EP0877124A1 - Method and equipment for embankment reconstruction - Google Patents

Method and equipment for embankment reconstruction Download PDF

Info

Publication number
EP0877124A1
EP0877124A1 EP97120741A EP97120741A EP0877124A1 EP 0877124 A1 EP0877124 A1 EP 0877124A1 EP 97120741 A EP97120741 A EP 97120741A EP 97120741 A EP97120741 A EP 97120741A EP 0877124 A1 EP0877124 A1 EP 0877124A1
Authority
EP
European Patent Office
Prior art keywords
embankment
wall
old
reconstruction
piled
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP97120741A
Other languages
German (de)
French (fr)
Inventor
Rauf Zabolonkov
Sergej Dobrotin
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
S Zolotilovo Statybiniu Darbu Imone "lokys"
Original Assignee
S Zolotilovo Statybiniu Darbu Imone "lokys"
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by S Zolotilovo Statybiniu Darbu Imone "lokys" filed Critical S Zolotilovo Statybiniu Darbu Imone "lokys"
Publication of EP0877124A1 publication Critical patent/EP0877124A1/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/06Moles; Piers; Quays; Quay walls; Groynes; Breakwaters ; Wave dissipating walls; Quay equipment
    • E02B3/066Quays
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/02Sheet piles or sheet pile bulkheads
    • E02D5/03Prefabricated parts, e.g. composite sheet piles
    • E02D5/04Prefabricated parts, e.g. composite sheet piles made of steel

Definitions

  • the present invention relates to hydrotecnical construction and can be used for embankment reconstruction in order to deepen the bottom of defined water area securing the same embankment cordon line.
  • Patent SU 1613522 presents equipment for reconstruction of embankment. This equipment is mounted on platform, movable on an embankment in longitudinal direction and consists of lowered borer, hollow bar with working element, piston with pressing and lifting mechanism, systems to prepare reinforcing concrete and apply it to soil. The bottom near embankment under reconstruction basis is bored in many places and ducts made in this way are filled with reinforcing concrete.
  • This invention presents method and equipment that allows to reconstruct the existing embankment construction with minimum technical and labor efforts, i.e. to reinforce its basis without changing the cordon line and at the same time without changing location of all elements necessary for normal port activities, with the aim to deepen the bottom of defined water area.
  • a support consisting of separate elements, lowered to bottom soil to designed bottom depth is offered to reconstruct the old embankment. Every element consists of sheet pile and metal connecting profile. Loads from the old wall are transferred via this connecting profile to additional elements inserted into the bottom. The whole unit - the old wall and new equipment - acts as unitary element.
  • Fig.1 and 2 are schematic views of embankment, consisting of old wall 1, made of welded together sheet piles 2, and new additional support element 3, consisting of separate elements5, lowered to the bottom soil till designed level 4. 6 is the initial bottom depth.
  • Elements 5, consisting of sheet piles 7 of a defined length and I-shaped metal profiles 8, are stand-manufactured.
  • One end of the metal I-shaped profile is by any suitable way, e.g. by welding, screwing etc., attached to the upper part of the lateral surface of sheet pile 7.
  • elements 5 from the old embankment are piled into the bottom till designed bottom depth 4 at a certain distance from the old wall 1, coinciding with the length of connecting I-shaped profile 8, at a defined step (2 at one sheet pile).
  • I-shaped profile 8 is attached to the lateral surface of sheet pile 7 at the angle ⁇ , equal to 90-135°.
  • Metal I-shaped profile 8 of the piled element 5 connects the old embankment wall 1 and new array 3. Loads, affecting the so reconstructed embankment, are transferred from the old wall 1 via connecting I-shaped metal profiles 8 to new array 3, constituting of piled elements 5. Thus, the whole complex - old wall 1 and new supporting array 3 - is acting as one element.
  • Another advantage of this reconstruction method is in possibility to secure the unchanged embankment cordon line 12 after reconstruction of the old embankment wall 1, i.e. no changes, relating to functionality of embankment equipment and communications, are necessary.
  • This invention is describing a particular metal I-shaped connecting profile 8, the end configuration of support with wall 1 of which is in conformity with the cross section of the support surface of the rhombi-shaped sheer pile 2. Nevertheless, specialists are aware, that in case of the old wall 1 consisting of sheet piles 2 having supporting surfaces of half-ring or other cross sections, connecting profiles 8 of corresponding support end shapes can be used.

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Composite Materials (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Revetment (AREA)

Abstract

The present invention relates to hydrotecnical construction and can be used for embankment reconstruction in order to deepen the bottom of the defined water area securing the same embankment cordon line.
The basis of the old embankment wall (1) is reinforced by erecting additional support (3) prior to deepening the bottom of the defined water area. the support (3) consists of plurality of elements (5), piled to a designed bottom depth. Each element (5) consists of sheet pile and metal connecting profile, attached to the upper part of lateral surface of the sheet pile (7) at an angle α, equal to 90-135°.
Metal profile of the piled to the bottom soil element (5) is connecting the old embankment wall (1) and new equipment (3). Loads affecting the thus reconstructed embankment are transferred from the old wall (1) via connecting metal profiles to new equipment (3). In this way, the whole complex - old wall (1) and new equipment (3) - acts as one element.

Description

The present invention relates to hydrotecnical construction and can be used for embankment reconstruction in order to deepen the bottom of defined water area securing the same embankment cordon line.
Sea and river embarkment basis should be enforced before deepening port bottom. Different methods of doing so are known. E.g. Patent SU 1613522 presents equipment for reconstruction of embankment. This equipment is mounted on platform, movable on an embankment in longitudinal direction and consists of lowered borer, hollow bar with working element, piston with pressing and lifting mechanism, systems to prepare reinforcing concrete and apply it to soil. The bottom near embankment under reconstruction basis is bored in many places and ducts made in this way are filled with reinforcing concrete.
Extensive equipment and complicated technology is necessary to reconstruct embankments in this way.
This invention presents method and equipment that allows to reconstruct the existing embankment construction with minimum technical and labor efforts, i.e. to reinforce its basis without changing the cordon line and at the same time without changing location of all elements necessary for normal port activities, with the aim to deepen the bottom of defined water area.
A support, consisting of separate elements, lowered to bottom soil to designed bottom depth is offered to reconstruct the old embankment. Every element consists of sheet pile and metal connecting profile. Loads from the old wall are transferred via this connecting profile to additional elements inserted into the bottom. The whole unit - the old wall and new equipment - acts as unitary element.
Further the invention is explained with reference to attached drawings, where:
  • Fig.1 - lateral view with the old embankment wall;
  • Fig.2 - cross sectional view per line A-A.
  • Fig.1 and 2 are schematic views of embankment, consisting of old wall 1, made of welded together sheet piles 2, and new additional support element 3, consisting of separate elements5, lowered to the bottom soil till designed level 4. 6 is the initial bottom depth.
    Elements 5, consisting of sheet piles 7 of a defined length and I-shaped metal profiles 8, are stand-manufactured. One end of the metal I-shaped profile is by any suitable way, e.g. by welding, screwing etc., attached to the upper part of the lateral surface of sheet pile 7. Using specialized detachable element 9 and piling machine 10, elements 5 from the old embankment are piled into the bottom till designed bottom depth 4 at a certain distance from the old wall 1, coinciding with the length of connecting I-shaped profile 8, at a defined step (2 at one sheet pile). To make it easier for element 5 to glide the surface of sheet pile 2 of the old wall1, I-shaped profile 8 is attached to the lateral surface of sheet pile 7 at the angle α, equal to 90-135°. At the same time the old wall 1 is acting as the guide for gliding of I-shaped profile 8 of being piled element 5. After insertion of one element 5, latch 11 is unlocked, element 9 detached and used to pile the second element 5. Deepening of the bottom can be done only having reinforced the embankment like this.
    Metal I-shaped profile 8 of the piled element 5 connects the old embankment wall 1 and new array 3. Loads, affecting the so reconstructed embankment, are transferred from the old wall 1 via connecting I-shaped metal profiles 8 to new array 3, constituting of piled elements 5. Thus, the whole complex - old wall 1 and new supporting array 3 - is acting as one element.
    Another advantage of this reconstruction method is in possibility to secure the unchanged embankment cordon line 12 after reconstruction of the old embankment wall 1, i.e. no changes, relating to functionality of embankment equipment and communications, are necessary.
    This invention is describing a particular metal I-shaped connecting profile 8, the end configuration of support with wall 1 of which is in conformity with the cross section of the support surface of the rhombi-shaped sheer pile 2. Nevertheless, specialists are aware, that in case of the old wall 1 consisting of sheet piles 2 having supporting surfaces of half-ring or other cross sections, connecting profiles 8 of corresponding support end shapes can be used.

    Claims (2)

    1. Method of embankment reconstruction, including additional reinforcement of the embankment basis, characterised in that plurality of elements (5), consisting of sheet pile (7) and connecting profile (8) are inserted along the old connecting wall (1) sheet piles (2), that act as guides, into the bottom near the basis of the embankment under reconstruction and are piled to designed bottom depth (4) at the distance from the old wall (1), corresponding to connecting metal profile (8) length of element (5).
    2. Equipment for embankment reconstruction, consisting of wall, made of plurality of piled sheet piles and embankment basis reinforcement equipment, characterised in that embankment reinforcement equipment (3) is constituted of plurality of elements (5), piled near the basis of embankment under reconstruction, every element (5) consisting of sheet pile (7) and connecting profile (8), attached to lateral surface of the upper part thereof at the angle α, equal to 90-135°, via which, loads, affecting the old wall (1) are transferred to new support equipment (3), the end configuration of support with wall (1) of metal connecting profile (8) corresponds to the cross section shape of support surface of sheet pile (2).
    EP97120741A 1997-05-06 1997-11-26 Method and equipment for embankment reconstruction Withdrawn EP0877124A1 (en)

    Applications Claiming Priority (2)

    Application Number Priority Date Filing Date Title
    LT97-082A LT4474B (en) 1997-05-06 1997-05-06 Method of and device for renovation of quay
    LT9700082 1997-05-06

    Publications (1)

    Publication Number Publication Date
    EP0877124A1 true EP0877124A1 (en) 1998-11-11

    Family

    ID=19721858

    Family Applications (1)

    Application Number Title Priority Date Filing Date
    EP97120741A Withdrawn EP0877124A1 (en) 1997-05-06 1997-11-26 Method and equipment for embankment reconstruction

    Country Status (3)

    Country Link
    EP (1) EP0877124A1 (en)
    LT (1) LT4474B (en)
    LV (1) LV12190B (en)

    Cited By (5)

    * Cited by examiner, † Cited by third party
    Publication number Priority date Publication date Assignee Title
    CN106968219A (en) * 2017-04-17 2017-07-21 中国农业大学 A kind of the old and new's dyke joint portion ruggedized construction and its application
    JP2017172296A (en) * 2016-03-25 2017-09-28 Jfeスチール株式会社 Reinforcement structure and reinforcement method of existing steel sheet pile wall
    JP2017180046A (en) * 2016-03-31 2017-10-05 Jfeスチール株式会社 Reinforcement structure and reinforcement method for existing steel pile wall
    JP2017180048A (en) * 2016-03-31 2017-10-05 Jfeスチール株式会社 Steel pile wall
    JP2017198035A (en) * 2016-04-28 2017-11-02 Jfeスチール株式会社 Steel pile wall

    Citations (3)

    * Cited by examiner, † Cited by third party
    Publication number Priority date Publication date Assignee Title
    GB347556A (en) * 1929-08-28 1931-04-30 Walther Prielipp Improvements in and relating to sheet pile walls
    US4172681A (en) * 1978-03-07 1979-10-30 Hache Joseph R R Sheet pile guide
    US4728225A (en) * 1985-02-11 1988-03-01 Schnabel Foundation Company Method of rehabilitating a waterfront bulkhead

    Family Cites Families (1)

    * Cited by examiner, † Cited by third party
    Publication number Priority date Publication date Assignee Title
    SU1613522A2 (en) 1989-01-17 1990-12-15 Ленинградский Институт Водного Транспорта Device for reconstructing mooring embankment

    Patent Citations (3)

    * Cited by examiner, † Cited by third party
    Publication number Priority date Publication date Assignee Title
    GB347556A (en) * 1929-08-28 1931-04-30 Walther Prielipp Improvements in and relating to sheet pile walls
    US4172681A (en) * 1978-03-07 1979-10-30 Hache Joseph R R Sheet pile guide
    US4728225A (en) * 1985-02-11 1988-03-01 Schnabel Foundation Company Method of rehabilitating a waterfront bulkhead

    Cited By (5)

    * Cited by examiner, † Cited by third party
    Publication number Priority date Publication date Assignee Title
    JP2017172296A (en) * 2016-03-25 2017-09-28 Jfeスチール株式会社 Reinforcement structure and reinforcement method of existing steel sheet pile wall
    JP2017180046A (en) * 2016-03-31 2017-10-05 Jfeスチール株式会社 Reinforcement structure and reinforcement method for existing steel pile wall
    JP2017180048A (en) * 2016-03-31 2017-10-05 Jfeスチール株式会社 Steel pile wall
    JP2017198035A (en) * 2016-04-28 2017-11-02 Jfeスチール株式会社 Steel pile wall
    CN106968219A (en) * 2017-04-17 2017-07-21 中国农业大学 A kind of the old and new's dyke joint portion ruggedized construction and its application

    Also Published As

    Publication number Publication date
    LT97082A (en) 1998-11-25
    LV12190A (en) 1998-12-20
    LV12190B (en) 1999-04-20
    LT4474B (en) 1999-02-25

    Similar Documents

    Publication Publication Date Title
    KR101302743B1 (en) Phc pile and its using the same soil cement wall construction methode
    KR101179778B1 (en) Method for constructing underground structure
    US4585678A (en) Steel sheet pile, sheet pile assembly thereof and the method of constructing the assembly
    KR101618723B1 (en) Reinforcing structure of the steel pipe for the retaining CIP wall
    CN112942368A (en) Deep foundation pit construction method with side wall supporting function
    EP0877124A1 (en) Method and equipment for embankment reconstruction
    CN112195928B (en) Pile plate composite structure for foundation pit support
    KR100923290B1 (en) Abutment structure of bridge
    JP3896351B2 (en) Construction method of underground wall and construction method of underpass
    KR100768473B1 (en) Underground structure construction method available of guided drainage and straight moving
    KR102511387B1 (en) Connecting structure of reinforced wall and constructing method thereof
    KR102345291B1 (en) Tunnel construction method and tunnel supporting structure
    KR102181917B1 (en) Cofferdam structure and construction method of temporary facility using the same
    KR100911457B1 (en) Pipe structures and construction method of pipe roof structures
    KR100401330B1 (en) A method of construction for earth-protection walls of building
    JPH11210369A (en) Underground submerged object
    KR100556976B1 (en) New Messer Shield engineering method
    JP5360657B2 (en) Retaining wall made of precast concrete
    CN2296365Y (en) Pile forming device for various section hollow pile
    EP0139100A1 (en) Steel sheet pile, sheet pile assembly thereof and the method of constructing the assembly
    JPS5851092B2 (en) Earth retaining installation method using advance shoring frame
    KR102511386B1 (en) Connecting structure of reinforced wall using reinforced block and constructing method thereof
    KR102625776B1 (en) Construction method of CIP retaining wall with improved water protection and ground subsidence prevention function
    CN212316958U (en) Non-excavation type miniature pile group/bundle pile plate wall supporting structure
    KR102276810B1 (en) Earth retaing structure, earth retaing plate and construction methd using the same

    Legal Events

    Date Code Title Description
    PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

    Free format text: ORIGINAL CODE: 0009012

    AK Designated contracting states

    Kind code of ref document: A1

    Designated state(s): BE FR GB IT SE

    AX Request for extension of the european patent

    Free format text: AL;LT;LV;MK;RO;SI

    17P Request for examination filed

    Effective date: 19990310

    AKX Designation fees paid

    Free format text: BE FR GB IT SE

    REG Reference to a national code

    Ref country code: DE

    Ref legal event code: 8566

    STAA Information on the status of an ep patent application or granted ep patent

    Free format text: STATUS: THE APPLICATION HAS BEEN WITHDRAWN

    18W Application withdrawn

    Withdrawal date: 19991025