EP1004707A1 - Methode zum Vertiefen und/oder Verstärken, Absichern oder Renovieren einer Kaimauer - Google Patents
Methode zum Vertiefen und/oder Verstärken, Absichern oder Renovieren einer Kaimauer Download PDFInfo
- Publication number
- EP1004707A1 EP1004707A1 EP98870257A EP98870257A EP1004707A1 EP 1004707 A1 EP1004707 A1 EP 1004707A1 EP 98870257 A EP98870257 A EP 98870257A EP 98870257 A EP98870257 A EP 98870257A EP 1004707 A1 EP1004707 A1 EP 1004707A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- quay wall
- cementing material
- water basin
- deepening
- network
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 19
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title claims abstract description 13
- 230000003014 reinforcing effect Effects 0.000 title claims abstract description 5
- 239000000463 material Substances 0.000 claims abstract description 12
- 238000004873 anchoring Methods 0.000 claims abstract description 5
- 230000002787 reinforcement Effects 0.000 claims description 6
- 239000007788 liquid Substances 0.000 claims description 2
- 230000001066 destructive effect Effects 0.000 claims 1
- 239000002689 soil Substances 0.000 description 2
- 230000000694 effects Effects 0.000 description 1
- 238000009415 formwork Methods 0.000 description 1
- 239000011440 grout Substances 0.000 description 1
- 230000002452 interceptive effect Effects 0.000 description 1
- 239000010802 sludge Substances 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/74—Means for anchoring structural elements or bulkheads
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
- E02B3/04—Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
- E02B3/06—Moles; Piers; Quays; Quay walls; Groynes; Breakwaters ; Wave dissipating walls; Quay equipment
Definitions
- This invention relates to a process for deepening and/or reinforcing, consolidating or renovating a quay wall constructed along a water basin.
- Quay walls to which the process according to the invention may be applied may belong i.a. to one of the following categories: sheet pile walls, combi-walls, sludge walls.
- Quay walls are difficult to deepen without moving the mooring line.
- the need to deepen an existing quay wall with the aim to achieve a greater water depth for the mooring of larger ships, without appreciably modifying and/or moving the mooring line and without interfering with the existing merchant shipping traffic, is felt increasingly, and it is consequently the aim of the invention to prescribe a process allowing the deepening of a quay wall of one of the above mentioned types, without interrupting or hampering the mooring of ships, while in addition, the normal activities ashore, such as the operation of cranes and train traffic, may be continued normally.
- a network of bores is formed down to the desired depth, into which a cementing material is introduced under high pressure to form a network of columns, after which from the water side and through the original quay wall, at different levels a series of anchorings is applied, and subsequently the original bottom of the water basin is dredged down to the desired depth.
- a reinforcement is applied in said bores.
- said reinforcement is applied in the still liquid cementing material.
- said reinforcement is applied in the already hardened cementing material, whereto desctructive borings are carried out in the hardened cementing material into which cementing material is added.
- Figure 1 shows a customary quay wall in which the reference 1 refers to any type of quay wall such as set forth in the preamble.
- Reference 2 refers to an anchoring such as those which are customary in different quay wall structures.
- the existing water level, which in many cases is subject to tides, is indicated by reference 3, and the earth body located landward by reference 4.
- the figures 1-4 also show the existing bottom level 5 of a water basin. With the latter, a river, a dock or the sea is meant, which may or may not be subject to tides.
- a series of columns 7, depending on local circumstances such as i.a. the soil structure are formed using high pressure jets.
- the depth to which the columns will be realised depends on various factors.
- the lowest level of a bore is suggested by references 8, 8'.
- First borings are carried out either vertically or inclined, either or not using high pressure jets.
- a hardening cementation material grout
- columns are formed.
- high pressure pressures are meant between 250 and 600 bars.
- Anchoring and/or nailing 10 applied at different levels ensures the stability of the new quay wall structure that formed by pillars 9, 9' that merge into each other.
- the existing quay wall consists of a closed, tight wall (e.g. sheet pile wall), this wall may serve as a permanent formwork.
- the existing quay wall structure or parts therefrom may also serve as elements of, and be incorporated into the new deepened and/or reinforced, consolidated, renovated quay wall structure. It is indeed possible to anchor this existing structure to the deeper concrete wall to be built yet.
- the base of the new quay wall After dredging the bottom, between the original level 5 and the level 6 to be realised, the base of the new quay wall has sufficient hold.
- the depth of this base will be determined by the geological structure of the soil and by the new loads to which the deepened quay wall structure will be subject and for which its dimensions have been calculated.
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Civil Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- Environmental & Geological Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Mechanical Engineering (AREA)
- Revetment (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Priority Applications (6)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| DE69824010T DE69824010T2 (de) | 1998-11-25 | 1998-11-25 | Methode zum Vertiefen und/oder Verstärken, Absichern oder Renovieren einer Kaimauer |
| AT98870257T ATE267300T1 (de) | 1998-11-25 | 1998-11-25 | Methode zum vertiefen und/oder verstärken, absichern oder renovieren einer kaimauer |
| EP98870257A EP1004707B1 (de) | 1998-11-25 | 1998-11-25 | Methode zum Vertiefen und/oder Verstärken, Absichern oder Renovieren einer Kaimauer |
| TW088108113A TW449629B (en) | 1998-11-25 | 1999-05-12 | Process for deepening and/or reinforcing, consolidating or renovating a quay wall constructed along a water basin |
| AU59420/99A AU5942099A (en) | 1998-11-25 | 1999-11-15 | Process for deepening and/or reinforcing, consolidating or renovating a quay wall constructed along a water basin |
| SG9905765A SG106570A1 (en) | 1998-11-25 | 1999-11-17 | Process for deepening and/or reinforcing, consolidating or renovating a quay wall constructed along a water basin |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| EP98870257A EP1004707B1 (de) | 1998-11-25 | 1998-11-25 | Methode zum Vertiefen und/oder Verstärken, Absichern oder Renovieren einer Kaimauer |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| EP1004707A1 true EP1004707A1 (de) | 2000-05-31 |
| EP1004707B1 EP1004707B1 (de) | 2004-05-19 |
Family
ID=8237124
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| EP98870257A Expired - Lifetime EP1004707B1 (de) | 1998-11-25 | 1998-11-25 | Methode zum Vertiefen und/oder Verstärken, Absichern oder Renovieren einer Kaimauer |
Country Status (6)
| Country | Link |
|---|---|
| EP (1) | EP1004707B1 (de) |
| AT (1) | ATE267300T1 (de) |
| AU (1) | AU5942099A (de) |
| DE (1) | DE69824010T2 (de) |
| SG (1) | SG106570A1 (de) |
| TW (1) | TW449629B (de) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2016017273A (ja) * | 2014-07-04 | 2016-02-01 | 五洋建設株式会社 | 既設岸構造物の補強構造及び補強方法 |
| JP2016108822A (ja) * | 2014-12-05 | 2016-06-20 | 鹿島建設株式会社 | 既設護岸または岸壁の更新方法および護岸または岸壁構造 |
| JP2021080641A (ja) * | 2019-11-14 | 2021-05-27 | 東洋建設株式会社 | 作業用設備 |
| CN113152444A (zh) * | 2021-03-09 | 2021-07-23 | 中铁八局集团有限公司 | 取水泵房水泥旋喷桩止水围护结构及其施工方法 |
Families Citing this family (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| HRP20231528A1 (hr) * | 2023-11-27 | 2025-06-06 | SPEGRA d.o.o. | Postupak sanacije izgrađenog obalnog područja |
| CN118186989B (zh) * | 2024-03-28 | 2024-08-30 | 宁波甬新工程咨询有限公司 | 一种水利工程设计用河道护坡加固装置 |
Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US4728225A (en) * | 1985-02-11 | 1988-03-01 | Schnabel Foundation Company | Method of rehabilitating a waterfront bulkhead |
| US4911583A (en) * | 1984-06-21 | 1990-03-27 | Schnabel Foundation Company | Structure and method for shoring a face of an excavation |
| US5368414A (en) * | 1991-07-19 | 1994-11-29 | Miller; Vincent G. | Method and system for rehabilitating a bulkhead |
-
1998
- 1998-11-25 EP EP98870257A patent/EP1004707B1/de not_active Expired - Lifetime
- 1998-11-25 DE DE69824010T patent/DE69824010T2/de not_active Expired - Lifetime
- 1998-11-25 AT AT98870257T patent/ATE267300T1/de not_active IP Right Cessation
-
1999
- 1999-05-12 TW TW088108113A patent/TW449629B/zh active
- 1999-11-15 AU AU59420/99A patent/AU5942099A/en not_active Abandoned
- 1999-11-17 SG SG9905765A patent/SG106570A1/en unknown
Patent Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US4911583A (en) * | 1984-06-21 | 1990-03-27 | Schnabel Foundation Company | Structure and method for shoring a face of an excavation |
| US4728225A (en) * | 1985-02-11 | 1988-03-01 | Schnabel Foundation Company | Method of rehabilitating a waterfront bulkhead |
| US5368414A (en) * | 1991-07-19 | 1994-11-29 | Miller; Vincent G. | Method and system for rehabilitating a bulkhead |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2016017273A (ja) * | 2014-07-04 | 2016-02-01 | 五洋建設株式会社 | 既設岸構造物の補強構造及び補強方法 |
| JP2016108822A (ja) * | 2014-12-05 | 2016-06-20 | 鹿島建設株式会社 | 既設護岸または岸壁の更新方法および護岸または岸壁構造 |
| JP2021080641A (ja) * | 2019-11-14 | 2021-05-27 | 東洋建設株式会社 | 作業用設備 |
| CN113152444A (zh) * | 2021-03-09 | 2021-07-23 | 中铁八局集团有限公司 | 取水泵房水泥旋喷桩止水围护结构及其施工方法 |
Also Published As
| Publication number | Publication date |
|---|---|
| SG106570A1 (en) | 2004-10-29 |
| DE69824010D1 (de) | 2004-06-24 |
| EP1004707B1 (de) | 2004-05-19 |
| AU5942099A (en) | 2000-06-01 |
| TW449629B (en) | 2001-08-11 |
| ATE267300T1 (de) | 2004-06-15 |
| DE69824010T2 (de) | 2005-05-12 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103374900B (zh) | 建设于淤泥质地基上的重力式码头及其施工方法 | |
| CN102561371A (zh) | 岛遂结合部钢沉箱围护结构 | |
| US5911545A (en) | Method for stabilizing and repair of docks and seawalls | |
| JP3423394B2 (ja) | 水中骨組構造物 | |
| EP1004707B1 (de) | Methode zum Vertiefen und/oder Verstärken, Absichern oder Renovieren einer Kaimauer | |
| CN202626934U (zh) | 建设于淤泥质地基上的重力式码头 | |
| JP4575800B2 (ja) | 堤防の補強構造および補強工法 | |
| CN107119716A (zh) | 海涂涌潮区公路隧道修建结构及其方法 | |
| Degen et al. | Offshore Stone Columns-Equipment, Quality Control and Outlook for Future Applications | |
| JPH1161775A (ja) | 港湾・河川土木構造物の補修・改修方法 | |
| Koerner et al. | Geotextiles used as flexible forms | |
| KR200232653Y1 (ko) | 그라우팅을 이용하여 보수된 교량 우물통 기초 | |
| JP7699500B2 (ja) | 補強された土構造物、及び土構造物補強方法 | |
| JP2020133311A (ja) | 補強された土構造物、及び土構造物補強方法 | |
| JPH0913344A (ja) | 二重締切堤防の変形防止工法 | |
| Boehm | The utilization of jet grouting and soil mixing methods to repair and support bulkhead structures | |
| Gazzarrini et al. | Roger Arena, South Tower, Vancouver, BC, Canada: jet grouting for the structural underpinning of the existing Georgia viaduct foundations and temporary excavation support | |
| JPH08189019A (ja) | 水中構造物の築造方法 | |
| JP2524579B2 (ja) | 水面下における既存土留壁の補強工法 | |
| KR20250021521A (ko) | 다짐판을 이용한 광폭 그리드 동치환의 시공 방법 | |
| Bendell | Port of Brisbane Foreshore Stabilisation Works for the New Common User Terminal-Berth 8, Fisherman Islands | |
| WEINREB et al. | Underwater construction techniques using Reinforced Earth | |
| Trewern et al. | Challenges associated with the redevelopment of Webb Dock | |
| KR100347070B1 (ko) | 중공 블록 | |
| Gilman et al. | Open Cell Wharf Structures—Applications from Coast to Coast |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
| AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE |
|
| AX | Request for extension of the european patent |
Free format text: AL;LT;LV;MK;RO;SI |
|
| 17P | Request for examination filed |
Effective date: 20001107 |
|
| AKX | Designation fees paid |
Free format text: AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE |
|
| AXX | Extension fees paid |
Free format text: LT PAYMENT 20001107;LV PAYMENT 20001107 |
|
| GRAH | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOS IGRA |
|
| GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
| 17Q | First examination report despatched |
Effective date: 20031217 |
|
| GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
| AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE |
|
| AX | Request for extension of the european patent |
Extension state: LT LV |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20040519 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20040519 Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20040519 Ref country code: CH Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20040519 Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20040519 |
|
| REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
| REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
| REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
| REF | Corresponds to: |
Ref document number: 69824010 Country of ref document: DE Date of ref document: 20040624 Kind code of ref document: P |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20040819 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20040819 Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20040819 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20040830 |
|
| LTIE | Lt: invalidation of european patent or patent extension |
Effective date: 20040519 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20041125 Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20041125 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20041130 |
|
| REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
| ET | Fr: translation filed | ||
| PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
| 26N | No opposition filed |
Effective date: 20050222 |
|
| REG | Reference to a national code |
Ref country code: IE Ref legal event code: MM4A |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20041019 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 20081117 Year of fee payment: 11 |
|
| GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20091125 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20091125 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 20121002 Year of fee payment: 15 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20121121 Year of fee payment: 15 Ref country code: NL Payment date: 20120924 Year of fee payment: 15 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: IT Payment date: 20121123 Year of fee payment: 15 |
|
| REG | Reference to a national code |
Ref country code: NL Ref legal event code: V1 Effective date: 20140601 |
|
| REG | Reference to a national code |
Ref country code: FR Ref legal event code: ST Effective date: 20140731 |
|
| REG | Reference to a national code |
Ref country code: DE Ref legal event code: R119 Ref document number: 69824010 Country of ref document: DE Effective date: 20140603 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20131125 Ref country code: NL Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20140601 Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20140603 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20131202 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: BE Payment date: 20141007 Year of fee payment: 17 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20151130 |