EP0336190A1 - Envelope for housing a bundle of fuel rods containing nuclear fuel - Google Patents

Envelope for housing a bundle of fuel rods containing nuclear fuel Download PDF

Info

Publication number
EP0336190A1
EP0336190A1 EP89104924A EP89104924A EP0336190A1 EP 0336190 A1 EP0336190 A1 EP 0336190A1 EP 89104924 A EP89104924 A EP 89104924A EP 89104924 A EP89104924 A EP 89104924A EP 0336190 A1 EP0336190 A1 EP 0336190A1
Authority
EP
European Patent Office
Prior art keywords
bushing
pull rod
head
foot
bush
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
EP89104924A
Other languages
German (de)
French (fr)
Inventor
Wolfgang Dipl.-Ing. Hummel (Fh)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Siemens AG
Original Assignee
Siemens AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Siemens AG filed Critical Siemens AG
Publication of EP0336190A1 publication Critical patent/EP0336190A1/en
Ceased legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G21NUCLEAR PHYSICS; NUCLEAR ENGINEERING
    • G21FPROTECTION AGAINST X-RADIATION, GAMMA RADIATION, CORPUSCULAR RADIATION OR PARTICLE BOMBARDMENT; TREATING RADIOACTIVELY CONTAMINATED MATERIAL; DECONTAMINATION ARRANGEMENTS THEREFOR
    • G21F5/00Transportable or portable shielded containers
    • G21F5/005Containers for solid radioactive wastes, e.g. for ultimate disposal
    • G21F5/008Containers for fuel elements

Definitions

  • the invention relates to a liner for receiving fuel rods containing nuclear fuel in accordance with the preamble of claim 1.
  • Such a rifle is known from FIG. 3 of German Offenlegungsschrift 35 06 584.
  • the sleeve of this known sleeve is permanently attached to the sleeve head, while the sleeve base has a latching element that can snap into a latching opening on the sleeve sleeve under the action of a return spring.
  • the empty rifle is first inserted into a recess on the bottom of a holding basket with its bottom part hanging from a lifting and transport device. There, an actuating rod passes through the locking element of the rifle foot and releases the locking of this rifle foot with the rifle jacket. The rifle head and the sleeve casing attached to it are then pulled out of the holding basket with the lifting and transporting device and transported to the side, while the rifle foot is held in the recess on the bottom of the holding basket by the actuating rod.
  • the invention has for its object to develop the known liner so that fuel rods filled in it in a tight packing can also be unloaded again easily and safely.
  • the can can be placed in a tub for unloading fuel rods filled in this can in a tight package. After loosening the attachment of the head-side end of the pull rod from the bush head, the bush head and the bush base are pulled apart, so that the fuel rods, which are filled in a tight packing in the bush, are pushed out of the bush shell with the thrust plate and are caught in the tub.
  • the claims 2 to 5 are directed to advantageous embodiments of the sleeve.
  • the bushing according to FIGS. 1 to 3 has a plate-like bush head 2 and a bush foot 3 which has a plate 3a parallel to the bush head 2.
  • the cross section of the bush head 2 and the plate 3a of the bush foot 3 is square.
  • Bush head 2 and plate 3a also have a congruent contour.
  • the socket base 3 also has a jacket 3b on the outside of the plate 3a, also with a square cross section.
  • a sleeve jacket 4 with a square cross section is placed over both the sleeve head 2 and the sleeve foot 3 and is seated in a gradation on the jacket surface of the sleeve head 2 or the sleeve base 3. While the sleeve jacket 4 is welded to the sleeve head 2, this sleeve jacket 4 is only loosely placed over the sleeve base 3.
  • a pull rod 5 has a thread at both ends. With one end, the head-side end, the pull rod 5 loosely engages through the bush head 2. On the other end, the foot-side end, the pull rod 5 is screwed into a flange nut 6, which passes through the plate 3a and thus the bushing base 3 loosely but without play .
  • This flange nut 6 is secured against rotation by pins designed as screws 7. These screws 7 engage through the flange of the flange nut 6, which rests on the outside of the plate 3a and thus the socket foot 3, into the plate 3a of the socket foot 3, into which they are screwed and on which the flange and thus the flange nut 6 also screwed to them.
  • a locking wire 8 engages through a transverse bore in the heads of the screws 7 on the outside of the plate 3a.
  • step 9 Between the threads on both ends of the pull rod 5 there is a step 9 at the head end of the pull rod 5.
  • a sleeve 10 is loosely pushed over this step 9 and engages at its end facing the bushing foot 3 a push plate 11 welded externally at this end.
  • This push plate 11, which is arranged at right angles to the pull rod 5, also has a square cross section and extends with clear play to the inside of the sleeve casing 4.
  • the sleeve 10 with the push plate 11 is also included attached to a stop body which is a nut 12 which is screwed onto the inside of the bush head 2 onto the thread on the head-side end of the pull rod 5.
  • the bushing head 2 On the outside of the bushing head 2, the bushing head 2 is fastened with a further nut 13, which is also screwed onto the thread at the head-side end of the pull rod 10 and is secured against self-loosening by a locking plate 14 worked on the nut 13.
  • This locking plate 14 is located on the nut 13.
  • An elevation on the outside of the bush head 2 is penetrated by the head end of the pull rod 5.
  • the locking plate 14 bears against a slope which is formed on the jacket of this elevation.
  • a holding basket 22 with a square cross section is shown in longitudinal section on the bottom 21 of a basin filled with water.
  • cylinders 23 with displaceable pistons (not visible) with piston rods 24 are arranged one above the other, each carrying a horizontal pressure bar 25.
  • two cylinders are arranged with pressure strips 25 located opposite one another in pairs. These cylinders can be acted upon on both sides of the piston in each case with a hydraulic medium.
  • a handling gripper 26 located above the basin can reach behind the bush head 2 of the bushing according to FIGS. 1 to 3 through two bushings 15 in the bush head 2 parallel to the pull rod 5 and pick up the bush so that it hangs on the handling gripper 26 with the vertical longitudinal axis of the pull rod 5.
  • Such a bush hanging on the handling gripper 26 is first lowered into the empty holding basket 22, in which all piston rods 24 are inserted into the cylinders 23, and the bushing foot 3 is centered in a recess 28 in the bottom of the holding basket 22.
  • the nut 13 is first loosened from the head end of the pull rod 5 and the bush head 2 with the sleeve jacket 4 welded to it is lifted off the sleeve foot 3 and pulled out of the holding basket 22 and transported to the side. Then the nut 12 is loosened at the head end of the pull rod 5 and the sleeve 10 with the push plate 9 is pulled off the pull rod 5 with the aid of another handling gripper and transported to the side.
  • a bundle of fuel rods with spent nuclear fuel in a tight packing is then placed vertically on the inside of the socket foot 3 in the holding basket 22 with a sealing device (not shown in detail) and held in this tight packing by the pressure bars 25 on the piston rods 24 extended from the cylinders 23.
  • the pull rod 5 can also be easily unscrewed from the flange nut 6 and removed from the socket base 3 and later, like the fuel rods 27, placed on the socket base 3 with the sealing device and screwed into the flange nut 6 on the socket base 3.
  • the handling gripper with the sleeve 10 attached to it, including the thrust plate 11, is moved over the holding basket 22 and the sleeve 10 is pushed again over the head end of the pull rod 5 and fastened by screwing the screw 12 onto the pull rod 5.
  • the handling gripper 26 with the sleeve head 2 and the sleeve casing 4 is moved over the holding basket 22 and the sleeve casing 4, as shown in FIG. 4, is pushed over the bundle of densely packed fuel rods 27 in the holding basket 22 from top to bottom.
  • the piston rods 24 carrying the pressure bars 25 are moved successively from top to bottom into the cylinders 23, each shortly before the lower end, ie the foot end of the sleeve casing 4, has reached the pressure bars in question.
  • the sleeve casing 4 is placed over the sleeve foot 3, and the handling gripper 26 can be released from the sleeve head 2. Then the nut 13 with the locking plate 14 is screwed back onto the head end of the pull rod 10.
  • the bushing according to FIGS. 1 to 3 is now filled with fuel rods 27 in a tight packing.
  • the load-bearing element of the bushing is the pull rod 5, which, if necessary, can also have a decentralized position indicated in FIG. 5.
  • the bush head 2, the thrust plate 11 and the foot end of the sleeve casing 4 can be provided with passage openings (32 and 33) for a coolant for removing post-decay heat, which the fuel rods used in the bush according to FIGS. 1 to 3 can emit.

Landscapes

  • Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • High Energy & Nuclear Physics (AREA)
  • Monitoring And Testing Of Nuclear Reactors (AREA)

Abstract

Located in the envelope shell (4) of a reliably dischargeable envelope for housing a bundle of fuel rods (27) containing nuclear fuel is a draw rod (5), which is mounted detachably on an envelope head (2) with an end on the head side and is mounted on an envelope foot (3) with the other end at the foot side, and freely passes through a thrust plate (11), which is arranged inside the envelope shell (4) at a right angle to the draw rod (5) and to which is assigned a stop element (12) detachably mounted on the end of the draw rod (5) on the head side. …<IMAGE>…

Description

Die Erfindung betrifft eine Büchse zum Aufnehmen Kernbrenn­stoff enthaltender Brennstäbe entsprechend dem Oberbegriff des Patentanspruches 1.The invention relates to a liner for receiving fuel rods containing nuclear fuel in accordance with the preamble of claim 1.

Eine derartige Büchse ist aus FIG 3 der deutschen Offenle­gungsschrift 35 06 584 bekannt. Der Büchsenmantel dieser be­kannten Büchse ist unlösbar am Büchsenkopf befestigt, während der Büchsenfuß ein Verrastorgan aufweist, das unter Einwirkung einer Rückstellfeder in eine Verrastöffnung am Büchsenmantel einrasten kann.Such a rifle is known from FIG. 3 of German Offenlegungsschrift 35 06 584. The sleeve of this known sleeve is permanently attached to the sleeve head, while the sleeve base has a latching element that can snap into a latching opening on the sleeve sleeve under the action of a return spring.

Die leere Büchse wird zunächst an einem Hebe- und Transport­gerät hängend mit ihrem Bodenteil unter Wasser in eine Aus­nehmung am Boden eines Haltekorbes eingesetzt. Dort durch­greift eine Betätigungsstange das Verrastorgan des Büchsen­fußes und löst die Verrastung dieses Büchsenfußes mit dem Büchsenmantel. Hierauf wird der Büchsenkopf und der an ihm befestigte Büchsenmantel mit dem Hebe-und Transportgerät wieder aus dem Haltekorb herausgezogen und zur Seite transportiert, während der Büchsenfuß in der Ausnehmung am Boden des Haltekorbes durch die Betätigungsstange festgehalten wird.The empty rifle is first inserted into a recess on the bottom of a holding basket with its bottom part hanging from a lifting and transport device. There, an actuating rod passes through the locking element of the rifle foot and releases the locking of this rifle foot with the rifle jacket. The rifle head and the sleeve casing attached to it are then pulled out of the holding basket with the lifting and transporting device and transported to the side, while the rifle foot is held in the recess on the bottom of the holding basket by the actuating rod.

Sodann wird ein Bündel z.B. abgebrannter, Kernbrennstoff ent­haltender Brennstäbe mit vertikaler, d.h. zum Büchsenfuß recht­winkliger Längsachse in dichter Packung auf dem BüchsenfuB aufgesetzt und durch seitlich im Haltekorb an Kolbenstangen von Zylindern aus- und einfahrbar angebrachte Druckleisten in dieser dichten Packung gehalten. Anschließend wird der mit dem Büchsenkopf am Hebe- und Transportgerät hängende, unten offene Büchsenmantel über die in dichter Packung im Haltekorb gehal­tenen Brennstäbe von oben nach unten geschoben, wobei die seit­lich im Haltekorb angebrachten Druckleisten entsprechend sukzessive von oben nach unten vom Brennstabbündel weggefahren werden. Schließlich wird der Büchsenmantel noch über den Büchsenfuß in der Aussparung am Boden des Haltekorbes gestülpt und das Verrastorgan von der Betätigungsstange freigegeben, so daß der Büchsenfuß wieder mit dem Büchsenmantel verrastet.A bundle of spent fuel rods containing nuclear fuel, for example, with a vertical longitudinal axis, that is to say at right angles to the rifle foot, is then placed in a tight packing on the rifle foot and is held in this tight packing by pressure bars attached laterally in the holding basket to piston rods of cylinders. Then the one hanging from the lifting and transport device with the rifle head is opened at the bottom The sleeve of the sleeve is pushed over the fuel rods held in a tight packing in the holding basket from top to bottom, the pressure bars attached laterally in the holding basket being moved away from the fuel bundle successively from top to bottom. Finally, the rifle jacket is slipped over the rifle foot in the recess at the bottom of the holding basket and the locking member is released from the actuating rod, so that the rifle foot locks again with the rifle jacket.

Da die wieder mit dem Büchsenfuß verschlossene Büchse mit den Brennstäben in dichter Packung gefüllt ist, kann es Schwierig­keiten bereiten, diese Brennstäbe beispielsweise im Zuge ihrer Entsorgung wieder aus der Büchse zu entladen, da sie in der Regel nach dem Entfernen des Büchsenfußes nicht mehr ohne weite­res von selbst aus dem Büchsenmantel der Büchse herausfallen.Since the can, which is closed again with the can base, is filled with the fuel rods in a tight packing, it can be difficult to unload these fuel rods from the can, for example, in the course of their disposal, since they are usually no longer easy to remove after removing the can base fall out of the can jacket of the can by itself.

Der Erfindung liegt die Aufgabe zugrunde, die bekannte Büchse weiterzubilden, so daß in ihr in dichter Packung eingefüllte Brennstäbe auch wieder problemlos und sicher entladen werden können.The invention has for its object to develop the known liner so that fuel rods filled in it in a tight packing can also be unloaded again easily and safely.

Zur Lösung dieser Aufgabe hat eine Büchse der eingangs er­wähnten Art erfindungsgemäß die Merkmale des kennzeichnenden Teiles des Patentanspruches 1.To achieve this object, a bushing of the type mentioned in the introduction has the features of the characterizing part of patent claim 1.

Zum Entladen in dichter Packung in diese Büchse eingefüll­ter Brennstäbe kann die Büchse in eine Wanne gelegt werden. Nach Lösen der Befestigung des kopfseitigen Endes der Zug­stange vom Büchsenkopf werden Büchsenkopf und Büchsenfuß aus­einandergezogen, so daß die in der Büchse in dichter Packung eingefüllten Brennstäbe mit der Schubplatte aus dem Büchsen­mantel geschoben und in der Wanne aufgefangen werden.The can can be placed in a tub for unloading fuel rods filled in this can in a tight package. After loosening the attachment of the head-side end of the pull rod from the bush head, the bush head and the bush base are pulled apart, so that the fuel rods, which are filled in a tight packing in the bush, are pushed out of the bush shell with the thrust plate and are caught in the tub.

Die Patentansprüche 2 bis 5 sind auf vorteilhafte Ausgestal­tungen der Büchse gerichtet.The claims 2 to 5 are directed to advantageous embodiments of the sleeve.

Die Erfindung und ihre Vorteile seien anhand der Zeichnung an einem Ausfährungsbeispiel näher erläutert:

  • FIG 1 zeigt eine Büchse im Längsschnitt entsprechend der strichpunktierten Linie I-I in FIG 2.
  • FIG 2 zeigt eine Draufsicht auf den Büchsenkopf der Büchse nach FIG 1.
  • FIG 3 zeigt eine Draufsicht auf den Büchsenfuß der Büchse nach FIG 1.
  • FIG 4 zeigt schematisch und im Längsschnitt einen Haltekorb zum Einfüllen von Brennstäben in eine Büchse nach den Figuren 1 bis 3.
  • FIG 5 zeigt schematisch einen Querschnitt durch eine Büchse nach den Figuren 1 bis 3 mit in dichter Packung eingefüllten Brennstäben.
The invention and its advantages are explained in more detail with reference to the drawing using an exemplary embodiment:
  • 1 shows a sleeve in longitudinal section along the dash-dotted line II in FIG. 2nd
  • 2 shows a plan view of the bush head of the bush according to FIG. 1.
  • 3 shows a plan view of the rifle foot of the rifle according to FIG. 1.
  • 4 shows schematically and in longitudinal section a holding basket for filling fuel rods into a can according to FIGS. 1 to 3.
  • 5 shows schematically a cross section through a bushing according to FIGS. 1 to 3 with fuel rods filled in tight packing.

Die Büchse nach den Figuren 1 bis 3 hat einen plattenartigen Büchsenkopf 2 und einen Büchsenfuß 3, der eine zum Büchsenkopf 2 parallele Platte 3a aufweist. Der Querschnitt des Büchsen­kopfes 2 und der Platte 3a des Büchsenfußes 3 ist quadratisch. Büchsenkopf 2 und Platte 3a haben ferner deckungsgleiche Kon­tur. Der Büchsenfuß 3 hat außerdem an der Außenseite der Platte 3a einen Mantel 3b ebenfalls mit quadratischem Querschnitt.The bushing according to FIGS. 1 to 3 has a plate-like bush head 2 and a bush foot 3 which has a plate 3a parallel to the bush head 2. The cross section of the bush head 2 and the plate 3a of the bush foot 3 is square. Bush head 2 and plate 3a also have a congruent contour. The socket base 3 also has a jacket 3b on the outside of the plate 3a, also with a square cross section.

Ein Büchsenmantel 4 mit quadratischem Querschnitt ist sowohl über den Büchsenkopf 2 als auch über den Büchsenfuß 3 ge­stülpt und sitzt jeweils in einer Abstufung an der Mantel­ fläche des Büchsenkopfes 2 bzw. des Büchsenfußes 3. Während der Büchsenmantel 4 am Büchsenkopf 2 festgeschweißt ist, ist dieser Büchsenmantel 4 über den Büchsenfuß 3 nur lose ge­stülpt.A sleeve jacket 4 with a square cross section is placed over both the sleeve head 2 and the sleeve foot 3 and is seated in a gradation on the jacket surface of the sleeve head 2 or the sleeve base 3. While the sleeve jacket 4 is welded to the sleeve head 2, this sleeve jacket 4 is only loosely placed over the sleeve base 3.

Eine Zugstange 5 weist an beiden Enden ein Gewinde auf. Mit einem Ende, dem kopfseitigen Ende, durchgreift die Zugstange 5 lose den Büchsenkopf 2. Auf dem anderen Ende, dem fußseitigen Ende, ist die Zugstange 5 in eine Flanschmutter 6 eingeschraubt, die die Platte 3a und damit den Büchsenfuß 3 lose, aber spiel­frei durchgreift. Diese Flanschmutter 6 ist mit als Schrauben 7 ausgebildeten Stiften gegen Verdrehen gesichert. Diese Schrauben 7 greifen durch den Flansch der Flanschmutter 6, der auf der Außenseite der Platte 3a und damit des Büchsen­fußes 3 anliegt, hindurch in die Platte 3a des Büchsenfußes 3, in die sie eingeschraubt sind und an der der Flansch und damit die Flanschmutter 6 mit ihnen festgeschraubt ist. Durch eine Querbohrung in den Köpfen der Schrauben 7 auf der Außenseite der Platte 3a greift ein Sicherungsdraht 8.A pull rod 5 has a thread at both ends. With one end, the head-side end, the pull rod 5 loosely engages through the bush head 2. On the other end, the foot-side end, the pull rod 5 is screwed into a flange nut 6, which passes through the plate 3a and thus the bushing base 3 loosely but without play . This flange nut 6 is secured against rotation by pins designed as screws 7. These screws 7 engage through the flange of the flange nut 6, which rests on the outside of the plate 3a and thus the socket foot 3, into the plate 3a of the socket foot 3, into which they are screwed and on which the flange and thus the flange nut 6 also screwed to them. A locking wire 8 engages through a transverse bore in the heads of the screws 7 on the outside of the plate 3a.

Zwischen den Gewinden an beiden Enden der Zugstange 5 befindet sich am kopfseitigen Ende der Zugstange 5 eine Abstufung 9. Über diese Abstufung 9 ist lose eine Hülse 10 geschoben, die an ihrem dem Büchsenfuß 3 zugewandten Ende eine an diesem Ende außen festgeschweißte Schubplatte 11 durchgreift. Diese zur Zugstange 5 im rechten Winkel angeordnete Schubplatte 11 hat ebenfalls quadratischen Querschnitt und reicht mit deutlichem Spiel bis zur Innenseite des Büchsenmantels 4. An der die Hülse 10 und damit auch die Schubplatte 11 lose durchgreifenden Zug­stange 5 ist die Hülse 10 mit der Schubplatte 11 mit einem Anschlagkörper befestigt, der eine Mutter 12 ist, die auf der Innenseite des Büchsenkopfes 2 auf das Gewinde auf dem kopf­seitigen Ende der Zugstange 5 aufgeschraubt ist.Between the threads on both ends of the pull rod 5 there is a step 9 at the head end of the pull rod 5. A sleeve 10 is loosely pushed over this step 9 and engages at its end facing the bushing foot 3 a push plate 11 welded externally at this end. This push plate 11, which is arranged at right angles to the pull rod 5, also has a square cross section and extends with clear play to the inside of the sleeve casing 4. On the pull rod 5, which loosely penetrates the sleeve 10 and thus also the push plate 11, the sleeve 10 with the push plate 11 is also included attached to a stop body which is a nut 12 which is screwed onto the inside of the bush head 2 onto the thread on the head-side end of the pull rod 5.

Auf der Außenseite des Büchsenkopfes 2 ist der Büchsenkopf 2 mit einer weiteren Mutter 13 befestigt, die ebenfalls auf das Gewinde am kopfseitigen Ende der Zugstange 10 aufgeschraubt und gegen selbständiges Lösen durch ein an der Mutter 13 an­gearbeitetes Sicherungsblech 14 gesichert ist. Dieses Siche­rungsblech 14 befindet sich an der Mutter 13. Eine Erhebung auf der Außenseite des Büchsenkopfes 2 wird vom kopfseitigen Ende der Zugstange 5 durchgriffen. Das Sicherungsblech 14 liegt an einer Schräge an, die am Mantel dieser Erhebung ausgebildet ist.On the outside of the bushing head 2, the bushing head 2 is fastened with a further nut 13, which is also screwed onto the thread at the head-side end of the pull rod 10 and is secured against self-loosening by a locking plate 14 worked on the nut 13. This locking plate 14 is located on the nut 13. An elevation on the outside of the bush head 2 is penetrated by the head end of the pull rod 5. The locking plate 14 bears against a slope which is formed on the jacket of this elevation.

Nach FIG 4 befindet sich auf dem Boden 21 eines mit Wasser gefüllten Beckens ein im Längsschnitt dargestellter Haltekorb 22 mit quadratischem Querschnitt. An allen vier Innenseiten dieses Haltekorbes 22 sind übereinander Zylinder 23 mit nicht zu erkennenden verschiebbaren Kolben mit Kolbenstangen 24 angeordnet, die jede eine horizontale Druckleiste 25 tragen. In einer Querschnittsebene des Haltekorbes 22 sind jeweils zwei Zylinder mit sich paarweise gegenüber befindlichen Druckleisten 25 angeordnet. Diese Zylinder sind beiderseits des jeweils in ihnen befindlichen Kolbens mit einem Hydraulikmedium beauf­schlagbar.According to FIG. 4, a holding basket 22 with a square cross section is shown in longitudinal section on the bottom 21 of a basin filled with water. On all four inner sides of this holding basket 22, cylinders 23 with displaceable pistons (not visible) with piston rods 24 are arranged one above the other, each carrying a horizontal pressure bar 25. In a cross-sectional plane of the holding basket 22, two cylinders are arranged with pressure strips 25 located opposite one another in pairs. These cylinders can be acted upon on both sides of the piston in each case with a hydraulic medium.

Ein über dem Becken befindlicher Handhabungsgreifer 26 kann den Büchsenkopf 2 der Büchse nach den Figuren 1 bis 3 durch zwei zur Zugstange 5 parallelen Durchführungen 15 im Büchsenkopf 2 hintergreifen und die Büchse aufheben, so daß sie mit vertikaler Längsachse der Zugstange 5 am Handhabungs­greifer 26 hängt. Eine solche am Handhabungsgreifer 26 hängen­de Büchse wird zunächst in den leeren Haltekorb 22, in dem alle Kolbenstangen 24 in die Zylinder 23 eingefahren sind, hinabgelassen und der Büchsenfuß 3 zentriert in eine Ausnehmung 28 am Boden des Haltekorbes 22 eingesetzt. Sodann wird zunächst die Mutter 13 vom kopfseitigen Ende der Zugstange 5 gelöst und der Büchsenkopf 2 mit dem an ihm angeschweißten Büchsenmantel 4 vom Büchsenfuß 3 abgehoben, aus dem Haltekorb 22 herausgezogen und zur Seite transportiert. Anschließend wird die Mutter 12 am kopfseitigen Ende der Zugstange 5 gelöst und die Hülse 10 mit der Schubplatte 9 mit Hilfe eines anderen Handhabungsgreifers von der Zugstange 5 abgezogen und zur Seite transportiert.A handling gripper 26 located above the basin can reach behind the bush head 2 of the bushing according to FIGS. 1 to 3 through two bushings 15 in the bush head 2 parallel to the pull rod 5 and pick up the bush so that it hangs on the handling gripper 26 with the vertical longitudinal axis of the pull rod 5. Such a bush hanging on the handling gripper 26 is first lowered into the empty holding basket 22, in which all piston rods 24 are inserted into the cylinders 23, and the bushing foot 3 is centered in a recess 28 in the bottom of the holding basket 22. Then the nut 13 is first loosened from the head end of the pull rod 5 and the bush head 2 with the sleeve jacket 4 welded to it is lifted off the sleeve foot 3 and pulled out of the holding basket 22 and transported to the side. Then the nut 12 is loosened at the head end of the pull rod 5 and the sleeve 10 with the push plate 9 is pulled off the pull rod 5 with the aid of another handling gripper and transported to the side.

Anschließend wird ein Bündel Brennstäbe mit abgebranntem Kern­brennstoff in dichter Packung mit einer nicht näher darge­stellten Dichtsetzvorrichtung vertikal auf die Innenseite des Büchsenfußes 3 im Haltekorb 22 aufgesetzt und durch die Druck­leisten 25 an den aus den Zylindern 23 ausgefahrenen Kolben­stangen 24 in dieser dichten Packung gehalten. Falls erforder­lich kann hierbei auch die Zugstange 5 ohne weiteres zunächst aus der Flanschmutter 6 herausgeschraubt und vom Büchsenfuß 3 entfernt und später wieder wie die Brennstäbe 27 mit der Dicht­setzvorrichtung auf den Büchsenfuß 3 aufgesetzt und in die Flanschmutter 6 am Büchsenfuß 3 eingeschraubt werden.A bundle of fuel rods with spent nuclear fuel in a tight packing is then placed vertically on the inside of the socket foot 3 in the holding basket 22 with a sealing device (not shown in detail) and held in this tight packing by the pressure bars 25 on the piston rods 24 extended from the cylinders 23. If necessary, the pull rod 5 can also be easily unscrewed from the flange nut 6 and removed from the socket base 3 and later, like the fuel rods 27, placed on the socket base 3 with the sealing device and screwed into the flange nut 6 on the socket base 3.

Sodann wird der Handhabungsgreifer mit der an ihm hängenden Hülse 10 einschließlich der Schubplatte 11 über den Haltekorb 22 gefahren und die Hülse 10 wieder über das kopfseitige Ende der Zugstange 5 geschoben und durch Aufschrauben der Schraube 12 auf die Zugstange 5 befestigt.Then the handling gripper with the sleeve 10 attached to it, including the thrust plate 11, is moved over the holding basket 22 and the sleeve 10 is pushed again over the head end of the pull rod 5 and fastened by screwing the screw 12 onto the pull rod 5.

Sodann wird der Handhabungsgreifer 26 mit dem Büchsenkopf 2 und dem Büchsenmantel 4 über den Haltekorb 22 gefahren und der Büchsenmantel 4, wie in FIG 4 dargestellt, über das Bündel dichtgepackter Brennstäbe 27 im Haltekorb 22 von oben nach unten geschoben. Hierbei werden die die Druckleisten 25 tragenden Kolbenstangen 24 sukzessive von oben nach unten in die Zylinder 23 eingefahren, jeweils kurz bevor das Unterende, d.h. das fußseitige Ende des Büchsenmantels 4 die betreffenden Druckleisten erreicht hat.Then the handling gripper 26 with the sleeve head 2 and the sleeve casing 4 is moved over the holding basket 22 and the sleeve casing 4, as shown in FIG. 4, is pushed over the bundle of densely packed fuel rods 27 in the holding basket 22 from top to bottom. Here, the piston rods 24 carrying the pressure bars 25 are moved successively from top to bottom into the cylinders 23, each shortly before the lower end, ie the foot end of the sleeve casing 4, has reached the pressure bars in question.

Schließlich wird der Büchsenmantel 4 über den Büchsenfuß 3 gestülpt, und der Handhabungsgreifer 26 kann vom Büchsenkopf 2 gelöst werden. Sodann wird die Mutter 13 mit dem Sicherungs­blech 14 wieder auf dem kopfseitigen Ende der Zugstange 10 festgeschraubt.Finally, the sleeve casing 4 is placed over the sleeve foot 3, and the handling gripper 26 can be released from the sleeve head 2. Then the nut 13 with the locking plate 14 is screwed back onto the head end of the pull rod 10.

Wie FIG 5, in der gleiche Teile mit gleichen Bezugszeichen wie in den Figuren 1 bis 4 versehen sind, zeigt, ist die Büchse nach den Figuren 1 bis 3 nunmehr mit Brennstäben 27 in dichter Packung gefüllt. Mit dem Handhabungsgreifer 26 kann die Büchse jetzt aus dem Haltekorb 22 herausgehoben und weitertranspor­tiert werden. Das tragende Element der Büchse ist hierbei die Zugstange 5, die, wenn erforderlich, auch eine in FIG 5 an­gedeutete dezentrale Lage haben kann.5, in which the same parts are provided with the same reference numerals as in FIGS. 1 to 4, the bushing according to FIGS. 1 to 3 is now filled with fuel rods 27 in a tight packing. With the handling gripper 26, the sleeve can now be lifted out of the holding basket 22 and transported further. The load-bearing element of the bushing is the pull rod 5, which, if necessary, can also have a decentralized position indicated in FIG. 5.

Zum Entleeren der in dichter Packung mit den Brennstäben 27 gefüllten Büchse nach den Figuren 1 bis 3 brauchen nur die Mutter 13 vom kopfseitigen Ende der Zugstange 5 gelöst und Büchsenkopf 2 und Büchsenfuß 3 mit Handhabungsgreifern ausein­andergezogen zu werden.For emptying the liner according to FIGS. 1 to 3, which is filled in tight packing with the fuel rods 27, only the nut 13 needs to be loosened from the head end of the pull rod 5 and the liner head 2 and liner base 3 are to be pulled apart with handling grippers.

Dies wird vorteilhaft in einer Wanne durchgeführt, in der die Büchse nach den Figuren 1 bis 3 liegt, so daß die durch die Schubplatte 11 aus dem Büchsenmantel 4 herausgedrückten Brenn­stäbe direkt in die Wanne fallen. Anschließend kann die Büchse wieder durch Aufsetzen des Büchsenkopfes 2 mit leerem Büchsenmantel 4 auf die Zugstange 5 und Aufschrauben der Mut­ter 13 auf das kopfseitige Ende dieser Zugstange 5 zusammen­gesetzt werden.This is advantageously carried out in a trough in which the sleeve according to FIGS. 1 to 3 lies, so that the fuel rods pushed out of the sleeve casing 4 by the thrust plate 11 fall directly into the trough. The bushing can then be put together again by placing the bushing head 2 with an empty bushing casing 4 on the pull rod 5 and screwing the nut 13 onto the head end of this pull rod 5.

Nach Abschrauben der Flanschmutter 6 vom fußseitigen Ende einer mit Brennstäben 27 gefüllten Büchse nach den Figuren 1 und 3 und Abheben des Büchsenfußes 3 von der auf dem Kopf stehenden Büchse mit Hilfe eines Handhabungsgreifers, der den Büchsenfuß 3 in den Durchführungen 30 im Mantel 3b hinter­ greift, können bei Bedarf auch einzelne Brennstäbe 27 mit einem geeigneten Ziehwerkzeug aus der Büchse herausgezogen werden. Anschließend kann die Büchse durch Aufsetzen des Büchsenfußes 3 auf das fußseitige Ende der Zugstange 5 und Festschrauben der Flanschmutter 6 wieder verschlossen werden.After unscrewing the flange nut 6 from the foot-side end of a bushing filled with fuel rods 27 according to FIGS. 1 and 3 and lifting the bushing foot 3 from the upside-down bushing with the aid of a handling gripper, the bushing foot 3 in the bushings 30 in the jacket 3b behind engages, if necessary, individual fuel rods 27 can also be pulled out of the sleeve using a suitable drawing tool. The bush can then be closed again by placing the bush foot 3 on the foot-side end of the pull rod 5 and screwing the flange nut 6 tight.

Büchsenkopf 2, Schubplatte 11 und das fußseitige Ende des Büchsenmantels 4 können mit Durchtrittsöffnungen (32 und 33) für ein Kühlmittel zum Abführen von Nachzerfallswärme versehen sein, die die in der Büchse nach den Figuren 1 bis 3 einge­setzten Brennstäbe abgeben können.The bush head 2, the thrust plate 11 and the foot end of the sleeve casing 4 can be provided with passage openings (32 and 33) for a coolant for removing post-decay heat, which the fuel rods used in the bush according to FIGS. 1 to 3 can emit.

Claims (5)

1. Büchse zum Aufnehmen eines Bündels Kernbrennstoff enthalten­der Brennstäbe mit einem Büchsenkopf, an dem ein Büchsenmantel befestigt ist, sowie mit einem Büchsenfuß, über den der Büchsenmantel lose gestülpt ist, dadurch ge­kennzeichnet, daß sich innerhalb des Büchsen­mantels (4) eine Zugstange (5) befindet, die mit einem kopf­seitigen Ende lösbar am Büchsenkopf (2) und mit dem anderen fußseitigen Ende am Büchsenfuß (3) befestigt ist, und daß die Zugstange (5) innerhalb des Büchsenmantels (4) eine zur Zug­stange (5) im rechten Winkel angeordnete Schubplatte (11) lose durchgreift, der innerhalb des Büchsenmantels (4) ein am kopf­seitigen Ende der Zugstange (5) lösbar angebrachter Anschlag­körper (12) zugeordnet ist.1. A bushing for receiving a bundle of fuel rods containing nuclear fuel with a bushing head to which a bushing jacket is fastened, and with a bushing foot over which the bushing jacket is loosely put, characterized in that a pull rod (5) is located within the bushing jacket (4). is located, which is releasably attached to the bush head (2) with one head end and with the other foot end to the bush foot (3), and that the pull rod (5) within the bush casing (4) is arranged at a right angle to the pull rod (5) Thrust plate (11) loosely engages, which is assigned a stop body (12) which is detachably attached to the head end of the pull rod (5) within the sleeve casing (4). 2. Büchse nach Anspruch 1, dadurch gekenn­zeichnet, daß die Zugstange (5) auch am Büchsenfuß (3) lösbar befestigt ist.2. Rifle according to claim 1, characterized in that the pull rod (5) is also releasably attached to the bush base (3). 3. Büchse nach Anspruch 1, dadurch gekenn­zeichnet, daß der Anschlagkörper eine Mutter (12) ist, die auf die Zugstange (5) aufgeschraubt ist.3. Bushing according to claim 1, characterized in that the stop body is a nut (12) which is screwed onto the pull rod (5). 4. Büchse nach Anspruch 1, dadurch gekenn­zeichnet, daß die Zugstange (5) den Büchsenkopf (2) lose durchgreift und mit einer Mutter (13) gehalten ist, die an der Außenseite des Büchsenkopfes (2) auf das kopfseitige Ende der Zugstange (5) aufgeschraubt ist.4. A bushing according to claim 1, characterized in that the pull rod (5) loosely engages through the bush head (2) and is held with a nut (13) which on the outside of the bush head (2) on the head end of the pull rod (5 ) is screwed on. 5. Büchse nach Anspruch 2, dadurch gekenn­zeichnet, daß am fußseitigen Ende der Zugstange (5) eine Flanschmutter (6) aufgeschraubt ist, die mit ihrem Flansch an der Außenseite des Büchsenfußes (3) anliegt und mit einem in den Flansch und in den Büchsenfuß (3) greifenden Stift (7) gegen Verdrehen gesichert ist.5. A bushing according to claim 2, characterized in that a flange nut (6) is screwed onto the foot end of the pull rod (5), the flange of which rests on the outside of the bushing foot (3) and with one in the flange and in the bushing foot (3) gripping pin (7) is secured against twisting.
EP89104924A 1988-03-31 1989-03-20 Envelope for housing a bundle of fuel rods containing nuclear fuel Ceased EP0336190A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE3811104 1988-03-31
DE3811104 1988-03-31

Publications (1)

Publication Number Publication Date
EP0336190A1 true EP0336190A1 (en) 1989-10-11

Family

ID=6351234

Family Applications (1)

Application Number Title Priority Date Filing Date
EP89104924A Ceased EP0336190A1 (en) 1988-03-31 1989-03-20 Envelope for housing a bundle of fuel rods containing nuclear fuel

Country Status (3)

Country Link
US (1) US4961900A (en)
EP (1) EP0336190A1 (en)
JP (1) JPH0212094A (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0654873A (en) * 1992-02-19 1994-03-01 Iwao Kasahara Supporter for correcting pollex valgus
JPH0713686Y2 (en) * 1991-06-14 1995-04-05 きみ子 清永 Correction tabi
JPH0741460Y2 (en) * 1992-07-28 1995-09-27 巌 笠原 Hallux valgus supporter
US5342158A (en) * 1992-09-30 1994-08-30 Gamma-Metrics Handling and deploying radioactive sources
JPH06304194A (en) * 1993-04-26 1994-11-01 Iwao Kasahara Supporter for correcting pollex valgus
JPH06304195A (en) * 1993-04-26 1994-11-01 Iwao Kasahara Supporter for correcting pollex valgus
US6318373B1 (en) 1999-09-20 2001-11-20 Iwao Kasahara Corrective supporter for correcting hallux valgus and digitus verus minimi deformity
US11515054B2 (en) 2011-08-19 2022-11-29 Holtec International Method of retrofitting a spent nuclear fuel storage system
US9640289B2 (en) * 2014-04-24 2017-05-02 Holtec International Storage system for nuclear fuel

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CH458552A (en) * 1965-04-09 1968-06-30 Gulf General Atomic Inc Container for a plurality of radioactive elements of a nuclear reactor
EP0128236A1 (en) * 1983-06-03 1984-12-19 Siemens Aktiengesellschaft Arrangement and method for storing spent fuel rods
EP0193041A1 (en) * 1985-02-25 1986-09-03 Siemens Aktiengesellschaft Device for introducing with a certain density nuclear fuel or neutron-absorbing material rods into a container

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4560532A (en) * 1982-04-15 1985-12-24 Westinghouse Electric Corp. Nuclear fuel assembly
US4508679A (en) * 1982-08-20 1985-04-02 General Electric Company Nuclear fuel assembly spacer
JPS60256096A (en) * 1984-06-01 1985-12-17 株式会社日立製作所 Fuel storage system for nuclear reactor

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CH458552A (en) * 1965-04-09 1968-06-30 Gulf General Atomic Inc Container for a plurality of radioactive elements of a nuclear reactor
EP0128236A1 (en) * 1983-06-03 1984-12-19 Siemens Aktiengesellschaft Arrangement and method for storing spent fuel rods
EP0193041A1 (en) * 1985-02-25 1986-09-03 Siemens Aktiengesellschaft Device for introducing with a certain density nuclear fuel or neutron-absorbing material rods into a container

Also Published As

Publication number Publication date
US4961900A (en) 1990-10-09
JPH0212094A (en) 1990-01-17

Similar Documents

Publication Publication Date Title
DE3017692C2 (en)
DE8709485U1 (en) Gripping tool for a device for remotely taking samples from a container, in particular a reactor pressure vessel
DE1930151A1 (en) Feed device for fasteners
DE8312630U1 (en) Device for blocking and releasing a drill rod with a substantially vertical axis
EP0336190A1 (en) Envelope for housing a bundle of fuel rods containing nuclear fuel
DE102009031272B3 (en) Lashing platform with magazine for twistlocks
DE2659430A1 (en) PACKAGING FOR THE TRANSPORT OF RADIATED FUEL ELEMENTS AND HANDLING TOOLS ADAPTED TO THIS
DE3131317C1 (en) Device for aligning tubular, essentially U-shaped hollow cross-section transport containers for dual-in-line housings before filling or emptying such transport containers
DE3110582C2 (en) Method for manipulating and / or storing a nuclear reactor fuel assembly
DE3315569A1 (en) METHOD AND MACHINE FOR MANIPULATING RODS
EP0742692B1 (en) Conveying trolley having a base plate and uprights
DE3242878C1 (en) Method for loading a container with rods of nuclear reactor fuel elements containing nuclear fuel or neutron absorber material and devices for carrying out this method
DE4042384C2 (en) Drum lifting device
DE2205677A1 (en) Method and apparatus for handling nuclear fuel element assemblies
DE3101875C2 (en) Container fastening device
DE2736222B2 (en) Lift catch
DE2043070B2 (en) Gripping device for bodies, in particular structures
DE3401422A1 (en) DEVICE FOR DETECTING AND LIFTING FILLED BAGS
DE2264383A1 (en) DEVICE FOR LIFTING AND TRANSPORTING A CORE REACTOR FUEL ELEMENT
EP0041162A1 (en) Lifting device for transporting containers
CH493261A (en) Device for installing and removing cylindrical filter cartridges from a filter container
EP0095222A1 (en) Device for gripping the upper edge of one or several metallic containers
DE3705181A1 (en) CORE REACTOR FUEL ELEMENT
EP1441974A1 (en) Container-spreader and pertaining container
DE3619237C2 (en)

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): DE ES FR SE

17P Request for examination filed

Effective date: 19891108

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION HAS BEEN REFUSED

18R Application refused

Effective date: 19920313