EP1004707B1 - Process for deepening and/or reinforcing, consolidating or renovating a quay wall constructed along a water basin - Google Patents

Process for deepening and/or reinforcing, consolidating or renovating a quay wall constructed along a water basin Download PDF

Info

Publication number
EP1004707B1
EP1004707B1 EP98870257A EP98870257A EP1004707B1 EP 1004707 B1 EP1004707 B1 EP 1004707B1 EP 98870257 A EP98870257 A EP 98870257A EP 98870257 A EP98870257 A EP 98870257A EP 1004707 B1 EP1004707 B1 EP 1004707B1
Authority
EP
European Patent Office
Prior art keywords
quay wall
network
cementing material
water basin
columns
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
EP98870257A
Other languages
German (de)
French (fr)
Other versions
EP1004707A1 (en
Inventor
Lucas Bols
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hydro Soil Services NV
Original Assignee
Hydro Soil Services NV
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hydro Soil Services NV filed Critical Hydro Soil Services NV
Priority to DE69824010T priority Critical patent/DE69824010T2/en
Priority to EP98870257A priority patent/EP1004707B1/en
Priority to AT98870257T priority patent/ATE267300T1/en
Priority to TW088108113A priority patent/TW449629B/en
Priority to AU59420/99A priority patent/AU5942099A/en
Priority to SG9905765A priority patent/SG106570A1/en
Publication of EP1004707A1 publication Critical patent/EP1004707A1/en
Application granted granted Critical
Publication of EP1004707B1 publication Critical patent/EP1004707B1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/06Moles; Piers; Quays; Quay walls; Groynes; Breakwaters ; Wave dissipating walls; Quay equipment

Definitions

  • a network of bores is formed down to the desired depth, into which a cementing material is introduced under high pressure to form a network of columns, after which from the water side and through the original quay wall, at different levels a series of anchorings is applied, and subsequently the original bottom of the water basin is dredged down to the desired depth.
  • Anchoring and/or nailing 10 applied at different levels ensures the stability of the new quay wall structure that formed by columns 9, 9' that merge into each other.
  • the existing quay wall consists of a closed, tight wall (e.g. sheet pile wall), this wall may serve as a permanent formwork.

Abstract

The invention refers to a process for deepening and/or reinforcing, consolidating or renovating a quay wall (1) constructed along a water basin, characterised in that, on land side behind and below said quay wall (1), using high pressure techniques, a network of bores is formed down to the desired depth, into which a cementing material is introduced under high pressure to form a network of columns (7), after which from the water side and through the original quay wall (1), at different levels a series of anchorings (2) is applied, and subsequently the original bottom of the water basin is dredged down to the desired depth. <IMAGE>

Description

  • This invention relates to a process for deepening and/or reinforcing, consolidating or renovating a quay wall constructed along a water basin, (see e.g. US-A-4 728 225).
  • Quay walls to which the process according to the invention may be applied, may belong i.a. to one of the following categories: sheet pile walls, combi-walls, sludge walls.
  • Quay walls are difficult to deepen without moving the mooring line. The need to deepen an existing quay wall with the aim to achieve a greater water depth for the mooring of larger ships, without appreciably modifying and/or moving the mooring line and without interfering with the existing merchant shipping traffic, is felt increasingly, and it is consequently the aim of the invention to prescribe a process allowing the deepening of a quay wall of one of the above mentioned types, without interrupting or hampering the mooring of ships, while in addition, the normal activities ashore, such as the operation of cranes and train traffic, may be continued normally.
  • In order to enable this in accordance with the invention, on land side behind and below said quay wall, using high pressure techniques, a network of bores is formed down to the desired depth, into which a cementing material is introduced under high pressure to form a network of columns, after which from the water side and through the original quay wall, at different levels a series of anchorings is applied, and subsequently the original bottom of the water basin is dredged down to the desired depth.
  • Still according to the invention, a reinforcement is applied in said bores.
  • According to a possible embodiment, said reinforcement is applied in the still liquid cementing material.
  • According to another embodiment, said reinforcement is applied in the already hardened cementing material, whereto desctructive borings are carried out in the hardened cementing material into which cementing material is added.
  • Other details and advantages of the invention will appear from the following description of a process for deepening and/or reinforcing, consolidating or renovating an existing quay wall. This description is exclusively given as an example and does not limit the invention. The reference numbers refer to the attached figures.
  • The different figures 1-5 schematically illustrate the subsequent steps of the process according to the invention.
  • Figure 1 shows a customary quay wall in which the reference 1 refers to any type of quay wall such as set forth in the preamble. Reference 2 refers to an anchoring such as those which are customary in different quay wall structures.
  • The existing water level, which in many cases is subject to tides, is indicated by reference 3, and the earth body located landward by reference 4.
  • The figures 1-4 also show the existing bottom level 5 of a water basin. With the latter, a river, a dock or the sea is meant, which may or may not be subject to tides. The level 6 which was realised in a later stage, is shown in figures 4 and 5, i.e. after the completion of the deepening works.
  • According to the process in accordance with the invention, behind the quay wall 1, i.e. on land side, a series of columns 7, depending on local circumstances such as i.a. the soil structure, are formed using high pressure jets. The depth to which the columns will be realised depends on various factors. In figures 4 and 5 the lowest level of a bore is suggested by references 8, 8'. First borings are carried out either vertically or inclined, either or not using high pressure jets. Afterwards, by means of the introduction of a hardening cementation material (grout) under high pressure, columns are formed. With "high pressure" pressures are meant between 250 and 600 bars. After hardening, columns 9, 9' are realised (figures 3 and 4).
  • Anchoring and/or nailing 10 applied at different levels, ensures the stability of the new quay wall structure that formed by columns 9, 9' that merge into each other. When the existing quay wall consists of a closed, tight wall (e.g. sheet pile wall), this wall may serve as a permanent formwork.
  • By realising the different columns in such a way, alongside and behind each other in one or more longitudinal or transverse rows, a network arises of pillars 9, 9' (figures 3, 4, 5) merging into each other, which form the new quay wall. The diameter of the pillars and their "quality" depend on local factors. In this respect, the high pressure techniques allow for great flexibility.
  • The existing quay wall structure or parts therefrom may also serve as elements of, and be incorporated into the new deepened and/or reinforced, consolidated, renovated quay wall structure. It is indeed possible to anchor this existing structure to the deeper concrete wall to be built yet.
  • After dredging the bottom, between the original level 5 and the level 6 to be realised, the base of the new quay wall has sufficient hold. The depth of this base will be determined by the geological structure of the soil and by the new loads to which the deepened quay wall structure will be subject and for which its dimensions have been calculated.
  • By applying the process according to the invention, and by using the high pressure techniques, widely varying underground structures may be realised by building a network of columns which will give rise to a massive structure of which the characteristics may be adapted to the local circumstances without any problem.

Claims (6)

  1. A Process for deepening and/or reinforcing, consolidating or renovating a quay wall (1) constructed along a water basin, characterised in that, on land side behind and below said quay wall (1), a network of bores is formed down to the desired depth, into which a binding agent is introduced under high pressure to form a network of columns (9), after which from the water side and through the original quay wall (1), at different levels a series of anchorings (2) is applied, and subsequently the original bottom of the water basin is dredged down to the desired depth."
  2. A process as claimed in claim 1, characterised in that the network of columns is formed by forming a network of bores using high pressure techniques, into which cement is introduced as a binding agent.
  3. Process according to claim 2, characterised in that in said bores a reinforcement is applied.
  4. Process according to claim 3, characterised in that as a binding agent use is made of a liquid cementing material and in that the reinforcement is introduced in the still liquid cementing material.
  5. Process as claimed in claim 3, characterised in that as a binding agent use is made of a liquid cementing material and in that the reinforcement is introduced in the already hardened cementing material, whereto destructive borings are carried out in the hardened cementing material into which further cementing material is added.
  6. Process according to any one of claims 1-5, characterised in that the network of columns is constructed such that a monolithic quay wall structure is formed.
EP98870257A 1998-11-25 1998-11-25 Process for deepening and/or reinforcing, consolidating or renovating a quay wall constructed along a water basin Expired - Lifetime EP1004707B1 (en)

Priority Applications (6)

Application Number Priority Date Filing Date Title
DE69824010T DE69824010T2 (en) 1998-11-25 1998-11-25 Method of deepening and / or strengthening, securing or renovating a quay wall
EP98870257A EP1004707B1 (en) 1998-11-25 1998-11-25 Process for deepening and/or reinforcing, consolidating or renovating a quay wall constructed along a water basin
AT98870257T ATE267300T1 (en) 1998-11-25 1998-11-25 METHOD FOR DEEPENING AND/OR STRENGTHENING, SECURING OR RENOVATING A QUAY WALL
TW088108113A TW449629B (en) 1998-11-25 1999-05-12 Process for deepening and/or reinforcing, consolidating or renovating a quay wall constructed along a water basin
AU59420/99A AU5942099A (en) 1998-11-25 1999-11-15 Process for deepening and/or reinforcing, consolidating or renovating a quay wall constructed along a water basin
SG9905765A SG106570A1 (en) 1998-11-25 1999-11-17 Process for deepening and/or reinforcing, consolidating or renovating a quay wall constructed along a water basin

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
EP98870257A EP1004707B1 (en) 1998-11-25 1998-11-25 Process for deepening and/or reinforcing, consolidating or renovating a quay wall constructed along a water basin

Publications (2)

Publication Number Publication Date
EP1004707A1 EP1004707A1 (en) 2000-05-31
EP1004707B1 true EP1004707B1 (en) 2004-05-19

Family

ID=8237124

Family Applications (1)

Application Number Title Priority Date Filing Date
EP98870257A Expired - Lifetime EP1004707B1 (en) 1998-11-25 1998-11-25 Process for deepening and/or reinforcing, consolidating or renovating a quay wall constructed along a water basin

Country Status (6)

Country Link
EP (1) EP1004707B1 (en)
AT (1) ATE267300T1 (en)
AU (1) AU5942099A (en)
DE (1) DE69824010T2 (en)
SG (1) SG106570A1 (en)
TW (1) TW449629B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6337396B2 (en) * 2014-07-04 2018-06-06 五洋建設株式会社 Reinforcement structure and reinforcement method for existing shore structures
JP6322560B2 (en) * 2014-12-05 2018-05-09 鹿島建設株式会社 Renewal method of existing revetment or quay and revetment or quay structure
CN113152444A (en) * 2021-03-09 2021-07-23 中铁八局集团有限公司 Water taking pump house cement jet grouting pile water stopping enclosure structure and construction method thereof

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4911583A (en) * 1984-06-21 1990-03-27 Schnabel Foundation Company Structure and method for shoring a face of an excavation
US4728225A (en) * 1985-02-11 1988-03-01 Schnabel Foundation Company Method of rehabilitating a waterfront bulkhead
US5368414A (en) * 1991-07-19 1994-11-29 Miller; Vincent G. Method and system for rehabilitating a bulkhead

Also Published As

Publication number Publication date
SG106570A1 (en) 2004-10-29
TW449629B (en) 2001-08-11
ATE267300T1 (en) 2004-06-15
EP1004707A1 (en) 2000-05-31
AU5942099A (en) 2000-06-01
DE69824010D1 (en) 2004-06-24
DE69824010T2 (en) 2005-05-12

Similar Documents

Publication Publication Date Title
CN103374900B (en) Build the gravity type quay on muddy foundation and construction method thereof
US5911545A (en) Method for stabilizing and repair of docks and seawalls
JP3423394B2 (en) Underwater frame structure
JP4575800B2 (en) Embankment reinforcement structure and reinforcement method
EP1004707B1 (en) Process for deepening and/or reinforcing, consolidating or renovating a quay wall constructed along a water basin
CN202626934U (en) Gravity wharf built on silty foundation
CN107119716A (en) Tidal land tidal bore area vcehicular tunnel builds structure and its method
KR102625776B1 (en) Construction method of CIP retaining wall with improved water protection and ground subsidence prevention function
KR200232653Y1 (en) A repaired part of damage using grouting
Koerner et al. Geotextiles used as flexible forms
JPH1161775A (en) Method for repair and improvement of harbor and river civil engineering structure
KR0182846B1 (en) Continuous welded pile and the construction of off shore structure using it
JP3510366B2 (en) How to build underwater structures
Degen et al. Offshore Stone Columns-Equipment, Quality Control and Outlook for Future Applications
JPH08184022A (en) Method of aerial reclamation construction
JP2001288726A (en) Method for constructing double sheet pile type harbor civil engineering structure
Trewern et al. Challenges associated with the redevelopment of Webb Dock
Johnson et al. Control for Underwater Construction
JPH0462221A (en) Back-fill injection work
JP2524579B2 (en) Reinforcement method of existing retaining wall under water surface
JPH0913344A (en) Deformation preventive method of double closing dike
JPH06146233A (en) Method of building bank
Wen-wei Experiments, methods of applying grouted jetted precast concrete sheet piles
KR100347070B1 (en) Hollow block
Smith Notable Southern African marine structures

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE

AX Request for extension of the european patent

Free format text: AL;LT;LV;MK;RO;SI

17P Request for examination filed

Effective date: 20001107

AKX Designation fees paid

Free format text: AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE

AXX Extension fees paid

Free format text: LT PAYMENT 20001107;LV PAYMENT 20001107

GRAH Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOS IGRA

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

17Q First examination report despatched

Effective date: 20031217

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE

AX Request for extension of the european patent

Extension state: LT LV

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20040519

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20040519

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20040519

Ref country code: CH

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20040519

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20040519

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REF Corresponds to:

Ref document number: 69824010

Country of ref document: DE

Date of ref document: 20040624

Kind code of ref document: P

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20040819

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20040819

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20040819

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20040830

LTIE Lt: invalidation of european patent or patent extension

Effective date: 20040519

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20041125

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20041125

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20041130

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

ET Fr: translation filed
PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed

Effective date: 20050222

REG Reference to a national code

Ref country code: IE

Ref legal event code: MM4A

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20041019

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20081117

Year of fee payment: 11

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20091125

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20091125

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 20121002

Year of fee payment: 15

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20121121

Year of fee payment: 15

Ref country code: NL

Payment date: 20120924

Year of fee payment: 15

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: IT

Payment date: 20121123

Year of fee payment: 15

REG Reference to a national code

Ref country code: NL

Ref legal event code: V1

Effective date: 20140601

REG Reference to a national code

Ref country code: FR

Ref legal event code: ST

Effective date: 20140731

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 69824010

Country of ref document: DE

Effective date: 20140603

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20131125

Ref country code: NL

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20140601

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20140603

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20131202

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: BE

Payment date: 20141007

Year of fee payment: 17

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20151130