023-02-28 | NuEnergy Partners, LP | Tendon support buoyancy system and method |
Family Cites Families (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2641040C3 (en) * | 1976-09-11 | 1980-05-14 | Marine Service Gmbh, 2000 Hamburg | Floating tank as a carrier for a gas liquefaction plant |
US4701321A (en) | 1982-05-06 | 1987-10-20 | Soft Sheen Products, Inc. | Liquid detergent with sunscreen agent |
US4456073A (en) * | 1982-08-24 | 1984-06-26 | Exxon Production Research Co. | Flexible connection apparatus |
US4606673A (en) * | 1984-12-11 | 1986-08-19 | Fluor Corporation | Spar buoy construction having production and oil storage facilities and method of operation |
US4735267A (en) * | 1985-03-11 | 1988-04-05 | Shell Oil Company | Flexible production riser assembly and installation method |
US4740109A (en) * | 1985-09-24 | 1988-04-26 | Horton Edward E | Multiple tendon compliant tower construction |
US4702321A (en) * | 1985-09-20 | 1987-10-27 | Horton Edward E | Drilling, production and oil storage caisson for deep water |
FR2610282B1 (en) * | 1987-01-29 | 1990-03-23 | Doris Engineering | FLEXIBLE MARINE PLATFORM WITH WELL HEADS ON THE SURFACE |
US4995762A (en) * | 1988-07-19 | 1991-02-26 | Goldman Jerome L | Semisubmersible vessel with captured constant tension buoy |
US4913238A (en) * | 1989-04-18 | 1990-04-03 | Exxon Production Research Company | Floating/tensioned production system with caisson |
US5147148A (en) * | 1991-05-02 | 1992-09-15 | Conoco Inc. | Heave-restrained platform and drilling system |
US5150987A (en) * | 1991-05-02 | 1992-09-29 | Conoco Inc. | Method for installing riser/tendon for heave-restrained platform |
US5439321A (en) * | 1993-03-11 | 1995-08-08 | Conoco Inc. | Interruptive mobile production system |
US6092483A (en) * | 1996-12-31 | 2000-07-25 | Shell Oil Company | Spar with improved VIV performance |
US6113314A (en) * | 1998-09-24 | 2000-09-05 | Campbell; Steven | Disconnectable tension leg platform for offshore oil production facility |
NO995239D0 (en) * | 1999-10-27 | 1999-10-27 | Applied Manufacturing Technolo | Torque-free suspension for riser tubes |
US6364021B1 (en) * | 2000-07-11 | 2002-04-02 | Halliburton Energy Services, Inc. | Well management system and method of operation |
US6712560B1 (en) * | 2000-12-07 | 2004-03-30 | Fmc Technologies, Inc. | Riser support for floating offshore structure |
-
2003
- 2003-07-09 US US10/616,399 patent/US20040052586A1/en not_active Abandoned
- 2003-08-05 WO PCT/US2003/024320 patent/WO2004015239A2/en active IP Right Grant
- 2003-08-05 OA OA1200500034A patent/OA12898A/en unknown
- 2003-08-05 DK DK03784895T patent/DK1540127T3/en active
- 2003-08-05 BR BRPI0313324-9B1A patent/BR0313324B1/en active IP Right Grant
- 2003-08-05 AU AU2003257153A patent/AU2003257153A1/en not_active Abandoned
- 2003-08-05 EP EP03784895A patent/EP1540127B1/en not_active Expired - Lifetime
Also Published As
Publication number | Publication date |
---|---|
BR0313324B1 (en) | 2013-09-10 |
US20040052586A1 (en) | 2004-03-18 |
WO2004015239A2 (en) | 2004-02-19 |
AU2003257153A8 (en) | 2004-02-25 |
OA12898A (en) | 2006-10-13 |
WO2004015239A3 (en) | 2004-06-03 |
DK1540127T3 (en) | 2007-03-26 |
AU2003257153A1 (en) | 2004-02-25 |
BR0313324A (en) | 2005-06-21 |
EP1540127A2 (en) | 2005-06-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP1540127B1 (en) | Offshore platform with vertically-restrained buoy and well deck | |
US6161620A (en) | Deepwater riser system | |
US6309141B1 (en) | Gap spar with ducking risers | |
US6227137B1 (en) | Spar platform with spaced buoyancy | |
US6092483A (en) | Spar with improved VIV performance | |
US6263824B1 (en) | Spar platform | |
US6854933B2 (en) | Vertically restrained centerwell SPAR | |
AU2008239913B2 (en) | Spar structures | |
US6884003B2 (en) | Multi-cellular floating platform with central riser buoy | |
US20080213048A1 (en) | Method for fabricating and transporting an integrated buoyancy system | |
US8764346B1 (en) | Tension-based tension leg platform | |
US20040182297A1 (en) | Riser pipe support system and method | |
US5575592A (en) | TLP tension adjust system | |
US6896062B2 (en) | Riser buoyancy system | |
US6632112B2 (en) | Buoyancy module with external frame | |
US6805201B2 (en) | Internal beam buoyancy system for offshore platforms | |
US20150337514A1 (en) | Offshore System with Subsea Riser | |
US6854516B2 (en) | Riser buoyancy system | |
WO1998029299A1 (en) | Spar with features against vortex induced vibrations | |
KR102477560B1 (en) | Hybrid offshore structure | |
Wanvik et al. | Deep water moored semisubmersible with dry wellheads and top tensioned well risers | |
Xu et al. | Conceptual Design for Utilizing Buoyancy Can to Support Spar Drilling Riser | |
Xu et al. | Design Features of Risers for the Extendable Draft Platform (EDP) | |
GB2329205A (en) | Riser installation method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 20050307 |
|
AK | Designated contracting states |
Kind code of ref document: A2 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LI LU MC NL PT RO SE SI SK TR |
|
AX | Request for extension of the european patent |
Extension state: AL LT LV MK |
|
17Q | First examination report despatched |
Effective date: 20050628 |
|
DAX | Request for extension of the european patent (deleted) | ||
RBV | Designated contracting states (corrected) |
Designated state(s): DK FR GB IE NL |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: 8566 |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): DK FR GB IE NL |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: DK Ref legal event code: T3 |
|
ET | Fr: translation filed | ||
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
26N | No opposition filed |
Effective date: 20070823 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 14 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 15 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 16 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: NL Payment date: 20220721 Year of fee payment: 20 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: IE Payment date: 20220721 Year of fee payment: 20 Ref country code: GB Payment date: 20220721 Year of fee payment: 20 Ref country code: DK Payment date: 20220721 Year of fee payment: 20 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 20220721 Year of fee payment: 20 |
|
REG | Reference to a national code |
Ref country code: DK Ref legal event code: EUP Expiry date: 20230805 |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: MK Effective date: 20230804 |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: PE20 Expiry date: 20230804 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: MK9A |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF EXPIRATION OF PROTECTION Effective date: 20230805 Ref country code: GB Free format text: LAPSE BECAUSE OF EXPIRATION OF PROTECTION Effective date: 20230804 |