EP1184525A1 - Faserplatte - Google Patents

Faserplatte Download PDF

Info

Publication number
EP1184525A1
EP1184525A1 EP01119297A EP01119297A EP1184525A1 EP 1184525 A1 EP1184525 A1 EP 1184525A1 EP 01119297 A EP01119297 A EP 01119297A EP 01119297 A EP01119297 A EP 01119297A EP 1184525 A1 EP1184525 A1 EP 1184525A1
Authority
EP
European Patent Office
Prior art keywords
density
plate
maximum
core
plate according
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP01119297A
Other languages
English (en)
French (fr)
Other versions
EP1184525B1 (de
Inventor
Johann Dipl.-Ing. Bitzi
Joachim Dipl.-Holzwirt Hasch
Rene Dipl.-Ing. Stadelmann
Volker Dipl.-Holzwirt Schwind
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kronotec AG
Original Assignee
Kronotec AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kronotec AG filed Critical Kronotec AG
Priority to SI200130285T priority Critical patent/SI1184525T1/xx
Publication of EP1184525A1 publication Critical patent/EP1184525A1/de
Application granted granted Critical
Publication of EP1184525B1 publication Critical patent/EP1184525B1/de
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C2/00Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
    • E04C2/02Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials
    • E04C2/10Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials of wood, fibres, chips, vegetable stems, or the like; of plastics; of foamed products
    • E04C2/16Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials of wood, fibres, chips, vegetable stems, or the like; of plastics; of foamed products of fibres, chips, vegetable stems, or the like

Definitions

  • the invention relates to a plate made of lignocellulosic fibers and and Polyurethane glue as a binder.
  • Such a wood fiber board is known for example from DE 196 00 478.
  • Panels are used as building boards, for planking ceilings and walls or for example used in the furniture industry.
  • the known plates are based on their size is quite heavy and therefore sometimes difficult to handle. Will you Used as building boards, they have to be fastened with special screws in order to prevent the plate from breaking out at the fastening point and from the surface can be solved. The panels must be cut to size carefully to avoid breaking out at the kerf. Overall, processing requires the building boards some experience to get a result with high quality achieve. Especially inexperienced do-it-yourselfers can hardly handle the plates.
  • the invention has for its object to improve the known plate.
  • the plate described above is characterized by an average bulk density of not more than 350 kg / m 3 , the density profile in the core of the plate being substantially constant over a range of two thirds of the plate thickness symmetrically to the center, and Deviation of the average density in the core from the maximum density in the top layer is a maximum of 15% but a maximum of 30 kg / m 3
  • the maximum density in the top layer can be smaller or larger than the middle one Density at the core. If the density in the top layer is lower than in the core, the Impact sound properties of the panel significantly improved.
  • a thermal conductivity ⁇ of 0.04-0.05 W / mK can be set for a plate with an average bulk density in the range of 180 kg / m 3 . This means that such a fiberboard insulates like a mineral insulation material.
  • the low weight of the plate also allows it, even plate thicknesses of 30 mm or 80 mm to realize, without the handling of the plate being particularly restricted would. This enables very good thermal insulation to be achieved with the panel become.
  • the panel also has good sound insulation, in particular impact sound insulation on. So it can be used not only as a door panel, but also as a floor substructure for screed-free floors for covering with carpets or the like Find use.
  • the board surface is so fine that cement slurry cannot penetrate and the impact sound insulation is not destroyed becomes. A floor structure can thus be manufactured more cost-effectively. So far Mineral fiber mats used, on which a barrier film had to be placed, to prevent cement slurry from entering.
  • the plate preferably has a thickness of 30 mm to 80 mm.
  • a core 1 and two cover layers 2 forming the top and bottom of the plate are formed in the ultralight wood fiber board.
  • the plate has an average density which is less than or equal to 350 kg / m 3 .
  • the average density runs constant over at least two thirds of the plate thickness s symmetrically to the center line M.
  • the average density in the outer layers 2 deviates by a maximum of 15% from the average density in the core 1, but is at most 30 kg / m 3 more.
  • a tongue (3) can be milled out of the plate, which corresponds to a groove (not shown here) provided on the opposite side edge, so that two plates can be inserted into one another and a wind and moisture-proof connection is created.
  • the wood fibers mixed with the binder are used a residual moisture content of 7% to 12% sprinkled and shaped into a mat.
  • the Mat is warmed up and further heat energy is supplied in a Contipress pressed to the plate, the mat first continuously except for the Target thickness s of the plate (for example 30 mm) is pressed and the pressure for a constant period of time is kept constant when the target strength s is reached.
  • the specific Pressing time is 7 to 10 seconds.
  • a specific pressing time is advantageous of 8.5 seconds. Very good results were achieved at a feed rate of 130 mm / s.
  • Figure 3 shows the setting of the press (distance) over the length in the distance curve of their frame.
  • the associated table of values is shown in FIG. 4, with distance I the setting for a plate of conventional design and distance II the setting for a plate according to the invention.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Wood Science & Technology (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Dry Formation Of Fiberboard And The Like (AREA)
  • Laminated Bodies (AREA)
  • Diaphragms For Electromechanical Transducers (AREA)

Abstract

Platte aus lignocellulosehaltigen Fasern und einem Polyurethanleim als Bindemittel mit einer mittleren Rohdichte von nicht mehr als 350 kg/m<3>, wobei der Dichteverlauf im Kern (1) über einen Bereich von 2/3 der Plattenstärke (s) symmetrisch zur Mitte (M) im wesentlichen konstant ist, und die Abweichung der mittleren Dichte im Kern 1 zur maximalen Dichte in der Deckschicht (2) maximal 15% höchstens jedoch 30 kg/m<3> beträgt. <IMAGE>

Description

Die Erfindung betrifft einen Platte aus lignocellulosehaltigen Fasern und und einem Polyurethanleim als Bindemittel.
Eine solche Holzfaserplatte ist beispielsweise aus der DE 196 00 478 bekannt. Solche Platten werden als Bauplatten, zur Beplankung von Decken und Wänden oder beispielsweise in der Möbelindustrie verwendet. Die bekannten Platten sind bezogen auf ihre Größe recht schwer und deshalb teilweise umständlich zu handhaben. Werden sie als Bauplatten verwendet, müssen sie mit Spezialschrauben befestigt werden, um zu verhindern, dass die Platte an der Befestigungsstelle nicht ausbricht und vom Untergrund gelöst werden kann. Das Zuschneiden der Platten muss sorgfältig erfolgen, um ein Ausbrechen an der Schnittfuge zu vermeiden. Insgesamt erfordert die Verarbeitung der Bauplatten eine gewisse Erfahrung, um ein Ergebnis mit hoher Qualität zu erzielen. Insbesondere ungeübte Heimwerker können mit den Platten nur schwer umgehen.
Der Erfindung liegt die Aufgabe zugrunde, die bekannte Platte zu verbessern.
Zur Lösung der Aufgabe zeichnet sich die eingangs beschriebene Platte durch eine mittlere Rohdichte von nicht mehr als 350 kg/m3 aus, wobei der Dichteverlauf im Kern der Platte über einen Bereich von zwei Dritteln der Plattenstärke symmetrisch zur Mitte im wesentlichen konstant ist, und die Abweichung der mittleren Dichte im Kern zur maximalen Dichte in der Deckschicht maximal 15% höchstens jedoch 30 kg/m3 beträgt.
Durch diese Ausgestaltung wird eine sehr leichte Platte mit einem im wesentlichen konstanten Dichtegradienten geschaffen. Durch ihr geringes Gewicht lässt sich die Platte gut handhaben. Der im wesentlichen konstante Dichtegradient führt zu einer hohen Biegeschubsteifigkeit und erleichtert außerdem die Bearbeitung der Platte. So ist es möglich, Ausfräsungen von im Grunde genommen beliebiger Tiefe vorzunehmen, wodurch sie trotz ihres geringen Gewichts gut als Bau- und Möbelplatte verwendet werden kann. Die konstante Dichte gestattet beispielsweise Bauplatten auf einfache Art und Weise auf der Unterkonstruktion zu befestigen, indem sie mit einem handelsüblichen Druckluftnagelgerät angetackert werden können. Die über den Querschnitt konstante Dichte stellt dabei sicher, dass der Nagel nicht durch die Platte durchgeschossen werden kann. Es ist außerdem möglich, die Seitenränder der Platte mit einem Feder-/Nut-Profil zu versehen. Dadurch ist es möglich, aneinandergrenzende Platten einfach miteinander zu verbinden und eine winddichte Anschlussfuge zu erreichen, die nicht besonders isoliert werden muss.
Die maximale Dichte in der Deckschicht kann kleiner oder größer sein als die mittlere Dichte im Kern. Wenn die Dichte in der Deckschicht kleiner ist als im Kern, werden die Trittschalleigenschaften der Platte deutlich verbessert.
Durch die besondere Ausgestaltung der Dichte kann bei einer Platte mit einer mittleren Rohdichte im Bereich von 180 kg/m3 eine Wärmeleitfähigkeit λ von 0,04 - 0,05 W/mK eingestellt werden. Damit dämmt eine solche Faserplatte wie ein mineralischer Dämmstoff.
Das geringe Gewicht der Platte lässt es auch zu, auch Plattenstärken von 30 mm oder 80 mm zu realisieren, ohne dass die Handhabbarkeit der Platte sonderlich eingeschränkt wäre. Dadurch kann eine sehr gute Wärmedämmung mit der Platte realisiert werden. Die Platte weist außerdem eine gute Schalldämmung, insbesondere Trittschalldämmung auf. So kann sie nicht nur als Türfüllung, sondern auch als Fussbodenunterkonstruktion für estrichfreie Böden zur Belegung mit Teppichböden oder dergleichen Verwendung finden. Die Plattenoberfläche ist so fein, dass Zementschlämme nicht eindringen können und die Trittschalldämmung dadurch nicht zunichte gemacht wird. Ein Bodenaufbau kann dadurch kostengünstiger hergestellt werden. Bisher wurden Mineralfasermatten verwendet, auf die eine Sperrfolie aufgelegt werden musste, um das Eindringen der Zementschlämme zu verhindern.
Vorzugsweise weist die Platte eine Dicke von 30 mm bis 80 mm auf.
Mit Hilfe einer Zeichnung soll ein Ausführungsbeispiel der Erfindung nachfolgend näher erläutert werden. Es zeigt:
Figur 1 -
einen Teilausschnitt einer Platte im Querschnitt;
Figur 2 -
das Rohdichte-Profil bezogen auf den Querschnitt eines ersten Ausführungsbeispiels;
Figur 2a -
das Rohdichte-Profil bezogen auf den Querschnitt eines zweiten Ausführungsbeispiels;
Figur 3 -
eine Distanzkurve zur Herstellung einer erfindungsgemäßen Platte;
Figur 4 -
die zur Distanzkurve nach Figur 3 zugehörige Wertetabelle.
In der ultraleichten Holzfaserplatte ist ein Kern 1 und zwei die Ober- und Unterseite der Platte bildende Deckschichten 2 ausgebildet. Die Platte weist eine mittlere Dichte auf, die kleiner oder gleich 350 kg/m3 ist. Im Kern 1 verläuft die mittlere Dichte über mindestens zwei Drittel der Plattenstärke s symmetrisch zur Mittellinie M konstant. Die mittlere Dichte in den Deckschichten 2 weicht um maximal 15% von der mittleren Dichte im Kern 1 ab, sie beträgt aber höchstens 30 kg/m3 mehr. An einer Seitenkante kann eine Feder (3) aus der Platte ausgefräst sein, die zu einer hier nicht näher dargestellten auf der gegenüberliegenden Seitenkante vorgesehenen Nut korrespondiert, so dass zwei Platten ineinandergesteckt werden können und eine wind- und feuchtigkeitsdichte Verbindung geschaffen wird.
Zur Herstellung der Platte werden die mit dem Bindemittel vermischten Holzfasern mit einem Restfeuchtegehalt von 7% bis 12% zu einer Matte gestreut und geformt. Die Matte wird angewärmt und unter Zuführung weiterer Wärmeenergie in einer Contipresse zu der Platte verpresst, wobei die Matte zunächst kontinuierlich bis auf die Sollstärke s der Platte (beispielsweise 30 mm) gepresst wird und der Pressdruck für eine längere Zeitspanne konstant gehalten wird, wenn die Sollstärke s erreicht wird.
Anschließend wird mit einem konstanten Pressdruck weiter gefahren. Die spezifische Presszeit liegt bei 7 bis 10 Sekunden. Vorteilhaft hat sich eine spezifische Presszeit von 8,5 Sekunden herausgestellt. Sehr gute Ergebnisse wurden erzielt bei einer Vorschubgeschwindigkeit von 130 mm/s.
Figur 3 zeigt in der Distanzkurve die Einstellung der Presse (Distanz) über die Länge ihres Rahmens. In Figur 4 ist die zugehörige Wertetabelle wiedergegeben, wobei Distanz I die Einstellung für eine Platte herkömmlicher Bauart und Distanz II die Einstellung für eine Platte gemäß der Erfindung angibt.
Aus Figur 3 wird ersichtlich, dass zur Herstellung der erfindungsgemäßen Platte die Distanz in der Presse kontinuierlich reduziert wird. Wobei die Anfangsdistanz von 60 mm für eine Platte mit der Endstärke von 31,45 mm wesentlich größer ist als mit 44 mm bei der herkömmlichen Plattenfertigung.

Claims (4)

  1. Platte aus lignocellulosehaltigen Fasern und einem Polyurethanleim als Bindemittel mit einer mittleren Rohdichte von nicht mehr als 350 kg/m3, wobei der Dichteverlauf im Kern (1) über einen Bereich von zwei Dritteln der Plattenstärke (s) symmetrisch zur Mitte (M) im wesentlichen konstant ist, und die Abweichung der mittleren Dichte im Kern (1) zur maximalen Dichte in der Deckschicht (2) maximal 15% höchstens jedoch 30 kg/m3 beträgt.
  2. Platte nach Anspruch 1, gekennzeichnet durch eine Wärmeleitfähigkeit (λ) von 0,04 - 0,05 W/mK.
  3. Platte nach Anspruch 1 oder 2, gekennzeichnet durch eine Stärke (s) von mindestens 30 mm, insbesondere 30 mm bis 80 mm.
  4. Platte nach einem der Ansprüche 1 bis 3, dadurch gekennzeichnet, dass an mindestens zwei sich gegenüberliegenden Seitenkanten ein Feder-Nut-Profil ausgebildet ist.
EP01119297A 2000-08-30 2001-08-10 Faserplatte Expired - Lifetime EP1184525B1 (de)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SI200130285T SI1184525T1 (en) 2000-08-30 2001-08-10 Fibreboard

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE10042534A DE10042534A1 (de) 2000-08-30 2000-08-30 Faserplatte
DE10042534 2000-08-30

Publications (2)

Publication Number Publication Date
EP1184525A1 true EP1184525A1 (de) 2002-03-06
EP1184525B1 EP1184525B1 (de) 2004-11-03

Family

ID=7654273

Family Applications (1)

Application Number Title Priority Date Filing Date
EP01119297A Expired - Lifetime EP1184525B1 (de) 2000-08-30 2001-08-10 Faserplatte

Country Status (7)

Country Link
EP (1) EP1184525B1 (de)
AT (1) ATE281570T1 (de)
DE (2) DE10042534A1 (de)
DK (1) DK1184525T3 (de)
ES (1) ES2231359T3 (de)
PT (1) PT1184525E (de)
SI (1) SI1184525T1 (de)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2005046950A1 (en) * 2003-11-13 2005-05-26 Swedwood International Ab Particle board
WO2013004433A1 (de) * 2011-07-01 2013-01-10 Egger Gmbh & Co. Og Sandwichplatte, insbesondere für ein möbel, sowie herstellungsverfahren

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1995020473A1 (en) * 1994-01-28 1995-08-03 Sunds Defibrator Industries Ab Method of manufacturing lignocellulosic board
EP0733756A2 (de) * 1995-03-22 1996-09-25 Wilsonart International Inc. Nut- und Feder-Verbindung und Verfahren zu ihrer Ausführung
DE19606262C1 (de) * 1996-02-21 1997-04-17 Glunz Ag Verfahren und Vorrichtung zur Herstellung einer mitteldichten Faserplatte
DE19600478A1 (de) 1996-01-09 1997-08-07 Glunz Ag Verfahren zur Herstellung einer leichten mitteldichten Faserplatte

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5492756A (en) * 1994-07-22 1996-02-20 Mississippi State University Kenaf core board material
DE19647240B4 (de) * 1996-11-15 2005-06-09 Fritz Homann Gmbh & Co. Kg Holzfaserplatte und Verfahren zu ihrer Herstellung
JP2002522251A (ja) * 1998-08-05 2002-07-23 フラウンホーファー ゲゼルシャフト ツア フェルデルング デア アンゲヴァンテン フォルシュング エー ファウ 中密度ボードの製造方法
US6641909B1 (en) * 1999-05-18 2003-11-04 Alberta Research Council Inc. Hemp hurd composite panels and method of making

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1995020473A1 (en) * 1994-01-28 1995-08-03 Sunds Defibrator Industries Ab Method of manufacturing lignocellulosic board
EP0733756A2 (de) * 1995-03-22 1996-09-25 Wilsonart International Inc. Nut- und Feder-Verbindung und Verfahren zu ihrer Ausführung
DE19600478A1 (de) 1996-01-09 1997-08-07 Glunz Ag Verfahren zur Herstellung einer leichten mitteldichten Faserplatte
DE19606262C1 (de) * 1996-02-21 1997-04-17 Glunz Ag Verfahren und Vorrichtung zur Herstellung einer mitteldichten Faserplatte

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2005046950A1 (en) * 2003-11-13 2005-05-26 Swedwood International Ab Particle board
US8398905B2 (en) 2003-11-13 2013-03-19 Swedwood International Ab Particle board
WO2013004433A1 (de) * 2011-07-01 2013-01-10 Egger Gmbh & Co. Og Sandwichplatte, insbesondere für ein möbel, sowie herstellungsverfahren
EA025515B1 (ru) * 2011-07-01 2016-12-30 Фриц Эггер Гмбх Унд Ко. Ог Многослойная плита для мебели, мебель с многослойной плитой, а также способ изготовления многослойной плиты

Also Published As

Publication number Publication date
PT1184525E (pt) 2005-02-28
EP1184525B1 (de) 2004-11-03
DK1184525T3 (da) 2005-01-31
SI1184525T1 (en) 2005-06-30
DE50104363D1 (de) 2004-12-09
ES2231359T3 (es) 2005-05-16
ATE281570T1 (de) 2004-11-15
DE10042534A1 (de) 2002-03-28

Similar Documents

Publication Publication Date Title
DE102016113132B3 (de) Brettsperrholz-Platte
DE69505863T2 (de) Verbundplatte
EP2746045B1 (de) Sperrholzplatte
EP1881124B1 (de) Leichtbauplatte
DE20018817U1 (de) Plattenelement
WO2008025312A1 (de) Bauplatte und verfahren zur herstellung einer bauplatte
DE2258161A1 (de) Bauplatte mit einer aus marmor bestehenden sichtflaeche
DE3229262A1 (de) Plattenfoermiges bauelement aus holz
DE2339796A1 (de) Aus einem nicht steigfaehigen gemisch von faserstoffen und bindemitteln gepressten profilkoerpern zusammengesetztes bauelement
EP1184525B1 (de) Faserplatte
DE3840093A1 (de) Massivholzplatte sowie verfahren zur herstellung derselben
DE202006013553U1 (de) Bauplatte
EP0320803A2 (de) Quaderförmiger Holzkörper zum Herausarbeiten von Holzbauteilen
DE9318466U1 (de) Verbundelement, insbesondere Verbundplatte, für Bauzwecke
DE102007018209A1 (de) Dämmplatte
DE20009571U1 (de) Tafelförmiges Holzverbundelement
DE102017100753A1 (de) Verfahren zum Befestigen eines zellulosebasierten Bauteils mit einem Bauteil aus einem anderen Material
EP3428361B1 (de) Verbundbauteil
EP4166743A1 (de) Inlay für türen
EP1247916B1 (de) Dämmformkörper, insbesondere Dämmplatte, aus Holzfaserstoff
DE10052490B4 (de) Hohlraumabdeckelement sowie Verfahren zur Herstellung von Hohlraumabdeckelementen
CH683902A5 (de) Verbundplatte mit wenigstens einer Deckschicht aus Holz.
WO2000029180A1 (de) Holzbauelement
DE19736952A1 (de) Platte
DE19829057C2 (de) Bauplatte aus Holz und Aluminium

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE TR

AX Request for extension of the european patent

Free format text: AL;LT;LV;MK;RO;SI

17P Request for examination filed

Effective date: 20020202

AKX Designation fees paid

Free format text: AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE TR

AXX Extension fees paid

Free format text: RO PAYMENT 20020202;SI PAYMENT 20020202

17Q First examination report despatched

Effective date: 20040226

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE TR

AX Request for extension of the european patent

Extension state: RO SI

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

Free format text: NOT ENGLISH

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REF Corresponds to:

Ref document number: 50104363

Country of ref document: DE

Date of ref document: 20041209

Kind code of ref document: P

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

Free format text: GERMAN

REG Reference to a national code

Ref country code: CH

Ref legal event code: NV

Representative=s name: BRAUN & PARTNER PATENT-, MARKEN-, RECHTSANWAELTE

Ref country code: DK

Ref legal event code: T3

REG Reference to a national code

Ref country code: GR

Ref legal event code: EP

Ref document number: 20050400018

Country of ref document: GR

REG Reference to a national code

Ref country code: SE

Ref legal event code: TRGR

REG Reference to a national code

Ref country code: PT

Ref legal event code: SC4A

Free format text: AVAILABILITY OF NATIONAL TRANSLATION

Effective date: 20041230

GBT Gb: translation of ep patent filed (gb section 77(6)(a)/1977)

Effective date: 20050302

REG Reference to a national code

Ref country code: ES

Ref legal event code: FG2A

Ref document number: 2231359

Country of ref document: ES

Kind code of ref document: T3

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20050810

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed

Effective date: 20050804

ET Fr: translation filed
PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DK

Payment date: 20080822

Year of fee payment: 8

Ref country code: LU

Payment date: 20080826

Year of fee payment: 8

Ref country code: NL

Payment date: 20080820

Year of fee payment: 8

Ref country code: PT

Payment date: 20080807

Year of fee payment: 8

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FI

Payment date: 20080825

Year of fee payment: 8

Ref country code: IE

Payment date: 20080819

Year of fee payment: 8

Ref country code: MC

Payment date: 20080820

Year of fee payment: 8

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: SE

Payment date: 20080825

Year of fee payment: 8

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GR

Payment date: 20080826

Year of fee payment: 8

REG Reference to a national code

Ref country code: PT

Ref legal event code: MM4A

Free format text: LAPSE DUE TO NON-PAYMENT OF FEES

Effective date: 20100210

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20090831

REG Reference to a national code

Ref country code: NL

Ref legal event code: V1

Effective date: 20100301

REG Reference to a national code

Ref country code: DK

Ref legal event code: EBP

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20090810

Ref country code: PT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20100210

REG Reference to a national code

Ref country code: SI

Ref legal event code: KO00

Effective date: 20100317

REG Reference to a national code

Ref country code: IE

Ref legal event code: MM4A

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20100301

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20090810

Ref country code: DK

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20090831

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20100303

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20090810

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20090811

REG Reference to a national code

Ref country code: DE

Ref legal event code: R082

Ref document number: 50104363

Country of ref document: DE

Representative=s name: GRAMM, LINS & PARTNER PATENT- UND RECHTSANWAEL, DE

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 16

REG Reference to a national code

Ref country code: DE

Ref legal event code: R082

Ref document number: 50104363

Country of ref document: DE

Representative=s name: GRAMM, LINS & PARTNER PATENT- UND RECHTSANWAEL, DE

Ref country code: DE

Ref legal event code: R081

Ref document number: 50104363

Country of ref document: DE

Owner name: SWISS KRONO TEC AG, CH

Free format text: FORMER OWNER: KRONOTEC AG, LUZERN, CH

REG Reference to a national code

Ref country code: CH

Ref legal event code: PFA

Owner name: SWISS KRONO TEC AG, CH

Free format text: FORMER OWNER: KRONOTEC AG, CH

REG Reference to a national code

Ref country code: AT

Ref legal event code: HC

Ref document number: 281570

Country of ref document: AT

Kind code of ref document: T

Owner name: SWISS KRONO TEC AG, CH

Effective date: 20170630

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 17

REG Reference to a national code

Ref country code: FR

Ref legal event code: CA

Effective date: 20170801

Ref country code: FR

Ref legal event code: CD

Owner name: KRONOTEC AG

Effective date: 20170801

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: ES

Payment date: 20170901

Year of fee payment: 17

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: TR

Payment date: 20170809

Year of fee payment: 17

Ref country code: AT

Payment date: 20170821

Year of fee payment: 17

Ref country code: BE

Payment date: 20170823

Year of fee payment: 17

REG Reference to a national code

Ref country code: CH

Ref legal event code: PCAR

Free format text: NEW ADDRESS: HOLEESTRASSE 87, 4054 BASEL (CH)

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 18

REG Reference to a national code

Ref country code: AT

Ref legal event code: MM01

Ref document number: 281570

Country of ref document: AT

Kind code of ref document: T

Effective date: 20180810

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180810

REG Reference to a national code

Ref country code: BE

Ref legal event code: HC

Owner name: SWISS KRONO TEC AG; CH

Free format text: DETAILS ASSIGNMENT: CHANGE OF OWNER(S), CHANGEMENT NOM PROPRIETAIRE, NOM ET ADRESSE

Effective date: 20170224

Ref country code: BE

Ref legal event code: MM

Effective date: 20180831

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180831

REG Reference to a national code

Ref country code: ES

Ref legal event code: FD2A

Effective date: 20190918

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: ES

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180811

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 20190822

Year of fee payment: 19

Ref country code: IT

Payment date: 20190821

Year of fee payment: 19

Ref country code: DE

Payment date: 20190829

Year of fee payment: 19

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20190827

Year of fee payment: 19

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: CH

Payment date: 20190826

Year of fee payment: 19

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 50104363

Country of ref document: DE

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20200810

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200831

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200831

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210302

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200831

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200810

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200810

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180810