EP0167403A2 - Site de stockage souterrain des déchets radioactifs - Google Patents

Site de stockage souterrain des déchets radioactifs Download PDF

Info

Publication number
EP0167403A2
EP0167403A2 EP85304786A EP85304786A EP0167403A2 EP 0167403 A2 EP0167403 A2 EP 0167403A2 EP 85304786 A EP85304786 A EP 85304786A EP 85304786 A EP85304786 A EP 85304786A EP 0167403 A2 EP0167403 A2 EP 0167403A2
Authority
EP
European Patent Office
Prior art keywords
layer
modules
water
disposal site
trench
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP85304786A
Other languages
German (de)
English (en)
Other versions
EP0167403A3 (en
EP0167403B1 (fr
Inventor
Charles William Mallory
Ralph Edmond Watts
William Samuel Sanner, Jr.
Joseph Brian Paladino
Arthur Willard Lilley
Steven Jay Winston
Billy Clark Stricklin
John Edward Razor
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CBS Corp
Original Assignee
Westinghouse Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Westinghouse Electric Corp filed Critical Westinghouse Electric Corp
Publication of EP0167403A2 publication Critical patent/EP0167403A2/fr
Publication of EP0167403A3 publication Critical patent/EP0167403A3/en
Application granted granted Critical
Publication of EP0167403B1 publication Critical patent/EP0167403B1/fr
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G21NUCLEAR PHYSICS; NUCLEAR ENGINEERING
    • G21FPROTECTION AGAINST X-RADIATION, GAMMA RADIATION, CORPUSCULAR RADIATION OR PARTICLE BOMBARDMENT; TREATING RADIOACTIVELY CONTAMINATED MATERIAL; DECONTAMINATION ARRANGEMENTS THEREFOR
    • G21F9/00Treating radioactively contaminated material; Decontamination arrangements therefor
    • G21F9/28Treating solids
    • G21F9/34Disposal of solid waste

Definitions

  • This invention generally relates to land disposal sites for toxic or nuclear waste materials having a non- structural cap supported by a solidly packed array of waste-containing modules which are arranged to be flexibly conformable with changes in the shape of the site brought about by seismic events or other natural disturbances.
  • This standing water ultimately caused the steel walls of the drums buried within the trenches to corrode and collapse.
  • the collapsing drums and compaction of the soil over time resulted in a downward movement or subsidence of the soil, which caused a depression to form over the top of the trench.
  • This depression in turn collected surface water and hence worsened the tendency of the trench to collect and maintain a pool of standing water over the drums.
  • the resulting increase in standing water resulted in still more soil subsidence and accelerated the corrosion and collapse of the drums buried therein.
  • the corrosion and collapse of the drum containers in such sites resulted in some radioactive contamination of the ground water flowing therethrough.
  • this type of site has an even worse problem with recoverability when a seismic disturbance does succeed in rupturing only a few or one of the containers encapsulated in the grout.
  • a relocation of the site might be the only solution if such a cracking or breaking of the inaccessible containers occurred.
  • a disposal site for the disposal of toxic waste material comprises a disposal site for the disposal of toxic waste material characterized in that said site comprises a depression in the earth; a non-rigid, water-shedding cap overlying the depression which is substantially formed from solid fluent material, and a plurality of modules disposed in the depression and under the cap for both encapsulating the waste, and for structurally supporting the non-rigid cap over the depression.
  • the invention also includes a disposal site which for the disposal of radioactive waste material, comprises a trench in the earth, a non-rigid, water-shedding and radiation-blocking cap overlying this trench and an array of modules disposed in the trench and under the cap for both encapsulating the radioactive waste material from water and for supporting the non-rigid cap over the trench.
  • the cap includes a layer of natural silt for shedding surface water away from the trench in order to prevent water from accumulating around the modules buried within the disposal site.
  • a layer of coarse, granular material having a high hydraulic conductivity may be placed between the tops of the modules and the underside of the silt layer for preventing water from seeping through- the silt layer and onto the modules by capillary action.
  • the coarse, granular material used in this layer is gravel.
  • a layer of graded rip-rap may be placed over the top surface of the silt layer in order to protect the silt from wind and water erosion, and to provide both a radiation barrier and an intrusion barrier for the waste-containing modules contained within the disposal site.
  • the trench in the earth may be flat-bottomed.
  • the floor of this trench may include a layer of coarse, granular, water conductive material such as gravel for preventing ground water from seeping up to the modules by way of capillary action. Additionally, a plurality of lysimeters may be placed throughout the floor of the trench under the layer of gravel in order to collect samples of water which may be later used to monitor the amount of radioactive leakage from the modules.
  • the modules used in the disposal site of the invention are preferably in the shape of right-angled prisms which may be solidly stacked into layers which are mutually slidable over one another, as well as columnar stacks wherein each column is slidably movable in the vertical direction relative to the other columns.
  • Such a solidly-packed arrangement affords a subsidence-free structure which is capable of supporting the non-rigid cap of the site, but which is flexibly conformable to changes in the shape of the earth brought about by seismic or other natural disturbances.
  • the invention also encompasses a process for burying nuclear waste material contained within a plurality of uniformly shaped, solidly-packable modules characterized by digging a trench; solidly packing the trench from one to the other with the solidly-packable modules, and placing the non-rigid, water-shedding and radiation-blocking cap formed from fluent, solid material over the tops of the modules as the trench is filled with a solid array of such modules in order to minimize the- exposure of the surrounding area to radiation emanating from the modules.
  • the packaging facility 1 of the system of the invention generally comprises four isolation walls 2a, 2b, 2c and 2d which enclose a remote handled waste packaging section 3 on the left side of the building, a module loading and transportation. section 60 in the center of the building, and a contact handled waste section 85 on the right side of the building. Both the remote and contact handled waste sections 3 and 85 include a drive-through 7 and 87, respectively.
  • trucks 13 and 95 deliver remote and- contact handled nuclear waste in relatively lightweight shipping containers (i.e., liners, 55-gallon drums, and LSA containers) from remotely located waste generating sites for encapsulation into the relatively heavy, solidly packed modules 200.
  • the final disposal site 150 of the modules 200 packed by the packaging facility 1 is located in close proximity to the facility 1 in order to minimize the distance which the packed modules 200 (which may weigh over 30,000 pounds) must be transported.
  • the isolation walls 2a, 2b, 2c and 2d minimize the possibility of the disposal site 150 becoming contaminated from any packaging accidents.
  • this section 3 includes a driveway 9 having an entrance (not shown) and an exit 11 for receiving a delivery truck 13.
  • trucks 13 will normally carry their loads of nuclear waste in a reusable, shielded shipping cask 15 of the type approved by the U.S. Department of Transportation or the U.S. Nuclear Regulatory Commission.
  • shielded shipping casks 15 Disposed within such shielded shipping casks 15 are metallic or plastic liners (not shown) which actually hold the wastes.
  • Section 3 of the facility 1 further includes a processing platform 18 which is about the same height as the height of the bed of the truck 13, a shield bell 19 having a hook assembly 21, and a remote-controlled traveling crane 23.
  • the shield bell 19 is preferably formed from a steel shell having a lead liner which is thick enough to reduce the amount of* radiation emanated from the noncontact waste to an acceptable level.
  • the crane 23 includes a primary hoist 25 detachably connectable to the hook assembly 21- of the shield bell 19 via an electric motor-operated pulley assembly 27.
  • the traveling crane 23 further includes a carriage 29 for moving the primary hoist 25 in the "X" direction (parallel to the driveway 9 of the drive-through 7), as well as a trolley 33 for moving the primary hoist 25 in a "Y" direction (parallel to the front face of the facility 1).
  • the vertically adjustable, electric motor-operated pulley assembly 27, in combination with the carriage 29 and trolley 33, allows the traveling crane 23 to swing the shield bell 19 over the shipping cask 15 of the delivery truck 13, pick up the waste-containing liner out of the cask 15, and place the liner at a desired position onto the processing platform 18.
  • a remote-controlled traveling crane 23 operated via a T.V. monitor is used in the preferred embodiment, any number of other types of existing remote-controlled crane mechanisms may be used to implement the invention.
  • a secondary hoist 35 is also connected between the traveling crane,23 and the shield bell 19. The secondary hoist 35 controls the position of a cable and hook (not shown) inside the shield bell 19 which is capable of detachably engaging the waste-containing liner disposed within the shielded shipping cask 15.
  • the remote-handled waste section 3 of the building 1 further includes a characterization station 37 having various radiation detectors 39 and ultrasonic detectors 41 for verifying that the contents of the liner inside the shipping cask 15 conform to the shipping manifest.
  • the radiation detectors 39 are used to measure the intensity of the radiation emanating from the waste contained in the liner and to check the "signature" of the radiation spectrum of this waste to confirm the accuracy of the shipping manifest.
  • the ultrasonic detectors 41 are used to determine whether or not any radioactive liquids are present- with the liner. Federal regulations strictly prohibit the burial of radioactive wastes in liquid form; consequently, the information provided by the ultrasonic detectors 41 is of paramount importance.
  • Both the radiation detectors 39 and ultrasonic detectors 41 are electrically connected to a bank of read-out dials 45 by means of cables disposed in grooves 43 in the processing platform 18.
  • the outputs of the radiation detectors 39 and the ultrasonic detectors 42 are preferably fed into a central computer both for record-keeping purposes, and for determining how much of a particular kind of waste can be loaded into a particular module before the surface radiation of the module 200 exceeds a preselected limit.
  • the central computer can further compute how much grout must be poured into a particular loaded module in order to properly encapsulate the wastes, and has the capacity to actuate an alarm circuit when the ultrasonic detectors 41 indicate that an unacceptable percentage of the wastes contained in the liner are in liquid form.
  • the height of the processing platform 18 is chosen to correspond approximately with the height of the bed of a trailer truck 13 so that any human operators who may be present on the platform 18 when the lid is removed from the cask 15 will not be exposed to the radiation beaming out of the top of the cask.
  • the shield bell 19 is lowered into the open cask 15, engages the liner contained therein, and then is swung over the sensors 39 and 41 of the characterization station 37 and quickly lowered to within a few inches of these sensors to minimize any of the exposure of section 3 to any radiation beaming out from the bottom of the shield bell 19 which reflects off of the platform 18.
  • the processing platform 18 is formed from a solid slab of concrete both for the structural solidarity of the facility 1 as a whole, as well as for shielding purposes. This last purpose will become clearer- after the structure and function of the lag storage wells 50 is explained hereinafter. While the characterization station 37 of the preferred embodiment includes only radiation detectors 39 and ultrasonic detectors 41 and other types of detectors (such as remote T.V. monitors for visually identifying the waste) may also be included if desired.
  • the remote-handled waste section 3 of the facility 1 includes four lag storage wells 50, as well as a remedial action room 53 formed from shielded walls 54 and accessible through shielded doors 55.
  • Each of the lag storage wells 50 includes a generally cylindrical well topped by a disk-shaped cover.
  • the lag storage wells 50 provide a safe and convenient storage area for nuclear waste shipments in which the characterization station 37 has detected the presence of liquids in excessive quantities or other unacceptable conditions. Additionally, the lag storage wells may be used to temporarily store shipments of remote-handled wastes when the grouting station 118 becomes backed up.
  • the materials and thickness of the disk-shaped cap which tops the wells 50 are chosen so as to reduce the amount of radiation beamed into the working area of section 3 from the remote-handled wastes storable therein to within a safe level.
  • the remedial action room provides a separately contained area within the remote handled section 3 of the facility 1 where broken liners (or liners containing liquids) may be properly repaired or treated without any danger of contaminating the main portion of the remote handled section 3, or the facility 1 at large.
  • the provision of a separately contained room 53 to repair the broken walls of a liner is important because the walls of the liner provide one of the three radiation and water barriers within a module 200 when the liner is grouted within one of these modules.
  • the remedial action room 53 provides a contained area where the liquid may be mixed- with suitable absorbants or other solidification media so as to bring it into a solid form acceptable for burial within the purview of present federal regulations.
  • neither the lag storage wells 50 nor the remedial action room 53 is used to process the remote-handled wastes. Instead, after the characterization tests are completed, these wastes are usually remotely hoisted through the labyrinth exit 56 formed by shield walls 57a, 57b which form the back of section 3 and placed into a module 200 on a rail cart 64 en route to the grouting station 118.
  • the module loading and transportation section 60 is centrally located within the facility 1 between the remote handled section 3 and the contact handled section 85.
  • the central location of the module loading and transportation section 60 allows it to conveniently serve both the contact and remote-handled sections 3 and 85 of the facility 1.
  • the module loading and transportation section 60 includes a conventional traveling crane 62 (which includes all the parts and capacities of previously described traveling crane 23) for loading modules 200 which are stacked outside the building 1 onto rail carts 64.
  • These rail carts 64 are freely movable along a pair of parallel loading rail assemblies 66a and 66b.
  • each of the loading rail assemblies 66a and 66b includes a plurality of pneumatically-actuated stopping mechanisms for stopping the rail carts 64 at various loading, grouting and capping positions along the loading rail assemblies 66a and 66b.
  • the module loading and transportation section 60 includes a return rail assembly 74 having a bed 78 which is inclined in the opposite direction from the beds 70a and 70b of the loading rail assemblies 66a and 66b.
  • the opposite inclination of the bed 78 of the return rail assembly 74 allows the rail carts to freely roll on the tracks 76 by the force of gravity back to a loading position in section 60 after a grouted and capped module 200 has been removed therefrom.
  • a shield wall 79 (which is preferably formed from a solid concrete wall at least 12 inches thick) is placed between the rail assembly 66a and the return rail assembly 74 in order to shield the contact section 85 from any exposure from the remote-handled wastes contained within the shield bell 19 as they are loaded into one of the modules 200 and grouted.
  • This shield wall 79 generally serves the dual function of allowing a contact-handled waste section 85 to be enclosed within the same facility as the remote handled waste section 3, and allowing the use of a common module loading and transportation section 60 for both the remote and the contact handled sections 3 and 85 of the facility 1. This last advantage avoids the provision of duplicate loading and transportation systems.
  • section 85 this section of the facility 1 includes many of the same general components present in the remote-handled section 3.
  • section 85 includes a drive-through 87 including the same sort of driveway 89, entrance 90 and exit (not shown) previously discussed with respect to drive-through 7.
  • Section 85 also includes a processing platform 93 preferably formed from a solid slab of concrete which rises to approximately the same height as the bed of a truck so as to facilitate the unloading of the packaged wastes from the delivery truck 9,5.
  • Section 85 also includes a pair of characterization stations 107a and 107b, as well as lag storage wells 113.
  • section 85 includes a remedial action room 112 for repairing broken containers, and converting liquid and other improperly packaged wastes into an acceptable solid form for burial.
  • section 85 includes some other components which- are unique in the building 1.
  • a relatively light-duty jib crane 99 having a magnetic or vacuum hoist 101 is used in lieu of the relatively heavy traveling crane 23 of section 3.
  • the wastes which are processed in section 85 are of a sufficiently low radiation level so that they may be directly contacted by human workers, there is no need for a crane capable of lifting the heavy shield bell 19 used in section 3. Consequently, the crane used in section 85 need only be capable of lifting lightly-packaged nuclear wastes, which typically arrive at the building 1 in 55-gallon steel drums 97.
  • a conveyor system 103 preferably formed from rollers is provided which greatly facilitates the handling of the drums 97 in which the wastes are contained.
  • a high-force compactor 110 is provided which not only compacts the wastes into a smaller volume, but squeezes the surrounding drum down to a point so far above the inelastic limit of the steel that the wastes are incapable of "springing back" in volume during the grouting process. This is an important advantage which will be elaborated on at a'later point in this text.
  • the conveyor system 103 includes both a pair of serially arranged compactor conveyor belts 105a and 105b, as well as a remedial action conveyor belt 106.
  • Compactor conveyor belt 105a conveys the 55-gallon drums 97 containing the contact-handled waste from the jib crane 99 through a first characterization station 107a which includes ultrasonic and radiation detectors (not shown), and into the loading mechanism 110.1 of the high-force compactor 110.
  • the high-force compactor 110 applies a pressure of between 500 and 1,100 tons to the 55-gallon drum containers, thereby reducing them into high-density "pucks" 117 having a density of between 60-70 lbs./cu. ft.
  • a compaction force of 600 tons is typically used.
  • the high-density pucks 117 are ejected from the high-force compactor 110, and slide down a ramp 111.2 onto compactor conveyor belt 105b, which in turn facilitates the movement of pucks 117 through a second characterization station 107b which is likewise equipped with ultrasonic and radiation detectors (not shown).
  • the conveyor belt 105b then conveys the high-density puck 117 to the magnetic or vacuum hoist 116 of a jib crane 114, which swings the puck 117 over into a module 200 en route to the grouting station 118.
  • the remedial action conveyor belt 106 comes into play when the characterization station 107a detects that (a) the drum 97 contains a liquid, (b) the walls of the drum 97 are broken, or (c) the waste contained within the drum 97 is not compressible. If any of these three conditions are detected, a human operator (not shown) merely pushes the drum 97 from the compactor conveyor 105a onto the remedial action conveyor belt 106, which in turn conveys the drum 97 to the remedial action room 112 where appropriate wall-repairing, liquid solidification, or separate in-drum grouting procedures are undertaken in order to put the drum 97 and its contents in proper condition for encapsulation within a module 200. In the event there is a back-up condition in the remedial action room 112, the drum 97 may be temporarily stored in the lag storage wells 113 of the contact handled section 85.
  • the high-force compactor 110 of the invention includes a loading mechanism 110.1 having a drum scoop 110.2 at the end of an articulated, retractable arm assembly 110.3 as shown. Drums 97 sliding down the chute at the end of the compactor conveyor 105a are fed into the drum scoop 110.2 by a human operator. The articulated, retractable arm assembly 110.3 then loads the drum 97 into a loading cradle 110.4.
  • the compactor 110 further includes a loading ram 110.5 which feeds the drum 97 into a retractable compaction- cylinder 110.6 which is movable between a position outside the main ram 110.8, and the top of the ejection ramp 111.2.
  • the compaction cylinder 110.6 is illustrated in its extended position away from the main ram 110.8, and adjacent the top of the ejection ramp 111.2. After the drum 97 is loaded into the compaction cylinder 110.6, the cylinder 110.6 is retracted into the main ram 110.8, where the drum 97 is crushed between the ram piston 110.9 (not shown), and the bed of the main ram 111.8. As previously mentioned, a compaction force of between 500 and 1,100 tons is applied to the drum 97. There are three distinct advantages associated with the use of such a high compaction force. First, the consequent reduction in volume of the drum 97 and its contents allows many more drums to be packed inside one of the modules 200.
  • the use of such a high compaction force allows thirty-five to eighty-four drums 97 to be packaged inside one of the modules 200, instead of fourteen.
  • the use of such a high compaction force deforms the steel in the drums 97 as well as the waste contained therein well beyond the inelastic limits of the materials, so that there is no possibility that the resulting, high-density pucks will attempt to "spring back" to a larger shape after they are ejected from the ejection ramp 111.2.
  • the elimination of such "spring back” eliminates the possibility of cavities or internal cracks forming within the hardening grout in the module 200 after the module 200 is loaded with pucks 117 and grouted.
  • the resulting high-density pucks 117 when covered with grout, form a positive, non-compressible reinforcing structure in the interior of the module 200 which assists the module in performing its alternative function as a structural support member for the earthen trench cap 164 which is applied over the disposal site 150.
  • the waste inside the drums 97 which is typically rags, paper and contaminated uniforms
  • the compactor 110 includes an air filtration system 111.4 having a filter 111.5, a blower assembly 111.6, and an exhaust stack 111.7.
  • the air filtration system 111.4 draws out any radioactive, airborne particles produced as a result of the application of the 660-1,100 ton force onto the drum 97 carrying the contactable waste.
  • section 85 of the facility 1 includes a grouting station 118 having an extendable trough 120 capable of pouring grout into a module 200 on rail carts 64 engaged to either rail assembly 66a (adjacent the remote-handled waste section 3) or rail assembly 66b (adjacent the contact-handled waste section 85).
  • a capping station 122 including a traveling crane 126 having a hoist 128 for lifting the lids 220 over the tops of the modules 200 incident to the capping process. A more precise description of the capping process will be given when the structure of the modules 200 is related in detail.
  • modules 200 are normally filled with waste, grouted at the grouting station 118 and capped at the waste packaging facility 1 located near the waste disposal site 150, they may also be processed at the facilities of the generator of the waste. Since the surface radiation of the resulting modules is generally low- enough for contact handling, the wastes in the modules 200 may be conveniently stored on-site pending the availability of disposal space. When disposal space is available, the modules 200 may be transported in reusable transportation overpacks (not shown) to the disposal site 150 and stacked directly into the trenches 152. While this method is not preferred, it is usually less expensive than using the on-site waste storage facilities.
  • FIG. 3 illustrates the disposal site 150 used in conjunction with the packaging facility 1.
  • the disposal site 150 generally comprises a trench 152 (or a plurality of parallel trenches) having a generally flat, alluvial floor 154.
  • a plurality of water-collecting lysimeters 155 are uniformly placed throughout the floor 154 in order to monitor the radiation level of water in the trench.
  • the lysimeters 155 are placed in the trench floor 154 by augering a hole in the floor, and inserting the elongated bodies of the lysimeters 155 therein.
  • a network of plastic tubes (not shown) enables the operators of the disposal site 150 to periodically draw out any water that has collected in the cups of the lysimeters 155. The radiation level of these water samples is periodically monitored to determine whether or not any radioactive substances have somehow been leached from the modules 200.
  • the floor 154 is covered with a gravel layer 156 about two feet thick, which acts as a capillary barrier.
  • the disposal site 150 is preferably selected in an area where all flow of ground water would be at least 80 feet below the trench floor 154, the gravel capillary barrier 156 is placed over the top of the floor 154 to provide added insurance against the seepage of ground water into the stacked array 160 of modules 200 by capillary action from the trench floor 154. While all of the capillary barriers in the disposal site 150 of the invention are preferably formed of gravel, it- should be noted that the invention encompasses the use of any coarse, granular substance having a high hydraulic conductivity.
  • the layer of gravel 156 is covered with a choked zone of sand 158 approximately four inches thick.
  • This choked zone of sand 158 acts as a road bed for the wheels of the heavy forklifts 185 and trailers 184 which are used to transport the modules 200 to the trench 152. If the zone 158 were not present, the wheels of these vehicles 184, 185 would tend to sink into the gravel layer 156.
  • the next component of the disposal site 150 is the solidly packed array 160 of hexagonal modules 200 illustrated in Figure 3.
  • the modules 200 are preferably stacked in mutually abutting columns, with each of the hexagonal faces of each of the modules 200 coplanar with the hexagonal faces of the other two modules forming the column.
  • the arrangement of the modules 200 into such mutually abutting columns results in at least four distinct advantages.
  • First, such solid packing of the modules 200 provides a support structure for the non-rigid trench cap 164 which may be quickly and conveniently formed from natural, fluent substances such as soil, sand and gravel.
  • Second, such an arrangement is almost completely devoid of any gaps between the modules 200 which could result in the previously discussed soil subsidence problems.
  • each of the modules 200 is capable of individual, differential movement along eight different planes (i.e., the top, bottom and six side surfaces of the hexagonal prisms which form the modules 200). Because none of the modules are rigidly interlocked with any of the adjacent modules, each of them is capable of at least some vertical and horizontal sliding movement in the event of a seismic disturbance.
  • Such an eight-plane freedom of movement renders the entire module array 160 flexibly conformable with changes in the shape of the trench 152, and eliminates or at least minimizes the probability of a local seismic disturbance creating local stress points in the array 160 that are powerful enough to rupture or crack the walls of individual containers.
  • the columnar stacking used in the array 160 makes it easy to recover a particular module 200 in the event that such recovery becomes desirable, since any one of the modules 200 may be withdrawn from the trench by digging a single, module-wide hole over the particular column that the desired module is included within.
  • the most radioactive or "hottest" of the modules 200 is placed on the bottom layer of the module array 160 and surrounded by less radioactive modules so that the surrounding modules, and the middle and top module layers will provide additional shielding from the radiation emanating from the materials in the "hot" modules.
  • the trench 152 further includes side gravel capillary barriers 162a and 162b which are positioned between the sides of the solid module array 160, and the walls of the trench 152. Again, the purpose of these barriers 162a and 162b is to prevent any seepage of water from being conducted from the sides of the trench 152 to the sides of the solidly packed array 160 of modules 200. In the preferred embodiment, each of these side capillary barriers 162a and 162b is about two feet thick.
  • the trench cap 164 is preferably a non-rigid cap formed from fluent, natural substances such as soil, sand and gravel. Such a cap 164 is more resistant to seismic disturbances than a rigid, synthetic structure would be. Specifically, the non-rigidity of the cap 164 makes it at least partially "self-healing" should any seismic disturbance act to vertically shift the various layers of the cap 164 small distances from one another. Additionally, in the event of a severe seismic disturbance which does succeed in causing considerable damage to the cap 164, the cap 164 may be easily repaired with conventional road building and earth moving equipment. As was previously indicated, the solidly packed array of modules 160 provides all of the structural support needed to construct and maintain the various layers of the trench cap 164.
  • the first layer of the trench cap 164 is preferably a layer of alluvium 166, which should range from between four feet thick on the sides to seven feet thick in the center.
  • the alluvium layer 166 (which is preferably formed from the indigenous soil which was removed in creating the trench 152) gradually slips away from the center line of the layer at a grade of approximately 4.5%.
  • Such a contour allows the cap 164 to effectively shed the water which penetrates the outer layers of the cap 164, and to direct this water into side drains 178a and 178b.
  • Such compaction may be effected either through conventional road bed compacting equipment, or by merely allowing the alluvium in the layer 166 to completely settle by natural forces.
  • the use of road bed compaction equipment is preferred.
  • the natural settling time of the alluvium in the invention is very fast as compared to the settling times of soils used in prior art disposal sites, it is still rarely shorter than three months, and may be as long as one year, depending upon the characteristics of the particular soil forming the alluvium.
  • road compaction equipment is used, the settling time may be reduced to a matter of a few days.
  • the alluvium layer 166 is placed over the solidly packed array 160 at approximately the same rate that the array 160 is formed by stacking the individual modules 200. Such contemporaneous placement of the alluvium layer 166 over the module array 160 minimizes the amount of radiation which the trench workers are exposed to as the disposal site 150 is formed.
  • a choked zone of sand 168 of approximately- four inches in thickness is applied over it.
  • another gravel capillary barrier 170 is placed over the choked sand layer 168.
  • the choked sand layer 168 serves as an intrusion barrier between the relatively coarse gravel forming the gravel capillary barrier 170, and the relatively finer alluvium in the alluvium layer 166.
  • another choked zone of sand 172 is applied over the gravel capillary barrier 170.
  • a layer of fine, water shedding silt 164 is applied over the choked zone of sand 172 overlying the gravel capillary barrier 170.
  • the choked zone of sand 172 serves as an intrusion barrier between the silt in the silt layer 174, and the gravel in the gravel capillary barrier 170.
  • the silt layer 174 is the principal water-shedding layer of the trench cap 164, and is approximately two feet thick, and formed from sized material (preferably obtained locally) which is compacted in place.
  • the use of a silt layer 174 in lieu of other water-shedding natural materials, such as clay, is advantageous in at least two respects. First, silt is often more easily obtainable locally than clay, and hence is less expensive. Secondly, if the silt layer 174 should become saturated with water, it will not tend to split or crack when it dries out as clay would. The absence of such splits or cracks helps maintain the overall integrity of the trench cap 164.
  • the side edges of the silt layer 174 terminate adjacent to the pair of french drains 178a and 178b located on either side of the trench 152.
  • the french drains 178a and 178b include a trench in which perforated pipes 182a and 182b are laid. Water flowing down the sides of the silt layer 174 will float through the perforations in the pipes 182a and 182b and flow along the drain trenches 180a and 180b, away from the trench 152.
  • the gravel capillary barrier 170 will prevent any water from migrating down from the saturated silt layer 174 into the module array 160 via capillary action.
  • the top and final layer 176 of the trench cap 164 consists of graded rip-rap which, in more colloquial terms, is very coarse gravel (which may be as large as boulder sized).
  • the rip-rap layer 176 performs at least three functions. First, it insulates the silt layer 174 from potentially erosive winds and running water. Second, it provides a final radiation barrier against the module array 160 which brings the radiation level of the disposal site 150 down to well within the range of normal background radiation. Third, it provides an intrusion barrier which discourages would-be human and animal intruders from digging up the ground above the module array 160.
  • the preferred embodiment of the cap 164 as heretofore described is for arid regions.
  • an alternative embodiment of the cap 164 would comprise a first water infiltration barrier of native soil over the solid array 160 of modules 200. This layer in turn would be covered by a sand and gravel capillary barrier similar to the previously discussed layers 168, 170 and 172. These sand and gravel capillary barriers would in turn be covered by a bio-intrusion layer of cobble, and topped by additional sand and gravel layers for supporting a final layer of soil having a vegetative cover.
  • the vegetative cover serves both to prevent any erosion which might occur on the upper layer of soil, and also removes water which infiltrates the top layer of the cap.
  • the vegetation used should have shallow roots in order that the integrity of the cap 164 will not be violated. Additionally, such an alternative embodiment might have a steeper slope of perhaps 10° or more because of the greater amount of rainfall associated with such regions.
  • the module 200 of the invention generally consists of a-container 201 having reinforced concrete walls and a lid 220 which caps the container 201 after it is filled with nuclear wastes and properly grouted.
  • the container 201 of the module 200 is a hexagonally-shaped prism 202 having a cylindrical interior 216.
  • the corners 204 where the hexagonal walls abut one another are preferably truncated so that small gaps will be left between abutting modules 200 when they are stacked in the module array 160 illustrated in Figure 3. These small spaces are large enough to receive recovery tools (should the recovery of any one of the modules 200 become desirable) but are small enough so that no significant amount of soil subsidence will occur when the modules 200 are arranged in the configuration illustrated in Figure 3. Further, the truncated shape of the corners 204 renders these corners less vulnerable to the chipping or cracking which could otherwise occur when the forklift 185 pushes the module 200 into the module array 160 incident to the stacking process.
  • the top portion 206 is opened as shown to permit the loading of nuclear waste and grout.
  • the top portion 206 includes three 1-bolt anchors 208a, 208b and 208c which allow the container 201 to be handled by the grappling hooks of the cranes in the packaging facility 1 and stacked into the trench 164.
  • these anchors 208a, 208b and 208c allow the modules 200 to be lifted out of the trench 164 if recovery is desired.
  • the shanks of the anchors 208a, 208b and 208c are deeply sunken into the concrete walls of the container 201 as indicated in order to insure an adequate grip thereto.
  • the bottom portion 209 of the container 201 includes the bottom surface 210 of the interior of the container 201, and an outer surface 211 having a pattern of grooves 212.
  • Each of these grooves are slightly deeper and wider than the forks of the shielded forklift 185, so that these- grooves 212 greatly facilitate the handling of the module 200 by the forklift 185.
  • the angular pattern of the grooves 212 also allows such a forklift to engage a particular module from a variety of different angles, which further facilitates the handling of the modules.
  • Reinforcing the concrete walls and bottom portion of the container 201 of the module is a "basket" 215 formed from commercially available, steel-reinforcing mesh.
  • the basket 215 greatly increases the tensile strength of the walls and bottom portion 209 of the container 201 of the module 200.
  • the walls of the container 201 are at least three inches thick.
  • the cylindrical interior 216 of the container 201 is at least seventy-five inches in diameter in order that fourteen drums or seven stacks of high-density pucks 117 may be stacked within the cylindrical interior 216 of the container 201.
  • the top portion 206 of the container 201 includes a plurality of grooves 214a, 214b, 214c, 214d, 214e and 214f for receiving the cap-securing rods 232a, 232b, 232c, 232d, 232e and 232f of the slab-type container lid 220, which will be presently discussed in detail.
  • the slab-type container lid 220 generally includes a disk-shaped upper section 222, and'an integrally formed, disk-shaped lower section 228 which has a slightly smaller diameter.
  • the edge of the upper section 222 is flattened in three sections 223.1, 223.2 and 223.3, which are spaced approximately 120° from one another.
  • these flattened sections 223.1, 223.2 and 223.3 should be angularly positioned so that they are directly opposite the previously discussed I-bolt anchors 208a, 208b and 208c, in order to provide clearance for crane hooks to engage the I-bolt sections of the anchors.
  • the top surface 224 of the upper section 222 of the lid 220 includes a radiation warning symbol 226, which is preferably molded into the face of the lid 220.
  • An identifying- serial number may also be molded into the top surface 224 of the lid 220 (as indicated in Figure 3) in order that the module 220 may be easily identified if recovery of the module ever becomes necessary or desirable.
  • three U-shaped transporting lugs 227a, 227c and 227e are placed around the circumference of the upper section 222 of the container lid 220 approximately 120° from one another. These lugs 227a, 227c and 227e are preferably offset from the flattened sections 223.1, 223.2 and 223.3 along the circumference of the upper section 222.
  • the container lid 220 further includes an integrally formed lower section 228 which has a slightly smaller diameter than the disk-shaped upper section 222.
  • a layer steel-reinforcing mesh 229 is molded into the concrete forming the container lid 220 in the position shown in Figure 5B.
  • cap-securing rods 232a, 232b, 232c, 232d, 232e and 232f are molded into the lid 220. These rods are slid into the complementary slots 214a, 214b, 214c, 214d, 214e and 214f after the container has been filled with nuclear waste and grouted.
  • Both the container lid 220 and the module container are preferably molded from non-porous portland-based concrete having a compressive tolerance on the order of 4,000 psi. Such concrete is both strong and resistant to penetration by water.
  • Figures 6 and 7 illustrate a module 200 which has been filled with high-density pucks 117 formed from the high-force compactor 110, and subsequently grouted and capped.
  • seven stacks of high-density pucks-117 are centrally positioned within the container 201 of the module 200 as shown in Figure 7.
  • the compacted containers which cover the compacted waste form an additional radiation and water barrier between the waste and the exterior of the module 200.
  • the extendable trough 120 of the grouting station 118 of the building 1 pours grout 218 over the seven stacks of pucks 117 so as to form a solid layer of grout between the pucks 117 and the inner surface of the walls of the container 201.
  • the grout used to fill the module 200 is a 3,000 or 4,000 psi portland-based concrete.
  • gypsum, pozzolan, flyash or other cementitious materials may also be used for grout.
  • the hardened grout 218 forms a third radiation and water barrier between the waste in the pucks 117 and the outer surface of the container 200, as is evident from the drawing.
  • the grout 218 also serves to anchor the cap-securing rods 232a, 232b, 232c, 232d, 232e and 232f into the body of the module 200, so that the container 201, the lid 220, the grout 218, and the stacks of pucks 117 become a single, solid structure having a considerable compressive and tensile strength.
  • the completed, hardened modules 200 are carried from the packaging building 1 by drop-bed trailers 184, and stacked into the solid array 160 illustrated in Figure 3 by means of shielded forklifts 185.
  • the module 200 may be specially modified to package special, high intensity nuclear wastes such as spent control rods.
  • the module 200 may be formed with very thick concrete walls so that a relatively small cylindrical hollow space is left in the center of the module. The control rods may then be transferred directly from a shield transportation cask 15 into the small cylindrical hollow space in the pre-grouted module.
  • Such a modified module may be made longer to accommodate several complete control rods.
  • pre-grouted modules 200 of normal height may be used if the rods are cut up into- smaller lengths.

Landscapes

  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Physics & Mathematics (AREA)
  • General Engineering & Computer Science (AREA)
  • High Energy & Nuclear Physics (AREA)
  • Processing Of Solid Wastes (AREA)
EP85304786A 1984-07-05 1985-07-04 Site de stockage souterrain des déchets radioactifs Expired - Lifetime EP0167403B1 (fr)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US62797784A 1984-07-05 1984-07-05
US627977 1984-07-05

Publications (3)

Publication Number Publication Date
EP0167403A2 true EP0167403A2 (fr) 1986-01-08
EP0167403A3 EP0167403A3 (en) 1986-12-30
EP0167403B1 EP0167403B1 (fr) 1990-05-09

Family

ID=24516897

Family Applications (1)

Application Number Title Priority Date Filing Date
EP85304786A Expired - Lifetime EP0167403B1 (fr) 1984-07-05 1985-07-04 Site de stockage souterrain des déchets radioactifs

Country Status (11)

Country Link
EP (1) EP0167403B1 (fr)
JP (1) JPS6135399A (fr)
KR (1) KR930008245B1 (fr)
BR (1) BR8503301A (fr)
CA (1) CA1246879A (fr)
DE (1) DE3577615D1 (fr)
ES (1) ES8702728A1 (fr)
FI (1) FI852651L (fr)
PH (1) PH25069A (fr)
YU (1) YU107385A (fr)
ZA (1) ZA854672B (fr)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0302177A2 (fr) * 1987-08-07 1989-02-08 Westinghouse Electric Corporation Site de stockage de déchets en forme de tumulus pyramidatix et sa construction

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6296276B2 (ja) * 2013-08-09 2018-03-20 清水建設株式会社 放射性廃棄物の埋設処分施設
KR101473712B1 (ko) 2013-12-10 2014-12-17 한국원자력환경공단 천층처분시설 방사성 폐기물 드럼의 정치를 위한 가이드 장치

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1539749B1 (de) * 1965-03-30 1970-10-01 Commissariat Energie Atomique Verfahren zum Einspritzen von fluessigen oder schlammigen radioaktiven Abfallstoffen in den Erdboden
GB2128801A (en) * 1982-09-20 1984-05-02 William Robert Burton Disposal of hazardous and toxic waste material
DE3410370A1 (de) * 1983-03-22 1984-10-31 National Nuclear Corp. Ltd., London Verfahren und einrichtung fuer die beseitigung von radioaktiven abfaellen

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5291566A (en) * 1976-01-29 1977-08-02 Shigeki Sunada Method of treating toxic material

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1539749B1 (de) * 1965-03-30 1970-10-01 Commissariat Energie Atomique Verfahren zum Einspritzen von fluessigen oder schlammigen radioaktiven Abfallstoffen in den Erdboden
GB2128801A (en) * 1982-09-20 1984-05-02 William Robert Burton Disposal of hazardous and toxic waste material
DE3410370A1 (de) * 1983-03-22 1984-10-31 National Nuclear Corp. Ltd., London Verfahren und einrichtung fuer die beseitigung von radioaktiven abfaellen

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0302177A2 (fr) * 1987-08-07 1989-02-08 Westinghouse Electric Corporation Site de stockage de déchets en forme de tumulus pyramidatix et sa construction
EP0302177A3 (fr) * 1987-08-07 1990-11-07 Westinghouse Electric Corporation Site de stockage de déchets en forme de tumulus pyramidatix et sa construction

Also Published As

Publication number Publication date
EP0167403A3 (en) 1986-12-30
CA1246879A (fr) 1988-12-20
DE3577615D1 (de) 1990-06-13
ZA854672B (en) 1986-02-26
KR860001451A (ko) 1986-02-26
YU107385A (en) 1990-12-31
KR930008245B1 (ko) 1993-08-27
FI852651L (fi) 1986-01-06
ES8702728A1 (es) 1986-12-16
ES544876A0 (es) 1986-12-16
EP0167403B1 (fr) 1990-05-09
FI852651A0 (fi) 1985-07-04
BR8503301A (pt) 1986-04-01
JPS6135399A (ja) 1986-02-19
PH25069A (en) 1991-02-19

Similar Documents

Publication Publication Date Title
US4784802A (en) Nuclear waste disposal site
US4681706A (en) Nuclear waste packaging facility
US4845372A (en) Nuclear waste packing module
US4844840A (en) Method and structure for hazardous waste containment
US3755079A (en) Nuclear reactor plant with integral entombment
US4955983A (en) Side loading vault system and method for the disposal of radioactive waste
US4842774A (en) Pyramiding tumuli waste disposal site and method of construction thereof
US4861194A (en) Waste disposal system
EP0168219A2 (fr) Modules pour conditionner les déchets nucléaires
EP0167403B1 (fr) Site de stockage souterrain des déchets radioactifs
CN85105835A (zh) 核废料封装组合罐
JPS6221100A (ja) 放射性廃棄物の地中処分方法
US5244311A (en) Method for increasing the capacity of an active landfill
JPH10153696A (ja) 高レベル放射性廃棄物の処分容器
CN85105839A (zh) 关于废料处置的改进
CN85105834A (zh) 核废料封装设施
RU2754771C1 (ru) Способ захоронения радиоактивных отходов и контейнер для их хранения
Grindstaff et al. SECURE system-an integrated waste management technique
JP3023410B1 (ja) 廃棄物を地下に階層式に積重ねることにより処理処分するための方法
JPH09211196A (ja) 放射性廃棄物の処分用緩衝材
Abee Problems in the burial of solid wastes at Oak Ridge National Laboratory
Fink et al. Supercompaction of radioactive waste at NPP Krsko
KR20180134812A (ko) 핵연료봉 매립 시스템
Gelbutovskiy et al. NORM–Contaminated Iodine Production Facilities Decommissioning in Turkmenistan: Experience and Results
Holcomb et al. High level radioactive solid waste burial operations for the EBR-II fuel cycle facility

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Designated state(s): BE CH DE FR GB IT LI NL SE

PUAL Search report despatched

Free format text: ORIGINAL CODE: 0009013

AK Designated contracting states

Kind code of ref document: A3

Designated state(s): BE CH DE FR GB IT LI NL SE

17P Request for examination filed

Effective date: 19870626

17Q First examination report despatched

Effective date: 19890222

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 19900427

Year of fee payment: 6

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): BE CH DE FR GB IT LI NL SE

ET Fr: translation filed
REF Corresponds to:

Ref document number: 3577615

Country of ref document: DE

Date of ref document: 19900613

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 19900702

Year of fee payment: 6

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 19900703

Year of fee payment: 6

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: CH

Payment date: 19900710

Year of fee payment: 6

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: BE

Payment date: 19900719

Year of fee payment: 6

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: SE

Payment date: 19900730

Year of fee payment: 6

ITTA It: last paid annual fee
PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: NL

Payment date: 19900731

Year of fee payment: 6

ITF It: translation for a ep patent filed

Owner name: MODIANO & ASSOCIATI S.R.L.

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed
PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Effective date: 19910704

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SE

Effective date: 19910705

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Effective date: 19910731

Ref country code: CH

Effective date: 19910731

Ref country code: BE

Effective date: 19910731

BERE Be: lapsed

Owner name: WESTINGHOUSE ELECTRIC CORP.

Effective date: 19910731

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Effective date: 19920201

GBPC Gb: european patent ceased through non-payment of renewal fee
NLV4 Nl: lapsed or anulled due to non-payment of the annual fee
PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Effective date: 19920331

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Effective date: 19920401

REG Reference to a national code

Ref country code: FR

Ref legal event code: ST

EUG Se: european patent has lapsed

Ref document number: 85304786.8

Effective date: 19920210