EP1397579B1 - Procede, systeme et outil pour evaluation d'un gisement et essai d'un puits pendant des operations de forage - Google Patents
Procede, systeme et outil pour evaluation d'un gisement et essai d'un puits pendant des operations de forage Download PDFInfo
- Publication number
- EP1397579B1 EP1397579B1 EP01971214A EP01971214A EP1397579B1 EP 1397579 B1 EP1397579 B1 EP 1397579B1 EP 01971214 A EP01971214 A EP 01971214A EP 01971214 A EP01971214 A EP 01971214A EP 1397579 B1 EP1397579 B1 EP 1397579B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- formation
- wellbore
- flow
- fluid
- tool
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000000034 method Methods 0.000 title claims abstract description 60
- 238000011156 evaluation Methods 0.000 title abstract description 15
- 238000005553 drilling Methods 0.000 title description 54
- 238000012360 testing method Methods 0.000 title description 12
- 230000015572 biosynthetic process Effects 0.000 claims abstract description 89
- 239000012530 fluid Substances 0.000 claims abstract description 86
- 230000035699 permeability Effects 0.000 claims abstract description 18
- 238000005094 computer simulation Methods 0.000 claims description 5
- 230000004941 influx Effects 0.000 claims description 5
- 230000004044 response Effects 0.000 claims description 3
- 230000000977 initiatory effect Effects 0.000 claims 1
- 238000005259 measurement Methods 0.000 abstract description 52
- 238000010276 construction Methods 0.000 abstract description 22
- 238000001514 detection method Methods 0.000 abstract description 9
- 239000003381 stabilizer Substances 0.000 abstract description 7
- 229930195733 hydrocarbon Natural products 0.000 abstract description 6
- 150000002430 hydrocarbons Chemical class 0.000 abstract description 6
- 239000004215 Carbon black (E152) Substances 0.000 abstract description 5
- 230000029058 respiratory gaseous exchange Effects 0.000 abstract 1
- 238000005755 formation reaction Methods 0.000 description 76
- 230000008569 process Effects 0.000 description 26
- 239000007789 gas Substances 0.000 description 24
- 238000004458 analytical method Methods 0.000 description 13
- 239000011435 rock Substances 0.000 description 13
- 238000004519 manufacturing process Methods 0.000 description 7
- 230000035515 penetration Effects 0.000 description 7
- 230000008859 change Effects 0.000 description 6
- 230000006870 function Effects 0.000 description 6
- 239000007788 liquid Substances 0.000 description 6
- 238000002347 injection Methods 0.000 description 5
- 239000007924 injection Substances 0.000 description 5
- 230000033001 locomotion Effects 0.000 description 5
- 239000011148 porous material Substances 0.000 description 5
- 230000005540 biological transmission Effects 0.000 description 4
- 238000005520 cutting process Methods 0.000 description 4
- 239000000203 mixture Substances 0.000 description 4
- 238000012544 monitoring process Methods 0.000 description 4
- 239000000700 radioactive tracer Substances 0.000 description 4
- 238000004441 surface measurement Methods 0.000 description 4
- 238000004364 calculation method Methods 0.000 description 3
- 230000003247 decreasing effect Effects 0.000 description 3
- 230000006698 induction Effects 0.000 description 3
- 239000003550 marker Substances 0.000 description 3
- 239000000463 material Substances 0.000 description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 3
- 230000003466 anti-cipated effect Effects 0.000 description 2
- 230000002596 correlated effect Effects 0.000 description 2
- 238000013499 data model Methods 0.000 description 2
- 230000002706 hydrostatic effect Effects 0.000 description 2
- VNWKTOKETHGBQD-UHFFFAOYSA-N methane Chemical compound C VNWKTOKETHGBQD-UHFFFAOYSA-N 0.000 description 2
- 230000036961 partial effect Effects 0.000 description 2
- 238000012545 processing Methods 0.000 description 2
- 230000009467 reduction Effects 0.000 description 2
- 230000002829 reductive effect Effects 0.000 description 2
- 238000009987 spinning Methods 0.000 description 2
- 230000009471 action Effects 0.000 description 1
- 230000004913 activation Effects 0.000 description 1
- 238000003491 array Methods 0.000 description 1
- 230000008901 benefit Effects 0.000 description 1
- 230000005465 channeling Effects 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 239000000470 constituent Substances 0.000 description 1
- 230000000875 corresponding effect Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 239000006185 dispersion Substances 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 238000009826 distribution Methods 0.000 description 1
- 230000009977 dual effect Effects 0.000 description 1
- 230000002500 effect on skin Effects 0.000 description 1
- 230000005674 electromagnetic induction Effects 0.000 description 1
- 238000001914 filtration Methods 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 230000002147 killing effect Effects 0.000 description 1
- 238000007726 management method Methods 0.000 description 1
- 238000013507 mapping Methods 0.000 description 1
- 239000011159 matrix material Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 229910052754 neon Inorganic materials 0.000 description 1
- GKAOGPIIYCISHV-UHFFFAOYSA-N neon atom Chemical compound [Ne] GKAOGPIIYCISHV-UHFFFAOYSA-N 0.000 description 1
- 239000003921 oil Substances 0.000 description 1
- 230000001681 protective effect Effects 0.000 description 1
- 239000012857 radioactive material Substances 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 230000000717 retained effect Effects 0.000 description 1
- 230000000630 rising effect Effects 0.000 description 1
- 238000005204 segregation Methods 0.000 description 1
- 230000011664 signaling Effects 0.000 description 1
- 230000037380 skin damage Effects 0.000 description 1
- 239000002002 slurry Substances 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 230000006641 stabilisation Effects 0.000 description 1
- 238000011105 stabilization Methods 0.000 description 1
- 230000000087 stabilizing effect Effects 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
- 230000001360 synchronised effect Effects 0.000 description 1
- 238000005406 washing Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/10—Locating fluid leaks, intrusions or movements
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
- E21B21/08—Controlling or monitoring pressure or flow of drilling fluid, e.g. automatic filling of boreholes, automatic control of bottom pressure
- E21B21/085—Underbalanced techniques, i.e. where borehole fluid pressure is below formation pressure
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/10—Locating fluid leaks, intrusions or movements
- E21B47/107—Locating fluid leaks, intrusions or movements using acoustic means
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
- E21B49/08—Obtaining fluid samples or testing fluids, in boreholes or wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
- E21B49/08—Obtaining fluid samples or testing fluids, in boreholes or wells
- E21B49/087—Well testing, e.g. testing for reservoir productivity or formation parameters
Definitions
- the present invention relates generally to testing and evaluating a section of reservoir intersected during the well construction process. More particularly, the present invention relates to methods, systems and tools used in testing and evaluation of a subsurface well formation during drilling of the wellbore.
- a reservoir is formed of one or more subsurface rock formations containing a liquid and/or gaseous hydrocarbon.
- the reservoir rock is porous and permeable.
- the degree of porosity relates to the volume of liquid contained within the reservoir.
- the permeability relates to the reservoir fluids' ability to move through the rock and be recovered for sale.
- a reservoir is an invisible, complex physical system that must be understood in order to determine the value of the contained hydrocarbons.
- the characteristics of a reservoir are extrapolated from the small portion of a formation exposed during the well drilling and construction process. It is particularly important to obtain an evaluation of the quality of rock (formation) intersected during well construction. Even though a large body of data may have been compiled regarding the characteristics of a specific reservoir, it is important to understand the characteristics of the rock intersected by a specific wellbore and to recognize, as soon as possible during the process of well construction, the effective permeability and permeability differences of the formation intersected during well construction.
- the present invention is primarily directed to wellbore and formation evaluation while drilling "underbalanced.”
- Underbalanced drilling is a well construction process defined as a state in which the pressure induced by the weight of the drilling fluid (hydrostatic pressure) is less than the actual pressure within the pore spaces of the reservoir rock (formation pressure).
- the well is typically drilled “overbalanced.”
- the pressure induced by the weight of the drilling fluid is greater than the actual pore pressure of the reservoir rock.
- the fluids within the pore spaces of the reservoir rock flow into the wellbore. Because flow is allowed to enter the wellbore, the fluid flow characteristics of the formation are more easily observed and measured.
- the drilling fluid may enter the formation from the wellbore. While this overbalanced flow may be evaluated to assess formation properties, it is more difficult to quantify fluid losses to the formation then it is to quantify fluid gains from the formation.
- important information can be determined by evaluating the fluids flowing to the well surface from the formation penetrated by the wellbore.
- the amount of gas included in the surface flow is particularly important in evaluating the formation producing the gas.
- the volume of gas per unit of time, or flow rate is a critical parameter.
- the rate of gas flow from the formation is affected by the back-pressure exerted through the wellbore.
- the information desired for a particular formation or layer is the flow rate capacity during expected flowing production pressure. The best measure of this flow rate occurs at the flowing production pressure, however, conventional gas flow measuring instruments require flow restricting orifices in performing flow measurements. Instruments using differential orifices as the basis for flow management are accurate only within a relatively narrow range of flow.
- Sporadic flow changes associated with penetration of different pressured or flowing formations can produce flow rates outside the accuracy limits of the measuring instrument.
- Surface measurements of gas flow are, consequently, performed at pressures that are different from normal flowing pressures and the results do not accurately indicate the gas flow potential of the formation.
- the procedures commonly employed to measure surface flow during drilling or constructing a well that restrict the flow as a part of the gas flow rate measurement reduce the accuracy of evaluations of formation capacity based upon such measurements.
- Conventional instruments that measure flow without restricting the flow are typically incapable of making precise measurements. These instruments, which generally use a Venturi tube in the flow line, produce unduly broad indications of flow rates.
- a well log is a recording, usually continuous, of a characteristic of a formation intersected by a borehole during the well construction process.
- well logs are utilized to distinguish lithology, porosity, and saturations of water oil and gas within the formation. Permeability values for the formation are not obtained in typical indirect analysis.
- An instrument for repeated formation tests (RFT) also exists. The RFT instrument can indicate potentially provided permeability within an order of magnitude of correctness.
- Well logging can account for as much as 5 to 15 percent of the total well construction cost.
- Drill stem testing requires the stopping of the drilling process, logging to identify possible reservoirs that may have been intersected, isolating each formation of each intersected reservoir with packers and flowing each formation in an effort to determine the flow potential of the individual formation. Drill stem testing can be very time consuming and the analysis is often indeterminate or incomplete. Generally, during drill string testing, the packers are set and reset to isolate each reservoir intersected. This may lead to equipment failures or a failure to accurately obtain information about a specific formation.
- each formation is tested as a whole, the values or data obtained provide an average formation value.
- Discrete characteristics within the formation must be obtained in another manner.
- the discrete characteristics within a layer of the formation are generally inferred from traditional well logging techniques and/or from core analysis.
- Well logging and core analyses are expensive and time-consuming.
- the extensive time involved in determining the permeability (productability) of each intersected reservoir layer in a wellbore through multiple packer movements and multiple flow and pressure buildup measurements required during a drill stem test make the process expensive and undesirable.
- US 5 130 950 discloses a pulse echo apparatus and method for measuring the characteristics of the borehole while it is being drilled.
- a component of the bottomhole assembly is provided with one or more ultrasonic transceivers.
- the transceivers generate signals that are indicative of the stand-off and borehole diameter.
- Electronic processing and control circuitry is provided to determine, from the signals, if gas has entered the borehole.
- a method according to claim 1 there is provided a method according to claim 1.
- a downhole tool according to claim 26 there is provided a system according to claim 33.
- One characteristic of the formation that determines the productability of the well is permeability. During production, the fluid flows through the medium of the reservoir rock pores with greater or lesser difficulty, depending on the characteristics of the porous medium. The parameter of "permeability" is a measure used to describe the ability of the rock to allow a fluid to flow through its pores.
- Parameters such as bottomhole temperature and pressure are acquired through a bottomhole assembly during actual drilling operations and the acquired values are transmitted to the surface.
- the drilling assembly drills the wellbore to a point above the formation of interest.
- the measuring instruments in subsurface instruments carried by the drilling assembly are calibrated with surface measuring instruments at the well surface.
- the calibration is performed by evaluating injected and return fluids circulated through the closed flow system provided by the drill string assembly and the wellbore annulus.
- Precise qualitative and quantitative measuring instruments may be provided in the calibrated system to produce accurate measurements of fluid composition, flow rates, volumes and condition of fluids injected into the drill string from the surface and fluids returning in the annulus from both the drill string and the formation.
- An important, but optional, feature of the present invention is the use of an ultrasonic gas flow meter in the surface measurements of gas being produced from the formation to permit unrestricted flow measurements that accurately reflect the formation's flow characteristics.
- a chromatograph is used in the surface measurements of annular fluid flow to precisely identify constituents of the flow. The results of the measurement assist in making well construction decisions as the well is being drilled.
- the bottomhole temperature and pressure may be used to determine density and/or viscosity of the produced fluids.
- the drilling operation may be stopped and the well shut in to allow the pressure to build up.
- a series of flows at different differential pressure may be used to extrapolate to the initial reservoir pressure. Using these parameters, an effective permeability can be calculated for the section of formation contributing to the flow.
- the measured parameters at the bit may be transmitted to the well surface using fluid pulse telemetry or other suitable means.
- the downhole data transmission rate relative to the rate of penetration in a reservoir, is such that the data acquisition at the bit downhole or at the surface is considered to be "real-time" data.
- Another means of obtaining the necessary data for the novel method of formation evaluation is to have the downhole measurements taken and stored in a subsurface memory device during actual well construction operations. After the data is acquired and stored in the memory device, it may be retrieved at a later time such as during the replacement of a worn out drill bit. This recorded data is considered “near real-time" because it is not transmitted to the surface from downhole.
- This near real-time data from downhole is synchronized and merged with either surface measurements of hydrocarbon production or downhole measurements from the subsurface measurement instrument and used to compute the permeability and productivity of the formation intersected during the well construction process. Near real-time methods are utilized when the added expense of real-time is not warranted. The choice is usually based upon required placement accuracy of the wellbore, or when the real-time transmission is technically not feasible, or when the general economics of the reservoir prohibit use of real-time methodology.
- the downhole tool connects between the drill string and bit. Blades on the tool provide external longitudinal recesses that channel fluid across transducers mounted on the blades.
- the tool structure functions as a drilling stabilizer and, while rotating, positively directs the well fluid into the fluid recesses where various transducers carried by the tool are used to assist in determining flow rate and other parameters of the well fluid. This latter feature is particularly useful in horizontal drilling application where the well fluids may tend to stratify vertically.
- Figure 1 illustrates a system of the present invention indicated generally at 10.
- the system 10 is employed to determine the permeability of a formation F that is to be penetrated by a wellbore B.
- a drilling assembly comprising a bit 11, drilling stabilizer 12, subsurface measuring and recording instrument 13 and drill string 14 extend from the wellbore B to the wellbore surface T. Only a portion of the bottomhole assembly is illustrated in Figure 1 .
- the projected wellbore trajectory is indicated by a dotted line section 15.
- a measuring system 20 used in the evaluation of a formation F is equipped with an inlet fluid measuring section 21, an outlet measurement section 22 and a calibrated instrument analysis section 23.
- the measuring system 20 measures and evaluates the fluids flowing into the well bore B through the drill string 14 and measures and evaluates the fluids returning to the top or surface of the wellbore T through an annulus A formed between the drill string and the wellbore.
- reference to measuring or evaluating "flow" of a fluid is intended to include measurement or evaluation of characteristics of the fluid such as temperature, pressure, resistivity, density, composition, volume, rate of flow and other variable characteristics or parameters of the fluid.
- the calibrated analysis section 23 may be supplemented with subsurface parameter values obtained from a subsurface values section 24.
- the data from the section 24 are delivered from either a data resource 25 or from an actual downhole measurements section 26.
- Data provided by the data resource section 25 may be data taken from historical data sources 25a, such as analogous or similar wells or the data may be derived from a computer data model 25b that performs mathematical calculations, or determines data from other inferential processes.
- the actual downhole measurements are provided through a real-time system section 27 or a near real-time system section 28.
- the system 20 is calibrated and checked before the wellbore B is extended into the formation F. This step in the procedure assists in determining system noise and in determining circulating system responses to changes in the back-pressure in the annulus A.
- the system calibration process and checking are preferably performed between 5 and 25 meters above the anticipated top of the formation F.
- the top of the formation F may be determined using a geological marker from an offset well, seismic data or reservoir contour mapping.
- a closed fluid flow system is established by the drilling assembly in the wellbore B such that fluids introduced into the drill string 14 travel through the drilling assembly 14, 13, 12, 11, and exit the drilling assembly through the bit 11 where they are returned to the well surface T through the annulus A. Only fluids introduced into the drill string 14 flow through the closed system during the calibration and checking process.
- the calibration performed by circulating a known quantity and density of a known fluid (gases included) while the drilling assembly and any downhole sensing equipment carried in the drilling assembly are deployed within the wellbore B.
- a material balance relating the injected fluids to the returned fluids is preferably employed in the calibration process.
- the calibration process is employed to establish a standard or control to detect or determine changes in measurements that result from encountering a productive formation environment.
- the following parameters are measured for a minimum of three different back-pressure values obtained at the annulus A while fluids are circulating through the system:
- the time required for the fluid to complete circulation through the drilling assembly and return to the surface through the annulus is monitored and recorded.
- a circulation time measurement is performed with the assistance of a tracer added to the injection fluid stream entering the drill pipe 11 at the well surface T.
- the elapsed time from injection of the tracer until reappearance of the tracer in the fluid returns at the well surface annulus indicates the circulation time.
- the tracer material may be a carbide, or an inert substance such as neon gas, or a short half-life radioactive material or other suitable material.
- the drilling operation is resumed and the drilling assembly is used to extend the wellbore into the formation F.
- the rate of penetration is preferably maintained at a rate below 25 meters per hour.
- the weight on bit and rotary or bit motor speeds are maintained as constant as possible to enhance the accuracy of the results of the system measurements.
- an underbalanced bottomhole pressure between 100 and 2000 psi below the anticipated pressure of the formation F.
- the bottomhole pressure can be adjusted by manipulation of the drilling fluid densities, pump rates and annular back-pressures.
- the point at which the drill bit 11 encounters the top of the formation F may be determined by closely monitoring the system 20 for any significant change in the bottomhole pressure, bottomhole temperature, C1 or surface flow rates. Once the top of the formation F has been traversed, an additional 1 to 5 meters of wellbore depth is drilled into the formation and the drilling is stopped as fluid circulation is maintained.
- reservoir flow and pressure response are established while injecting fluid into the drill string 14 from the surface and combining the injected fluids with fluids flowing from the reservoir F into the wellbore B.
- the combined injection and formation fluids flow through the annulus A to the well surface T.
- the following sensor point measurements are performed:
- the measurements I)-IV) are made and recorded for a preferred period of time equivalent to 1.5 to 15 times the "bottoms up” time.
- "Bottoms up” time is the time required to flow fluid at the bottom of the wellbore to the well surface.
- the next step in the method is to reduce the circulating back-pressure or bottomhole pressure by 30 to 40 percent, preferably not to exceed 35 percent of the draw down on the bottomhole pressure (BHP) for a period of time of from 1.5 to 15 times the bottoms up time, depending on the annular flow conditions.
- BHP bottomhole pressure
- the time of each back-pressure change is recorded, to be correlated with the flow measurements.
- the back-pressure is increased, using either a surface choke or by increasing the bottomhole pressure, to a safe drilling level and then stabilized over a period of from 1.5 to 15 times the bottoms up time.
- Drilling is resumed and the borehole B is extended to the formation F at a steady drilling rate of preferably 10-20 meters per hour.
- the sensor points variable measurements I)-IV) are continuously monitored and recorded. Drilling is continued until the formation F has been fully traversed. Once the wellbore extends below the bottom of the formation by 2 to 10 meters, drilling is stopped. Fluid flow through the annulus is continued for a time of from 2 to 15 times the bottoms up time. If the back-pressure in the annulus A cannot be increased without killing the well, the annulus back-pressure is decreased by 15-20 percent from the initial pressure value occurring following initial penetration of the formation bottom. If the back-pressure in the annulus A is still high enough to kill the well, the annulus back-pressure is decreased 30-40 percent from the initial pressure value.
- IPR Inflow Production
- Evaluation of the formation F using the measurements and data obtained in the described process may be enhanced with the use of a computer model 29 of the reservoir.
- the computer model can account for variances attributable to multiple formation layers, partial penetration of a zone, dual porosity of the formation and the occurrence of vertical, horizontal or high angle wellbores as well as other variations in parameters.
- the computer model may be employed to more accurately project well production and reserve estimates. Presentation of the evaluation and activation of alarms is made by an evaluation section 30.
- a kick alarm 31 provides early warning of an influx of formation fluids into the wellbore.
- the methods of the present invention may also be practiced in a system using data obtained directly with downhole flow measurement instruments that comprise a part of the drilling assembly.
- a directly measuring downhole system the requirement for initial system calibration is reduced or becomes unnecessary.
- the steps used in performance of the method when using direct downhole flow measurement instruments are substantially the same as those employed when downhole flow parameters are determined inferentially or are obtained from indirect measurements or a data resource.
- Using actually determined subsurface flow measurements eliminates the requirement for the computer model 29 or the data model 25b and otherwise reduces the need for extensive mathematical correlations and calculations to obtain accurate formation values. Direct measurements also enable rapid warning of a kick to initiate an alarm from the measuring component 31.
- FIGS 2 and 3 illustrate details in a preferred subsurface measurement tool, indicated generally at 50, for assisting in determining permeability of the formation F.
- the measurement tool 50 is illustrated connected to a drill bit 51 to function as part of a near-bit stabilizer. It will be appreciated that the tool 50 may be employed at other near-bit locations within a bottomhole drilling assembly and need not necessarily be connected immediately to the bit, the objective being to provide a stabilizing relationship between the bit and the tool 50.
- the instrument tool 50 includes three separate types of detection devices in the vicinity of the drill bit permitting a large number of combinations of signals to be analyzed thereby producing increased flexibility and accuracy in both measurement while drilling (MWD) and formation analysis operations.
- MWD measurement while drilling
- the instrument tool 50 is equipped with an axially extending body 52 having a central, axially developed passage 55 for conveying fluid between a first axial tool end 56 and a second axial tool end 57. Radially and axially extending, circumferentially spaced blades 60, 61 and 62 extend from an external tool surface 65.
- the instrument tool 50 is connected at its first end 56 to a bit 51 and at its second axial end 57 to a monitoring and recording tool 66 that processes and records the measurements taken by the instrument tool 50.
- the tool 66 records and/or transmits measurements to the well surface. Recorded measurements are retained in the recorded memory until the drilling assembly is retrieved to the well surface or the measurements may be transmitted to the surface through fluid pulse telemetry or other suitable communication means.
- the tools 50 and 66 are connected with the measuring system 20 for real-time or near real-time measurements that permit formation evaluation.
- Analog to digital converters in the measuring system 20 process signals detected at the transducer receivers and capacitive energy transducers and supply numerical representations to a microprocessor system within the components 23, 29 and 30.
- the measuring system 20 of the present invention employs a microprocessor and digital-to-analog converters to enable the production of many different types of signals with the acoustic transducers or electromagnetic antenna systems. Both high and low frequency signals can be created.
- fast rise time and slow fall time "saw tooth" signals may be employed to provide specific, more discrete rates of change in electronic signaling as compared to older techniques employing continuous variations of sine waves.
- the output signals from the energy transducers employed in the present invention are calibrated and the programming employed in the measuring system is modified to counter intrinsic tool inductance and capacitance that would normally distort the output signals. Reduction in distortion and the presence of discreetly rising and falling signals contribute to greater accuracy in the measurement of the inductance of the fluids. Broad variations in times of signal changes are employed to cause attenuations or reinforcements of signals depending upon gas bubble sizes or oil droplet diameters and volumes. The combinations of frequencies ranging from high to low, and varying rates of change within signals assist in sorting smaller and larger bubbles and globules. The dimensions of water concentrations between other fluid contacts also alters the broad range of signals in different ways. Significant fluid geometry information is extractable from the many signals being altered by the flowing fluids and then detected at the receivers of the present invention.
- FIG. 3 several fluid receiving recesses 70, 71 and 72 are defined between the circumferentially spaced blades in an area intermediate the external surface 65 of the tool body and the wellbore wall (not illustrated).
- the recesses 70, 71 and 72 are illustrated in Figure 3 between dotted lines 73, 74 and 75, respectively, and external tool surfaces 76, 77 and 78, respectively, of the tool 50.
- the primary monitored indicator of flow in the recesses 70, 71 and 72 is preferably a marker comprising a bubble of gas or a gaseous cluster entrained within the liquid flowing through the recess being monitored.
- the electrical sensors, circuitry and analytical process for correlating the measurements taken by the various transducers determine a rate of movement of the bubble marker past the transducers.
- Energy transducers are carried by the blades for evaluating characteristics of fluid contained in the fluid receiving recesses. The measured characteristics are convertible into a measure of the flow rate of the fluid flowing through the recesses.
- acoustic transducer receivers 85 and acoustic transducer transmitters 86 are carried in the blades 61 and 60, respectively.
- Electromagnetic induction transmitting transducers 90 and electromagnetic receiving transducers 91 are carried in the blade 60 and 62, respectively.
- Electrical capacitance transducers 95, 96 and 97 are carried on the tool body between the blades 62 and 61.
- the energy transducers carried by the tool 50 are deployed at axially spaced locations along the tool body 65 and blades 60, 61 and 62 to enable the transducers to detect variable parameters associated with axial movement of fluid flowing through the recesses with which the transducers are associated. Accordingly, three acoustic receivers 85a, 85b and 85c are deployed at axially spaced locations along the blade 61 and three acoustic transducer transmitters 86a, 86b and 86c are deployed at axially spaced locations along the blade 60.
- two electromagnetic transmitters 90a and 90b are axially deployed along the blade 60 and three electromagnetic receivers 91 a, 91 b and 91 c are axially deployed along the blade 62.
- Capacitive transducers are also deployed at circumferentially and axially spaced locations along the body of the tool 50. Capacitive transducers 95, 96 and 97 are displayed in Figure 3 at only one axial location. Similar arrays of capacitive transducers (not illustrated) are deployed at other axially spaced locations between the blades 61 and 62.
- the various transmitters, receivers and capacitance energy transducers are preferably located high within the protected areas between the stabilizer blades to avoid the mud and rock cuttings that often accumulate in greatest qualities on the lower portions of the blades.
- the blades function to form fluid channeling recesses to confine the fluid being monitored and also provide protective structure for the energy transmitters.
- the induction transmitting antennas of the transducers 90 are positioned within notches in the blade 62 that have curved shapes with sloping surfaces 90b that slightly increase from a parabolic shape to produce an over focusing from a parallel beam to a concentrated point at the receiving transducers 91.
- Over focusing of the transmitter signal counteracts dispersion caused by bubbles and rock cuttings in the fluid flowing past the sensors.
- the angles between the transmitters and receivers are preferably optimized for vector processing relating to typical rotation speeds and expected fluid velocities.
- the capacitance transducers 95, 96 and 97 are preferably provided with concave surface electrode shapes 95a to improve contact with the convex surfaces of bubbles or rounded oil globules entrained within the fluid flowing past the transducers.
- Gas bubble shapes change sizes as a function of changing depth and pressure within the wellbore.
- the capacitance transducers preferably protrude slightly radially from the body of the tool body 50 with the concave surface shapes having an increasing curvature toward the top 95b of the tool 50 to permit better contact of the surface with both small and larger bubbles.
- the larger curvature at the top of the transducers permits improved matching of shapes of the smaller bubbles or oil globules with the transducers.
- the smaller curvature at the bottom 95a of the transducers forms a better match with the external surfaces of larger bubbles or globules.
- the acoustic and electromagnetic transducers in the tool 50 and associated instruments in the recording tool 66 monitor the characteristics of the fluid intercepted in the travel paths of the energy signals traveling between transducers.
- the capacitive transducers monitor the characteristics of the fluid engaging the reactive surfaces of the transducers.
- Each of the three acoustic transmitters communicate with each of the three acoustic receivers to produced nine transmission paths. The paths are identified as a function of their physical position within the fluid receiving recess.
- the electromagnetic transducers function similarly to produce a total of six transmission paths.
- the radial and axial displacement of transducer paths produces an array of readings that can be correlated both in time and location to provide the rate of flow of fluids flowing through the fluid receiving recesses.
- the change in capacitance along the axial distribution of the capacitive transducers provides a measure of the flow past the monitoring surfaces.
- the measuring process performed by the tool 50 is preferably done while the tool is rotating with the bit in the wellbore.
- the rotating motion of the tool homogenizes the liquid and gases into a uniform mixture that enhances the detection capabilities of the sensors.
- Rotation of the tool 50 also permits each set of three detection systems to provide full borehole coverage.
- the blades of the tool protect the measuring devices from impact with borehole walls and also afford protection from impact with solids in the returning well fluids.
- Rotation of the tool produces centrifuging of certain fluids that enter the fluid receiving recesses of the tool. Gas, oil and water are inclined to be differentially concentrated by centrifuging. As a result, methane and other gases may be more easily detected as they are concentrated within the receiving recesses by the spinning motion, pushing denser liquids to the outer edges of the blades.
- the spinning of the tool also significantly reduces segregation of fluids with respected to the top or bottom side of an inclined wellbore. Mixtures of liquids commonly encountered in well drilling produce complex combinations of signal frequencies and signal wavelet shapes transmitted from acoustic and reactive sources to detectors. Analysis of the transmitted signals provides numerous data sets for physically evaluating a slurry having variations in mixing rules or properties.
- the tool 50 may be used as a kick detector during the construction of the well.
- the tool's kick detection capability stems from its ability to recognize changes in the subsurface wellbore conditions and fluids associated with a kick. Subsurface detection of increased flow rate or other variables can give an early kick warning. If a wellbore influx or kick occurs during drilling, the presence of oil bubbles in the fluid flowing through the recess 72 will slow acoustic travel times between the acoustic sensors 85a, 85b, 85c and 86a, 86b, 86c.
- Gas bubbles in the recess 72 will cause far greater increases in acoustic travel time between the energy transducers significant acoustic wave amplitude attenuations will also occur upon the influx of oil or gas into the recess 72. Wave shapes of acoustic signals will be distorted or exhibit complex interference and dielectric measurements will deviate from drilling mud readings. A predetermined combination of the described sensor readings causes the software or firmware in the measurement section 30 to alter mud pulsing priorities and send warnings to the surface kick detection component 31.
- Gas or oil bubbles passing up past the bit during a trip out of the hole are detected by leaving the power on to the induction and acoustic monitoring systems included in the tool 50. Since mud pulses are not being relayed during tripping, a warning system as relayed to the drilling crew by changing acoustic pulses to a gas detection indication sequence.
- a stethoscope type or amplified sound detection and filtering system in the component 31 enables a crewman to hear a kick warning pulse pattern (e.g., SOS) during a brief quiet period (block lowering time) between pulling each stand.
- a kick warning pulse pattern e.g., SOS
- the tool 50 may also be used to indicate early wellbore stability problems. Faster acoustic travel times, some resistivity changes, and some dielectric changes can indicate increases in quantities of rock cuttings. Mud velocity reductions or other actions may be taken to reduce excessive "washing out” or widening of the borehole after increased cuttings volumes from weaker formations are detected.
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Physics & Mathematics (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Environmental & Geological Engineering (AREA)
- Geochemistry & Mineralogy (AREA)
- Geophysics (AREA)
- Mechanical Engineering (AREA)
- Acoustics & Sound (AREA)
- Earth Drilling (AREA)
- Geophysics And Detection Of Objects (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
- Supply Devices, Intensifiers, Converters, And Telemotors (AREA)
- Examining Or Testing Airtightness (AREA)
- Analysing Materials By The Use Of Radiation (AREA)
- Drilling And Boring (AREA)
Claims (8)
- Procédé pour évaluer une caractéristique de formation dans un puits comportant un trou de forage pour croiser une formation souterraine et percé à partir d'une surface de trou de forage au moyen d'un trépan de forage supporté à l'extrémité d'un train de tiges de forage, le procédé comprenant les étapes consistant à :faire varier une contre-pression dans un anneau formé entre le trou de forage et le train de tiges de forage tout en faisant circuler un fluide à travers le train de tiges de forage et le trou de forage ;mesurer les débits du fluide à différentes contre-pressions d'anneau correspondantes pendant la circulation du fluide ; etdéterminer un paramètre de formation sur la base des débits mesurés aux différentes contre-pressions d'anneau.
- Procédé selon la revendication 1, dans lequel le paramètre de formation comprend une pression de réservoir.
- Procédé selon la revendication 1, dans lequel le paramètre de formation comprend une perméabilité de formation.
- Procédé selon la revendication 1, dans lequel le train de tiges de forage et le trou de forage font partie d'un système de circulation de fluide en circuit fermé.
- Procédé selon la revendication 1, comprenant en outre l'étape de détermination d'une valeur souhaitée pour la contre-pression d'anneau sur la base des débits mesurés aux différentes contre-pressions d'anneau.
- Procédé selon la revendication 1, comprenant en outre l'étape de détection d'un afflux de fluides de formation dans le trou de forage sur la base des débits mesurés aux différentes contre-pressions d'anneau.
- Procédé selon la revendication 6, comprenant en outre l'étape de lancement d'une alarme en réponse à la détection de l'afflux de fluides de formation dans le trou de forage.
- Procédé selon la revendication 1, dans lequel l'étape de détermination de paramètre de formation comprend en outre l'entrée des débits mesurés aux différentes contre-pressions d'anneau dans un modèle informatique d'un réservoir.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP08004186A EP1936112B1 (fr) | 2001-04-25 | 2001-09-19 | Procédé, système et outil pour évaluation de réservoir et test réussi au cours d'opérations de forage |
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US09/842,488 US6585044B2 (en) | 2000-09-20 | 2001-04-25 | Method, system and tool for reservoir evaluation and well testing during drilling operations |
US842488 | 2001-04-25 | ||
PCT/US2001/029325 WO2002088522A1 (fr) | 2001-04-25 | 2001-09-19 | Procede, systeme et outil pour evaluation d'un gisement et essai d'un puits pendant des operations de forage |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP08004186A Division EP1936112B1 (fr) | 2001-04-25 | 2001-09-19 | Procédé, système et outil pour évaluation de réservoir et test réussi au cours d'opérations de forage |
Publications (3)
Publication Number | Publication Date |
---|---|
EP1397579A1 EP1397579A1 (fr) | 2004-03-17 |
EP1397579A4 EP1397579A4 (fr) | 2005-07-20 |
EP1397579B1 true EP1397579B1 (fr) | 2009-03-11 |
Family
ID=25287435
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP08004186A Expired - Lifetime EP1936112B1 (fr) | 2001-04-25 | 2001-09-19 | Procédé, système et outil pour évaluation de réservoir et test réussi au cours d'opérations de forage |
EP01971214A Expired - Lifetime EP1397579B1 (fr) | 2001-04-25 | 2001-09-19 | Procede, systeme et outil pour evaluation d'un gisement et essai d'un puits pendant des operations de forage |
Family Applications Before (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP08004186A Expired - Lifetime EP1936112B1 (fr) | 2001-04-25 | 2001-09-19 | Procédé, système et outil pour évaluation de réservoir et test réussi au cours d'opérations de forage |
Country Status (5)
Country | Link |
---|---|
EP (2) | EP1936112B1 (fr) |
AT (2) | ATE425344T1 (fr) |
CA (2) | CA2448404A1 (fr) |
DE (2) | DE60140827D1 (fr) |
WO (1) | WO2002088522A1 (fr) |
Families Citing this family (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102004020672A1 (de) * | 2004-04-28 | 2005-11-17 | Hilti Ag | Bohrkrone, Bohrsystem und Verfahren zur Bestimmung des elektromagnetischen Umfeldes einer Bohrkrone |
WO2008106544A2 (fr) * | 2007-02-27 | 2008-09-04 | Precision Energy Services, Inc. | Système et procédé de caractérisation de réservoir en utilisant des données de forage déséquilibré |
US9477002B2 (en) | 2007-12-21 | 2016-10-25 | Schlumberger Technology Corporation | Microhydraulic fracturing with downhole acoustic measurement |
BRPI0810900A2 (pt) * | 2007-12-21 | 2016-07-19 | Prad Res & Dev Ltd | sistema para medição de sinais acústicos em uma região anular, método para medição de sinais acústicos em uma região anular, sistema para medição de sinais acústicos em uma parede de furo perfurado, método para medição de sinais acústicos em uma parede de furo perfurado, sistema para medição de sinais acústicos no interior de uma ferramenta de interior de poço, e método para medição de energia acústica em propagação no interior de uma ferramenta de interior de poço. |
US9567843B2 (en) | 2009-07-30 | 2017-02-14 | Halliburton Energy Services, Inc. | Well drilling methods with event detection |
GB2480940B (en) | 2010-01-05 | 2015-10-07 | Halliburton Energy Services Inc | Well control systems and methods |
MY168333A (en) | 2011-04-08 | 2018-10-30 | Halliburton Energy Services Inc | Automatic standpipe pressure control in drilling |
US9249638B2 (en) | 2011-04-08 | 2016-02-02 | Halliburton Energy Services, Inc. | Wellbore pressure control with optimized pressure drilling |
US9222350B2 (en) | 2011-06-21 | 2015-12-29 | Diamond Innovations, Inc. | Cutter tool insert having sensing device |
US8783381B2 (en) | 2011-07-12 | 2014-07-22 | Halliburton Energy Services, Inc. | Formation testing in managed pressure drilling |
MX353095B (es) * | 2011-07-12 | 2017-12-19 | Halliburton Energy Services Inc | Pruebas de la formación en perforación de presión controlada. |
WO2013050989A1 (fr) * | 2011-10-06 | 2013-04-11 | Schlumberger Technology B.V. | Réalisation d'analyses lors d'un forage par fracturation |
EP2587227A1 (fr) * | 2011-10-31 | 2013-05-01 | Welltec A/S | Outil d'extraction pour déterminer la vitesse de débit |
CA2990160C (fr) | 2015-06-25 | 2022-03-01 | Saudi Arabian Oil Company | Essai de puits |
CN106869917A (zh) * | 2017-03-24 | 2017-06-20 | 中国石油集团川庆钻探工程有限公司 | 基于井底和井口流入动态曲线共同约束的产能评价方法 |
CN112780253B (zh) * | 2020-01-20 | 2022-05-10 | 中国石油天然气集团有限公司 | 裂缝型储层的预测及评价方法 |
CN114925632B (zh) * | 2022-05-26 | 2023-09-01 | 西南石油大学 | 一种缝洞型气藏产能测试的动态模拟方法 |
Family Cites Families (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5006845A (en) * | 1989-06-13 | 1991-04-09 | Honeywell Inc. | Gas kick detector |
US5130950A (en) * | 1990-05-16 | 1992-07-14 | Schlumberger Technology Corporation | Ultrasonic measurement apparatus |
US5235285A (en) * | 1991-10-31 | 1993-08-10 | Schlumberger Technology Corporation | Well logging apparatus having toroidal induction antenna for measuring, while drilling, resistivity of earth formations |
NO178386C (no) * | 1993-11-23 | 1996-03-13 | Statoil As | Transduser-anordning |
GB9601362D0 (en) * | 1996-01-24 | 1996-03-27 | Anadrill Int Sa | Method and apparatus for determining fluid influx during drilling |
WO1999000575A2 (fr) * | 1997-06-27 | 1999-01-07 | Baker Hughes Incorporated | Dispositifs de forage munis de capteurs permettant de mesurer les proprietes des boues de forage en fond de puits |
US6173793B1 (en) * | 1998-12-18 | 2001-01-16 | Baker Hughes Incorporated | Measurement-while-drilling devices with pad mounted sensors |
US6325159B1 (en) | 1998-03-27 | 2001-12-04 | Hydril Company | Offshore drilling system |
US6230557B1 (en) * | 1998-08-04 | 2001-05-15 | Schlumberger Technology Corporation | Formation pressure measurement while drilling utilizing a non-rotating sleeve |
US6257356B1 (en) * | 1999-10-06 | 2001-07-10 | Aps Technology, Inc. | Magnetorheological fluid apparatus, especially adapted for use in a steerable drill string, and a method of using same |
-
2001
- 2001-09-19 AT AT01971214T patent/ATE425344T1/de not_active IP Right Cessation
- 2001-09-19 CA CA002448404A patent/CA2448404A1/fr not_active Abandoned
- 2001-09-19 EP EP08004186A patent/EP1936112B1/fr not_active Expired - Lifetime
- 2001-09-19 DE DE60140827T patent/DE60140827D1/de not_active Expired - Lifetime
- 2001-09-19 WO PCT/US2001/029325 patent/WO2002088522A1/fr active Application Filing
- 2001-09-19 CA CA002547584A patent/CA2547584C/fr not_active Expired - Lifetime
- 2001-09-19 EP EP01971214A patent/EP1397579B1/fr not_active Expired - Lifetime
- 2001-09-19 DE DE60137974T patent/DE60137974D1/de not_active Expired - Fee Related
- 2001-09-19 AT AT08004186T patent/ATE452280T1/de not_active IP Right Cessation
Also Published As
Publication number | Publication date |
---|---|
ATE452280T1 (de) | 2010-01-15 |
DE60140827D1 (de) | 2010-01-28 |
EP1936112A3 (fr) | 2008-07-23 |
ATE425344T1 (de) | 2009-03-15 |
EP1936112A2 (fr) | 2008-06-25 |
WO2002088522A1 (fr) | 2002-11-07 |
DE60137974D1 (de) | 2009-04-23 |
CA2547584A1 (fr) | 2002-11-07 |
EP1397579A1 (fr) | 2004-03-17 |
EP1397579A4 (fr) | 2005-07-20 |
EP1936112B1 (fr) | 2009-12-16 |
CA2547584C (fr) | 2008-11-18 |
CA2448404A1 (fr) | 2002-11-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US6585044B2 (en) | Method, system and tool for reservoir evaluation and well testing during drilling operations | |
EP1397579B1 (fr) | Procede, systeme et outil pour evaluation d'un gisement et essai d'un puits pendant des operations de forage | |
CA2556427C (fr) | Soutirage regulier pour test de pression de formation | |
US7063174B2 (en) | Method for reservoir navigation using formation pressure testing measurement while drilling | |
EP1623090B1 (fr) | Appareil et procede d'essai de formations pour optimiser le tirage | |
US5741962A (en) | Apparatus and method for analyzing a retrieving formation fluid utilizing acoustic measurements | |
CA2416112C (fr) | Procede pour determiner des proprietes relatives a un puits en sous pression | |
US6176323B1 (en) | Drilling systems with sensors for determining properties of drilling fluid downhole | |
US7032661B2 (en) | Method and apparatus for combined NMR and formation testing for assessing relative permeability with formation testing and nuclear magnetic resonance testing | |
WO2011059959A2 (fr) | Intégration d'une source de données multiples pour applications de forage | |
US4739655A (en) | Method of automatically determining drilling fluid lag time while drilling a well | |
US8077545B2 (en) | Method for detecting gas influx in wellbores and its application to identifying gas bearing formations | |
EP0953726A1 (fr) | Dispositif et procédé pour l'essai de fluides de formation dans un puit au moyen de signaux acoustiques | |
US7832501B2 (en) | Measurement ahead of the drilling bit by analysis of formation cuttings using ultraviolet light to detect the presence of oil or gas | |
CA2542418C (fr) | Procede et systeme d'evaluation des caracteristiques de pression d'un fluide interstitiel dans une formation souterraine | |
Stuivenwold et al. | New instrumentation for managing sand-problem prone fields | |
GB2365039A (en) | Determining properties relating to underbalanced well | |
Chace et al. | A New Production Logging Service for Multiphase Horizontal Wells | |
SA02220637B1 (ar) | طريقة لقياس خواص الطمى mud والتكوين formation بقاع البئر downhole |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 20031124 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE TR |
|
AX | Request for extension of the european patent |
Extension state: AL LT LV MK RO SI |
|
RIN1 | Information on inventor provided before grant (corrected) |
Inventor name: WIEMERS, TIM Inventor name: CHACON, EDGAR Inventor name: RESTER, STEPHEN Inventor name: JOHNSON, MICHAEL, H. Inventor name: ALLEN, ROB, L. Inventor name: HUNT, JAMES, L. Inventor name: BALDAUFF, JOHN, J. |
|
A4 | Supplementary search report drawn up and despatched |
Effective date: 20050602 |
|
RIC1 | Information provided on ipc code assigned before grant |
Ipc: 7E 21B 47/10 B Ipc: 7E 21B 47/12 A |
|
17Q | First examination report despatched |
Effective date: 20060526 |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
REF | Corresponds to: |
Ref document number: 60137974 Country of ref document: DE Date of ref document: 20090423 Kind code of ref document: P |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090311 Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090311 |
|
NLV1 | Nl: lapsed or annulled due to failure to fulfill the requirements of art. 29p and 29m of the patents act | ||
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090611 Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090311 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090311 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090824 Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090622 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090311 |
|
26N | No opposition filed |
Effective date: 20091214 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20090930 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20100401 Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20090919 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20090930 Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20090930 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090612 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20090919 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090311 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090311 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 20110901 Year of fee payment: 11 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: IT Payment date: 20110915 Year of fee payment: 11 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: ST Effective date: 20130531 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20121001 Ref country code: IT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20120919 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 20190703 Year of fee payment: 19 |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20200919 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20200919 |