EP1073812A1 - Building component with a support grid and method of producing the same - Google Patents
Building component with a support grid and method of producing the sameInfo
- Publication number
- EP1073812A1 EP1073812A1 EP00909087A EP00909087A EP1073812A1 EP 1073812 A1 EP1073812 A1 EP 1073812A1 EP 00909087 A EP00909087 A EP 00909087A EP 00909087 A EP00909087 A EP 00909087A EP 1073812 A1 EP1073812 A1 EP 1073812A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- support grid
- fiber layer
- component
- fibers
- grid
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F13/00—Coverings or linings, e.g. for walls or ceilings
- E04F13/02—Coverings or linings, e.g. for walls or ceilings of plastic materials hardening after applying, e.g. plaster
- E04F13/04—Bases for plaster
Definitions
- the invention relates to a component for plasterable outer and inner walls and a method for its production with the features in the preamble of the main method and device claim.
- the insulation panel shown here consists of a panel element with a fiber layer and optionally a support layer.
- a plaster base with an embedded support grid is attached to the outer surface of the fiber layer.
- the plaster base consists of a
- Coating formed by an intimately mixed mixture of a dispersion and short cut fibers.
- the support grid adheres to the coating on the surface of the fiber layer and is additionally fixed by several dowels.
- the previously known component has a certain construction cost in the manufacture. In particular, the support grid must be subsequently connected to the insulation layer and temporarily fixed until the coating is applied.
- the invention solves this problem with the features in the main method and device claim.
- Manufacturing processes have the advantage that they require less manufacturing effort and correspondingly lower costs. Manufacturing is also simplified.
- the connection between the fiber layer and the inserted support grid is better.
- This plaster base preferably consists of a coating according to DE-U-296 08 066.
- the support grid is embedded at least partially recessed in the surface of the fiber layer and is thereby connected to the fiber layer in a particularly intimate manner.
- the preferably mineral fibers are sticky and thus combine themselves and in a simple manner with the support grid placed on them. It is also advantageous if the support grid at
- Fibreboard production is placed on the still undensified fiber layer and then pressed together with the fibers. This joint pressing process also improves the connection between the fibers and the support grid.
- Figure 1 a cut and partially broken cross-section through a component
- FIG. 2 a top view of the component from FIG. 1.
- a plate-shaped component (1) for plasterable outer and inner walls is shown. In the exemplary embodiment shown, it is designed as an insulation board. It can also be a building board or another type of component (1).
- the component (1) consists of a fibrous, single or multi-layer plate element (5) and a plaster base (3), which provides a well-adhering surface for a suitable interior or exterior plaster (11).
- the plaster base (3) can be of any design. In the embodiment shown, it consists of a coating (6 ") on the outer surface (2) of the plate element (5).
- the coating (6) is formed by an intimately mixed mixture of a binder and short cut fibers. The binder is preferred The mixture is applied in liquid or pasty form to the surface (2) of the component (1). After curing, the coating (6) forms a rough, hard and stable plaster-bearing layer tough elastic and has a certain flexibility, which increases the elasticity of
- Thermal insulation boards or other substrates can at least partially follow.
- the coating (6) corresponds preferably the version known from DE-U-296 08 066.
- the plate element (5) has at least one fiber layer (4), which preferably has the function of a
- Insulation layer in particular for thermal or acoustic insulation.
- one or more additional layers (9), e.g. a stable base plate should be available.
- the fibers (10) are arranged in a suitable manner in the fiber layer (4). They are preferably swirled and mixed with an irregular orientation.
- the fiber layer (4) consists of any suitable fibers (10), which are e.g. are mineral fibers.
- the fibers (10) can also be made of plastic or natural materials, e.g. Hemp or cotton. Fiber mixtures can also be used.
- the fiber layer (4) can contain binders and other additives.
- a support grid (7) is inserted or integrated in the fiber layer (4) on the outer surface (2).
- the support grid (7) is introduced during the production of the fiber layer (4) or the plate element (5) and is preferably at least partially embedded in the surface (2).
- the support grid (7) can be partially embedded and thereby protrude a little bit beyond the surface (2). Alternatively, it can also be completely embedded.
- the support grid (7) is with the
- the fibers (10) are used in the manufacture of the fibers (10)
- the fiber layer (4) is initially filled into a suitable holder, for example at the end or shortly after the filling process the support grid (7) is fed and placed on the fiber bed.
- the support grid (7) can already be at least partially pressed into the surface of the fiber bed and embedded.
- the fibers (10) have a sticky surface at this stage and thereby stick to the support grid (7).
- the loosely poured fiber layer (4) can then be pressed together with the support grid (7) by a suitable pressing device to the desired fiber plate thickness and compressed.
- the plaster base (3) and in particular the coating (6) are then applied in a suitable manner to the prefabricated plate element (5) with the inserted support grid (7), thus completing the component (1).
- the component (1) can be placed on a base (12), e.g. masonry.
- dowels (8) are used for this purpose, which are driven through the component (1) and which rest with their heads on the plaster base (3) or the coating (6).
- the surface of the fiber layer (4) is reinforced and reinforced by the support grid (2). It supports the holding forces introduced by the dowel (8) and secures the component
- the support grid (7) allows the component (1) to be installed in a tack-free and dowelled manner. On the wall like this
- the support grid (7) is preferably made of plastic, glass fibers or other suitable materials.
- Support grid (7) can be in the form of a fabric. It has a suitable mesh size, on the one hand, the dowels (8) and on the other hand to offer the desired support and arming function.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Finishing Walls (AREA)
- Laminated Bodies (AREA)
- Details Of Garments (AREA)
- Road Paving Structures (AREA)
Abstract
Description
Claims
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE29901016U DE29901016U1 (en) | 1999-01-22 | 1999-01-22 | Component with support grid |
DE29901016U | 1999-01-22 | ||
PCT/EP2000/000401 WO2000043609A1 (en) | 1999-01-22 | 2000-01-20 | Building component with a support grid and method of producing the same |
Publications (2)
Publication Number | Publication Date |
---|---|
EP1073812A1 true EP1073812A1 (en) | 2001-02-07 |
EP1073812B1 EP1073812B1 (en) | 2001-12-12 |
Family
ID=8068296
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP00909087A Expired - Lifetime EP1073812B1 (en) | 1999-01-22 | 2000-01-20 | Building component with a support grid and method of producing the same |
Country Status (5)
Country | Link |
---|---|
EP (1) | EP1073812B1 (en) |
AT (1) | ATE210774T1 (en) |
DE (2) | DE29901016U1 (en) |
PL (1) | PL348856A1 (en) |
WO (1) | WO2000043609A1 (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2975417B1 (en) * | 2011-05-19 | 2013-05-10 | Saint Gobain Isover | EXTERIOR BUILDING WALL IN DENSE MINERAL WOOL |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3907298A1 (en) * | 1989-03-07 | 1990-09-13 | Siplast Gmbh | BITUMINOES ADAPTER FOR TILING OR APPLYING PLASTER |
DE29608066U1 (en) | 1996-05-04 | 1997-09-04 | Wiehofsky, Fritz, 86938 Schondorf | Component for plasterable exterior and interior walls |
-
1999
- 1999-01-22 DE DE29901016U patent/DE29901016U1/en not_active Expired - Lifetime
-
2000
- 2000-01-20 EP EP00909087A patent/EP1073812B1/en not_active Expired - Lifetime
- 2000-01-20 AT AT00909087T patent/ATE210774T1/en not_active IP Right Cessation
- 2000-01-20 WO PCT/EP2000/000401 patent/WO2000043609A1/en active IP Right Grant
- 2000-01-20 DE DE50000060T patent/DE50000060D1/en not_active Expired - Fee Related
- 2000-01-20 PL PL00348856A patent/PL348856A1/en not_active IP Right Cessation
Non-Patent Citations (1)
Title |
---|
See references of WO0043609A1 * |
Also Published As
Publication number | Publication date |
---|---|
DE29901016U1 (en) | 2000-06-29 |
DE50000060D1 (en) | 2002-01-24 |
WO2000043609A1 (en) | 2000-07-27 |
ATE210774T1 (en) | 2001-12-15 |
PL348856A1 (en) | 2002-06-17 |
EP1073812B1 (en) | 2001-12-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE1584509C3 (en) | Process for the production of building panels from lightweight concrete | |
EP1564338B1 (en) | Device for the production of insulating elements | |
DE19729058A1 (en) | Composite element and method for its production | |
DE10159632B4 (en) | Dowels and method for mounting insulation boards and a device for driving a spreader into a dowel | |
EP0051101B1 (en) | Cement slab, and process and device for producing the same | |
WO2013164393A2 (en) | Method for producing a drywall | |
EP1073812B1 (en) | Building component with a support grid and method of producing the same | |
DE3430564C2 (en) | Formwork angles for ceilings | |
DE2646429A1 (en) | PROCESS FOR MANUFACTURING SELF-SUPPORTING ELEMENTS, IN PARTICULAR ROOF TABLES AND PANELS FOR BUILDING ELEMENTS | |
EP1669511B1 (en) | Lightweight construction element and manufacturing method | |
EP0580614B1 (en) | Process and means for anchoring fastening elements in boreholes | |
EP1505218B1 (en) | Thermal insulation compound system | |
EP0575710B1 (en) | Process for the manufacture of a slab shaped sound absorbing element for use under soffits | |
DE10213490B4 (en) | Method for mounting insulation boards | |
EP0170218A2 (en) | Method of manufacturing a masonry element, masonry element manufactured according to the method and supporting plate for the element | |
DE102005053104B4 (en) | construction panels | |
EP0441295A1 (en) | Method for repairing building façades | |
DE10356990B4 (en) | Method for producing a lightweight element with tiles | |
EP0960989A1 (en) | Building block and method of making a building block of concrete | |
DE102023107736A1 (en) | Floor, ceiling or wall element | |
EP1936064B1 (en) | Joint strip | |
DE10118288A1 (en) | Method and device for the production of wall components with a plaster coating and corresponding wall component | |
DE102015105637A1 (en) | Wall or ceiling element, process for its manufacture and buildings | |
DE102021125449A1 (en) | PROCESS FOR THE MANUFACTURE OF A CORE-INSULATED PRECAST CONCRETE PART AND A CORE-INSULATED PRECAST CONCRETE PART | |
EP2146018B1 (en) | Prefabricated wall and its method of production |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 20001129 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE |
|
GRAG | Despatch of communication of intention to grant |
Free format text: ORIGINAL CODE: EPIDOS AGRA |
|
17Q | First examination report despatched |
Effective date: 20010521 |
|
GRAG | Despatch of communication of intention to grant |
Free format text: ORIGINAL CODE: EPIDOS AGRA |
|
GRAH | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOS IGRA |
|
GRAH | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOS IGRA |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT;WARNING: LAPSES OF ITALIAN PATENTS WITH EFFECTIVE DATE BEFORE 2007 MAY HAVE OCCURRED AT ANY TIME BEFORE 2007. THE CORRECT EFFECTIVE DATE MAY BE DIFFERENT FROM THE ONE RECORDED. Effective date: 20011212 Ref country code: IE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20011212 Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20011212 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20011212 Ref country code: GB Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20011212 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20011212 |
|
REF | Corresponds to: |
Ref document number: 210774 Country of ref document: AT Date of ref document: 20011215 Kind code of ref document: T |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: IF02 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20020120 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20020122 Year of fee payment: 5 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D Free format text: GERMAN |
|
REF | Corresponds to: |
Ref document number: 50000060 Country of ref document: DE Date of ref document: 20020124 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20020131 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20020312 Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20020312 Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20020312 |
|
ET | Fr: translation filed | ||
NLV1 | Nl: lapsed or annulled due to failure to fulfill the requirements of art. 29p and 29m of the patents act | ||
GBV | Gb: ep patent (uk) treated as always having been void in accordance with gb section 77(7)/1977 [no translation filed] |
Effective date: 20011212 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20020627 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FD4D |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20020801 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
26N | No opposition filed | ||
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 20021224 Year of fee payment: 4 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: BE Payment date: 20030121 Year of fee payment: 4 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: AT Payment date: 20030127 Year of fee payment: 4 |
|
NLV1 | Nl: lapsed or annulled due to failure to fulfill the requirements of art. 29p and 29m of the patents act | ||
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20040120 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20040131 Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20040131 Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20040131 |
|
BERE | Be: lapsed |
Owner name: *WIEHOFSKY FRITZ Effective date: 20040131 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20040930 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: ST |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20050802 |