EP0392641A1 - Bridge construction - Google Patents
Bridge construction Download PDFInfo
- Publication number
- EP0392641A1 EP0392641A1 EP90201084A EP90201084A EP0392641A1 EP 0392641 A1 EP0392641 A1 EP 0392641A1 EP 90201084 A EP90201084 A EP 90201084A EP 90201084 A EP90201084 A EP 90201084A EP 0392641 A1 EP0392641 A1 EP 0392641A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- bridge
- module
- launching rail
- trestle
- launching
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D15/00—Movable or portable bridges; Floating bridges
- E01D15/12—Portable or sectional bridges
- E01D15/124—Folding or telescopic bridges; Bridges built up from folding or telescopic sections
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/005—Piers, trestles, bearings, expansion joints or parapets specially adapted for portable or sectional bridges
Definitions
- This invention relates to a method of constructing a modular bridge across a span and to apparatus for use in such a method.
- EP-A-0081389 discloses a modular bridge comprising at least one intermediate bridge module and two end bridge modules, each of the bridge modules comprising two longitudinal main girder structures and an intermediate deck having a deck surface, the main girder structures being foldably connected one along each side of the deck and being foldable from an operative position in which the main girder structures offer extensions of the deck surface on either side of the deck for use to a closed position in which the main girder structures are folded beneath the deck, the main girder structures of the end bridge modules being longitudinally tapered in depth when seen from a side of the module in its operative position, the main girder structures of the intermediate module(s) not being so tapered, wherein each of the end bridge modules and the intermediate bridge module(s), are connected to form a bridge.
- EP-A-0081388 discloses the construction of such bridge by putting up a building frame, having upwardly facing rollers, on the first bank of the span to be crossed.
- a preliminary beam is assembled on the frame and pushed outwards towards the bank.
- the bridge assembly is assembled progressively on the frame, behind the preliminary beam, with the beam being attached to the leading module.
- the preliminary beam has at its outer end a jacking unit with support rollers so that, when the jacking unit reaches the far bank of the span, it may rest on it and allow the assembly of beam and bridge to roll across the span, the bridge assembly is then lowered onto the bank and the beam withdrawn back through the bridge assembly. This procedure is illustrated in Figures 23A to 23F of EP-A-0081388.
- EP-A-0075671 discloses a demountable non-opening bridge comprising discrete channel-section modules and an H-section launching girder, wherein modules comprise a central part and two wing parts, the wing parts comprise box-section track girders, the two wing parts are downwardly hinging below the central part for transportation, in the laying of the bridge the launching girders are assembled and made first, whereafter the various modules are coupled together and pushed over the launching girder and the launching girder remains in the bridge as a bearing element.
- EP-A-0075671 discloses the construction of such a bridge by the joint use of a laying vehicle having a cantilever arm and a four-tonne crane.
- the laying vehicle moves to the bank of the span to be crossed with a launching girder ramp (or end) member already in position on guide rollers of the cantilever arm.
- the cantilever arm comprises a pinion to advance the ramp member over the span by means of a co-operating rack.
- the crane delivers launching girder inner sections which are coupled up and advanced. Once the launching girder has reached the required length, a second launching girder ramp (end) member is coupled up.
- the cantilever arm of the laying vehicle is lowered so that the launching girder is then supported by its own hydraulically deployable feet.
- a ramp (end) bridge module is now lifted by the crane onto the launching girder.
- Inner (intermediate) bridge modules are coupled up and drawn over the launching girder by means of a block and tackle and reversing roller.
- the final module is a further ramp (end) module.
- the hydraulic feet are then retracted.
- EP-A-0075611 also discloses the use of a single layer vehicle combining the capabilities of the laying vehicle and crane described above. It is equipped both with a cantilever arm and with a four-tonne crane.
- CH-A-495468 discloses another method of constructing a modular bridge across a span.
- a crane or a specialised vehicle is required to lay the bridge, and to provide a counter-balancing weight on the dome bank side of the launching trestle, to prevent the bridge and launching nose from toppling over as the launching proceeds.
- the present invention enables the construction of a modular bridge across a span without the requirement for specialist vehicles. Furthermore, it is desirable for bridges of this type to be capable of being built quickly, even at night, by few men.
- the trestle preferably has one or more rollers for supporting the launching rail, the rollers desirably being drivable to move the launching rail over the beam of the first trestle.
- the trestle also preferably comprises one or more rollers for supporting the bridge modules.
- the launching rail is preferably of inverted-T shaped configuration. This configuration allows the effective use of lateral guide means, for the launching rail, to be positioned on the trestle.
- the lateral guide means for the launching rail may comprise retractable pinch wheels. Because of the use of a trestle it is a simple matter also to provide lateral guide means for the bridge modules, which may comprise one or more vertically mounted guide rollers.
- the trestle may comprise means for selectively restraining the launching rail during construction: the selective restraining means desirably comprise retractable hooks.
- the trestle comprises means for adjusting the level of the trestle.
- a second trestle is placed on the home bank to take a proportion of the load of the modules.
- the second trestle will desirably be of similar construction to the first trestle, except that it is not necessary for it to be provided with retaining means such as hooks or means for moving the rail over the beam, such as powered rollers.
- Each bridge module is preferably substantially described in EP-A-0081388 in that it comprises two longitudinal main girder structures and an intermediate deck having a deck surface, the main girder structures being foldably connected one along each side of the deck and being foldable between an operative position in which the main girder structures offer extensions of the deck surface on either side of the deck for use and a closed position in which the main girder structures are folded beneath the deck.
- a bridge formed of such modules will normally comprise two end modules, in each of which the main girder structures are longitudinally tapered in depth when seen from the side of the module and at least one intermediate module in which the main girder structures are not so tapered.
- the main girder structures be box girder structures; that each main girder structure comprise at least one lifting attachment on a surface offering the extension of the deck surface; that each of the lifting attachments be recessed; that each main girder structure comprise at least one lifting attachment on a surface which is facing a corresponding surface of the other main girder structure when the module is in the operative position; that the deck comprise two lip portions and that each of the main girder structures comprise a shoulder portion, each of which lip portions stays on a respective one of the shoulder portions when the module is in the operative position; and/or that the module further comprise a bracing means between the main girder structure for bracing the module when in the operative position.
- the disclosed bracing means comprised steel bracing wires.
- the bridge modules preferably comprise bracing arms, one end of each of which is pivotably attached either to a main girder structure or to the deck surface, and the other end of which is receivable in a slide in the other of the main girder structure and the deck.
- the bracing arm is pivotably attached to a main girder structure and receivable in a slide in the deck.
- a further preferred feature of a bridge module usable in the present invention concerns means for joining adjacent bridge modules.
- joining plates are provided at each end of each of the intermediate bridge modules and at the inner end of each of the end modules. Each joining plate would be provided with a hole to receive a pin when joining plates of adjacent bridge modules are placed together. So much is similar with the present case.
- pairs of joining plates would be provided at one end of the bridge module and would be adapted to lie either side of single joining plates of adjacent bridge modules.
- a pin would be manually inserted through the resulting laminate of joining plates to hold the modules together.
- the arrangement of joining plates is hermaphrodite in nature.
- means may be provided for remotely inserting a pin through a laminate of joining plates, each of which is provided with a pin-receiving hole.
- Such means may take the form of a bell-crank lever, adapted to be operable from the side of a bridge module when in position on the launching rail and arranged to move a pin through a laminate of joining plates.
- a preferred feature of the method of the invention involves the use of means for altering the angle of approach offered by one or both of the end bridge modules.
- Such means may take the form of a hydraulically operable articulating ram for moving a tapered portion of the end bridge module with respect to a connecting portion of the module, which is adapted to connect to the end module to an adjacent intermediate module.
- One or more filling elements may be inserted in the end module so that the hydraulic cylinders can be relaxed after articulation.
- each bridge comprising a number of modules, may be provided with a sub-frame for bracing frame for (a) bracing the bridge in the open position and (b) supporting the bridge on the launching rail so that it can be boomed out across the span.
- a sub-frame may be provided at each end of a bridge, preferably being located at the inner end of each of the end modules.
- Each sub-frame preferably has a pair of rollers, one for bearing on each flange of the inverted T-section of the launching rail.
- Figures 1A to 1C and Figures 2A to 2C show the modules from which the launching rail used in the invention is built up.
- Figures 1A, 1B and 1C show an intermediate launching rail 1, which is of a length of 19 feet 6 inches (5.94 metres) which ensures that the launching rail modules are compatible for transport with the ISO 6.1 metres (20 feet) container system.
- Each intermediate launching rail module weighs about 0.8 tonnes and comprises a longitudinal upstanding member 3 which carries, at its lower edge, a pair of flanges 5 and 7.
- the intermediate launching rail module thus has the configuration of an inverted-T.
- Each is provided with a tension connection for connection to a bridge module, as will be described later.
- each intermediate launching rail module 1 At the upper and lower edges of each of each intermediate launching rail module 1 is a row of joining lugs for connecting the module with an adjacent module.
- the upper row of lugs is designated by reference numeral 9 and the lower row by reference numeral 11.
- the joining lugs are so positioned that each intermediate launching rail module 1 is hermaphrodite in nature and can therefore connect with any other module.
- Horizontal pins (not shown) can be inserted through aligned holes in cooperating rows of joining lugs in adjacent launching rail modules.
- An end launching rail module 13 is shown in Figures 2A, 2B and 2C.
- the left-hand end of the module in Figures 2A and 2B is equipped with upper and lower rows of joining lugs 15 and 17, corresponding to the rows of joining lugs 9 and 11 described above for the intermediate launching rail module 1.
- the end launching rail module 13 comprises a tapered (when viewed from the side) longitudinal member 19 in the place of the longitudinal member 3 described for the intermediate launching rail module 1.
- the end launching rail module 13 also has lower flanges 21 and 23 and, in this respect, is also of a generally inverted-T shaped section.
- the right-hand end of the end launching rail module 13 shown in Figures 2A and 2B is equipped with opposed horizontally projecting studs 25 and 27 on opposite sides of the module.
- One use of the studs 25 and 27 is to engage with a bearing pad 29, shown in Figures 3A, 3B and 3C.
- the bearing pad 29 is shown in outline in Figures 2A and 2B.
- the purpose of the bearing pad 29 is to distribute the load of a bridge, when formed on the launching rail, on the bank of a span. There will be one bearing pad 29 at each end of the bridge.
- the pads 29 conform to the profile of the toe of the bridge and therefore present their upper surfaces as part of the bridge decking in use.
- Each of the launching rail modules is of a light-weight hollow construction of rectangular section.
- the depth and width of each module is such that it can be accommodated beneath a bridge formed from bridge modules, which will now be described.
- each intermediate bridge module 31 comprises a centre decking 33 and left and right main girder structures 35 and 37 which can pivot about a respective axis 39 or 41 (Figure 4C) to adopt the folded configuration shown in Figure 4D for the purposes of transport.
- the decking 33 for each intermediate module 31 is formed of six generally planar decking members 33a to 33f (Figure 4B), each side of which has a line 43 ( Figure 4E) which, in the open position of the module, bears on a shoulder 45 of the adjacent main girder structure 35.
- a support arm 47 extending from the main girder section 35 bears the pivotal connection between the decking 33 and the main girder structure 35.
- each of the main girder structures 35 and 37 Pivotally mounted on each of the main girder structures 35 and 37 is a respective bracing arm 49 or 51, whose free end engages in a respective slide 53 or 55 ( Figures 4B) at the underneath of the centre deck 33.
- the bracing arms 49 and 51 move in their respective slides 53 and 55 during folding and unfolding of the intermediate bridge modules 31.
- Recessed lifting points 57 and 59 are provided in each main girder structure.
- the module When it is desired to unfold a bridge module from its folded (transport) position shown in Figure 4D to its deployed, open position shown in Figures 4A, 4B and 4C, the module is simply lifted by means of a crane using a sling attached at the lifting points 57 and 59.
- the main girder structures 35 and 37 will swing of their own accord out from under the deck 33.
- the unfolding of the intermediate bridge modules is described in detail in EP-A-0081388 and will not be repeated here, but it should be noted that the length of the sling can be chosen so that the line of action passes almost through the centre of gravity of the cross section of the intermediate bridge modules as they are unfolded. In this way, the load on the sliding bracing arms 49 and 51 and their stops which are mounted in slides 53 and 55 is minimised.
- Shock absorbers can additionally be fitted to reduce shock load.
- the intermediate bridge modules 31 is provided with a recovery sling 61, which comprises wires each attached to a lower portion of a surface of a respective one of the main girder structure 35 and 37 which is inwardly facing when the module is open, the wires terminating in a common ring 63, which is accessible from above the centre deck.
- a recovery sling 61 which comprises wires each attached to a lower portion of a surface of a respective one of the main girder structure 35 and 37 which is inwardly facing when the module is open, the wires terminating in a common ring 63, which is accessible from above the centre deck.
- the module is simply picked up by a crane acting at the ring 63.
- the module will fold to the position shown in Figure 4D. Again, the general principle of the folding process is described in EP-A-0081388 and will not be repeated here.
- the intermediate bridge module As for the dimensions of the intermediate bridge module, it is again 19 feet 6 inches in length (5.94 metres) to be compatible with the ISO 6.1 metre (20 feet) container system. When the module is in its folded condition, it is 8 feet (2.44 metres) in width, again to be compatible with the ISO container requirements, but in its open position the total width of the intermediate bridge module 31 is 13 feet 5 inches (4.1 metres), which is a sufficient width for carrying such heavy vehicle as tanks.
- Each of the main girder structures 35 and 37, over which the tracks of the tanks pass, is 40.5 inches (1.03 metres) in height (in the open position) and 39 inches (1 metre) in width (again in the open position).
- the pin shooting apparatus comprises a bell-crank lever 71, one end of which projects for the operator's use at the outer edge of the main girder structure 35, and the other end of which connects with a pin 73 to push the pin through a nest of joining plates 67 (and 65 of the next module). Pins through upper joining dowels can be inserted by a man on the deck 33 of the bridge module 31.
- the tapered end bridge module 75 shown in Figures 5A to 5D has many features in common with the intermediate bridge module 31, but differs in that the main girder structures 77 and 79 are tapered when seen from the side, when the module is in its open (deployed) position.
- the end module 75 again comprises a deck 81, but this time only five deck members 81a to 81e are provided.
- the deck member at the fully tapered end of the end module 75 (the right-hand in Figures 5A and 5B) is missing: its place is taken in the fully assembed bridge by the bearing pad 29.
- the deck section 81e nearest the fully tapered end is provided with a connection 83 for connecting the module to the launching rail, as will subsequently be described.
- the end bridge module 75 can be opened from a closed position (shown in Figures 5D and 5E) to an open position (shown in Figures 5A, 5B and 5C) by lifting the end module 75 at recessed lifting points 85 and 87 on the deck-extension surfaces of the main girder structures 77 and 79 by means of a crane.
- a recovery sling (not shown) for the reverse operation is also provided. Opening and closing the end modules 75 is again very similar to the process described in EP-A-0081388 and will not be repeated here.
- Bracing arms 89 and 91 each attached to a respective main girder structure (77 or 79) by a pivot extend towards and terminate in slides 93 and 95 under the lower surface of the deck 81. Their purpose is the same as for the intermediate bridge module 31. Joining plates 94, 96, 97 and 99 are also correspondingly positioned for joining the end bridge modules 75 to its adjacent intermediate bridge module 31. A pin shooting mechanism 101 is again provided.
- a difference between the end bridge module 75 and the intermediate bridge module 31 is that the end bridge module 75 is articulated by way of a pivot 103 at a lower portion of the end bridge module adjacent where it is connected to an intermediate bridge module 31.
- the articulation means that the end bridge module is split into a ramp section 105 and a joining section 107.
- the ramp section 105 can be moved relative to the joining section 107 by means of a hydraulic piston and cylinder arrangement 109 mounted at the joining end of each main girder structure 77 and 79.
- the upper surface of the deck 81 is level. This is shown by the discontinuous lines in Figure 5A.
- the lower surfaces of the main girder structures 77 and 79 are level. This is usually, though not exclusively, the position adopted when the bridge is in use for carrying traffic.
- This configuration is shown in solid lines in Figure 5A.
- the gap 111 can be filled in use by a deck compression unit 113, which is a planar narrow deck extension unit. Hydraulic pressure in the piston and cylinder arrangement 109 can be relaxed once the deck compression unit is in place.
- the maximum overall dimensions for the end bridge module 75 are the same as for the intermediate bridge module 31.
- Figures 6A, 6B and 6C show an inter-trackway bracing frame.
- One of these is located under the deck at each end of the bridge formed from end and intermediate bridge modules 75 and 31 and allows the bridge to be supported on a launching rail, formed from launching rail end and intermediate modules 13 and 1, during booming out.
- the bracing frame 115 also braces the bridge in the open position.
- Each bracing frame 115 is fitted to one of the end bridge modules 75 and is located in the jaws at the joining section 107 of each end bridge module 75.
- the bracing frame 115 consists of a portal frame 117, on the inside of each upright of which is mounted a flanged wheel 119 or 121 on a horizontal axis for supporting the bridge on flanges of the launching rail (shown in dotted lines in Figure 6C). Additional supports 123 and 125 extend outwardly from the uprights to make further engagement with the end bridge module 75. Additional vertical bracing 127 and 129 extends between the supports 123 and 125 on the one hand and the cross member of the portal frame 117 on the other hand.
- FIGS 7A to 7E give an overall view of a bridge 131 after construction.
- the bridge comprises three intermediate bridge modules 31 and two end bridge modules 75. These can clearly be seen in the side and plan views of Figures 7A and 7B.
- Underneath the deck of the bridge 131 can be seen (in dotted lines in Figure 7B) a launching rail 133, which is itself formed of intermediate modules 1 and end modules 13.
- a bracing frame 115 can be seen in position in Figure 7D.
- FIGs 7A and 7B show how the bridge 131 would be configured when spanning a gap between substantially level banks. Both bridge end modules are fully articulated. On the other hand, in Figure 7E, the end module 75 is not articulated. This reduces the ramp slope at the end of the bridge and renders it more suitable for use on a sloping bank.
- FIG 8 shows a trestle 135, which is the subject of one aspect of.the invention and which can be used in accordance with a method of the invention.
- the trestle 135 comprises a pair of upright guide posts 137 and 139 of rectangular section, between which is movably and lockably mounted a support beam 141.
- the support beam 141 is constructed of two support beam members 143 and 145, interconnected by a number of spacers 147.
- Each guide post 137 or 139 is mounted on a respective anvil-shaped beam 149 or 151, which is in turn supported on the respective base plate 153 or 155. Free ends of the anvil-shaped beams 149 and 151 are spaced from their respective base plate 153 or 155 by means of limit screws 157.
- the limit screws 157 are manually adjustable to give longitudinal level adjustment for the trestle 135.
- the support beam 141 moves and is locked with respect to the guide posts 137 and 139 by means of hydraulic piston and cylinder arrangements 159 and 161, one associated with each guide post. Hydraulic fluid for the piston and cylinder arrangements 159 and 161 are supplied from a trestle hydraulic power pack supply (not shown).
- rollers 163 and 165 are launching rail support rollers powered by the trestle hydraulic power pack supply. They are flanged and have a surface with a high coefficient of friction so that they can drive the launching rail 133 shown in discontinuous lines in Figures 8 in the direction of the arrow 167, which is the direction of launching the launching rail 133, and eventually, the bridge 131.
- the launching rail support rollers 163 and 165 are centrally disposed along the support beam 141.
- each of the launching rail support rollers 163 and 165 is a respective retractable pinch wheel 167 or 169 mounted, like the launching rail support rollers, for rotation about a horizontal axis.
- the rotatable pinch wheels 167 and 169 bear upon the upper surfaces of the flanges 5 and 7 (see Figures 1C) of each of the launching rail modules.
- the pinch wheels 167 and 169 can be retracted by hydraulic piston and cylinder arrangements 171 and 173, respectively.
- Either side of the launching rail support rollers is a pair of bridge support rollers 175 and 177. They are again mounted for horizontal rotation. The pairs of bridge support rollers 175 and 177 support the lower surfaces of the main girder structures of the bridge 131, but are not powered. They are therefore passive, low-friction supports. Lateral guide rollers 179, mounted for vertical non-powered rotation, are position one either side of the path of the main girder structures of the bridge 131 during launching.
- Two hydraulically retractable launching rail hooks 181 are mounted on the support beam 141 and extend in a downstream direction (as far as the direction of launch is concerned). They terminate in upwardly curved hooked portions. The hooks can pivot about horizontal axes to bring them out of and into engagement with the protrusions 25 and 27, respectively, (see Figures 2B) of a tapered end module 13 of the launching rail 133.
- FIG 8A shows an alternative construction of the trestle 135, in which longitudinal level adjustment is achieved in a different way.
- the anvil shaped beams 149 and 151 are absent, and instead sloping tie rods or braces 150 and 152 are pivotally attached at their upper ends each to a respective one of the guide posts 137 and 139 and at their lower ends each to a respective one of the base plates 153 and 155.
- the length of each of the tie rods 150 and 152 can be adjusted in a similar fashion to a turnbuckle, as will be described later, with reference to Figure 9A.
- a second trestle 183 is shown in Figure 9. Two of these second trestles 183 are used in the preferred method of construction of the present invention.
- the second trestle 183 is broadly similar to the first trestle 135 except that (a) the second trestle 183 does not have to be of such heavy construction as the first trestle 135 because, in use, it does not have to withstand such heavy loading, and (b) the only interaction between the second trestle 183 and the launching girder 133 is such that the launching girder 133 is supported by non-powered rollers.
- the second trestle 183 comprises a pair of vertical guide posts 185 and 187 which movably and lockably support a support beam 189 composed of two parallel girders 191 and 193 between which extend spacing members 195.
- Each of the guide posts 185 and 187 terminates at its lower end on a respective anvil-shaped member 197 or 199 whose centre portion rests on a respective baseplate 201 or 203.
- Adjusting screws 205 allow for longitudinal level adjustment as with the first roller.
- a flanged roller 207 or 209 Either side of the centre of the length of the support beam 189 is a flanged roller 207 or 209, both of which act as launching rail support rollers.
- Pairs of bridge support rollers 211 and 123 are provided, as for the first trestle, as are lateral guide rollers 215, which are rotatable about a vertical axis and which limit lateral movement of the bridge modules 131 during construction of the bridge.
- the vertical movement of the support beam 189 towards and away from the ground is provided by a pair of hydraulic piston and cylinder arrangements 217 and 219, each mounted on a respective guide post 185 or 187.
- Figure 9A shows an alternative construction of the second trestle 183, in which longitudinal level adjustment is achieved in a different way.
- the Figure 9A construction differs from the Figure 9 construction in the same way that the Figure 8A construction of the first trestle 135 differed from the Figure 8 construction.
- the anvil shaped beams 197 and 199 are absent, and instead sloping tie rods or braces 198 and 200 are pivotally attached at their upper ends each to a respective one of the guide posts 185 and 187 and at their lower ends each to a respective one of the baseplates 201 and 203.
- the length of each of the tie rods 198 and 200 can be adjusted in a similar fashion to a turnbuckle.
- each tie rod (198 in this case) comprising an upper tie rod end 198A and a lower tie rod end 198B, which are formed at the ends that are not pivotally attached to the guide post 185 or the base plate 201 with left and right hand screw threads, respectively.
- the threaded ends of the upper and lower tie rod ends 198A and 198B both engage female-threaded ends of a central tube 198C, which carries a handwheel 198D.
- the central tube 198C lies along the central axis of the handwheel 198D.
- a levelling means which comprises a tie rod of adjustable length extending between and pivotally attached to a guide post and a base plate, has the following two advantages. First, need for coordinating the adjustment of the two adjusting screws 205 ( Figure 9) - that is, slackening one off before (or while) the other screw is being extended - is avoided. Secondly, the support beam 189 can be lowered further in view of the absence of the anvil shaped beams 197 and 199 ( Figure 9).
- a bridge by the preferred method in accordance with the present invention, it is particularly appropriate to use two hydraulic power packs.
- One would be positioned on the bridge under construction and would be used for articulating the bridge end modules 75 by means of the piston and cylinder arrangements 109.
- the other power pack would be located on the home bank and would be for raising and lowering the support beams 141 and 189 of the first and second trestles 135 and 183 and also for powering the friction drive rollers 163 and 165 of the first trestle, for moving the retractable pinch wheels 167 and 169 into and out of position and for moving the launching rail hooks 181 into and out of position.
- Each portable hydraulic power pack can be powered by an air-cooled diesel engine of about 10 horsepower (7.5 kiloWatts) driving a variable displacement pump working at a pressure of 300 psi (20.6 MN/m2).
- the engine would be provided with hand or inertia start to obviate the need for batteries.
- Spare power units could be provided as a precaution against breakdown.
- an emergency hand pump could be provided to enable the bridge to be jacked down in the event of power failure. Recovery, however, would hardly be feasible with a manual pump, due to the height to which the bridge has to be jacked.
- FIGS 10A to 10G illustrate a method of constructing a bridge in accordance with the invention.
- the bridge illustrated is to be built of a total of five bridge modules (three intermediate bridge modules 71 and two end bridge modules 75) and is capable of reaching a span of 100 feet (30.5 metres) (nominal). For spans above 100 feet (30.5 metres) to 160 feet (48.8 metres), link reinforcement would be required. However, as some 95% of gaps in north-west Europe do not exceed 100 feet (30.5 metres), it is not foreseen that this will be a problem. Before construction proper can begin, all the components must be brought to the home bank. The components needed are as follows:
- the first trestle 135 is placed close to an parallel with the home bank.
- the second trestle 183 is placed parallel to the first trestle but some 15 feet (4.6 metres) parallel to and behind the first trestle 135.
- a first hydraulic power pack 223 is placed near the trestles in such a place that it can service the hydraulic requirements of the two trestles 135 and 183.
- an end launching rail module 13 is placed on two trestles with its toe towards the far bank.
- An end bearing pad 29 may be in position on the toe of the end launching rail module 13.
- the crane 221 now lifts an intermediate launching rail module 1 into position for connection behind the end launching rail module 13. Because the intermediate launching rail modules only weigh 0.8 tonnes, it is not necessary for the crane 221 to be chocked at this stage.
- FIG 10B shows a second intermediate launching rail 1 being brought into position behind the first intermediate launching rail module 1, to which it is coupled.
- the launching rail being formed is boomed forward using a friction drive roller of the first trestle 135. This is done first to keep the centre of gravity of the launching rail being formed between the first and second trestles 135 and 183.
- a third trestle 225 of identical construction to the second trestle 183, is placed towards the back of the launching rail being formed.
- the crane 221 is moved to its final position, where it is chocked by means of outriggers and jacks, as shown in Figure 10C.
- a further intermediate launching rail module 1 is then lifted into position on the launching rail being formed.
- a second launching rail end module 13 is lifted into position to complete the launching rail.
- the second trestle 183 can be removed, the weight of the launching rail being entirely supported now by the first and third trestles 135 and 225; it should be noted that the first power pack 223 continues to service the requirements of the first and third trestles 135 and 225.
- a first bridge module (which will be an end bridge module 75) has been put in position on the launching rail.
- the positioning of the end bridge module 75 is shown in Figure 10B.
- the end bridge module 75 will have been deployed in its unfolded position before fitting on the launching rail.
- a first roller bracing frame 115 is fitted between the trackways of the end bridge module 75, which is connected by means of a tension connection at position W (Fgiure 10E) to the launching rail.
- the end bridge module 75 is articulated upwards (in the position shown by the discontinuous lines in Figure 5A) so that the upper chord is approximately horizontal.
- a second hydraulic power pack 227 is positioned on the bridge deck and hydraulically connected to the piston and cylinder arrangements 109 of the end bridge module 75.
- the droop of the launching rail can be counteracted by hydraulic adjustment of the articulation of the end launching rail module 75.
- the position of the support beam 141 of the first trestle 135 can be adjusted vertically by means of the hydraulic piston and cylinder arrangements 159 and 161 of the first trestle 135.
- Figure 10I shows the second end bridge module 75 being connected to the bridge.
- the second end bridge module 75 is articulated so that its lower chord is approximately horizontal.
- a second bracing frame is inserted between the trackways.
- the bridge is ready for launching and jacking down. Because the bridge has been driven forward as each bridge module 31 or 75 has been added, the far end of the launching rail will be over the far bank when the second end bridge module 75 is assembled.
- the launching rail must be driven as far forward as possible until the projections 25 and 27 of the second end launching rail module 13 are located in the hooks 181 of the first trestle 135.
- the bearing pad 29 on the first end launching rail module 13 can now be landed on the far bank by articulating the first end bridge module 75 and/or by lowering the support beam 141 of the first trestle 135.
- the launching rail now becomes a simply supported beam over which the bridge can be launched.
- the connection at W is now released and the bridge pushed across the gap or span by means of a booming vehicle, which could be the crane 221. This is shown in Figure 10K.
- the first end bridge module 75 is articulated downwards by using the second power pack 227 so that the launching rail is relieved of the load of the bridge.
- the deck compression unit 113 as shown in Figure 11A, is inserted to transmit the top chord compressive load.
- the piston and cylinder arrangements 109 of the first end bridge module 75 can then be relaxed. Note that, as the ramps of the first end bridge module 75 are articulated downwards, the launching rail can move downwards from the roller bracing frame 115, thus relieving rollers 119 and 121 ( Figure 6C) of any load.
- the second hydraulic power pack 227 can now be disconnected and moved back along the bridge ready to jack down on the home bank.
- the first stage of jacking down on the home bank ( Figure 10M and Figures 12A, B and C) involes making a tension connection between the launching rail and the bridge at point X.
- the hooks 181 of the first trestle 135 are retracted to disengage them from the protrusions 25 and 27 on the second end launching rail module 13.
- the weight of the home bank end of the bridge is borne by the toe of the second end bridge module 75 on the support beam 141 of the first trestle 135.
- the ramps of the second end bridge module 75 are then articulated upwards so that the toe of the second end launching rail module 13 will be lowered to the ground and into its seating in a second bearing pad 29, which has been positioned there to receive it.
- the launching rail can now support the weight of the bridge while the ramps of the second end bridge module 75 are articulated upwards to free the first trestle 135, which can be removed by the crane 221.
- the tension connection at X is now released and the ramps of the second end bridge module 75 are articulated downwards at the far end so as to relieve load on the launching rail and to allow a deck compression unit 113 to be inserted.
- the bridge is now ready for traffic.
- the launching rail remains in the bridge, ready for recovery, which can take place from either end, due to the symmetrical construction of the bridge.
- the lower connecting pins joining the end launching rail modules 13 to their respective neighbouring intermediate launching rail modules 1 can be removed. In this way, it is possible to reduce the end slope of the bridge, or even to have the level deck, by reducing the width of the deck compression units 113 shown in Figure 5A, if the lower launching rail connecting pins are also removed.
- each end launching rail module 13 and each intermediate launching rail module 1 is provided with a tension connection for connection to the centre decking of the bridge at the appropriate point.
- the sequence for recovery and dismantling the bridge is essentially the reverse of the launching sequence.
- the timing may be comparable.
- a bridge of MLC 70 capability can readily be built with the minimum of specialist equipment and no specialist vehicles. It is anticipated that a nominal 100 feet (30.5 metres) span could be bridged with the aid of a crane and six men in less than 30 minutes by night. The 4 metre wide deck presented by the bridge in use should be sufficient for conveying the majority of ground based military equipment across the span.
Abstract
A method of constructing a modular bridge across a span, comprises placing at least a first trestle (135) on the home bank of the span, placing a first module (13) of a modular launching rail on the trestle, connecting one or more subsequent launching rail modules (1,13) to the launching rail being formed, placing a first bridge module (75) on the launching rail, connecting one or more subsequent bridge modules (31, 75) to the bridge being formed, booming out the launching rail across the span and launching the bridge across the span along the launching raill
Description
- This invention relates to a method of constructing a modular bridge across a span and to apparatus for use in such a method.
- In military operations, it is desirable, if not essential, to have a capability for allowing heavy ground equipment, such as tanks, to cross difficulties in terrain. Such difficulties may include gaps formed by ditches, canals and rivers. Although the construction of a bridge for light vehicles is comparatively straight forward, providing a bridge which is capable of supporting a tank is of considerably greater difficulty.
- EP-A-0081389 discloses a modular bridge comprising at least one intermediate bridge module and two end bridge modules, each of the bridge modules comprising two longitudinal main girder structures and an intermediate deck having a deck surface, the main girder structures being foldably connected one along each side of the deck and being foldable from an operative position in which the main girder structures offer extensions of the deck surface on either side of the deck for use to a closed position in which the main girder structures are folded beneath the deck, the main girder structures of the end bridge modules being longitudinally tapered in depth when seen from a side of the module in its operative position, the main girder structures of the intermediate module(s) not being so tapered, wherein each of the end bridge modules and the intermediate bridge module(s), are connected to form a bridge.
- EP-A-0081388 discloses the construction of such bridge by putting up a building frame, having upwardly facing rollers, on the first bank of the span to be crossed. A preliminary beam is assembled on the frame and pushed outwards towards the bank. The bridge assembly is assembled progressively on the frame, behind the preliminary beam, with the beam being attached to the leading module. The preliminary beam has at its outer end a jacking unit with support rollers so that, when the jacking unit reaches the far bank of the span, it may rest on it and allow the assembly of beam and bridge to roll across the span, the bridge assembly is then lowered onto the bank and the beam withdrawn back through the bridge assembly. This procedure is illustrated in Figures 23A to 23F of EP-A-0081388.
- EP-A-0075671 discloses a demountable non-opening bridge comprising discrete channel-section modules and an H-section launching girder, wherein modules comprise a central part and two wing parts, the wing parts comprise box-section track girders, the two wing parts are downwardly hinging below the central part for transportation, in the laying of the bridge the launching girders are assembled and made first, whereafter the various modules are coupled together and pushed over the launching girder and the launching girder remains in the bridge as a bearing element.
- EP-A-0075671 discloses the construction of such a bridge by the joint use of a laying vehicle having a cantilever arm and a four-tonne crane. The laying vehicle moves to the bank of the span to be crossed with a launching girder ramp (or end) member already in position on guide rollers of the cantilever arm. The cantilever arm comprises a pinion to advance the ramp member over the span by means of a co-operating rack. The crane delivers launching girder inner sections which are coupled up and advanced. Once the launching girder has reached the required length, a second launching girder ramp (end) member is coupled up. The cantilever arm of the laying vehicle is lowered so that the launching girder is then supported by its own hydraulically deployable feet. A ramp (end) bridge module is now lifted by the crane onto the launching girder. Inner (intermediate) bridge modules are coupled up and drawn over the launching girder by means of a block and tackle and reversing roller. The final module is a further ramp (end) module. The hydraulic feet are then retracted. This construction sequence is as illustrated in Figure 6 of EP-A-0075671.
- EP-A-0075611 also discloses the use of a single layer vehicle combining the capabilities of the laying vehicle and crane described above. It is equipped both with a cantilever arm and with a four-tonne crane.
- Finally, CH-A-495468 discloses another method of constructing a modular bridge across a span. Once again, a crane or a specialised vehicle is required to lay the bridge, and to provide a counter-balancing weight on the dome bank side of the launching trestle, to prevent the bridge and launching nose from toppling over as the launching proceeds.
- The present invention enables the construction of a modular bridge across a span without the requirement for specialist vehicles. Furthermore, it is desirable for bridges of this type to be capable of being built quickly, even at night, by few men.
- A trestle having those features set out in the pre-characterising portion of
Claim 1 is disclosed in EP-A-0 081 388. - According to the present invention there is provided a trestle characterised by those features set out in the characterising portion of
Claim 1. - The trestle preferably has one or more rollers for supporting the launching rail, the rollers desirably being drivable to move the launching rail over the beam of the first trestle. The trestle also preferably comprises one or more rollers for supporting the bridge modules.
- The launching rail is preferably of inverted-T shaped configuration. This configuration allows the effective use of lateral guide means, for the launching rail, to be positioned on the trestle. The lateral guide means for the launching rail may comprise retractable pinch wheels. Because of the use of a trestle it is a simple matter also to provide lateral guide means for the bridge modules, which may comprise one or more vertically mounted guide rollers. In addition, the trestle may comprise means for selectively restraining the launching rail during construction: the selective restraining means desirably comprise retractable hooks.
- It is a preferred feature of the trestle that it comprises means for adjusting the level of the trestle.
- In a preferred aspect of the method, a second trestle is placed on the home bank to take a proportion of the load of the modules. The second trestle will desirably be of similar construction to the first trestle, except that it is not necessary for it to be provided with retaining means such as hooks or means for moving the rail over the beam, such as powered rollers.
- Each bridge module is preferably substantially described in EP-A-0081388 in that it comprises two longitudinal main girder structures and an intermediate deck having a deck surface, the main girder structures being foldably connected one along each side of the deck and being foldable between an operative position in which the main girder structures offer extensions of the deck surface on either side of the deck for use and a closed position in which the main girder structures are folded beneath the deck.
- A bridge formed of such modules will normally comprise two end modules, in each of which the main girder structures are longitudinally tapered in depth when seen from the side of the module and at least one intermediate module in which the main girder structures are not so tapered.
- Some preferred features of modules suitable for use in the method of the present invention are the same as or closely similar to the preferred features of the modules disclosed in EP-A-0081388. Thus, it is desirable that the main girder structures be box girder structures; that each main girder structure comprise at least one lifting attachment on a surface offering the extension of the deck surface; that each of the lifting attachments be recessed; that each main girder structure comprise at least one lifting attachment on a surface which is facing a corresponding surface of the other main girder structure when the module is in the operative position; that the deck comprise two lip portions and that each of the main girder structures comprise a shoulder portion, each of which lip portions stays on a respective one of the shoulder portions when the module is in the operative position; and/or that the module further comprise a bracing means between the main girder structure for bracing the module when in the operative position.
- In EP-A-0081388, the disclosed bracing means comprised steel bracing wires. In a preferred module suitable for use in the present invention, the bridge modules preferably comprise bracing arms, one end of each of which is pivotably attached either to a main girder structure or to the deck surface, and the other end of which is receivable in a slide in the other of the main girder structure and the deck. Preferably, the bracing arm is pivotably attached to a main girder structure and receivable in a slide in the deck.
- A further preferred feature of a bridge module usable in the present invention concerns means for joining adjacent bridge modules. In EP-A-0081388, joining plates are provided at each end of each of the intermediate bridge modules and at the inner end of each of the end modules. Each joining plate would be provided with a hole to receive a pin when joining plates of adjacent bridge modules are placed together. So much is similar with the present case. In the prior disclosure, however, pairs of joining plates would be provided at one end of the bridge module and would be adapted to lie either side of single joining plates of adjacent bridge modules. A pin would be manually inserted through the resulting laminate of joining plates to hold the modules together. In the present case, there are two improvements to this structure. First, the arrangement of joining plates is hermaphrodite in nature. It therefore does not matter which way round the intermediate bridge modules are. Secondly, means may be provided for remotely inserting a pin through a laminate of joining plates, each of which is provided with a pin-receiving hole. Such means may take the form of a bell-crank lever, adapted to be operable from the side of a bridge module when in position on the launching rail and arranged to move a pin through a laminate of joining plates. By this arrangement, it is not necessary for a man to go underneath the bridge during construction, thereby saving time.
- A preferred feature of the method of the invention involves the use of means for altering the angle of approach offered by one or both of the end bridge modules. Such means may take the form of a hydraulically operable articulating ram for moving a tapered portion of the end bridge module with respect to a connecting portion of the module, which is adapted to connect to the end module to an adjacent intermediate module. One or more filling elements may be inserted in the end module so that the hydraulic cylinders can be relaxed after articulation.
- It is particularly appropriate for further module bracing means, in addition to or instead of those described previously, to be provided. To this end, each bridge, comprising a number of modules, may be provided with a sub-frame for bracing frame for (a) bracing the bridge in the open position and (b) supporting the bridge on the launching rail so that it can be boomed out across the span. A sub-frame may be provided at each end of a bridge, preferably being located at the inner end of each of the end modules. Each sub-frame preferably has a pair of rollers, one for bearing on each flange of the inverted T-section of the launching rail.
- For a better understanding of the present invention, and to show how it may be put into effect, reference will now be made by way of example to the accompanying drawings, in which:-
- Figures 1A, 1B and 1C show side elevation, plan and end views of an intermediate launching rail module;
- Figures 2A, 2B and 2C show side elevation, plan and end views of an end launching rail module;
- Figures 3A, 3B and 3C show side elevation, plan and end views of a bearing pad for use in conjunction with an end module of a launching rail;
- Figures 4A, 4B and 4C show side elevation, plan and end views of an intermediate bridge module in its open position;
- Figure 4D shows an end view of the module in its folded position; and
- Figure 4E shows a detail of construction of the intermediate bridge module;
- Figures 5A, 5B and 5C show side elevation, plan and end views of an end bridge module in its open position;
- Figure 5D shows an end view of such module in its folded position; and
- Figure 5E shows a partial underneath view of a folded end module;
- Figures 6A, 6B and 6C show side elevation, plan and end views of a sub-frame for bracing a bridge and for supporting bridge modules on a launching rail;
- Figures 7A, 7B and 7C show side elevation, plan and end views of an assembled bridge;
- Figure 7D shows an enlarged section on D-D of Figure 7A; and
- Figure 7E shows a side elevation view of an alternative configuration of the end of a bridge;
- Figure 8 shows a perspective view of a first embodiment of a first trestle for use in constructing a bridge;
- Figure 8A shows a perspective view of a second embodiment of the first trestle;
- Figure 9 shows a perspective view of a first embodiment of a second trestle for use in constructing a bridge;
- Figure 9A shows a perspective view of a second embodiment of the second trestle;
- Figures 10A to 10N show successive steps in constructing a bridge in accordance with the invention;
- Figures 11A and 11B show steps in completing the construction of the bridge at the far bank; and
- Figures 12A, 12B and 12C show concluding stages of the construction of the bridge at the home bank.
- Referring now to the drawings, Figures 1A to 1C and Figures 2A to 2C show the modules from which the launching rail used in the invention is built up. Figures 1A, 1B and 1C show an
intermediate launching rail 1, which is of a length of 19 feet 6 inches (5.94 metres) which ensures that the launching rail modules are compatible for transport with the ISO 6.1 metres (20 feet) container system. Each intermediate launching rail module weighs about 0.8 tonnes and comprises a longitudinalupstanding member 3 which carries, at its lower edge, a pair offlanges - At the upper and lower edges of each of each intermediate
launching rail module 1 is a row of joining lugs for connecting the module with an adjacent module. The upper row of lugs is designated by reference numeral 9 and the lower row byreference numeral 11. The joining lugs are so positioned that each intermediatelaunching rail module 1 is hermaphrodite in nature and can therefore connect with any other module. Horizontal pins (not shown) can be inserted through aligned holes in cooperating rows of joining lugs in adjacent launching rail modules. - An end launching
rail module 13 is shown in Figures 2A, 2B and 2C. The left-hand end of the module in Figures 2A and 2B is equipped with upper and lower rows of joining lugs 15 and 17, corresponding to the rows of joininglugs 9 and 11 described above for the intermediatelaunching rail module 1. The end launchingrail module 13 comprises a tapered (when viewed from the side)longitudinal member 19 in the place of thelongitudinal member 3 described for the intermediatelaunching rail module 1. The end launchingrail module 13 also haslower flanges rail module 13 shown in Figures 2A and 2B is equipped with opposed horizontally projectingstuds studs bearing pad 29, shown in Figures 3A, 3B and 3C. Thebearing pad 29 is shown in outline in Figures 2A and 2B. The purpose of thebearing pad 29 is to distribute the load of a bridge, when formed on the launching rail, on the bank of a span. There will be one bearingpad 29 at each end of the bridge. Thepads 29 conform to the profile of the toe of the bridge and therefore present their upper surfaces as part of the bridge decking in use. - Each of the launching rail modules is of a light-weight hollow construction of rectangular section. The depth and width of each module is such that it can be accommodated beneath a bridge formed from bridge modules, which will now be described.
- As can be seen from Figures 4A, 4B and 4C, which illustrate an
intermediate bridge module 31 in its open state, the modules envisaged for use in the present invention are substantially the same as those disclosed in EP-A-0081388, the disclosure of which is incorporated by reference into this application. Eachintermediate bridge module 31 comprises acentre decking 33 and left and rightmain girder structures respective axis 39 or 41 (Figure 4C) to adopt the folded configuration shown in Figure 4D for the purposes of transport. - The
decking 33 for eachintermediate module 31 is formed of six generallyplanar decking members 33a to 33f (Figure 4B), each side of which has a line 43 (Figure 4E) which, in the open position of the module, bears on ashoulder 45 of the adjacentmain girder structure 35. Asupport arm 47 extending from themain girder section 35 bears the pivotal connection between thedecking 33 and themain girder structure 35. - Pivotally mounted on each of the
main girder structures arm respective slide 53 or 55 (Figures 4B) at the underneath of thecentre deck 33. The bracingarms respective slides intermediate bridge modules 31. - Recessed lifting points 57 and 59 are provided in each main girder structure. When it is desired to unfold a bridge module from its folded (transport) position shown in Figure 4D to its deployed, open position shown in Figures 4A, 4B and 4C, the module is simply lifted by means of a crane using a sling attached at the lifting points 57 and 59. The
main girder structures deck 33. The unfolding of the intermediate bridge modules is described in detail in EP-A-0081388 and will not be repeated here, but it should be noted that the length of the sling can be chosen so that the line of action passes almost through the centre of gravity of the cross section of the intermediate bridge modules as they are unfolded. In this way, the load on the sliding bracingarms slides - As can be seen in Figure 4C the
intermediate bridge modules 31 is provided with arecovery sling 61, which comprises wires each attached to a lower portion of a surface of a respective one of themain girder structure common ring 63, which is accessible from above the centre deck. To close theintermediate module 31, the module is simply picked up by a crane acting at thering 63. Of its own accord, the module will fold to the position shown in Figure 4D. Again, the general principle of the folding process is described in EP-A-0081388 and will not be repeated here. - As for the dimensions of the intermediate bridge module, it is again 19 feet 6 inches in length (5.94 metres) to be compatible with the ISO 6.1 metre (20 feet) container system. When the module is in its folded condition, it is 8 feet (2.44 metres) in width, again to be compatible with the ISO container requirements, but in its open position the total width of the
intermediate bridge module 31 is 13feet 5 inches (4.1 metres), which is a sufficient width for carrying such heavy vehicle as tanks. Each of themain girder structures - Successive bridge modules are coupled together by means of nesting
hermaphrodite joining plates main girder structures plates 67 are located in Figures 4C. To obviate the need for a man to climb under the bridge during construction, a remotepin shooting apparatus 69 is provided. The pin shooting apparatus comprises a bell-crank lever 71, one end of which projects for the operator's use at the outer edge of themain girder structure 35, and the other end of which connects with apin 73 to push the pin through a nest of joining plates 67 (and 65 of the next module). Pins through upper joining dowels can be inserted by a man on thedeck 33 of thebridge module 31. - The tapered
end bridge module 75 shown in Figures 5A to 5D has many features in common with theintermediate bridge module 31, but differs in that themain girder structures end module 75 again comprises adeck 81, but this time only fivedeck members 81a to 81e are provided. The deck member at the fully tapered end of the end module 75 (the right-hand in Figures 5A and 5B) is missing: its place is taken in the fully assembed bridge by thebearing pad 29. Thedeck section 81e nearest the fully tapered end is provided with aconnection 83 for connecting the module to the launching rail, as will subsequently be described. - As with the
intermediate bridge module 31, theend bridge module 75 can be opened from a closed position (shown in Figures 5D and 5E) to an open position (shown in Figures 5A, 5B and 5C) by lifting theend module 75 at recessed lifting points 85 and 87 on the deck-extension surfaces of themain girder structures end modules 75 is again very similar to the process described in EP-A-0081388 and will not be repeated here. - Bracing
arms slides deck 81. Their purpose is the same as for theintermediate bridge module 31. Joiningplates end bridge modules 75 to its adjacentintermediate bridge module 31. Apin shooting mechanism 101 is again provided. - A difference between the
end bridge module 75 and theintermediate bridge module 31 is that theend bridge module 75 is articulated by way of a pivot 103 at a lower portion of the end bridge module adjacent where it is connected to anintermediate bridge module 31. The articulation means that the end bridge module is split into aramp section 105 and a joiningsection 107. Theramp section 105 can be moved relative to the joiningsection 107 by means of a hydraulic piston andcylinder arrangement 109 mounted at the joining end of eachmain girder structure deck 81 is level. This is shown by the discontinuous lines in Figure 5A. At the other extent of the articulation, the lower surfaces of themain girder structures deck compression unit 113, which is a planar narrow deck extension unit. Hydraulic pressure in the piston andcylinder arrangement 109 can be relaxed once the deck compression unit is in place. - The maximum overall dimensions for the
end bridge module 75 are the same as for theintermediate bridge module 31. - Figures 6A, 6B and 6C show an inter-trackway bracing frame. One of these is located under the deck at each end of the bridge formed from end and
intermediate bridge modules intermediate modules - The bracing
frame 115 also braces the bridge in the open position. Each bracingframe 115 is fitted to one of theend bridge modules 75 and is located in the jaws at the joiningsection 107 of eachend bridge module 75. The bracingframe 115 consists of aportal frame 117, on the inside of each upright of which is mounted aflanged wheel Additional supports end bridge module 75. Additional vertical bracing 127 and 129 extends between thesupports portal frame 117 on the other hand. - Figures 7A to 7E give an overall view of a
bridge 131 after construction. The bridge comprises threeintermediate bridge modules 31 and twoend bridge modules 75. These can clearly be seen in the side and plan views of Figures 7A and 7B. Underneath the deck of thebridge 131 can be seen (in dotted lines in Figure 7B) a launchingrail 133, which is itself formed ofintermediate modules 1 and endmodules 13. A bracingframe 115 can be seen in position in Figure 7D. - Figures 7A and 7B show how the
bridge 131 would be configured when spanning a gap between substantially level banks. Both bridge end modules are fully articulated. On the other hand, in Figure 7E, theend module 75 is not articulated. This reduces the ramp slope at the end of the bridge and renders it more suitable for use on a sloping bank. - Figure 8 shows a
trestle 135, which is the subject of one aspect of.the invention and which can be used in accordance with a method of the invention. Thetrestle 135 comprises a pair of upright guide posts 137 and 139 of rectangular section, between which is movably and lockably mounted asupport beam 141. Thesupport beam 141 is constructed of twosupport beam members spacers 147. - Each
guide post beam respective base plate beams respective base plate trestle 135. - The
support beam 141 moves and is locked with respect to the guide posts 137 and 139 by means of hydraulic piston andcylinder arrangements cylinder arrangements - Between the
members support beam 141 are mounted a variety of rollers. Two of them, 163 and 165, are launching rail support rollers powered by the trestle hydraulic power pack supply. They are flanged and have a surface with a high coefficient of friction so that they can drive the launchingrail 133 shown in discontinuous lines in Figures 8 in the direction of thearrow 167, which is the direction of launching the launchingrail 133, and eventually, thebridge 131. The launchingrail support rollers support beam 141. Above each of the launchingrail support rollers retractable pinch wheel rotatable pinch wheels flanges 5 and 7 (see Figures 1C) of each of the launching rail modules. When theretractable pinch wheels rail support rollers rail 133 when driving it. Thepinch wheels cylinder arrangements - Either side of the launching rail support rollers is a pair of
bridge support rollers bridge support rollers bridge 131, but are not powered. They are therefore passive, low-friction supports.Lateral guide rollers 179, mounted for vertical non-powered rotation, are position one either side of the path of the main girder structures of thebridge 131 during launching. - Two hydraulically retractable launching rail hooks 181 are mounted on the
support beam 141 and extend in a downstream direction (as far as the direction of launch is concerned). They terminate in upwardly curved hooked portions. The hooks can pivot about horizontal axes to bring them out of and into engagement with theprotrusions tapered end module 13 of the launchingrail 133. - Figure 8A shows an alternative construction of the
trestle 135, in which longitudinal level adjustment is achieved in a different way. The anvil shapedbeams base plates tie rods - A
second trestle 183 is shown in Figure 9. Two of thesesecond trestles 183 are used in the preferred method of construction of the present invention. Thesecond trestle 183 is broadly similar to thefirst trestle 135 except that (a) thesecond trestle 183 does not have to be of such heavy construction as thefirst trestle 135 because, in use, it does not have to withstand such heavy loading, and (b) the only interaction between thesecond trestle 183 and the launchinggirder 133 is such that the launchinggirder 133 is supported by non-powered rollers. - The
second trestle 183 comprises a pair of vertical guide posts 185 and 187 which movably and lockably support asupport beam 189 composed of twoparallel girders 191 and 193 between which extendspacing members 195. Each of the guide posts 185 and 187 terminates at its lower end on a respective anvil-shapedmember respective baseplate screws 205 allow for longitudinal level adjustment as with the first roller. - Either side of the centre of the length of the
support beam 189 is aflanged roller bridge support rollers lateral guide rollers 215, which are rotatable about a vertical axis and which limit lateral movement of thebridge modules 131 during construction of the bridge. Again, the vertical movement of thesupport beam 189 towards and away from the ground is provided by a pair of hydraulic piston andcylinder arrangements respective guide post - Figure 9A shows an alternative construction of the
second trestle 183, in which longitudinal level adjustment is achieved in a different way. The Figure 9A construction differs from the Figure 9 construction in the same way that the Figure 8A construction of thefirst trestle 135 differed from the Figure 8 construction. The anvil shapedbeams baseplates tie rods tie rod 198, by each tie rod (198 in this case) comprising an uppertie rod end 198A and a lowertie rod end 198B, which are formed at the ends that are not pivotally attached to theguide post 185 or thebase plate 201 with left and right hand screw threads, respectively. (Which has the left thread and which has the right does not matter, as long as there is one of each.) The threaded ends of the upper and lower tie rod ends 198A and 198B both engage female-threaded ends of a central tube 198C, which carries ahandwheel 198D. The central tube 198C lies along the central axis of thehandwheel 198D. By turning thehandwheel 198D, the length of thetie rod 198 can be increased or decreased in order to keep the guide post near vertical. The same principle applies to the second embodiment of thefirst trestle 135 shown in Figure 8A. - The use of such a levelling means, which comprises a tie rod of adjustable length extending between and pivotally attached to a guide post and a base plate, has the following two advantages. First, need for coordinating the adjustment of the two adjusting screws 205 (Figure 9) - that is, slackening one off before (or while) the other screw is being extended - is avoided. Secondly, the
support beam 189 can be lowered further in view of the absence of the anvil shapedbeams 197 and 199 (Figure 9). This is significant when jacking down the home bank end of the bridge (see Figures 12A, 12B and 12C), because the minimum height to which the roller beam can be lowered determines the amount of upward articulation required on the tapered end ramps of the bridge in order to lower the launching rail to the ground. By adopting the alternative construction of Figure 9A, the support beam can be lowered nearer the ground, and the articulation provided on the bridge end ramp can therefore be significantly reduced. - To construct a bridge by the preferred method in accordance with the present invention, it is particularly appropriate to use two hydraulic power packs. One would be positioned on the bridge under construction and would be used for articulating the
bridge end modules 75 by means of the piston andcylinder arrangements 109. The other power pack would be located on the home bank and would be for raising and lowering the support beams 141 and 189 of the first andsecond trestles friction drive rollers retractable pinch wheels - Each portable hydraulic power pack can be powered by an air-cooled diesel engine of about 10 horsepower (7.5 kiloWatts) driving a variable displacement pump working at a pressure of 300 psi (20.6 MN/m²). The engine would be provided with hand or inertia start to obviate the need for batteries. Spare power units could be provided as a precaution against breakdown. In addition, an emergency hand pump could be provided to enable the bridge to be jacked down in the event of power failure. Recovery, however, would hardly be feasible with a manual pump, due to the height to which the bridge has to be jacked.
- Figures 10A to 10G illustrate a method of constructing a bridge in accordance with the invention. The bridge illustrated is to be built of a total of five bridge modules (three
intermediate bridge modules 71 and two end bridge modules 75) and is capable of reaching a span of 100 feet (30.5 metres) (nominal). For spans above 100 feet (30.5 metres) to 160 feet (48.8 metres), link reinforcement would be required. However, as some 95% of gaps in north-west Europe do not exceed 100 feet (30.5 metres), it is not foreseen that this will be a problem. Before construction proper can begin, all the components must be brought to the home bank. The components needed are as follows: - Three intermediate launching rail modules;
- Two end launching rail modules;
- Three intermediate bridge modules;
- Two end bridge modules;
- Two end pads;
- One powered first trestle;
- Two second trestles;
- Two inter-trackway bracing frames; and
- Two hydraulic power packs.
- All these components could be brought to the site on a total of four 8T trucks which, in addition to the standard mobile crane would be all the vehicles needed for the bridge to be constructed. The crane would be expected to have a 3.5 tonne lift at a 15 feet (4.6 metres) outreach. The crane is designated by
reference numeral 221 in Figure 10. - Using the
crane 221 free on wheels, thefirst trestle 135 is placed close to an parallel with the home bank. Thesecond trestle 183 is placed parallel to the first trestle but some 15 feet (4.6 metres) parallel to and behind thefirst trestle 135. A firsthydraulic power pack 223 is placed near the trestles in such a place that it can service the hydraulic requirements of the twotrestles - With the
crane 221 being positioned on the centre line of the bridge to be constructed, and the loaded trucks conveniently positioned alongside, an end launchingrail module 13 is placed on two trestles with its toe towards the far bank. Anend bearing pad 29 may be in position on the toe of the end launchingrail module 13. - The
crane 221 now lifts an intermediatelaunching rail module 1 into position for connection behind the end launchingrail module 13. Because the intermediate launching rail modules only weigh 0.8 tonnes, it is not necessary for thecrane 221 to be chocked at this stage. - Figure 10B shows a second
intermediate launching rail 1 being brought into position behind the first intermediatelaunching rail module 1, to which it is coupled. At this point, the launching rail being formed is boomed forward using a friction drive roller of thefirst trestle 135. This is done first to keep the centre of gravity of the launching rail being formed between the first andsecond trestles - A
third trestle 225, of identical construction to thesecond trestle 183, is placed towards the back of the launching rail being formed. Thecrane 221 is moved to its final position, where it is chocked by means of outriggers and jacks, as shown in Figure 10C. A further intermediatelaunching rail module 1 is then lifted into position on the launching rail being formed. Finally, in this stage of the operation, a second launchingrail end module 13 is lifted into position to complete the launching rail. At this point, thesecond trestle 183 can be removed, the weight of the launching rail being entirely supported now by the first andthird trestles first power pack 223 continues to service the requirements of the first andthird trestles - When the last section (the second end module 13) of the launching rail has been connected, the launching rail is not boomed forward until a first bridge module (which will be an end bridge module 75) has been put in position on the launching rail. The positioning of the
end bridge module 75 is shown in Figure 10B. Theend bridge module 75 will have been deployed in its unfolded position before fitting on the launching rail. At this point, a firstroller bracing frame 115 is fitted between the trackways of theend bridge module 75, which is connected by means of a tension connection at position W (Fgiure 10E) to the launching rail. Note that theend bridge module 75 is articulated upwards (in the position shown by the discontinuous lines in Figure 5A) so that the upper chord is approximately horizontal. In this way theend bridge module 75 is appropriately aligned for connection to an intermediate bridge module. The launching rail is now boomed out by 20 feet (6.1 metres) and anintermediate bridge module 31 is connected to theend bridge module 75, again in its deployed position, connection to theend bridge module 75 is made by connecting pins. The lower chord outer pins are placed by hand. Thelever mechanism 101 used for sliding the lower chord inner pins into position obviate the necessity for a man to go underneath the bridge. The upper chord tension connections can be made by a man standing on the deck. Each time subsequentintermediate bridge modules 31 are added, the bridge, still connected at point W to the launching rail, is moved forward the same distance (20 feet (6.1 metres)) by means of the drive rollers of thefirst trestle 135. - During this phase, a second
hydraulic power pack 227 is positioned on the bridge deck and hydraulically connected to the piston andcylinder arrangements 109 of theend bridge module 75. As building proceeds, the droop of the launching rail can be counteracted by hydraulic adjustment of the articulation of the end launchingrail module 75. As a further adjustment, the position of thesupport beam 141 of thefirst trestle 135 can be adjusted vertically by means of the hydraulic piston andcylinder arrangements first trestle 135. - Figure 10I shows the second
end bridge module 75 being connected to the bridge. The secondend bridge module 75 is articulated so that its lower chord is approximately horizontal. At this point, a second bracing frame is inserted between the trackways. - At this point, the bridge is ready for launching and jacking down. Because the bridge has been driven forward as each
bridge module end bridge module 75 is assembled. The launching rail must be driven as far forward as possible until theprojections rail module 13 are located in thehooks 181 of thefirst trestle 135. Thebearing pad 29 on the first end launchingrail module 13 can now be landed on the far bank by articulating the firstend bridge module 75 and/or by lowering thesupport beam 141 of thefirst trestle 135. The launching rail now becomes a simply supported beam over which the bridge can be launched. The connection at W is now released and the bridge pushed across the gap or span by means of a booming vehicle, which could be thecrane 221. This is shown in Figure 10K. - With the bridge fully launched, jacking down on the far bank can proceed (Figures 10L, 11A and 11B). The first
end bridge module 75 is articulated downwards by using thesecond power pack 227 so that the launching rail is relieved of the load of the bridge. Thedeck compression unit 113, as shown in Figure 11A, is inserted to transmit the top chord compressive load. The piston andcylinder arrangements 109 of the firstend bridge module 75 can then be relaxed. Note that, as the ramps of the firstend bridge module 75 are articulated downwards, the launching rail can move downwards from theroller bracing frame 115, thus relievingrollers 119 and 121 (Figure 6C) of any load. The secondhydraulic power pack 227 can now be disconnected and moved back along the bridge ready to jack down on the home bank. - The first stage of jacking down on the home bank (Figure 10M and Figures 12A, B and C) involes making a tension connection between the launching rail and the bridge at point X. The
hooks 181 of thefirst trestle 135 are retracted to disengage them from theprotrusions rail module 13. At this point, the weight of the home bank end of the bridge is borne by the toe of the secondend bridge module 75 on thesupport beam 141 of thefirst trestle 135. The ramps of the secondend bridge module 75 are then articulated upwards so that the toe of the second end launchingrail module 13 will be lowered to the ground and into its seating in asecond bearing pad 29, which has been positioned there to receive it. The launching rail can now support the weight of the bridge while the ramps of the secondend bridge module 75 are articulated upwards to free thefirst trestle 135, which can be removed by thecrane 221. The tension connection at X is now released and the ramps of the secondend bridge module 75 are articulated downwards at the far end so as to relieve load on the launching rail and to allow adeck compression unit 113 to be inserted. - The bridge is now ready for traffic.
- The launching rail remains in the bridge, ready for recovery, which can take place from either end, due to the symmetrical construction of the bridge.
- It should be noted that if the launching rail is suspended from the tension connection marked X and from a corresponding one at the other end of the bridge, the lower connecting pins joining the end launching
rail modules 13 to their respective neighbouring intermediatelaunching rail modules 1 can be removed. In this way, it is possible to reduce the end slope of the bridge, or even to have the level deck, by reducing the width of thedeck compression units 113 shown in Figure 5A, if the lower launching rail connecting pins are also removed. - It should be mentioned that, to achieve the various tension connections (as mentioned for points W and X) during construction of the bridge, each end launching
rail module 13 and each intermediatelaunching rail module 1 is provided with a tension connection for connection to the centre decking of the bridge at the appropriate point. - The sequence for recovery and dismantling the bridge is essentially the reverse of the launching sequence. The timing may be comparable.
- It can thus be seen that a bridge of MLC 70 capability can readily be built with the minimum of specialist equipment and no specialist vehicles. It is anticipated that a nominal 100 feet (30.5 metres) span could be bridged with the aid of a crane and six men in less than 30 minutes by night. The 4 metre wide deck presented by the bridge in use should be sufficient for conveying the majority of ground based military equipment across the span.
Claims (8)
1. A method of constructing a modular bridge assembly, comprising a bridge and a launching rail, across a span, the method comprising placing at least a first trestle (135) on the home bank of the span, placing a first module (13) of a modular launching rail on the trestle, connecting one or more subsequent launching rail modules (1, 13) to the launching rail being formed, placing a first bridge module (75) on the launching rail, connecting one or more subsequent bridge modules (31, 75) to the bridge being formed, booming out the launching rail across the span and launching the bridge across the span along the launching rail; the method being characterised in that the centre of gravity of the bridge assembly as launching proceeds lies on the home side of the first trestle.
2. A method as claimed in Claim 1, characterised in that the first trestle comprises one or more rollers (163, 165) for supporting the launching rail.
3. A method as claimed in Claim 2, characterised in that the launching rail support rollers (163, 165) are drivable to move the launching rail over the beam of the first trestle.
4. A method as claimed in Claim 2 or 3, characterised in that the first trestle comprises one or more rollers (175, 177) for supporting the bridge assembly.
5. A method as claimed in any one of Claims 1 to 4, characterised in that the first trestle comprises at least one support beam (141) and at least two guide posts (137, 139) for holding the support.
6. A method as claimed in any one of Claims 1 to 5, characterised in that each bridge module comprises two longitudinal main girder structures (35, 37) and an intermediate deck (33) having a deck surface, the main girder structures being foldably connected one along each side of the deck and being foldable between an operative position in which the main girder structures offer extensions of the deck surface on either side of the deck for use and a closed position in which the main girder structures are folded beneath the deck.
7. A method as claimed in any one of Claims 1 to 7, characterised by placing a second trestle (183) on the home bank to take a proportion of the load of the bridge assembly being formed.
8. A method as claimed in Claim 7, characterised in that the second trestle comprises one or more rollers (207, 209) for supporting the launching rail, one or more rollers (209, 211) for supporting the bridge and lateral guide means (215) for the bridge modules.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
GB8415136 | 1984-06-14 | ||
GB8415136 | 1984-06-14 |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP85303530.1 Division | 1985-05-20 |
Publications (1)
Publication Number | Publication Date |
---|---|
EP0392641A1 true EP0392641A1 (en) | 1990-10-17 |
Family
ID=10562406
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP19850303530 Expired - Lifetime EP0164936B2 (en) | 1984-06-14 | 1985-05-20 | Bridge construction |
EP90201084A Withdrawn EP0392641A1 (en) | 1984-06-14 | 1985-05-20 | Bridge construction |
Family Applications Before (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP19850303530 Expired - Lifetime EP0164936B2 (en) | 1984-06-14 | 1985-05-20 | Bridge construction |
Country Status (2)
Country | Link |
---|---|
EP (2) | EP0164936B2 (en) |
DE (1) | DE3585848D1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103215889A (en) * | 2013-04-24 | 2013-07-24 | 中铁工程设计咨询集团有限公司 | Arch bridge foundation used on bad geological conditions and construction method of arch bridge foundation |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
IL79874A0 (en) * | 1986-08-28 | 1986-11-30 | Israel State | Rapid deployment stationary bridge |
FR2619134B1 (en) * | 1987-08-04 | 1990-11-23 | Mediterranee Const Ind | MODULAR BRIDGE WITH FAST IMPLEMENTATION |
US5511268A (en) * | 1994-08-08 | 1996-04-30 | The United States Of America As Represented By The Secretary Of Commerce | Construction of large structures by robotic crane placement of modular bridge sections |
US6895623B2 (en) | 2003-09-09 | 2005-05-24 | James D. Zimmerlee | Pier system and method of construction |
KR101630312B1 (en) * | 2015-11-17 | 2016-06-24 | 한국도로공사 | Rapid bridge replacement construction method using through bridge girder segment |
CN112411348A (en) * | 2020-11-27 | 2021-02-26 | 上海金鹿建设(集团)有限公司 | Construction trestle |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
BE679190A (en) * | 1965-04-09 | 1966-09-16 | ||
CH495468A (en) * | 1969-11-21 | 1970-08-31 | Ferriere Cattaneo Sa | Emergency bridge |
FR2365005A1 (en) * | 1976-09-17 | 1978-04-14 | Magirus Deutz Ag | VEHICLE FOR TRANSPORT AND INSTALLATION OF DECK ELEMENTS |
EP0075671A1 (en) * | 1981-09-30 | 1983-04-06 | DORNIER SYSTEM GmbH | Dismountable bridge |
EP0076597A2 (en) * | 1981-10-05 | 1983-04-13 | The Secretary of State for Defence in Her Britannic Majesty's Government of the United Kingdom of Great Britain and | Bridge module for use in a crane assisted method of building a transportable girder bridge |
EP0081388A2 (en) * | 1981-12-08 | 1983-06-15 | Williams Fairey Engineering Ltd | Transportable bridge structure |
-
1985
- 1985-05-20 EP EP19850303530 patent/EP0164936B2/en not_active Expired - Lifetime
- 1985-05-20 DE DE8585303530T patent/DE3585848D1/en not_active Expired - Lifetime
- 1985-05-20 EP EP90201084A patent/EP0392641A1/en not_active Withdrawn
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
BE679190A (en) * | 1965-04-09 | 1966-09-16 | ||
CH495468A (en) * | 1969-11-21 | 1970-08-31 | Ferriere Cattaneo Sa | Emergency bridge |
FR2365005A1 (en) * | 1976-09-17 | 1978-04-14 | Magirus Deutz Ag | VEHICLE FOR TRANSPORT AND INSTALLATION OF DECK ELEMENTS |
EP0075671A1 (en) * | 1981-09-30 | 1983-04-06 | DORNIER SYSTEM GmbH | Dismountable bridge |
EP0076597A2 (en) * | 1981-10-05 | 1983-04-13 | The Secretary of State for Defence in Her Britannic Majesty's Government of the United Kingdom of Great Britain and | Bridge module for use in a crane assisted method of building a transportable girder bridge |
EP0081388A2 (en) * | 1981-12-08 | 1983-06-15 | Williams Fairey Engineering Ltd | Transportable bridge structure |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103215889A (en) * | 2013-04-24 | 2013-07-24 | 中铁工程设计咨询集团有限公司 | Arch bridge foundation used on bad geological conditions and construction method of arch bridge foundation |
CN103215889B (en) * | 2013-04-24 | 2015-12-02 | 中铁工程设计咨询集团有限公司 | A kind of arch bridge base for poor geological conditions and construction method thereof |
Also Published As
Publication number | Publication date |
---|---|
DE3585848D1 (en) | 1992-05-21 |
EP0164936B2 (en) | 1995-08-09 |
EP0164936A2 (en) | 1985-12-18 |
EP0164936B1 (en) | 1992-04-15 |
EP0164936A3 (en) | 1987-01-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US9334668B2 (en) | Modular drilling rig system | |
US5511268A (en) | Construction of large structures by robotic crane placement of modular bridge sections | |
EP0081388B1 (en) | Transportable bridge structure | |
US4920595A (en) | Solid bridge kit | |
WO1996005375A9 (en) | Construction of large structures by robotic crane placement of modular bridge sections | |
US4663793A (en) | Methods of deploying a bridge of a particular construction | |
US20140026335A1 (en) | System and method for bridge replacement | |
US5549176A (en) | Bridge construction machinery and method for constructing bridges | |
US4665577A (en) | Methods of constructing modular bridges | |
US5511266A (en) | Continuous incrementally erecting viaduct construction system | |
US5940916A (en) | Bridge span-by-span construction apparatus and method | |
EP0155840A2 (en) | Apparatus and method for providing access to the underside of a bridge-deck | |
WO1994020699A1 (en) | Improvement in a collapsible container, housing accommodation, etc. | |
EP0392641A1 (en) | Bridge construction | |
EP0165712B1 (en) | Bridge construction | |
US4062081A (en) | Transportable bridge and method | |
US5443353A (en) | Automatic ramp car | |
EP0541619B1 (en) | Bridge construction system | |
SU1087459A1 (en) | Mobile hoist | |
NL2030208B1 (en) | Erecting a self-climbing tower crane | |
CN114960465B (en) | Swivel construction method for steel tower of chain lifting cable-stayed bridge | |
GB2311506A (en) | A method for loading and unloading aircraft loading/unloading apparatus | |
GB2060559A (en) | Movable hoist | |
CN117230697A (en) | Combined crawler stack bridge vehicle, split-loading transportation method and erection method thereof | |
CN116575350A (en) | Bridge girder erection machine transportation method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 19900521 |
|
AC | Divisional application: reference to earlier application |
Ref document number: 164936 Country of ref document: EP |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): DE FR GB |
|
17Q | First examination report despatched |
Effective date: 19920504 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN |
|
18D | Application deemed to be withdrawn |
Effective date: 19940422 |