EP1533048B1 - Control of detonative cleaning apparatus - Google Patents

Control of detonative cleaning apparatus Download PDF

Info

Publication number
EP1533048B1
EP1533048B1 EP04257175A EP04257175A EP1533048B1 EP 1533048 B1 EP1533048 B1 EP 1533048B1 EP 04257175 A EP04257175 A EP 04257175A EP 04257175 A EP04257175 A EP 04257175A EP 1533048 B1 EP1533048 B1 EP 1533048B1
Authority
EP
European Patent Office
Prior art keywords
vessel
monitoring
conduit
sensor
coupled
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Not-in-force
Application number
EP04257175A
Other languages
German (de)
French (fr)
Other versions
EP1533048A1 (en
Inventor
James R Hochstein, Jr.
Michael J. Aarnio
Donald W. Kendrick
Thomas R.A. Bussing
Robert R. Niblock
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Raytheon Technologies Corp
Original Assignee
United Technologies Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from US10/718,730 external-priority patent/US7011047B2/en
Priority claimed from US10/801,215 external-priority patent/US7267134B2/en
Application filed by United Technologies Corp filed Critical United Technologies Corp
Priority to PL04257175T priority Critical patent/PL1533048T3/en
Publication of EP1533048A1 publication Critical patent/EP1533048A1/en
Application granted granted Critical
Publication of EP1533048B1 publication Critical patent/EP1533048B1/en
Not-in-force legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F28HEAT EXCHANGE IN GENERAL
    • F28GCLEANING OF INTERNAL OR EXTERNAL SURFACES OF HEAT-EXCHANGE OR HEAT-TRANSFER CONDUITS, e.g. WATER TUBES OR BOILERS
    • F28G7/00Cleaning by vibration or pressure waves
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B08CLEANING
    • B08BCLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
    • B08B7/00Cleaning by methods not provided for in a single other subclass or a single group in this subclass
    • B08B7/0007Cleaning by methods not provided for in a single other subclass or a single group in this subclass by explosions
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B08CLEANING
    • B08BCLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
    • B08B9/00Cleaning hollow articles by methods or apparatus specially adapted thereto 
    • B08B9/08Cleaning containers, e.g. tanks
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27DDETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS, OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
    • F27D19/00Arrangements of controlling devices
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27DDETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS, OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
    • F27D21/00Arrangements of monitoring devices; Arrangements of safety devices
    • F27D21/0014Devices for monitoring temperature
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27DDETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS, OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
    • F27D25/00Devices or methods for removing incrustations, e.g. slag, metal deposits, dust; Devices or methods for preventing the adherence of slag
    • F27D25/006Devices or methods for removing incrustations, e.g. slag, metal deposits, dust; Devices or methods for preventing the adherence of slag using explosives
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F28HEAT EXCHANGE IN GENERAL
    • F28GCLEANING OF INTERNAL OR EXTERNAL SURFACES OF HEAT-EXCHANGE OR HEAT-TRANSFER CONDUITS, e.g. WATER TUBES OR BOILERS
    • F28G15/00Details
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F28HEAT EXCHANGE IN GENERAL
    • F28GCLEANING OF INTERNAL OR EXTERNAL SURFACES OF HEAT-EXCHANGE OR HEAT-TRANSFER CONDUITS, e.g. WATER TUBES OR BOILERS
    • F28G15/00Details
    • F28G15/02Supports for cleaning appliances, e.g. frames
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F28HEAT EXCHANGE IN GENERAL
    • F28GCLEANING OF INTERNAL OR EXTERNAL SURFACES OF HEAT-EXCHANGE OR HEAT-TRANSFER CONDUITS, e.g. WATER TUBES OR BOILERS
    • F28G7/00Cleaning by vibration or pressure waves
    • F28G7/005Cleaning by vibration or pressure waves by explosions or detonations; by pressure waves generated by combustion processes

Definitions

  • the invention relates to industrial equipment. More particularly, the invention relates to the detonative cleaning of industrial equipment.
  • Such equipment includes furnaces (coal, oil, waste, etc.), boilers, gasifiers, reactors, heat exchangers, and the like.
  • the equipment involves a vessel containing internal heat transfer surfaces that are subjected to fouling by accumulating particulate such as soot, ash, and minerals, more integrated buildup such as slag and/or fouling, and the like.
  • particulate build-up may progressively interfere with plant operation, reducing efficiency and throughput and potentially causing damage.
  • Cleaning of the equipment is therefore highly desirable and is attended by a number of relevant considerations. Often direct access to the fouled surfaces is difficult. Additionally, to maintain revenue it is desirable to minimize downtime associated with cleaning.
  • a variety of technologies have been proposed.
  • WO 01/78912 discloses an apparatus according to the preamble of claim 1 and method for acoustic cleaning. Additional technology is disclosed in Huque, Z. Experimental Investigation of Slag Removal Using Pulse Detonation Wave Technique, DOE/HBCU/OMI Annual Symposium, Miami, FL., March 16-18, 1999 . Particular blast wave techniques are described by Hanjali ⁇ and Smajevi ⁇ in their publications: Hanjali ⁇ , K. and Smajevi ⁇ , I., Further Experience Using Detonation Waves for Cleaning Boiler Heating Surfaces, International Journal of Energy Research Vol.
  • sensors including at least one temperature sensor and at least one pressure sensor.
  • Such sensors may also include at least one thermocouple positioned on the conduit or on the vessel and at least one infrared sensor.
  • the at least one infrared sensor may include an infrared camera.
  • the sensors may also include at least one combustion emission sensor.
  • the central controller may be programmed to generate maintenance or service requests responsive to the input.
  • the control system may be programmed to communicate with a remote monitoring system.
  • the control system may be programmed to control operation of the conduit responsive to input from the sensor.
  • the control system may be programmed with a number of different cleaning processes or protocols to execute the processes responsive to corresponding sensed conditions.
  • An imaging inspection camera may be coupled to the control system for visual monitoring of the vessel interior.
  • a monitoring system for monitoring the operation of a number of remote detonative cleaning apparatus as claimed in claim 11.
  • At least one of the processor and memory may store instructions for causing the apparatus to operate.
  • the monitoring system may include one or more displays. At least one of the one or more displays may be connected to permit at least part time display of a video camera input.
  • a method for cleaning surfaces within a number of vessels at a number of locations At a central location, data is monitored regarding each of the vessels. Responsive to the monitored data for a particular one of the vessels, a detonative cleaning apparatus associated with a particular vessel is caused to be discharged to clean the surface within the particular vessel.
  • the method may be performed via a programmed control and monitoring system that is programmed to select, responsive to the monitored data, at least one of a number of at least partially predetermined cleaning protocols and to cause the discharge according to the selected protocol.
  • the method may be performed in a repeated sequential way.
  • An infrared camera may be used within each vessel to inspect the associated surface while the vessel is in operation.
  • the monitoring may include at least one of monitoring a surface emissivity within the vessel, monitoring an image of a vessel interior, and monitoring a quantity of a chemical species in the vessel interior.
  • the method may include receiving an automated maintenance or service request for at least one of the vessels. The request may be specific to one of the apparatus or may be general.
  • FIG. 1 shows a furnace 20 having an exemplary three associated soot blowers 22.
  • the furnace vessel is formed as a right parallelepiped and the soot blowers are all associated with a single common wall 24 of the vessel and are positioned at like height along the wall.
  • Other configurations are possible (e.g., a single soot blower, one or more soot blowers on each of multiple levels, and the like).
  • Each soot blower 22 includes an elongate combustion conduit 26 extending from an upstream distal end 28 away from the furnace wall 24 to a downstream proximal end 30 closely associated with the wall 24.
  • the end 30 may be well within the furnace.
  • combustion of a fuel/oxidizer mixture within the conduit 26 is initiated proximate the upstream end (e.g., within an upstreammost 10% of a conduit length) to produce a detonation wave which is expelled from the downstream end as a shockwave along with associated combustion gases for cleaning surfaces within the interior volume of the furnace.
  • Each soot blower may be associated with a fuel/oxidizer source 32.
  • An exemplary source includes a liquified or compressed gaseous fuel cylinder 34 and an oxygen cylinder 36 in respective containment structures 38 and 40.
  • the oxidizer is a first oxidizer such as essentially pure oxygen.
  • a second oxidizer may be in the form of shop air delivered from a central air source 42.
  • air is stored in an air accumulator 44.
  • Fuel, expanded from that in the cylinder 34 is generally stored in a fuel accumulator 46.
  • Each exemplary source 32 is coupled to the associated conduit 26 by appropriate plumbing below.
  • each soot blower includes a spark box 50 for initiating combustion of the fuel oxidizer mixture and which, along with the source 32, is controlled by a control and monitoring system (not shown).
  • FIG. 1 further shows the wall 24 as including a number of ports for inspection and/or measurement. Exemplary ports include an optical monitoring port 54 and a temperature monitoring port 56 associated with each soot blower 22 for respectively receiving an infrared and/or visible light video camera and thermocouple probe for viewing the surfaces to be cleaned and monitoring internal temperatures. Other probes/monitoring/sampling may be utilized, including pressure monitoring, composition sampling, and the like.
  • FIG. 2 shows further details of an exemplary soot blower 22.
  • the exemplary detonation conduit 26 is formed with a main body portion formed by a series of doubly flanged conduit sections or segments 60 arrayed from upstream to downstream and a downstream nozzle conduit section or segment 62 having a downstream portion 64 extending through an aperture 66 in the wall and ending in the downstream end or outlet 30 exposed to the furnace interior 68.
  • the term nozzle is used broadly and does not require the presence of any aerodynamic contraction, expansion, or combination thereof.
  • Exemplary conduit segment material is metallic (e.g., stainless steel).
  • the outlet 30 may be located further within the furnace if appropriate support and cooling are provided.
  • FIG. 2 further shows furnace interior tube bundles 70, the exterior surfaces of which are subject to fouling.
  • each of the conduit segments 60 is supported on an associated trolley 72, the wheels of which engage a track system 74 along the facility floor 76.
  • the exemplary track system includes a pair of parallel rails engaging concave peripheral surfaces of the trolley wheels.
  • the exemplary segments 60 are of similar length L, and are bolted end-to-end by associated arrays of bolts in the bolt holes of their respective flanges. Similarly, the downstream flange of the downstreammost of the segments 60 is bolted to the upstream flange of the nozzle 62.
  • a reaction strap 80 (e.g., cotton or thermally/structurally robust synthetic) in series with one or more metal coil reaction springs 82 is coupled to this last mated flange pair and connects the combustion conduit to an environmental structure such as the furnace wall for resiliently absorbing reaction forces associated with discharging of the soot blower and ensuring correct placement of the combustion conduit for subsequent firings.
  • additional damping (not shown) may be provided.
  • the reaction strap/spring combination may be formed as a single length or a loop. In the exemplary embodiment, this combined downstream section has an overall length L 2 .
  • Alternative resilient recoil absorbing means may include non-metal or non-coil springs or rubber or other elastomeric elements advantageously at least partially elastically deformed in tension, compression, and/or shear, pneumatic recoil absorbers, and the like.
  • the predetonator conduit segment 84 Extending downstream from the upstream end 28 is a predetonator conduit section/segment 84 which also may be doubly flanged and has a length L 3 .
  • the predetonator conduit segment 84 has a characteristic internal cross-sectional area (transverse to an axis/centerline 500 of the conduit) which is smaller than a characteristic internal cross-sectional area (e.g., mean, median, mode, or the like) of the downstream portion (60, 62) of the combustion conduit.
  • the predetonator cross-sectional area is a characterized by a diameter of between 8 cm and 12 cm whereas the downstream portion is characterized by a diameter of between 20 cm and 40 cm.
  • exemplary cross-sectional area ratios of the downstream portion to the predetonator segment are between 1:1 and 10:1, more narrowly, 2:1 and 10:1.
  • An overall length L between ends 28 and 30 may be 1-15 m, more narrowly, 5-15 m.
  • a transition conduit segment 86 extends between the predetonator segment 84 and the upstreammost segment 60.
  • the segment 86 has upstream and downstream flanges sized to mate with the respective flanges of the segments 84 and 60 has an interior surface which provides a smooth transition between the internal cross-sections thereof.
  • the exemplary segment 86 has a length L 4 .
  • An exemplary half angle of divergence of the interior surface of segment 86 is ⁇ 12°, more narrowly 5-10°.
  • a fuel/oxidizer charge may be introduced to the detonation conduit interior in a variety of ways. There may be one or more distinct fuel/oxidizer mixtures. Such mixture(s) may be premixed external to the detonation conduit, or may be mixed at or subsequent to introduction to the conduit.
  • FIG. 3 shows the segments 84 and 86 configured for distinct introduction of two distinct fuel/oxidizer combinations: a predetonator combination; and a main combination.
  • a pair of predetonator fuel injection conduits 90 are coupled to ports 92 in the segment wall which define fuel injection ports.
  • a pair of predetonator oxidizer conduits 94 are coupled to oxidizer inlet ports 96.
  • these ports are in the upstream half of the length of the segment 84.
  • each of the fuel injection ports 92 is paired with an associated one of the oxidizer ports 96 at even axial position and at an angle (exemplary 90° shown, although other angles including 180° are possible) to provide opposed jet mixing of fuel and oxidizer.
  • a purge gas conduit 98 is similarly connected to a purge gas port 100 yet further upstream.
  • An end plate 102 bolted to the upstream flange of the segment 84 seals the upstream end of the combustion conduit and passes through an igniter/initiator 106 (e.g., a spark plug) having an operative end 108 in the interior of the segment 84.
  • an igniter/initiator 106 e.g., a spark plug
  • main fuel and oxidizer are introduced to the segment 86.
  • main fuel is carried by a number of main fuel conduits 112 and main oxidizer is carried by a number of main oxidizer conduits 110, each of which has terminal portions concentrically surrounding an associated one of the fuel conduits 112 so as to mix the main fuel and oxidizer at an associated inlet 114.
  • the fuels are hydrocarbons.
  • both fuels are the same, drawn from a single fuel source but mixed with distinct oxidizers: essentially pure oxygen for the predetonator mixture; and air for the main mixture.
  • Exemplary fuels useful in such a situation are propane, MAPP gas, or mixtures thereof.
  • ethylene and liquid fuels e.g., diesel, kerosene, and jet aviation fuels.
  • the oxidizers can include mixtures such as air/oxygen mixtures of appropriate ratios to achieve desired main and/or predetonator charge chemistries.
  • monopropellant fuels having molecularly combined fuel and oxidizer components may be options.
  • the combustion conduit is initially empty except for the presence of air (or other purge gas).
  • the predetonator fuel and oxidizer are then introduced through the associated ports filling the segment 84 and extending partially into the segment 86 (e.g., to near the midpoint) and advantageously just beyond the main fuel/oxidizer ports.
  • the predetonator fuel and oxidizer flows are then shut off.
  • An exemplary volume filled the predetonator fuel and oxidizer is 1-40%, more narrowly 1-20%, of the combustion conduit volume.
  • the main fuel and oxidizer are then introduced, to substantially fill some fraction (e.g., 20-100%) of the remaining volume of the combustor conduit.
  • the main fuel and oxidizer flows are then shut off.
  • the spark box is triggered to provide a spark discharge of the initiator igniting the predetonator charge.
  • the predetonator charge being selected for very fast combustion chemistry, the initial deflagration quickly transitions to a detonation within the segment 84 and producing a detonation wave. Once such a detonation wave occurs, it is effective to pass through the main charge which might, otherwise, have sufficiently slow chemistry to not detonate within the conduit of its own accord.
  • the wave passes longitudinally downstream and emerges from the downstream end 30 as a shockwave within the furnace interior, impinging upon the surfaces to be cleaned and thermally and mechanically shocking to typically at least loosen the contamination.
  • a purge gas e.g., air from the same source providing the main oxidizer and/or nitrogen
  • a baseline flow of the purge gas may be maintained between charge/discharge cycles so as to prevent gas and particulate from the furnace interior from infiltrating upstream and to assist in cooling of the detonation conduit.
  • internal surface enhancements may substantially increase internal surface area beyond that provided by the nominally cylindrical and frustoconical segment interior surfaces.
  • the enhancement may be effective to assist in the deflagration-to-detonation transition or in the maintenance of the detonation wave.
  • FIG. 4 shows internal surface enhancements applied to the interior of one of the main segments 60.
  • the exemplary enhancement is nominally a Chin spiral, although other enhancements such as Shchelkin spirals and Smimov cavities may be utilized.
  • the spiral is formed by a helical member 120.
  • the exemplary member 120 is formed as a circular-sectioned metallic element (e.g., stainless steel wire) of approximately 8-20mm in sectional diameter. Other sections may alternatively be used.
  • the exemplary member 120 is held spaced-apart from the segment interior surface by a plurality of longitudinal elements 122.
  • the exemplary longitudinal elements are rods of similar section and material to the member 120 and welded thereto and to the interior surface of the associated segment 60.
  • Such enhancements may also be utilized to provide predetonation in lieu of or in addition to the foregoing techniques involving different charges and different combustor cross-sections.
  • the apparatus may be used in a wide variety of applications.
  • the apparatus may be applied to: the pendants or secondary superheaters, the convective pass (primary superheaters and the economizer bundles); air preheaters; selective catalyst removers (SCR) scrubbers; the baghouse or electrostatic precipitator; economizer hoppers; ash or other heat/accumulations whether on heat transfer surfaces or elsewhere, and the like.
  • SCR selective catalyst removers
  • economizer hoppers ash or other heat/accumulations whether on heat transfer surfaces or elsewhere, and the like.
  • FIG. 6 schematically shows one of a number of levels of a vessel 200. At this level, a number of combustion conduits 202A-D are positioned. In the exemplary embodiment, downstream outlets of the conduits are positioned in the interior of the vessel and upstream ends are external to the vessel. Although shown straight, the conduits may have non-straight configurations to discharge shockwaves in desired locations with desired directions.
  • Each conduit is closely associated with an interface module 204A-D which may provide local control of various operational parameters (e.g., including fuel and oxidizer introduction, purge and cooling gas introduction, initiation, and the like). Further details of an exemplary interface module are discussed below.
  • the given vessel level may also include sensors 206 and 208. However, the sensors need not be level-specific. Similarly, the conduits could be other than level-specific and other than oriented to discharge in parallel planes.
  • the sensors may be conduit-specific (e.g., close to the outlet of a specific associated conduit or to the furnace surface cleaned by such conduit) or may be more generally located.
  • the sensors may detect one or more of thermal conditions, pressures, flows, chemical conditions, and/or visual conditions. Exemplary sensor operation is discussed in further detail below.
  • the modules and sensors are coupled via communication lines 209 to a hub (e.g., ethernet) 210.
  • the sensors are coupled to the hub via the modules (e.g., coupled to the modules by communication or signal lines).
  • the modules are coupled to a central supply unit 212 via fluid and power lines 213.
  • the hub and supply unit may be level-specific, common, or some combination.
  • the hub is coupled for signal communication (e.g., via network lines 215 such as a fiber optic line, Ethernet line, or the like) to a control and monitoring system 214 of the facility (e.g., a general purpose computer running control/monitoring software) which may be specific to the vessel or central to a group of vessels at a site (e.g., a given facility).
  • the supply unit may similarly be coupled to the system 214 via the hub 210 or may exist independently.
  • the system 214 is in communication with a remote control and monitoring system 216.
  • the system 216 may be in secure communication with a number of systems 214 at a number of different sites.
  • the system 216 may be colocated with one or more of those systems 214 and off-site of the others.
  • the exemplary communication between the system 216 and systems 214 is via a wide area network 217 such as the internet.
  • Alternative public and private networks or other communication systems may be used.
  • the supply unit 212 may, itself, be fed from a remotely located tank farm 218 (e.g., a central tank farm of the facility) via lines 219 for supply of non-air gases and other fluids and from appropriate shop air and power sources (not shown) which may also be central sources of the facility).
  • the system 214 may communicate with several central systems.
  • the system 216 may be a central system of a facility owner/operator communicating with systems 214 at various facilities of that owner/operator.
  • a central system 223 may be a central system of a service vendor communicating with systems 214 of various facilities of various owners/operators either directly or via the systems 216.
  • the systems 214 may inform the system 223 that service or routine maintenance is necessary or otherwise appropriate (the decision being made at any of the systems 214, 216, or 223).
  • an emergency control panel 220 is in close proximity to the system 214.
  • the exemplary emergency control panel includes one or more status lights and one or more switches (e.g., red/green status lights and emergency kill switches for each conduit plus a master kill switch for all conduits). These are coupled by lines 222 extending to the individual interface modules.
  • the kill switches may be tripped by a technician to safe the conduits (e.g., shut the fuel and oxidizer valves, disable the ignition, and the like, to safely shut down and/or disable the associated conduits).
  • the interface modules themselves may be set up in a failsafe mode whereby a break in the associated line(s) 215 or 222 causes a module to transition to a safe mode.
  • FIGS. 7 and 8 show an exemplary interface module 204 in association with a combustion conduit 202.
  • the interface module includes a control electronics enclosure 230 from which a status light 232 extends.
  • a status light 232 extends in close proximity to the enclosure 230 are respective fuel and oxidizer valve enclosures 234 and 236 and an air accumulator 238.
  • fuel and oxidizer lines 240 and 242 extend into the valve enclosures 234 and 236 and connect with electronically-controlled valves (not shown) which, in turn, are connected via appropriate fluid lines to the conduit 202.
  • a shop air line 244 may connect to the oxidizer valve enclosure 236.
  • the control enclosure is connected via appropriate ones of the lines 209 to both the control panel 220 and to the hub 210.
  • a local kill switch 246 may be connected to the control electronics via a line 248 and may be mounted directly on the electronics enclosure 230 or in proximity thereto.
  • FIG. 9 shows exemplary control electronics from the electronics enclosure 230 of the interface module 204.
  • the electronics serve as a local control/monitoring system specific to the associated conduit.
  • the core of the electronics is a CPU emulator board 250 running interface control software.
  • the emulator 250 communicates with a relay bank 252 via lines 254 for controlling the various valves within the enclosures 234 and 236 associated with the respective relays via valve control lines 256.
  • the valves are fail-closed.
  • the emulator 250 receives a timer input via a line 258 connected to conduit-mounted ionization probes (e.g., two probes longitudinally spaced near the conduit downstream end and representing subsets of the generically-identified sensors 206).
  • the emulator communicates via lines 260 with an ethernet based controller 262 that interfaces with the hub 210 via the lines 209.
  • the controller 262 is configured to receive input from thermocouples and resistance temperature detectors (RTD) via lines 270, from pressure sensors via analog lines 272, and limit switches via discrete input lines 274.
  • the thermocouples may be connected at various locations along the conduit, to the valve enclosures, or somewhere within the vessel,.
  • the pressure sensors e.g., transducers
  • the thermocouples/RTDs may represent subsets of the generically-identified sensors 206 and 208.
  • the limit switches may verify the positioning of mechanical hardware (e.g., to confirm that enclosures are securely closed before firing).
  • UPS uninterruptible power supply
  • battery back-up 286 delivers the AC power to the power supplies 280 and 282 and the ethernet controller in the event of loss of power from the source 284.
  • a variety of means may permit the control and monitoring system 214 to decide to initiate detonative cleaning by one or more of the conduits and to determine characteristics of such cleaning.
  • the identified sensors may include combinations of imaging or non-imaging radiation sensors (e.g., IR sensors). Alternatively, or additionally, sensors external to the vessel may monitor the vessel interior through windows as described above.
  • the sensors may provide an indication of chemical emissions (e.g., pollutants). For example, ions such as CH - and OH - have characteristic frequencies which can be sensed (e.g., 324 nm and 282 nm in the IR band). Emissivity or other measurements may directly detect build-up on surfaces. Temperature measurements of fluid traveling through tube bundles may provide indications of insulative build-up on the tubes.
  • the sensors may facilitate continuous monitoring.
  • the various sensors may be used to determine the nature of any build-up (e.g., the composition of a deposit, the thickness of the deposit, and the extent of the deposit). These may be used to determine appropriate cleaning sequences/protocols characterized by the particular conduits to be discharged and the characteristics of such discharge (e.g., the nature and quantity of the particular fuel/oxidizer charge(s) to be introduced to particular conduit(s)).
  • the relative timing of the firing of different conduits may be selected to achieve desired performance (this may include delays to avoid interference or synchronization to provide a combined effect).
  • a firing sequence which may include one or more firings of one or more conduits
  • the results of such reassessment and subsequent reassessments may be used to fine tune particular cleaning protocols for future use.
  • Data from the sensors may also be used to determine the condition of the cleaning system and its components.
  • a lack of input from ion sensors may indicate a lack of detonations.
  • Pressure sensors may indicate insufficient or excess fuel or oxidizer pressures.
  • Temperature sensors may indicate conduit overheating.
  • Such abnormal condition data may cause a warning to be displayed and may cause n automated service/maintenance request to be generated.
  • the control system 214 may be programmed to generally command any of various kinds of single shot discharges and send corresponding commands to the control electronics of the individual conduits.
  • That control electronics may store the information necessary to actually charge and discharge in the appropriate way for the specific shot (e.g., the fuel/oxidizer amounts).
  • the control system 214 may send a general command representative of a sharp, high power pulse to the local control electronics which, in turn, is able to generate the shot even though the fill parameters for a sharp, high power shot may differ amongst the conduits.
  • the control system 214 may further be programmed to generate combinations of such shots for particular protocols.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Cleaning In General (AREA)
  • Incineration Of Waste (AREA)
  • Bidet-Like Cleaning Device And Other Flush Toilet Accessories (AREA)
  • Magnetically Actuated Valves (AREA)
  • Cleaning By Liquid Or Steam (AREA)

Abstract

A shockwave cleaning apparatus cleans one or more surfaces within a vessel A sensor (206, 208) senses one or more thermodynamic properties associated with the vessel (200). A control system (214) is coupled to an initiator and a fuel/oxidizer source to control the firing of the apparatus responsive to input from the sensor (206, 208). <IMAGE>

Description

  • The invention relates to industrial equipment. More particularly, the invention relates to the detonative cleaning of industrial equipment.
  • Surface fouling is a major problem in industrial equipment. Such equipment includes furnaces (coal, oil, waste, etc.), boilers, gasifiers, reactors, heat exchangers, and the like. Typically the equipment involves a vessel containing internal heat transfer surfaces that are subjected to fouling by accumulating particulate such as soot, ash, and minerals, more integrated buildup such as slag and/or fouling, and the like. Such particulate build-up may progressively interfere with plant operation, reducing efficiency and throughput and potentially causing damage. Cleaning of the equipment is therefore highly desirable and is attended by a number of relevant considerations. Often direct access to the fouled surfaces is difficult. Additionally, to maintain revenue it is desirable to minimize downtime associated with cleaning. A variety of technologies have been proposed. By way of example, various technologies have been proposed in U.S. patents 5,494,004 and 6,438,191 and U.S. patent application publication 2002/0112638 . In particular, WO 01/78912 discloses an apparatus according to the preamble of claim 1 and method for acoustic cleaning. Additional technology is disclosed in Huque, Z. Experimental Investigation of Slag Removal Using Pulse Detonation Wave Technique, DOE/HBCU/OMI Annual Symposium, Miami, FL., March 16-18, 1999. Particular blast wave techniques are described by Hanjalić and Smajević in their publications: Hanjalić, K. and Smajević, I., Further Experience Using Detonation Waves for Cleaning Boiler Heating Surfaces, International Journal of Energy Research Vol. 17, 583-595 (1993) and Hanjalić, K. and Smajević, I., Detonation-Wave Technique for On-load Deposit Removal from Surfaces Exposed to Fouling: Parts I and II, Journal of Engineering for Gas Turbines and Power, Transactions of the ASME, Vol. 1, 116 223-236, January 1994. Such systems are also discussed in Yugoslav patent publications P 1756/88 and P 1728/88 . Such systems are often identified as "soot blowers" after the key application for the technology.
  • Nevertheless, there remain opportunities for further improvement in the field.
  • According to one aspect of the invention there is provided an apparatus for cleaning one or more surfaces within a vessel as claimed in claim 1.
  • In various preferred embodiments, there may be a number of such sensors including at least one temperature sensor and at least one pressure sensor. Such sensors may also include at least one thermocouple positioned on the conduit or on the vessel and at least one infrared sensor. The at least one infrared sensor may include an infrared camera. The sensors may also include at least one combustion emission sensor. The central controller may be programmed to generate maintenance or service requests responsive to the input. The control system may be programmed to communicate with a remote monitoring system. The control system may be programmed to control operation of the conduit responsive to input from the sensor. The control system may be programmed with a number of different cleaning processes or protocols to execute the processes responsive to corresponding sensed conditions. An imaging inspection camera may be coupled to the control system for visual monitoring of the vessel interior.
  • According to another aspect of the invention there is provided a monitoring system for monitoring the operation of a number of remote detonative cleaning apparatus as claimed in claim 11.
  • In various preferred embodiments, at least one of the processor and memory may store instructions for causing the apparatus to operate. The monitoring system may include one or more displays. At least one of the one or more displays may be connected to permit at least part time display of a video camera input.
  • According to another aspect of the invention there is provided a method for cleaning surfaces within a number of vessels at a number of locations. At a central location, data is monitored regarding each of the vessels. Responsive to the monitored data for a particular one of the vessels, a detonative cleaning apparatus associated with a particular vessel is caused to be discharged to clean the surface within the particular vessel.
  • In various preferred embodiments, the method may be performed via a programmed control and monitoring system that is programmed to select, responsive to the monitored data, at least one of a number of at least partially predetermined cleaning protocols and to cause the discharge according to the selected protocol. The method may be performed in a repeated sequential way. An infrared camera may be used within each vessel to inspect the associated surface while the vessel is in operation. The monitoring may include at least one of monitoring a surface emissivity within the vessel, monitoring an image of a vessel interior, and monitoring a quantity of a chemical species in the vessel interior. The method may include receiving an automated maintenance or service request for at least one of the vessels. The request may be specific to one of the apparatus or may be general.
  • The details of one or more embodiments of the invention are set forth in the accompanying drawings and the description below. Other features, objects, and advantages of the invention will be apparent from the description and drawings, and from the claims.
    • FIG. 1 is a view of an industrial furnace associated with several soot blowers positioned to clean a level of the furnace.
    • FIG. 2 is a side view of one of the blowers of FIG. 1.
    • FIG. 3 is a partially cut-away side view of an upstream end of the blower of FIG. 2.
    • FIG. 4 is a longitudinal sectional view of a main combustor segment of the soot blower of FIG. 2.
    • FIG. 5 is an end view of the segment of FIG. 4.
    • FIG. 6 is a schematic view of a control system for multiple cleaning apparatus.
    • FIG. 7 is a top view of an exemplary interface module of the apparatus of FIG. 6.
    • FIG. 8 is a side view of the interface module of FIG. 7.
    • FIG. 9 is a schematic view of control electronics for the interface module of FIG. 7.
  • Like reference numbers and designations in the various drawings indicate like elements.
  • FIG. 1 shows a furnace 20 having an exemplary three associated soot blowers 22. In the illustrated embodiment, the furnace vessel is formed as a right parallelepiped and the soot blowers are all associated with a single common wall 24 of the vessel and are positioned at like height along the wall. Other configurations are possible (e.g., a single soot blower, one or more soot blowers on each of multiple levels, and the like).
  • Each soot blower 22 includes an elongate combustion conduit 26 extending from an upstream distal end 28 away from the furnace wall 24 to a downstream proximal end 30 closely associated with the wall 24. Optionally, however, the end 30 may be well within the furnace. In operation of each soot blower, combustion of a fuel/oxidizer mixture within the conduit 26 is initiated proximate the upstream end (e.g., within an upstreammost 10% of a conduit length) to produce a detonation wave which is expelled from the downstream end as a shockwave along with associated combustion gases for cleaning surfaces within the interior volume of the furnace. Each soot blower may be associated with a fuel/oxidizer source 32. Such source or one or more components thereof may be shared amongst the various soot blowers. An exemplary source includes a liquified or compressed gaseous fuel cylinder 34 and an oxygen cylinder 36 in respective containment structures 38 and 40. In the exemplary embodiment, the oxidizer is a first oxidizer such as essentially pure oxygen. A second oxidizer may be in the form of shop air delivered from a central air source 42. In the exemplary embodiment, air is stored in an air accumulator 44. Fuel, expanded from that in the cylinder 34 is generally stored in a fuel accumulator 46. Each exemplary source 32 is coupled to the associated conduit 26 by appropriate plumbing below. Similarly, each soot blower includes a spark box 50 for initiating combustion of the fuel oxidizer mixture and which, along with the source 32, is controlled by a control and monitoring system (not shown). FIG. 1 further shows the wall 24 as including a number of ports for inspection and/or measurement. Exemplary ports include an optical monitoring port 54 and a temperature monitoring port 56 associated with each soot blower 22 for respectively receiving an infrared and/or visible light video camera and thermocouple probe for viewing the surfaces to be cleaned and monitoring internal temperatures. Other probes/monitoring/sampling may be utilized, including pressure monitoring, composition sampling, and the like.
  • FIG. 2 shows further details of an exemplary soot blower 22. The exemplary detonation conduit 26 is formed with a main body portion formed by a series of doubly flanged conduit sections or segments 60 arrayed from upstream to downstream and a downstream nozzle conduit section or segment 62 having a downstream portion 64 extending through an aperture 66 in the wall and ending in the downstream end or outlet 30 exposed to the furnace interior 68. The term nozzle is used broadly and does not require the presence of any aerodynamic contraction, expansion, or combination thereof. Exemplary conduit segment material is metallic (e.g., stainless steel). The outlet 30 may be located further within the furnace if appropriate support and cooling are provided. FIG. 2 further shows furnace interior tube bundles 70, the exterior surfaces of which are subject to fouling. In the exemplary embodiment, each of the conduit segments 60 is supported on an associated trolley 72, the wheels of which engage a track system 74 along the facility floor 76. The exemplary track system includes a pair of parallel rails engaging concave peripheral surfaces of the trolley wheels. The exemplary segments 60 are of similar length L, and are bolted end-to-end by associated arrays of bolts in the bolt holes of their respective flanges. Similarly, the downstream flange of the downstreammost of the segments 60 is bolted to the upstream flange of the nozzle 62. In the exemplary embodiment, a reaction strap 80 (e.g., cotton or thermally/structurally robust synthetic) in series with one or more metal coil reaction springs 82 is coupled to this last mated flange pair and connects the combustion conduit to an environmental structure such as the furnace wall for resiliently absorbing reaction forces associated with discharging of the soot blower and ensuring correct placement of the combustion conduit for subsequent firings. Optionally, additional damping (not shown) may be provided. The reaction strap/spring combination may be formed as a single length or a loop. In the exemplary embodiment, this combined downstream section has an overall length L2. Alternative resilient recoil absorbing means may include non-metal or non-coil springs or rubber or other elastomeric elements advantageously at least partially elastically deformed in tension, compression, and/or shear, pneumatic recoil absorbers, and the like.
  • Extending downstream from the upstream end 28 is a predetonator conduit section/segment 84 which also may be doubly flanged and has a length L3. The predetonator conduit segment 84 has a characteristic internal cross-sectional area (transverse to an axis/centerline 500 of the conduit) which is smaller than a characteristic internal cross-sectional area (e.g., mean, median, mode, or the like) of the downstream portion (60, 62) of the combustion conduit. In an exemplary embodiment involving circular sectioned conduit segments, the predetonator cross-sectional area is a characterized by a diameter of between 8 cm and 12 cm whereas the downstream portion is characterized by a diameter of between 20 cm and 40 cm. Accordingly, exemplary cross-sectional area ratios of the downstream portion to the predetonator segment are between 1:1 and 10:1, more narrowly, 2:1 and 10:1. An overall length L between ends 28 and 30 may be 1-15 m, more narrowly, 5-15 m. In the exemplary embodiment, a transition conduit segment 86 extends between the predetonator segment 84 and the upstreammost segment 60. The segment 86 has upstream and downstream flanges sized to mate with the respective flanges of the segments 84 and 60 has an interior surface which provides a smooth transition between the internal cross-sections thereof. The exemplary segment 86 has a length L4. An exemplary half angle of divergence of the interior surface of segment 86 is ≤ 12°, more narrowly 5-10°.
  • A fuel/oxidizer charge may be introduced to the detonation conduit interior in a variety of ways. There may be one or more distinct fuel/oxidizer mixtures. Such mixture(s) may be premixed external to the detonation conduit, or may be mixed at or subsequent to introduction to the conduit. FIG. 3 shows the segments 84 and 86 configured for distinct introduction of two distinct fuel/oxidizer combinations: a predetonator combination; and a main combination. In the exemplary embodiment, in an upstream portion of the segment 84, a pair of predetonator fuel injection conduits 90 are coupled to ports 92 in the segment wall which define fuel injection ports. Similarly, a pair of predetonator oxidizer conduits 94 are coupled to oxidizer inlet ports 96. In the exemplary embodiment, these ports are in the upstream half of the length of the segment 84. In the exemplary embodiment, each of the fuel injection ports 92 is paired with an associated one of the oxidizer ports 96 at even axial position and at an angle (exemplary 90° shown, although other angles including 180° are possible) to provide opposed jet mixing of fuel and oxidizer. Discussed further below, a purge gas conduit 98 is similarly connected to a purge gas port 100 yet further upstream. An end plate 102 bolted to the upstream flange of the segment 84 seals the upstream end of the combustion conduit and passes through an igniter/initiator 106 (e.g., a spark plug) having an operative end 108 in the interior of the segment 84.
  • In the exemplary embodiment, the main fuel and oxidizer are introduced to the segment 86. In the illustrated embodiment, main fuel is carried by a number of main fuel conduits 112 and main oxidizer is carried by a number of main oxidizer conduits 110, each of which has terminal portions concentrically surrounding an associated one of the fuel conduits 112 so as to mix the main fuel and oxidizer at an associated inlet 114. In exemplary embodiments, the fuels are hydrocarbons. In particular exemplary embodiments, both fuels are the same, drawn from a single fuel source but mixed with distinct oxidizers: essentially pure oxygen for the predetonator mixture; and air for the main mixture. Exemplary fuels useful in such a situation are propane, MAPP gas, or mixtures thereof. Other fuels are possible, including ethylene and liquid fuels (e.g., diesel, kerosene, and jet aviation fuels). The oxidizers can include mixtures such as air/oxygen mixtures of appropriate ratios to achieve desired main and/or predetonator charge chemistries. Further, monopropellant fuels having molecularly combined fuel and oxidizer components may be options.
  • In operation, at the beginning of a use cycle, the combustion conduit is initially empty except for the presence of air (or other purge gas). The predetonator fuel and oxidizer are then introduced through the associated ports filling the segment 84 and extending partially into the segment 86 (e.g., to near the midpoint) and advantageously just beyond the main fuel/oxidizer ports. The predetonator fuel and oxidizer flows are then shut off. An exemplary volume filled the predetonator fuel and oxidizer is 1-40%, more narrowly 1-20%, of the combustion conduit volume. The main fuel and oxidizer are then introduced, to substantially fill some fraction (e.g., 20-100%) of the remaining volume of the combustor conduit. The main fuel and oxidizer flows are then shut off. The prior introduction of predetonator fuel and oxidizer past the main fuel/oxidizer ports largely eliminates the risk of the formation of an air or other non-combustible slug between the predetonator and main charges. Such a slug could prevent migration of the combustion front between the two charges.
  • With the charges introduced, the spark box is triggered to provide a spark discharge of the initiator igniting the predetonator charge. The predetonator charge being selected for very fast combustion chemistry, the initial deflagration quickly transitions to a detonation within the segment 84 and producing a detonation wave. Once such a detonation wave occurs, it is effective to pass through the main charge which might, otherwise, have sufficiently slow chemistry to not detonate within the conduit of its own accord. The wave passes longitudinally downstream and emerges from the downstream end 30 as a shockwave within the furnace interior, impinging upon the surfaces to be cleaned and thermally and mechanically shocking to typically at least loosen the contamination. The wave will be followed by the expulsion of pressurized combustion products from the detonation conduit, the expelled products emerging as a jet from the downstream end 30 and further completing the cleaning process (e.g., removing the loosened material). After or overlapping such venting of combustion products, a purge gas (e.g., air from the same source providing the main oxidizer and/or nitrogen) is introduced through the purge port 100 to drive the final combustion products out and leave the detonation conduit filled with purge gas ready to repeat the cycle (either immediately or at a subsequent regular interval or at a subsequent irregular interval (which may be manually or automatically determined by the control and monitoring system)). Optionally, a baseline flow of the purge gas may be maintained between charge/discharge cycles so as to prevent gas and particulate from the furnace interior from infiltrating upstream and to assist in cooling of the detonation conduit.
  • In various implementations, internal surface enhancements may substantially increase internal surface area beyond that provided by the nominally cylindrical and frustoconical segment interior surfaces. The enhancement may be effective to assist in the deflagration-to-detonation transition or in the maintenance of the detonation wave. FIG. 4 shows internal surface enhancements applied to the interior of one of the main segments 60. The exemplary enhancement is nominally a Chin spiral, although other enhancements such as Shchelkin spirals and Smimov cavities may be utilized. The spiral is formed by a helical member 120. The exemplary member 120 is formed as a circular-sectioned metallic element (e.g., stainless steel wire) of approximately 8-20mm in sectional diameter. Other sections may alternatively be used. The exemplary member 120 is held spaced-apart from the segment interior surface by a plurality of longitudinal elements 122. The exemplary longitudinal elements are rods of similar section and material to the member 120 and welded thereto and to the interior surface of the associated segment 60. Such enhancements may also be utilized to provide predetonation in lieu of or in addition to the foregoing techniques involving different charges and different combustor cross-sections.
  • The apparatus may be used in a wide variety of applications. By way of example, just within a typical coal-fired furnace, the apparatus may be applied to: the pendants or secondary superheaters, the convective pass (primary superheaters and the economizer bundles); air preheaters; selective catalyst removers (SCR) scrubbers; the baghouse or electrostatic precipitator; economizer hoppers; ash or other heat/accumulations whether on heat transfer surfaces or elsewhere, and the like. Similar possibilities exist within other applications including oil-fired furnaces, black liquor recovery boilers, biomass boilers, waste reclamation burners (trash burners), and the like.
  • A variety of systems may be provided for monitoring and/or controlling operation of the detonative cleaning apparatus. The implementation of any particular control and monitoring system may be influenced by the physical environment including the nature and configuration of the vessel and its surfaces and the arrangement of the combustion conduit(s). FIG. 6 schematically shows one of a number of levels of a vessel 200. At this level, a number of combustion conduits 202A-D are positioned. In the exemplary embodiment, downstream outlets of the conduits are positioned in the interior of the vessel and upstream ends are external to the vessel. Although shown straight, the conduits may have non-straight configurations to discharge shockwaves in desired locations with desired directions. Each conduit is closely associated with an interface module 204A-D which may provide local control of various operational parameters (e.g., including fuel and oxidizer introduction, purge and cooling gas introduction, initiation, and the like). Further details of an exemplary interface module are discussed below. The given vessel level may also include sensors 206 and 208. However, the sensors need not be level-specific. Similarly, the conduits could be other than level-specific and other than oriented to discharge in parallel planes. The sensors may be conduit-specific (e.g., close to the outlet of a specific associated conduit or to the furnace surface cleaned by such conduit) or may be more generally located. The sensors may detect one or more of thermal conditions, pressures, flows, chemical conditions, and/or visual conditions. Exemplary sensor operation is discussed in further detail below.
  • For signal communication, the modules and sensors are coupled via communication lines 209 to a hub (e.g., ethernet) 210. In the exemplary embodiment, the sensors are coupled to the hub via the modules (e.g., coupled to the modules by communication or signal lines). For physical input (e.g., fuel, oxidizer, purge gas, coolant, power, and the like), the modules are coupled to a central supply unit 212 via fluid and power lines 213. The hub and supply unit may be level-specific, common, or some combination. The hub is coupled for signal communication (e.g., via network lines 215 such as a fiber optic line, Ethernet line, or the like) to a control and monitoring system 214 of the facility (e.g., a general purpose computer running control/monitoring software) which may be specific to the vessel or central to a group of vessels at a site (e.g., a given facility). The supply unit may similarly be coupled to the system 214 via the hub 210 or may exist independently. The system 214 is in communication with a remote control and monitoring system 216. The system 216 may be in secure communication with a number of systems 214 at a number of different sites. In such a situation, however, the system 216 may be colocated with one or more of those systems 214 and off-site of the others. The exemplary communication between the system 216 and systems 214 is via a wide area network 217 such as the internet. Alternative public and private networks or other communication systems may be used. The supply unit 212 may, itself, be fed from a remotely located tank farm 218 (e.g., a central tank farm of the facility) via lines 219 for supply of non-air gases and other fluids and from appropriate shop air and power sources (not shown) which may also be central sources of the facility). The system 214 may communicate with several central systems. For example, the system 216 may be a central system of a facility owner/operator communicating with systems 214 at various facilities of that owner/operator. A central system 223 may be a central system of a service vendor communicating with systems 214 of various facilities of various owners/operators either directly or via the systems 216. Based ultimately upon data provided by the sensors 206 and 208, the systems 214 may inform the system 223 that service or routine maintenance is necessary or otherwise appropriate (the decision being made at any of the systems 214, 216, or 223).
  • In the exemplary embodiment, an emergency control panel 220 is in close proximity to the system 214. The exemplary emergency control panel includes one or more status lights and one or more switches (e.g., red/green status lights and emergency kill switches for each conduit plus a master kill switch for all conduits). These are coupled by lines 222 extending to the individual interface modules. In the event of a control system failure which might prevent control (namely safing) of the conduits via the system 214 and hub 210, the kill switches may be tripped by a technician to safe the conduits (e.g., shut the fuel and oxidizer valves, disable the ignition, and the like, to safely shut down and/or disable the associated conduits). The interface modules themselves may be set up in a failsafe mode whereby a break in the associated line(s) 215 or 222 causes a module to transition to a safe mode.
  • FIGS. 7 and 8 show an exemplary interface module 204 in association with a combustion conduit 202. In the exemplary implementation, the interface module includes a control electronics enclosure 230 from which a status light 232 extends. In close proximity to the enclosure 230 are respective fuel and oxidizer valve enclosures 234 and 236 and an air accumulator 238. In the exemplary embodiment, fuel and oxidizer lines 240 and 242 extend into the valve enclosures 234 and 236 and connect with electronically-controlled valves (not shown) which, in turn, are connected via appropriate fluid lines to the conduit 202. Similarly, a shop air line 244 may connect to the oxidizer valve enclosure 236. The control enclosure is connected via appropriate ones of the lines 209 to both the control panel 220 and to the hub 210. A local kill switch 246 may be connected to the control electronics via a line 248 and may be mounted directly on the electronics enclosure 230 or in proximity thereto.
  • FIG. 9 shows exemplary control electronics from the electronics enclosure 230 of the interface module 204. The electronics serve as a local control/monitoring system specific to the associated conduit. The core of the electronics is a CPU emulator board 250 running interface control software. The emulator 250 communicates with a relay bank 252 via lines 254 for controlling the various valves within the enclosures 234 and 236 associated with the respective relays via valve control lines 256. For safety, advantageously the valves are fail-closed. To ensure successful detonation wave creation, the emulator 250 receives a timer input via a line 258 connected to conduit-mounted ionization probes (e.g., two probes longitudinally spaced near the conduit downstream end and representing subsets of the generically-identified sensors 206). The emulator communicates via lines 260 with an ethernet based controller 262 that interfaces with the hub 210 via the lines 209. The controller 262 is configured to receive input from thermocouples and resistance temperature detectors (RTD) via lines 270, from pressure sensors via analog lines 272, and limit switches via discrete input lines 274. In an exemplary implementation, the thermocouples may be connected at various locations along the conduit, to the valve enclosures, or somewhere within the vessel,. The pressure sensors (e.g., transducers) may measure pressures in one or more locations in the valve enclosures or other locations. The thermocouples/RTDs may represent subsets of the generically-identified sensors 206 and 208. The limit switches may verify the positioning of mechanical hardware (e.g., to confirm that enclosures are securely closed before firing).
  • Power for the emulator and solenoid bank is supplied by DC power supplies 280 and 282 drawing power from an AC power source 284. In the exemplary embodiment, an uninterruptible power supply (UPS)/battery back-up 286 delivers the AC power to the power supplies 280 and 282 and the ethernet controller in the event of loss of power from the source 284.
  • In operation, a variety of means may permit the control and monitoring system 214 to decide to initiate detonative cleaning by one or more of the conduits and to determine characteristics of such cleaning. The identified sensors may include combinations of imaging or non-imaging radiation sensors (e.g., IR sensors). Alternatively, or additionally, sensors external to the vessel may monitor the vessel interior through windows as described above. The sensors may provide an indication of chemical emissions (e.g., pollutants). For example, ions such as CH- and OH- have characteristic frequencies which can be sensed (e.g., 324 nm and 282 nm in the IR band). Emissivity or other measurements may directly detect build-up on surfaces. Temperature measurements of fluid traveling through tube bundles may provide indications of insulative build-up on the tubes. The sensors may facilitate continuous monitoring.
  • In operation, the various sensors may be used to determine the nature of any build-up (e.g., the composition of a deposit, the thickness of the deposit, and the extent of the deposit). These may be used to determine appropriate cleaning sequences/protocols characterized by the particular conduits to be discharged and the characteristics of such discharge (e.g., the nature and quantity of the particular fuel/oxidizer charge(s) to be introduced to particular conduit(s)). The relative timing of the firing of different conduits may be selected to achieve desired performance (this may include delays to avoid interference or synchronization to provide a combined effect). After a firing sequence (which may include one or more firings of one or more conduits) there may be a reassessment to determine whether further firings are appropriate based on sensor input. The results of such reassessment and subsequent reassessments may be used to fine tune particular cleaning protocols for future use. Data from the sensors may also be used to determine the condition of the cleaning system and its components. A lack of input from ion sensors may indicate a lack of detonations. Pressure sensors may indicate insufficient or excess fuel or oxidizer pressures. Temperature sensors may indicate conduit overheating. Such abnormal condition data may cause a warning to be displayed and may cause n automated service/maintenance request to be generated. In an exemplary implementation, the control system 214 may be programmed to generally command any of various kinds of single shot discharges and send corresponding commands to the control electronics of the individual conduits. That control electronics may store the information necessary to actually charge and discharge in the appropriate way for the specific shot (e.g., the fuel/oxidizer amounts). For example, the control system 214 may send a general command representative of a sharp, high power pulse to the local control electronics which, in turn, is able to generate the shot even though the fill parameters for a sharp, high power shot may differ amongst the conduits. The control system 214 may further be programmed to generate combinations of such shots for particular protocols.
  • One or more embodiments of the present invention have been described. Nevertheless, it will be understood that various modifications may be made without departing from the scope of the invention as set forth in the accompanying claims. For example, the invention may be adapted for use with a variety of industrial equipment and with variety of soot blower technologies. Aspects of the existing equipment and technologies may influence aspects of any particular implementation. Accordingly, other embodiments are within the scope of the following claims.

Claims (20)

  1. An apparatus for cleaning one or more surfaces within a vessel (200) having a vessel wall (24) separating a vessel exterior from a vessel interior and having a wall aperture (66), the apparatus comprising:
    at least one elongate conduit (26) having an upstream first end (28) and a downstream second end (30) and positionable so as to direct a shockwave from the second end into the vessel interior;
    a source (32) of fuel and oxidizer coupled to the conduit to deliver the fuel and oxidizer to the conduit;
    an initiator (106) positionable so as to initiate a reaction of the fuel and oxidizer to produce the shockwave;
    at least one sensor (206, 208) for sensing one or more thermodynamic properties associated with the vessel; and
    a control system (214) coupled to the initiator, the source, and the sensor for receiving input from the sensor and controlling operation of the initiator and source responsive to said input;
    said apparatus being characterised by further comprising:
    a plurality of said elongate conduits (202A-D) and a plurality of initiators, each of the conduits associated with one or more of the initiators; and in that
    the control system includes:
    a plurality of local controllers (204A-D) respectively associated with and so coupled to one of the initiators; and
    a central controller (214) coupled to the plurality of local controllers (204A-D).
  2. The apparatus of claim 1 wherein:
    there are a plurality of such sensors (206, 208) including at least one temperature sensor and at least one pressure sensor.
  3. The apparatus of claim 1 or 2 wherein:
    there are a plurality of such sensors (206, 208) including at least one thermocouple that is positionable on the conduit or on the vessel and at least one infrared sensor.
  4. The apparatus of claim 3 wherein:
    the at least one infrared sensor includes an infrared camera.
  5. The apparatus of any preceding claim wherein:
    there are a plurality of such sensors (206, 208) including at least one combustion emission sensor.
  6. The apparatus of any preceding claim wherein:
    the central controller (214) is programmable so as to generate maintenance or service requests responsive to the input.
  7. The apparatus of any preceding claim wherein:
    the control system communicates with a remote monitoring system (216).
  8. The apparatus of any preceding claim wherein:
    the control system is programmable so as to control operation of the conduit responsive to input from said at least one sensor (206, 208).
  9. The apparatus of any preceding claim wherein:
    the control system is programmable with a plurality of different cleaning processes and is further programmable so as to execute the processes responsive to corresponding sensed conditions.
  10. The apparatus of any preceding claim further comprising:
    an imaging inspection camera coupled to the control system for visual monitoring of the vessel interior.
  11. A monitoring system for monitoring the operation of a plurality of remote detonative cleaning apparatus, the system comprising:
    a plurality of remote detonative cleaning apparatus as claimed in any preceding claim;
    a communications interface for communicating with the apparatus;
    a processor coupled to the communications interface; and
    memory coupled to the processor;
    wherein at least one of the processor and memory store instructions for:
    receiving data from the apparatus; and
    recording information regarding the apparatus.
  12. The system of claim 11 being a monitoring and control system wherein:
    at least one of the processor and memory stores instructions for causing the apparatus to operate.
  13. The system of claim 11 or 12 further including one or more displays.
  14. The system of claim 13 wherein:
    at least one of the one or more displays is connectable so as to permit at least part time display of video camera input.
  15. A method for cleaning surfaces within a plurality of vessels at a plurality of locations, the method comprising:
    at a central location, monitoring data regarding each of the vessels; and
    responsive to said monitored data for a particular one of the vessels, causing a detonative cleaning apparatus associated with the particular vessel to discharge to clean the surface within the particular vessel.
  16. The method of claim 15 performed via a programmed control and monitoring system and that is programmed to select, responsive to said monitored data, at least one of a plurality of at least partially predetermined cleaning protocols and to cause said discharge according to the selected at least one protocol.
  17. The method of claim 15 or 16 performed in a repeated sequential way.
  18. The method of claim 15,16, or 17 further comprising:
    using an infrared camera within each vessel to inspect the associated surface while the vessel is in operation.
  19. The method of any of claims 15 to 18 wherein said monitoring comprises at least one of:
    monitoring a surface emissivity within each of the vessels;
    monitoring quantities of one or more chemical species in each of the vessels; and
    monitoring one or more images of interiors of each of the vessels.
  20. The method of any of claims 15 to 19 further comprising:
    receiving an automated maintenance or service request for at least one of the vessels.
EP04257175A 2003-11-20 2004-11-19 Control of detonative cleaning apparatus Not-in-force EP1533048B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PL04257175T PL1533048T3 (en) 2003-11-20 2004-11-19 Control of detonative cleaning apparatus

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
US801215 1997-02-18
US10/718,730 US7011047B2 (en) 2003-11-20 2003-11-20 Detonative cleaning apparatus
US718730 2003-11-20
US10/801,215 US7267134B2 (en) 2004-03-15 2004-03-15 Control of detonative cleaning apparatus

Publications (2)

Publication Number Publication Date
EP1533048A1 EP1533048A1 (en) 2005-05-25
EP1533048B1 true EP1533048B1 (en) 2008-06-04

Family

ID=34437431

Family Applications (1)

Application Number Title Priority Date Filing Date
EP04257175A Not-in-force EP1533048B1 (en) 2003-11-20 2004-11-19 Control of detonative cleaning apparatus

Country Status (10)

Country Link
EP (1) EP1533048B1 (en)
JP (1) JP3993596B2 (en)
CN (1) CN1623690A (en)
AT (1) ATE397498T1 (en)
AU (1) AU2004229043B2 (en)
DE (1) DE602004014232D1 (en)
ES (1) ES2309469T3 (en)
NZ (1) NZ536700A (en)
PL (1) PL1533048T3 (en)
RU (1) RU2285567C2 (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080264357A1 (en) * 2007-04-26 2008-10-30 United Technologies Corporation Control of detonative cleaning apparatus
EP2274566A4 (en) * 2008-05-13 2015-04-01 Soottech Aktiebolag A method for measuring conditions in a power boiler furnace using a sootblower
US20110302904A1 (en) * 2010-06-11 2011-12-15 General Electric Company Pulsed Detonation Cleaning Device with Multiple Folded Flow Paths
CN102297635A (en) * 2010-06-22 2011-12-28 北京凡元兴科技有限公司 Dust and dirt cleaner for military firearms
US8651066B2 (en) 2010-09-28 2014-02-18 Bha Altair, Llc Pulse detonation cleaning system
RU2487297C1 (en) * 2012-01-10 2013-07-10 Федеральное Государственное Автономное Образовательное Учреждение Высшего Профессионального Образования "Сибирский Федеральный Университет" Method to clean surfaces of steam generator heating
JP2017187267A (en) * 2016-03-31 2017-10-12 Jfeエンジニアリング株式会社 Boiler anticorrosive device and anticorrosive method
JP7458180B2 (en) * 2019-12-23 2024-03-29 川崎重工業株式会社 Shock wave soot blower system and its operating method
JP7432359B2 (en) * 2019-12-26 2024-02-16 川崎重工業株式会社 Shock wave soot blower and its operating method

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5082502A (en) * 1988-09-08 1992-01-21 Cabot Corporation Cleaning apparatus and process
FI109098B (en) * 2000-04-14 2002-05-31 Nirania Ky Acoustic Cleaning Apparatus and Method
US6935281B2 (en) * 2001-04-12 2005-08-30 Bang & Clean Gmbh Method for cleaning combustion devices

Also Published As

Publication number Publication date
AU2004229043B2 (en) 2007-04-26
JP3993596B2 (en) 2007-10-17
ATE397498T1 (en) 2008-06-15
JP2005188918A (en) 2005-07-14
DE602004014232D1 (en) 2008-07-17
RU2004133923A (en) 2006-05-10
ES2309469T3 (en) 2008-12-16
EP1533048A1 (en) 2005-05-25
PL1533048T3 (en) 2009-02-27
CN1623690A (en) 2005-06-08
NZ536700A (en) 2007-01-26
AU2004229043A1 (en) 2005-06-09
RU2285567C2 (en) 2006-10-20

Similar Documents

Publication Publication Date Title
US7267134B2 (en) Control of detonative cleaning apparatus
US7011047B2 (en) Detonative cleaning apparatus
US7104223B2 (en) Detonative cleaning apparatus
EP1985382A2 (en) Control of detonative cleaning apparatus
EP1533048B1 (en) Control of detonative cleaning apparatus
US20090277479A1 (en) Detonative Cleaning Apparatus
US20050126597A1 (en) Inspection camera
US20050130084A1 (en) Detonative cleaning apparatus
US20080092828A1 (en) Detonative cleaning apparatus
US7442034B2 (en) Detonative cleaning apparatus
US7047908B2 (en) Cooling flange
US20050126594A1 (en) Soot blower access apparatus
GB2408555A (en) Detonative cleaning device with cooling
GB2408784A (en) Detonative cleaning with monitoring camera
EP1533050A1 (en) Detonative cleaning apparatus
US20050126512A1 (en) Pressure probe
US20050125930A1 (en) Detonative cleaning apparatus
GB2408557A (en) Detonative cleaning apparatus with pressure probe
US20050125932A1 (en) Detonative cleaning apparatus nozzle
NZ536698A (en) Detonative cleaning apparatus
AU2004229044B2 (en) Detonative cleaning apparatus
GB2408556A (en) Moveable support for combustion conduit of detonative cleaning apparatus

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LU MC NL PL PT RO SE SI SK TR

AX Request for extension of the european patent

Extension state: AL HR LT LV MK YU

17P Request for examination filed

Effective date: 20050816

AKX Designation fees paid

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LU MC NL PL PT RO SE SI SK TR

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LU MC NL PL PT RO SE SI SK TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REF Corresponds to:

Ref document number: 602004014232

Country of ref document: DE

Date of ref document: 20080717

Kind code of ref document: P

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080604

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080604

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080604

REG Reference to a national code

Ref country code: ES

Ref legal event code: FG2A

Ref document number: 2309469

Country of ref document: ES

Kind code of ref document: T3

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080904

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080604

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20081104

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20081004

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080604

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080604

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080604

REG Reference to a national code

Ref country code: PL

Ref legal event code: T3

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080904

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080604

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080604

26N No opposition filed

Effective date: 20090305

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20090212

Year of fee payment: 5

Ref country code: PL

Payment date: 20090227

Year of fee payment: 5

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20081130

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20090219

Year of fee payment: 5

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20090601

NLV4 Nl: lapsed or anulled due to non-payment of the annual fee

Effective date: 20090601

REG Reference to a national code

Ref country code: IE

Ref legal event code: MM4A

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080604

REG Reference to a national code

Ref country code: FR

Ref legal event code: ST

Effective date: 20090731

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20081130

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20081130

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20081119

REG Reference to a national code

Ref country code: ES

Ref legal event code: FD2A

Effective date: 20081120

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: ES

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20081120

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20091119

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20081119

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20081205

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080604

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080604

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080905

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20100601

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20091119

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PL

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20091119

REG Reference to a national code

Ref country code: PL

Ref legal event code: LAPE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20081130