EP0377390A1 - Verfahren zur Herstellung von Bimetallrohren und nach diesem Verfahren hergestellte Rohre - Google Patents
Verfahren zur Herstellung von Bimetallrohren und nach diesem Verfahren hergestellte Rohre Download PDFInfo
- Publication number
- EP0377390A1 EP0377390A1 EP89420523A EP89420523A EP0377390A1 EP 0377390 A1 EP0377390 A1 EP 0377390A1 EP 89420523 A EP89420523 A EP 89420523A EP 89420523 A EP89420523 A EP 89420523A EP 0377390 A1 EP0377390 A1 EP 0377390A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- component
- blank
- annular space
- tubular
- alloy
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D—WORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D51/00—Making hollow objects
- B21D51/02—Making hollow objects characterised by the structure of the objects
- B21D51/06—Making hollow objects characterised by the structure of the objects folded objects
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21C—MANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES OR PROFILES, OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
- B21C23/00—Extruding metal; Impact extrusion
- B21C23/22—Making metal-coated products; Making products from two or more metals
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21C—MANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES OR PROFILES, OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
- B21C23/00—Extruding metal; Impact extrusion
- B21C23/01—Extruding metal; Impact extrusion starting from material of particular form or shape, e.g. mechanically pre-treated
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21C—MANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES OR PROFILES, OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
- B21C33/00—Feeding extrusion presses with metal to be extruded ; Loading the dummy block
- B21C33/002—Encapsulated billet
Definitions
- the invention relates to a method of manufacturing bimetallic tubes, the section of which comprises an external annular zone and an internal annular zone of different compositions. It is particularly applicable to steel tubes.
- the invention also relates to the tubes obtained by this method, in particular the steel tubes, as well as the tubular blank enabling the manufacturing method of the invention to be implemented.
- Such tubes can in particular be used whenever only their outer or inner wall is in contact with a fluid whose composition, temperature or other characteristics require the use of a metal or alloy of particular composition and cost relatively high. We can then limit the thickness of the annular zone made of such a metal or alloy and use for the rest of the section of the tube a metal or alloy of much lower cost, whose essential function is then to ensure the holding tube mechanics.
- a method of manufacturing such bimetallic tubes is known. It consists in producing a blank comprising two tubular components of different compositions which one fits into the other.
- One of the components is made of stainless or refractory steel or of a refractory alloy.
- the other component is, for example, unalloyed or alloyed steel.
- the two components are clamped against each other when heated.
- the method of manufacturing a bimetallic tube by hot coextrusion according to the invention consists in producing a blank comprising two tubular components of coaxial revolution. These two components are made up of metals or alloys, of different compositions, housed coaxially one inside the other.
- each of these tubular components are determined, in a plane perpendicular to the common axis, so as to provide between their facing walls an annular space, of radial width not less than 3 mm; the radial width of this annular space is preferably at least equal to 2% of the external diameter of the internal component and is not greater than the radial width of the tubular component of smaller thickness.
- This annular space is filled with a metal or divided alloy, the composition of which is compatible with the compositions of the two tubular components, then it is closed in a sealed manner at each of the two ends by means of closure.
- the blank is then heated to the extrusion temperature which is determined according to the characteristics of the metals or alloys which constitute it, then the coextrusion of this blank is carried out, by means of a press, through a die, so as to obtain a bimetallic tube, the reduction ratio between the solid section of the blank and that of the bimetallic tube obtained being at least equal to 4.
- the radial width of the annular space is not substantially greater than 10 mm.
- the blank comprises a first tubular component made of unalloyed, or alloyed or even stainless steel, the second tubular component being made of a different material such as stainless or refractory steel or of a stainless alloy or refractory containing in total at least 50% by mass of elements of the group comprising Co, Cr, Mo, Ni, or in a nickel-based alloy.
- the content of additives in the steel of the second component is higher than that of the steel in the first component .
- the radial width of the wall of the first component is greater than that of the wall of the second component.
- the mechanical characteristics of resistance to deformation of the steel of the first component are superior to those of the steel or alloy of the second component.
- the first tubular component of the blank is the external component or the internal component
- the second tubular component of the blank being, respectively, the internal component or the external component.
- the metal or divided alloy with which the annular space is filled consists for the most part of granules advantageously of generally substantially spherical shape, the mean diameter being less than 1 mm.
- This metal or divided alloy can be of any material compatible with the composition of the first and second tubular components. It may for example be a non-alloy, or alloy, or stainless steel or a stainless or refractory alloy containing in total at least 50% by mass of elements of the group comprising Co, Cr, Mo, Ni, or an alloy based on nickel.
- the divided metal or alloy is packed in the annular space so as to reach an apparent density of at least 50% of the real density of this metal or alloy.
- the means for closing the annular space of the blank are preferably two metal end pieces arranged at the two ends of the blank. These end pieces are advantageously made of unalloyed or alloyed steel.
- each end piece is connected to the two corresponding ends of each component of the blank by sealed annular weld beads.
- a vacuum can be created in the annular space before heating the blank to extrusion temperature.
- the preform is extruded by means of a press, comprising a piston provided with a needle which engages in the preform, previously housed in a container, then in the die integral with the latter. This causes the flow of the blank and therefore of its components to flow through the annular space between the needle and the die, the lubrication being provided by a layer of glass.
- the invention also relates to the tubular blank comprising the two coaxial tubular components whose structure has been described above and which makes it possible to implement the method according to the invention.
- the invention also relates to a bimetallic tube of revolution, seamless, produced by coextrusion; this tube has an outer layer and an inner layer, made of different metals or alloys, bonded together metallurgically by a bonding layer from a divided metal; this, during the coextrusion process, was welded to itself as well as to the internal component and the external component.
- This blank 1 seen in section along a plane passing through the axis X1-X1, comprises two tubular components 2, 3 with cylindrical walls of revolution, arranged one inside the other, coaxially with respect to X1 - X1.
- the first tubular component 2, with a greater radial thickness "e1” is an external component made of low-alloy steel whose total content of additives is less than 5%.
- This thickness "e1" is more than twice that of "e2" of the second tubular component 3, which constitutes the internal component of the blank.
- An annular space 4 is formed between the outer wall 5 of the second tubular component 3 and the inner wall 6 of the first tubular component 2.
- the radial width "e3" of this annular space 4 is, in the case of this FIG. 1, much less to the radial thickness "e2" of the second tubular component 3.
- This radial width "e3” may be closer to the radial thickness "e2" of the second tubular component 3, the thinner of the blank, without however exceeding it .
- the second tubular component 3 can be produced, depending on the uses, in stainless or refractory steel or else in an alloy containing, in total, at least 50% by mass of elements of the group comprising Co, Cr, Mo, Ni or still in a nickel-based alloy.
- Two annular end pieces 7, 8 are each arranged at one end of the blank 1. These two pieces 7, 8 can be made of unalloyed or low-alloyed steel; they may have a composition close to that of the tubular component of the blank whose wall is the thickest. This composition is in particular determined to allow a tight junction by welding with the two tubular components 2, 3 of the blank 1. These 2 end pieces 7, 8 ensure the centering of the two tubular components 2 and 3 relative to the 'common axis X1 - X1 through annular ribs 9, 10 which engage with each other.
- the annular space 4 is filled with a metal or divided alloy whose composition is compatible with the compositions of the two tubular components.
- This metal or divided alloy can be chosen, for example, from non-alloyed, alloyed, stainless or refractory steels or also from alloys containing, in total, at least 50% by mass of elements, from the group comprising Co, Cr, Mo, Or.
- This divided metal is preferably in the form of granules, for the most part substantially spherical and with an average diameter of less than 1 mm.
- Packing of this metal or alloy divided in the annular space 4 is carried out, by any suitable method, in order to obtain an apparent density at least equal to 50% of the actual density.
- This packing can in particular be carried out by vibration or compression.
- a sealed connection is made between each of them and the corresponding ends of the tubular components 2, 3 by sealed annular weld beads 11, 12, 13, 14.
- chamfers are formed, inclined at approximately 45 °, on the end edges of the tubular components and of the end pieces in the areas where these weld beads are to be made.
- the blank 1, thus prepared, is then heated by known means such as a gas oven, or electric radiation or induction oven or oven with a salt bath or the like.
- the heating temperature depends, on the one hand, on the characteristics of the metals or alloys which constitute the blank and, on the other hand, on the coextrusion conditions: strength of the press, dimensions of the blank, reduction rate of the section , nature of the lubricant used. This heating temperature is greater than 1000 ° C.
- the lubricants giving the best results are glasses.
- the reduction ratio between initial section of the blank and section of the tube obtained must be at least 4 and preferably at least 6 in order to obtain a good metallurgical bond, by means of the layer of divided metal.
- compositions and the thicknesses of the two tubular components 2, 3 of the blank 1 are determined according to the conditions of use of the bimetallic tube obtained.
- the first component 2, which is less alloyed is in contact with the least corrosive fluid and its thickness is determined essentially to give the tube the necessary mechanical strength. This explains why this first component is, more often than not, thicker than the second.
- the composition of the second component 3 is chosen for its resistance to corrosion by the most corrosive fluid. In the case of the present figure 1 this fluid is that which circulates inside the tube.
- this fluid is that which circulates inside the tube.
- a wise choice of the metal or alloy constituting this second component makes it possible to provide very little wear and therefore a relatively small thickness of this component 3 compared to the thickness of the first component 2 necessary to ensure the mechanical strength of the tube.
- a blank 1 of structure similar to that of FIG. 1 is prepared. It comprises: a first component 2, external of 223 mm outside diameter, 140 mm inside diameter and 870 mm long in carbon steel with low additions of Mn and V of type 20 MV6 (AFNOR standard), a second internal component 3, of 126 mm outside diameter, 100 mm internal diameter and 870 mm long, in stainless steel type AISI 316 (AISI STANDARD).
- the annular space 4 between the two components 2, 3 of 7 mm in radial width, is filled with divided stainless steel type AISI 316 L mainly in the form of substantially spherical granules of diameter between 0.1 and 1 mm. Tamping by vibration achieves an apparent density of approximately 60% of the actual density.
- This annular space is closed by two end plates 7, 8 also made of carbon steel type 20MV6. Each of these plates is provided with an annular rib 9, 10 of a few mm in height which engages in the annular space 4 filled with divided stainless steel.
- These two end plates 7, 8 are each connected to the two components 2, 3 by sealed weld beads 11, 12, 13, 14, produced by arc welding under argon.
- This blank is then heated to a temperature between 1150 and 1200 ° C. in a gas oven, then, after coating conventionally carried out with a layer of lubricating glass, both on the exterior surface and on the interior surface, the following is introduced.
- the blank in the container of a press and coextrusion is carried out through a die of 117 mm in diameter.
- the press piston is provided with a needle of 94 mm in diameter which makes it possible to obtain, after coextrusion then release, a bimetallic tube of 114.3 mm of outside diameter and 92.6 mm of inside diameter.
- the reduction ratio between the section of the blank 1 and that of the tube obtained is therefore approximately 9.3.
- Micrographic examinations carried out on samples taken in several points of the bimetallic tube show an excellent metallurgical bond produced by means of the layer of metal divided between the external layer and the internal layer at the time of the passage through the die.
- This layer of divided metal also makes it possible, before coextrusion, during the heating phase of the blank, to absorb the phenomena of differential radial expansion of one component with respect to the other; this bonding layer also facilitates, during coextrusion, the sliding of one of the two components of the blank relative to the other without risk of tearing, cracking or creasing.
- FIG. 2 shows a blank 21, making it possible to manufacture, according to a second embodiment of the method according to the invention, a metal tube which, in itself, is also part of the invention.
- This blank seen in section along a plane passing through its axis X2-X2 comprises two tubular components 22, 23 with cylindrical walls of revolution, arranged one inside the other, coaxially with respect to X2-X2.
- the first tubular component 22 is an internal component made of carbon steel. Its radial thickness, e11, is greater than that, e12 of the second tubular component 23 which is external. Between these two components is formed an annular space 24 between the outer wall 25 of the first tubular component 22 and the inner wall 26 of the second tubular component 23.
- the radial width e13 of this annular space is in the case of this blank much less than the radial thickness e12 of the thinnest external component 23 while being greater than 2% of the external diameter of the internal component 22, not less than 3 mm and not more than 10 mm.
- the second external component 23 is made of stainless or refractory steel or else of an alloy containing, in total, at least 50% by mass of elements of the group comprising Co, Cr, Mo, Ni.
- annular end pieces 27, 28 made of carbon steel ensure the centering of the two components 22, 23 by means of the annular ribs 29, 30.
- the annular space 24 is filled of a metal or divided alloy whose composition is compatible with the compositions of the two tubular components and which is preferably in the form of granules for the most part substantially spherical and of average diameter preferably less than 1 mm.
- This divided metal can be an alloyed or unalloyed carbon steel, a stainless or refractory steel or even a alloy containing, in total, at least 50% by mass of elements of the group comprising Co, Cr, Mo, Ni. This divided metal is vibrated to obtain an apparent density at least equal to 50% of the actual density.
- the end pieces 27, 28 are connected to the corresponding ends of the components 22, 23 by annular and sealed weld beads 31, 32, 33, 34.
- the blank 21 thus prepared is heated, by known means, to a suitable temperature above 1000 ° C. This temperature is determined, in known manner, taking into account the characteristics of the metals or alloys which constitute the blank and the conditions extrusion.
- the extrusion is then carried out in a known manner, by placing the blank, after coating, in a known manner both on its outer surface and on its inner surface, by a lubricating glass, in the container, provided with a die, an extrusion press.
- the thrust of the blank is provided by a piston provided with a needle which passes through the blank and engages in the die. Lubrication is preferably provided in a known manner by glasses.
- the sections of the needle, of the die, and of the blank are determined so as to obtain a reduction ratio of at least 4 and, preferably, at least 6.
- a blank of structure similar to that of FIG. 2 is prepared, comprising a first internal component 22 of carbon steel of type 20 MV 6 (AFNOR STANDARD) 189 mm in outside diameter, 60 mm in inside diameter and 870 mm long.
- the second external component 23, made of 316 stainless steel (AISI STANDARD) has an outside diameter of 223 mm, an inside diameter of 200 mm and a length of 870 mm.
- the surface conditions of the facing walls forming the annular space are prepared so as to avoid the presence of oxide. One can for example practice before mounting the blank brushing or grinding of these walls.
- the annular space 24 of 5.5 mm in radial width is filled with divided stainless steel, type 316 (AISI STANDARD), mainly in the form of substantially spherical granules with a diameter between 0.1 and 1 mm. After tamping by vibration, the apparent density of this divided steel is approximately 60% of its actual density. After the end pieces 27, 28 of 20MV6 steel have been put in place, they are connected to the two components 22, 23 by sealed weld beads 31, 32, 33, 34 produced by arc welding under argon.
- AISI STANDARD divided stainless steel
- the blank thus produced is heated between 1050 and 1200 ° C. in a gas oven and then, after coating with a layer of lubricating glass, in known manner both on the outer surface and on the inner surface, coextrusion using a press.
- the piston of this press comprises a needle of 52.1 mm in diameter which engages in the blank 21 then in the die of 66 mm in diameter.
- Micrographic examinations carried out on samples taken at several points of the bimetallic tube, show an excellent metallurgical bond produced by means of the layer of divided metal between the internal layer and the external layer of the tube. Furthermore, taking into account the characteristics of the process, tubular products which do not require tight tolerances can be used for the two components, in particular for the facing surfaces forming the annular space, which makes it possible to lower the manufacturing costs.
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Pressure Welding/Diffusion-Bonding (AREA)
- Extrusion Of Metal (AREA)
- Laminated Bodies (AREA)
- Metal Extraction Processes (AREA)
- Non-Disconnectible Joints And Screw-Threaded Joints (AREA)
- Blow-Moulding Or Thermoforming Of Plastics Or The Like (AREA)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
AT89420523T ATE88926T1 (de) | 1989-01-03 | 1989-12-29 | Verfahren zur herstellung von bimetallrohren und nach diesem verfahren hergestellte rohre. |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
FR8900025 | 1989-01-03 | ||
FR8900025A FR2641210B1 (fr) | 1989-01-03 | 1989-01-03 | Procede de fabrication de tubes bimetalliques et tubes obtenus par ce procede |
Publications (2)
Publication Number | Publication Date |
---|---|
EP0377390A1 true EP0377390A1 (de) | 1990-07-11 |
EP0377390B1 EP0377390B1 (de) | 1993-05-05 |
Family
ID=9377447
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP89420523A Expired - Lifetime EP0377390B1 (de) | 1989-01-03 | 1989-12-29 | Verfahren zur Herstellung von Bimetallrohren und nach diesem Verfahren hergestellte Rohre |
Country Status (9)
Country | Link |
---|---|
US (1) | US5005756A (de) |
EP (1) | EP0377390B1 (de) |
JP (1) | JPH02229616A (de) |
KR (1) | KR900011524A (de) |
AT (1) | ATE88926T1 (de) |
DE (1) | DE68906374T2 (de) |
ES (1) | ES2040490T3 (de) |
FR (1) | FR2641210B1 (de) |
RU (1) | RU2007239C1 (de) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0602877A1 (de) * | 1992-12-14 | 1994-06-22 | General Electric Company | Aus mehreren Schichten bestehendes Verbundrohr für eine Waffe |
US6047586A (en) * | 1997-10-02 | 2000-04-11 | Alcatel | Method for manufacturing a metal tube with at least one optical fiber therein |
Families Citing this family (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB9008273D0 (en) * | 1990-04-11 | 1990-06-13 | Ici Plc | Manufacture of bi-metallic tube by explosive bonding,hot extrusion and co-extrusion |
EP0847826A4 (de) * | 1996-03-29 | 2000-01-12 | Sumitomo Metal Ind | Verfahren zum diffusionsschweissen von metallischen werkstoffen |
US6098871A (en) * | 1997-07-22 | 2000-08-08 | United Technologies Corporation | Process for bonding metallic members using localized rapid heating |
US6470550B1 (en) * | 1999-11-11 | 2002-10-29 | Shear Tool, Inc. | Methods of making tooling to be used in high temperature casting and molding |
EP1437426A1 (de) * | 2003-01-10 | 2004-07-14 | Siemens Aktiengesellschaft | Verfahren zum Herstellen von einkristallinen Strukturen |
US20050006899A1 (en) * | 2003-07-09 | 2005-01-13 | Lewis John K. | Weldable conduit and method |
US20050006900A1 (en) * | 2003-07-09 | 2005-01-13 | Lewis John K. | System and method for coupling conduit |
US7243409B2 (en) * | 2003-07-09 | 2007-07-17 | Lewis John K | Weldable conduit method of forming |
US7596848B2 (en) * | 2004-04-12 | 2009-10-06 | United States Steel Corporation | Method for producing bimetallic line pipe |
US7714888B2 (en) * | 2005-03-07 | 2010-05-11 | Blue Marlin Llc | Reflection spectroscopic means for detecting patterned objects |
US8281976B2 (en) * | 2009-09-11 | 2012-10-09 | Plymouth Tube Co. | Method of making multi-component composite metallic tube |
EA017045B1 (ru) * | 2010-03-26 | 2012-09-28 | Александр Михайлович Басалай | Двухслойная металлическая труба и способ изготовления двухслойной металлической трубы |
DE102010044463B4 (de) | 2010-09-06 | 2022-01-20 | AWS Schäfer Technologie GmbH | Verfahren zur Herstellung von Bimetallrohren |
RU182261U1 (ru) * | 2017-12-22 | 2018-08-09 | Акционерное общество "Научно-производственное объединение "Центральный научно-исследовательский институт технологии машиностроения", АО "НПО "ЦНИИТМАШ" | Заготовка биметаллической трубы для трубопроводов перегретого пара |
RU2763714C1 (ru) * | 2021-06-10 | 2021-12-30 | Федеральное государственное бюджетное образовательное учреждение высшего образования «Московский авиационный институт (национальный исследовательский университет)» | Способ изготовления биметаллических труб |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2023498A (en) * | 1932-07-21 | 1935-12-10 | Dow Chemical Co | Method of producing composite wrought forms of magnesium alloys |
US3066403A (en) * | 1959-11-06 | 1962-12-04 | Charles A Brauchler | Method of making extruded tubes from powdered metal |
US3566741A (en) * | 1969-06-09 | 1971-03-02 | Joseph L Sliney | Tubular, seamless, dual-hardness armor plate |
DE2211129A1 (de) * | 1971-03-15 | 1972-09-21 | Asea Ab | Verfahren zur Herstellung von Rohren aus Kompoundmatenal |
US3753704A (en) * | 1967-04-14 | 1973-08-21 | Int Nickel Co | Production of clad metal articles |
SU869927A1 (ru) * | 1980-01-21 | 1981-10-07 | Институт проблем материаловедения АН УССР | Пола заготовка дл гидростатического прессовани армированных труб |
SU995962A1 (ru) * | 1981-07-09 | 1983-02-15 | Днепропетровский Ордена Трудового Красного Знамени Металлургический Институт | Заготовка дл прессовани биметаллических изделий |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5417359A (en) * | 1977-07-08 | 1979-02-08 | Hitachi Ltd | Manufacture of clad |
SU859080A1 (ru) * | 1979-11-01 | 1981-08-30 | Коммунарский горно-металлургический институт | Способ диффузионной сварки разнородных материалов |
JPS59179212A (ja) * | 1983-03-30 | 1984-10-11 | Sumitomo Metal Ind Ltd | 熱間押出し製管用2層金属片の製造方法 |
DE3562070D1 (en) * | 1984-02-23 | 1988-05-11 | Bbc Brown Boveri & Cie | Process for bonding superalloy work pieces by diffusion |
US4620660A (en) * | 1985-01-24 | 1986-11-04 | Turner William C | Method of manufacturing an internally clad tubular product |
-
1989
- 1989-01-03 FR FR8900025A patent/FR2641210B1/fr not_active Expired - Lifetime
- 1989-12-28 JP JP1345127A patent/JPH02229616A/ja active Pending
- 1989-12-29 DE DE8989420523T patent/DE68906374T2/de not_active Expired - Fee Related
- 1989-12-29 EP EP89420523A patent/EP0377390B1/de not_active Expired - Lifetime
- 1989-12-29 AT AT89420523T patent/ATE88926T1/de not_active IP Right Cessation
- 1989-12-29 ES ES198989420523T patent/ES2040490T3/es not_active Expired - Lifetime
-
1990
- 1990-01-02 RU SU4742918/27A patent/RU2007239C1/ru not_active IP Right Cessation
- 1990-01-03 KR KR1019900000040A patent/KR900011524A/ko not_active Application Discontinuation
- 1990-01-03 US US07/460,539 patent/US5005756A/en not_active Expired - Lifetime
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2023498A (en) * | 1932-07-21 | 1935-12-10 | Dow Chemical Co | Method of producing composite wrought forms of magnesium alloys |
US3066403A (en) * | 1959-11-06 | 1962-12-04 | Charles A Brauchler | Method of making extruded tubes from powdered metal |
US3753704A (en) * | 1967-04-14 | 1973-08-21 | Int Nickel Co | Production of clad metal articles |
US3566741A (en) * | 1969-06-09 | 1971-03-02 | Joseph L Sliney | Tubular, seamless, dual-hardness armor plate |
DE2211129A1 (de) * | 1971-03-15 | 1972-09-21 | Asea Ab | Verfahren zur Herstellung von Rohren aus Kompoundmatenal |
SU869927A1 (ru) * | 1980-01-21 | 1981-10-07 | Институт проблем материаловедения АН УССР | Пола заготовка дл гидростатического прессовани армированных труб |
SU995962A1 (ru) * | 1981-07-09 | 1983-02-15 | Днепропетровский Ордена Трудового Красного Знамени Металлургический Институт | Заготовка дл прессовани биметаллических изделий |
Non-Patent Citations (1)
Title |
---|
PATENT ABSTRACTS OF JAPAN, vol. 9, no. 38 (M-358)[1761], 19 février 1985; & JP-A-59 179 212 (SUMITOMO KINZOKU KOGYO K.K.) 11-10-1984 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0602877A1 (de) * | 1992-12-14 | 1994-06-22 | General Electric Company | Aus mehreren Schichten bestehendes Verbundrohr für eine Waffe |
TR28217A (tr) * | 1992-12-14 | 1996-02-29 | Gen Electric | Cok-tabakali kompozit top namlusu. |
US6047586A (en) * | 1997-10-02 | 2000-04-11 | Alcatel | Method for manufacturing a metal tube with at least one optical fiber therein |
Also Published As
Publication number | Publication date |
---|---|
KR900011524A (ko) | 1990-08-01 |
DE68906374T2 (de) | 1993-08-26 |
EP0377390B1 (de) | 1993-05-05 |
FR2641210B1 (fr) | 1991-03-15 |
US5005756A (en) | 1991-04-09 |
JPH02229616A (ja) | 1990-09-12 |
ATE88926T1 (de) | 1993-05-15 |
DE68906374D1 (de) | 1993-06-09 |
FR2641210A1 (fr) | 1990-07-06 |
RU2007239C1 (ru) | 1994-02-15 |
ES2040490T3 (es) | 1993-10-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP0377390B1 (de) | Verfahren zur Herstellung von Bimetallrohren und nach diesem Verfahren hergestellte Rohre | |
EP0868248B1 (de) | Verfahren zum verbinden durch heterogenes stumpfschweissen von zwei verschiedenartigen werkstücken und anwendungen | |
FR2573836A1 (fr) | Joint d'echappement silencieux | |
FR2605908A1 (fr) | Cylindre de laminoir a pas de pelerin pour la fabrication de tubes | |
EP0312421B1 (de) | Verfahren zur Befestigung durch Schweissen eines Stutzens an ein dickwandiges Element, wie ein Stutzenring eines Kernreaktorgefässes | |
EP2666580B1 (de) | Schweißdraht mit festem zentralen Drahtkern, und sein Herstellungverfahren | |
EP3469206B1 (de) | Raketentriebwerkbrennkammer mit rippen mit variabler zusammensetzung | |
EP0511040A1 (de) | Verfahren zum Verbinden eines Stückes aus Manganstahl und eines Stückes aus Kohlenstoffstahl und hergestellte Verbindung | |
EP0839593B1 (de) | Verfahren zum Herstellen eines Hohlrevolutionskörpers durch Fliessdrehen | |
WO2020208040A1 (fr) | Procédé de fabrication d'un fil d'armure d'une ligne flexible de transport de fluide et fil d'armure et ligne flexible issus d'un tel procédé | |
EP3240371A1 (de) | Bauteil zum zusammenbau eines vakuum-behälters, und verfahren zur herstellung dieses bauteils für den zusammenbau | |
EP2309527B1 (de) | Vorrichtung zur fügen durch schweißen eines Deckels am ende einer Zylinderkörper und Vakuumröhre mit einer solchen Vorrichtung | |
CA2048188C (fr) | Procede et dispositif de revetement d'une piece comportant une surface inclinee a revetir de poudre en couche mince | |
FR2959949A1 (fr) | Procede de soudage circulaire ou longitudinal de tube | |
WO2022184991A1 (fr) | Elément tubulaire fileté à segment | |
WO2022184992A1 (fr) | Elément tubulaire fileté à segment | |
FR2687337A1 (fr) | Procede de realisation de tubes par travail a chaud de poudres metalliques et tubes ainsi obtenus. | |
EP1043092B1 (de) | Verfahren zum Verbinden zweier Werkstücke, Werkstücke und Verbindung hergestellt mit diesem Verfahren | |
WO2003072289A2 (fr) | Procede de fabrication d'emballage metallique | |
WO1993013884A1 (fr) | Procede et dispositif pour le formage a chaud de metaux ou alliages metalliques | |
BE556520A (de) | ||
FR3089834A1 (fr) | Procédé de fabrication d’une pièce métallurgique par compaction à chaud de poudre métallique | |
BE561773A (de) | ||
EP1547097A1 (de) | Behälter für radioaktive stoffe und verfahren zum verschliessen eines solchen behälters | |
FR2533468A1 (fr) | Capsule pour ebauches servant a l'extrusion de pieces, notamment de tubes |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AT DE ES GB IT SE |
|
17P | Request for examination filed |
Effective date: 19900728 |
|
17Q | First examination report despatched |
Effective date: 19911015 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AT DE ES GB IT SE |
|
REF | Corresponds to: |
Ref document number: 88926 Country of ref document: AT Date of ref document: 19930515 Kind code of ref document: T |
|
GBT | Gb: translation of ep patent filed (gb section 77(6)(a)/1977) |
Effective date: 19930512 |
|
REF | Corresponds to: |
Ref document number: 68906374 Country of ref document: DE Date of ref document: 19930609 |
|
ITF | It: translation for a ep patent filed |
Owner name: ING. A. GIAMBROCONO & C. S.R.L. |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: FG2A Ref document number: 2040490 Country of ref document: ES Kind code of ref document: T3 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
26N | No opposition filed | ||
EAL | Se: european patent in force in sweden |
Ref document number: 89420523.6 |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: IF02 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 20031117 Year of fee payment: 15 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20031120 Year of fee payment: 15 Ref country code: AT Payment date: 20031120 Year of fee payment: 15 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: SE Payment date: 20031201 Year of fee payment: 15 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: ES Payment date: 20031217 Year of fee payment: 15 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20041229 Ref country code: AT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20041229 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20041230 Ref country code: ES Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20041230 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20050701 |
|
EUG | Se: european patent has lapsed | ||
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20041229 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES;WARNING: LAPSES OF ITALIAN PATENTS WITH EFFECTIVE DATE BEFORE 2007 MAY HAVE OCCURRED AT ANY TIME BEFORE 2007. THE CORRECT EFFECTIVE DATE MAY BE DIFFERENT FROM THE ONE RECORDED. Effective date: 20051229 |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: FD2A Effective date: 20041230 |