EP1216340B1 - Method and device for construction of an underground pipe duct - Google Patents

Method and device for construction of an underground pipe duct Download PDF

Info

Publication number
EP1216340B1
EP1216340B1 EP00967606A EP00967606A EP1216340B1 EP 1216340 B1 EP1216340 B1 EP 1216340B1 EP 00967606 A EP00967606 A EP 00967606A EP 00967606 A EP00967606 A EP 00967606A EP 1216340 B1 EP1216340 B1 EP 1216340B1
Authority
EP
European Patent Office
Prior art keywords
pipe elements
elements
substructure
pipe
behind
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
EP00967606A
Other languages
German (de)
French (fr)
Other versions
EP1216340A1 (en
Inventor
Ludwig Pfeiffer
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ludwig Pfeiffer Hoch- und Tiefbau & Co KG GmbH
Original Assignee
Ludwig Pfeiffer Hoch- und Tiefbau & Co KG GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ludwig Pfeiffer Hoch- und Tiefbau & Co KG GmbH filed Critical Ludwig Pfeiffer Hoch- und Tiefbau & Co KG GmbH
Publication of EP1216340A1 publication Critical patent/EP1216340A1/en
Application granted granted Critical
Publication of EP1216340B1 publication Critical patent/EP1216340B1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/04Directional drilling
    • E21B7/046Directional drilling horizontal drilling
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/20Driving or forcing casings or pipes into boreholes, e.g. sinking; Simultaneously drilling and casing boreholes

Definitions

  • the invention relates to a method specified in the preamble of claim 1 Genus and a device according to the preamble of claim 4.
  • the invention is based on the object, the method and the device of at the outset designated type in that the nachzuschiebenden the dismantling unit Pipe elements are exposed to significantly smaller loads and therefore much cheaper pipes can be used.
  • the invention has the advantage that due to the drive coupling the tube elements to a arranged in its interior, gradually advanced Substructure each individual pipe element only to his own propulsion must absorb necessary forces.
  • the main load is absorbed by the substructure, which comparatively inexpensively from push rods, pipes, lattice girders od. Like. Are assembled can and z. B. is made of steel.
  • an apparatus for producing an underground pipe a removal unit 1, which is driven from a starting or Preßgrube 2 in a preselected, usually horizontal advancing direction v , so that a gradually longer, suitable for receiving the pipe through hole 3 arises.
  • the dismantling unit 1 includes in the exemplary embodiment a cutting head 4, which can be rotated by means of a drive motor, not shown, in revolutions and has a substantially the inner diameter of the through hole 3 corresponding outer diameter. With the cutting head 4 a this in the direction of arrow v trailing and rotatable here with him conveyor 5 is connected in the form of a screw conveyor, which serves the purpose of transporting detached from the cutting head 4 soil in the start pit 2.
  • the dismantling unit 1 usually has a working tube 6, at the front end of a control head 7 is pivotally mounted, which is adjustable by means of hydraulic or pneumatic cylinder / piston assemblies 8 within certain limits to correct the propulsion direction v as needed or influence to be able to.
  • the control head 7 has a rearwardly tapered sliding surface 9, which creates a transition from the diameter of the through-hole 3 to the smaller inner diameter of a guide and transport tube 10 and forms a type of hopper for the mined material.
  • the conveyor 5 is composed of individual sections, which are coupled in the direction of advance v or in the direction of a parallel axis 11 of the through hole 3 to each other, as indicated in Fig.
  • the guide and transport tube 10 is composed of individual pipe sections, which are arranged in succession on impact.
  • Fig. 1 schematically a hydraulic or pneumatic, acting on the guide and transport tube 10 and / or the conveyor 5 propulsion unit 14 indicated by means of which the cutting head 4, the conveyor 5 and the guide and transport tube 10 in the course of To be driven for a longer through hole 1.
  • the actual pipeline is formed by means of tubular elements 18, which the Working tube 6 are pushed from the starting pit 2 and the outer diameter essentially correspond to the inner diameter of the perforation 3.
  • the inner diameter of the Pipe elements 18 sufficiently larger than the outer diameter of the guide and Transport tube 10, so that between the two a hollow space 19 (Fig. 2 and 3) arises in the manner of a cylinder ring.
  • the substructure 20 is formed by two push rods 21 and 22, preferably made of square tubes.
  • Each push rod 21, 22 is, as shown in particular in FIGS. 2 and 4, composed of a plurality of rod sections 21a, 21b, or 22a, 22b arranged one behind the other in the direction of advance v .
  • Each rod portion 21a, 22a and 21b, 22b is provided at one end as shown in FIG. 2 and 4 with a driver element 23 which projects radially outwardly from the respective rod member.
  • the rod portions 21a, 22a and 21b, 22b have at their ends preferably axially cooperating plug connection elements, by means of which they are axially connectable to each other.
  • the receiving openings 24 are formed using tubular rod portions 21a, 21b and 22a, 22b, respectively, by their hollow end portions, while the projections 25 suitably protrude from plates 27 fixed to the respective ends of the rod portions (here 21b, 22b) and with radial , Extensions projecting beyond the circumference of the rod sections 21b, 22b simultaneously form the driver elements 23.
  • the plates 27 and the bar sections 21a, 22a and 21b, 22b are preferably made of steel so that they can be joined by welding. Alternatively, it would be possible to provide the plates 27 on both sides with projections 25 and transverse holes 26 and to connect in each case by transverse pins with the two abutting ends of the rod portions 21a, 21b and 22a, 22b.
  • the rod sections 21a, 21b and 22a, 22b have a length in the direction of advance v which is slightly greater than the length of the tubular elements 18 used in the individual case.
  • the function enabled thereby results from the procedure described below for the propulsion of the tubular elements 18.
  • the substructure 20 each have two push rods 21, 22 and Rod sections 21a, 21b, 22a, 22b, the diametrically according to FIG. 1 to 3 on each other opposite sides of the guide and transport tube 10 are arranged.
  • the rod sections expediently have a width which is approximately equal to the radial width of the Interspace 19 corresponds, so that they in the radial direction by the outer or Inner walls of the tube 10 and der Rohretti 18 out and against kinking are secured. This will be explained in more detail below with reference to the various method steps explained, which are to be executed when using the device according to the invention.
  • tube elements 18 can be used, which is essential less stable than the previously used tube elements, e.g. for usual Concrete or vitrified clay pipes applies.
  • a sure fall out of the Carrier elements 23 can be achieved in that the push rods 21, 22 in FIG. 3 slightly V-shaped to each other.
  • the rod sections are useful 21a, 21b, 22a, 22b pulled out to the starting pit 2 out of the tubular elements 18.
  • the driver elements 23 during the propulsion of the tubular elements 18 is not unintentional jam in the butt joints between two consecutive tubular elements 18, the thicknesses and the positions of the driver elements 23 are selected so that the clear Distances between two driving elements one behind the other in the direction of advance 23, when the substructure 20 in the assembled state located, d. H. the rod elements 21a, 21b or 22a, 22b are arranged in abutment, are slightly larger than the distance of the end-side end faces of the tubular elements 18th equivalent. This ensures that while driving the driver elements 23 at the rear ends of them run ahead pipe elements 18, the front ends the tubular elements 18 but with sufficient clearance in front of them ahead Driver elements 23 come to rest and do not touch them. As Fig. 2 clearly shows, remain between the individual tubular elements 18 sufficiently wide, the easy removal of the driver elements 23 enabling butt joints or column 30th
  • Pipe elements 18 In order to lay the pipeline still liquid or gas tight, are the Pipe elements 18 preferably provided at their rear ends with sleeves 31, which in the Cross section optionally slightly reduced front end 32 of the subsequent tubular elements 18 in and also sufficient space for a ring-shaped Leave sealing element 33.
  • the arrangement of FIG. 2 is such that the pipe ends when driving do not collide against each other and the rear ends of the pipe elements 18 are surmounted with sufficient axial length of the sleeves 31.
  • the invention is not limited to the described embodiment, which can be modified in many ways. This applies primarily to those in individual cases used dismantling unit, which are designed differently than shown and instead of the screw conveyor any other conveyor, e.g. B. a hydraulic or with back and having driving loren provided conveyor for the excavated soil could. It is clear that the conveyor 5, if necessary, with appropriate means the bottoms of the tubular elements 18 may be supported so that they automatically with the Pipe elements 18 is driven. Such funds are for. B. in Fig. 3 schematically illustrated support legs 34. Further, other than the illustrated substructures be provided, in particular those which instead of the push rods, the tube 10 enclosing Pipe sections, lattice girder or other structures have and are statically sufficiently stable.
  • driver elements can be provided be, for.
  • those with the help of spring elements from the butt joints be driven out between the pipe elements as soon as the guide and transport pipe 10 is pulled out of the pipeline.
  • the driver elements at the rear ends of the bar sections and arranged so that they Do not obstruct the insertion of the tube elements, or the driver elements in middle Instead of providing at the ends of the rod sections, in which case the Rod sections each partially associated with two consecutive pipe elements would.
  • the driver elements by extruder welding od.
  • the driver elements by extruder welding od.

Landscapes

  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Mechanical Engineering (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)
  • Laying Of Electric Cables Or Lines Outside (AREA)
  • Pipeline Systems (AREA)
  • Processes Specially Adapted For Manufacturing Cables (AREA)

Abstract

The invention relates to a method and device for the construction of an underground pipe duct, particularly for civil engineering. An underground bore (3) is drilled from a starting shaft (2) into which a number of pipe sections (18) are driven to form the pipe duct. The pipe sections (18) are driven in by means of a frame construction (20) to which the pipe sections (18) are coupled in the drive direction individually or groupwise.

Description

Die Erfindung betrifft ein Verfahren der im Oberbegriff des Anspruchs 1 angegebenen Gattung und eine Vorrichtung nach dem Oberbegriff des Anspruchs 4.The invention relates to a method specified in the preamble of claim 1 Genus and a device according to the preamble of claim 4.

Im Tiefbau werden unterirdische Rohrleitungen für die Wasser-, Gas- und Femwärmeversorgung od. dgl. häufig dadurch hergestellt, daß von einer sogenannten Start- oder Preßgrube aus zunächst eine z. B. einen Fräs- oder Schneidkopf aufweisende Abbaueinheit im Erdreich vorgetrieben wird, um in diesem eine Durchbohrung auszubilden. Unabhängig davon, auf welche Art und Weise die Durchbohrung im Einzelfall hergestellt wird, werden der Abbaueinheit Rohrelemente nachgeschoben, um mit diesen in der entstehenden Durchbohrung eine der Abbaueinheit unmittelbar folgende, allmählich wachsende Rohrleitung auszubilden. Die Abbaueinheit ist außerdem mit einer zum Transport des abgebauten Erdreichs in die Startgrube bestimmten und ihr nachlaufenden Fördereinheit versehen, die z. B. eine in einem Führungs- und Transportrohr angeordnete Förderschnecke aufweist (US-PS 2 839 271, TIS 4/82, Seiten 253 - 258).In civil engineering, underground pipelines for the supply of water, gas and heat are provided od. Like. Frequently produced by that of a so-called start or Preßgrube from first a z. B. a milling or cutting head having removal unit is driven in the soil to form a through hole in this. Independently of which way the puncture made on a case-by-case basis is, the removal unit pipe elements are nachgeschoben with these in the resulting drilling one of the mining unit immediately following, gradually train growing pipeline. The removal unit is also equipped with a for Transport of mined soil into the starting pit and follow it Supply unit provided, the z. B. arranged in a guide and transport pipe Screw conveyor has (US-PS 2,839,271, TIS 4/82, pages 253-258).

Das Einbringen der Rohrelemente in die im wesentlichen horizontalen Durchbohrungen bereitet beträchtliche Schwierigkeiten. Um zu vermeiden, daß sich das über der herzustellenden Rohrleitung befindliche Erdreich senkt, was insbesondere bei der Herstellung von Rohrleitungen unter Straßen, d. h. unter dem fließenden Verkehr, oder unter bebautem Gelände vermieden werden muß, werden die Durchbohrungen in der Regel mit einem Querschnitt gebohrt, der dem Querschnitt der Rohrelementen in etwa entspricht. Dadurch ergeben sich beim Vortreiben der Rohrelemente beträchtliche Reibungskräfte, die einerseits durch die normale Reibung der Rohrwandungen an der Durchbohrungswand, andererseits durch die Auflast des über den Rohrelementen befindlichen Erdreichs bedingt sind. Üblicherweise wird davon ausgegangen, daß pro Quadratmeter Rohrwand eine Preßkraft von ca. einer Tonne für die am Anfang der Durchbohrung in der Startgrube angeordnete Vortriebseinheit benötigt wird. Bei der Verlegung von Rohren mit einem Außendurchmesser von beispielsweise 870 mm (500 mm) werden pro laufendem Meter Rohr somit ca. 2,7 Tonnen (1,57 Tonnen) Preßkraft benötigt, was auf einer Gesamtlänge von 100 m Rohrleitung etwa 270 Tonnen (157 Tonnen) ergibt. Diesem Druck oder geringfügig kleineren Drücken müssen insbesondere die nahe der Startgrube befindlichen Rohrelemente während des Verlegens standhalten können. Aus diesem Grund werden zur Herstellung von Rohrleitungen dieser Art in der Regel kostspielige Rohre aus Stahlbeton oder durch Glasfasern verstärkten Kunststoffen verwendet, obwohl diese Rohre nach dem Verlegen nur eine vergleichsweise kleine, aus der jeweiligen Auflast resultierenden Druckfestigkeit aufweisen brauchen. Abgesehen davon lassen sich auf diese Art wegen der hohen erforderlichen Preßkräfte ohnehin nur Rohrleitungen von maximal etwa 100 m Länge herstellen, während bei der Herstellung längerer Rohrleitungen alle ca. 50 bis 100 m sog. Zwischenpreßstationen eingerichtet werden müssen. Das Verlegen unterirdischer Rohrleitungen kann daher nicht immer wirtschaftlich durchgeführt werden, weil außer großen aufwendigen Hydraulikpressen auch teure Rohrmaterialien für die Rohrelemente benötigt werden.The introduction of the pipe elements in the substantially horizontal through holes presents considerable difficulties. To avoid that over the produced Pipeline soil lowers, which is particularly in the production of Pipelines under roads, d. H. under the flow of traffic, or under construction Terrain must be avoided, the punctures are usually with a Drilled cross section, which corresponds approximately to the cross section of the tubular elements. Thereby arise when driving the pipe elements considerable frictional forces, the on the one hand by the normal friction of the pipe walls at the through-hole wall, on the other hand due to the load of the soil located above the pipe elements are. Usually, it is assumed that per square meter pipe wall a Pressing force of about one ton for the beginning of the puncture in the starting pit arranged propulsion unit is needed. When laying pipes with a Outside diameters of, for example, 870 mm (500 mm) are measured per meter Tube thus requires about 2.7 tons (1.57 tons) of pressing force, reflecting a total length 100 m of pipeline results in about 270 tons (157 tons). This pressure or Smaller pressures, in particular, must be near the starting pit Pipe elements during installation can withstand. For this reason, become Production of piping of this type usually expensive pipes of reinforced concrete or glass fiber reinforced plastics, although these tubes are after the Only lay a relatively small, resulting from the respective load Need to have compressive strength. Apart from that, this is the way to go because of high required pressing forces anyway only pipes of a maximum of about 100 m Length, while in the production of longer pipes all about 50 to 100 m so-called Zwischenpreßstationen must be established. Laying underground Therefore, piping can not always be carried out economically, because Apart from large complex hydraulic presses also expensive pipe materials for the pipe elements needed.

Es sind daher bereits eine Vorrichtung und ein Verfahren der eingangs bezeichneten Gattungen bekannt geworden (EP-A-0 319 667), mittels derer eine derartige Zwischenpreßstation eingespart werden kann. Hierzu wird die Rohrleitung in zwei, jeweils aus einer Vielzahl von unmittelbar hintereinander liegenden Rohren bestehende Hälften unterteilt, wobei die in Vorpreßrichtung hintere Hälfte auf übliche Weise von einer Startgrube aus und gleichzeitig die vordere Hälfte mittels einer an ihr Hinterende angesetzten, durch die hintere Hälfte erstreckten Zwischenpreßstation vorgetrieben wird. Die auf die hintersten Rohre beider Hälften auszuübenden Preßkräfte können auf diese Weise zwar halbiert, insgesamt aber nicht wesentlich reduziert werden, wenn Rohrleitungen der genannten Längen hergestellt werden sollen. Therefore, there are already a device and a method of the initially described Genera become known (EP-A-0 319 667), by means of which such Zwischenpreßstation can be saved. For this, the pipeline is in two, each off a plurality of directly behind one another tubes existing halves subdivided, wherein the rear in Vorpreßrichtung in the usual way of a Starting pit and at the same time the front half by means of an attached to the rear end, is driven by the rear half extended Zwischenpreßstation. The on Although the rearmost tubes of both halves to be exerted pressing forces in this way halved, but not significantly reduced overall, if piping of the said lengths are to be produced.

Der Erfindung liegt die Aufgabe zugrunde, das Verfahren und die Vorrichtung der eingangs bezeichneten Art dahingehend weiterzubilden, daß die der Abbaueinheit nachzuschiebenden Rohrelemente erheblich kleineren Belastungen ausgesetzt werden und daher wesentlich preisgünstigere Rohre verwendet werden können.The invention is based on the object, the method and the device of at the outset designated type in that the nachzuschiebenden the dismantling unit Pipe elements are exposed to significantly smaller loads and therefore much cheaper pipes can be used.

Zur Lösung dieser Aufgabe dienen die kennzeichnenden Merkmale der Ansprüche 1 und 4.To solve this problem, the characterizing features of claims 1 and 4.

Die Erfindung bringt den Vorteil mit sich, daß aufgrund der antriebsmäßigen Ankopplung der Rohrelemente an eine in ihrem Inneren angeordneten, allmählich vorgetriebene Unterkonstruktion jedes einzelne Rohrelement nur die zu seinem eigenen Vortrieb erforderlichen Kräfte aufnehmen muß. Bei den oben angegebenen Beispielen bedeutet das bei einer Länge der Rohrelemente von z. B. 2 m, daß jedes einzelne Rohrelement unabhängig davon, ob es am Anfang oder am Ende der allmählich wachsenden Rohrleitung angeordnet wird, nur Belastungen von ca. 5,4 Tonnen (3,14 Tonnen) standhalten braucht. Die Hauptlast wird dagegen von der Unterkonstruktion aufgenommen, die vergleichsweise preisgünstig aus Schubstangen, Rohren, Gitterträgern od. dgl. zusammengesetzt werden kann und z. B. aus Stahl hergestellt wird.The invention has the advantage that due to the drive coupling the tube elements to a arranged in its interior, gradually advanced Substructure each individual pipe element only to his own propulsion must absorb necessary forces. In the examples given above this means at a length of the tubular elements of z. B. 2 m, that each individual pipe element independently whether it is at the beginning or the end of the gradually growing pipeline is arranged to withstand only loads of approximately 5.4 tonnes (3.14 tonnes). The main load, on the other hand, is absorbed by the substructure, which comparatively inexpensively from push rods, pipes, lattice girders od. Like. Are assembled can and z. B. is made of steel.

Weitere vorteilhafte Merkmale der Erfindung ergeben sich aus den Unteransprüchen.Further advantageous features of the invention will become apparent from the dependent claims.

Die Erfindung wird nachfolgend in Verbindung mit den beiliegenden Zeichnungen an einem Ausführungsbeispiel näher erläutert. Es zeigen:

  • Fig. 1 grob schematisch einen Horizontalschnitt durch eine erfindungsgemäße Vorrichtung zur Herstellung unterirdischer Rohrleitungen;
  • Fig. 2 Einzelheiten der erfindungsgemäßen Vorrichtung in einer entsprechenden, jedoch gegenüber Fig. 1 vergrößerten Darstellung;
  • Fig. 3 einen Schnitt längs der Linie III - III der Fig. 2 unter Weglassung eines Dichtelements; und
  • Fig. 4 eine vergrößerte Einzelheit X der Fig. 2.
  • The invention will be explained in more detail below in connection with the accompanying drawings of an embodiment. Show it:
  • Figure 1 roughly schematically a horizontal section through a device according to the invention for the production of underground pipelines.
  • Fig. 2 shows details of the device according to the invention in a corresponding, but with respect to Figure 1 enlarged view.
  • 3 shows a section along the line III - III of Figure 2 omitting a sealing element ..; and
  • 4 shows an enlarged detail X of FIG. 2.
  • Nach Fig. 1 enthält eine Vorrichtung zur Herstellung einer unterirdischen Rohrleitung eine Abbaueinheit 1, die von einer Start- bzw. Preßgrube 2 aus in einer vorgewählten, meistens horizontalen Vortriebsrichtung v vorgetrieben wird, so daß eine allmählich länger werdende, zur Aufnahme der Rohrleitung geeignete Durchbohrung 3 entsteht. Die Abbaueinheit 1 enthält im Ausführungsbeispiel einen Schneidkopf 4, der mittels eines nicht dargestellten Antriebsmotors in Umdrehungen versetzt werden kann und einen im wesentlichen dem Innendurchmesser der Durchbohrung 3 entsprechenden Außendurchmesser aufweist. Mit dem Schneidkopf 4 ist eine diesem in Richtung des Pfeils v nachlaufende und hier mit ihm drehbare Fördereinrichtung 5 in Form einer Förderschnecke verbunden, die dem Zweck dient, vom Schneidkopf 4 abgelöstes Erdreich nach innen in die Startgrube 2 zu transportieren. Ferner weist die Abbaueinheit 1 in der Regel ein Arbeitsrohr 6 auf, an dessen Vorderende ein Steuerkopf 7 schwenkbar gelagert ist, der mittels hydraulischer oder pneumatischer Zylinder/Kolben-Anordnungen 8 in gewissen Grenzen verstellbar ist, um die Vortriebsrichtung v bei Bedarf korrigieren bzw. beeinflussen zu können. Der Steuerkopf 7 besitzt eine sich nach hinten konisch verjüngende Gleitfläche 9, die einen Übergang vom Durchmesser der Durchbohrung 3 zu dem dieser gegenüber kleineren Innendurchmesser eines Führungs- und Transportrohrs 10 schafft und eine Art von Einfülltrichter für das abgebaute Material bildet. Die Fördereinrichtung 5 wird aus einzelnen Abschnitten zusammengesetzt, die in Vortriebsrichtung v bzw. in Richtung einer dazu parallelen Achse 11 der Durchbohrung 3 aneinander gekoppelt werden, wie in Fig. 1 durch ein Kupplungselement 12 angedeutet ist, auf das ein koaxiales Kupplungselement eines nachfolgenden Förderschneckenabschnitts aufgesteckt und mittels eines Querstifts an diesem gesichert werden kann. Durch den Querstift wird gleichzeitig die Drehbewegung übertragen. Auch das Führungs- und Transportrohr 10 wird aus einzelnen Rohrabschnitten zusammengesetzt, die auf Stoß hintereinander angeordnet werden. Im übrigen ist in Fig. 1 schematisch eine hydraulische oder pneumatische, auf das Führungs- und Transportrohr 10 und/oder die Fördereinrichtung 5 wirkende Vortriebseinheit 14 angedeutet, mittels derer der Schneidkopf 4, die Fördereinrichtung 5 und das Führungs- und Transportrohr 10 im Zuge der länger werdenden Durchbohrung 1 vorgetrieben werden.According to Fig. 1, an apparatus for producing an underground pipe a removal unit 1, which is driven from a starting or Preßgrube 2 in a preselected, usually horizontal advancing direction v , so that a gradually longer, suitable for receiving the pipe through hole 3 arises. The dismantling unit 1 includes in the exemplary embodiment a cutting head 4, which can be rotated by means of a drive motor, not shown, in revolutions and has a substantially the inner diameter of the through hole 3 corresponding outer diameter. With the cutting head 4 a this in the direction of arrow v trailing and rotatable here with him conveyor 5 is connected in the form of a screw conveyor, which serves the purpose of transporting detached from the cutting head 4 soil in the start pit 2. Furthermore, the dismantling unit 1 usually has a working tube 6, at the front end of a control head 7 is pivotally mounted, which is adjustable by means of hydraulic or pneumatic cylinder / piston assemblies 8 within certain limits to correct the propulsion direction v as needed or influence to be able to. The control head 7 has a rearwardly tapered sliding surface 9, which creates a transition from the diameter of the through-hole 3 to the smaller inner diameter of a guide and transport tube 10 and forms a type of hopper for the mined material. The conveyor 5 is composed of individual sections, which are coupled in the direction of advance v or in the direction of a parallel axis 11 of the through hole 3 to each other, as indicated in Fig. 1 by a coupling element 12, fitted onto the coaxial coupling element of a subsequent screw conveyor section and can be secured by a cross pin on this. The transverse pin simultaneously transmits the rotary motion. Also, the guide and transport tube 10 is composed of individual pipe sections, which are arranged in succession on impact. Incidentally, in Fig. 1 schematically a hydraulic or pneumatic, acting on the guide and transport tube 10 and / or the conveyor 5 propulsion unit 14 indicated by means of which the cutting head 4, the conveyor 5 and the guide and transport tube 10 in the course of To be driven for a longer through hole 1.

    Die eigentliche Rohrleitung wird mit Hilfe von Rohrelementen 18 gebildet, die dem Arbeitsrohr 6 von der Startgrube 2 aus nachgeschoben werden und deren Außendurchmesser im wesentlichen dem Innendurchmesser der Durchbohrung 3 entsprechen. Bei zylindrischen Rohrleitungen, die hier vorausgesetzt werden, ist der Innendurchmesser der Rohrelemente 18 ausreichend größer als der Außendurchmesser des Führungs- und Transportrohrs 10, so daß zwischen beiden ein hohler Zwischenraum 19 (Fig. 2 und 3) nach Art eines Zylinderrings entsteht.The actual pipeline is formed by means of tubular elements 18, which the Working tube 6 are pushed from the starting pit 2 and the outer diameter essentially correspond to the inner diameter of the perforation 3. at cylindrical pipes, which are assumed here, is the inner diameter of the Pipe elements 18 sufficiently larger than the outer diameter of the guide and Transport tube 10, so that between the two a hollow space 19 (Fig. 2 and 3) arises in the manner of a cylinder ring.

    Vorrichtungen dieser Art sind dem Fachmann z. B. unter der Bezeichnung "Horizontal-Preßbohrgerät" allgemein bekannt und brauchen daher nicht näher erläutert werden. Devices of this kind are the expert z. B. under the name "Horizontal Preßbohrgerät" Generally known and therefore need not be explained in detail.

    Erfindungsgemäß erfolgt der Vortrieb der Rohrelemente 18 in der Durchbohrung 3 nicht mit Hilfe einer Vortriebseinheit, die auf das Hinterende des letzten, von der Startgrube 2 aus zugänglichen Rohrelements 18 einwirkt, sondern mit Hilfe einer Unterkonstruktion 20. Diese ist in Fig. 1 schematisch angedeutet, während Fig. 2 bis 4 Einzelheiten zeigen.According to the propulsion of the tubular elements 18 in the through hole 3 is not carried out with the help of a propulsion unit, which is on the rear end of the last, from the starting pit 2 From accessible tubular element 18 acts, but with the aid of a substructure 20th This is indicated schematically in FIG. 1, while FIGS. 2 to 4 show details.

    Im Ausführungsbeispiel wird die Unterkonstruktion 20 von zwei vorzugsweise aus Quadratrohren bestehenden Schubstangen 21 bzw. 22 gebildet. Jede Schubstange 21, 22 wird, wie insbesondere Fig. 2 und 4 zeigen, aus einer Mehrzahl von in Vortriebsrichtung v hintereinander angeordneten Stangenabschnitten 21a, 21b, bzw. 22a, 22b zusammengesetzt. Jeder Stangenabschnitt 21a, 22a bzw. 21b, 22b ist gemäß Fig. 2 und 4 an einem Ende mit einem Mitnehmerelement 23 versehen, das vom betreffenden Stangenelement radial nach außen ragt. Außerdem weisen die Stangenabschnitte 21a, 22a bzw. 21b, 22b an ihren Enden vorzugsweise axial zusammenwirkende Steckverbindungselemente auf, mittels derer sie axial miteinander verbindbar sind. Diese Steckverbindungselemente enthalten im Ausführungsbeispiel (Fig. 4) am einen Ende der Stangenabschnitte, hier z. B. 21a und 22a, jeweils eine Aufnahmeöffnung 24 und am anderen Ende der Stangenabschnitte, hier z. B. 21b und 22b, jeweils einen axial vorstehenden, mit möglichst geringem Spiel in die Aufnahmeöffnung 24 passenden Vorsprung 25. Dabei sind sowohl die die Aufnahmeöffnungen 24 umgebenden Wandabschnitte als auch die Vorsprünge 25 mit Querlöchern 26 (Fig. 4) versehen, durch die bei auf Stoß angeordneten Stangenelementen 21a, 21b bzw. 22a, 22b nicht dargestellte Querstifte gesteckt werden können. Die Aufnahmeöffnungen 24 werden bei Anwendung rohrförmiger Stangenabschnitte 21a, 21b bzw. 22a, 22b durch deren hohle Endabschnitte gebildet, während die Vorsprünge 25 zweckmäßig von Platten 27 abstehen, die an den entsprechenden Enden der Stangenabschnitte (hier 21b, 22b) befestigt sind und mit radialen, über den Umfang der Stangenabschnitte 21b, 22b hinausragenden Verlängerungen gleichzeitig die Mitnehmerelemente 23 bilden. Die Platten 27 und die Stangenabschnitte 21a, 22a bzw. 21b, 22b bestehen vorzugsweise aus Stahl, so daß sie durch Schweißen verbunden werden können. Alternativ wäre es möglich, die Platten 27 beidseitig mit Vorsprüngen 25 und Querlöchern 26 zu versehen und jeweils durch Querstifte mit den beiden zusammenstoßenden Enden der Stangenabschnitte 21a, 21b bzw. 22a, 22b zu verbinden. In the exemplary embodiment, the substructure 20 is formed by two push rods 21 and 22, preferably made of square tubes. Each push rod 21, 22 is, as shown in particular in FIGS. 2 and 4, composed of a plurality of rod sections 21a, 21b, or 22a, 22b arranged one behind the other in the direction of advance v . Each rod portion 21a, 22a and 21b, 22b is provided at one end as shown in FIG. 2 and 4 with a driver element 23 which projects radially outwardly from the respective rod member. In addition, the rod portions 21a, 22a and 21b, 22b have at their ends preferably axially cooperating plug connection elements, by means of which they are axially connectable to each other. These connector elements included in the embodiment (Fig. 4) at one end of the rod sections, here z. B. 21a and 22a, respectively a receiving opening 24 and at the other end of the rod sections, here z. B. 21b and 22b, each having an axially projecting, with as little play in the receiving opening 24 matching projection 25. In this case, both the receiving openings 24 surrounding wall sections and the projections 25 with transverse holes 26 (Fig. 4) provided by the at arranged on push rod elements 21a, 21b and 22a, 22b transverse pins not shown can be inserted. The receiving openings 24 are formed using tubular rod portions 21a, 21b and 22a, 22b, respectively, by their hollow end portions, while the projections 25 suitably protrude from plates 27 fixed to the respective ends of the rod portions (here 21b, 22b) and with radial , Extensions projecting beyond the circumference of the rod sections 21b, 22b simultaneously form the driver elements 23. The plates 27 and the bar sections 21a, 22a and 21b, 22b are preferably made of steel so that they can be joined by welding. Alternatively, it would be possible to provide the plates 27 on both sides with projections 25 and transverse holes 26 and to connect in each case by transverse pins with the two abutting ends of the rod portions 21a, 21b and 22a, 22b.

    Die Stangenabschnitte 21a, 21b, bzw. 22a, 22b haben in Vortriebsrichtung v eine Länge, die geringfügig größer als die Länge der im Einzelfall verwendeten Rohrelemente 18 ist. Die dadurch ermöglichte Funktion ergibt sich aus der weiter unten beschriebenen Verfahrensweise beim Vortrieb der Rohrelemente 18.The rod sections 21a, 21b and 22a, 22b have a length in the direction of advance v which is slightly greater than the length of the tubular elements 18 used in the individual case. The function enabled thereby results from the procedure described below for the propulsion of the tubular elements 18.

    Vorzugsweise weist die Unterkonstruktion 20 jeweils zwei Schubstangen 21, 22 bzw. Stangenabschnitte 21a, 21b, 22a, 22b auf, die gemäß Fig. 1 bis 3 auf einander diametral gegenüberliegenden Seiten des Führungs- und Transportrohrs 10 angeordnet werden. Damit sich dabei eine stabile und druckfeste Anordnung ergibt, d. h. die Schubstangen 21, 22 bei Druckbelastung nicht nach oben oder unten abknicken, ist das Führungs- und Transportrohr 10 auf seinem Außenmantel zweckmäßig mit Paaren von Führungs- und Positioniermitteln, z. B. durch Schweißen befestigten, L-förmigen Führungsschienen 28 versehen, die zwischen sich Führungsspalte 29 bilden, die im wesentlichen der Breite der Schubstangen 21, 22 entsprechen (Fig. 3). Dadurch werden die Schubstangen 21, 22 bzw. die Stangenabschnitte 21a, 21b und 22a, 22b zwischen den Paaren von oben und unten angrenzenden Führungsschienen 28 gehalten. In der dazu senkrechten Richtung, d. h. radial zur Achse des Führungs- und Transportrohrs 10 und horizontal betrachtet, besitzen die Stangenabschnitte zweckmäßig eine Breite, die etwa der radialen Breite des Zwischenraums 19 entspricht, so daß sie in radialer Richtung durch die Außen- bzw. Innenwandungen des Rohrs 10 bzw. der Rohrelemente 18 geführt und gegen Abknicken gesichert sind. Dies wird nachfolgend anhand der verschiedenen Verfahrensschritte näher erläutert, die bei Anwendung der erfindungsgemäßen Vorrichtung auszuführen sind.Preferably, the substructure 20 each have two push rods 21, 22 and Rod sections 21a, 21b, 22a, 22b, the diametrically according to FIG. 1 to 3 on each other opposite sides of the guide and transport tube 10 are arranged. This results in a stable and pressure-resistant arrangement, d. H. the push rods 21, 22 do not bend up or down under pressure, is the leadership and Transport tube 10 on its outer shell expediently with pairs of leadership and Positioning, z. B. by welding, L-shaped guide rails 28th provided, which form between them guide gaps 29, which is substantially the width of the Push rods 21, 22 correspond (Fig. 3). As a result, the push rods 21, 22nd or the bar sections 21a, 21b and 22a, 22b between the pairs from above and held down adjacent guide rails 28. In the direction perpendicular to it, d. H. radially to the axis of the guide and transport tube 10 and viewed horizontally, the rod sections expediently have a width which is approximately equal to the radial width of the Interspace 19 corresponds, so that they in the radial direction by the outer or Inner walls of the tube 10 and der Rohrelemente 18 out and against kinking are secured. This will be explained in more detail below with reference to the various method steps explained, which are to be executed when using the device according to the invention.

    Nachdem die Durchbohrung 3, ausgehend von der Startgrube 2, eine solche Länge erreicht hat, daß sie die Abbaueinheit 1 völlig aufnimmt, einschließlich eines ersten Abschnitts der Fördereinrichtung 5 und des Rohrs 10, werden im Zuge der ständig länger werdenden Durchbohrung 3 einerseits mittels der Kupplungselemente 12 (Fig. 1) weitere Abschnitte der Fördereinrichtung 5 aneinander gekoppelt. Andererseits wird dem Arbeitsrohr 6 zunächst ein einzelnes Rohrelement 18 nachgeschoben. Dazu kann von der Startgrube 2 aus mit Hilfe der Vortriebseinheit 14 unmittelbar auf das in Vortriebsrichtung v hintere Ende des Rohrelements 18 eingewirkt werden, dessen vorderes Ende sich dabei gegen das Hinterende des Arbeitsrohrs 6 legen und dieses ebenfalls vortreiben würde. Alternativ wäre es möglich, zunächst je einen Stangenabschnitt 21a, 22a in die zugehörigen Führungsspalte 29 einzulegen und dabei die Mitnehmerelemente 23 so anzuordnen, daß sie radial nach außen ragen, an den vorderen Enden der Stangenabschnitte 21a, 22a zu liegen kommen und sich an das Hinterende des Arbeitsrohrs 6 legen. Anschließend würde das erste, in Fig. 2 links dargestellte Rohrelement 18a in die Durchbohrung 3 so eingeführt, daß die Schubstangen 21, 22 bzw. Stangenelemente 21a, 22a die aus Fig. 1 bis 3 ersichtliche Lage einnehmen. Das Rohrelement 18a wird dann z. B. wie üblich mit Hilfe der Vortriebseinheit 14 von der Startgrube 2 aus vorgetrieben, bis es ebenfalls ganz oder überwiegend in der Durchbohrung 3 angeordnet ist. Das Arbeitsrohr 6 kann dabei dadurch vorgetrieben werden, daß mit der Vortriebseinheit 14 auch auf die hinteren Enden der Stangenelemente 21 a, 22a eingewirkt wird. Diese erste Phase des Vortriebs ist nicht besonders kritisch.After the through hole 3, starting from the starting pit 2, has reached such a length that it completely absorbs the dismantling unit 1, including a first section of the conveyor 5 and the pipe 10, are in the course of continuously increasing through hole 3 on the one hand by means of the coupling elements 12 (Fig. 1) further sections of the conveyor 5 coupled together. On the other hand, the working tube 6 is first pushed a single pipe element 18. These can be acted upon directly from the starting pit 2 by means of the propulsion unit 14 to the rear in the direction of propulsion v end of the tubular element 18, the front end of which lie against the rear end of the working tube 6 and this would also drive. Alternatively, it would be possible to first insert a respective rod portion 21a, 22a in the associated guide gaps 29 and thereby the driver elements 23 to be arranged so that they protrude radially outward, come to lie on the front ends of the rod portions 21a, 22a and to the rear end of the working tube 6. Subsequently, the first pipe element 18a shown on the left in FIG. 2 would be introduced into the throughbore 3 so that the push rods 21, 22 or rod elements 21a, 22a occupy the position shown in FIGS. The tubular element 18a is then z. B. as usual with the help of the propulsion unit 14 is driven from the start pit 2 until it is also arranged entirely or predominantly in the through hole 3. The working tube 6 can be driven by the fact that with the propulsion unit 14 and the rear ends of the rod members 21 a, 22 a is acted upon. This first phase of propulsion is not particularly critical.

    Unter der Annahme, daß das in Fig. 2 linke Rohrelement 18a das erste der Abbaueinheit 1 nachgeschobene Rohrelement ist, wird zunächst an den bereits in der Durchbohrung 3 befindlichen Abschnitt der Fördereinrichtung 5 ein weiterer Abschnitt angekoppelt. Danach werden die Stangenabschnitte 21b, 22b in der aus Fig. 2 und 4 ersichtlichen Weise an die Stangenabschnitte 21a, 22a angekoppelt und durch in die Querlöcher 26 eingeführte Querstifte axial fest mit diesen verbunden. Dabei kommen die Mitnehmerelemente 23 an den Vorderenden der Stangenabschnitte 21b, 22b und hinter dem hinteren Ende des bereits in die Durchbohrung 3 eingeführten Rohrabschnitts 18a zu liegen. Anschließend wird auf die vormontierten Stangenabschnitte 21b, 22b das nächste Rohrelement, hier 18b, aufgeschoben, bis es mit seiner Vorderseite an die Mitnehmerelemente 23 stößt.Assuming that the left in Fig. 2 pipe element 18 a, the first of the dismantling unit. 1 pushed pipe element is first to the already in the through hole. 3 located portion of the conveyor 5 coupled to another section. Thereafter, the rod portions 21b, 22b in the Figs. 2 and 4 apparent Way coupled to the rod portions 21 a, 22 a and through into the transverse holes 26th inserted transverse pins axially fixedly connected to these. Here are the driver elements 23 at the front ends of the bar sections 21b, 22b and behind the rear End of the already introduced into the through hole 3 pipe section 18a to lie. Subsequently, on the pre-assembled rod sections 21b, 22b, the next pipe element, here 18b, postponed until it with its front to the driver elements 23 encounters.

    Es wird nun mit Hilfe der Vortriebseinrichtung 14 eine in Vortriebsrichtung v gerichtete Kraft auf die Stangenabschnitte 21b, 22b und das Rohrelement 18b ausgeübt. Beim weiteren Vortrieb legen sich daher die Mitnehmerelemente 23 der Stangenabschnitte 21b, 22b an das Hinterende des schon in der Durchbohrung 3 befindlichen Rohrelements 18a an, wodurch dieses in Vortriebsrichtung mit der Unterkonstruktion 20 gekoppelt und im weiteren Verlauf allein von dieser vorgetrieben wird.With the aid of the advancing device 14, a force directed in the direction of advance v is now exerted on the rod sections 21b, 22b and the tubular element 18b. During further propulsion, therefore, the driver elements 23 of the rod sections 21b, 22b engage the rear end of the tubular element 18a already located in the throughbore 3, whereby it is coupled in the advancing direction to the substructure 20 and driven forward by it alone.

    Ist auch das zweite Rohrelement 18b ausreichend weit vorgetrieben, werden in analoger Weise weitere, Fördereinrichtungsabschnitte angekoppelt, weitere Stangenabschnitte an die Stangenabschnitte 21b, 22b angeschlossen und weitere Rohrelemente 18 auf diese Stangenabschnitte aufgesetzt. Dadurch werden die Mitnehmerelemente 23 der verschiedenen Stangenelemente 21a, 21b bzw. 22a, 22b stets kraftmäßig mit den Hinterenden der ihnen unmittelbar vorauslaufenden Rohrelemente 18 gekoppelt, so daß diese einzeln und jedes für sich von der Unterkonstruktion 20 vorgepreßt werden, ohne daß die Vortriebskräfte wie bisher vom jeweils hinteren Rohrelement 18 auf das jeweils vorderste Rohrelement 18 übertragen werden müßten. Jedes einzelne Rohrelement 18 muß vielmehr höchstens demjenigen Druck standhalten, den die nachlaufenden Mitnehmerelemente 23 der Unterkonstruktion 20 ausüben müssen, um dieses spezielle Rohrelement vorzutreiben. Obwohl somit die zum Vortrieb der Unterkonstruktion 20 benötigte Kraft der Summe der für den Vortrieb aller Rohrelemente 18 benötigten Kraft entspricht, wird auf jedes einzelne Rohrelement nur die zum Vortrieb eines einzigen Rohrelementes 18 benötigte Kraft ausgeübt. Dadurch können Rohrelemente 18 verwendet werden, die wesentlich weniger stabil als die bisher verwendeten Rohrelemente sind, wie dies z.B. für übliche Beton- oder Steinzeugrohre gilt.Is also the second tube member 18b sufficiently advanced, are in analog Way coupled further conveyor sections, more rod sections to the Rod sections 21b, 22b connected and other pipe elements 18 on this Rod sections put on. As a result, the driver elements 23 of the various Rod elements 21a, 21b and 22a, 22b always with the rear ends of the force coupled directly upstream pipe elements 18 so that they individually and each be pre-pressed by the substructure 20 without the propulsive forces as before from the respective rear pipe element 18 to the respective foremost pipe element 18 would have to be transferred. Each individual tube element 18 must rather at most withstand the pressure that the trailing driver elements 23 have to exercise the substructure 20 to propel this particular pipe element. Thus, although required for propulsion of the substructure 20 force of the sum of for the propulsion of all pipe elements 18 required force is equal to each single pipe element only needed for the propulsion of a single pipe element 18 Power exercised. As a result, tube elements 18 can be used, which is essential less stable than the previously used tube elements, e.g. for usual Concrete or vitrified clay pipes applies.

    Nach Fertigstellung der Rohrleitung werden zunächst von einer am anderen Ende angeordneten Zielgrube aus die Abbaueinheit 1 und die Fördereinrichtung 5 samt Führungs- und Transportrohr 10 geborgen. Dadurch kommen die Stangenabschnitte 21a, 21b bzw. 22a, 22b frei, sodaß sie nach innen geschwenkt und dann aus der Rohrleitung herausgezogen werden können, wobei die Querstifte nacheinander aus den zugehörigen Querlöchern 26 herausgezogen werden. Werden die Mitnehmerelemente 23 dabei, wie insbesondere Fig. 3 zeigt, an den beiden Seiten des Führungs- und Transportrohrs 10 angeordnet, fallen die Stangenabschnitte 21a, 21b, 22a, 22b usw. beim Herausziehen des Rohrs 10 sogar unter dem Einfluß der Schwerkraft selbsttätig auf den Boden der Rohrleitung, so daß sie nur zur Zielgrube hin herausgezogen werden brauchen. Ein noch sicheres Herausfallen der Mitnehmerelemente 23 kann dadurch erzielt werden, daß die Schubstangen 21, 22 in Fig. 3 leicht V-förmig zueinander angeordnet werden. Alternativ wäre es aber auch möglich, die Fördereinrichtungsabschnitte wie üblich von der Startgrube 2 aus zu bergen, da hier meistens mehr Platz vorhanden ist. In diesem Fall werden zweckmäßig auch die Stangenabschnitte 21a, 21b, 22a, 22b zur Startgrube 2 hin aus den Rohrelementen 18 herausgezogen. After completion of the pipeline are first arranged by one at the other end Target pit from the dismantling unit 1 and the conveyor 5 together with leadership and Salvaged transport tube 10. This results in the rod portions 21a, 21b and 22a, 22b free, so that they swung inwards and then pulled out of the pipe can be, with the transverse pins successively from the corresponding transverse holes 26th be pulled out. Be the driver elements 23 here, in particular Fig. 3 shows, arranged on the two sides of the guide and transport tube 10, fall Bar sections 21a, 21b, 22a, 22b, etc. even when pulling out of the tube 10 under the influence of gravity automatically on the floor of the pipeline, so that they only for Target pit to be pulled out. A sure fall out of the Carrier elements 23 can be achieved in that the push rods 21, 22 in FIG. 3 slightly V-shaped to each other. Alternatively, it would also be possible to recover the conveyor sections as usual from the starting pit 2, since here usually more space is available. In this case, the rod sections are useful 21a, 21b, 22a, 22b pulled out to the starting pit 2 out of the tubular elements 18.

    Damit sich die Mitnehmerelemente 23 beim Vortrieb der Rohrelemente 18 nicht ungewollt in den Stoßfugen zwischen zwei aufeinanderfolgenden Rohrelementen 18 verklemmen, sind die Dicken und die Positionen der Mitnehmerelemente 23 so gewählt, daß die lichten Abstände zwischen zwei in Vortriebsrichtung hintereinander liegenden Mitnehmerelementen 23 dann, wenn sich die Unterkonstruktion 20 im fertig zusammengesetzten Zustand befindet, d. h. die Stangenelemente 21a, 21b bzw. 22a, 22b auf Stoß angeordnet sind, etwas größer sind, als dem Abstand der endseitigen Stirnflächen der Rohrelemente 18 entspricht. Dadurch ist sichergestellt, daß sich beim Vortrieb zwar die Mitnehmerelemente 23 an die Hinterenden der ihnen vorauslaufenden Rohrelemente 18 anlegen, die Vorderenden der Rohrelemente 18 aber mit ausreichendem Spiel vor den ihnen vorauslaufenden Mitnehmerelementen 23 zu liegen kommen und diese nicht berühren. Wie Fig. 2 deutlich zeigt, verbleiben dadurch zwischen den einzelnen Rohrelementen 18 ausreichend breite, das leichte Entfernen der Mitnehmerelemente 23 ermöglichende Stoßfugen bzw. Spalte 30.Thus, the driver elements 23 during the propulsion of the tubular elements 18 is not unintentional jam in the butt joints between two consecutive tubular elements 18, the thicknesses and the positions of the driver elements 23 are selected so that the clear Distances between two driving elements one behind the other in the direction of advance 23, when the substructure 20 in the assembled state located, d. H. the rod elements 21a, 21b or 22a, 22b are arranged in abutment, are slightly larger than the distance of the end-side end faces of the tubular elements 18th equivalent. This ensures that while driving the driver elements 23 at the rear ends of them run ahead pipe elements 18, the front ends the tubular elements 18 but with sufficient clearance in front of them ahead Driver elements 23 come to rest and do not touch them. As Fig. 2 clearly shows, remain between the individual tubular elements 18 sufficiently wide, the easy removal of the driver elements 23 enabling butt joints or column 30th

    Um die Rohrleitung dennoch flüssigkeits- oder gasdicht verlegen zu können, sind die Rohrelemente 18 an ihren Hinterenden vorzugsweise mit Muffen 31 versehen, die die im Querschnitt gegebenenfalls etwas reduzierten Vorderenden 32 der nachfolgenden Rohrelemente 18 in sich aufnehmen und außerdem ausreichenden Platz für ein ringförmiges Dichtelement 33 lassen. Dabei ist die Anordnung gemäß Fig. 2 so, daß die Rohrenden beim Vortrieb nicht gegeneinander stoßen und die hinteren Stirnenden der Rohrelemente 18 mit ausreichender axialer Länge von den Muffen 31 überragt werden.In order to lay the pipeline still liquid or gas tight, are the Pipe elements 18 preferably provided at their rear ends with sleeves 31, which in the Cross section optionally slightly reduced front end 32 of the subsequent tubular elements 18 in and also sufficient space for a ring-shaped Leave sealing element 33. The arrangement of FIG. 2 is such that the pipe ends when driving do not collide against each other and the rear ends of the pipe elements 18 are surmounted with sufficient axial length of the sleeves 31.

    Die Erfindung ist nicht auf das beschriebene Ausführungsbeispiel beschränkt, das auf vielfache Weise abgewandelt werden kann. Dies gilt in erster Linie für die im Einzelfall verwendete Abbaueinheit, die anders als dargestellt ausgebildet sein und statt der Förderschnecke irgendeine andere Fördereinrichtung, z. B. eine hydraulische oder mit hin- und herfahrenden Loren versehene Fördereinrichtung für das abgebaute Erdreich aufweisen könnte. Dabei ist klar, daß die Fördereinrichtung 5 bei Bedarf mit geeigneten Mitteln auf den Böden der Rohrelemente 18 abgestützt sein kann, damit sie automatisch mit den Rohrelementen 18 vorgetrieben wird. Derartige Mittel sind z. B. in Fig. 3 schematisch dargestellte Stützfüße 34. Weiter können andere als die dargestellten Unterkonstruktionen vorgesehen werden, insbesondere solche, die anstatt der Schubstangen das Rohr 10 umschließende Rohrabschnitte, Gitterträger od. sonstige Konstruktionen aufweisen und statisch ausreichend stabil sind. Dabei können auch andere Mitnehmerelemente vorgesehen werden, z. B. solche, die mit Hilfe von Federelementen aus den Stoßfugen zwischen den Rohrelementen herausgetrieben werden, sobald das Führungs- und Transportrohr 10 aus der Rohrleitung herausgezogen wird. Möglich wäre es auch, die Mitnehmerelemente an den Hinterenden der Stangenabschnitte und so anzuordnen, daß sie das Einlegen der Rohrelemente nicht behindern, oder die Mitnehmerelemente in mittleren Bereichen anstatt an den Enden der Stangenabschnitte vorzusehen, in welchen Fall die Stangenabschnitte jeweils teilweise zwei aufeinanderfolgenden Rohrelementen zugeordnet wären. Weiter wäre es möglich, die Mitnehmerelemente durch Extruderschweißen od. dgl. an den Innenmänteln der Rohrelemente anstatt an den Stangenelementen anzubringen, insbesondere wenn es sich um Rohrelemente aus Kunststoff (z. B. PVC) od. dgl. handelt, die keine Muffen aufweisen und daher stumpf miteinander verschweißt werden müssen. Denkbar wäre natürlich auch, die Rohrelemente nicht einzeln, sondern z. B. paarweise oder in Gruppen von drei oder mehr Rohrelementen an die Unterkonstruktion anzukoppeln, in welchem Fall die Rohrelemente ausreichend stabil sein müßten, um entsprechend zwei oder mehr Rohrelemente vor sich herzuschieben. Wird jede dieser Gruppen auf nur wenige Rohrelemente beschränkt, sind auch in diesem Fall die von jedem einzelnen Rohrelement zu übertragenden Kräfte vergleichsweise klein. Schließlich versteht sich, daß die verschiedenen Merkmale auch in anderen als den dargestellten und beschriebenen Kombinationen angewendet werden können.The invention is not limited to the described embodiment, which can be modified in many ways. This applies primarily to those in individual cases used dismantling unit, which are designed differently than shown and instead of the screw conveyor any other conveyor, e.g. B. a hydraulic or with back and having driving loren provided conveyor for the excavated soil could. It is clear that the conveyor 5, if necessary, with appropriate means the bottoms of the tubular elements 18 may be supported so that they automatically with the Pipe elements 18 is driven. Such funds are for. B. in Fig. 3 schematically illustrated support legs 34. Further, other than the illustrated substructures be provided, in particular those which instead of the push rods, the tube 10 enclosing Pipe sections, lattice girder or other structures have and are statically sufficiently stable. In this case, other driver elements can be provided be, for. For example, those with the help of spring elements from the butt joints be driven out between the pipe elements as soon as the guide and transport pipe 10 is pulled out of the pipeline. It would also be possible, the driver elements at the rear ends of the bar sections and arranged so that they Do not obstruct the insertion of the tube elements, or the driver elements in middle Instead of providing at the ends of the rod sections, in which case the Rod sections each partially associated with two consecutive pipe elements would. Further, it would be possible, the driver elements by extruder welding od. Like. to attach to the inner shells of the tubular elements instead of to the pole elements, in particular if they are pipe elements made of plastic (eg PVC) or the like, which have no sleeves and therefore must be butt welded together. It would also be conceivable, of course, the pipe elements not individually, but z. In pairs or to couple in groups of three or more pipe elements to the substructure, in which case the pipe elements would have to be sufficiently stable to correspondingly push two or more pipe elements in front of him. Will each of these groups be on only Limited pipe elements are in this case also the case of each individual Pipe element to be transmitted forces comparatively small. Finally, it goes without saying that the various features in other than those shown and described Combinations can be applied.

    Claims (16)

    1. Method for the construction of an underground pipeline, in particular for civil engineering works, wherein starting from an initial trench (2) an underground passage (3) is constructed using an excavator unit (1), a plurality of pipe elements (18) forming the pipeline are advanced in this passage and the advancing force is applied with an advance working unit (14) arranged in the initial trench (2) as well as a substructure (20), which can be advanced with this and extends through the pipe elements (18), and wherein the pipe elements (18) are advanced as a result of all or several pipe elements (18) being coupled to the substructure (20) and thus being advanced by the substructure (20) either singly or in several groups comprising pipe elements (18) lying one behind the other.
    2. Method according to Claim 1, characterised in that the pipe elements (18) are coupled to the substructure (20) by means of entrainment elements (23), which are attached to the pipe elements (18) and/or the substructure (20) and are arranged one behind the other in the advancing direction.
    3. Method according to Claim 1 or 2, characterised in that a transport device (5) runs behind the excavator unit (11), and that the substructure (20) includes at least one connecting rod (21, 22), which is arranged in a space (19) between the transport unit (5) and the walls of the pipe elements (18) and is advanced by means of the advance working unit (14).
    4. Device for the construction of an underground pipeline, in particular for civil engineering works, with an excavator unit (11), which can be advanced in the direction of a passage (3) being formed, an advance working unit (14) arranged at the beginning of the passage (3) to advance a plurality of pipe elements (18) forming the pipeline inserted into the passage (3) one behind the other, a substructure (20), which can be advanced by the advance working unit (14), for insertion into the pipe elements (18), and means, which can be arranged one behind the other in the advancing direction for coupling the pipe elements (18) to the substructure (20), wherein these means are configured so that all the pipe elements (18) or a plurality of pipe elements (18) respectively belonging to a group of pipe elements (18) lying one behind the other can be coupled to the substructure (20).
    5. Device according to Claim 4, characterised in that the excavator unit (11) is provided with a transport unit (5) following it and the substructure (20) has at least one connecting rod (21, 22), which can be inserted into a space (19) between the walls of the pipe elements (18) and the transport unit (5).
    6. Device according to Claim 5, characterised in that the transport unit (5) is surrounded by a guide and transport tube (10), which has guide and positioning means (28) for the at least one connecting rod (21, 22).
    7. Device according to Claim 6, characterised in that at least two connecting rods (21, 22) arranged diametrically to the guide and transport tube (10) are provided.
    8. Device according to one of Claims 4 to 7, characterised in that the means for coupling the pipe elements (18) comprise a plurality of entrainment elements (23), which are arranged one behind the other in the advancing direction and project radially from the substructure (20) and/or the pipe elements (18).
    9. Device according to Claim 8, characterised in that the entrainment elements (23) are attached to the front ends of the connecting rods (21, 22) in the advancing direction (v).
    10. Device according to one of Claims 5 to 8, characterised in that the at least one connecting rod (21, 22) can be assembled from a plurality of rod sections (21a, 21b or 22a, 22b), which each have a length substantially corresponding to the length of the pipe elements (18).
    11. Device according to Claim 10, characterised in that each rod section (21 a, 21 b or 22a, 22b) is provided with an entrainment element (23).
    12. Device according to one of Claims 10 or 11, characterised in that the rod sections (21a, 21b or 22a, 22b) are provided with axially acting connector elements (24, 25) at their ends.
    13. Device according to Claim 12, characterised in that the connector elements (24, 25) are provided with transverse holes (26) intended to receive transverse pins.
    14. Device according to one of Claims 4 to 13, characterised in that the pipe elements (18) are provided with faces at their ends, and the entrainment elements (23) are configured and spaced from one another in the advancing direction (v) in such a way that gaps (30) receiving the entrainment elements (23) with play are respectively formed between mutually assigned faces of pipe elements (18) laid one behind the other.
    15. Device according to Claim 14, characterised in that at their rear ends in the advancing direction (v) the pipe elements (18) are provided with bushings (31) bridging the gap (30).
    16. Device according to Claim 15, characterised in that the bushings (31) leave cavities between them and the pipe elements (18) for the insertion of gaskets (33).
    EP00967606A 1999-10-01 2000-09-22 Method and device for construction of an underground pipe duct Expired - Lifetime EP1216340B1 (en)

    Applications Claiming Priority (3)

    Application Number Priority Date Filing Date Title
    DE19947493 1999-10-01
    DE19947493A DE19947493A1 (en) 1999-10-01 1999-10-01 Method to manufacture underground pipeline; involves advancing pipe elements through bore hole from starting pit and inserting sub-construction through pipe elements to connect elements
    PCT/DE2000/003345 WO2001025588A1 (en) 1999-10-01 2000-09-22 Method and device for construction of an underground pipe duct

    Publications (2)

    Publication Number Publication Date
    EP1216340A1 EP1216340A1 (en) 2002-06-26
    EP1216340B1 true EP1216340B1 (en) 2005-12-14

    Family

    ID=7924275

    Family Applications (1)

    Application Number Title Priority Date Filing Date
    EP00967606A Expired - Lifetime EP1216340B1 (en) 1999-10-01 2000-09-22 Method and device for construction of an underground pipe duct

    Country Status (5)

    Country Link
    EP (1) EP1216340B1 (en)
    AT (1) ATE312998T1 (en)
    AU (1) AU7772100A (en)
    DE (3) DE19947493A1 (en)
    WO (1) WO2001025588A1 (en)

    Family Cites Families (5)

    * Cited by examiner, † Cited by third party
    Publication number Priority date Publication date Assignee Title
    US2839271A (en) 1955-05-02 1958-06-17 Charles W Kandle Tunneling machine
    FR2389819A1 (en) * 1977-05-03 1978-12-01 Kubota Ltd Intermediate sleeve for laying pipes by propulsion - has seal for slide region between socket and spigot and includes lubricant feeder
    JPH01151695A (en) * 1987-12-07 1989-06-14 Iseki Poly Tech Inc Pipe propulsion device
    JP2699105B2 (en) * 1989-04-28 1998-01-19 株式会社イセキ開発工機 Middle pushing device for underground propulsion of pipes
    DE4224831A1 (en) * 1992-07-28 1994-02-03 Beb Erdgas & Erdoel Gmbh Method and device for the underground introduction of transport pipes of greater length into the ground

    Also Published As

    Publication number Publication date
    AU7772100A (en) 2001-05-10
    EP1216340A1 (en) 2002-06-26
    DE19947493A1 (en) 2001-04-05
    DE50011865D1 (en) 2006-01-19
    ATE312998T1 (en) 2005-12-15
    DE10083033D2 (en) 2002-04-11
    WO2001025588A1 (en) 2001-04-12

    Similar Documents

    Publication Publication Date Title
    EP2553201B1 (en) Method for producing a horizontally drilled bore hole in the ground and horizontal drilling device
    EP2553202B1 (en) Method for operating a horizontal drilling device and horizontal drilling device
    EP0860638B1 (en) Device and process of laying ceramic tubes without excavation
    CH683016A5 (en) A method for expanding a wellbore and Expanding apparatus.
    WO2009095046A1 (en) Method for trenchless laying of pipelines
    EP2900895B1 (en) Device and method for laying a pipeline in a borehole
    EP2553203B1 (en) Horizontal drilling device
    DE19749007C2 (en) Device for connecting a draw tube with a drawing device
    EP1216340B1 (en) Method and device for construction of an underground pipe duct
    EP0414891A1 (en) Method and device for trench-free laying of pipelines
    DE3729560A1 (en) METHOD AND DEVICE FOR PRODUCING A PIPELINE IN A HOLE DESIGNED IN THE GROUND
    DE2505980A1 (en) Tunnel tube section forwarding - uses hydraulic or pneumatic pressure from pressure pipe between component and abutment
    AT509158B1 (en) DEVICE FOR REMOVING OR REPLACING CABLES
    EP0583650B1 (en) Method and device for underground introduction of long transport pipes into the earth
    EP3387208B1 (en) Method and device for trenchless laying of a cable or pipe in the ground
    DE19825582C2 (en) Device for trenchless re-laying of drinking water pipes in particular
    EP2253574A1 (en) Method for anchoring a tube feed device
    DE19920395C1 (en) Equipment for widening earth holes and/or for destruction of pipe conduits laid in earth together with laying new pipe conduits
    DE102005052653A1 (en) Method for renovation of underground pipeline involves drive means which is guided through pipeline and traction force of pull/ push drive is applied at adapter to pull out pipeline which is to be replaced
    DE3825811A1 (en) Method and apparatus for the gradual, automatic driving of a pipe section through a through-bore
    DE102019127115A1 (en) System and method for establishing house connections
    CH683446A5 (en) Retrievable tunneling machine.
    DE3911469A1 (en) Drilling installation
    DE3539897A1 (en) Method and arrangement for producing underground structural objects guided rectilinearly in a closed profile, in particular tunnel-like structures under the turf level, by pressing tube elements into the ground
    DE4209012A1 (en) Pipe puller for underground pipeline laying - has puller press with hollow ram as axial guide for puller element

    Legal Events

    Date Code Title Description
    PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

    Free format text: ORIGINAL CODE: 0009012

    17P Request for examination filed

    Effective date: 20020402

    AK Designated contracting states

    Kind code of ref document: A1

    Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE

    AX Request for extension of the european patent

    Free format text: AL;LT;LV;MK;RO;SI

    GRAP Despatch of communication of intention to grant a patent

    Free format text: ORIGINAL CODE: EPIDOSNIGR1

    GRAS Grant fee paid

    Free format text: ORIGINAL CODE: EPIDOSNIGR3

    GRAA (expected) grant

    Free format text: ORIGINAL CODE: 0009210

    AK Designated contracting states

    Kind code of ref document: B1

    Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: IT

    Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRE;WARNING: LAPSES OF ITALIAN PATENTS WITH EFFECTIVE DATE BEFORE 2007 MAY HAVE OCCURRED AT ANY TIME BEFORE 2007. THE CORRECT EFFECTIVE DATE MAY BE DIFFERENT FROM THE ONE RECORDED.SCRIBED TIME-LIMIT

    Effective date: 20051214

    Ref country code: FI

    Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

    Effective date: 20051214

    Ref country code: GB

    Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

    Effective date: 20051214

    Ref country code: NL

    Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

    Effective date: 20051214

    Ref country code: IE

    Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

    Effective date: 20051214

    REG Reference to a national code

    Ref country code: GB

    Ref legal event code: FG4D

    Free format text: NOT ENGLISH

    REG Reference to a national code

    Ref country code: CH

    Ref legal event code: EP

    REG Reference to a national code

    Ref country code: IE

    Ref legal event code: FG4D

    Free format text: LANGUAGE OF EP DOCUMENT: GERMAN

    REF Corresponds to:

    Ref document number: 50011865

    Country of ref document: DE

    Date of ref document: 20060119

    Kind code of ref document: P

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: DK

    Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

    Effective date: 20060314

    Ref country code: GR

    Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

    Effective date: 20060314

    Ref country code: SE

    Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

    Effective date: 20060314

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: ES

    Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

    Effective date: 20060325

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: PT

    Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

    Effective date: 20060515

    NLV1 Nl: lapsed or annulled due to failure to fulfill the requirements of art. 29p and 29m of the patents act
    GBV Gb: ep patent (uk) treated as always having been void in accordance with gb section 77(7)/1977 [no translation filed]

    Effective date: 20051214

    REG Reference to a national code

    Ref country code: IE

    Ref legal event code: FD4D

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: LI

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20060930

    Ref country code: MC

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20060930

    Ref country code: CH

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20060930

    Ref country code: BE

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20060930

    PLBE No opposition filed within time limit

    Free format text: ORIGINAL CODE: 0009261

    STAA Information on the status of an ep patent application or granted ep patent

    Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

    26N No opposition filed

    Effective date: 20060915

    EN Fr: translation not filed
    REG Reference to a national code

    Ref country code: CH

    Ref legal event code: PL

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: AT

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20060922

    BERE Be: lapsed

    Owner name: LUDWIG PFEIFFER, HOCH- UND TIEFBAU G.M.B.H. & CO.

    Effective date: 20060930

    PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

    Ref country code: DE

    Payment date: 20071024

    Year of fee payment: 8

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: FR

    Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

    Effective date: 20070202

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: LU

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20060922

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: CY

    Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

    Effective date: 20051214

    Ref country code: FR

    Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

    Effective date: 20051214

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: DE

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20090401