EP0278701B1 - Improvements in or relating to defrosting of heat exchangers - Google Patents
Improvements in or relating to defrosting of heat exchangers Download PDFInfo
- Publication number
- EP0278701B1 EP0278701B1 EP88300999A EP88300999A EP0278701B1 EP 0278701 B1 EP0278701 B1 EP 0278701B1 EP 88300999 A EP88300999 A EP 88300999A EP 88300999 A EP88300999 A EP 88300999A EP 0278701 B1 EP0278701 B1 EP 0278701B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- defrost
- heat exchanger
- interval
- controller
- defrost cycle
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000010257 thawing Methods 0.000 title claims description 23
- 238000005070 sampling Methods 0.000 claims abstract description 10
- 239000003507 refrigerant Substances 0.000 claims description 21
- 230000000977 initiatory effect Effects 0.000 claims description 18
- 238000001514 detection method Methods 0.000 claims description 4
- 238000001579 optical reflectometry Methods 0.000 claims description 3
- 230000015572 biosynthetic process Effects 0.000 claims description 2
- 230000001419 dependent effect Effects 0.000 claims description 2
- 230000003044 adaptive effect Effects 0.000 abstract 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 4
- 238000001704 evaporation Methods 0.000 description 3
- 238000000034 method Methods 0.000 description 3
- 238000001816 cooling Methods 0.000 description 2
- 230000003247 decreasing effect Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 230000006870 function Effects 0.000 description 2
- 238000010438 heat treatment Methods 0.000 description 2
- 238000012544 monitoring process Methods 0.000 description 2
- 230000002411 adverse Effects 0.000 description 1
- 230000004888 barrier function Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005485 electric heating Methods 0.000 description 1
- 230000008020 evaporation Effects 0.000 description 1
- 238000002347 injection Methods 0.000 description 1
- 239000007924 injection Substances 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000000750 progressive effect Effects 0.000 description 1
- 238000002310 reflectometry Methods 0.000 description 1
- 230000004044 response Effects 0.000 description 1
- 230000002441 reversible effect Effects 0.000 description 1
- 238000010561 standard procedure Methods 0.000 description 1
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F25—REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
- F25D—REFRIGERATORS; COLD ROOMS; ICE-BOXES; COOLING OR FREEZING APPARATUS NOT OTHERWISE PROVIDED FOR
- F25D21/00—Defrosting; Preventing frosting; Removing condensed or defrost water
- F25D21/002—Defroster control
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F25—REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
- F25B—REFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
- F25B2700/00—Sensing or detecting of parameters; Sensors therefor
- F25B2700/11—Sensor to detect if defrost is necessary
- F25B2700/111—Sensor to detect if defrost is necessary using an emitter and receiver, e.g. sensing by emitting light or other radiation and receiving reflection by a sensor
Definitions
- the present invention relates to the defrosting of heat exchangers particularly, but not exclusively, to the defrosting of a heat pump system.
- a fin-and-tube air-to-refrigerant heat exchanger is used as an evaporator in heat pump systems to collect heat from the air.
- frosting or icing up of the heat exchanger may occur.
- Such frosting both lowers (and, indeed, may stop) the throughput of air and acts as a barrier to the transfer of heat between the air and the primary and secondary surface material of the heat exchanger. It is conventional, therefore, to make provision for the heat exchanger to be defrosted from time to time where it is operating in low temperature humid air conditions where frosting occurs.
- a typical defrosting technique used with heat exchangers is the "hot-gas" technique; in this, by operation of suitable valving in the refrigerant circuit, the heat exchanger is injected with hot compressor discharge gas, the air-to-refrigerant evaporator thus operating temporarily as a condenser, thereby rejecting heat to the outside and causing the frosting or ice to be melted. Operation in this way obviously detracts from the overall efficiency of the heat pump since while the defrost cycle is in operation the evaporator is not able to fulfil its normal function of collecting heat from the surrounding air.
- a sensor is provided to detect frosting or icing up of the evaporator - this may be done, for example, by measuring the temperature of the primary or secondary surface of the evaporator, the refrigerant temperature or pressure, the air pressure difference across the coil, the optical reflectivity of the evaporator and so on.
- a control circuit periodically samples the output of this sensor to determine whether a defrost cycle should be initiated. The defrosting cycle may either be of fixed duration or terminated by sensing that the frost or ice has been melted.
- EP-A-0063178 discloses a heat pump defrost control system in which a defrost controller operates to adjust the interval to the initiation of the next defrost cycle on the basis of the difference in the times of the two preceding defrost cycles. This difference is multiplied by a constant and added to a basic time interval to determine the interval before the next defrost.
- EP-A-0021151 discloses a heat pump defrosting system corresponding to the precharacterising part of claim 1.
- the invention seeks to provide an improved way of controlling the interval between defrost cycles and provides a heat exchanger defrosting system comprising a heat exchanger liable to frosting, means operable to carry out a defrost cycle of the heat exchanger and a controller for controlling defrosting comprising means for initiating a defrost cycle on detection of an operating parameter having a value indicative of the need for defrosting of the heat exchanger, the controller in use sampling the values of one or more operating parameters of the system at intervals to determine whether a defrost cycle is required, and being operative to vary the interval between the end of one defrost cycle and the enablement of the start of the next depending on the length of said one defrost cycle to establish a longer interval when said length is shorter and vice versa, characterised in that the controller is operative to improve the overall operating efficiency of the system by increasing the interval between successive samplings if and only if the durations of the two preceding defrost cycles are both below a predetermined optimum range of durations for the
- the present invention provides, inter alia, a defrost controller for a heat exchanger which is operative to adapt the defrosting operation to prevailing conditions by increasing or decreasing the intervals between defrosting cycles as appropriate.
- Fig 1 shows an example of a heat pump to which the present invention may be applied and which comprises a compressor 1 for driving refrigerant around a refrigerant circuit comprising an air-to-refrigerant fin-and-tube evaporator 2 which is exposed to outside air, a condenser 3 in which the refrigerant cools and rejects heat to another medium such as water in a hot-water supply circuit or space air, a refrigerant expansion device 4 which may be a thermostatic expansion valve or an electronically controlled expansion valve and a hot gas injection valve 12.
- a compressor 1 for driving refrigerant around a refrigerant circuit comprising an air-to-refrigerant fin-and-tube evaporator 2 which is exposed to outside air
- a condenser 3 in which the refrigerant cools and rejects heat to another medium such as water in a hot-water supply circuit or space air
- a refrigerant expansion device 4 which may be a thermostatic expansion valve or an electronically controlled expansion valve and
- the system has associated with it a system controller 5 which incorporates electronic circuitry and appropriate interfaces to enable the system to operate under the control of one or more inputs generally designated 6 which may, for example, be used to signal to the system controller 5 a set point value for one or more relevant operating parameters of the system.
- An example of such a parameter is the temperature of the secondary medium leaving the condenser 3 where the system is intended primarily for heating purposes.
- a set point for air or water leaving the evaporator can be applied by one of the inputs 6 to the system controller 5.
- the system controller 5 has various sensors associated with it and distributed around the elements of the refrigerant circuit are electro-mechanical devices such as solenoid valves for controlling the refrigerant flow around the refrigerant circuit and to control the progressive loading and unloading of the compressor 1 in response to increasing and decreasing cooling or heating demands.
- electro-mechanical devices such as solenoid valves for controlling the refrigerant flow around the refrigerant circuit and to control the progressive loading and unloading of the compressor 1 in response to increasing and decreasing cooling or heating demands.
- One of the functions of the system controller 5 is, in appropriate operating conditions, periodically to determine whether defrosting of the evaporator 2 is required and, if so, to initiate and control a defrosting cycle.
- the evaporator 2 (or each evaporator where there is a number of them) has associated with it a sensor 7 which can supply to the system controller 5 a signal (such as an analogue voltage) which when compared with a reference value is indicative of the need or otherwise for the initiation of a defrost cycle.
- the sensor 7 may detect the temperature of the primary or secondary surface of the evaporator 2, the air pressure difference across the evaporator coil (which will increase as the evaporator coil frosts up), the pressure in, or pressure difference across, an appropriate part of the refrigerant system (such as at the exit of the evaporator 2), the optical reflectivity of the exterior of the evaporator or by any other variable indicative of the actual or likely occurrence of frosting.
- the system controller 5 may be implemented using discrete electronic components, IC digital logic circuits or be based around a suitably programmed micro-computer.
- the system controller 5 is to be implemented using a microprocessor (MPU) and associated interfacing and support circuitry.
- MPU microprocessor
- the MPU 10 will execute a suitable program stored in a non-volatile, usually read only memory (ROM), have random access memory (RAM) available as program workspace and be provided with suitable interfaces to accept control and information signals and emit data and commands signals in a form electrically compatible with the controlled or controlling equipment of the heat pump system.
- the program for the MPU 10 will be such as to cause a desired control algorithm for the heat pump to be carried into effect. In particular, this program may be used in implementing the present invention.
- the system controller 5 includes a defrost interval timer 8 which is used to generate a defrost-enable signal 9 which is used to signal the microprocessor 10 that the time has been reached at which a determination is to be made of whether a defrost cycle should be initiated.
- the timer 8 may be implemented by means of a MPU register or RAM memory location in which a timing count is loaded, its value being incremented or decremented at appropriate intervals and a time-out determination made i.e. by the start of the timing interval, the time 8 can be loaded with a number representing the interval in, say, minutes or seconds with this value then being decremented periodically (for example every second or minute as appropriate) and then a determination be made by the microprocessor 10 to whether the count has reached zero.
- the MPU 10 makes a determination, from the output of one of more of the sensors 7, as to whether a defrost cycle is to be initiated. If the determination is that a defrost cycle is required, the system controller 5 sends the appropriate control signals to the electro-mechanical devices controlling operation of the heat pump to initiate a hot-gas defrost cycle, in this case by the hot gas defrost in which hot, gaseous refrigerant is delivered to the evaporator 2 via valve 12.
- the defrost cycle length timer 11 is activated and this is used to record the time that the defrost cycle actually takes to complete. This may be achieved by initially storing a count of zero in the timer 11 and having the MPU 10 increment this at regular intervals. At appropriate intervals during the defrost cycle the MPU checks the output of the sensor(s) 7 to determine whether the defrost cycle is completed. At the end of the defrost cycle, the timer 11 will contain information as to the time which was taken to carry out the defrost cycle. This value is then used to determine whether an adjustment needs to be made of the defrost sampling interval in the next cycle.
- This determination can be made on the basis that a long defrost time suggest adverse operating conditions making more frequent defrost cycles desirable while a shorter than expected defrost cycle, indicating that defrosting is completing in less time than was expected, suggests that a longer defrost interval can be tolerated (and in the interests of efficiency this determination should be followed by an increase in the defrost interval).
- the adjustment of the defrost interval can be done in a step-wise or linear manner or, indeed, in accordance with any other law appropriate to the circumstances.
- Figures 3 and 4 illustrate one arrangement in which adjustment is made in a series of steps.
- the controller 5 issues a command for defrost to be carried out. It may be carried out by any of the standard methods such as the hot gas mentioned above, electric heating elements, warm water, etc, until defrost completion is detected by any one of the sensing methods described above.
- the controller 5 can provide control facilities through which each of the parameter set points may be varied, for example, defrost initiation occurring between 3°C and 9°C, the higher value enabling evaporator coil secondary surface temperatures to be effectively monitored; in the case of defrost termination temperatures between 5°C and 15°C may be selected.
- the controller 5 includes a control facility in which the maximum optimum defrost period may be preset, for example between 1 and 6 minutes in the example shown in fig 3, and as described below. Below optimum band, 0 to 75% of preset maximum optimum defrost period Optimum band within 75% to 100% of the present maximum optimum defrost period, Above optimum band 100% to 200% of preset maximum optimum defrost period.
- the actual defrost time taken as established by the defrost duration timer 11 is compared by the controller 5 with those defined parameters in fig 3 to determine in which band the defrost termination signal occurred.
- the controller 5 has a control facility in which the 100% parameter for the interval time between defrost initiations may be set, for example between 30 and 90 minutes as another set point.
- the subsequent interval between defrost will be incremented by a discrete percentage value i.e. to 120% of the original preset interval. If the system interval time for a defrost initiation is reached and the defrost initiation sensor temperature is greater than that at which defrost is required then no defrosting will take place and the control system will automatically increment the control defrost interval time.
- the interval between defrost is again incremented to a longer time interval until a maximum value is reached, for example if fig 4, up to 160%. If the actual defrost period terminates within the "optimum band", in the illustrated example 75 to 100% of the set point (period Y), then no change will occur to the controlled interval time between defrost initiations. Thus, in this condition the controller 5 takes account of the defrost times necessary and the time interval between defrosts to achieve an optimum operating condition.
- the subsequent interval between defrost will be decremented and if necessary after subsequent defrosts further decremented, until a minimum time between defrosts is reached.
- defrost termination will occur irrespective of the signal from the defrost termination sensor, i.e. this is a maximum defrost time override condition.
- the defrost interval time can return to the 100% set point or remain at the previous operating set point.
- the above logic is applicable to any evaporator coil circuit that is defrosted in total.
- Fig 5 shows part of a heat-pump system having a number of evaporators EVAP1, EVAP2, EVAPN, with associated solenoid valves SV, refrigerant expansion devices tev and defrost sensors SI...SN.
- the controller 5 can cause defrosting of some circuits while others continue operation as evaporators.
- the controller 5 is arranged to have the capability of dictating the defrost logic such that coincident defrosting of all the evaporators is inhibited.
- the defrost cycle for this type of evaporator coil arrangement is determined on the basis of previous defrost times.
- the actual defrost time for a particular evaporator EVAPX is compared to the parameters as defined in fig 2 to determine in which band the defrost termination signal occurred. This information is then related to the information obtained for the previous defrost time on the other coil(s) and the following decision table can be used to update the defrost interval time:-
- controller 5 dictates that each circuit is sensed for defrost in sequence within the time interval between defrost as shown in fig 6.
- the time interval at which the next coil defrost cycle is initiated in the case of two coils, will be half the defrost time interval determined by fig 4.
- the actual time interval is divided evenly amongst the number of coils involved.
- each evaporator has its own sensor designated S1...Sn; when evaporator EVAP1 has terminated its defrost, the time taken D1, is used for the controller 5 to select the time interval T1 between defrosts (fig 4) based on table 1. The time then allocated before defrost initiation of the next evaporator EVAP2, is in the case shown in, T1/2 (fig 6). After the second evaporator EVAP2 has defrosted then the defrost time D2 is used for the controller to select the revised time interval T2 between defrost initiation (fig 4) based on table 1.
- the revised time before defrost initiation of the first evaporator EVAP1 again is T2/2.
- two such sensors may be provided at opposite sides (in the direction of air flow through the evaporator) of the evaporator and means may be provided to select for monitoring purposes, whichever of those sensors whose output indicates the greater likelihood of frosting.
- the output used would be the one from the sensor 7 indicating the lower evaporator temperature.
- the time to defrost is variable dependent upon the capacity load being generated at that time (eg 1/2 or 1/4 load) - the greater the unloading, the higher the evaporating temperature which in turn reduces the likelihood of frost formation.
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Physics & Mathematics (AREA)
- Mechanical Engineering (AREA)
- Thermal Sciences (AREA)
- General Engineering & Computer Science (AREA)
- Defrosting Systems (AREA)
- Air Conditioning Control Device (AREA)
Abstract
Description
- The present invention relates to the defrosting of heat exchangers particularly, but not exclusively, to the defrosting of a heat pump system.
- A fin-and-tube air-to-refrigerant heat exchanger is used as an evaporator in heat pump systems to collect heat from the air. At low ambient temperatures frosting or icing up of the heat exchanger may occur. Such frosting both lowers (and, indeed, may stop) the throughput of air and acts as a barrier to the transfer of heat between the air and the primary and secondary surface material of the heat exchanger. It is conventional, therefore, to make provision for the heat exchanger to be defrosted from time to time where it is operating in low temperature humid air conditions where frosting occurs.
- A typical defrosting technique used with heat exchangers is the "hot-gas" technique; in this, by operation of suitable valving in the refrigerant circuit, the heat exchanger is injected with hot compressor discharge gas, the air-to-refrigerant evaporator thus operating temporarily as a condenser, thereby rejecting heat to the outside and causing the frosting or ice to be melted. Operation in this way obviously detracts from the overall efficiency of the heat pump since while the defrost cycle is in operation the evaporator is not able to fulfil its normal function of collecting heat from the surrounding air. Conventionally, a sensor is provided to detect frosting or icing up of the evaporator - this may be done, for example, by measuring the temperature of the primary or secondary surface of the evaporator, the refrigerant temperature or pressure, the air pressure difference across the coil, the optical reflectivity of the evaporator and so on. Conventionally, a control circuit periodically samples the output of this sensor to determine whether a defrost cycle should be initiated. The defrosting cycle may either be of fixed duration or terminated by sensing that the frost or ice has been melted.
- Taking steps to control the interval between defrost cycle is, in itself, known.
- EP-A-0063178 discloses a heat pump defrost control system in which a defrost controller operates to adjust the interval to the initiation of the next defrost cycle on the basis of the difference in the times of the two preceding defrost cycles. This difference is multiplied by a constant and added to a basic time interval to determine the interval before the next defrost. EP-A-0021151 discloses a heat pump defrosting system corresponding to the precharacterising part of
claim 1. - The invention seeks to provide an improved way of controlling the interval between defrost cycles and provides a heat exchanger defrosting system comprising a heat exchanger liable to frosting, means operable to carry out a defrost cycle of the heat exchanger and a controller for controlling defrosting comprising means for initiating a defrost cycle on detection of an operating parameter having a value indicative of the need for defrosting of the heat exchanger, the controller in use sampling the values of one or more operating parameters of the system at intervals to determine whether a defrost cycle is required, and being operative to vary the interval between the end of one defrost cycle and the enablement of the start of the next depending on the length of said one defrost cycle to establish a longer interval when said length is shorter and vice versa, characterised in that the controller is operative to improve the overall operating efficiency of the system by increasing the interval between successive samplings if and only if the durations of the two preceding defrost cycles are both below a predetermined optimum range of durations for the defrost cycle, whereas the controller is operative to decrease the intervals between the successive samplings if the duration of the most recent defrost cycle is greater than a predetermined optimum range of durations for the defrost cycle.
- As will be apparent from the above, the present invention provides, inter alia, a defrost controller for a heat exchanger which is operative to adapt the defrosting operation to prevailing conditions by increasing or decreasing the intervals between defrosting cycles as appropriate.
- The invention will be further described with reference to the accompanying drawings in which:-
- Fig 1 is a somewhat schematic block diagram of a heat pump with which the present invention may be used.
- Fig 2 is a functional block diagram showing the defrost controller.
- Fig 3 shows how the defrost time may be varied by the controller of fig 2.
- Fig 4 shows how the time interval between defrost may be adjusted as a percentage of a set-point value.
- Fig 5 shows part of a multi-evaporator heat pump system with which the present invention may be employed.
- Fig 6 shows how the defrost controller may operate with a system such as that shown in fig 5.
- Fig 1 shows an example of a heat pump to which the present invention may be applied and which comprises a
compressor 1 for driving refrigerant around a refrigerant circuit comprising an air-to-refrigerant fin-and-tube evaporator 2 which is exposed to outside air, acondenser 3 in which the refrigerant cools and rejects heat to another medium such as water in a hot-water supply circuit or space air, a refrigerant expansion device 4 which may be a thermostatic expansion valve or an electronically controlled expansion valve and a hotgas injection valve 12. - The system has associated with it a system controller 5 which incorporates electronic circuitry and appropriate interfaces to enable the system to operate under the control of one or more inputs generally designated 6 which may, for example, be used to signal to the system controller 5 a set point value for one or more relevant operating parameters of the system. An example of such a parameter is the temperature of the secondary medium leaving the
condenser 3 where the system is intended primarily for heating purposes. Of course, where a cooling demand is to be serviced by the evaporator, a set point for air or water leaving the evaporator can be applied by one of theinputs 6 to the system controller 5. As is conventional, the system controller 5 has various sensors associated with it and distributed around the elements of the refrigerant circuit are electro-mechanical devices such as solenoid valves for controlling the refrigerant flow around the refrigerant circuit and to control the progressive loading and unloading of thecompressor 1 in response to increasing and decreasing cooling or heating demands. - One of the functions of the system controller 5 is, in appropriate operating conditions, periodically to determine whether defrosting of the
evaporator 2 is required and, if so, to initiate and control a defrosting cycle. For this purpose, the evaporator 2 (or each evaporator where there is a number of them) has associated with it asensor 7 which can supply to the system controller 5 a signal (such as an analogue voltage) which when compared with a reference value is indicative of the need or otherwise for the initiation of a defrost cycle. As mentioned above, thesensor 7 may detect the temperature of the primary or secondary surface of theevaporator 2, the air pressure difference across the evaporator coil (which will increase as the evaporator coil frosts up), the pressure in, or pressure difference across, an appropriate part of the refrigerant system (such as at the exit of the evaporator 2), the optical reflectivity of the exterior of the evaporator or by any other variable indicative of the actual or likely occurrence of frosting. - The system controller 5 may be implemented using discrete electronic components, IC digital logic circuits or be based around a suitably programmed micro-computer. In the following, it will be assumed that the system controller 5 is to be implemented using a microprocessor (MPU) and associated interfacing and support circuitry. Thus the
MPU 10 will execute a suitable program stored in a non-volatile, usually read only memory (ROM), have random access memory (RAM) available as program workspace and be provided with suitable interfaces to accept control and information signals and emit data and commands signals in a form electrically compatible with the controlled or controlling equipment of the heat pump system. The program for the MPU 10 will be such as to cause a desired control algorithm for the heat pump to be carried into effect. In particular, this program may be used in implementing the present invention. - In the following description given with reference to fig 2, two timer registers (8 and 11) are shown which in operation store counts associated with and determining the execution of the defrost cycle. Depending on the implementation of the system controller 5, these may again be in the form of discrete electronic components, digital logic ICs such as digital counters or could be program variables in the execution of the system controller's control program. The system controller 5 includes a
defrost interval timer 8 which is used to generate a defrost-enable signal 9 which is used to signal themicroprocessor 10 that the time has been reached at which a determination is to be made of whether a defrost cycle should be initiated. In the case of the system controller 5 being based round aMPU 10, thetimer 8 may be implemented by means of a MPU register or RAM memory location in which a timing count is loaded, its value being incremented or decremented at appropriate intervals and a time-out determination made i.e. by the start of the timing interval, thetime 8 can be loaded with a number representing the interval in, say, minutes or seconds with this value then being decremented periodically (for example every second or minute as appropriate) and then a determination be made by themicroprocessor 10 to whether the count has reached zero. - When a defrost interval time-out has occurred, the
MPU 10 makes a determination, from the output of one of more of thesensors 7, as to whether a defrost cycle is to be initiated. If the determination is that a defrost cycle is required, the system controller 5 sends the appropriate control signals to the electro-mechanical devices controlling operation of the heat pump to initiate a hot-gas defrost cycle, in this case by the hot gas defrost in which hot, gaseous refrigerant is delivered to theevaporator 2 viavalve 12. - At the start of a defrost cycle, the defrost cycle length timer 11 is activated and this is used to record the time that the defrost cycle actually takes to complete. This may be achieved by initially storing a count of zero in the timer 11 and having the
MPU 10 increment this at regular intervals. At appropriate intervals during the defrost cycle the MPU checks the output of the sensor(s) 7 to determine whether the defrost cycle is completed. At the end of the defrost cycle, the timer 11 will contain information as to the time which was taken to carry out the defrost cycle. This value is then used to determine whether an adjustment needs to be made of the defrost sampling interval in the next cycle. This determination can be made on the basis that a long defrost time suggest adverse operating conditions making more frequent defrost cycles desirable while a shorter than expected defrost cycle, indicating that defrosting is completing in less time than was expected, suggests that a longer defrost interval can be tolerated (and in the interests of efficiency this determination should be followed by an increase in the defrost interval). As mentioned above, the adjustment of the defrost interval can be done in a step-wise or linear manner or, indeed, in accordance with any other law appropriate to the circumstances. - Figures 3 and 4 illustrate one arrangement in which adjustment is made in a series of steps.
- Having detected that defrost is necessary, the controller 5 issues a command for defrost to be carried out. It may be carried out by any of the standard methods such as the hot gas mentioned above, electric heating elements, warm water, etc, until defrost completion is detected by any one of the sensing methods described above.
- In the illustrated system described above the initiation and termination of the defrost cycle are achieved using a
temperature sensor 7. In this case, the controller 5 can provide control facilities through which each of the parameter set points may be varied, for example, defrost initiation occurring between 3°C and 9°C, the higher value enabling evaporator coil secondary surface temperatures to be effectively monitored; in the case of defrost termination temperatures between 5°C and 15°C may be selected. - The controller 5 includes a control facility in which the maximum optimum defrost period may be preset, for example between 1 and 6 minutes in the example shown in fig 3, and as described below.
Below optimum band, 0 to 75% of preset maximum optimum defrost period
Optimum band within 75% to 100% of the present maximum optimum defrost period,
Aboveoptimum band 100% to 200% of preset maximum optimum defrost period. - The actual defrost time taken as established by the defrost duration timer 11 is compared by the controller 5 with those defined parameters in fig 3 to determine in which band the defrost termination signal occurred.
- In addition the controller 5 has a control facility in which the 100% parameter for the interval time between defrost initiations may be set, for example between 30 and 90 minutes as another set point. In the event of the actual defrost period terminating within the "below optimum band" as shown in fig 3 (period X) then the subsequent interval between defrost will be incremented by a discrete percentage value i.e. to 120% of the original preset interval. If the system interval time for a defrost initiation is reached and the defrost initiation sensor temperature is greater than that at which defrost is required then no defrosting will take place and the control system will automatically increment the control defrost interval time. If subsequent defrost period is still within the "below optimum band" then the interval between defrost is again incremented to a longer time interval until a maximum value is reached, for example if fig 4, up to 160%. If the actual defrost period terminates within the "optimum band", in the illustrated example 75 to 100% of the set point (period Y), then no change will occur to the controlled interval time between defrost initiations. Thus, in this condition the controller 5 takes account of the defrost times necessary and the time interval between defrosts to achieve an optimum operating condition.
- If the actual defrost period terminates in the "above optimum band", i.e. in the illustrated example 100% to 200% of the preset datum point (period Z), then the subsequent interval between defrost will be decremented and if necessary after subsequent defrosts further decremented, until a minimum time between defrosts is reached.
- At 200% of maximum optimum defrost period, defrost termination will occur irrespective of the signal from the defrost termination sensor, i.e. this is a maximum defrost time override condition.
- Depending upon the particular application in question, after compressor shut-down the defrost interval time can return to the 100% set point or remain at the previous operating set point.
- At any start-up of the
compressor 1 following normal, controlled shutdown, 5 minutes is added to the remaining defrost interval time by adding 5 minutes to the time value stored intime 8, to inhibit early defrost initiation and to ensure stable running operating conditions are achieved. - The above logic is applicable to any evaporator coil circuit that is defrosted in total.
- The invention is, however, equally applicable to a system having a number of heat exchangers subject to defrosting. Fig 5, for example, shows part of a heat-pump system having a number of evaporators EVAP1, EVAP2, EVAPN, with associated solenoid valves SV, refrigerant expansion devices tev and defrost sensors SI...SN. In such multi-coil circuits, the controller 5 can cause defrosting of some circuits while others continue operation as evaporators.
- In such an arrangement, the controller 5 is arranged to have the capability of dictating the defrost logic such that coincident defrosting of all the evaporators is inhibited.
- The defrost cycle for this type of evaporator coil arrangement is determined on the basis of previous defrost times.
- For example:
At the conclusion of a defrost, the actual defrost time for a particular evaporator EVAPX is compared to the parameters as defined in fig 2 to determine in which band the defrost termination signal occurred. This information is then related to the information obtained for the previous defrost time on the other coil(s) and the following decision table can be used to update the defrost interval time:- - To ensure maximum energy is available for the defrost cycle when multiple evaporator coil circuits are involved the controller 5 dictates that each circuit is sensed for defrost in sequence within the time interval between defrost as shown in fig 6.
- At the termination of a defrost the time interval at which the next coil defrost cycle is initiated, in the case of two coils, will be half the defrost time interval determined by fig 4.
- In case of additional multiple evaporator coils the actual time interval is divided evenly amongst the number of coils involved.
- Referring back to the illustration in fig 5, each evaporator has its own sensor designated S1...Sn; when evaporator EVAP1 has terminated its defrost, the time taken D1, is used for the controller 5 to select the time interval T1 between defrosts (fig 4) based on table 1. The time then allocated before defrost initiation of the next evaporator EVAP2, is in the case shown in, T1/2 (fig 6). After the second evaporator EVAP2 has defrosted then the defrost time D2 is used for the controller to select the revised time interval T2 between defrost initiation (fig 4) based on table 1. In the case of only two evaporators, the revised time before defrost initiation of the first evaporator EVAP1 again is T2/2. Thus it can be seen that the time between defrost initiation of evaporation in turn is constantly varied but is always biased towards a maximum value in order to restrict the number of defrost cycles to a minimum.
- In the case of implementations of the
sensor 7 such as by temperature detection or reflectivity detection, to account for variables such as differences in prevailing winds, two such sensors may be provided at opposite sides (in the direction of air flow through the evaporator) of the evaporator and means may be provided to select for monitoring purposes, whichever of those sensors whose output indicates the greater likelihood of frosting. In other words, in the case of temperature monitoring, the output used would be the one from thesensor 7 indicating the lower evaporator temperature. - The principle described above for using multiple sensors may be accepted on a single evaporator coil to overcome the problem associated with variable conditions existing on either side of the coil due to wind/sleet etc.
- Significant aspects of the above described system controller include the following:
- 1. It varies the time interval between initiations of a defrost cycle.
- 2. It utilises the time taken to achieve a satisfactory defrost to determine selectively the time interval at which the next defrost should be initiated if required.
- 3. The defrost interval time may be either incremented or decremented.
- 4. By measuring the defrost time, the controller effectively compensates for the type and degree of frost or ice that has accumulated on the heat exchanger surface.
- 5. By virtue of 4, the controller effectively takes into account the moisture content of the air passing over the heat exchanger, the prevailing refrigerant evaporating temperature, the air temperature and the capacity load on the heat exchanger. If the coil is cold but no ice is forming, the defrost time will be very short; the system recognises that the latent heat requirement is low (i.e. the relative humidity of the air is low) and thus increments the time between defrosts. The system also takes into account the amount of heat available to carry out defrost.
- 6. Any or all of the following system set points are variable.
- (i) defrost time
- (ii) defrost interval time
- (iii) defrost initiation parameter (eg coil temperature)
- (iv) defrost termination parameter (eg coil temperature)
- 7. The defrost time interval is incremented or decremented by a percentage of the interval time set point.
- 8. By restricting to a minimum the time during which defrost is recurring the EER (energy efficiency ratio) or COP (coefficient of performance) is held at a maximum value for the prevailing ambient conditions.
- 9. When multiple evaporator circuits are involved, equally time spaced defrosts are initiated in sequence. No two coils can be defrosted simultaneously.
- 10. The coil demanding maximum defrost capability takes priority.
- 11. On start up the controller will not initiate any defrost cycle prematurely to ensure stable conditions are established.
- 12. It ensures equal number of defrosts per evaporator.
- 13. It provides a time delay at start of operation before timing of the defrost initiation sampling interval can commence (eg 5 minutes).
- It will be apparent from the above that the system is applicable to a wide variety of heat pump systems including unidirectional and reversible ones and ones with refrigerant/air as well as to other types of heat exchanger in use of which frosting and icing problems occur.
- The time to defrost is variable dependent upon the capacity load being generated at that time (
eg 1/2 or 1/4 load) - the greater the unloading, the higher the evaporating temperature which in turn reduces the likelihood of frost formation.
Claims (5)
- A heat exchanger defrosting system comprising a heat exchanger liable to frosting, means operable to carry out a defrost cycle of the heat exchanger and a controller for controlling defrosting comprising means for initiating a defrost cycle on detection of an operating parameter having a value indicative of the need for defrosting of the heat exchanger, the controller in use sampling the values of one or more operating parameters of the system at intervals to determine whether a defrost cycle is required, and being operative to vary the interval between the end of one defrost cycle and the enablement of the start of the next depending on the length of said one defrost cycle to establish a longer interval when said length is shorter and vice versa, characterised in that the controller is operative to improve the overall operating efficiency of the system by increasing the interval between successive samplings if and only if the durations of the two preceding defrost cycles are both below a predetermined optimum range of durations for the defrost cycle, whereas the controller is operative to decrease the intervals between the successive samplings if the duration of the most recent defrost cycle is greater than a predetermined optimum range of durations for the defrost cycle.
- A heat exchanger defrost system according to claim 1, wherein the controller is operative to increase or decrease the sampling interval by a fraction dependent upon the measured defrost duration.
- A system according to any one of the preceding claims wherein the controller includes at least one sensor for measuring the heat exchanger air surface temperature or optical reflectivity or the air pressure difference across the heat exchanger to determine whether defrosting is required.
- A system according to any one of the preceding claims wherein the heat exchanger has two sides alternatively more liable to frosting depending on prevailing conditions, and wherein sensors are provided at both such sides of the heat exchanger, in order to ensure that the defrost interval will be dictated by the sensor that is located in that position where frost formation is dominant.
- A heat pump system comprising a refrigerant circuit having a refrigerant compressor, a refrigerant condensor and at least one refrigerant evaporator comprising a heat exchanger defrosting system according to any one of the preceding claims.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
AT8888300999T ATE105071T1 (en) | 1987-02-06 | 1988-02-05 | DEFROST SYSTEM FOR HEAT EXCHANGER. |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
GB8702722 | 1987-02-06 | ||
GB878702722A GB8702722D0 (en) | 1987-02-06 | 1987-02-06 | Defrosting of heat exchangers |
Publications (3)
Publication Number | Publication Date |
---|---|
EP0278701A2 EP0278701A2 (en) | 1988-08-17 |
EP0278701A3 EP0278701A3 (en) | 1989-10-04 |
EP0278701B1 true EP0278701B1 (en) | 1994-04-27 |
Family
ID=10611837
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP88300999A Expired - Lifetime EP0278701B1 (en) | 1987-02-06 | 1988-02-05 | Improvements in or relating to defrosting of heat exchangers |
Country Status (5)
Country | Link |
---|---|
EP (1) | EP0278701B1 (en) |
AT (1) | ATE105071T1 (en) |
DE (1) | DE3889237D1 (en) |
ES (1) | ES2055736T3 (en) |
GB (1) | GB8702722D0 (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE60030971T2 (en) * | 2000-08-18 | 2007-06-14 | Ranco Inc. Of Delaware, Wilmington | Control device and method for controlling defrosting in a refrigerator |
WO2011041780A2 (en) * | 2009-10-02 | 2011-04-07 | The Controls Group, Inc. | Removal of an accumulated frozen substance from a cooling unit |
FR3101137B1 (en) * | 2019-09-19 | 2022-03-18 | Guinault Sa | Air conditioning unit for aircraft |
Family Cites Families (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4206612A (en) * | 1977-07-15 | 1980-06-10 | Emhart Industries, Inc. | Refrigeration system control method and apparatus |
DE2850198A1 (en) * | 1978-11-18 | 1980-05-29 | Hamadeh | Deicing control for refrigerator plant - has heating elements controlled in groups with temp. sensor cut=out to minimise energy consumed |
US4251988A (en) * | 1978-12-08 | 1981-02-24 | Amf Incorporated | Defrosting system using actual defrosting time as a controlling parameter |
US4680940A (en) * | 1979-06-20 | 1987-07-21 | Vaughn Eldon D | Adaptive defrost control and method |
US4328680A (en) * | 1980-10-14 | 1982-05-11 | General Electric Company | Heat pump defrost control apparatus |
DE3043459A1 (en) * | 1980-11-18 | 1982-07-08 | Linde Ag, 6200 Wiesbaden | DEFROST THE REQUIRED FURNITURE |
DE3110042A1 (en) * | 1981-03-16 | 1982-09-30 | Gesellschaft für Wärmepumpen und Energierückgewinnungsanlagen mbH, 7311 Holzmaden | Method and arrangement for the defrosting of ice on an air cooler of a heat pump or refrigerator |
DE3115599C2 (en) * | 1981-04-16 | 1986-07-10 | KKW Kulmbacher Klimageräte-Werk GmbH, 8650 Kulmbach | Defrost control for a heat pump |
US4395887A (en) * | 1981-12-14 | 1983-08-02 | Amf Incorporated | Defrost control system |
DE3235642A1 (en) * | 1982-09-25 | 1984-03-29 | 3 E Elektronik-Elektro-Energieanlagen Baugesellschaft mbH, 5500 Trier | Device for electric defrost regulation for the evaporator of a refrigerating plant |
DE3238354A1 (en) * | 1982-10-15 | 1984-04-19 | Siemens AG, 1000 Berlin und 8000 München | METHOD FOR DEFROSTING THE EVAPORATOR OF AN EXAMPLE OF A REFRIGERATOR USED AS A HEAT PUMP |
US4538420A (en) * | 1983-12-27 | 1985-09-03 | Honeywell Inc. | Defrost control system for a refrigeration heat pump apparatus |
US4563877A (en) * | 1984-06-12 | 1986-01-14 | Borg-Warner Corporation | Control system and method for defrosting the outdoor coil of a heat pump |
US4627245A (en) * | 1985-02-08 | 1986-12-09 | Honeywell Inc. | De-icing thermostat for air conditioners |
-
1987
- 1987-02-06 GB GB878702722A patent/GB8702722D0/en active Pending
-
1988
- 1988-02-05 DE DE3889237T patent/DE3889237D1/en not_active Expired - Lifetime
- 1988-02-05 ES ES88300999T patent/ES2055736T3/en not_active Expired - Lifetime
- 1988-02-05 AT AT8888300999T patent/ATE105071T1/en not_active IP Right Cessation
- 1988-02-05 EP EP88300999A patent/EP0278701B1/en not_active Expired - Lifetime
Also Published As
Publication number | Publication date |
---|---|
GB8702722D0 (en) | 1987-03-11 |
EP0278701A3 (en) | 1989-10-04 |
EP0278701A2 (en) | 1988-08-17 |
DE3889237D1 (en) | 1994-06-01 |
ATE105071T1 (en) | 1994-05-15 |
ES2055736T3 (en) | 1994-09-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US5319943A (en) | Frost/defrost control system for heat pump | |
CA1336010C (en) | Apparatus for controlling a thermostatic expansion valve | |
US4680940A (en) | Adaptive defrost control and method | |
US4882908A (en) | Demand defrost control method and apparatus | |
CA1242778A (en) | Apparatus and method for controlling a refrigerator in low ambient temperature conditions | |
EP0164948B1 (en) | Control system and method for defrosting the outdoor coil of a heat pump | |
US4662184A (en) | Single-sensor head pump defrost control system | |
US4993233A (en) | Demand defrost controller for refrigerated display cases | |
EP0157723B1 (en) | Refrigeration unit compressor control | |
CN100340829C (en) | Method and system for control of defrosting reversible heat pump | |
EP0816783A2 (en) | Defrost control method and apparatus | |
US5970726A (en) | Defrost control for space cooling system | |
US4694657A (en) | Adaptive defrost control and method | |
EP1225406B1 (en) | Defrost control method and apparatus | |
EP0278701B1 (en) | Improvements in or relating to defrosting of heat exchangers | |
US5927083A (en) | Compressor cycle dependent defrost control | |
GB2130747A (en) | Control device for refrigeration cycle | |
EP0552906A2 (en) | Defrost starting method and device for refrigerant evaporators | |
JPS59185927A (en) | Defrostation controller | |
EP1787071A1 (en) | Refrigerant cycle with defrost termination control | |
JPH0684834B2 (en) | Defroster for air conditioner | |
JPS611963A (en) | Method of controlling refrigerant for heat pump type air conditioner | |
JPH0684832B2 (en) | Defroster for air conditioner | |
JPS61128068A (en) | Defrostation control system of heat pump | |
JPH0225104Y2 (en) |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
AK | Designated contracting states |
Kind code of ref document: A2 Designated state(s): AT BE CH DE ES FR GB GR IT LI LU NL SE |
|
PUAL | Search report despatched |
Free format text: ORIGINAL CODE: 0009013 |
|
AK | Designated contracting states |
Kind code of ref document: A3 Designated state(s): AT BE CH DE ES FR GB GR IT LI LU NL SE |
|
17P | Request for examination filed |
Effective date: 19900330 |
|
17Q | First examination report despatched |
Effective date: 19900817 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AT BE CH DE ES FR GB GR IT LI LU NL SE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SE Free format text: THE PATENT HAS BEEN ANNULLED BY A DECISION OF A NATIONAL AUTHORITY Effective date: 19940427 Ref country code: NL Effective date: 19940427 Ref country code: LI Effective date: 19940427 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 19940427 Ref country code: DE Effective date: 19940427 Ref country code: CH Effective date: 19940427 Ref country code: BE Effective date: 19940427 Ref country code: AT Effective date: 19940427 |
|
REF | Corresponds to: |
Ref document number: 105071 Country of ref document: AT Date of ref document: 19940515 Kind code of ref document: T |
|
REF | Corresponds to: |
Ref document number: 3889237 Country of ref document: DE Date of ref document: 19940601 |
|
ET | Fr: translation filed | ||
ITF | It: translation for a ep patent filed | ||
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: FG2A Ref document number: 2055736 Country of ref document: ES Kind code of ref document: T3 |
|
NLV1 | Nl: lapsed or annulled due to failure to fulfill the requirements of art. 29p and 29m of the patents act | ||
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 19950228 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
26N | No opposition filed | ||
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 20000210 Year of fee payment: 13 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: ES Payment date: 20000222 Year of fee payment: 13 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: ES Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20010206 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20011031 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: ST |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: IF02 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: RN Ref country code: FR Ref legal event code: D5 |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: FD2A Effective date: 20021016 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES;WARNING: LAPSES OF ITALIAN PATENTS WITH EFFECTIVE DATE BEFORE 2007 MAY HAVE OCCURRED AT ANY TIME BEFORE 2007. THE CORRECT EFFECTIVE DATE MAY BE DIFFERENT FROM THE ONE RECORDED. Effective date: 20050205 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 20060510 Year of fee payment: 19 |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20070205 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20070205 |