EP0795059B1 - A method of providing a road surface with an overlay - Google Patents

A method of providing a road surface with an overlay Download PDF

Info

Publication number
EP0795059B1
EP0795059B1 EP95937001A EP95937001A EP0795059B1 EP 0795059 B1 EP0795059 B1 EP 0795059B1 EP 95937001 A EP95937001 A EP 95937001A EP 95937001 A EP95937001 A EP 95937001A EP 0795059 B1 EP0795059 B1 EP 0795059B1
Authority
EP
European Patent Office
Prior art keywords
layer
binder
stone
finer
stones
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
EP95937001A
Other languages
German (de)
French (fr)
Other versions
EP0795059A1 (en
Inventor
Leo Hove
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ESHA GROUP BV
Original Assignee
Esha Holding BV
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Esha Holding BV filed Critical Esha Holding BV
Publication of EP0795059A1 publication Critical patent/EP0795059A1/en
Application granted granted Critical
Publication of EP0795059B1 publication Critical patent/EP0795059B1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C7/00Coherent pavings made in situ
    • E01C7/08Coherent pavings made in situ made of road-metal and binders
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C7/00Coherent pavings made in situ
    • E01C7/08Coherent pavings made in situ made of road-metal and binders
    • E01C7/18Coherent pavings made in situ made of road-metal and binders of road-metal and bituminous binders
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C7/00Coherent pavings made in situ
    • E01C7/08Coherent pavings made in situ made of road-metal and binders
    • E01C7/35Toppings or surface dressings; Methods of mixing, impregnating, or spreading them
    • E01C7/351Toppings or surface dressings; Methods of mixing, impregnating, or spreading them with exclusively hydraulical binders; Aggregate, fillers or other additives for application on or in the surface of toppings with exclusively hydraulic binders

Definitions

  • the present invention relates to a method of providing a road surface with an overlay, normally for general road maintenance and restoration of good antiskid properties.
  • the discussed cold methods can be modified so as to be much better applicable even for the said more critical works.
  • a basic idea is that the finer stone fraction is applied not as an individual full layer of stones on the top of the lower, coarser stone fraction, but only to the extent of filling out the upper voids of the lower layer of coarse stones, in association with another basic idea of applying the required binder to the finer stone fraction not as a bed underneath this fraction, but rather by a spraying of a low viscosity binder against the top side of this fraction, such that the binder, seeking rapidly downwardly, will very soon effect an initial binding of the finer stone fraction, which will also be mechanically stabilized in the upper voids between the underlying coarse stones.
  • the downwardly penetrating low-viscid binder which, however, may be an emulsion of a high viscid bitumen material, which may be adapted to 'break' relatively soon so as to cause an effective binding both of the lower coarse stone fraction to the former road surface and of the upper finer stone fraction to orin the upper voids of the lower, coarse stone fraction, without the finer stones being present above the top side of the coarse stone layer.
  • the finer stone will not behave as loose stones, and the binder will soon sink down from the surface, whereby the traffic on the road can soon be resumed.
  • the major part of the surface area will be constituted by the smaller stones, which will provide a texture in favour of good skid resistance and low noise generation.
  • the bituminous binder will effectively fill out the voids between the stones at least in the lower half of the overlay, thus providing for improved stress releiving and waterproofing.
  • bituminous binder preferably a polymer modified bituminous emulsion to ensure waterproofing and perfect bonding to the old surface as well as for temporarily securing the first chipping layer in place.
  • the first chipping layer of relatively coarse stones e.g. 12-14 mm
  • the first chipping layer of relatively coarse stones is laid out in a single layer, preferably not fully compact, so as to cover some 95% of the surface area.
  • a second layer of smaller nominally single sized chippings e.g. 6-7 mm is then applied, taking care not to disturb greatly the first layer, the dosage being controlled to the effect that the second layer fills up the voids between the coarse stones without any substantial overheight therein.
  • the combined layers are compacted to interlock the second layer with the first layer and make the top sides of the two layers flush with each other.
  • a low viscosity bituminous binder preferably a polymer modified bituminous emulsion with good adhesion and breaking characteristics, is evenly applied to the surface such that the remaining voids in the first layer are filled and a surface texture is clearly visible.
  • the binder will flow down in contact with all the stones, thus producing an effective bonding of and in the combined layer.
  • the treatment is finished by applying a thin top layer of still smaller chippings, e.g. sand, in order to prevent contact of the binder with the traffic tyres in the initial stages and to aid the quick build up of skid resistance.
  • chippings e.g. sand
  • the actual quantities of chippings, their grading and size, can be used to calculate the voids in the layers and to dictate the binder addition to achieve the desired texture, given the traffic weight and speed, the degree of site difficulty and the characteristics of the existing road surface.
  • the chippings in the second layer are preferably pre-coated with bituminous binder or chemically coated in order to ensure that the applied bituminous binder or binder emulsion will penetrate the underlying layer and not break so quickly as to form a thick coating on the surface aggregate. Also, the overlay will then be better stabilized should water be present, particularly when freeze-thaw cycles occur.
  • hot binders such as cutback bitumen would not allow for satisfactory grouting or penetration of the binder into the voids, unless the viscosity is undesirably low, and would not, therefore, provide the same durability as when using emulsion binders, which may be of low viscosity, but nevertheless be based on high viscosity bitumen.
  • the invention will comprise also the use of hot binders, which may present advantages in terms of costs on lightly trafficked roads.
  • the stones in the first layer should not be coarser than 20-24 mm and not finer than some 8 mm.
  • the secondary stones should preferably be only one fraction smaller, e.g. 8-10 mm, so that these stones will still be 'relatively large' and not liable to be deposited on top of each other.
  • the invention is not limited to the use of any special aggregate or binder qualities, so the method may be widely varied in this respect, as long as satisfying results are obtained, subject to different requirements.
  • both of the chipping layers may be pre-coated.
  • other materials e.g. recycled asphalt, graded into the respective fractions.
  • a certain content of fine fractions may be tolerable in both chippings, and in connection with graded aggregates the fine fraction may be used in the final top layer, when used.
  • the first layer may be a low cost aggregate such as gravel stones with low skid resistance properties, followed in the second layer by a higher skid resistant chipping, thus maximizing the resources of higher cost quality aggregate.
  • various artificial aggregates may be used, e.g. slag or calcined bauxite, cementious mortar or cement concrete, formed or crushed, or any suitable waste product, with or without pre-coating.
  • geotextiles or other fibre reinforcement between the layers, including grids prepared from metal or polymer compounds, especially between the existing road surface and the first layer.
  • the binder may be selected from many usable substances such as cutback bitumen, foamed bitumen and modified versions of these with additives or polymers or fibres or filler, added to the binder or during construction, and all emulsion variants thereof.
  • any suitable breaking control system may be used.
  • Further binder examples will be thermo-setting binders and other resin binders including polyurethane, acrylic, polysulphide, expoxide, and all two component binder systems.
  • Different binders may be selected for the respective grouting application and bond coating, where the latter is used.
  • a cost saving may be obtained by using unmodified bituminous binder in one or more applications.
  • a slurry surfacing as a final wearing surface or a fine slurry seal, possibly applied as a spray.
  • a suitable slurry will be a stone fraction of 0.2-0.3 mm in a fast breaking bituminous emulsion.
  • the invention will be applicable also in connection with the construction of new roads and on cement concrete, on airfields, car-park decks etc., and even for providing waterproof layers in buildings. Aggregates may be coloured, if desired.

Description

The present invention relates to a method of providing a road surface with an overlay, normally for general road maintenance and restoration of good antiskid properties. By the laying out of a thin overlay it is economically possible to make use of high quality aggregates for maximum performance, and it is even possible to make a relevant selection between respective road sections more and less exposed to load and wear, e.g. with respect to binder dosage.
For works on the more heavily trafficked roads it is normal practice to make use for this purpose, of a so-called "thin hot mix asphalt". Despite of this preference, it is well known among experts that this hot technique implies a row of difficulties of both technical and environmental kinds, mainly caused by a vapourization of volatiles from the applied bituminous binder. Many attempts have been made to remedy the various problems, but so far without any fully acceptable result. The asphalt workers are still seen in the midst of the well known "blue smoke".
There do exist 'cold' alternatives, though with their own problems and limitations, based on the laying out of a layer of relatively coarse stones in a bed of a binder initially applied to the road surface by spraying. The stone layer is rolled, whereafter it stabilizes gradually. The coarse stones, although giving good strength when stabilized, are not too advantageous with respect to skid resistance, so for more qualified roads it is preferred to extend the method as in EP 0127470 A2 by spraying a binder on the top of the coarse layer and add a top layer of a less coarse stone fraction, better suited for skid resistance. In both cases, however, road users will experience problems caused by loose stones and sometimes even a surface surplus of liquid bituminous binder, unless the new surface is thoroughly rolled and allowed to stabilize through a considerable period of time.
This, of course, is not acceptable in practice, and while some compromise is possible for smaller roads, implying severe speed restrictions, it will be unacceptable in connection with highways and other heavily trafficked roads, e.g. also in city areas. The hot method, therefore, despite its problems and disadvantages, is still preferred for such more critical works.
According to the present invention it has been recognized that the discussed cold methods can be modified so as to be much better applicable even for the said more critical works. A basic idea is that the finer stone fraction is applied not as an individual full layer of stones on the top of the lower, coarser stone fraction, but only to the extent of filling out the upper voids of the lower layer of coarse stones, in association with another basic idea of applying the required binder to the finer stone fraction not as a bed underneath this fraction, but rather by a spraying of a low viscosity binder against the top side of this fraction, such that the binder, seeking rapidly downwardly, will very soon effect an initial binding of the finer stone fraction, which will also be mechanically stabilized in the upper voids between the underlying coarse stones. These, in their turn, will also be stabilized by the downwardly penetrating low-viscid binder which, however, may be an emulsion of a high viscid bitumen material, which may be adapted to 'break' relatively soon so as to cause an effective binding both of the lower coarse stone fraction to the former road surface and of the upper finer stone fraction to orin the upper voids of the lower, coarse stone fraction, without the finer stones being present above the top side of the coarse stone layer.
Thus, the finer stone will not behave as loose stones, and the binder will soon sink down from the surface, whereby the traffic on the road can soon be resumed. The major part of the surface area will be constituted by the smaller stones, which will provide a texture in favour of good skid resistance and low noise generation. The bituminous binder will effectively fill out the voids between the stones at least in the lower half of the overlay, thus providing for improved stress releiving and waterproofing.
It may still be preferred to start with a bottom layer of a bond coat of bituminous binder, preferably a polymer modified bituminous emulsion to ensure waterproofing and perfect bonding to the old surface as well as for temporarily securing the first chipping layer in place.
The first chipping layer of relatively coarse stones, e.g. 12-14 mm, is laid out in a single layer, preferably not fully compact, so as to cover some 95% of the surface area. A second layer of smaller nominally single sized chippings, e.g. 6-7 mm is then applied, taking care not to disturb greatly the first layer, the dosage being controlled to the effect that the second layer fills up the voids between the coarse stones without any substantial overheight therein. Thereafter the combined layers are compacted to interlock the second layer with the first layer and make the top sides of the two layers flush with each other.
Thereafter a low viscosity bituminous binder, preferably a polymer modified bituminous emulsion with good adhesion and breaking characteristics, is evenly applied to the surface such that the remaining voids in the first layer are filled and a surface texture is clearly visible. In this grouting stage the binder will flow down in contact with all the stones, thus producing an effective bonding of and in the combined layer.
Preferably and in particular where heavy traffic is to be resumed quickly, the treatment is finished by applying a thin top layer of still smaller chippings, e.g. sand, in order to prevent contact of the binder with the traffic tyres in the initial stages and to aid the quick build up of skid resistance.
The actual quantities of chippings, their grading and size, can be used to calculate the voids in the layers and to dictate the binder addition to achieve the desired texture, given the traffic weight and speed, the degree of site difficulty and the characteristics of the existing road surface.
The chippings in the second layer are preferably pre-coated with bituminous binder or chemically coated in order to ensure that the applied bituminous binder or binder emulsion will penetrate the underlying layer and not break so quickly as to form a thick coating on the surface aggregate. Also, the overlay will then be better stabilized should water be present, particularly when freeze-thaw cycles occur.
Generally, the use of hot binders such as cutback bitumen would not allow for satisfactory grouting or penetration of the binder into the voids, unless the viscosity is undesirably low, and would not, therefore, provide the same durability as when using emulsion binders, which may be of low viscosity, but nevertheless be based on high viscosity bitumen. However, the invention will comprise also the use of hot binders, which may present advantages in terms of costs on lightly trafficked roads.
Normally, the stones in the first layer should not be coarser than 20-24 mm and not finer than some 8 mm. For primary stones of a given fraction, e.g. 14 mm, the secondary stones should preferably be only one fraction smaller, e.g. 8-10 mm, so that these stones will still be 'relatively large' and not liable to be deposited on top of each other.
The invention is not limited to the use of any special aggregate or binder qualities, so the method may be widely varied in this respect, as long as satisfying results are obtained, subject to different requirements.
If desired, both of the chipping layers may be pre-coated. Instead of virgin chippings, other materials may be used, e.g. recycled asphalt, graded into the respective fractions. Of course, a certain content of fine fractions may be tolerable in both chippings, and in connection with graded aggregates the fine fraction may be used in the final top layer, when used.
The first layer may be a low cost aggregate such as gravel stones with low skid resistance properties, followed in the second layer by a higher skid resistant chipping, thus maximizing the resources of higher cost quality aggregate. Also, various artificial aggregates may be used, e.g. slag or calcined bauxite, cementious mortar or cement concrete, formed or crushed, or any suitable waste product, with or without pre-coating.
Although the method is well usable under cold conditions, the invention will of course comprise even the use of heated aggregates and/or binder.
For some applications it may be advantageous to make use of geotextiles or other fibre reinforcement between the layers, including grids prepared from metal or polymer compounds, especially between the existing road surface and the first layer.
The binder may be selected from many usable substances such as cutback bitumen, foamed bitumen and modified versions of these with additives or polymers or fibres or filler, added to the binder or during construction, and all emulsion variants thereof. For the emulsions, any suitable breaking control system may be used. Further binder examples will be thermo-setting binders and other resin binders including polyurethane, acrylic, polysulphide, expoxide, and all two component binder systems.
Different binders may be selected for the respective grouting application and bond coating, where the latter is used. A cost saving may be obtained by using unmodified bituminous binder in one or more applications.
Instead of small chippings or sand for the said top layer, when used, it will be possible to use a slurry surfacing as a final wearing surface or a fine slurry seal, possibly applied as a spray. A suitable slurry will be a stone fraction of 0.2-0.3 mm in a fast breaking bituminous emulsion.
The invention will be applicable also in connection with the construction of new roads and on cement concrete, on airfields, car-park decks etc., and even for providing waterproof layers in buildings. Aggregates may be coloured, if desired.
In the following some examples of the method are given:
Example I:
Overlay on highways and other heavily trafficked roads:
  • a. Laying out of 13-14 kg/m2 stone material, fraction 12-16 mm.
  • b. Rolling with pneumatic tyred roller.
  • c. Laying out 6-8 kg/m2 bitumen coated stone material with high polishing resistance, fraction 8-12 mm, for complete filling out of texture in first layer.
  • d. Rolling with steel roller.
  • e. Spraying out 3.5 kg/m2 of a 70% polymer modified cationic bitumen emulsion.
  • f. Laying out 5-7 kg/m2 stone material, fraction 2-5 mm.
  • g. Rolling with steel roller and optionally pneumatic tyred roller.
  • h. Opening road for traffic with limited speed through approximately 2 hours, then cleaning road surface with suction sweeper.
  • Example Ia:
    Same example, only starting with spraying out a first layer of 1.2 kg/m2 of the bitumen emulsion and reducing item e to 2.3 kg/m2
    Example II:
    Overlay on roads with medium traffic load:
  • a. Spraying out of 1.2 kg/m2 of a polymer modified, rapid breaking cationic bitumen emulsion with 3% rejuvenator, e.g. "MaxiCoat", Vejtek Int. A/S, Denmark.
  • b. Laying out 13-14 kg/m2 of a stone material, fraction 12-16 mm.
  • c. Rolling with pneumatic tyred roller.
  • d. Laying out 6-8 kg/m2 of recycled asphalt, fraction 8-12 mm for complete filling out of texture in first layer.
  • e. Rolling with tandem steel roller.
  • f. Spraying out 2.1 kg/m2 of a 70% polymer modified cationic bitumen emulsion with 3% rejuvenator.
  • g. Laying out 5-7 kg/m2 of recycled asphalt, fraction 0-6 mm.
  • h. Rolling with steel roller and optionally pneumatic tyred roller.
  • i. Opening road for traffic through 24 hours with limited speed and then, if necessary, cleaning road with suction sweeper.
  • Example III:
    Overlay on roads in dwelling areas or generally in low-noise areas:
  • a. Spraying out 0.9 kg/m2 of a 70% polymer modified rapid breaking cationic bitumen emulsion.
  • b. Laying out 11-12 kg/m2 of a stone material, fraction 8-12 mm.
  • c. Rolling with pneumatic tyred roller.
  • d. Laying out 5-6 kg/m2 of a bitumen coated stone material, fraction 5-8 mm, for complete filling out of texture in first layer.
  • e. Rolling with tandem steel roller.
  • f. Spraying out 1.9 kg/m2 of a 70% polymer modified cationic bitumen emulsion.
  • g. Laying out 5-6 kg/m2 of a stone material, fraction 2-5 mm.
  • h. Rolling with steel roller and optionally with pneumatic tyred roller.
  • i. Opening road for traffic for a few hours with limited speed, then cleaning road with suction sweeper, if required.
  • Claims (9)

    1. A method of providing a road surface with a binder bonded overlay by a successive laying out of stone layers of coarse and finer particle sizes, respectively, characterized in that the first layer of the coarse stones is laid out, with or without previous application of binder to the existing road surface, with the stones distributed into a slightly loose layer structure, whereafter the finer stone fraction is laid out with a dosage so as to substantially fill out the upper voids of the coarse stone layer without any noticeable further layer build-up, whereafter the combined layer is compacted and a binder is applied to the resulting surface, this binder exhibiting an application viscosity low enough to condition a penetration of the binder to the lower voids of the combined layer, and the binder being applied with a dosage corresponding to a filling of both the lower and the upper voids up to a level slightly underneath the top level of the compacted layer structure.
    2. A method according to claim 1, by which the finer stone fraction is laid out directly on the first layer, without any intermediate treatment thereof.
    3. A method according to claim 1, by which a final, mainly temporary surface layer is applied after the application of the binder, viz. as a still finer stone fraction, e.g. sand, in dry condition or as a slurry, suspended in a bituminous emulsion.
    4. A method according to claim 1, by which the finer stones finer are sized only a fraction smaller than those of the first coarse layer, for example 14:10 mm.
    5. A method according to claim 1, by which both stones and binder are used in cold condition.
    6. A method according to claim 1, by which at least one of the stone fractions are pre-coated with a bituminous substance or chemically coated so as to be hydrophobic.
    7. A method according to claim 1, by which at least one of the stone fractions comprises crushed recycled asphalt.
    8. A method according to claim 1, whereby the first coarse stone layer is laid out on a base layer of a binder of higher viscosity than that of the binder applied to the combined layer.
    9. A method according to claim 1, by which the aggregates at least partly consist of artificial material such as crushed slag, calcined bauxite, cementious mortar or cement concrete.
    EP95937001A 1994-11-28 1995-11-28 A method of providing a road surface with an overlay Expired - Lifetime EP0795059B1 (en)

    Applications Claiming Priority (4)

    Application Number Priority Date Filing Date Title
    DK135694 1994-11-28
    DK135694A DK135694A (en) 1994-11-28 1994-11-28 Process for surface treatment of road surfaces
    DK1356/94 1994-11-28
    PCT/DK1995/000478 WO1996017130A1 (en) 1994-11-28 1995-11-28 A method of providing a road surface with an overlay

    Publications (2)

    Publication Number Publication Date
    EP0795059A1 EP0795059A1 (en) 1997-09-17
    EP0795059B1 true EP0795059B1 (en) 2001-10-17

    Family

    ID=8103958

    Family Applications (1)

    Application Number Title Priority Date Filing Date
    EP95937001A Expired - Lifetime EP0795059B1 (en) 1994-11-28 1995-11-28 A method of providing a road surface with an overlay

    Country Status (5)

    Country Link
    EP (1) EP0795059B1 (en)
    AU (1) AU3924595A (en)
    DE (1) DE69523332T2 (en)
    DK (1) DK135694A (en)
    WO (1) WO1996017130A1 (en)

    Cited By (1)

    * Cited by examiner, † Cited by third party
    Publication number Priority date Publication date Assignee Title
    DE102005032148A1 (en) * 2005-07-07 2007-01-11 Ute Gaul Compact protective layer for a road surface comprises using a grain-graded mineral material mixture with a bitumen-containing binder layer coated with chippings and a bitumen-containing binder layer coated with sand as uppermost layer

    Families Citing this family (1)

    * Cited by examiner, † Cited by third party
    Publication number Priority date Publication date Assignee Title
    FR2779424B1 (en) * 1998-06-08 2000-08-18 Colas Sa COMPOSITION AND METHOD FOR PRODUCING A LAYER OF A ROAD, CORRESPONDING LAYER

    Family Cites Families (4)

    * Cited by examiner, † Cited by third party
    Publication number Priority date Publication date Assignee Title
    US2147195A (en) * 1935-03-27 1939-02-14 Sam E Finley Method of constructing pavements
    US2220149A (en) * 1937-10-14 1940-11-05 Finley Sam Everett Method of constructing bituminousbound wearing surfaces for roadways and streets
    DE2039627A1 (en) * 1970-08-10 1972-02-24 Strabag Bau Ag Method for producing the wear layer of a road pavement
    GR71832B (en) * 1983-05-27 1983-06-29 Giorgo Mih Kalo

    Cited By (1)

    * Cited by examiner, † Cited by third party
    Publication number Priority date Publication date Assignee Title
    DE102005032148A1 (en) * 2005-07-07 2007-01-11 Ute Gaul Compact protective layer for a road surface comprises using a grain-graded mineral material mixture with a bitumen-containing binder layer coated with chippings and a bitumen-containing binder layer coated with sand as uppermost layer

    Also Published As

    Publication number Publication date
    WO1996017130A1 (en) 1996-06-06
    DE69523332T2 (en) 2002-07-11
    AU3924595A (en) 1996-06-19
    EP0795059A1 (en) 1997-09-17
    DE69523332D1 (en) 2001-11-22
    DK135694A (en) 1996-05-29

    Similar Documents

    Publication Publication Date Title
    US4668548A (en) Integrally-anchored fiber-reinforced concrete overlays and surfacings and method of making same
    MXPA06009497A (en) Water-permeable paving and method for producing a paving.
    US3870426A (en) Method of protecting pavement from corrosive salts and an impermeable pavement membrane and pavement overlay for use in said method
    Hicks et al. Asphalt surfaces on steel bridge decks
    CA2366009A1 (en) Method of resurfacing roads and bridge decks
    US4118137A (en) Pavement and process of providing the same
    KR100889252B1 (en) Block having a load divergence function and manufacturing and road constructing method for the same
    CN104927759B (en) A kind of interface adhesive material and black overlay structure and its construction technology of changing in vain based on the material
    EA012317B1 (en) Carriageway and surface for carriageway
    EP0795059B1 (en) A method of providing a road surface with an overlay
    EP0356066B1 (en) Improved material for bridge joints and for use in, and method of, repairing or surfacing roads and the like
    US3340780A (en) Construction of asphalt overlays on rigid concrete pavements
    US2147195A (en) Method of constructing pavements
    CN213448074U (en) Composite construction suitable for steel bridge deck drainage is mated formation
    US20050209376A1 (en) Methods and compositions for microsurfacing
    JPH0223603Y2 (en)
    Authority Manual for Low Volume Roads
    Vanelstraete et al. Crack prevention and use of overlay systems
    EP0127470A2 (en) Method for constructing durable skid-resistant surface layers on roads
    JP7350599B2 (en) How to repair asphalt paved roads
    CN217479871U (en) Tunnel pavement structure using non-stick wheel emulsified asphalt adhesive layer
    EP0216148A2 (en) Bituminous surfacing for roads and process for making bituminous surfacings in the cold state for roads
    Brennan et al. Premixed bituminous-bound courses: Standard materials
    AU732009B2 (en) A method of paving road with pervious cement concrete
    US888886A (en) Pavement and method of making the same.

    Legal Events

    Date Code Title Description
    PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

    Free format text: ORIGINAL CODE: 0009012

    17P Request for examination filed

    Effective date: 19970623

    AK Designated contracting states

    Kind code of ref document: A1

    Designated state(s): BE DE FR GB GR LU NL

    RAP1 Party data changed (applicant data changed or rights of an application transferred)

    Owner name: ESHA HOLDING B.V.

    GRAG Despatch of communication of intention to grant

    Free format text: ORIGINAL CODE: EPIDOS AGRA

    17Q First examination report despatched

    Effective date: 20000814

    GRAG Despatch of communication of intention to grant

    Free format text: ORIGINAL CODE: EPIDOS AGRA

    GRAH Despatch of communication of intention to grant a patent

    Free format text: ORIGINAL CODE: EPIDOS IGRA

    GRAH Despatch of communication of intention to grant a patent

    Free format text: ORIGINAL CODE: EPIDOS IGRA

    GRAA (expected) grant

    Free format text: ORIGINAL CODE: 0009210

    AK Designated contracting states

    Kind code of ref document: B1

    Designated state(s): BE DE FR GB GR LU NL

    REF Corresponds to:

    Ref document number: 69523332

    Country of ref document: DE

    Date of ref document: 20011122

    REG Reference to a national code

    Ref country code: GB

    Ref legal event code: IF02

    ET Fr: translation filed
    REG Reference to a national code

    Ref country code: GR

    Ref legal event code: EP

    Ref document number: 20020400178

    Country of ref document: GR

    PLBE No opposition filed within time limit

    Free format text: ORIGINAL CODE: 0009261

    STAA Information on the status of an ep patent application or granted ep patent

    Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

    PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

    Ref country code: GR

    Payment date: 20020918

    Year of fee payment: 8

    26N No opposition filed
    PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

    Ref country code: BE

    Payment date: 20021018

    Year of fee payment: 8

    PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

    Ref country code: LU

    Payment date: 20021121

    Year of fee payment: 8

    PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

    Ref country code: FR

    Payment date: 20021128

    Year of fee payment: 8

    PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

    Ref country code: DE

    Payment date: 20030123

    Year of fee payment: 8

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: LU

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20031128

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: BE

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20031130

    BERE Be: lapsed

    Owner name: *ESHA HOLDING B.V.

    Effective date: 20031130

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: DE

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20040602

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: GR

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20040603

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: FR

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20040730

    REG Reference to a national code

    Ref country code: FR

    Ref legal event code: ST

    REG Reference to a national code

    Ref country code: GB

    Ref legal event code: 732E

    NLS Nl: assignments of ep-patents

    Owner name: ESHA GROUP B.V.

    Effective date: 20080305

    REG Reference to a national code

    Ref country code: NL

    Ref legal event code: TD

    Effective date: 20100708

    PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

    Ref country code: GB

    Payment date: 20121120

    Year of fee payment: 18

    PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

    Ref country code: NL

    Payment date: 20121130

    Year of fee payment: 18

    REG Reference to a national code

    Ref country code: NL

    Ref legal event code: V1

    Effective date: 20140601

    GBPC Gb: european patent ceased through non-payment of renewal fee

    Effective date: 20131128

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: NL

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20140601

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: GB

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20131128