EP0281571A1 - Configuration de charpente/configuration de grenier et methode pour agrandir la surface d'habitation dans une maison - Google Patents

Configuration de charpente/configuration de grenier et methode pour agrandir la surface d'habitation dans une maison

Info

Publication number
EP0281571A1
EP0281571A1 EP87903453A EP87903453A EP0281571A1 EP 0281571 A1 EP0281571 A1 EP 0281571A1 EP 87903453 A EP87903453 A EP 87903453A EP 87903453 A EP87903453 A EP 87903453A EP 0281571 A1 EP0281571 A1 EP 0281571A1
Authority
EP
European Patent Office
Prior art keywords
roof
construction
loft
old
new
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP87903453A
Other languages
German (de)
English (en)
Inventor
Halfdan Langeland
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Publication of EP0281571A1 publication Critical patent/EP0281571A1/fr
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0266Enlarging
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0266Enlarging
    • E04G23/027Loft conversion by truss modification

Definitions

  • the present invention relates to a method for enlarging the living area in a dwelling house, preferably a relatively small or medium-sized single-family house/terrace house with ridge, saddle or hipped roof, where the roof trusses have a top angle which is so large that the loft cannot be lived in and which in all other respects correspond with the introductory part of the subsequent claim 1.
  • the invention also relates to a new roof construction with new technical detail solutions for use when implementing this method.
  • the disadvantage of an extension is primarily that the costs are relatively high, mainly due to the fact that the same work has to be carried out as when erecting a one-family house, i.e. foundation work, foundation walls, main storey and roof.
  • the costs of an extension can be compared with the costs of a single-family house . , leaving aside in either case the possibility of work by the owner himself. (The price per square metre of living area today amounts to about kr.
  • a definite advantage of opting for enlargement of the living area by extension as compared with the above mentioned building-on of a loft storey suitable for living in consists in the fact that the owner can continue to live in the house and to use it while it is being converted.
  • a similarly definite disadvantage consists in the encroachment on the site and the reduction of the site area. Furthermore enlargement of the area by extension can frequently be impossible owing to the fact that the sites in regulated building estates are frequently not sufficiently large to allow enlargement of the house by extension, and in such cases the enlargement of the living area has been inhibited.
  • the general aim has been to avoid, the disadvantages and defects associated with the state of the art and thus to arrive primarily at a method involving such measures as to enable the work to be carried out very quickly and particularly efficiently, another aim being to achieve a construction of high mechanical strength and low weight. Further, closely related objects will be apparent from the following description.
  • the costs are inter alia roughly half as high as the costs per square metre of living area (the calculated average price amounts to about kr. 2,500 incl. VAT per square metre of living area as in January 1986).
  • the construction time is short since the specialised work can normally be completed within 10 hours, the entire duration of the work having been calculated as amounting to from 10 to 12 days.
  • the method in accordance with the invention also involves a minimum encroachment on the living floor of the house,- it being sufficie to change and mount the staircase; there is no reduction or disturbance of the used site/ground area and no conflict as regards the boundaries of adjacent property.
  • the "construction pack" on which the method ' and the prefabricated roof elements for its implementation are based comprises the following steps:
  • New drawings are prepared (facades, sections and plans).
  • the probl of a staircase leading to the loft is solved by locating it above the existing basement staircase, or in the case o houses without basement, by using one of the floorson the main level as an area for the staircase.
  • the council has granted building permission, the building work can commence.
  • 3- Removal of existing roof floor and the gable top cladding (which can be carried out by the owner himself) . It should be noted that upright boards, roof gutters, rainwater heads and suspended roofs/ underroofs or possible shingles are normally not to be dismantled.
  • the new system is in principle based on this being retained and the roof being tight during the construction period, which again means a reduction in costs. 4- Once the dismantling operation has been completed, 3 joiners are put to work on the building and the new construction 2 is mounted.
  • the roof construction is prefabricated and dimensioned according to the calculations in such a way that laths for ventilation and cladding are not necessary (see design of rafters).
  • the new roof construction 11 is placed next to the old construction 10 and glued and nailed to the latter.
  • additional support is achieved, and the ceiling in the main storey is not affected by the construction work.
  • the subchord/beam of the new trusses is so dimensioned that with regard to the clear span between the jamb walls the layer of beams becomes self-bearing, i.e. that a support is not necessary. With extra long spans subchords/loft beams can be clamped and for further reinforcement hidden supports resting on the outer walls can be provided.
  • the suspended roof and laths are assembled (one gable is open) . According to the calculations it takes three men about 10 hours to assemble the trusses and to seal the new outer roof and gables.
  • the old roof and the trusses 1 which are within the living space of the new loft floor are removed and taken out through the open gable. Subsequently windows are fitted, the roof is covered e.g. with concrete tiles, the gable walls are fitted with laths and clad, the staircase is changed and the staircase leading to the loft is fitted.
  • hipped roofs too can be converted according to the same system, with that difference that on the gable sides the roof is closed with a half hip up to the loft gable.
  • the gable wall is pulled back 120 cm by comparison with the gable wall of the dwelling house.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Working Measures On Existing Buildindgs (AREA)
  • Door And Window Frames Mounted To Openings (AREA)
  • Residential Or Office Buildings (AREA)

Abstract

La configuration de charpente/configuration de grenier est une configuration de charpente préfabriquée, non-assemblée qui est assemblée sur le site de construction. On utilise une partie de l'ancienne configuration qui sert de support auxiliaire. En passant la partie inférieure de la semelle de poutre à travers le toit existant et en construisant le nouveau toit au-dessus, on obtient un toit étanche pendant toute la durée de la construction. Cette configuration permet de réaliser des planchers et des greniers suspendus librement et pouvant être situés comme on le désire. Le procédé est caractérisé en ce que l'on découpe un évidement dans les côtés de l'ancienne charpente de combles des deux côtés du toit, après quoi on passe les parties inférieures de semelles de poutres (poutres) que l'on assemble avec les parties inférieures de semlles de poutres existantes. Le piètement est spécialement adapté de sorte que lorsque les poutres traversières sont montées, on utilise les anciens chéneaux de tête et de toit. Lorsque le nouveau toit est étanche, l'ancien toit est enlevé jusqu'au niveau des murs de soutien. Sur de longues portées, des poutres en fer peuvent être passées à travers les parties inférieures de semelles de poutres.
EP87903453A 1986-06-06 1987-06-05 Configuration de charpente/configuration de grenier et methode pour agrandir la surface d'habitation dans une maison Withdrawn EP0281571A1 (fr)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
NO862262 1986-06-06
NO862262A NO862262L (no) 1986-06-06 1986-06-06 Framgangsmaate til utvidelse av boligarealet i et bolighus.

Publications (1)

Publication Number Publication Date
EP0281571A1 true EP0281571A1 (fr) 1988-09-14

Family

ID=19888966

Family Applications (1)

Application Number Title Priority Date Filing Date
EP87903453A Withdrawn EP0281571A1 (fr) 1986-06-06 1987-06-05 Configuration de charpente/configuration de grenier et methode pour agrandir la surface d'habitation dans une maison

Country Status (5)

Country Link
EP (1) EP0281571A1 (fr)
AU (1) AU7483787A (fr)
DK (1) DK369188D0 (fr)
NO (1) NO862262L (fr)
WO (1) WO1987007666A1 (fr)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102720370B (zh) * 2012-06-29 2015-06-24 湖南省第五工程有限公司 用于砼屋架翻身扶直的铁夹和预应力砼屋架翻身扶直方法
CN110348042A (zh) * 2019-05-23 2019-10-18 西南交通大学 一种提高空间网架结构安全性能的方法

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2980968A (en) * 1960-06-10 1961-04-25 Jones Ellis Method of enlarging a wood house
US3040479A (en) * 1960-06-27 1962-06-26 Ayotte Edward Thomas Process of converting a low pitch house to a house of higher pitch
FR2554488A2 (fr) * 1981-12-22 1985-05-10 Gary Jean Procede de transformation d'une charpente et elements de charpente en vue de la mise en oeuvre de ce procede
US4442640A (en) * 1983-03-25 1984-04-17 Gary Jean Pierre Method of converting a roof frame and frame elements for performing this method
FR2564882B1 (fr) * 1984-05-22 1986-10-31 Roux Paul Procede d'amenagement de combles initialement non amenageables et structure en resultant.
FR2569750B1 (fr) * 1984-08-31 1986-11-14 Fouchard Noel Procede de transformation de charpente destine a la surelevation d'un batiment sans modification de la pente du toit et poutre pouvant supporter le plancher nouvellement cree

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See references of WO8707666A1 *

Also Published As

Publication number Publication date
DK369188D0 (da) 1988-07-01
AU7483787A (en) 1988-01-11
NO862262D0 (no) 1986-06-06
WO1987007666A1 (fr) 1987-12-17
NO862262L (no) 1987-12-07

Similar Documents

Publication Publication Date Title
US8297024B2 (en) System and method for modifying existing structures to provide improved resistance to extreme environmental conditions
US20040103596A1 (en) Construction system for manufactured housing units
US20170121958A1 (en) Construction Method to Reinforce Masonry Walls with Wood
US7665251B1 (en) Structural steel framed houses with gable end frames, intermediate frames, and wall and roof panels having perimeters of C-shaped steel channels
Anderson Wood-frame house construction
US4265061A (en) Building system
US4852311A (en) Roof structures
US4955174A (en) Expandable building with modular roof system
EP0281571A1 (fr) Configuration de charpente/configuration de grenier et methode pour agrandir la surface d'habitation dans une maison
Designs Site Plan
Sherwood et al. Wood-frame house construction
US11746544B2 (en) Method and device for minimally invasive construction of additional level on a building
GB2200383A (en) Engineered housing
Chen et al. Design and construction of a two-story modern bamboo house
GB2355274A (en) Roofing with prefabricated panels
CZ19995A3 (en) Living unit, process of its production and a floor frame for such living unit
JP3168257B2 (ja) 木造住宅の施工方法
CA2412174A1 (fr) Systeme et methode de construction de batiments modulaires
Sparks The response of low-rise non-engineered structures to extreme wind conditions
AU1491100A (en) Combined floor, wall and roof frame/truss
AU2018417116A1 (en) Building including a cantilevered structure
SCALE Front Elevation
Hore et al. Structures and Superstructures
Twelvetrees Rivington's Notes on Building Construction
Forest Products Laboratory (US) Technique of house nailing

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 19880506

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE CH DE FR GB IT LI LU NL SE

17Q First examination report despatched

Effective date: 19891109

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN

18D Application deemed to be withdrawn

Effective date: 19900522