EP1258574A2 - Dalle composite porteuse pour bâtiments - Google Patents
Dalle composite porteuse pour bâtiments Download PDFInfo
- Publication number
- EP1258574A2 EP1258574A2 EP02396056A EP02396056A EP1258574A2 EP 1258574 A2 EP1258574 A2 EP 1258574A2 EP 02396056 A EP02396056 A EP 02396056A EP 02396056 A EP02396056 A EP 02396056A EP 1258574 A2 EP1258574 A2 EP 1258574A2
- Authority
- EP
- European Patent Office
- Prior art keywords
- steel sheet
- heat insulation
- concrete
- insulation layer
- joining plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
- E04B5/16—Load-carrying floor structures wholly or partly cast or similarly formed in situ
- E04B5/32—Floor structures wholly cast in situ with or without form units or reinforcements
- E04B5/36—Floor structures wholly cast in situ with or without form units or reinforcements with form units as part of the floor
- E04B5/38—Floor structures wholly cast in situ with or without form units or reinforcements with form units as part of the floor with slab-shaped form units acting simultaneously as reinforcement; Form slabs with reinforcements extending laterally outside the element
- E04B5/40—Floor structures wholly cast in situ with or without form units or reinforcements with form units as part of the floor with slab-shaped form units acting simultaneously as reinforcement; Form slabs with reinforcements extending laterally outside the element with metal form-slabs
Definitions
- the invention relates to a load bearing slab structure in buildings, where the slab structure comprises at least an upper metal sheet construction, a concrete layer provided on top of it and a heat insulation layer provided underneath it and arranged to join said slab construction at the top surface of said insulation layer, as well as a lower steel sheet construction provided at the bottom surface of said heat insulation layer, which steel sheet construction has a surface joint with to the bottom surface of said heat insulation layer, so that the distance between the upper and lower steel sheet constructions is defined by the heat insulation layer.
- Another object of the invention is a prefabricated element in order to realize in buildings a load bearing slab structure of the above-described type.
- Corrugated metal sheet has for a long time been used for instance in base floor structures, both as a casting mold and as a replacement for concrete reinforcements, in which case the corrugated sheet and the attached concrete together form a so-called composite structure.
- the combination of metal sheet and hardened concrete is generally called a composite slab.
- a critical feature in the design of said slab is the deformation created in the casting process prior to the hardening of the concrete. Said deformation is seen in a drawing of the patent publication GB-1,094,581, and in order to prevent the creation of such deformations, it is suggested that the corrugated metal sheet is supported, for the duration of the casting process, by auxiliary structures provided underneath, which structures are removed after the concrete mass is hardened. According to said publication, it also is advantageous to provide the corrugated metal sheet by an additional, generally straight metal sheet that is attached underneath it.
- the slab structure designed for base floor, intermediate floor, roof and wall structures of buildings, through which structures an air stream is arranged to flow for heating or cooling purposes.
- the slab structure comprises at least the following layers in a combined sandwich structure: an insulating layer made of self-adhesive, expandable insulation material; a corrugated sheet provided with grip protuberances; an intermediate sheet or the like arranged in between the two aforementioned layers, which intermediate sheet together with the corrugations of said corrugated sheet defines an air duct system in the structure, and which sheet prevents the corrugations of the corrugated sheet from being filled at said air ducts when producing the insulation layer of an expanding material; a casting component, for instance a concrete layer, which is either precast or cast on site, by using said corrugated sheet as the mold sheet, on the opposite side of the corrugated sheet with respect to said insulation layer, so that said casting component together with the
- an additional sheet is provided underneath the corrugated sheet, in similar fashion as in the above described publication GB-1 094 581, but here the purpose is to obtain in the corrugated sheet such air ducts that remain open irrespective of the casting and expansion of the insulation layer, which procedure is applied directly onto the combination of the corrugated sheet and the additional sheet.
- Said FI publication does not, however, at all discuss the problems that arise when casting wet, fluid concrete mass onto the corrugated sheet, i.e. onto the joining plate.
- the publication WO-96/02711 specifies a prefabricated sandwich element comprising an upper metal or steel sheet, a lower metal or steel sheet and a core part provided therebetween, said core part being made of expanded polystyrene, polyurethane or mineral wool.
- the sheets are joined to the core by gluing, heat-fusion or by adhesion.
- the side edges of the elements are provided with undercuts, and in said area, i.e. between the element edges, there are provided the edge parts of the lower sheet with their concrete engagements and the folds of the upper sheet with their concrete engagements.
- the edges of the lower sheet are folded to above the upper sheet, and in this area, there are arranged respective lower sheet edge parts with concrete engagements and upper sheet folds with concrete engagements.
- the elements can be joined together at said edges, or simply, in the second embodiment, arranged in a mutual butt contact. On top of said combination, there is cast concrete, which is engaged with the edge elements described above.
- a second defined teaching of said publication is that the concrete layer and element form, as a uniform entity, a load bearing structure, where the lower metal sheet carries the tensile stress, and the hardened thin concrete layer carries the compression stress.
- the concrete layer is fairly thin, i.e. the question is mainly of a concrete coating, which is not and cannot be the major load bearing structure element in the way it is described in the above mentioned publication.
- it is difficult to achieve a high load bearing capacity when using the suggested structure.
- the suggested structure may suffer from strength-weakening corrosion problems when it is used in base floors.
- the fire resistance of the suggested structure with respect to the space provided underneath it is below standard, which makes it difficult to use the structure as intermediate floors and roofs.
- the object of the present invention is to attain an element, suitable to be prefabricated, that can be installed, if possible, to rest only at the ends or side edges on the top edge of the foundation or of the walls, on top of which element there can then be poured fluid concrete mass without causing remarkable deformations in said element.
- the aim is to avoid the use of any supports that are arranged underneath the element in order to support it during the concrete casting, but are disassembled or removed after the concrete is hardened, even if the bearing distance should be large.
- a second object of the invention is to attain a load bearing slab structure for buildings, which slab structure is based on metal sheets and a concrete layer and is capable of bearing even large loads.
- a third object of the invention is to attain a slab structure of the described type, which could also function as an ideally effective heat insulation without harmful cold bridges and could insulate, when used as a base floor, the space above it for instance against the radon emitted from the ground underneath the slab without having to perform additional work on site. Further an object of the invention is to attain a load bearing slab structure with first-class fire resistance, which can accordingly be used in many different building subjects.
- the most essential advantage of the slab structure of the invention is the fact that it can be used, apart from a base floor with a creeper space in buildings, also as an intermediate floor and a roof, and it already has an excellent load bearing capacity in itself, which capacity can be further adjusted by means of additional concrete reinforcements and by the thickness of the concrete casting, although in most cases additional reinforcements are not needed at all, or only to a minimal degree.
- An additional advantage is that in most cases, after the concrete has hardened, it is not necessary to do for example insulation work, because the slab structure already includes insulation against moisture, heat and radon, and the slab structure is compacted, without any special measures, for instance against the heat insulation of the foundation.
- the most essential advantage of the prefabricated element to be utilized in the production of the slab structure is that it is capable of carrying the load of the wet concrete mass even with a large bearing distance, for instance 6 - 7 m, without specially added props or supports, with only minimal deformations. This means that in most cases the elements can be installed at their ends and/or edges only, to rest on the foundation or the wall edges, and extra intermediate supports are not needed. After casting, the load bearing slab is ready, because the structure does not need dismountable molds or casting supports, and piping and the like for various purposes can be suspended in the slab structure.
- the joining plate functions by compression stress, and after the concrete is hardened, when the base floor is loaded, it functions by tensile stress, and secondly, that the tensile stress created in the bottom surface sheet of the heat insulation and the compression stress created in the joining plate receive the deformation moment directed towards the element by the weight of the wet concrete.
- the ready-made slab structure according to the invention has excellent fire resistance, because there the steel parts that in part receive the total loads, i.e. the joining plate in particular, are effectively heat insulated during a fire, also against heat that comes from below. This makes it possible to use the slab structure according to the invention also as intermediate floors and roofs.
- the ready-made slab structure according to the invention also has an excellent heat insulation capacity, because the joining plate provided on top and the steel sheet part or steel profiles provided underneath are not at any point in mutual contact and do not even come near to each other. Thus both heat losses and condensation water problems are avoided, and the slab structure of the invention can be used both as base floors and as roofs without extra heat insulation. Moreover, among the advantages of the invention let us point out the possibility to lay the foundations of a building at a rapid speed, particularly when combined with steel beams. A remarkable amount of time and money is saved in reduced earth-moving and digging work. Because the base floor is not supported against the earth, it need not be built and evened out.
- a light and accurately measured prefabricated element, combined of an insulation, a joining plate and a steel sheet part or steel sheet profiles, is economical to transport even at longer distances, and these elements are easily installed irrespective of the weather conditions. For instance the installation of floor heating in cast concrete is conveniently carried out. All of the above mentioned features result in cost-effective, rapid and ecologically efficient building.
- Fig. 1 represents a first embodiment of a load-bearing slab structure according to the invention and of an element prefabricated for said structure, shown in a cross-section corresponding to the plane I - I of figure 4, and seen in an axonometric illustration.
- Fig. 2 represents a second embodiment of a load-bearing slab structure according to the invention and of an element prefabricated for said structure, shown in a cross-section corresponding to the plane I - I of figure 4, and seen in an axonometric illustration.
- Fig. 3 represents a third embodiment of a load-bearing slab structure according to the invention and of an element prefabricated for said structure, shown in a cross-section corresponding to the plane I - I of figure 4, and seen in an axonometric illustration.
- Fig. 4 illustrates a fourth embodiment of a load-bearing slab structure according to the invention and of an element prefabricated for said structure, seen in a longitudinal section corresponding to the plane II - II of figures 1 - 2, and shown as installed in the final location, on the foundation or walls of a building.
- the slab structure 1 comprises at least an upper metal sheet construction, on top of it a concrete layer 7 and underneath it a heat insulation layer 8, the top surface Py of said heat insulation layer being fixed with said sheet construction, as well as a lower steel sheet construction installed at the bottom surface Pa of said heat insulation layer, which lower steel sheet construction is in surfaced fixing with the bottom surface of the heat insulation layer, so that the distance between the upper and lower steel sheet constructions is defined by the thickness H2 of the heat insulation layer.
- the load bearing slab structure 1 for buildings is suited to be used in buildings as base floors, intermediate floors and roofs, but especially as base floors and reinforcements owing to the heat insulation layer 8 that constitutes the structural part thereof.
- the ready-made slab structure 1 according to the invention comprises at least a corrugated metal joining plate 3 and a concrete layer 7 that is cast and hardened on site on top of said slab structure and is thus attached to the joining plate provided with several concrete engagement ribs 13.
- a ready-made slab structure 1 includes a heat insulation layer 8 provided underneath said joining plate 3 and attached to said slab 3 at its top surface Py.
- the slab structure 1 also includes either a continuous steel sheet part 4 attached to the bottom surface Pa of said heat insulation layer by means of a surfaced fixing, or a number of adjacent steel sheet profiles 5, 6 attached thereto by means of a surface joint.
- Said steel sheet part 4 or respectively the steel sheet profiles 5, 6 have dimensions to carry, in the slab structure 1, at least those tensile stresses that are directed thereto, during the casting of the concrete mass B and after it, when the concrete mass still is in fluid state.
- the joining plate 3 has shapes and dimensions to carry at least the tensile stresses, directed thereto during the use of the slab structure, of the total load C + F, composed of the weight of the hardened concrete C and of the external other load F resting on the slab structure when the concrete C is hardened, while the joining plate and the hardened concrete C together form the main load bearing structure of the ready-made slab.
- the joining plate 3 has shapes and dimensions to carry the compression stresses caused by the fluid, not yet hardened concrete mass created by the concrete layer 7.
- the materials of the slab structure include, starting from the top: concrete or reinforced concrete, typically a joining plate made of steel, and heat insulation, as well as the steel profiles or steel sheet provided at the bottom surface.
- the load bearing slab structure 1 according to the invention is composed of four superimposed and mutually joined structural parts with a structural joining effect between them.
- an industrially made, prefabricated element 20 which is brought to the building site to be used as an underlay for base floors, intermediate floors or roofs.
- Said prefabricated element 20 comprises a composite steel slab 3 provided with at least several concrete engagement ribs 13, a heat insulation layer 8 directly attached to said slab 3, and a continuous steel sheet part 4, or a number of adjacent steel sheet profiles 5, 6 provided at the bottom surface Pa of the heat insulation layer.
- the joining plate 3 is advantageously composed of a continuous steel sheet, i.e. one continuous steel sheet, provided with several concrete engagement ribs 13 that are widened when proceeding away from the heat insulation layer, i.e. in the direction W2 ⁇ W1.
- the top surface Py of the heat insulation layer 8 is directly, i.e. immediately, without other sheet material layers, attached to at least the downwardly directed intermediate sections 12 arranged between the concrete engagement ribs 13, i.e. the sections that are located against the heat insulation layer.
- Said intermediate sections 12 may be planar in shape, or they may include various patterns 19 in order to enhance the engagement of the concrete layer 7, or in order to further reinforce the prefabricated element 20.
- the envelope surface of the intermediate sections 12 is advantageously a plane, and at least 50% or advantageously at least 70% of the area of the planar and intermediate sections is connected to said envelope surface, so that in a preferred embodiment of the heat insulation, the planar top surface Py is attached to the joining plate 3 in a sufficiently large area.
- the heat insulation layer 8 is cast onto the composite steel slab, said planar feature is of no remarkable importance.
- the sheet part and respectively the profiles have shapes and dimensions to carry at least the tensile stresses directed thereto when the concrete layer 7 of the slab structure is still in the form of non-hardened concrete mass B.
- the bending resistance of the joining plate 3 is higher than the bending resistance of the part 4 of the continuous steel sheet, or the added bending resistance of the adjacent steel sheet profiles 5, 6, in which values there are taken into account both the material thickness and shape of the concrete engagement ribs 13, and possibly the shape of the longitudinal corrugations 15.
- the bending resistance of the joining plate is essentially higher, for instance at least 1.5 times as high or typically at least double or possibly at least triple in comparison with the bending resistance of the continuous steel sheet par, or with the added bending resistances of the adjacent steel sheet profiles.
- the material thickness S1 of the joining plate 3 is larger than the material thickness S2 of the continuous steel sheet part, or the average of the material thickness S3 of the adjacent steel sheet profiles, i.e. the real material thickness when calculated as distributed throughout the whole slab.
- the above described element 20 is arranged, at the ends 16b or the edges 16a, 16b, to rest on the foundation 30 or the walls 30b, so that the steel joining plate points upwardly, and the steel sheet part 4 or respectively the steel sheet profiles 5, 6, point downwardly, in which case in the area below the steel sheet part or the steel sheet profiles, restricted by the element ends or side edges, there is left a space T for air, such as a ventilated plinth or a room.
- the prefabricated element 20 has sufficient rigidity and strength in order to be able to operate at the length L L and width of the element between the ends 16b or the edges 16a, 16b without intermediate supports that should later be removed.
- the building may for various reasons be provided with load bearing structures, or with walls at other places than at the ends or edges of the element.
- these supports are not removable but permanent supports, and they do not prevent the achieving of the advantages of the invention, i.e. the extremely long bearing distance or support distance.
- the fluid concrete mass is poured onto the composite steel slab 3 up to the desired thickness H1, whereafter the concrete mass is allowed to be hardened to form the concrete layer 7.
- the thickness H1 of the concrete layer 7 is larger, in a predetermined proportion, than the height H4 of the concrete engagement ribs 13.
- the thickness of the cast concrete is 100 mm - 160 mm, but depending on the situation it may even fall outside the range of said measures.
- a concrete reinforcement 17 can be added in a suitable way on top of the joining plate profile prior to the casting of the concrete mass B.
- the simplest way to do this is to arrange the concrete reinforcement in a lattice, so that the first set of reinforcement steels is arranged on top of the concrete engagement ribs 13 of the joining plate, whereafter there is added, transversally on top of them, a second set of reinforcement steels, so that the second set is arranged transversally to the first set and suitably attached thereto, and positioned at least approximately in parallel with the concrete engagement ribs 13 and arranged for example in between them, as is seen in figure 2.
- the concrete layer 7 includes, after the concrete mass B is hardened, a concrete reinforcement 17 that is separate from the joining plate, which concrete reinforcement together with the joining plate 3 increases the load bearing capacity of the slab structure, i.e. its rigidity and strength.
- the composite steel slab 3 protrudes out of the heat insulation layer 8 and of the steel sheet part 4 located below it, or respectively out of the steel sheet profiles 5, 6 for the length of the protrusion Lu.
- the protrusions Lu or more accurately the intermediate sections 12 shown in said protrusions, are positioned so that they rest on top of the supporting top surfaces 23 of the load bearing areas of the foundation 30a or the walls 30b. Now the fluid concrete mass B can be cast.
- the external lining plate 18 of the foundation 30a or of the walls 30b or the like which plate may on the inner surface include the heat insulation 29 of the foundation or plinth or wall, in the way described in figure 4, is allowed to extend upwardly from the surface 23 supporting the element 20 of the foundation and respectively of the wall, for the length of the mold height H3, in which case the external lining plate 18 serves as the mold for the concrete mass B to be cast.
- the prefabricated element 20 so that the bottom surface Pa of its heat insulation layer 8 and/or the bottom surfaces of the steel sheet part 4 or the steel sheet profiles 5, 6 are set, when installing the element in place, against the top edge 28 of the heat insulation possibly provided at the inner surface of the foundation or the wall, in which case a continuous, continuous heat insulation is achieved in the junction of the base floor or the roof and the foundation 30a or respectively the wall 30b.
- the joining plate 3 is preferably made of an element obtained by bending one single steel sheet, which means that the joining plate 3 contains only one layer of steel sheet material, but other corresponding joining plates can, when desired, be supplied for instance in succession and adjacently in the horizontal direction, in the planar direction of the joining plate, i.e. in the installation direction.
- said arrangement of the slabs in succession can hardly bring forth any advantages, because it is already possible to manufacture as large joining plates as the transportation conditions of prefabricated elements 20 allow.
- Glue layers for instance glue films, or surface coating, such as zinc coating or the like, is naturally not considered as sheet material.
- the joining plate 3 is provided with concrete engagement ribs 13 and intermediate sections 12 therebetween.
- the average distances W3 between the concrete engagement ribs 13 are essentially smaller than the width W L of the joining plate, which means that one prefabricated element 20 includes several, generally at least three concrete engagement ribs 13, but preferably four or several concrete engagement ribs.
- the concrete engagement ribs are dovetail-shaped, in which case the width W2 of the ribs at the point that is level with the intermediate sections is essentially smaller than the width W1 of the ribs at the bottom 21 of the ribs, which bottom is located at the rib distance H4 from the intermediate sections 12.
- the height of the concrete engagement ribs 13 can be within the range 30 mm - 70 mm, although other measures can also be applied according to the needs of the situation.
- the concrete engagement ribs 13 are arranged in the elements 20 so that the width transversal to their length is increased, i.e. W2 ⁇ W1, when proceeding away from the heat insulation layer, and they obtain a shape where they are widened towards the inside of the concrete layer 7, W2 ⁇ W1.
- the bottoms 21 of the concrete engagement ribs 13 are, at least in the direction opposite to the longitudinal direction of the ribs, which is the same as the direction of the length L L of the element 20, provided with transversal grips 22, such as additional ribs.
- the composite steel sheet 3 only its overall shape is described here, but it may also include several other details. This type of joining plate and its functions in the hardened concrete layer 7 is known as such, wherefore they are not explained in more detail here.
- the heat insulation layer 8 is attached, with a separate glue layer 9a, as in figure 1, or with a glue 9c contained in the heat insulation layer 8, for instance with the glue formed by the binding agent of mineral wool when said heat insulation is mineral wool, or with glue additionally absorbed therein, as is apparent from figure 3, to the downwardly pointing intermediate sections 12 provided in between the concrete engagement ribs 13.
- the described adhesion of the joining plate 3 and the heat insulation layer 8 with glue 9a or 9c is obtained, when the heat insulation layer is formed of a separately manufactured heat insulation plate, which can be made of expanded polymer or mineral wool.
- the heat insulation layer 9 is, due to its own adhering properties 9d, attached both to the flute surfaces 23 of the concrete engagement ribs 13 and to the downwardly pointing intermediate sections 12 provided in between the concrete engagement ribs.
- This kind of adhesion is achieved by casting the expanded or expandable plastic directly against the joining plate 3 and by allowing it thus to be polymerized to the desired density and hardness, in which case both the heat insulation layer 8 and its adhesion to the joining plate are obtained in one and the same work step.
- the heat insulation layer 8 is made of expanded polymer, it advantageously contains rigid expanded polystyrene or rigid expanded polyurethane, but it is possible that other suitable polymers shall also be made commercially available.
- the employed heat insulation layer 8 can be made of mineral wool or a similar material that is bound with a hardening, i.e. polymerizing plastic or with some other binding agent - in which case the fire resistance, or resistance to high temperatures, of said agent must also be taken into account. It is also possible to improve the fire resistance, or resistance to high temperatures, of expanded polymers by a suitable treatment, for instance by adding fire resistant agents. It is not as such necessary that the material of the heat insulation layer 8 maintains its strength at high temperatures, i.e.
- the material of the heat insulation layer is neither ignited nor destroyed; in other words, it suffices that said heat insulation material maintains an essential part of its fire resistance properties, i.e. is capable to carry its own weight at high temperatures, and thus maintains its porous internal structure as well as its outer shape and measures.
- the heat insulation layer need not carry external loads in these conditions, i.e. when it is contained in a ready-made slab structure, where the concrete C already is hardened.
- the material of the heat insulation layer 8 must be sufficiently strong in the installation conditions, for example at room temperature and/or at open air temperatures, where the concrete mass B still is in a fluid state.
- the compression strength of the material of the heat insulation layer must be at least 75 kPa, but typically at least 100 kPa. If possible, the compression strength of the heat insulation layer material should be at least of the order 200 kPa - 300 kPa.
- the thickness H2 of the heat insulation layer is typically about 150 - 200 mm, although other measures are also possible, and it must be resistant to moisture, as well as to stresses caused by the junction effects between the heat insulation layer, the joining plate 3 and the steel sheet part 4, to be explained in more detail below, or the steel sheet profiles.
- the steel sheet part 4 and respectively the steel sheet profiles 5, 6, can be realized by alternative structures.
- the continuous steel sheet part 4 is essentially planar, as is shown in figure 4.
- the continuous steel sheet part 4 contains longitudinal ridges 15 that extend into the heat insulation layer 8, as is shown in figure 2.
- the adjacent steel sheet profiles 5 are either planar strip profiles 5a, i.e. steel sheet strips, as is shown in figure 1, or shaped profiles 5b provided with a longitudinal ridge 15, as is shown in figure 3.
- the steel sheet profiles are generally referred to with the number 5, and the more detailed reference numbers 5a, 5b are only used when special cases are being discussed.
- the continuous steel sheet part 4 may also contain for example perforations 14.
- the steel sheet part 4, and respectively the outermost profiles 6 of the steel sheet profiles 5, 6, may also contain folds 11 pointing towards the joining plate 3 along the sides 16a of the slab structure. This means that said folds 11 are bent 90° around the edge of the heat insulation layer and extend at a given length along the side surface of the heat insulation, advantageously attached thereto.
- the grip between the steel sheet part 4, to be described next, and the steel sheet profiles 5, 6, can be further improved.
- the joining plate 3 and the continuous steel sheet 4 or the steel sheet profiles 5, 6, are at all points arranged at a minimum distance H8, i.e. the joining plate and the continuous steel sheet part or the steel sheet profiles are not in contact at any point.
- Said minimum distance H8 is secured both between the continuous steel sheet part 4 or the top surfaces of the longitudinal ridges 15 of the steel sheet profiles 5, 6 and the joining plate, and between the steel sheet part 4 or the top edges of the folds 11 provided at the edges of the steel sheet profiles 5, 6 and the joining plate, for example the intermediate sections 12 thereof.
- said minimum distance H8 is at least 30% of the thickness H2 of the heat insulation layer, or advantageously at least 50% of the thickness H2 of the heat insulation layer. If longitudinal ridges 15 and/or folds 11 are not provided in the structure, the minimum distance H8 is equal to the thickness H2 of the heat insulation layer.
- the steel sheet part 4 or respectively the steel sheet profiles 5, 6 are arranged to form a surfaced fixing with the heat insulation layer 8 by means of a separate layer of glue 9b, as in figure 1, or by means of the glue 9c contained in the heat insulation layer 8, for example by means of glue formed by the binding agent when the heat insulation is made of mineral wool, or by means of glue additionally absorbed therein, as in figure 3.
- glue 9b or 9c contained in the heat insulation layer 8
- the described engagement achieved by means of glue 9b or 9c between the steel sheet part 4 or the steel sheet profiles 5, 6 and the heat insulation layer 8 is achieved, when the heat insulation layer is formed of a separately manufactured heat insulation plate, which can be made of expanded polymer or mineral wool.
- the heat insulation layer 8 may, owing to its own adhering properties 9d, also be in surface engagement with the steel sheet part 4 or with the steel sheet profiles 5 along the whole surface thereof, irrespective of whether said steel sheet parts or steel sheet profiles, in this case shaped profiles 5b, include longitudinal ridges 15 or not.
- the latter situation is created by pouring the expanded or expandable plastic directly against the steel sheet part 4 or the steel sheet profiles 5, and by allowing it then to be polymerized to the desired density and hardness, as was already described above.
- the own adhesive properties of the glue 9b, 9c, or of the heat insulation 9d must have a predetermined strength that is capable of transferring at least those shearing forces that are created when the concrete layer 7 exists as a not yet hardened concrete mass B.
- Either the joining plate 3 and/or the steel sheet part 4 and/or the heat insulation layer 8 and/or at least one of the layers of the glue 9a, 9b is advantageously impermeable to gas, in which case it is possible to make the structure insulate any radon gas emitted from the ground, which is necessary when the slab structure is used as a base floor.
- This impermeability to gas when positioned at the right spot, also forms a steam block, which is necessary when the structure 1 is used as a base floor or roof.
- the joining plate 3 and the concrete layer 7 made of hardened concrete, possibly provided with additional concrete reinforcements constitute the primary load bearing structure, and the heat insulation layer 8 serves as an insulation against radon gas, moisture and heat.
- the steel sheet profiles 5, 6, or the steel sheet part 4 serve mainly as suspension structures for sewers and pipework.
- the heat insulation layer and the steel sheet profiles 5, 6 or the steel sheet part 4 also increase the rigidity of the ready-made structure, thus reducing deformations and problems owing to vibration.
- the joining plate 3 when casting concrete, when the concrete is fluid concrete mass B, the joining plate 3 operates under compression stress, and after the concrete is hardened, when loading the slab structure 1, under tensile stress.
- the joining plate 3 has dimensions to be able to carry said compression and tensile stresses. For the sake of clarity, let us point out that compression stresses from the casting period are not transferred to the concrete, because at that stage the concrete is not yet hardened. Compression stresses in the joining plate lower post-casting tension levels during an effective load on the joining plate, but according to the current understanding, this does not have any remarkable effect in the functions of the structure.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Laminated Bodies (AREA)
- Building Environments (AREA)
- Panels For Use In Building Construction (AREA)
- Acyclic And Carbocyclic Compounds In Medicinal Compositions (AREA)
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
FI20011033A FI119604B (fi) | 2001-05-16 | 2001-05-16 | Kuormitusta kantava yhdistetty laatta rakennuksia varten |
FI20011033 | 2001-05-16 |
Publications (3)
Publication Number | Publication Date |
---|---|
EP1258574A2 true EP1258574A2 (fr) | 2002-11-20 |
EP1258574A3 EP1258574A3 (fr) | 2003-09-03 |
EP1258574B1 EP1258574B1 (fr) | 2006-03-01 |
Family
ID=8561213
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP02396056A Expired - Lifetime EP1258574B1 (fr) | 2001-05-16 | 2002-04-19 | Dalle composite porteuse pour bâtiments |
Country Status (5)
Country | Link |
---|---|
EP (1) | EP1258574B1 (fr) |
AT (1) | ATE318965T1 (fr) |
DE (1) | DE60209461D1 (fr) |
DK (1) | DK1258574T3 (fr) |
FI (1) | FI119604B (fr) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1605112A1 (fr) * | 2004-06-11 | 2005-12-14 | O & P Research and Development | Procédé pour la fabrication d'une construction de bâtiment et coffrage pour ce procédé |
WO2008041251A1 (fr) * | 2006-10-05 | 2008-04-10 | Metecno S.P.A. | Structure de plancher de bâtiment et procédé pour sa pose |
WO2009010994A1 (fr) * | 2007-07-16 | 2009-01-22 | Metecno S.P.A. | Panneau autoportant pour des planchers de bâtiment et plancher résultant de celui-ci |
WO2010135795A1 (fr) * | 2009-05-28 | 2010-12-02 | Tuper S.A | Dalle de ciment ondulé comportant des moules structuraux |
CN104314210A (zh) * | 2014-10-17 | 2015-01-28 | 李东 | 一种增强边框岩棉板隔音轻质楼板 |
JP2017110453A (ja) * | 2015-12-18 | 2017-06-22 | Jfe建材株式会社 | フラットデッキプレート |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP2752528A1 (fr) | 2013-01-04 | 2014-07-09 | Termo Panels Oy | Élément de dallage |
RU191406U1 (ru) * | 2019-03-22 | 2019-08-05 | Олег Георгиевич Асташов | Строительная теплоизоляционная панель |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2245688A (en) * | 1940-12-19 | 1941-06-17 | H E Beyster Corp | Roof structure |
FR1199624A (fr) * | 1958-04-03 | 1959-12-15 | Plancher en béton armé à coffrage suspendu | |
GB1094581A (en) * | 1965-01-27 | 1967-12-13 | Robertson Co H H | Corrugated and composite sheets particularly for floors |
FR2098568A5 (fr) * | 1970-07-10 | 1972-03-10 | Catesson Claude | |
US3712010A (en) * | 1970-08-17 | 1973-01-23 | Univ Iowa State Res Found | Prestressed metal and concrete composite structure |
US4120131A (en) * | 1976-09-03 | 1978-10-17 | Carroll Research, Inc. | Building structure |
US4517782A (en) * | 1980-12-12 | 1985-05-21 | Nadalaan S.A. | Construction element |
WO1999055978A1 (fr) * | 1998-04-24 | 1999-11-04 | Granstroem Anders | Structure de sol |
-
2001
- 2001-05-16 FI FI20011033A patent/FI119604B/fi not_active IP Right Cessation
-
2002
- 2002-04-19 DE DE60209461T patent/DE60209461D1/de not_active Expired - Lifetime
- 2002-04-19 DK DK02396056T patent/DK1258574T3/da active
- 2002-04-19 EP EP02396056A patent/EP1258574B1/fr not_active Expired - Lifetime
- 2002-04-19 AT AT02396056T patent/ATE318965T1/de not_active IP Right Cessation
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2245688A (en) * | 1940-12-19 | 1941-06-17 | H E Beyster Corp | Roof structure |
FR1199624A (fr) * | 1958-04-03 | 1959-12-15 | Plancher en béton armé à coffrage suspendu | |
GB1094581A (en) * | 1965-01-27 | 1967-12-13 | Robertson Co H H | Corrugated and composite sheets particularly for floors |
FR2098568A5 (fr) * | 1970-07-10 | 1972-03-10 | Catesson Claude | |
US3712010A (en) * | 1970-08-17 | 1973-01-23 | Univ Iowa State Res Found | Prestressed metal and concrete composite structure |
US4120131A (en) * | 1976-09-03 | 1978-10-17 | Carroll Research, Inc. | Building structure |
US4517782A (en) * | 1980-12-12 | 1985-05-21 | Nadalaan S.A. | Construction element |
WO1999055978A1 (fr) * | 1998-04-24 | 1999-11-04 | Granstroem Anders | Structure de sol |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1605112A1 (fr) * | 2004-06-11 | 2005-12-14 | O & P Research and Development | Procédé pour la fabrication d'une construction de bâtiment et coffrage pour ce procédé |
NL1026388C2 (nl) * | 2004-06-11 | 2005-12-15 | O & P Res And Dev | Werkwijze voor het vervaardigen van een bouwconstructie, alsmede bekisting daarvoor. |
US7845138B2 (en) | 2004-06-11 | 2010-12-07 | Op-Deck Holdings B.V. | Method for the production of a building construction as well as formwork therefor |
WO2008041251A1 (fr) * | 2006-10-05 | 2008-04-10 | Metecno S.P.A. | Structure de plancher de bâtiment et procédé pour sa pose |
WO2009010994A1 (fr) * | 2007-07-16 | 2009-01-22 | Metecno S.P.A. | Panneau autoportant pour des planchers de bâtiment et plancher résultant de celui-ci |
WO2010135795A1 (fr) * | 2009-05-28 | 2010-12-02 | Tuper S.A | Dalle de ciment ondulé comportant des moules structuraux |
CN104314210A (zh) * | 2014-10-17 | 2015-01-28 | 李东 | 一种增强边框岩棉板隔音轻质楼板 |
JP2017110453A (ja) * | 2015-12-18 | 2017-06-22 | Jfe建材株式会社 | フラットデッキプレート |
Also Published As
Publication number | Publication date |
---|---|
FI20011033A (fi) | 2002-11-17 |
EP1258574A3 (fr) | 2003-09-03 |
FI119604B (fi) | 2009-01-15 |
DK1258574T3 (da) | 2006-06-26 |
DE60209461D1 (de) | 2006-04-27 |
ATE318965T1 (de) | 2006-03-15 |
FI20011033A0 (fi) | 2001-05-16 |
EP1258574B1 (fr) | 2006-03-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US6578343B1 (en) | Reinforced concrete deck structure for bridges and method of making same | |
US7143555B2 (en) | Hybrid precast concrete and metal deck floor panel | |
FI91180B (fi) | Ennalta valmistettu rakennuksen perustuselementti | |
WO2000079069A1 (fr) | Systeme formant une paroi monolithique en beton | |
US20090217612A1 (en) | Modular Composite Floor Units | |
EA011532B1 (ru) | Конструкция междуэтажного перекрытия со стальными балками перекрытия, снабженными отверстиями с кромками | |
US3894370A (en) | Reinforced structures incorporating strip deck material | |
US7845138B2 (en) | Method for the production of a building construction as well as formwork therefor | |
US3956859A (en) | Foundation of a heated building without a cellar | |
EP0880627B1 (fr) | Structure de plancher ou de plafond | |
EP1258574B1 (fr) | Dalle composite porteuse pour bâtiments | |
CA3053454C (fr) | Element de construction hybride en beton poreux | |
FI69178B (fi) | Byggnadssystem baserat pao tunna betongplattor och kassettelement foer genomfoerande av detsamma | |
DK174207B1 (da) | Dæk med virkning som en sammensat konstruktion | |
RU201193U1 (ru) | Сталебетонное изоляционное перекрытие | |
CN113684957A (zh) | 一种组合楼板及其施工方法 | |
RU2194131C2 (ru) | Многослойная панель | |
SE512156C2 (sv) | Bjälklagskonstruktion | |
JP2004197520A (ja) | ボイド型枠、そのボイド型枠を使用したコンクリート構造及びコンクリート層の施工方法 | |
FI82743B (fi) | Foerfarande foer framstaellning av en sammansatt konstruktion och formskiva foer anvaendning i sammansatta konstruktioner. | |
RU55806U1 (ru) | Сборно-монолитное неразрезное перекрытие из комплексных железобетонных элементов для каркасных зданий | |
AU772991B2 (en) | Integral concrete wall forming system | |
JP2000038781A (ja) | 建物の防音構造 | |
OA19152A (en) | Aerated concrete-hybrid construction element. | |
EP3423646A1 (fr) | Plancher de base d'un bâtiment et procédé de construction d'une base d'un bâtiment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
AK | Designated contracting states |
Kind code of ref document: A2 Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE TR |
|
AX | Request for extension of the european patent |
Free format text: AL;LT;LV;MK;RO;SI |
|
PUAL | Search report despatched |
Free format text: ORIGINAL CODE: 0009013 |
|
AK | Designated contracting states |
Kind code of ref document: A3 Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE TR |
|
AX | Request for extension of the european patent |
Extension state: AL LT LV MK RO SI |
|
17P | Request for examination filed |
Effective date: 20040116 |
|
AKX | Designation fees paid |
Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE TR |
|
AXX | Extension fees paid |
Extension state: LT Payment date: 20040116 Extension state: RO Payment date: 20040116 Extension state: SI Payment date: 20040116 Extension state: LV Payment date: 20040116 |
|
17Q | First examination report despatched |
Effective date: 20041125 |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE TR |
|
AX | Request for extension of the european patent |
Extension state: LT LV RO SI |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT;WARNING: LAPSES OF ITALIAN PATENTS WITH EFFECTIVE DATE BEFORE 2007 MAY HAVE OCCURRED AT ANY TIME BEFORE 2007. THE CORRECT EFFECTIVE DATE MAY BE DIFFERENT FROM THE ONE RECORDED. Effective date: 20060301 Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20060301 Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20060301 Ref country code: BE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20060301 Ref country code: LI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20060301 Ref country code: CH Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20060301 |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20060419 |
|
REF | Corresponds to: |
Ref document number: 60209461 Country of ref document: DE Date of ref document: 20060427 Kind code of ref document: P |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20060430 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20060602 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20060612 |
|
REG | Reference to a national code |
Ref country code: SE Ref legal event code: TRGR |
|
REG | Reference to a national code |
Ref country code: DK Ref legal event code: T3 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20060801 |
|
LTIE | Lt: invalidation of european patent or patent extension |
Effective date: 20060301 |
|
NLV1 | Nl: lapsed or annulled due to failure to fulfill the requirements of art. 29p and 29m of the patents act | ||
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
26N | No opposition filed |
Effective date: 20061204 |
|
EN | Fr: translation not filed | ||
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20070309 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20060602 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20060301 Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20060419 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DK Payment date: 20080425 Year of fee payment: 7 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20060430 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FI Payment date: 20080418 Year of fee payment: 7 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20060301 Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20060301 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 20080424 Year of fee payment: 7 |
|
REG | Reference to a national code |
Ref country code: DK Ref legal event code: EBP |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20090419 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20090419 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20090419 Ref country code: DK Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20090430 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: SE Payment date: 20190416 Year of fee payment: 18 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20200420 |