EP0084298A1 - Portal for removing and laying railway tracks, particularly points - Google Patents

Portal for removing and laying railway tracks, particularly points Download PDF

Info

Publication number
EP0084298A1
EP0084298A1 EP82830269A EP82830269A EP0084298A1 EP 0084298 A1 EP0084298 A1 EP 0084298A1 EP 82830269 A EP82830269 A EP 82830269A EP 82830269 A EP82830269 A EP 82830269A EP 0084298 A1 EP0084298 A1 EP 0084298A1
Authority
EP
European Patent Office
Prior art keywords
portal
central section
crossbeam
bogie
railway
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP82830269A
Other languages
German (de)
French (fr)
Inventor
Andrea Tedeschi
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Publication of EP0084298A1 publication Critical patent/EP0084298A1/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00Laying, rebuilding, or taking-up tracks; Tools or machines therefor
    • E01B29/02Transporting, laying, removing, or renewing lengths of assembled track, assembled switches, or assembled crossings

Definitions

  • the present invention relates to a portal for re--moving and laying railway tracks, particularly points.
  • the portal which' is the subject of the present invention is of the type having a crossbeam with ends which are vertically slidable along respective pillars.
  • This replacement operation should be carried out quickly so as to limit the consequences of interruption to the railway and, if possible, to prevent any shutdowns of the tracks adjacent that undergoing maintenance.
  • the track sections to be replaced are raised by means of portals which are movable on auxiliary rails located at the sides of the track undergoing maintenance. This procedure is particularly complicated and requires a large amount of time, as well as resulting in considerable interference with the running of trains on the tracks adjacent that undergoing maintenance.
  • the replacement operation is even lengthier and more difficult at present, and requires the use of a very large work force. Indeed, it is not possible to lay the auxiliary rails alongside the track section including the points, and the points must be raised from the ballast by batteries of jacks to such an extent as to allow the laying of auxiliary rails underneath them in alignment with the railway track and the insertion of a plurality of bogies between the points and the auxiliary rails, on which the points are then rested and by means of which they are carried away.
  • the problem behind the present invention is that of devising a portal of the type specified, which has structural and functional characteristics such as to satisfy the said requirement.
  • each of the pillars has its own means of individual advancement on the ground, for example, tracks or tyred wheels.
  • the crossbeam comprises a central section and end sections which can be withdrawn individually from the central section, the central section being provided with its own retractable support means.
  • a portal according to the invention is generally indicated 1.
  • the portal 1 is used for the removal and laying of sections of railway track, particularly points. The operation of the portal 1 will be described below with reference to the removal of worn points 2A and the laying of new points 2B to replace them along a railway line 3.
  • the portal 1 is of the type in which a horizontal crossbeam 4 has ends slidable vertically along respective lateral pillars, both indicated 5, under the action of respective vertical hydraulic cylinders, both indicated 6.
  • each pillar 5 has its own means 7 of advancement over the ground, such that they are self-propelled.
  • These means 7 each comprise a track 8 rotated by a respective hydraulic motor 9 which is connected to it by a chain transmission with chains 10, 11.
  • the tracks 8 are of such a length and width as to give the portal the stability necessary to allow it to move safely over the ground and, in particular, to allow it to move on the ballast, travelling safely over the sleepers and any rails which may be in its path.
  • the crossbeam 4 includes a central section 12 and end sections, each indicated 13.
  • Each of the end sections 13 can be extended individually from the central section 12, with which it is engaged telescopically, by means of a respective horizontal hydraulic cylinder 14.
  • the central section 12 of the crossbeam 4 is provided with its own retractable support means, generally indicated 15. More particularly, the retractable support means 15 comprise a railway bogie 16 on which the central section 12 of the crossbeam 4 is mounted with the interpositioning of a turntable 17.
  • the railway bogie 16 has wheels 18 mounted at the ends of legs 19 which are hinged to the bogie 16 and are angularly displaceable under the action of hydraulic cylinders 20 between a lowered operative position and a retracted withdrawn non-operative position.
  • a bolt 21 is located in correspondence with the turntable 17 to lock the central section 12 of the crossbeam 4 angularly relative to the bogie 16, either in alignment with the direction of advance of the bogie or perpendicularly thereto.
  • a seat 22 for an operator On the central section 12 of the crossbeam 4 is mounted a seat 22 for an operator, a first motor 23, to advantage a diesel engine, for driving a hydraulic pump 24 which supplies pressurised oil to the hydraulic cylinders, a control box 25 for the hydraulics, and a group of manually-operable directional valves 26 located in front of the seat 22 for use by the operator in controlling the hydraulic cylinders.
  • Rigid and flexible tubing known in itself and hence not shown connects the pump, the hydraulic cylinders, the hydraulic control box, and the directional valves.
  • Grippers 27 of a conventional self-closing type for gripping the heads of the rails are suspended by chains 28 from the central section 12 of the crossbeam 4.
  • the operation of the portal 1 is described below with reference to an initial moment (see Figure 3) when the portal 1, having been driven along the railway line 3, reaches the point where it is to be used.
  • the bogie 16 has its wheels lowered into engagement with the track
  • the crossbeam 4 is supported by the bogie 16 in alignment with the direction of the bogie itself and hence with the track
  • the pillars 5 are vertical and extend above the crossbeam 4 itself
  • the tracks are raised to a medium height and are non-operative.
  • the portal 1 lies completely within the clearance prescribed for trains and can therefore be moved freely along the railway.
  • the operator increases the width of the portal 1 by extending the end sections 13 of the crossbeam 4 from the central section 12 thereof by means of the horizontal cylinders 14.
  • the width of the track may be taken to be the maximum distance between the rails alone at the particular point, excluding the sleepers. Indeed, at the point where the portal is located, a limited number of sleepers (four or five) may have already been removed.
  • the operator effects a horizontal displacement of the central section 12 by reaction against the end sections 13 which are fixed relative to the ground by the pillars (see Figure 8).
  • the amount of the horizontal movement of the central section 12 is chosen to bring the grippers 27 into a position which is substantially centered relative to the track so that the track can be gripped efficiently.
  • the portal 1 acts in cooperation with other portals (see Figure 11) similar to the portal 1,which are distributed regularly along the points so as to ensure their safe and stable support.
  • the three portals 1 are, as described previously, brought astride the points 2A to be removed so as to be positioned at their ends and intermediately.
  • the points 2A are lifted and removed from their seatings by virtue of the combined action of the three portals, each of which is manoeuvred by a respective operator as described previously.
  • the points are carried to and placed on a service bogie 29 waiting on the line 3.
  • the three portals are then brought astride new points 2B which are resting on another service bogie 30 which is waiting on the line 3 on the opposite side from the bogie 29. Acting always in cooperation, the three portals lift the points 2B from the bogie 30 and carry them to the seating on the ballast where they are lowered.
  • the operators ensure the correct alignment of the points with the line 3 by moving the central sect--ions 12 of the respective portals appropriately.
  • each portal is brought back to its initial condition by repeating the operations described above with reference to Figures 3 to 10 in reverse.
  • a further advantage of the portal according to the invention lies in the fact that it allows a drastic reduction in the work force which is decreased substantially to the very small number of operators necessary to drive the portals used in the operation.
  • the portal according to the invention further allows a considerable improvement in the working conditions for the work force to be achieved from the point of view of accidents.
  • the tracks may be replaced by a series of tyred wheels.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Machines For Laying And Maintaining Railways (AREA)

Abstract

A portal (1) for removing and laying railway tracks (3), particularly points, allows the period of interruption of the railway and the work force used to be drastically reduced. The portal (1) has a crossbeam (4) with ends slidable vertically along respective pillars (5). Each of the pillars (5) is provided with tracks (8). The crossbeam (4) includes a central section (12) and end sections (13) which can be individually extended from the central section (12). The central section (12) is mounted on a railway bogie (16) with the interpositioning of a turntable (17), the bogie (16) having withdrawable, retractable wheels (18).

Description

  • The present invention relates to a portal for re--moving and laying railway tracks, particularly points.
  • More particularly, the portal which' is the subject of the present invention is of the type having a crossbeam with ends which are vertically slidable along respective pillars.
  • It is known that it is periodically necessary to replace sections of railway track, for example, during maintenance of the railway network, by removing the assembly of the rails and their sleepers which no longer meet the required standards of efficiency and safety in order to replace them with a new assembly of rails and sleepers properly assembled beforehand.
  • This replacement operation should be carried out quickly so as to limit the consequences of interruption to the railway and, if possible, to prevent any shutdowns of the tracks adjacent that undergoing maintenance.
  • At present, the track sections to be replaced are raised by means of portals which are movable on auxiliary rails located at the sides of the track undergoing maintenance. This procedure is particularly complicated and requires a large amount of time, as well as resulting in considerable interference with the running of trains on the tracks adjacent that undergoing maintenance.
  • When the track section to be replaced includes points, the replacement operation is even lengthier and more difficult at present, and requires the use of a very large work force. Indeed, it is not possible to lay the auxiliary rails alongside the track section including the points, and the points must be raised from the ballast by batteries of jacks to such an extent as to allow the laying of auxiliary rails underneath them in alignment with the railway track and the insertion of a plurality of bogies between the points and the auxiliary rails, on which the points are then rested and by means of which they are carried away.
  • The operation of laying new points is exactly the same and, moreover, is made even lengthier and more difficult by the need to bring the ends of the points into exact alignment with the rest of the track.
  • All these disadvantages have had to be accepted until now. With regard to the duration of the interruption to the railway, in order to try to reduce this as much as possible, considerable financial rewards have been instituted for the gangs of skilled workmen, the amount of the awards increasing with the time saved relative to the time expected.
  • Thus, there has been a strongly-felt need to overcome the aforementioned disadvantages which are at present encountered in the removal and laying of railway tracks and particularly of points.
  • The problem behind the present invention is that of devising a portal of the type specified, which has structural and functional characteristics such as to satisfy the said requirement.
  • This problem is solved by a portal of the type specified in which each of the pillars has its own means of individual advancement on the ground, for example, tracks or tyred wheels.
  • To advantage, in the portal according to the invention, the crossbeam comprises a central section and end sections which can be withdrawn individually from the central section, the central section being provided with its own retractable support means.
  • Further characteristics and advantages of the portal according to the invention will emerge from the following description of a preferred embodiment, given by way of non-limiting example with reference to the appended drawings, in which:
    • Figure 1 is a perspective view of a portal according to the invention in one of its positions of operation;
    • Figure 2 is a perspective view of the portal of Figure 1 in another position of operation;
    • Figures 3 to 10 are schematic perspective views on a reduced scale of the portal according to the invention in successive positions of operation, and
    • Figure 11 is a schematic perspective view on a further reduced scale of three portals according to the invention used for the removal and laying of points.
  • With reference to the appended drawings, a portal according to the invention is generally indicated 1.
  • The portal 1 is used for the removal and laying of sections of railway track, particularly points. The operation of the portal 1 will be described below with reference to the removal of worn points 2A and the laying of new points 2B to replace them along a railway line 3.
  • The portal 1 is of the type in which a horizontal crossbeam 4 has ends slidable vertically along respective lateral pillars, both indicated 5, under the action of respective vertical hydraulic cylinders, both indicated 6.
  • In the portal 1 according to the invention, each pillar 5 has its own means 7 of advancement over the ground, such that they are self-propelled.
  • These means 7 each comprise a track 8 rotated by a respective hydraulic motor 9 which is connected to it by a chain transmission with chains 10, 11. The tracks 8 are of such a length and width as to give the portal the stability necessary to allow it to move safely over the ground and, in particular, to allow it to move on the ballast, travelling safely over the sleepers and any rails which may be in its path.
  • In the portal 1 according to the invention, the crossbeam 4 includes a central section 12 and end sections, each indicated 13. Each of the end sections 13 can be extended individually from the central section 12, with which it is engaged telescopically, by means of a respective horizontal hydraulic cylinder 14.
  • The central section 12 of the crossbeam 4 is provided with its own retractable support means, generally indicated 15. More particularly, the retractable support means 15 comprise a railway bogie 16 on which the central section 12 of the crossbeam 4 is mounted with the interpositioning of a turntable 17. The railway bogie 16 has wheels 18 mounted at the ends of legs 19 which are hinged to the bogie 16 and are angularly displaceable under the action of hydraulic cylinders 20 between a lowered operative position and a retracted withdrawn non-operative position.
  • A bolt 21 is located in correspondence with the turntable 17 to lock the central section 12 of the crossbeam 4 angularly relative to the bogie 16, either in alignment with the direction of advance of the bogie or perpendicularly thereto.
  • On the central section 12 of the crossbeam 4 is mounted a seat 22 for an operator, a first motor 23, to advantage a diesel engine, for driving a hydraulic pump 24 which supplies pressurised oil to the hydraulic cylinders, a control box 25 for the hydraulics, and a group of manually-operable directional valves 26 located in front of the seat 22 for use by the operator in controlling the hydraulic cylinders.
  • Rigid and flexible tubing known in itself and hence not shown connects the pump, the hydraulic cylinders, the hydraulic control box, and the directional valves.
  • Grippers 27 of a conventional self-closing type for gripping the heads of the rails are suspended by chains 28 from the central section 12 of the crossbeam 4.
  • The operation of the portal 1 is described below with reference to an initial moment (see Figure 3) when the portal 1, having been driven along the railway line 3, reaches the point where it is to be used. At this moment, the bogie 16 has its wheels lowered into engagement with the track, the crossbeam 4 is supported by the bogie 16 in alignment with the direction of the bogie itself and hence with the track, the pillars 5 are vertical and extend above the crossbeam 4 itself, and the tracks are raised to a medium height and are non-operative.
  • In this position, it should be noted that the portal 1 lies completely within the clearance prescribed for trains and can therefore be moved freely along the railway.
  • Subsequently, the bolt 21 is removed, the crossbeam 4 is displaced angularly through 90° about the turntable 17, and the bolt 21 is inserted again in the new position. The crossbeam (see Figure 4) is thus perpendicular to the direction of the bogie and hence perpendicular to the track.
  • Now, depending on the width of the track section, particularly the points, for removal, at the point where the portal is located, the operator increases the width of the portal 1 by extending the end sections 13 of the crossbeam 4 from the central section 12 thereof by means of the horizontal cylinders 14.
  • With regard to this increase, and in order to keep it to a minimum, it should be noted that the width of the track may be taken to be the maximum distance between the rails alone at the particular point, excluding the sleepers. Indeed, at the point where the portal is located, a limited number of sleepers (four or five) may have already been removed.
  • The width of the portal thus being increased strictly to the extent necessary, the operator lowers the pillars 5 by means of the vertical cylinders 6, to bring the tracks 8 to bear on the ground. At this moment, the crossbeam 4 and the bogie 16 are raised by reaction (see Figure 6).
  • Subsequently, the legs 19 of the bogie 16 are withdrawn so that the entire space beneath the portal is free. The grippers 27 may now be attached to the central section 12 of the crossbeam 4 by means of their chains 28. The operator, again operating the vertical cylinders 6, now lowers the crossbeam 4 until the grippers 27 reach the height of the rails (see Figure 7).
  • Then, by operating the horizontal cylinders 14, the operator effects a horizontal displacement of the central section 12 by reaction against the end sections 13 which are fixed relative to the ground by the pillars (see Figure 8). The amount of the horizontal movement of the central section 12 is chosen to bring the grippers 27 into a position which is substantially centered relative to the track so that the track can be gripped efficiently.
  • The operator, by operating the vertical cylinders 6 again, effects a vertical upward movement of the crossbeam 4 (see Figure 9) which is accompanied initially by the firm closure of the grippers 27 on the respective rails and then the lifting of the track from the ballast.
  • The operator then puts the tracks 8 into motion by means of the hydraulic motors 9, causing the advancement of the portal 1 along the line and hence the removal of the suspended track section (see Figure 10) from its seating.
  • Clearly, in the case of relatively long track sections, as in the case of points, the portal 1 acts in cooperation with other portals (see Figure 11) similar to the portal 1,which are distributed regularly along the points so as to ensure their safe and stable support.
  • In the case illustrated in Figure 11, the three portals 1 are, as described previously, brought astride the points 2A to be removed so as to be positioned at their ends and intermediately. The points 2A are lifted and removed from their seatings by virtue of the combined action of the three portals, each of which is manoeuvred by a respective operator as described previously. Thus, the points are carried to and placed on a service bogie 29 waiting on the line 3. The three portals are then brought astride new points 2B which are resting on another service bogie 30 which is waiting on the line 3 on the opposite side from the bogie 29. Acting always in cooperation, the three portals lift the points 2B from the bogie 30 and carry them to the seating on the ballast where they are lowered. The operators ensure the correct alignment of the points with the line 3 by moving the central sect--ions 12 of the respective portals appropriately. When the points are laid, each portal is brought back to its initial condition by repeating the operations described above with reference to Figures 3 to 10 in reverse.
  • From the structural characteristics of the portal according to the invention and its functional characteristics described above, the unaccustomed rapidity with which track sections in general and points in particular are removed and laid is clear.
  • In particular, the time necessary for laying the auxiliary rails and the need to use jacks and similar equipment are completely eliminated.
  • A further advantage of the portal according to the invention lies in the fact that it allows a drastic reduction in the work force which is decreased substantially to the very small number of operators necessary to drive the portals used in the operation.
  • The portal according to the invention further allows a considerable improvement in the working conditions for the work force to be achieved from the point of view of accidents.
  • Numerous variations may be made to the portal described above by an expert in the art. For example, the tracks may be replaced by a series of tyred wheels.
  • This and any other variant are entirely within the scope of the inventive concept of the present invention as defined by the following claims.

Claims (6)

1. Portal (1) for the removal and laying of railway tracks (3), particularly points (2A, 2B), of the type having a crossbeam (4) with ends vertically slidable along respective pillars (5), characterised in that each of the pillars (5) has its own means (7) of individual advancement on the ground.
2. A portal as claimed in Claim 1, characterised in that the crossbeam (4) includes a central section (12) and end sections (13) which can be extended individually from the central section (12), said central section (12) having its own retractable support means (15).
3. A portal as claimed in Claim 2, characterised in that the retractable support means are constituted by a railway bogie (16) having withdrawable, retractable wheels (18).
4. A portal as claimed in Claim 3, characterised in that the central section (12) is mounted on the bogie (16) with the interpositioning of a turntable (17).
5. A portal as claimed in any of the preceding claims, characterised in that the advancement means (7) for the pillars (5) comprise tracks (8).
6. A portal as claimed in any of Claims 1 to 4, characterised in that the advancement means (7) for the pillars (5) comprise tyred wheels.
EP82830269A 1981-10-27 1982-10-27 Portal for removing and laying railway tracks, particularly points Withdrawn EP0084298A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
IT2471581 1981-10-27
IT24715/81A IT1139295B (en) 1981-10-27 1981-10-27 PORTAL FOR THE REMOVAL AND LAYING OF RAILWAY TRACKS, IN PARTICULAR DEVIATORS

Publications (1)

Publication Number Publication Date
EP0084298A1 true EP0084298A1 (en) 1983-07-27

Family

ID=11214491

Family Applications (1)

Application Number Title Priority Date Filing Date
EP82830269A Withdrawn EP0084298A1 (en) 1981-10-27 1982-10-27 Portal for removing and laying railway tracks, particularly points

Country Status (2)

Country Link
EP (1) EP0084298A1 (en)
IT (1) IT1139295B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0196701A1 (en) * 1985-03-25 1986-10-08 AMECA S.r.l. Machine for handling and replacing rail switches, and track sections generally
EP0971071A1 (en) * 1998-07-10 2000-01-12 Fassetta Mecanique Method and device for laying railway track elements using a tracked vehicle
ES2308949A1 (en) * 2008-06-10 2008-12-01 Tecsa Empresa Constructora, S.A. Machine for unloading and positioning rails on crossties in railway tracks
ES2308954A1 (en) * 2008-07-29 2008-12-01 Tecsa Empresa Constructora, S.A Machine for the loading and unloading of rollers of trailer and positioning of roads ferreas (Machine-translation by Google Translate, not legally binding)
EP2031129A1 (en) * 2004-03-27 2009-03-04 W & D McCulloch Railway rail handling apparatus and method
GB2453754A (en) * 2007-10-17 2009-04-22 W & D Mcculloch Apparatus and methods for handling railway rails and ancillary components
FR2986246A1 (en) * 2012-01-31 2013-08-02 Geismar Ancien Ets L Railway track spreader for use with lifting machine to load/unload rails, has intermediate clamp device moved in plane defined by curved rails to grip rails at location between outer clamp device positions, and moved perpendicular to line

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE563834C (en) * 1931-04-10 1932-11-10 Otto Taxis Track laying machine with crawler tracks
FR884476A (en) * 1942-07-25 1943-08-18 Albert Collet Fils D Method for laying railway tracks in progress
DE2309930A1 (en) * 1973-02-28 1974-08-29 Juergen Frenzel DEVICE FOR LAYING SECTIONS OF TRACK
FR2326540A1 (en) * 1975-09-30 1977-04-29 Jardin Et Billiard Entreprise Railway track laying machine - consists of longitudinal girder placed on carriage, with four wheels, and supports in form of parallelogram
EP0066312A1 (en) * 1981-05-22 1982-12-08 AMECA S.r.l. Machine for replacing railway switches and track portions

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE563834C (en) * 1931-04-10 1932-11-10 Otto Taxis Track laying machine with crawler tracks
FR884476A (en) * 1942-07-25 1943-08-18 Albert Collet Fils D Method for laying railway tracks in progress
DE2309930A1 (en) * 1973-02-28 1974-08-29 Juergen Frenzel DEVICE FOR LAYING SECTIONS OF TRACK
FR2326540A1 (en) * 1975-09-30 1977-04-29 Jardin Et Billiard Entreprise Railway track laying machine - consists of longitudinal girder placed on carriage, with four wheels, and supports in form of parallelogram
EP0066312A1 (en) * 1981-05-22 1982-12-08 AMECA S.r.l. Machine for replacing railway switches and track portions

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0196701A1 (en) * 1985-03-25 1986-10-08 AMECA S.r.l. Machine for handling and replacing rail switches, and track sections generally
EP0971071A1 (en) * 1998-07-10 2000-01-12 Fassetta Mecanique Method and device for laying railway track elements using a tracked vehicle
FR2780993A1 (en) * 1998-07-10 2000-01-14 Fassetta Mecanique METHOD AND DEVICE FOR LAYING TRACK ELEMENT BY TRACKED LORRIES
EP2031129A1 (en) * 2004-03-27 2009-03-04 W & D McCulloch Railway rail handling apparatus and method
EP1733096B2 (en) 2004-03-27 2019-09-04 W & D McCulloch Ltd. Railway rail handling apparatus and method
GB2453754A (en) * 2007-10-17 2009-04-22 W & D Mcculloch Apparatus and methods for handling railway rails and ancillary components
ES2308949A1 (en) * 2008-06-10 2008-12-01 Tecsa Empresa Constructora, S.A. Machine for unloading and positioning rails on crossties in railway tracks
EP2133469A2 (en) * 2008-06-10 2009-12-16 Tecsa Empresa Constructora, S.A. Machine for unloading and positioning rails on crossties in railway tracks
US8006624B2 (en) 2008-06-10 2011-08-30 Tecsa Empresa Constructora, S.A. Machine for unloading and positioning rails on crossties in railway tracks
EP2133469A3 (en) * 2008-06-10 2013-01-23 Tecsa Empresa Constructora, S.A. Machine for unloading and positioning rails on crossties in railway tracks
ES2308954A1 (en) * 2008-07-29 2008-12-01 Tecsa Empresa Constructora, S.A Machine for the loading and unloading of rollers of trailer and positioning of roads ferreas (Machine-translation by Google Translate, not legally binding)
FR2986246A1 (en) * 2012-01-31 2013-08-02 Geismar Ancien Ets L Railway track spreader for use with lifting machine to load/unload rails, has intermediate clamp device moved in plane defined by curved rails to grip rails at location between outer clamp device positions, and moved perpendicular to line

Also Published As

Publication number Publication date
IT8124715A0 (en) 1981-10-27
IT1139295B (en) 1986-09-24

Similar Documents

Publication Publication Date Title
CA1290618C (en) Mobile installation for loading, transporting and unloading as well as exchanging railroad ties
US5617795A (en) Tie guide and plate holding apparatus
AT406970B (en) MACHINE FOR PREPARING WELDING WORK ON A TRACK
EP2403994B1 (en) Apparatus and method for the handling of railway sleepers
CA2166438C (en) Machine and an installation for implementing track maintenance operations
EP1733096B1 (en) Railway rail handling apparatus and method
AT391723B (en) ANNEX OR MACHINE COMBINATION AND METHOD FOR PROGRESSIVE PARTIAL SLEEPING - REPLACEMENT OF A TRACK
US3465687A (en) Rail positioning system
DE2818514A1 (en) MOBILE DEVICE FOR CONTINUOUS REPLACEMENT OR RENEWING A TRACK COMPOSED OF RAILS AND SLEEPERS
EP0084298A1 (en) Portal for removing and laying railway tracks, particularly points
CA1322298C (en) Mobile tie exchange machine arrangement
US4773332A (en) Mobile apparatus for loading, transporting and laying an assembled track section
GB2207166A (en) On-track machine for clearing and planing ballast
US4392433A (en) Railway maintenance machine
CH624443A5 (en)
AT391722B (en) SYSTEM AND METHOD FOR PROGRESSIVE PARTIAL SLEEP-REPLACEMENT OF A TRACK
US2786426A (en) Tie replacing machine
US4133266A (en) Railroad crosstie replacement machine
CA1255540A (en) Track-bound carriage for an assembled track section
US5564179A (en) Heat exchanger bundle extractor assembly
US20090145324A1 (en) Movable crawler system for railroad equipment
US2991725A (en) Railway tie spacer
US2887135A (en) Adzing apparatus for railroad crossties
CN221029331U (en) Railway ballast cleaning device
DE2817635C2 (en)

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Designated state(s): AT BE CH DE FR GB LI LU NL SE

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION HAS BEEN WITHDRAWN

18W Application withdrawn

Withdrawal date: 19840215