EP0235562A2 - Process and device for the measured supply of fine solid particles to an industrial furnace - Google Patents

Process and device for the measured supply of fine solid particles to an industrial furnace Download PDF

Info

Publication number
EP0235562A2
EP0235562A2 EP87101087A EP87101087A EP0235562A2 EP 0235562 A2 EP0235562 A2 EP 0235562A2 EP 87101087 A EP87101087 A EP 87101087A EP 87101087 A EP87101087 A EP 87101087A EP 0235562 A2 EP0235562 A2 EP 0235562A2
Authority
EP
European Patent Office
Prior art keywords
delivery
metering container
line
gas
section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP87101087A
Other languages
German (de)
French (fr)
Other versions
EP0235562A3 (en
EP0235562B1 (en
Inventor
Hans-Günther Dr.-Ing. Rachner
Hans-Klaus Dr. Schott
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kuettner GmbH and Co KG
Paul Wurth SA
Original Assignee
Kuettner GmbH and Co KG
Paul Wurth SA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kuettner GmbH and Co KG, Paul Wurth SA filed Critical Kuettner GmbH and Co KG
Priority to AT87101087T priority Critical patent/ATE68589T1/en
Publication of EP0235562A2 publication Critical patent/EP0235562A2/en
Publication of EP0235562A3 publication Critical patent/EP0235562A3/en
Application granted granted Critical
Publication of EP0235562B1 publication Critical patent/EP0235562B1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21BMANUFACTURE OF IRON OR STEEL
    • C21B5/00Making pig-iron in the blast furnace
    • C21B5/001Injecting additional fuel or reducing agents
    • C21B5/003Injection of pulverulent coal
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27BFURNACES, KILNS, OVENS, OR RETORTS IN GENERAL; OPEN SINTERING OR LIKE APPARATUS
    • F27B1/00Shaft or like vertical or substantially vertical furnaces
    • F27B1/10Details, accessories, or equipment peculiar to furnaces of these types
    • F27B1/20Arrangements of devices for charging
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27DDETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS, OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
    • F27D3/00Charging; Discharging; Manipulation of charge
    • F27D3/18Charging particulate material using a fluid carrier
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10JPRODUCTION OF PRODUCER GAS, WATER-GAS, SYNTHESIS GAS FROM SOLID CARBONACEOUS MATERIAL, OR MIXTURES CONTAINING THESE GASES; CARBURETTING AIR OR OTHER GASES
    • C10J2200/00Details of gasification apparatus
    • C10J2200/15Details of feeding means
    • C10J2200/156Sluices, e.g. mechanical sluices for preventing escape of gas through the feed inlet

Definitions

  • the invention relates to a method for the metered introduction of fine-grained, in particular dust-like solids, in particular coal dust, from a dosing container containing a solid supply and under pressure into an industrial furnace having several feed points, in particular a shaft furnace such as a blast furnace or a cupola furnace, in which the solids are fed to the individual feed points in a carrier gas stream with a high solids load, each through a delivery line, the carrier gas being fed to the lower end section of the metering container in a flow which causes local loosening in the lower section of the solids supply and the delivery lines open into the loosening area.
  • a shaft furnace such as a blast furnace or a cupola furnace
  • the invention further relates to a device for carrying out the aforementioned method with a metering container designed as a pressure vessel, which is to be filled with solid to be fed to the furnace at its upper section and which has a plurality of open-topped chambers at its lower end section, in each of which at least one to a supply point leading delivery line opens, and which are each provided with a gas-permeable inflow base, on the side facing away from the solid column, a carrier gas line for supplying carrier gas opens.
  • a metering container designed as a pressure vessel, which is to be filled with solid to be fed to the furnace at its upper section and which has a plurality of open-topped chambers at its lower end section, in each of which at least one to a supply point leading delivery line opens, and which are each provided with a gas-permeable inflow base, on the side facing away from the solid column, a carrier gas line for supplying carrier gas opens.
  • coal dust which can be obtained from raw coal in a grinding and drying plant, the coal dust being fed to the industrial furnace by means of a corresponding device by pneumatic conveying.
  • the most important metallurgical requirement is that the metering of the coal dust, ie the amount of coal dust supplied to the furnace per unit of time, is carried out with the greatest possible accuracy, so that the metallurgy As far as possible, fluctuations in the furnace are subject to as little fluctuations as possible.
  • coal dust for example in a blast furnace, is not supplied at one point but has to be fed to each blow mold, industrial furnaces generally have several feed points, a further requirement being that the coal dust must be fed evenly to the individual feed points.
  • the carrier gas flow to be supplied to the chambers of the dosing container below the inflow bottoms must be (at least) such that it always leads to sufficient loosening of the solid in the local loosening zone in the case of the type of solid to be conveyed - that is to say also at the highest operating pressure occurring in the dosing container that the so-called loosening point of the solid bed in the metering container is reached or exceeded in every operating state. In the case of a fine-grained solid, this loosening point is only insignificantly dependent on the pressure under which the solid bed is.
  • the present invention has for its object to provide a method and a device suitable for performing the method of the types described above, by means of which, with the least possible investment, an accurate, operationally reliable and robust, largely independent of the inevitably fluctuating respective properties of the solid Dosage of the predetermined total amount of solids fed to the furnace is to be ensured, the total amount of the solid also being to be largely uniformly fed to the individual feed points of the furnace and the largest possible control range for the respective solids delivery capacity should be present in the individual delivery lines, and furthermore the wear of the delivery lines should be as small as possible or limited to a small section.
  • the dosing container containing the solids supply is continuously weighed, so that the actual weight of the dosing container (including its contents) with which the initial weight is the target -Discharge capacity and the target weight resulting from the start of discharge is compared and the pressure in the dosing container is increased or decreased when the target weight is exceeded or undershot, and that a regulation of the delivery rate of each delivery line in a known manner by Secondary gas is added, the secondary gas being fed upstream of the feed lines to the respective feed point of the industrial furnace to a throttle point.
  • the above-described gravimetric metering of the total amount of solids supplied to the furnace per unit of time and its regulation via the pressure difference between the pressure in the metering container and the furnace or the end of the delivery lines achieve an extraordinarily high degree of accuracy within the scope of the requirements , which is usually so large that the pressure regulating the total discharge rate in the metering container is generally only changed at intervals of the order of 5 to 10 minutes, this accuracy being able to be achieved with comparatively little effort.
  • the differential pressure is preferably regulated in a manner known per se by supplying or removing pressurized top gas, which is supplied through the metering container of the solids supply.
  • the amount of top gas supplied is preferably such that not only is the amount of solids discharged from the metering container replaced by top gas, and the gap volume between the solid parts corresponding to the respective operating pressure is filled by gas, but also that part of the top gas supplied is always up to the local loosening area flows and is discharged through the delivery lines together with the solids and the carrier gas supplied to the metering vessel at the lower end section.
  • the latter has proven to be extremely useful for ensuring a steady flow of solids into the chambers and for the desired high solids loading.
  • the amount of carrier gas supplied to the lower end section of the metering vessel is preferably kept constant for a particular type of solid in the method according to the invention, the amount of carrier gas being dimensioned such that it is below the level of the respective type of solid the highest operating pressure in the dosing tank leads to a loosening of the solid in the local loosening zone.
  • the metering vessel is designed in a manner known per se as a weighing vessel, in the upper end section of which a top gas line provided with a control valve for supplying top gas under excess pressure opens out, that a (first) control device is present by means of which the actual weight of the metering vessel (together with its contents) is to be compared with its target weight at predetermined intervals and if the target weight is exceeded or undershot, the pressure in the metering container is increased or regulated by regulating the top gas pressure.
  • another essential feature of the present invention is the cross-sectional narrowing of the delivery lines at their end section and the supply of Secondary gas to the delivery lines more or less immediately adjacent to the cross-sectional constriction.
  • the large cross-sectional constriction at the end of the delivery lines also gives the great advantage that the non-restricted part of the delivery lines, the length of which can be 100 to 200 meters, is operated at a relatively low delivery speed of, for example, 0.8 to 3 m / sec can be, which only causes a correspondingly low wear, while only the flow velocity in the narrowed part is relatively high (e.g. 18 to 30 m / sec) and only in this short section of the delivery line there is more wear, these short sections according to Wear can be exchanged.
  • the cross-sectional constriction in the delivery lines is preferably continuous, with a conical and the like between the section of the delivery line having the larger cross section and its section having the smaller cross section. trained intermediate section may be present.
  • the cross-sectional ratio between the non-constricted and the constricted part of a delivery line can, according to the invention, be approximately 10: 1 - 25: 1, it being preferably provided that the non-restricted cross-section of the delivery lines each has a diameter of approximately 25 to 40 mm, while the constricted Cross section has a diameter of 6 to 8 mm.
  • Electrical load cells on which the dosing vessel is supported, and whose measurement signals are to be fed to the first control device, are preferably provided as weight measuring devices for the weight measurements of the metering container and their contents.
  • load cells are not only extremely robust and relatively inexpensive, but also have a level of accuracy that is sufficiently high for gravimetric metering within the framework of the circumstances described above.
  • the measuring devices for determining the relative actual delivery rate in the delivery lines do not need to be highly complex measuring devices which measure the flow rate in the delivery lines with a relatively high degree of accuracy, since according to the invention only a relative measurement of the delivery rate in the individual delivery lines to one another needs to take place because with these measuring devices, in contrast to previously known devices such as the device described above according to DE-OS 29 34 130, no absolute values have to be measured. Accordingly, it is preferably provided that these measuring devices are capacitively operating measuring devices, with impairments in the measuring results due to changes in moisture etc. not playing a role in this relative measurement, since the properties of the conveyed material in the individual delivery lines are essentially the same at the same time are.
  • Fig. 1 shows a highly schematic and simplified representation of a device for the metered introduction of coal dust into a blast furnace, not shown, of which only one blow mold 2 is indicated, of which there are several distributed over the circumference of the blast furnace, each in one Wind tunnel 3 open.
  • the coal dust to be blown into the blast furnace 1 is put into a storage silo 4 after its production in a grinding and drying system, in which a quantity of coal can be stored under an inert atmosphere, which is sufficient to bridge a production loss of the grinding and drying system that lasts several hours can.
  • the ground coal passes from the storage silo 4 via a cellular wheel sluice 5 into a sluice vessel 6, which after filling is closed by a valve 7 to the storage silo 4.
  • the sluice vessel 6 is strung at its lower end section via a line 8 with sluice gas originating from a wind boiler 9 until the predetermined working pressure of a metering container 10 arranged below the sluice vessel 6, also designed as a pressure vessel, is reached and that in the sluice vessel 6 located coal dust reaches the metering container 10 after opening valves 11. After filling the metering container 10, the valves 11 are closed again.
  • the gas line 12 leading from the wind boiler 9 to line 8 for the lock gas is continued via the connection point of line 8 and is connected to an upper gas line 13 which leads to the upper section of the metering container 10 and in which a control valve 14 is arranged.
  • a plurality of chambers 15 are arranged which are open at the top, that is to say into the metering container 10, the maximum number of which corresponds to the number of blow molds 2 of the blast furnace 1 to be charged with coal dust.
  • Each chamber 15 is provided with a gas-permeable inflow base 16 in its lower region.
  • a carrier gas line 17 opens into each chamber 15 below the inflow bottoms 16, the carrier gas lines 17 being connected to the gas line 12 via a valve 18.
  • a delivery line 19 is led out of each chamber 15, the delivery lines 19, of which only one line is shown for the sake of clarity, each end in the chambers 15 somewhat above the inflow floor 16, where the coal dust is loosened or fluidized by the introduced carrier gas is.
  • the conveyor lines 19, the length of which is between 100 and 200 meters, have a free cross section of 25 mm over their entire length.
  • the cross section of the delivery lines 19 is in each case significantly reduced downstream of the feed point 20 in question and adjacent to it, to a diameter of 6 mm. As can be seen from FIG. 2, this considerable reduction in cross-section does not occur suddenly, but essentially continuously via a conical intermediate piece 21.
  • the gas line 12 coming from the air boiler 9 is continued via the connection point of the carrier gas lines 17 with a bypass line 22, via which secondary gas is to be conducted into the relevant delivery line 19.
  • a control valve 23 is arranged in each bypass line 22 and is used to regulate the amount of secondary gas supplied to the relevant delivery line 19.
  • connection point 24 for the bypass line 22 is preceded by a capacitive measuring device 25 upstream in each delivery line 19, by means of which the relative delivery rate of the relevant delivery line 19 can be determined.
  • the measuring devices 25 each give their measured values to a u.a. a control device 26 containing a computer, with which the control valves 23 in the bypass lines 22 are to be controlled.
  • the dosing container 10 is supported on load cells 27, by means of which its weight (together with its content) can be measured continuously, the measured values being fed to a control device 28, which is also connected to the control valve 14 of the upper gas line 13.
  • the required operating pressure is set in the dosing tank 10 via the upper gas line 13, the differential pressure between the pressure in the dosing tank 10 and the pressure prevailing in the blast furnace 1 or that prevailing at the end of the delivery lines 19 Pressure is basically kept constant during the emptying of the metering container 10.
  • the actual weight of the dosing container 10 (including its contents) is constantly compared by the control device 28 with the target weight of the dosing container 10, that is to say with the weight that the dosing container has after the time that has elapsed since the emptying began, taking into account the specified discharge rate ought to. If the actual weight of the metering container 10 corresponds to its target weight, this indicates that the specified discharge quantity has actually been discharged and fed to the blast furnace 1 in the relevant time interval, so that the operating conditions are not changed. If, on the other hand, the actual weight of the metering container 10 is greater than its target weight at the relevant time, this means that too little coal dust has been discharged from the metering container 10.
  • the Re Gel device 28 that the previously constant pressure in the metering container 10 is increased by the control device 28 acts accordingly on the control valve 14 of the upper gas line 13. If, on the other hand, the actual weight is smaller than the target weight of the metering container 10 and accordingly too much coal dust has been discharged from the metering container at the time of measurement, the control device 28 brings about a reduction in the previously constant pressure in the metering container 10 and thus a corresponding reduction in the discharge capacity.
  • the amount of carrier gas supplied via the carrier gas lines 17 to the metering container 10 via its chambers 15 is kept constant. so that the conditions determined during or before start of operation, adapted to the respective properties of the coal dust and adjusted to the predetermined throughput, remain essentially unchanged. This obviously also applies in an advantageous manner to the fluidization conditions at the beginning of the delivery lines 19.
  • control device 26 detects that the measured delivery capacity of a particular delivery line 19 is greater than the determined mean value and must therefore be reduced for the purpose of equalization, the control device 26 acts on the control valve 23 of the relevant bypass line 22 in such a way that that of the relevant delivery line 19 at the connection point 24 supplied secondary gas is increased in quantity, so that there is a corresponding dilution of the two-component flow and thus a reduction in the discharge capacity of the feed line 19 in question of solid matter (coal dust). If, on the other hand, the delivery rate determined in a delivery line 19 is less than the mean value, the reverse process takes place, ie the secondary gas flow supplied to the delivery line 19 is reduced accordingly.
  • connection points 24 of the bypass lines 22 are each arranged adjacent to the constriction point 21, there is therefore a considerable pressure drop due to the pressure drop during delivery in the delivery line 19 to the metering container 10 and also due to the cross-sectional constriction to the blast furnace 1, so that there is a large control range of the order of 1: 3 - 1: 4 can be achieved in the individual delivery lines 19.
  • the wear on the delivery lines 19 is extremely low, since you can get under normal conditions with conveyor speeds in the range of about 0.8 to 3 m / sec and only in the area of the lance-shaped constriction section 19 'speeds in the range of 18 to 30 m / sec can be achieved, which, however, not as a negative side effect of Cross-sectional narrowing of the delivery lines 19 to be considered, but in view of the high wind speeds in the wind tunnel 3 or in the blow molds 2 and the internal pressure prevailing in the furnace are necessary in order to be able to blow the two-component flow into the blast furnace.
  • the relatively small diameter at the narrowed end section 19 'of the conveyor lines 19 also proves to be advantageous when it is introduced into the blast furnace 1, since such dimensions allow manual insertion even with the high internal pressures of the blast furnace.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Manufacturing & Machinery (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Blast Furnaces (AREA)
  • Filling Or Emptying Of Bunkers, Hoppers, And Tanks (AREA)
  • Sampling And Sample Adjustment (AREA)
  • Feeding, Discharge, Calcimining, Fusing, And Gas-Generation Devices (AREA)
  • Crucibles And Fluidized-Bed Furnaces (AREA)
  • Processing And Handling Of Plastics And Other Materials For Molding In General (AREA)
  • Organic Low-Molecular-Weight Compounds And Preparation Thereof (AREA)
  • Vertical, Hearth, Or Arc Furnaces (AREA)
  • Furnace Charging Or Discharging (AREA)

Abstract

A process and apparatus for the metered introduction of fine-grain materials, particularly pulverulent solid substances (i.e., coal dust) from a pressurized metering container which contains a supply of solid material, into an industrial furnace having a plurality of feed locations such as a blast furnace or cupola furnace is presented. The solid material is fed to the individual feed locations in a carrier gas stream through a conveying duct, the gas stream being highly charged with the solid material. The carrier gas is fed to the lower end section of the metering container in a flow which causes a local loosening in the lower section of the supply of solid material with the conveying ducts opening into the loosening region. The apparatus includes a metering container, which is designed as a pressure vessel and which is adapted to be filled at its upper end section with solid material to be fed to the furnace. The metering container includes at its lower end section a plurality of upwardly open chambers. At least one conveying duct leading to a feed location opens into each of the chambers. The conveying ducts are provided in each instance with a gas-permeable incident flow floor. Also, on the side of each conveying duct remote from the metering container a carrier gas duct for the carrier gas feed communicates therewith.

Description

Die Erfindung betrifft ein Verfahren zum dosierten Einführen feinkörniger, insbesondere staubförmiger Feststoffe, insbesondere Kohlenstaub, aus einem einen Feststoffvorrat enthaltenden, unter Druck stehenden Dosierbehälter in einen mehrere Zuführ­stellen aufweisenden Industrieofen, insbesondere einen Schachtofen wie einen Hochofen oder einen Kupol­ofen, bei dem der Feststoff den einzelnen Zuführstellen in einem Trägergasstrom mit hoher Feststoffbeladung je­weils durch eine Förderleitung zugeführt wird, wobei das Trägergas dem unteren Endabschnitt des Dosierbehälter in einer eine lokale Auflockerung im unteren Abschnitt des Fest­stoffvorrates bewirkenden Strömung zugeführt wird und die Förderleitungen in den Auflockerungsbereich münden.The invention relates to a method for the metered introduction of fine-grained, in particular dust-like solids, in particular coal dust, from a dosing container containing a solid supply and under pressure into an industrial furnace having several feed points, in particular a shaft furnace such as a blast furnace or a cupola furnace, in which the solids are fed to the individual feed points in a carrier gas stream with a high solids load, each through a delivery line, the carrier gas being fed to the lower end section of the metering container in a flow which causes local loosening in the lower section of the solids supply and the delivery lines open into the loosening area.

Die Erfindung betrifft weiterhin eine Vorrichtung zur Durchführung des vorgenannten Verfahrens mit einem als Druckgefäß ausgebildeten Dosierbehälter, welcher an seinem oberen Abschnitt mit dem Ofen zuzuführenden Fest­stoff zu befüllen ist, und der an seinem unteren Endab­schnitt mehrere nach oben offene Kammern aufweist, in welche jeweils mindestens eine zu einer Zuführstelle führende För­derleitung mündet, und die jeweils mit einem gasdurch­lässigen Anströmboden versehen sind, an dessen der Fest­stoffsäule abgekehrter Seite eine Trägergasleitung zum Zuführen von Trägergas mündet.The invention further relates to a device for carrying out the aforementioned method with a metering container designed as a pressure vessel, which is to be filled with solid to be fed to the furnace at its upper section and which has a plurality of open-topped chambers at its lower end section, in each of which at least one to a supply point leading delivery line opens, and which are each provided with a gas-permeable inflow base, on the side facing away from the solid column, a carrier gas line for supplying carrier gas opens.

Zur Einsparung hochwertiger Brennstoffe wie z.B. Öl oder Koks läßt sich ein Teil des Brennstoffes durch Kohlen­staub ersetzen, der in einer Mahl- und Trocknungsanlage aus Rohkohle zu gewinnen ist, wobei der Kohlenstaub dem Industrieofen mittels einer entsprechenden Vorrichtung durch pneumatische Förderung zugeführt wird.To save high-quality fuels such as Oil or coke can replace part of the fuel with coal dust, which can be obtained from raw coal in a grinding and drying plant, the coal dust being fed to the industrial furnace by means of a corresponding device by pneumatic conveying.

Dabei besteht die wesentlichste metallurgische Forderung darin, daß die Dosierung des Kohlenstaubes, also die dem Ofen je Zeiteinheit zugeführte Kohlenstaubmenge, mit mög­lichst großer Genauigkeit erfolgt, damit die metallurgi­ schen Vorgänge im Ofen insoweit möglichst geringen Schwankungen unterworfen werden.The most important metallurgical requirement is that the metering of the coal dust, ie the amount of coal dust supplied to the furnace per unit of time, is carried out with the greatest possible accuracy, so that the metallurgy As far as possible, fluctuations in the furnace are subject to as little fluctuations as possible.

Da der Kohlenstaub bspw. bei einem Hochofen nicht an einer Stelle zugeführt wird, sondern jeder Blasform zuzuführen ist, weisen Industrieöfen im allgemeinen mehrere Zuführstellen auf, wobei eine weitere Anfor­derung darin besteht, daß der Kohlenstaub den einzel­nen Zuführstellen jeweils gleichmäßig zugeführt wer­den muß.Since the coal dust, for example in a blast furnace, is not supplied at one point but has to be fed to each blow mold, industrial furnaces generally have several feed points, a further requirement being that the coal dust must be fed evenly to the individual feed points.

Verschiedene Feststoffe bzw. Feststoffsorten besitzen i.a. bei gleichen Bedingungen unterschiedliche fluid­mechanische Eigenschaften und zeigen demgemäß ein unter­schiedliches Förderverhalten, welches sich empirisch ermitteln läßt. Die den Kammern des Dosierbehälters un­terhalb der Anströmböden zuzuführende Trägergasströmung muß (wenigstens) so bemessen sein, daß sie bei der zu fördernden Feststoffsorte stets - also auch bei dem höchsten im Dosierbehälter auftretenden Betriebsdruck - ­zu einer ausreichenden Lockerung des Feststoffes in der lokalen Auflockerungszone führt, d.h., daß der sog. Locke­rungspunkt der im Dosierbehälter vorhandenen Feststoff­schüttung in jedem Betriebszustand erreicht bzw. über­schritten wird. Dieser Lockerungspunkt ist bei einem feinkörnigen Feststoff nur unwesentlich von dem Druck abhängig, unter dem die Feststoffschüttung steht.Different solids or types of solids generally have different fluid mechanical properties under the same conditions and accordingly show different delivery behavior, which can be determined empirically. The carrier gas flow to be supplied to the chambers of the dosing container below the inflow bottoms must be (at least) such that it always leads to sufficient loosening of the solid in the local loosening zone in the case of the type of solid to be conveyed - that is to say also at the highest operating pressure occurring in the dosing container that the so-called loosening point of the solid bed in the metering container is reached or exceeded in every operating state. In the case of a fine-grained solid, this loosening point is only insignificantly dependent on the pressure under which the solid bed is.

Zur Lösung der vorliegenden Problematik sind in der Literatur bereits verschiedene Vorschläge unterbreitet und zum Teil auch bereits zumindest versuchsmäßig er­probt worden, doch konnten die bisher vorliegenden Lö­ sungsvorschläge die an ein derartiges Verfahren und eine Vorrichtung zur Durchführung des Verfahrens zu stellenden Anforderungen bisher nicht optimal befrie­digen.Various proposals have already been made in the literature for solving the problem at hand, and some of them have already been tried out, at least on an experimental basis, but the previously available solutions Solution proposals that so far have not optimally satisfied the requirements to be placed on such a method and a device for carrying out the method.

So ist bspw. gemäß der DE-OS 29 34 130 vorgesehen, daß sowohl die Regelung der dem Ofen zuzuführenden Feststoff-­Gesamtförderleistung (sämtlicher Förderleitungen) als auch die Regelung der Feststoff-Förderleistungen der ein­zelnen Förderleitungen durch Veränderung der dem unteren Endabschnitt des Dosierbehälters zugeführten Trägergas­menge erfolgt. Dieses geschieht mittels Staubstrommeß­stellen, die jeder einzelnen Förderleitung zugeordnet sind, wobei die Staubstrommeßstellen jeweils auf ein Stellventil einwirken, welches in jeder Trägergas-Zuführ­leitung angeordnet ist. Eine solche Regelung der Förder­leistung über die Trägergasströmung führt jedoch nicht stets zu den erwünschten Ergebnissen. Zu dieser Techno­logie ist unter anderem festzustellen, daß eine quanti­tative Messung des Feststoffanteils derartiger Zwei-Kom­ponenten-Strömungen selbst bei großem Aufwand verhältnis­mäßig ungenau ist, wenn mit einer solchen Messung absolute Werte ermittelt werden sollen. Es kommt hinzu, daß sich bei der in der DE-OS 29 34 130 vorgeschlagenen Arbeitsweise ei­ne Feinregelung der Förderleistungen der einzelnen Förder­leitungen ersichtlich nur schwer erzielen läßt, da die von den Staubstrommeßstellen ausgelösten Veränderungen der Trä­gergaszufuhr den Fluidisierungszustand des Feststoffes am Beginn der Förderleitungen stark verändern können.For example, according to DE-OS 29 34 130, it is provided that both the regulation of the total solid conveying capacity to be supplied to the furnace (all the conveying lines) and the regulation of the solid conveying capacities of the individual conveying lines by changing the amount of carrier gas supplied to the lower end section of the metering container he follows. This is done by means of dust flow measuring points which are assigned to each individual delivery line, the dust flow measuring points each acting on a control valve which is arranged in each carrier gas supply line. However, such regulation of the delivery rate via the carrier gas flow does not always lead to the desired results. Regarding this technology, it should be noted, among other things, that a quantitative measurement of the solids content of such two-component flows is relatively imprecise even with great effort if absolute values are to be determined with such a measurement. In addition, with the method of operation proposed in DE-OS 29 34 130, it is difficult to achieve fine regulation of the delivery rates of the individual delivery lines, since the changes in the carrier gas supply triggered by the dust flow measuring points greatly change the fluidization state of the solid at the beginning of the delivery lines can.

Der vorliegenden Erfindung liegt die Aufgabe zugrunde, ein Verfahren sowie eine zur Durchführung des Verfahrens geeignete Vorrichtung der eingangs beschriebenen Gattun­gen zu schaffen, mittels derer bei einem möglichst ge­ringen Investitionsaufwand eine genaue, betrieblich zu­verlässige und robuste, von den zwangsläufig schwanken­den jeweiligen Eigenschaften des Feststoffes weitgehend unabhängige Dosierung der dem Ofen zugeführten vorgege­benen gesamten Feststoffmenge sicherzustellen ist, wobei die Gesamtmenge des Feststoffes darüber hinaus den ein­zelnen Zuführstellen des Ofens weitgehend gleichmäßig zu­zuführen sein soll und in den einzelnen Förderleitungen ein möglichst großer Regelbereich für die jeweilige Fest­stoff-Förderleistung vorhanden sein soll, und wobei wei­terhin der Verschleiß der Förderleitungen möglichst klein bzw. auf einen kleinen Abschnitt beschränkt sein soll.The present invention has for its object to provide a method and a device suitable for performing the method of the types described above, by means of which, with the least possible investment, an accurate, operationally reliable and robust, largely independent of the inevitably fluctuating respective properties of the solid Dosage of the predetermined total amount of solids fed to the furnace is to be ensured, the total amount of the solid also being to be largely uniformly fed to the individual feed points of the furnace and the largest possible control range for the respective solids delivery capacity should be present in the individual delivery lines, and furthermore the wear of the delivery lines should be as small as possible or limited to a small section.

Als Lösung des verfahrensmäßigen Teils dieser Aufgabe ist erfindungsgemäß vorgesehen, daß zur Regelung der dem Ofen zugeführten Gesamtförderleistung sämtlicher Förderleitungen der den Feststoffvorrat enthaltende Dosierbehälter kontinuierlich gewogen wird, daß das Ist-Gewicht des Dosierbehälters (samt Inhalt) mit dessen sich aus dem Anfangsgewicht, der Soll-Austragsleistung und der seit Austragsbeginn verstrichenen Zeit ergebenden Soll-Gewicht verglichen wird und bei einem Über- bzw. Unterschreiten des Soll-Gewichtes der Druck im Dosierbehälter erhöht bzw. erniedrigt wird, und daß eine Regelung der Förderleistung jeder Förderleitung in an sich bekannter Weise durch Zugabe von Sekundär­gas erfolgt, wobei das Sekundärgas den Förderleitungen jeweils benachbart zu der betreffenden Zuführstelle des Industrieofens stromaufwärts zu einer Drosselstelle zu­geführt wird.As a solution to the procedural part of this task it is provided according to the invention that to regulate the total delivery rate of the furnace all the delivery lines, the dosing container containing the solids supply is continuously weighed, so that the actual weight of the dosing container (including its contents) with which the initial weight is the target -Discharge capacity and the target weight resulting from the start of discharge is compared and the pressure in the dosing container is increased or decreased when the target weight is exceeded or undershot, and that a regulation of the delivery rate of each delivery line in a known manner by Secondary gas is added, the secondary gas being fed upstream of the feed lines to the respective feed point of the industrial furnace to a throttle point.

Bei dem erfindungsgemäßen Verfahren wird durch die vor­stehend beschriebene gravimetrische Dosierung der dem Ofen je Zeiteinheit zugeführten Gesamtmenge an Feststoff und deren Regelung über die Druckdifferenz zwischen dem Druck im Dosierbehälter und dem Ofen bzw. dem Ende der Förderleitungen eine im Rahmen der gestellten Anforde­rungen außerordentlich hohe Genauigkeit erzielt, die in der Regel so groß ist, daß der die Gesamtaustragsleistung regelnde Druck im Dosierbehälter i.a. nur in Zeitinter­vallen in der Größenordnung von 5 - 10 min verändert wird, wobei diese Genauigkeit mit einem vergleichsweise relativ geringen Aufwand zu erreichen ist. Dabei erfolgt die Re­gelung des Differenzdruckes bevorzugt in an sich bekannter Weise durch Zu- bzw. Abfuhr von unter Druck stehendem Obergas, welches durch den Dosierbehälter des Feststoff­vorrates zugeführt wird. Die zugeführte Obergasmenge wird dabei bevorzugt so bemessen, daß nicht nur die jeweils aus dem Dosierbehälter ausgetragene Feststoffmenge durch Obergas ersetzt wird, und das dem jeweiligen Betriebsdruck entsprechende Lückenvolumen zwischen den Feststoffteilen durch Gas ausgefüllt wird, sondern daß auch stets ein Teil des zugeführten Obergases bis in den lokalen Auflockerungs­bereich strömt und zusammen mit dem Feststoff sowie dem dem Dosiergefäß am unteren Endabschnitt zugeführten Trä­gergas durch die Förderleitungen ausgetragen wird. Letzteres hat sich zur Sicherstellung eines stetigen Nachfließens von Feststoff in die Kammern sowie für die gewünschte hohe Feststoffbeladung als höchst zweckmäßig erwiesen.In the method according to the invention, the above-described gravimetric metering of the total amount of solids supplied to the furnace per unit of time and its regulation via the pressure difference between the pressure in the metering container and the furnace or the end of the delivery lines achieve an extraordinarily high degree of accuracy within the scope of the requirements , which is usually so large that the pressure regulating the total discharge rate in the metering container is generally only changed at intervals of the order of 5 to 10 minutes, this accuracy being able to be achieved with comparatively little effort. The differential pressure is preferably regulated in a manner known per se by supplying or removing pressurized top gas, which is supplied through the metering container of the solids supply. The amount of top gas supplied is preferably such that not only is the amount of solids discharged from the metering container replaced by top gas, and the gap volume between the solid parts corresponding to the respective operating pressure is filled by gas, but also that part of the top gas supplied is always up to the local loosening area flows and is discharged through the delivery lines together with the solids and the carrier gas supplied to the metering vessel at the lower end section. The latter has proven to be extremely useful for ensuring a steady flow of solids into the chambers and for the desired high solids loading.

Im Gegensatz zu dem oben beschriebenen vorbekannten Verfahren wird die dem unteren Endabschnitt des Do­siergefäßes zeitlich zugeführte Trägergasmenge (be­zogen auf den Normzustand) bei dem erfindungsgemäßen Verfahren für eine bestimmte Feststoffsorte bevorzugt konstant gehalten, wobei die Trägergasmenge so bemes­sen wird, daß sie bei der betreffenden Feststoffsorte unter dem höchsten im Dosierbehälter auftretenden Be­triebsdruck noch zu einer Lockerung des Feststoffes in der lokalen Auflockerungszone führt.In contrast to the previously known method described above, the amount of carrier gas supplied to the lower end section of the metering vessel (based on the standard state) is preferably kept constant for a particular type of solid in the method according to the invention, the amount of carrier gas being dimensioned such that it is below the level of the respective type of solid the highest operating pressure in the dosing tank leads to a loosening of the solid in the local loosening zone.

Der vorrichtungsmäßige Teil der obigen Aufgabe wird er­findungsgemäß dadurch gelöst, daß das Dosiergefäß in an sich bekannter Weise als Wiegegefäß ausgebildet ist, in dessen oberen Endabschnitt eine mit einem Regelventil ver­sehene Obergasleitung zum Zuführen von unter Überdruck stehendem Obergas mündet, daß eine (erste) Regeleinrich­tung vorhanden ist, mittels welcher das Ist-Gewicht des Dosiergefäßes (nebst Inhalt) jeweils nach vorgegebenen Zeitintervallen mit dessen Soll-Gewicht zu vergleichen ist und bei einem Über- bzw. Unterschreiten des Soll-Ge­wichtes der Druck im Dosierbehälter durch Regelung des Obergasdruckes zu erhöhen bzw. zu erniedrigen ist und bei Übereinstimmung des Soll-Gewichtes mit dem Ist-Ge­wicht konstantzuhalten ist, daß der Querschnitt der Förderleitungen jeweils in dem der betreffenden Zuführ­ stelle stromaufwärts unmittelbar vorgeordneten Abschnitt wesentlich verringert ist, daß jeweils eine Sekundärgas führende Bypassleitung stromaufwärts benachbart zu der Querschnittsverengung in jede Förderleitung mündet, daß in jeder Förderleitung eine Meßeinrichtung vorhanden ist, mittels welcher die relative Ist-Förderleistung der be­treffenden Förderleitung zu bestimmen ist, daß ein Mittel­wertbildner vorhanden ist, mittels dessen die rechneri­sche mittlere Förderleistung je Förderleitung zu bestim­men ist, und daß in jeder Förderleitung eine (zweite) Regeleinrichtung vorhanden ist, mittels welcher die der Förderleitung zugeführte Sekundärgasmenge zu erhöhen bzw. zu erniedrigen ist, wenn die von der Meßeinrichtung er­mittelte Ist-Förderleistung der Förderleitung größer bzw. kleiner ist als die vom Mittelwertbildner ermittelte mitt­lere Förderleistung je Förderleitung.The device-related part of the above object is achieved in that the metering vessel is designed in a manner known per se as a weighing vessel, in the upper end section of which a top gas line provided with a control valve for supplying top gas under excess pressure opens out, that a (first) control device is present by means of which the actual weight of the metering vessel (together with its contents) is to be compared with its target weight at predetermined intervals and if the target weight is exceeded or undershot, the pressure in the metering container is increased or regulated by regulating the top gas pressure. is to be reduced and, if the target weight corresponds to the actual weight, it is to be kept constant that the cross section of the delivery lines is in each case in that of the feed in question place upstream immediately upstream section is significantly reduced in each case that a bypass line carrying secondary gas leads upstream adjacent to the cross-sectional constriction in each delivery line, that in each delivery line there is a measuring device by means of which the relative actual delivery rate of the delivery line in question is to be determined that a Averaging is available, by means of which the calculated average delivery rate per delivery line is to be determined, and that in each delivery line there is a (second) control device by means of which the amount of secondary gas supplied to the delivery line is to be increased or decreased if the amount determined by the measuring device Actual delivery rate of the delivery line is greater or smaller than the average delivery rate per delivery line determined by the averager.

Neben der beschriebenen gravimetrischen Dosierung der dem Ofen zugeführten Gesamtfeststoffmenge und deren Regelung über den Differenzdruck zwischen dem Druck im Dosierbehäl­ter und im Ofen bzw. am Ende der Förderleitungen besteht ein weiteres wesentliches Merkmal der vorliegenden Erfin­dung in der Querschnittsverengung der Förderleitungen an deren Endabschnitt und der Zuführung von Sekundärgas zu den Förderleitungen mehr oder weniger unmittelbar benach­bart der Querschnittsverengung. Aufgrund der Querschnitts­verengung der Förderleitungen besteht an der Verengungs­stelle aufgrund des Druckabfalls in den Förderleitungen ein erheblicher Druckunterschied zum Druck im Dosierbe­hälter und andererseits aufgrund der mit der Querschnitts­verengung verbundenen Drosselung zum Druck im Ofen, so daß mit den Sekundärgas führenden Bypassleitungen jeweils eine verhältnismäßig große Gasmenge in die Förderleitungen ein­zuführen ist und sich demgemäß ein verhältnismäßig großer Regelbereich für die aus den einzelnen Förderleitungen in den Ofen strömende Feststoffmenge ergibt, da in eine Förderleitung eingeführtes Sekundärgas die Zwei-Stoff-­Mischung entsprechend verdünnt und demgemäß bei größerer Zugabe von Sekundärgas dem Ofen aus der betreffenden Leitung weniger Feststoff je Zeiteinheit zuströmt.In addition to the described gravimetric dosing of the total amount of solids fed to the furnace and its regulation via the differential pressure between the pressure in the dosing container and in the furnace or at the end of the delivery lines, another essential feature of the present invention is the cross-sectional narrowing of the delivery lines at their end section and the supply of Secondary gas to the delivery lines more or less immediately adjacent to the cross-sectional constriction. Due to the cross-sectional narrowing of the delivery lines, there is a considerable pressure difference to the pressure in the dosing tank at the constriction point due to the pressure drop in the delivery lines and, on the other hand, due to the restriction to the pressure in the furnace associated with the cross-sectional narrowing, so that a relatively large amount of gas flows into the bypass lines with the secondary gas Delivery lines are to be introduced and accordingly a relatively large one Control range for the amount of solids flowing into the furnace from the individual delivery lines results, since secondary gas introduced into a delivery line dilutes the two-substance mixture accordingly and accordingly, with a greater addition of secondary gas, the furnace receives less solid per unit time from the line in question.

Die starke Querschnittsverengung am Ende der Förderlei­tungen ergibt darüber hinaus noch den großen Vorteil, daß in dem nicht verengten Teil der Förderleitungen, deren Länge 100 bis 200 Meter betragen können, mit ei­ner relativ geringen Fördergeschwindigkeit von bspw. 0,8 bis 3 m/sec gefahren werden kann, die lediglich ei­nen entsprechend geringen Verschleiß bewirkt, während nur die Strömungsgeschwindigkeit im verengten Teil re­lativ hoch ist (z.B. 18 bis 30 m/sec) und es lediglich in diesem kurzen Abschnitt der Förderleitung zu stärke­rem Verschleiß kommt, wobei diese kurzen Abschnitte nach entsprechendem Verschleiß ausgetauscht werden können.The large cross-sectional constriction at the end of the delivery lines also gives the great advantage that the non-restricted part of the delivery lines, the length of which can be 100 to 200 meters, is operated at a relatively low delivery speed of, for example, 0.8 to 3 m / sec can be, which only causes a correspondingly low wear, while only the flow velocity in the narrowed part is relatively high (e.g. 18 to 30 m / sec) and only in this short section of the delivery line there is more wear, these short sections according to Wear can be exchanged.

Die Querschnittsverengung in den Förderleitungen erfolgt bevorzugt stetig, wobei zwischen dem den größeren Quer­schnitt aufweisenden Abschnitt der Förderleitung und ihrem den kleineren Querschnitt aufweisenden Abschnitt ein konisch u.ä. ausgebildeter Zwischenabschnitt vorhan­den sein kann.The cross-sectional constriction in the delivery lines is preferably continuous, with a conical and the like between the section of the delivery line having the larger cross section and its section having the smaller cross section. trained intermediate section may be present.

Das Querschnittsverhältnis zwischen dem nicht verengten und dem verengten Teil einer Förderleitung kann erfindungs­gemäß etwa 10:1 - 25:1 betragen, wobei bevorzugt vorge­sehen ist, daß der nicht verengte Querschnitt der Förder­leitungen jeweils einen Durchmesser von etwa 25 bis 40 mm aufweist, während der verengte Querschnitt einen Durch­messer von 6 bis 8 mm besitzt.The cross-sectional ratio between the non-constricted and the constricted part of a delivery line can, according to the invention, be approximately 10: 1 - 25: 1, it being preferably provided that the non-restricted cross-section of the delivery lines each has a diameter of approximately 25 to 40 mm, while the constricted Cross section has a diameter of 6 to 8 mm.

Als Gewichtsmeßeinrichtungen für die Gewichtsmes­sungen des Dosierbehälters nebst Inhalt sind bevor­zugt elektrische Kraftmeßdosen vorgesehen, auf denen das Dosiergefäß abgestützt ist, und deren Meßsignale der er­sten Regeleinrichtung zuzuführen sind. Derartige Kraft­meßdosen sind nicht nur äußerst robust und relativ preis­wert, sondern besitzen im Rahmen der vorstehend beschrie­benen Gegebenheiten auch eine für die gravimetrische Do­sierung hinreichend große Genauigkeit.Electrical load cells, on which the dosing vessel is supported, and whose measurement signals are to be fed to the first control device, are preferably provided as weight measuring devices for the weight measurements of the metering container and their contents. Such load cells are not only extremely robust and relatively inexpensive, but also have a level of accuracy that is sufficiently high for gravimetric metering within the framework of the circumstances described above.

Bei den Meßeinrichtungen zum Bestimmen der relativen Ist-­Förderleistung in den Förderleitungen braucht es sich nicht um höchst aufwendige Meßeinrichtungen zu handeln, welche die Durchflußmenge in den Förderleitungen mit relativ großer Genauigkeit messen, da erfindungsgemäß lediglich eine re­lative Messung der Förderleistung in den einzelnen Förder­leitungen zueinander zu erfolgen braucht, weil mit diesen Meßeinrichtungen im Gegensatz zu vorbekannten Vorrichtungen wie der weiter oben beschriebenen Vorrichtung gemäß der DE-OS 29 34 130 keine Absolutwerte gemessen werden müssen. Demgemäß ist bevorzugt vorgesehen, daß es sich bei diesen Meßeinrichtungen um kapazitiv arbeitende Meßeinrichtungen handelt, wobei Beeinträchtigungen der Meßergebnisse durch Veränderung der Feuchtigkeit etc. bei dieser relativen Mes­sung keine Rolle spielen, da die Eigenschaften des Förder­gutes in den einzelnen Förderleitungen zum gleichen Zeit­punkt im wesentlichen gleich sind.The measuring devices for determining the relative actual delivery rate in the delivery lines do not need to be highly complex measuring devices which measure the flow rate in the delivery lines with a relatively high degree of accuracy, since according to the invention only a relative measurement of the delivery rate in the individual delivery lines to one another needs to take place because with these measuring devices, in contrast to previously known devices such as the device described above according to DE-OS 29 34 130, no absolute values have to be measured. Accordingly, it is preferably provided that these measuring devices are capacitively operating measuring devices, with impairments in the measuring results due to changes in moisture etc. not playing a role in this relative measurement, since the properties of the conveyed material in the individual delivery lines are essentially the same at the same time are.

Weitere bevorzugte Ausgestaltungen der vorliegenden Erfin­dung sind in den Unteransprüchen beschrieben.Further preferred embodiments of the present invention are described in the subclaims.

Die Erfindung ist nachstehend an einem Ausführungsbeispiel unter Bezugnahme auf eine schematische Zeichnung weiter erläutert. Es zeigt:

  • Fig. 1 eine vereinfachte schematische Darstel­lung einer erfindungsgemäßen Vorrich­tung; und
  • Fig. 2 eine vereinfachte Darstellung einer Ver­engungsstelle einer Förderleitung.
The invention is explained below using an exemplary embodiment with reference to a schematic drawing. It shows:
  • Figure 1 is a simplified schematic representation of a device according to the invention. and
  • Fig. 2 is a simplified representation of a constriction of a delivery line.

Fig. 1 zeigt eine stark schematisierte und vereinfachte Darstellung einer Vorrichtung zum dosierten Einführen von Kohlenstaub in einen im wesentlichen nicht dargestellten Hochofen, von dem lediglich eine Blasform 2 angedeutet ist, von der über den Umfang des Hochofens verteilt meh­rere vorhanden sind, die jeweils in einem Windkanal 3 mün­den.Fig. 1 shows a highly schematic and simplified representation of a device for the metered introduction of coal dust into a blast furnace, not shown, of which only one blow mold 2 is indicated, of which there are several distributed over the circumference of the blast furnace, each in one Wind tunnel 3 open.

Der in den Hochofen 1 einzublasende Kohlenstaub wird nach dessen Herstellung in einer Mahl- und Trocknungsanlage in ein Vorratssilo 4 gegeben, in dem unter inerter Atmosphäre eine Kohlemenge bevorratet werden kann, die ausreicht, um ggf. einen mehrstündigen Produktionsausfall der Mahl- und Trocknungsanlage überbrücken zu können. Aus dem Vorrats­silo 4 gelangt die gemahlene Kohle über eine Zellenrad­schleuse 5 in ein Schleusengefäß 6, welche nach Füllung mittels eines Ventils 7 zum Vorratssilo 4 zu schließen ist. Danach wird das Schleusengefäß 6 an seinem unteren Endab­schnitt über eine Leitung 8 mit aus einem Windkessel 9 stammenden Schleusengas bespannt, bis der vorgegebene Arbeitsdruck eines unterhalb des Schleusengefäßes 6 an­geordneten, ebenfalls als Druckgefäß ausgebildeten Do­sierbehälters 10 erreicht ist und der im Schleusengefäß 6 befindliche Kohlenstaub nach Öffnen von Ventilen 11 in den Dosierbehälter 10 gelangt. Nach dem Befüllen des Dosierbehälters 10 werden die Ventile 11 wieder geschlos­sen.The coal dust to be blown into the blast furnace 1 is put into a storage silo 4 after its production in a grinding and drying system, in which a quantity of coal can be stored under an inert atmosphere, which is sufficient to bridge a production loss of the grinding and drying system that lasts several hours can. The ground coal passes from the storage silo 4 via a cellular wheel sluice 5 into a sluice vessel 6, which after filling is closed by a valve 7 to the storage silo 4. Thereafter, the sluice vessel 6 is strung at its lower end section via a line 8 with sluice gas originating from a wind boiler 9 until the predetermined working pressure of a metering container 10 arranged below the sluice vessel 6, also designed as a pressure vessel, is reached and that in the sluice vessel 6 located coal dust reaches the metering container 10 after opening valves 11. After filling the metering container 10, the valves 11 are closed again.

Die von dem Windkessel 9 zur Leitung 8 für das Schleusen­gas führende Gasleitung 12 ist über die Anschlußstelle der Leitung 8 weitergeführt und mit einer Obergasleitung 13 verbunden, die zum oberen Abschnitt des Dosierbehäl­ters 10 führt, und in welcher ein Regelventil 14 angeord­net ist.The gas line 12 leading from the wind boiler 9 to line 8 for the lock gas is continued via the connection point of line 8 and is connected to an upper gas line 13 which leads to the upper section of the metering container 10 and in which a control valve 14 is arranged.

Am unteren Ende des Dosierbehälters 10 sind mehrere nach oben, also in den Dosierbehälter 10 hinein offene Kammern 15 angeordnet, deren Anzahl maximal der Anzahl der mit Kohlenstaub zu beschickenden Blasformen 2 des Hochofens 1 entspricht. Jede Kammer 15 ist in ihrem unteren Bereich mit einem gas­durchlässigen Anströmboden 16 versehen. Unterhalb der An­strömböden 16 mündet jeweils eine Trägergasleitung 17 in jede Kammer 15, wobei die Trägergasleitungen 17 über ein Ventil 18 mit der Gasleitung 12 verbunden sind.At the lower end of the metering container 10, a plurality of chambers 15 are arranged which are open at the top, that is to say into the metering container 10, the maximum number of which corresponds to the number of blow molds 2 of the blast furnace 1 to be charged with coal dust. Each chamber 15 is provided with a gas-permeable inflow base 16 in its lower region. A carrier gas line 17 opens into each chamber 15 below the inflow bottoms 16, the carrier gas lines 17 being connected to the gas line 12 via a valve 18.

Aus jeder Kammer 15 ist eine Förderleitung 19 herausge­führt, wobei die Förderleitungen 19, von denen der besseren Übersicht halber nur eine Leitung dargestellt ist, in den Kammern 15 jeweils etwas oberhalb des Anströmbodens 16 en­den, wo der Kohlenstaub durch das eingeführte Trägergas aufgelockert bzw. fluidisiert ist.A delivery line 19 is led out of each chamber 15, the delivery lines 19, of which only one line is shown for the sake of clarity, each end in the chambers 15 somewhat above the inflow floor 16, where the coal dust is loosened or fluidized by the introduced carrier gas is.

Die Förderleitungen 19, deren Länge zwischen 100 und 200 Meter beträgt, weisen im wesentlichen über ihre ge­samte Länge einen freien Querschnitt von 25 mm auf. Der Querschnitt der Förderleitungen 19 ist jeweils stromab­wärts zu der betreffenden Zuführstelle 20 und benachbart zu dieser wesentlich verringert, und zwar auf einen Durch­messer von 6 mm. Wie aus Fig. 2 erkennbar ist, erfolgt diese erhebliche Querschnittsverringerung nicht schlag­artig, sondern im wesentlichen stetig über ein konisches Zwischenstück 21.The conveyor lines 19, the length of which is between 100 and 200 meters, have a free cross section of 25 mm over their entire length. The cross section of the delivery lines 19 is in each case significantly reduced downstream of the feed point 20 in question and adjacent to it, to a diameter of 6 mm. As can be seen from FIG. 2, this considerable reduction in cross-section does not occur suddenly, but essentially continuously via a conical intermediate piece 21.

Die vom Windkessel 9 kommende Gasleitung 12 ist über die Anschlußstelle der Trägergasleitungen 17 mit einer Bypass­leitung 22 weitergeführt, über welche Sekundärgas in die betreffende Förderleitung 19 zu leiten ist. In jeder By­passleitung 22 ist ein Regelventil 23 angeordnet, mit dem die der betreffenden Förderleitung 19 zugeführte Sekundär­gasmenge zu regeln ist.The gas line 12 coming from the air boiler 9 is continued via the connection point of the carrier gas lines 17 with a bypass line 22, via which secondary gas is to be conducted into the relevant delivery line 19. A control valve 23 is arranged in each bypass line 22 and is used to regulate the amount of secondary gas supplied to the relevant delivery line 19.

Der Anschlußstelle 24 für die Bypassleitung 22 ist eine kapazitive Meßeinrichtung 25 stromaufwärts in jeder För­derleitung 19 vorgeordnet, mittels welcher die relative Förderleistung der betreffenden Förderleitung 19 zu be­stimmen ist. Die Meßeinrichtungen 25 geben ihre Meßwerte jeweils an eine u.a. einen Rechner enthaltende Regelein­richtung 26, mit welcher die Regelventile 23 in den By­passleitungen 22 zu regeln sind.The connection point 24 for the bypass line 22 is preceded by a capacitive measuring device 25 upstream in each delivery line 19, by means of which the relative delivery rate of the relevant delivery line 19 can be determined. The measuring devices 25 each give their measured values to a u.a. a control device 26 containing a computer, with which the control valves 23 in the bypass lines 22 are to be controlled.

Der Dosierbehälter 10 ist auf Kraftmeßdosen 27 abgestützt, mittels derer sein Gewicht (nebst Inhalt) kontinuierlich zu messen ist, wobei die Meßwerte einer Regeleinrichtung 28 zugeführt werden, die darüber hinaus mit dem Regelven­til 14 der Obergasleitung 13 in Verbindung steht.The dosing container 10 is supported on load cells 27, by means of which its weight (together with its content) can be measured continuously, the measured values being fed to a control device 28, which is also connected to the control valve 14 of the upper gas line 13.

Da die Befüllung des Dosierbehälters 10 über die oben bereits gemachten Anmerkungen hinaus im vorliegenden Zusammenhang ohne besonderes Interesse ist, beschränkt sich die nachstehende Beschreibung der Wirkungsweise der Vorrichtung auf den Betriebsablauf nach erfolgter Füllung des Dosierbehälters 10.Since the filling of the dosing container 10 is of no particular interest beyond the comments already made above in the present context, the following description of the mode of operation of the device is limited to the operational sequence after the dosing container 10 has been filled.

Abhängig von den jeweiligen Fördereigenschaften des Kohlenstaubes und der betrieblich vorgegebenen Förder­leistung wird im Dosierbehälter 10 über die Obergaslei­tung 13 der erforderliche Betriebsdruck eingestellt, wo­bei der Differenzdruck zwischen dem Druck im Dosierbe­hälter 10 und dem im Hochofen 1 herrschenden Druck bzw. dem am Ende der Förderleitungen 19 herrschenden Druck während der Entleerung des Dosierbehälters 10 grundsätz­lich konstantgehalten wird.Depending on the respective conveying properties of the coal dust and the operationally specified delivery rate, the required operating pressure is set in the dosing tank 10 via the upper gas line 13, the differential pressure between the pressure in the dosing tank 10 and the pressure prevailing in the blast furnace 1 or that prevailing at the end of the delivery lines 19 Pressure is basically kept constant during the emptying of the metering container 10.

Das Ist-Gewicht des Dosierbehälters 10 (samt Inhalt) wird von der Regeleinrichtung 28 ständig mit dem Soll-­Gewicht des Dosierbehälters 10 verglichen, d.h. also mit demjenigen Gewicht, welches der Dosierbehälter nach der seit Beginn der Entleerung verstrichenen Zeit unter Berücksichtigung der vorgegebenen Aus­tragsleistung haben müßte. Entspricht dabei das Ist-Gewicht des Dosierbehälters 10 seinem Soll-Gewicht, so zeigt dieses an, daß in dem betreffenden Zeitintervall die vorgegebene Austragsmenge auch tatsächlich ausgetragen und dem Hochofen 1 zugeführt worden ist, so daß die Be­triebsverhältnisse nicht verändert werden. Ist dagegen das Ist-Gewicht des Dosierbehälters 10 größer als sein Soll-­Gewicht zu dem betreffenden Zeitpunkt, so bedeutet dieses, daß zuwenig Kohlenstaub aus dem Dosierbehälter 10 ausge­tragen worden ist. In einem solchen Falle bewirkt die Re­ geleinrichtung 28, daß der zuvor konstantgehaltene Druck im Dosierbehälter 10 erhöht wird, indem die Re­geleinrichtung 28 entsprechend auf das Regelventil 14 der Obergasleitung 13 einwirkt. Ist dagegen zum Meß­zeitpunkt das Ist-Gewicht kleiner als das Soll-Gewicht des Dosierbehälters 10 und demgemäß zuviel Kohlenstaub aus dem Dosierbehälter ausgetragen worden, so bewirkt die Regeleinrichtung 28 eine Herabsetzung des zuvor konstanten Druckes im Dosierbehälter 10 und damit eine entsprechende Verringerung der Austragsleistung.The actual weight of the dosing container 10 (including its contents) is constantly compared by the control device 28 with the target weight of the dosing container 10, that is to say with the weight that the dosing container has after the time that has elapsed since the emptying began, taking into account the specified discharge rate ought to. If the actual weight of the metering container 10 corresponds to its target weight, this indicates that the specified discharge quantity has actually been discharged and fed to the blast furnace 1 in the relevant time interval, so that the operating conditions are not changed. If, on the other hand, the actual weight of the metering container 10 is greater than its target weight at the relevant time, this means that too little coal dust has been discharged from the metering container 10. In such a case, the Re Gel device 28 that the previously constant pressure in the metering container 10 is increased by the control device 28 acts accordingly on the control valve 14 of the upper gas line 13. If, on the other hand, the actual weight is smaller than the target weight of the metering container 10 and accordingly too much coal dust has been discharged from the metering container at the time of measurement, the control device 28 brings about a reduction in the previously constant pressure in the metering container 10 and thus a corresponding reduction in the discharge capacity.

Auf diese Weise ist mit relativ einfachen, robusten und betrieblich zuverlässigen Mitteln sicherzustellen, daß dem Hochofen 1 die vorgegebene Kohlenstaubmenge je Zeit­einheit im Rahmen der geforderten Genauigkeit auch tat­sächlich zugeführt wird.In this way it can be ensured with relatively simple, robust and operationally reliable means that the predetermined amount of coal dust per unit of time is actually supplied to the blast furnace 1 within the required accuracy.

Während der Beschickung des Hochofens 1 mit Kohlenstaub wird die über die Trägergasleitungen 17 dem Dosierbehäl­ter 10 über dessen Kammern 15 zugeführte Trägergasmenge konstantgehalten. so daß die bei bzw. vor Betriebsaufnahme ermittelten, den jeweiligen Eigenschaften des Kohlenstaubes angepaßten und auf die vorgegebene Durchsatzleistung abge­stellten Bedingungen im wesentlichen unverändert bleibt. Dieses gilt mithin ersichtlich in vorteilhafter Weise auch für die Fluidisierungsbedingungen am Beginn der Förderlei­tungen 19.During the charging of the blast furnace 1 with coal dust, the amount of carrier gas supplied via the carrier gas lines 17 to the metering container 10 via its chambers 15 is kept constant. so that the conditions determined during or before start of operation, adapted to the respective properties of the coal dust and adjusted to the predetermined throughput, remain essentially unchanged. This obviously also applies in an advantageous manner to the fluidization conditions at the beginning of the delivery lines 19.

Da nun aber - wie oben ausgeführt - eine weitere betrieb­liche Forderung darin besteht, daß den einzelnen Zuführ­stellen 20 des Hochofens 1 der Kohlenstaub auch weitgehend gleichmäßig zugeführt wird, erfolgt während des Austrages eine entsprechende relative Regelung der Förderleistungen der einzelnen Förderleitungen 19, indem die von den ka­pazitiven Meßeinrichtungen 25 der Förderleitungen 19 er­mittelten Feststoff-Durchströmleistungen der Meßeinrich­tung 25 als Signale zugeführt werden und in einem Mittel­wertbildner der Regeleinrichtung 26 ein rechnerischer Mittelwert der Förderleistung je Förderleitung 19 er­mittelt wird. Stellt die Regeleinrichtung 26 dabei fest, daß die gemessene Förderleistung einer bestimmten För­derleitung 19 größer ist als der ermittelte Mittelwert und demgemäß zwecks Vergleichmäßigung zu reduzieren ist, so wirkt die Regeleinrichtung 26 derart auf das Regel­ventil 23 der betreffenden Bypassleitung 22 ein, daß das der betreffenden Förderleitung 19 an der Anschluß­stelle 24 zugeführte Sekundärgas mengenmäßig erhöht wird, so daß eine entsprechende Verdünnung der Zwei-Komponenten-­Strömung und damit eine Verminderung der Austragsleistung der betreffenden Förderleitung 19 an Feststoff (Kohlen­staub) erfolgt. Ist dagegen die in einer Förderleitung 19 festgestellte Förderleistung kleiner als der Mittelwert, so erfolgt der umgekehrte Vorgang, d.h. die der Förder­leitung 19 zugeführte Sekundärgasströmung wird entspre­chend verringert.However, since - as stated above - a further operational requirement is that the coal dust is also largely uniformly fed to the individual feed points 20 of the blast furnace 1, a corresponding relative regulation of the delivery rates takes place during the discharge of the individual delivery lines 19, in that the solids flow rates determined by the capacitive measuring devices 25 of the delivery lines 19 are supplied to the measuring device 25 as signals and a calculated average value of the delivery rate per delivery line 19 is determined in an averager of the control device 26. If the control device 26 detects that the measured delivery capacity of a particular delivery line 19 is greater than the determined mean value and must therefore be reduced for the purpose of equalization, the control device 26 acts on the control valve 23 of the relevant bypass line 22 in such a way that that of the relevant delivery line 19 at the connection point 24 supplied secondary gas is increased in quantity, so that there is a corresponding dilution of the two-component flow and thus a reduction in the discharge capacity of the feed line 19 in question of solid matter (coal dust). If, on the other hand, the delivery rate determined in a delivery line 19 is less than the mean value, the reverse process takes place, ie the secondary gas flow supplied to the delivery line 19 is reduced accordingly.

Da die Anschlußstellen 24 der Bypassleitungen 22 jeweils benachbart zu der Verengungsstelle 21 angeordnet sind, be­steht mithin aufgrund des Druckabfalls während der Förde­rung in der Förderleitung 19 zum Dosierbehälter 10 wie auch aufgrund der Querschnittsverengung zum Hochofen 1 ein be­achtliches Druckgefälle, so daß sich ein großer Regelbereich in der Größenordnung von 1:3 - 1:4 in den einzelnen För­derleitungen 19 erzielen läßt.Since the connection points 24 of the bypass lines 22 are each arranged adjacent to the constriction point 21, there is therefore a considerable pressure drop due to the pressure drop during delivery in the delivery line 19 to the metering container 10 and also due to the cross-sectional constriction to the blast furnace 1, so that there is a large control range of the order of 1: 3 - 1: 4 can be achieved in the individual delivery lines 19.

Trotz der hohen Feststoffbeladung, die abhängig von den Eigenschaften der Kohle, den Leitungsabmessungen etc.,je nach dem Gegendruck im Industrieofen im Bereich 20:1 bis größer 100:1 kg Kohle/kg Gas liegt, ist der Ver­schleiß der Förderleitungen 19 außerordentlich gering, da man unter üblichen Verhältnissen mit Fördergeschwin­digkeiten im Bereich von ca. 0,8 bis 3 m/sec auskommt und nur im Bereich des lanzenförmigen Verengungsabschnittes 19′ Geschwindigkeiten im Bereich von 18 bis 30 m/sec er­reicht werden, die jedoch nicht als negativer Nebeneffekt der Querschnittsverengung der Förderleitungen 19 zu be­trachten, sondern im Hinblick auf die hohen Windgeschwin­digkeiten im Windkanal 3 bzw. in den Blasformen 2 und den im Ofen herrschenden Innendruck erforderlich sind, um die Zwei-Komponenten-Strömung in den Hochofen einblasen zu können. Dabei erweist sich der aufgrund der Querschnitts­verengung vorliegende relativ geringe Durchmesser am ver­engten Endabschnitt 19′ der Förderleitungen 19 auch beim Einführen in den Hochofen 1 als vorteilhaft, da bei der­artigen Dimensionen selbst bei den hohen Innendrücken des Hochofens ein Einführen von Hand noch möglich ist.Despite the high solids loading, which, depending on the properties of the coal, the line dimensions etc., and depending on the back pressure in the industrial furnace, is in the range from 20: 1 to greater than 100: 1 kg coal / kg gas, the wear on the delivery lines 19 is extremely low, since you can get under normal conditions with conveyor speeds in the range of about 0.8 to 3 m / sec and only in the area of the lance-shaped constriction section 19 'speeds in the range of 18 to 30 m / sec can be achieved, which, however, not as a negative side effect of Cross-sectional narrowing of the delivery lines 19 to be considered, but in view of the high wind speeds in the wind tunnel 3 or in the blow molds 2 and the internal pressure prevailing in the furnace are necessary in order to be able to blow the two-component flow into the blast furnace. Here, due to the narrowing of the cross-section, the relatively small diameter at the narrowed end section 19 'of the conveyor lines 19 also proves to be advantageous when it is introduced into the blast furnace 1, since such dimensions allow manual insertion even with the high internal pressures of the blast furnace.

BEZUGSZEICHENLISTEREFERENCE SIGN LIST

  • 1 Hochofen1 blast furnace
  • 2 Blasform2 blow mold
  • 3 Windkanal3 wind tunnel
  • 4 Vorratssilo4 storage silos
  • 5 Zellenradschleuse5 rotary valve
  • 6 Schleusengefäß6 lock vessel
  • 7 Ventil7 valve
  • 8 Leitung8 line
  • 9 Windkessel9 air tanks
  • 10 Dosierbehälter10 dosing containers
  • 11 Ventile11 valves
  • 12 Gasleitung12 gas pipe
  • 13 Obergasleitung13 Upper gas line
  • 14 Regelventil (in 13)14 control valve (in 13)
  • 15 Kammern15 chambers
  • 16 Anströmboden (von 15)16 inflow floor (from 15)
  • 17 Trägergasleitung17 carrier gas line
  • 18 Ventil18 valve
  • 19 Förderleitungen19 conveyor lines
  • 20 Zuführstelle20 feed point
  • 21 Konisches Zwischenstück (von 19)21 conical spacer (from 19)
  • 22 Bypassleitung22 Bypass line
  • 23 Regelventil23 control valve
  • 24 Anschluß (für 22 an 19)24 connection (for 22 to 19)
  • 25 Meßeinrichtung (in 19)25 measuring device (in 19)
  • 26 Regeleinrichtung26 control device
  • 27 Kraftmeßdosen27 load cells
  • 28 Regeleinrichtung28 control device

Claims (12)

1. Verfahren zum dosierten Einführen feinkörniger, insbe­sondere staubkörniger Feststoffe, insbesondere Kohlenstaub, aus einem einen Feststoffvorrat enthaltenden, unter Druck stehenden Dosierbehälter in einen mehrere Zuführstellen aufweisenden Industrieofen, insbesondere einen Schachtofen wie einen Hochofen oder einen Kupolofen, bei dem der Feststoff den einzelnen Zuführstellen in einem Trägergas­strom mit hoher Feststoffbeladung jeweils durch eine Förder­leitung zugeführt wird, wobei das Trägergas dem unteren Endabschnitt des Dosierbehälters in einer eine lokale Auf­lockerung im unteren Abschnitt des Feststoffvorrates be­wirkenden Strömung zugeführt wird und die Förderleitungen in den Auflockerungsbereich münden, dadurch gekennzeichnet, daß der den Feststoffvorrat enthaltende Dosierbehälter kon­tinuierlich gewogen wird; daß das Ist-Gewicht des Dosierbe­hälters mit dessen Soll-Gewicht verglichen wird und bei ei­nem Über- bzw. Unterschreiten des Soll-Gewichtes der Druck im Dosierbehälter erhöht bzw. erniedrigt wird; und daß eine Regelung der Förderleistung jeder Förderleitung in an sich bekannter Weise durch Zugabe von Sekundärgas erfolgt, wobei das Sekundärgas den Förderleitungen jeweils benachbart zu der betreffenden Zuführstelle stromaufwärts zu einer Drossel­stelle zugeführt wird.1.Procedure for the metered introduction of fine-grained, in particular dust-grained solids, in particular coal dust, from a dosing container containing a solid supply, under pressure, into an industrial furnace having a plurality of feed points, in particular a shaft furnace such as a blast furnace or a cupola furnace, in which the solid enters the individual feed points a carrier gas stream with a high solids load is fed through a delivery line, the carrier gas being fed to the lower end section of the metering container in a flow causing local loosening in the lower section of the solids supply and the delivery lines opening into the loosening area, characterized in that the containing the solids supply Dosing container is weighed continuously; that the actual weight of the dosing container is compared with its target weight and the pressure in the dosing container is increased or decreased when the target weight is exceeded or undershot; and that the delivery rate of each delivery line is regulated in a manner known per se by adding secondary gas, the secondary gas being supplied to the delivery lines in each case adjacent to the relevant feed point upstream of a throttle point. 2. Verfahren nach Anspruch 1, dadurch gekennzeichnet, daß die dem unteren Endabschnitt des Dosierbehälters zeitlich zugeführte, auf Normzustand bezogene Trägergasmenge für eine bestimmte Feststoffsorte konstantgehalten wird, wobei die Trägergasmenge so bemessen wird, daß sie bei der betreffenden Feststoffsorte unter dem höchsten im Do­sierbehälter auftretenden Betriebsdruck noch zu einer Lockerung des Feststoffes in der lokalen Auflockerungs­zone führt.2. The method according to claim 1, characterized in that the amount of carrier gas supplied to the lower end portion of the metering container in terms of time, based on the standard condition, is kept constant, the carrier gas quantity being dimensioned such that it occurs under the highest level of solids in the metering container Operating pressure leads to a loosening of the solid in the local loosening zone. 3. Verfahren nach Anspruch 1 oder 2, dadurch gekennzeichnet, daß die Regelung des Druckes im Dosierbehälter durch Zu- ­bzw. Abfuhr von unter Druck stehendem Obergas erfolgt, wel­ches oberhalb des Feststoffvorrates zu- bzw. abgeführt wird.3. The method according to claim 1 or 2, characterized in that the regulation of the pressure in the metering container by supply or Removal of pressurized top gas takes place, which is supplied or removed above the solid supply. 4. Verfahren nach Anspruch 3, dadurch gekennzeichnet, daß die dem Dosierbehälter zugeführte Obergasmenge zu bemessen wird, daß nicht nur jeweils die aus dem Dosierbehälter aus­getragene Feststoffmenge durch Obergas ersetzt wird, und daß dem jeweiligen Betriebsdruck entsprechende Lückenvolumen zwischen den Feststoffteilen durch Gas ausgefüllt wird, son­dern daß auch ein Teil des zugeführten Obergases bis in den lokalen Auflockerungsbereich strömt und zusammen mit dem Feststoff sowie dem dem Dosiergefäß am unteren Endabschnitt zugeführten Trägergas durch die Förderleitungen ausgetragen wird.4. The method according to claim 3, characterized in that the amount of top gas supplied to the metering container is dimensioned such that not only the amount of solid discharged from the metering tank is replaced by top gas, and that the respective operating pressure corresponding gap volume between the solid parts is filled with gas, but that part of the supplied top gas flows into the local loosening area and is discharged through the delivery lines together with the solid matter and the carrier gas supplied to the metering vessel at the lower end section. 5. Vorrichtung zur Durchführung des Verfahrens nach einem oder mehreren der vorhergehenden Ansprüche, mit einem als Druckgefäß ausgebildeten Dosierbehälter, welcher an seinem oberen Abschnitt mit Feststoff zu befüllen ist, und der an seinem unteren Endabschnitt mehrere nach oben offene Kammern aufweist, in welche jeweils mindestens eine zu einer Zuführ­ stelle führende Förderleitung mündet, und die jeweils mit einem gasdurchlässigen Anströmboden versehen sind, auf dessen der Feststoffsäule abgekehrter Seite eine Trägergasleitung zum Zuführen von Trägergas mündet, dadurch gekennzeichnet, daß der Dosierbehälter (10) in an sich bekannter Weise als Wiegegefäß ausgebildet ist, in dessen oberen Endabschnitt eine mit einem Regelventil (14) versehene Obergasleitung (13) zum Zuführen von unter Druck stehendem Obergas mündet; daß eine (erste) Regeleinrichtung (28) vorhanden ist, mittels welcher das Ist-Gewicht des Dosierbehälters (10) mit dessen Soll-Gewicht zu vergleichen ist und bei einem Über- bzw. Unterschreiten des Soll-Gewichtes der Druck im Dosierbehälter (10) durch Regelung des Obergasdruckes zu erhöhen bzw. zu erniedrigen ist und bei Übereinstimmung des Soll-Gewichtes mit dem Ist-Gewicht konstantzuhalten ist; daß der Querschnitt der Förderleitungen (19) jeweils in dem der betreffenden Zuführ­stelle (20) stromaufwärts unmittelbar vorgeordneten Abschnitt (19′) wesentlich verringert ist; daß jeweils eine Sekundär­gas führende Bypassleitung (22) stromaufwärts benachbart zu der Querschnittsverengung (21) in jede Förderleitung (19) mündet; daß in jeder Förderleitung (19) eine Meßeinrichtung (25) vorhanden ist, mittels welcher die relative Ist-Förder­leistung der betreffenden Förderleitung (19) zu bestimmen ist; daß ein Mittelwertbildner vorhanden ist, mittels dessen die mittlere Förderleistung je Förderleitung (19) zu be­stimmen ist; und daß in jeder Förderleitung (19) eine (zweite) Regeleinrichtung (26) vorhanden ist, mittels welcher die der Förderleitung (19) zugeführte Sekundärgasmenge zu erhöhen bzw. zu erniedrigen ist, wenn die von der Meßeinrichtung (25) ermittelte Ist-Förderleistung der Förderleitung (19) größer bzw. kleiner ist als die vom Mittelwertbildner ermittelte mittlere Fördergeschwindigkeit je Förderleitung (19).5. Apparatus for carrying out the method according to one or more of the preceding claims, with a metering container designed as a pressure vessel, which is to be filled with solid at its upper section, and which has a plurality of open-topped chambers at its lower end section, in each of which at least one to a feeder place leading delivery line opens, and which are each provided with a gas-permeable inflow floor, on the side facing away from the solid column, a carrier gas line for supplying carrier gas opens, characterized in that the metering container (10) is designed in a manner known per se as a weighing vessel, in the upper end section opens with a control valve (14) provided upper gas line (13) for supplying pressurized upper gas; that a (first) control device (28) is present, by means of which the actual weight of the metering container (10) can be compared with its target weight and, if the target weight is exceeded or undershot, the pressure in the metering container (10) is to be increased or decreased by regulating the upper gas pressure and is to be kept constant if the target weight matches the actual weight; that the cross section of the delivery lines (19) in each of the feed point (20) upstream immediately upstream section (19 ') is substantially reduced; that a bypass line (22) carrying secondary gas opens upstream of each delivery line (19) adjacent to the cross-sectional constriction (21); that in each delivery line (19) there is a measuring device (25) by means of which the relative actual delivery rate of the delivery line (19) in question is to be determined; that there is an averager by means of which the average delivery rate per delivery line (19) is to be determined; and that in each delivery line (19) there is a (second) control device (26) by means of which the amount of secondary gas supplied to the delivery line (19) can be increased or decreased when the actual delivery rate of the measuring device (25) determined Conveying line (19) is greater or smaller than the average conveying speed per conveying line (19) determined by the averager. 6. Vorrichtung nach Anspruch 5, dadurch gekennzeichnet, daß der Dosierbehälter (10) auf elektrischen Kraftmeßdosen (27) abgestützt ist, deren Meßsignale der ersten Regeleinrichtung (28) zuzuführen sind.6. The device according to claim 5, characterized in that the metering container (10) is supported on electrical load cells (27), the measurement signals of the first control device (28) are to be supplied. 7. Vorrichtung nach Anspruch 5 oder 6, dadurch gekennzeichnet, daß die Querschnittsverengung (21) in den Förderleitungen (19) im wesentlichen stetig ausgebildet ist.7. The device according to claim 5 or 6, characterized in that the cross-sectional constriction (21) in the delivery lines (19) is substantially continuous. 8. Vorrichtung nach Anspruch 7, dadurch gekennzeichnet, daß zwischen dem den größeren Querschnitt aufweisenden Abschnitt einer Förderleitung (19) und ihrem den kleineren Querschnitt aufweisenden Abschnitt (19′) ein konisch ausgebildeter Zwischenabschnitt (21) vorhanden ist.8. The device according to claim 7, characterized in that between the larger cross-section of a conveyor line (19) and its smaller cross-section (19 ') has a conical intermediate section (21) is present. 9. Vorrichtung nach einem oder mehreren der Ansprüche 5 bis 8, dadurch gekennzeichnet, daß das Querschnittsverhältnis vor und nach der Verengungsstelle (21) etwa 10:1 - 25:1 beträgt.9. The device according to one or more of claims 5 to 8, characterized in that the cross-sectional ratio before and after the constriction (21) is about 10: 1 - 25: 1. 10. Vorrichtung nach einem oder mehreren der Ansprüche 5 bis 9, dadurch gekennzeichnet, daß der Querschnitt der Förderleitungen (19) von etwa 25 bis 40 mm auf etwa 6 bis 8 mm verringert ist.10. The device according to one or more of claims 5 to 9, characterized in that the cross section of the conveyor lines (19) is reduced from about 25 to 40 mm to about 6 to 8 mm. 11. Vorrichtung nach einem oder mehreren der Ansprüche 5 bis 10, dadurch gekennzeichnet, daß die Meßeinrichtungen (25) zum Bestimmen der relativen Ist-Förderleistung in den Förderleitungen (19) kapazitive Meßeinrichtungen sind.11. The device according to one or more of claims 5 to 10, characterized in that the measuring devices (25) for determining the relative actual delivery rate in the delivery lines (19) are capacitive measuring devices. 12. Vorrichtung nach einem oder mehreren der Ansprüche 5 bis 11, dadurch gekennzeichnet, daß die am unteren Endabschnitt des Dosierbehälters (10) angeordneten Kammern (15) jeweils als topfförmige Ansätze ausgebildet sind, in die jeweils eine Förderleitung (19) mündet.12. The device according to one or more of claims 5 to 11, characterized in that the at the lower end portion of the metering container (10) arranged chambers (15) are each formed as pot-shaped approaches, in each of which a delivery line (19) opens.
EP87101087A 1986-02-01 1987-01-27 Process and device for the measured supply of fine solid particles to an industrial furnace Expired - Lifetime EP0235562B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
AT87101087T ATE68589T1 (en) 1986-02-01 1987-01-27 METHOD AND DEVICE FOR THE DOSED INTRODUCTION OF FINE GRAIN SOLIDS INTO AN INDUSTRIAL FURNACE.

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE3603078 1986-02-01
DE3603078A DE3603078C1 (en) 1986-02-01 1986-02-01 Method and device for the metered introduction of fine-grained solids into an industrial furnace, in particular a blast furnace or cupola furnace

Publications (3)

Publication Number Publication Date
EP0235562A2 true EP0235562A2 (en) 1987-09-09
EP0235562A3 EP0235562A3 (en) 1988-09-28
EP0235562B1 EP0235562B1 (en) 1991-10-16

Family

ID=6293137

Family Applications (1)

Application Number Title Priority Date Filing Date
EP87101087A Expired - Lifetime EP0235562B1 (en) 1986-02-01 1987-01-27 Process and device for the measured supply of fine solid particles to an industrial furnace

Country Status (7)

Country Link
US (1) US4758118A (en)
EP (1) EP0235562B1 (en)
AT (1) ATE68589T1 (en)
BR (1) BR8700455A (en)
CA (1) CA1296530C (en)
DE (1) DE3603078C1 (en)
RU (1) RU2054047C1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0270013A2 (en) * 1986-12-04 1988-06-08 Paul Wurth S.A. Process for injection by pneumatic means metered amounts of pulverulent materials into a vessel maintained at variable pressure
EP0383093A2 (en) * 1989-02-14 1990-08-22 Paul Wurth S.A. Method for the pneumatic and dosed injection of pulverised material into a vessel, subjected to a variable pressure
WO2010037601A1 (en) * 2008-09-30 2010-04-08 Siemens Aktiengesellschaft Ash metering system for high pressures using a combination of an ash pump and an ash lock
WO2011042194A3 (en) * 2009-10-10 2011-07-21 Choren Industries Gmbh Metering system, dense phase conveying system and method for supplying bulk material in powder form

Families Citing this family (33)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4883390A (en) * 1982-08-16 1989-11-28 Petrocarb, Inc. Method and apparatus for effecting pneumatic conveyance of particulate solids
JP3083593B2 (en) * 1991-07-16 2000-09-04 ダイヤモンドエンジニアリング株式会社 Pulverized coal emission control device
US5265983A (en) * 1992-06-02 1993-11-30 The Babcock & Wilcox Company Cascading pressure continuous blow bottle
US5388537A (en) * 1994-08-02 1995-02-14 Southern California Edison Company System for burning refuse-derived fuel
US5657704A (en) * 1996-01-23 1997-08-19 The Babcock & Wilcox Company Continuous high pressure solids pump system
US5992335A (en) 1996-09-13 1999-11-30 Nkk Corporation Method of blowing synthetic resin into furnace and apparatus therefor
DE19755368B4 (en) * 1996-12-27 2005-10-27 Makita Corp., Anjo Starting device for an electric motor
DE19857306C2 (en) * 1998-12-14 2003-05-28 Eko Stahl Gmbh Method and device for blowing solid particles into a shaft furnace
LU90585B1 (en) 2000-04-26 2001-10-29 Wurth Paul Sa A device for discharging dust from a dry dust collector of a blast furnace
DE10162398A1 (en) * 2001-12-13 2003-07-24 Moeller Materials Handling Gmb System for feeding a plurality of consumers, e.g. B. cells of aluminum melting furnaces with bulk material, for. B. powdered alumina
US6722294B2 (en) * 2002-08-06 2004-04-20 Vitro Global, S.A. Method and apparatus for feeding a pulverized material
US6748883B2 (en) * 2002-10-01 2004-06-15 Vitro Global, S.A. Control system for controlling the feeding and burning of a pulverized fuel in a glass melting furnace
WO2005040433A2 (en) * 2003-10-21 2005-05-06 Outokumpu Technology Oy Direct smelting plant and process
DE102005047583C5 (en) * 2005-10-04 2016-07-07 Siemens Aktiengesellschaft Method and device for the controlled supply of fuel dust into an entrained flow gasifier
US7660680B1 (en) 2006-06-26 2010-02-09 Rockwell Automation Technologies, Inc. Systems and methods for totalizing parallel feeds
DE202006016093U1 (en) * 2006-10-20 2008-03-06 Claudius Peters Technologies Gmbh Coal distributor for blast furnaces and the like
US7524146B2 (en) * 2006-11-30 2009-04-28 William Jeffrey Peet Pneumatic uneven flow factoring for particulate matter distribution system
US8496412B2 (en) * 2006-12-15 2013-07-30 General Electric Company System and method for eliminating process gas leak in a solids delivery system
MX2010003635A (en) * 2007-10-04 2012-04-02 Vitro Global Sa Method and apparatus for feeding a pulverized material.
US20100014946A1 (en) * 2007-10-29 2010-01-21 Uop Llc Catalyst flow control device for transfer of solids between two vessels
LU91376B1 (en) * 2007-11-16 2009-05-18 Wurth Paul Sa Injections system for solid particles
US8075227B2 (en) * 2007-11-30 2011-12-13 Uop Llc Device to transfer catalyst from a low pressure vessel to a high pressure vessel and purge the transferred catalyst
US7841807B2 (en) * 2008-10-30 2010-11-30 Uop Llc Method of transferring particles
US7878736B2 (en) * 2008-10-30 2011-02-01 Uop Llc Apparatus for transferring particles
CN101398258B (en) * 2008-11-04 2012-09-05 首钢总公司 Air-coal mixed spraying automatic control system and method thereof
US8951315B2 (en) * 2008-11-12 2015-02-10 Exxonmobil Research And Engineering Company Method of injecting fuel into a gasifier via pressurization
US7874769B2 (en) * 2008-12-11 2011-01-25 Uop Llc Method for transferring particles
US7887264B2 (en) * 2008-12-11 2011-02-15 Uop Llc Apparatus for transferring particles
US7841808B2 (en) * 2009-01-28 2010-11-30 Uop Llc Method for transferring particles
US7878737B2 (en) * 2008-12-22 2011-02-01 Uop Llc Apparatus for transferring particles
DE102014216336A1 (en) 2014-08-18 2016-02-18 Küttner Holding GmbH & Co. KG Process for injecting replacement reductants into a blast furnace
WO2020148456A1 (en) * 2019-01-18 2020-07-23 Tricoya Technologies Ltd A system and a method for transferring solid particles from a first environment at a first gas pressure to a second environment at a second gas pressure
JP7365575B2 (en) * 2019-08-09 2023-10-20 三菱マテリアル株式会社 Continuous ore feeding device

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR1293650A (en) * 1961-04-07 1962-05-18 Saint Chamond Granat Ets System for regulating the flow rate of a pulverulent material transported by a gaseous vehicle
FR2126743A5 (en) * 1971-02-08 1972-10-06 Sueddeutsche Kalkstickstoff
EP0116764A1 (en) * 1982-12-22 1984-08-29 Kawasaki Steel Corporation Apparatus for blowing powdery refining agent into refining vessel
EP0164436A1 (en) * 1984-06-14 1985-12-18 Wilfried Stein Device for the metered transportation of pulverulent matter

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3689045A (en) * 1971-06-03 1972-09-05 Earl E Coulter Pulverized fuel delivery system for a blast furnace
DE2554565A1 (en) * 1975-12-04 1977-06-16 Otto & Co Gmbh Dr C PLANT FOR THE PRESSURE GASIFICATION OF FINE-GRAIN FUELS
DE2703736C2 (en) * 1977-01-29 1982-11-25 Freier Grunder Eisen- Und Metallwerke Gmbh, 5908 Neunkirchen Device for pneumatic upward conveyance of powdery or fine-grained bulk material
DE2714355A1 (en) * 1977-03-31 1978-10-12 Klein Alb Kg Free-running material e.g. pulverised coal charging system - with flow rate controlled gate setting and carrier gas admission
DD139271A1 (en) * 1978-09-28 1979-12-19 Manfred Schingnitz METHOD AND DEVICE FOR DELIVERING DUST-SOFT MATERIALS
DD206309A3 (en) * 1981-07-17 1984-01-18 Kretschmer Horst METHOD FOR REGULATING MASS STRUCTURES
JPS58104833A (en) * 1981-12-12 1983-06-22 Kawasaki Steel Corp Continuously supplying method and device for transporting granule from one distributive transportation tank to plural supply ends by controlling mass flow to optional preset value
DE3225449C2 (en) * 1982-07-07 1988-09-29 Klöckner Stahlforschung GmbH, 8458 Sulzbach-Rosenberg Method and device for measuring and / or regulating the mass flow of solid particles
NL183951C (en) * 1983-01-12 1989-03-01 Hoogovens Groep Bv DOSING DEVICE FOR DOSING POWDER COAL IN AN AIR LINE TO A MAIN OVEN.
FR2549580A1 (en) * 1983-07-19 1985-01-25 Wurth Paul Sa METHOD AND DEVICE FOR THE INJECTION OF PULVERIZED CHARCOAL IN AN INDUSTRIAL FURNACE

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR1293650A (en) * 1961-04-07 1962-05-18 Saint Chamond Granat Ets System for regulating the flow rate of a pulverulent material transported by a gaseous vehicle
FR2126743A5 (en) * 1971-02-08 1972-10-06 Sueddeutsche Kalkstickstoff
EP0116764A1 (en) * 1982-12-22 1984-08-29 Kawasaki Steel Corporation Apparatus for blowing powdery refining agent into refining vessel
EP0164436A1 (en) * 1984-06-14 1985-12-18 Wilfried Stein Device for the metered transportation of pulverulent matter

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0270013A2 (en) * 1986-12-04 1988-06-08 Paul Wurth S.A. Process for injection by pneumatic means metered amounts of pulverulent materials into a vessel maintained at variable pressure
EP0270013A3 (en) * 1986-12-04 1989-04-26 Paul Wurth S.A. Process for injection by pneumatic means metered amounts of pulverulent materials into a vessel maintained at variable pressure
AU603162B2 (en) * 1986-12-04 1990-11-08 Paul Wurth S.A. Process for injecting, by pneumatic means, metered quantities of pulverulent material into a chamber which is under variable pressure
EP0383093A2 (en) * 1989-02-14 1990-08-22 Paul Wurth S.A. Method for the pneumatic and dosed injection of pulverised material into a vessel, subjected to a variable pressure
EP0383093A3 (en) * 1989-02-14 1991-01-23 Paul Wurth S.A. Method for the pneumatic and dosed injection of pulverised material into a vessel, subjected to a variable pressure
WO2010037601A1 (en) * 2008-09-30 2010-04-08 Siemens Aktiengesellschaft Ash metering system for high pressures using a combination of an ash pump and an ash lock
WO2011042194A3 (en) * 2009-10-10 2011-07-21 Choren Industries Gmbh Metering system, dense phase conveying system and method for supplying bulk material in powder form
US8899884B2 (en) 2009-10-10 2014-12-02 Linde Ag Metering system, dense phase conveying system and method for supplying bulk material in powder form

Also Published As

Publication number Publication date
EP0235562A3 (en) 1988-09-28
BR8700455A (en) 1987-12-08
DE3603078C1 (en) 1987-10-22
RU2054047C1 (en) 1996-02-10
ATE68589T1 (en) 1991-11-15
US4758118A (en) 1988-07-19
EP0235562B1 (en) 1991-10-16
CA1296530C (en) 1992-03-03

Similar Documents

Publication Publication Date Title
EP0235562B1 (en) Process and device for the measured supply of fine solid particles to an industrial furnace
DE2831208C2 (en)
DE3227875C2 (en)
EP2095050B1 (en) Solids distributor for injection plants, blast furnaces and the like
DE2308474C2 (en) Dosing system for shaft furnaces, especially blast furnaces
EP0856068B1 (en) Process for conveying a finely divided solid
DE2703736C2 (en) Device for pneumatic upward conveyance of powdery or fine-grained bulk material
DE2723542A1 (en) METHOD FOR CONTINUOUS CONVEYING AND EVALUATION OF SOLID PARTICLES INTO A PRESSURE APPARATUS
DE3316368A1 (en) METHOD AND DEVICE FOR DETERMINING AND MONITORING THE FUEL MASS CURRENT WHICH IS ADMITTED TO THE CARBURETOR IN THE PARTIAL OXIDATION (GASIFICATION) OF FINE-GRAINED TO DUST-SHAPED FUELS
DE2711114C2 (en) Device and method for removing bulk material from a storage space with a moving sensor protruding into the bulk material flow
DE2934130A1 (en) METHOD AND DEVICE FOR FEEDING DUSTY MATERIALS
EP2185902B1 (en) Calibration of dust load flow measuring systems
EP0218869A1 (en) Device for uniformly dosing granular abrasive material in pneumatically working blasting devices
EP0059904A1 (en) Plant for feeding coal to metallurgical processing vessels with a plurality of blow-in sites, and method of operating the plant
EP0121599B1 (en) Method and device for pneumatically transporting particulate matter
DE3050394C2 (en) Process for feeding a powdered fuel mixture to the blow molds of a blast furnace
DE3241704C2 (en)
DE3521657A1 (en) Process for controlling the degree of filling of a conveying device conveying green pellets through a hardening furnace and device for carrying out the process
EP0495172B1 (en) Dosing apparatus
DE3418455A1 (en) Method and apparatus for injecting fine granular solids into a metal melt
DE2617490A1 (en) METHOD AND DEVICE FOR SUPPLYING DRY, FLOWABLE CARBON DUST INTO A HIGH-PRESSURE COAL GASIFICATION REACTOR
EP0516613B1 (en) Plant comprising a shaft, in particular a reduction shaft furnace
DE3320477C2 (en)
DE2214737C2 (en) Process and device for regulating and safely monitoring the inert gas overpressure in the bunker and allocation system of a plant for the suspension gasification of finely divided solid fuels
DE3027606C2 (en)

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A2

Designated state(s): AT BE FR GB IT SE

PUAL Search report despatched

Free format text: ORIGINAL CODE: 0009013

AK Designated contracting states

Kind code of ref document: A3

Designated state(s): AT BE FR GB IT SE

17P Request for examination filed

Effective date: 19890323

17Q First examination report despatched

Effective date: 19901206

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: PAUL WURTH S.A.

Owner name: DR. KUETTNER GMBH & CO. KG

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE FR GB IT SE

REF Corresponds to:

Ref document number: 68589

Country of ref document: AT

Date of ref document: 19911115

Kind code of ref document: T

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: SE

Payment date: 19911111

Year of fee payment: 6

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 19911218

Year of fee payment: 6

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: AT

Payment date: 19920109

Year of fee payment: 6

ITF It: translation for a ep patent filed

Owner name: MODIANO & ASSOCIATI S.R.L.

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 19920117

Year of fee payment: 6

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: BE

Payment date: 19920204

Year of fee payment: 6

ET Fr: translation filed
GBT Gb: translation of ep patent filed (gb section 77(6)(a)/1977)
PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed
PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Effective date: 19930127

Ref country code: AT

Effective date: 19930127

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SE

Effective date: 19930128

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Effective date: 19930131

BERE Be: lapsed

Owner name: S.A. PAUL WURTH

Effective date: 19930131

Owner name: KUTTNER G.M.B.H. & CO. K.G.

Effective date: 19930131

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 19930127

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Effective date: 19930930

REG Reference to a national code

Ref country code: FR

Ref legal event code: ST

EUG Se: european patent has lapsed

Ref document number: 87101087.2

Effective date: 19930810

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES;WARNING: LAPSES OF ITALIAN PATENTS WITH EFFECTIVE DATE BEFORE 2007 MAY HAVE OCCURRED AT ANY TIME BEFORE 2007. THE CORRECT EFFECTIVE DATE MAY BE DIFFERENT FROM THE ONE RECORDED.

Effective date: 20050127