EP0777080A1 - Method for mounting a steam generating boiler - Google Patents

Method for mounting a steam generating boiler Download PDF

Info

Publication number
EP0777080A1
EP0777080A1 EP96402503A EP96402503A EP0777080A1 EP 0777080 A1 EP0777080 A1 EP 0777080A1 EP 96402503 A EP96402503 A EP 96402503A EP 96402503 A EP96402503 A EP 96402503A EP 0777080 A1 EP0777080 A1 EP 0777080A1
Authority
EP
European Patent Office
Prior art keywords
height
ceiling
boiler
supporting structure
parts
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP96402503A
Other languages
German (de)
French (fr)
Other versions
EP0777080B1 (en
Inventor
Jean-Claude Etlicher
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Alstom Power Boiler SA
Original Assignee
GEC Alsthom Stein Industrie
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GEC Alsthom Stein Industrie filed Critical GEC Alsthom Stein Industrie
Publication of EP0777080A1 publication Critical patent/EP0777080A1/en
Application granted granted Critical
Publication of EP0777080B1 publication Critical patent/EP0777080B1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F22STEAM GENERATION
    • F22BMETHODS OF STEAM GENERATION; STEAM BOILERS
    • F22B37/00Component parts or details of steam boilers
    • F22B37/02Component parts or details of steam boilers applicable to more than one kind or type of steam boiler
    • F22B37/24Supporting, suspending, or setting arrangements, e.g. heat shielding
    • F22B37/244Supporting, suspending, or setting arrangements, e.g. heat shielding for water-tube steam generators suspended from the top

Definitions

  • the present invention relates to a method of mounting a steam generating boiler.
  • the height h n is equal to the total height H of the boiler, that is to say that during the assembly of the ceiling. on the ground, the entire supporting structure is erected, the ceiling is then disassembled into two parts, the central part of which is gradually raised to full height, the parts of the boiler being suspended from this part successively in a position a few meters from the ground .
  • the assembly of the entire supporting structure takes a long time, before which it is impossible to raise the ceiling and suspend parts of the boiler.
  • the invention provides a faster mounting method.
  • said height h n is less than the total height H of the support structure and steps for lifting the ceiling and mounting the boiler parts are performed step by step simultaneously with stages of erection of the supporting structure up to its total height H.
  • the ceiling can be temporarily placed at heights h i on temporary laying beams supported by horizontal master beams of the supporting structure.
  • the ceiling can be temporarily placed at heights h i on mounting pads supported by the pylons of the support structure.
  • the lifting of the ceiling can be carried out by hydraulic jacks fixed on temporary support beams supported by horizontal main beams of the support structure or on temporary extensions supported at heights h i by horizontal beams of the support structure.
  • Figures 1 to 5 show in perspective the different stages of mounting a boiler according to the method according to the invention.
  • Figure 6 is a partial perspective view of an alternative embodiment.
  • a steam generating boiler consists of a support structure 1 in the form of a tower of total height H, a ceiling 2 fixed at the top of this structure and boiler parts 3 suspended from this ceiling 2 and of total height h .
  • the supporting structure 1 consists of pylons 1A connected by horizontal beams 1B and braces 1C. Such a boiler, once mounted, is shown in Figure 6.
  • the supporting structure 1 is erected at its total height H, simultaneously with the previous step, as shown in FIGS. 3 and 4 and the ceiling 2 is then raised to the height H, thanks to the jacks 5 installed at the top of the supporting structure 1, as shown in FIGS. 4 and 5.
  • parts of the boiler 3 can still be mounted a few meters from the ground, during this last operation for lifting the ceiling 2.
  • the jacks 5 are fixed on risers 8 in the form of a gantry to allow the lifting of the ceiling 2 to the level of the last horizontal beams 1B.
  • this type of installation of the jacks 5 can also be used for intermediate installations of jacks 5, in place of the temporary support beams 6.
  • This variant makes it possible to arrange the jacks 5 at the height h i for installing the ceiling 2.
  • the ceiling 2 is supported by horizontal beams 1B which must be central and dimensioned accordingly.
  • the installation and fixing of the ceiling 2 can be carried out on the pylons 1A of the supporting structure 1. This can be obtained for example by installing on the pylons 1A, at heights h i , lateral mounting pads 9 connecting with the ceiling 2.
  • This variant, shown in FIG. 6, makes it possible to lighten the horizontal beams 1B of the supporting structure 1 and therefore requires a less powerful crane 7.
  • the height h 1 is substantially equal to the height h of the boiler parts 3.
  • the supporting structure 1 is then erected at its total height H, simultaneously with the previous step, as shown in FIGS. 4 and 5 and the ceiling 2 is then raised to the height H, thanks to the jacks 5 installed at the top of the supporting structure 1, as shown in FIGS. 5 and 6.
  • parts of the boiler 3 can still be mounted a few meters from the ground, during this last operation for lifting the ceiling 2.

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The installation of a steam boiler involves using a carrying structure (1) in the form of a tower of a determined height (H). A ceiling (2), of a height (h) less than that of the tower, is fixed to the top of the tower and boiler parts (3) are suspended from it. The procedure involves assembling the ceiling on the ground on which the tower is erected. The ceiling is then raised progressively to a determined height (hn) and the boiler parts suspended some metres from the ground. That height is less than or equal to the height of the boiler parts and is attained in stages. If it is less than the height of the boiler parts, the structure is erected to a determined height (h(n+1)). The ceiling is raised to this height and the boiler parts successively suspended. These stages are repeated until it reaches a height equal to that of the ceiling.

Description

La présente invention se rapporte à un procédé de montage d'une chaudière de production de vapeur.The present invention relates to a method of mounting a steam generating boiler.

Elle concerne plus précisément un procédé de montage d'une chaudière de production de vapeur constituée d'une structure porteuse en forme de tour de hauteur totale H, d'un plafond fixé au sommet de cette structure et de parties de chaudière suspendues à ce plafond de hauteur totale h, selon lequel

  • (a) on assemble ledit plafond porteur sur le sol cependant qu'on érige ladite structure porteuse à une hauteur hn,
  • (b) on lève progressivement le plafond jusqu'à la hauteur hn et monte successivement des parties de chaudière suspendues dans une position à quelques mètres du sol.
It relates more precisely to a method of mounting a steam generating boiler consisting of a support structure in the form of a tower of total height H, a ceiling fixed at the top of this structure and parts of the boiler suspended from this ceiling. total height h, according to which
  • (a) assembling said load-bearing ceiling on the ground, however, erecting said load-bearing structure at a height h n ,
  • (b) the ceiling is gradually raised to the height h n and successively raises parts of the boiler suspended in a position a few meters from the ground.

Un tel procédé de montage est décrit dans le brevet FR-2 648 216. Selon ce procédé connu, la hauteur hn est égale à la hauteur totale H de la chaudière, c'est-à-dire que pendant l'assemblage du plafond au sol, on érige toute la structure porteuse, le plafond est ensuite désassemblé en deux parties dont la partie centrale est levée progressivement jusqu'à la hauteur totale, les parties de chaudière étant suspendues à cette partie successivement dans une position à quelques mètres du sol.Such a mounting method is described in patent FR-2,648,216. According to this known method, the height h n is equal to the total height H of the boiler, that is to say that during the assembly of the ceiling. on the ground, the entire supporting structure is erected, the ceiling is then disassembled into two parts, the central part of which is gradually raised to full height, the parts of the boiler being suspended from this part successively in a position a few meters from the ground .

Selon ce procédé, le montage de toute la structure porteuse prend un délai important, avant lequel il est impossible de lever le plafond et de suspendre des parties de chaudière.According to this process, the assembly of the entire supporting structure takes a long time, before which it is impossible to raise the ceiling and suspend parts of the boiler.

L'invention propose un procédé de montage plus rapide.The invention provides a faster mounting method.

Pour ce faire, selon le procédé conforme à l'invention, ladite hauteur hn est inférieure à la hauteur totale H de la structure porteuse et on réalise pas à pas des étapes de levage du plafond et de montage des parties de chaudière simultanément à des étapes d'érection de la structure porteuse jusqu'à sa hauteur totale H.To do this, according to the method according to the invention, said height h n is less than the total height H of the support structure and steps for lifting the ceiling and mounting the boiler parts are performed step by step simultaneously with stages of erection of the supporting structure up to its total height H.

De préférence, ladite hauteur hn est inférieure ou égale à la hauteur des parties de chaudière h et le procédé comporte également les étapes suivantes:

  • (c) si hn est inférieure à h, on érige la structure porteuse à au moins une hauteur hn+1, simultanément à l'étape précédente,
  • (d) on lève progressivement le plafond jusqu'à la hauteur hn+1 et monte successivement des parties de chaudière suspendues dans une position à quelques mètres du sol,
  • on répète les étapes (c) et (d) jusqu'à ce que hi soit sensiblement égale à h,
  • on érige la structure porteuse à sa hauteur totale H, simultanément à l'étape précédente,
  • on lève ensuite le plafond jusqu'à la hauteur H.
Preferably, said height h n is less than or equal to the height of the boiler parts h and the method also includes the following steps:
  • (c) if h n is less than h, the supporting structure is erected at least at a height h n + 1 , simultaneously with the preceding step,
  • (d) the ceiling is gradually raised to the height h n + 1 and successively parts of the boiler suspended in a position a few meters from the ground,
  • steps (c) and (d) are repeated until h i is substantially equal to h,
  • the supporting structure is erected at its total height H, simultaneously with the previous step,
  • the ceiling is then raised to height H.

Dans le cas d'une chaudière de production de vapeur comportant une structure porteuse constitué de pylônes reliés par des poutres horizontales et de contreventements, le plafond peut être provisoirement posé aux hauteurs hi sur des poutres de pose provisoires supportées par des poutres maîtresses horizontales de la structure porteuse.In the case of a steam generating boiler comprising a support structure consisting of pylons connected by horizontal beams and bracing, the ceiling can be temporarily placed at heights h i on temporary laying beams supported by horizontal master beams of the supporting structure.

Dans le cas d'une chaudière de production de vapeur comportant une structure porteuse constitué de pylônes reliés par des contreventements, le plafond peut être provisoirement posé aux hauteurs hi sur des plots de pose supportés par les pylônes de la structure porteuse.In the case of a steam generating boiler comprising a support structure consisting of pylons connected by braces, the ceiling can be temporarily placed at heights h i on mounting pads supported by the pylons of the support structure.

Le levage du plafond peut être réalisé par des vérins hydrauliques fixés sur des poutres de support provisoires supportées par des poutres maîtresses horizontales de la structure porteuse ou sur des rehausses provisoires supportées aux hauteurs hi par des poutres horizontales de la structure porteuse.The lifting of the ceiling can be carried out by hydraulic jacks fixed on temporary support beams supported by horizontal main beams of the support structure or on temporary extensions supported at heights h i by horizontal beams of the support structure.

L'invention est décrite ci-après plus en détail à l'aide de figures ne représentant qu'un mode de réalisation préféré de l'invention.The invention is described below in more detail using figures showing only a preferred embodiment of the invention.

Les figures 1 à 5 représentent en perspective les différentes étapes du montage d'une chaudière selon le procédé conforme à l'invention.Figures 1 to 5 show in perspective the different stages of mounting a boiler according to the method according to the invention.

La figure 6 est une vue partielle en perspective d'une variante de réalisation.Figure 6 is a partial perspective view of an alternative embodiment.

Une chaudière de production de vapeur est constituée d'une structure porteuse 1 en forme de tour de hauteur totale H , d'un plafond 2 fixé au sommet de cette structure et de parties de chaudière 3 suspendues à ce plafond 2 et de hauteur totale h. La structure porteuse 1 est constitué de pylônes 1A reliés par des poutres horizontales 1B et de contreventements 1C. Une telle chaudière, une fois montée, est représentée sur la figure 6.A steam generating boiler consists of a support structure 1 in the form of a tower of total height H, a ceiling 2 fixed at the top of this structure and boiler parts 3 suspended from this ceiling 2 and of total height h . The supporting structure 1 consists of pylons 1A connected by horizontal beams 1B and braces 1C. Such a boiler, once mounted, is shown in Figure 6.

Le procédé conforme à l'invention commence par les étapes suivantes, après préparation des massifs supports des pylônes 1A de la structure porteuse 1 et du sol à un niveau 0:

  • (a) on assemble le plafond 2 sur le sol dans un gabarit légèrement inférieur au gabarit intérieur de la structure porteuse 1, cependant qu'on érige ladite structure porteuse 1 au moins à une hauteur h1, comme représenté sur la figure 1, au moyen d'une grue 7;
  • (b) on installe sur la structure porteuse 1 des vérins hydrauliques 5, comme représenté sur la figure 2; ils sont fixés sur des poutres de support provisoires 6 supportées par les poutres horizontales 1B de la structure porteuse 1, au-dessus de la hauteur h1; grâce aux vérins 5, on lève progressivement le plafond 2 jusqu'à la hauteur h1 et monte successivement, tranche par tranche, des parties de chaudière 3A suspendues dans une position à quelques mètres du sol, comme représenté sur la figure 3; une fois la hauteur h1 atteinte, le plafond 2 est stabilisé comme représenté sur la figure 4; pour ce faire, il est provisoirement posé sur des poutres de pose 4 provisoires supportées par les poutres maîtresses horizontales 1B de la structure porteuse 1.
The process in accordance with the invention begins with the following steps, after preparation of the solid supports for the pylons 1A of the supporting structure 1 and of the ground at a level 0:
  • (a) the ceiling 2 is assembled on the ground in a template slightly lower than the inside template of the support structure 1, however that said support structure 1 is erected at least at a height h 1 , as shown in FIG. 1, at by means of a crane 7;
  • (b) hydraulic cylinders 5 are installed on the support structure 1, as shown in FIG. 2; they are fixed on temporary support beams 6 supported by the horizontal beams 1B of the supporting structure 1, above the height h 1 ; thanks to the jacks 5, the ceiling 2 is gradually raised to the height h 1 and successively rises, section by section, parts of the boiler 3A suspended in a position a few meters from the ground, as shown in FIG. 3; once the height h 1 has been reached, the ceiling 2 is stabilized as shown in FIG. 4; to do this, it is temporarily placed on 4 temporary laying beams supported by the horizontal master beams 1B of the supporting structure 1.

On érige la structure porteuse 1 à sa hauteur totale H, simultanément à l'étape précédente, comme représenté sur les figures 3 et 4 et on lève ensuite le plafond 2 jusqu'à la hauteur H, grâce aux vérins 5 installés au sommet de la structure porteuse 1, comme représenté sur les figures 4 et 5. Eventuellement des parties de chaudière 3 peuvent encore être montées à quelques mètres du sol, lors de cette dernière opération de levage du plafond 2.The supporting structure 1 is erected at its total height H, simultaneously with the previous step, as shown in FIGS. 3 and 4 and the ceiling 2 is then raised to the height H, thanks to the jacks 5 installed at the top of the supporting structure 1, as shown in FIGS. 4 and 5. Optionally, parts of the boiler 3 can still be mounted a few meters from the ground, during this last operation for lifting the ceiling 2.

Au sommet de la structure porteuse 1, les vérins 5 sont fixés sur des rehausses 8 en forme de portique pour permettre le levage du plafond 2 jusqu'au niveau des dernières poutres horizontales 1B.At the top of the supporting structure 1, the jacks 5 are fixed on risers 8 in the form of a gantry to allow the lifting of the ceiling 2 to the level of the last horizontal beams 1B.

En variante, ce type d'installation des vérins 5 peut également être utilisé pour les installations intermédiaires de vérins 5, à la place des poutres de support provisoires 6. Cette variante permet de disposer les vérins 5 à la hauteur hi de pose du plafond 2.As a variant, this type of installation of the jacks 5 can also be used for intermediate installations of jacks 5, in place of the temporary support beams 6. This variant makes it possible to arrange the jacks 5 at the height h i for installing the ceiling 2.

Selon le mode de réalisation décrit ci-dessus, par l'intermédiaire des poutres de pose provisoires 4, le plafond 2 est supporté par des poutres horizontales 1B qui doivent être maîtresses et dimensionnées en conséquence. En variante, la pose et fixation du plafond 2 peut être réalisée sur les pylônes 1A de la structure porteuse 1. Ceci peut être obtenu par exemple en installant sur les pylônes 1A, aux hauteurs hi, des plots de pose 9 latéraux de liaison avec le plafond 2. Cette variante, représentée sur la figure 6, permet d'alléger les poutres horizontales 1B de la structure porteuse 1 et donc nécessite une grue 7 moins puissante.According to the embodiment described above, by means of the temporary laying beams 4, the ceiling 2 is supported by horizontal beams 1B which must be central and dimensioned accordingly. As a variant, the installation and fixing of the ceiling 2 can be carried out on the pylons 1A of the supporting structure 1. This can be obtained for example by installing on the pylons 1A, at heights h i , lateral mounting pads 9 connecting with the ceiling 2. This variant, shown in FIG. 6, makes it possible to lighten the horizontal beams 1B of the supporting structure 1 and therefore requires a less powerful crane 7.

Selon le procédé décrit ci-dessus, la hauteur h1 est sensiblement égale à la hauteur h des parties de chaudière 3.According to the method described above, the height h 1 is substantially equal to the height h of the boiler parts 3.

Les étapes (a) et (b) décrites peuvent être décomposées en plusieurs étapes successives de levage du plafond 2 et de suspension des parties de chaudière 3.The steps (a) and (b) described can be broken down into several successive steps of lifting the ceiling 2 and suspending the boiler parts 3.

Dans ce cas, h1 est inférieure à la hauteur h des parties de chaudière (3) et le procédé comporte également les étapes suivantes:

  • (c) on érige la structure porteuse 1 à au moins une hauteur h2, simultanément à l'étape (b),
  • (d) on lève progressivement le plafond 2 jusqu'à la hauteur h2 et monte successivement des parties de chaudière 3 suspendues dans une position à quelques mètres du sol,
  • on répète les étapes (c) et (d) jusqu'à ce que hi soit sensiblement égale à h.
In this case, h 1 is less than the height h of the boiler parts (3) and the method also includes the following steps:
  • (c) the supporting structure 1 is erected at at least one height h 2 , simultaneously with step (b),
  • (d) the ceiling 2 is gradually raised to the height h 2 and successively raises parts of the boiler 3 suspended in a position a few meters from the ground,
  • repeating steps (c) and (d) until h i is substantially equal to h.

On érige ensuite la structure porteuse 1 à sa hauteur totale H, simultanément à l'étape précédente, comme représenté sur les figures 4 et 5 et on lève ensuite le plafond 2 jusqu'à la hauteur H, grâce aux vérins 5 installés au sommet de la structure porteuse 1, comme représenté sur les figures 5 et 6. Eventuellement des parties de chaudière 3 peuvent encore être montées à quelques mètres du sol, lors de cette dernière opération de levage du plafond 2.The supporting structure 1 is then erected at its total height H, simultaneously with the previous step, as shown in FIGS. 4 and 5 and the ceiling 2 is then raised to the height H, thanks to the jacks 5 installed at the top of the supporting structure 1, as shown in FIGS. 5 and 6. Optionally, parts of the boiler 3 can still be mounted a few meters from the ground, during this last operation for lifting the ceiling 2.

Claims (6)

Procédé de montage d'une chaudière de production de vapeur constituée d'une structure porteuse (1) en forme de tour de hauteur totale H, d'un plafond (2) fixé au sommet de cette structure et de parties de chaudière (3) suspendues à ce plafond (2) et de hauteur totale h, comportant les étapes suivantes: (a) on assemble ledit plafond (2) sur le sol cependant qu'on érige ladite structure porteuse (1) au moins à une hauteur hn, (b) on lève progressivement le plafond (2) jusqu'à la hauteur hn et monte successivement des parties de chaudière (3A) suspendues dans une position à quelques mètres du sol,    caractérisé en ce que ladite hauteur hn est inférieure à la hauteur totale H de la structure porteuse (1) et en ce qu'on réalise pas à pas des étapes de levage du plafond (2) et de montage des parties de chaudière (3) simultanément à des étapes d'érection de la structure porteuse (1) jusqu'à sa hauteur totale H.Method for mounting a steam generating boiler consisting of a support structure (1) in the form of a tower of total height H, a ceiling (2) fixed at the top of this structure and parts of the boiler (3) suspended from this ceiling (2) and of total height h, comprising the following steps: (a) assembling said ceiling (2) on the ground, however, erecting said supporting structure (1) at least at a height h n , (b) the ceiling (2) is gradually raised to the height h n and successively raises parts of the boiler (3A) suspended in a position a few meters from the ground, characterized in that said height h n is less than the total height H of the support structure (1) and in that steps are carried out step by step for lifting the ceiling (2) and mounting the boiler parts (3 ) simultaneously with stages of erection of the supporting structure (1) up to its total height H. Procédé selon la revendication 1, caractérisé en ce que ladite hauteur hn est inférieure ou égale à la hauteur h des parties de chaudière (3) et en ce qu'il comporte également les étapes suivantes: (c) si hn est inférieure à h, on érige la structure porteuse (1) à au moins une hauteur hn+1, simultanément à l'étape précédente, (d) on lève progressivement le plafond (2) jusqu'à la hauteur hn+1 et monte successivement des parties de chaudière (3) suspendues dans une position à quelques mètres du sol, - on répète les étapes (c) et (d) jusqu'à ce que hi soit égale à h, - on érige la structure porteuse (1) à sa hauteur totale H, simultanément à l'étape précédente, - on lève ensuite le plafond (2) jusqu'à la hauteur H. Method according to claim 1, characterized in that said height h n is less than or equal to the height h of the boiler parts (3) and in that it also comprises the following steps: (c) if h n is less than h, the supporting structure (1) is erected at least at a height h n + 1 , simultaneously with the preceding step, (d) the ceiling (2) is gradually raised to the height h n + 1 and successively raises parts of the boiler (3) suspended in a position a few meters from the ground, - steps (c) and (d) are repeated until h i is equal to h, - the supporting structure (1) is erected at its total height H, simultaneously with the previous step, - the ceiling (2) is then raised to height H. Procédé de montage, selon la revendication 1 ou 2, d'une chaudière de production de vapeur comportant une structure porteuse (1) constitué de pylônes (1A) reliés par des poutres horizontales (1B) et de contreventements (1C), caractérisé en ce que le plafond (2) est provisoirement posé aux hauteurs hi sur des poutres de pose (4) provisoires supportées par des poutres maîtresses horizontales (1B) de la structure porteuse (1).Method of mounting, according to claim 1 or 2, of a steam generating boiler comprising a supporting structure (1) consisting of pylons (1A) connected by horizontal beams (1B) and bracing (1C), characterized in that that the ceiling (2) is temporarily placed at heights h i on temporary laying beams (4) supported by horizontal main beams (1B) of the supporting structure (1). Procédé de montage, selon la revendication 1 ou 2, d'une chaudière de production de vapeur comportant une structure porteuse (1) constitué de pylônes (1A) reliés par des contreventements (1B, 1C), caractérisé en ce que le plafond (2) est provisoirement posé aux hauteurs hi sur des plots de pose (9) supportés par les pylônes (1A) de la structure porteuse (1).Method of mounting, according to claim 1 or 2, of a steam generating boiler comprising a support structure (1) consisting of pylons (1A) connected by braces (1B, 1C), characterized in that the ceiling (2 ) is temporarily placed at heights h i on mounting pads (9) supported by the pylons (1A) of the supporting structure (1). Procédé selon la revendication 3 ou 4, caractérisé en ce que le levage du plafond (2) est réalisé par des vérins hydrauliques (5) fixés sur des poutres de support provisoires (6) supportées par des poutres maîtresses horizontales (1B) de la structure porteuse (1).Method according to claim 3 or 4, characterized in that the lifting of the ceiling (2) is carried out by hydraulic cylinders (5) fixed on temporary support beams (6) supported by horizontal main beams (1B) of the structure carrier (1). Procédé selon la revendication 3 ou 4, caractérisé en ce que le levage du plafond (2) est réalisé par des vérins hydrauliques (5) fixés sur des rehausses provisoires (7) supportées aux hauteurs hi par des poutres horizontales (1B) de la structure porteuse (1).Method according to claim 3 or 4, characterized in that the lifting of the ceiling (2) is carried out by hydraulic cylinders (5) fixed on temporary extensions (7) supported at heights h i by horizontal beams (1B) of the supporting structure (1).
EP96402503A 1995-11-28 1996-11-21 Method for mounting a steam generating boiler Expired - Lifetime EP0777080B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
FR9514076A FR2741701B1 (en) 1995-11-28 1995-11-28 METHOD FOR ASSEMBLING A STEAM PRODUCTION BOILER
FR9514076 1995-11-28

Publications (2)

Publication Number Publication Date
EP0777080A1 true EP0777080A1 (en) 1997-06-04
EP0777080B1 EP0777080B1 (en) 2000-01-19

Family

ID=9484954

Family Applications (1)

Application Number Title Priority Date Filing Date
EP96402503A Expired - Lifetime EP0777080B1 (en) 1995-11-28 1996-11-21 Method for mounting a steam generating boiler

Country Status (8)

Country Link
EP (1) EP0777080B1 (en)
CN (1) CN1130518C (en)
ES (1) ES2144220T3 (en)
FR (1) FR2741701B1 (en)
GR (1) GR3033106T3 (en)
PT (1) PT777080E (en)
RU (1) RU2156918C2 (en)
ZA (1) ZA969914B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1136754A2 (en) 2000-03-24 2001-09-26 Alstom Power Boiler Service GmbH Steam generator and method of assembling
WO2004048849A1 (en) * 2002-11-26 2004-06-10 Foster Wheeler Energia Oy Tower boiler including a stationary supporting structure
ES2370317A1 (en) * 2008-04-25 2011-12-14 Alstom Technology Ltd. Method for assembling a steam generator
EP3086034A1 (en) * 2015-04-20 2016-10-26 General Electric Technology GmbH Method for connecting heat exchanging surfaces to a main structure of a boiler, boiler and boiler module
WO2016172018A1 (en) * 2015-04-20 2016-10-27 General Electric Technology Gmbh Method for erecting a boiler

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE10335499B3 (en) * 2003-07-31 2004-11-25 Alstom Power Boiler Gmbh Steam generator erection method has pre-assembled pipe wall modules attached to steam vessel frame before fitting frame cover
FI124429B (en) 2005-12-15 2014-08-29 Foster Wheeler Energia Oy Method and apparatus for supporting the walls of a power boiler
EP2933555A1 (en) * 2014-04-15 2015-10-21 Alstom Technology Ltd Method for erecting a boiler, module and boiler comprising the module
CN104690488B (en) * 2015-02-10 2017-05-03 衡阳市大成锅炉有限公司 Method for assembling large-sized single-drum boiler body
CN107448924A (en) * 2017-08-22 2017-12-08 山东电力工程咨询院有限公司 A kind of construction method of boiler layering lifting
DK3918262T3 (en) * 2019-12-12 2022-08-29 Thyssenkrupp Ind Solutions Ag Tower structure of a preheating tower of a plant for thermal processing of minerals and method of setting up the preheating tower

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3751783A (en) * 1971-06-22 1973-08-14 Combustion Eng Method of erection of horizontal surfaced heat transfer modules for steam generating units
FR2648216A1 (en) * 1989-06-07 1990-12-14 Stein Industrie METHOD FOR ASSEMBLING A VAPOR BOILER STEAM PRODUCTION SYSTEM

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3751783A (en) * 1971-06-22 1973-08-14 Combustion Eng Method of erection of horizontal surfaced heat transfer modules for steam generating units
FR2648216A1 (en) * 1989-06-07 1990-12-14 Stein Industrie METHOD FOR ASSEMBLING A VAPOR BOILER STEAM PRODUCTION SYSTEM

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1136754A2 (en) 2000-03-24 2001-09-26 Alstom Power Boiler Service GmbH Steam generator and method of assembling
WO2004048849A1 (en) * 2002-11-26 2004-06-10 Foster Wheeler Energia Oy Tower boiler including a stationary supporting structure
CN100439796C (en) * 2002-11-26 2008-12-03 福斯特韦勒能源股份公司 Tower boiler including a stationary supporting structure
ES2370317A1 (en) * 2008-04-25 2011-12-14 Alstom Technology Ltd. Method for assembling a steam generator
EP3086034A1 (en) * 2015-04-20 2016-10-26 General Electric Technology GmbH Method for connecting heat exchanging surfaces to a main structure of a boiler, boiler and boiler module
WO2016172018A1 (en) * 2015-04-20 2016-10-27 General Electric Technology Gmbh Method for erecting a boiler

Also Published As

Publication number Publication date
FR2741701B1 (en) 1997-12-26
FR2741701A1 (en) 1997-05-30
ZA969914B (en) 1997-06-18
CN1159538A (en) 1997-09-17
CN1130518C (en) 2003-12-10
RU2156918C2 (en) 2000-09-27
PT777080E (en) 2000-06-30
GR3033106T3 (en) 2000-08-31
ES2144220T3 (en) 2000-06-01
EP0777080B1 (en) 2000-01-19

Similar Documents

Publication Publication Date Title
EP0777080B1 (en) Method for mounting a steam generating boiler
CN1856644B (en) Method of conducting service on a wind turbine using equipment mounted on the hub
JPH1182285A (en) Construction method of wind power generator, climbing crane device, and maintenance using the same
EP0244542A1 (en) Lifting method and device, especially for an oil production platform
EP0034541B1 (en) Flue or vertical pipe for gas discharge
FR3065977B1 (en) ASSEMBLY OF STRUCTURAL ELEMENTS FOR FORMING AERIAL PARKING WITH FLOORS, AND AIR PARKING WITH CORRESPONDING FLOORS
JPH10205430A (en) Construction method for wind power generator
EP0402248A1 (en) Erection process for a steam generating plant with steam boiler
WO2006037870A1 (en) Method for installing legs of an offshore oil-drilling rig
JPH10205429A (en) Construction method for wind power generator
JP2634999B2 (en) Dismantling method of branch line tower
FR2587393A1 (en) Method and device for constructing reinforced concrete chimneys
JPH11200615A (en) Detachable ladder
CN214117757U (en) Square steel structure assembled encloses fender
JPH10196122A (en) Arch supporting assembling system and assembling method
JPH11285122A (en) Pole replacing method and assisting tool for pole replacement
CN217782808U (en) Hanging basket support for installing tower crown structure of building
FR2820769A1 (en) Safety railing panel has lower and upper fixings at ends and intermediate support piece for temporary holding during mounting on scaffolding tubes
CN214497598U (en) Well lid slope controller
FR2749034A1 (en) Method for altering traditional timber framed buildings for conversions
EP0362247A1 (en) Method and device for the construction of buildings by raised slabs
JP2634271B2 (en) Jack-up method and device
FR2570362A1 (en) Method for installing a gantry crane intended in particular for loading and unloading containers, installation for the implementation of this method and gantry crane obtained
EP3931414A1 (en) Foundation and tool for installing a composite pole
FR3132314A1 (en) Shading device intended to provide shade in an urban environment and method of assembling such a device

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): BE ES GB GR PT

17P Request for examination filed

Effective date: 19971022

GRAG Despatch of communication of intention to grant

Free format text: ORIGINAL CODE: EPIDOS AGRA

RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: ALSTOM ENERGY SYSTEMS S.A.

17Q First examination report despatched

Effective date: 19990507

GRAG Despatch of communication of intention to grant

Free format text: ORIGINAL CODE: EPIDOS AGRA

GRAH Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOS IGRA

GRAH Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOS IGRA

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): BE ES GB GR PT

GBT Gb: translation of ep patent filed (gb section 77(6)(a)/1977)

Effective date: 20000314

REG Reference to a national code

Ref country code: ES

Ref legal event code: FG2A

Ref document number: 2144220

Country of ref document: ES

Kind code of ref document: T3

REG Reference to a national code

Ref country code: PT

Ref legal event code: SC4A

Free format text: AVAILABILITY OF NATIONAL TRANSLATION

Effective date: 20000322

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed
PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: PT

Payment date: 20011019

Year of fee payment: 6

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GR

Payment date: 20011025

Year of fee payment: 6

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: BE

Payment date: 20011114

Year of fee payment: 6

REG Reference to a national code

Ref country code: GB

Ref legal event code: IF02

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20021030

Year of fee payment: 7

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20021130

BERE Be: lapsed

Owner name: S.A. *ALSTOM ENERGY SYSTEMS

Effective date: 20021130

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20030531

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20030609

REG Reference to a national code

Ref country code: PT

Ref legal event code: MM4A

Free format text: LAPSE DUE TO NON-PAYMENT OF FEES

Effective date: 20030531

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: ES

Payment date: 20031120

Year of fee payment: 8

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20031121

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20031121

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: ES

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20041122

REG Reference to a national code

Ref country code: ES

Ref legal event code: FD2A

Effective date: 20041122