EP0066478A1 - Method to assure the mechanical continuity between two adjoining panels of a reinforced concrete wall cast in the earth - Google Patents

Method to assure the mechanical continuity between two adjoining panels of a reinforced concrete wall cast in the earth Download PDF

Info

Publication number
EP0066478A1
EP0066478A1 EP82400579A EP82400579A EP0066478A1 EP 0066478 A1 EP0066478 A1 EP 0066478A1 EP 82400579 A EP82400579 A EP 82400579A EP 82400579 A EP82400579 A EP 82400579A EP 0066478 A1 EP0066478 A1 EP 0066478A1
Authority
EP
European Patent Office
Prior art keywords
panel
jacks
cylinders
excavation
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP82400579A
Other languages
German (de)
French (fr)
Other versions
EP0066478B1 (en
Inventor
Roland Alfred Charles Stenne
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sondages Injections Forages SIF Enterprise Bachy
Original Assignee
SIF ENTREPRISE
Sondages Injections Forages SIF Enterprise Bachy
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SIF ENTREPRISE, Sondages Injections Forages SIF Enterprise Bachy filed Critical SIF ENTREPRISE
Publication of EP0066478A1 publication Critical patent/EP0066478A1/en
Application granted granted Critical
Publication of EP0066478B1 publication Critical patent/EP0066478B1/en
Expired legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/18Bulkheads or similar walls made solely of concrete in situ
    • E02D5/182Bulkheads or similar walls made solely of concrete in situ using formworks to separate sections

Definitions

  • the invention relates to the field of civil engineering and relates more particularly to a method for ensuring mechanical continuity and the transmission of forces between two adjacent panels of a reinforced concrete wall molded in the sul.
  • the object of the invention is to provide a new method for ensuring mechanical continuity and the transmission of forces between two adjacent panels of a reinforced concrete wall, molded in the ground, which is free from the above-mentioned defects and constitutes remarkable technical progress. .
  • this method consists in drowning in the concrete of a panel n in progress the bodies of a plurality of jacks distributed at intervals over the height of the panel and arranged at the end of said panel adjacent to the panel n +1 next to be produced, the rods of the jacks being in the retracted position and their ends being brought in the immediate vicinity of the shuttering means of the end of the excavation in which the panel n is poured, then, after sufficient setting of the concrete of this panel, execution of the excavation of the next panel n + 1 and removal of the formwork means provided at the end of the excavation of the panel n, to deploy the rods of the jacks so that they penetrate into the excavation of the next n + 1 panel to be produced and, finally, to concretize the excavation of said n + 1 panel, thus embedding the rods of the jacks in the concrete.
  • the jacks deployed act as reinforcements ensuring the transmission of forces from one panel to another.
  • the cylinder body and the cylinder rod at their opposite ends, with flanges or end plates.
  • the body of the cylinder could be provided with protrusions intended to improve the adhesion between the concrete and the body of the cylinder, the rod being the only one provided with a flange or anchoring plate at its free end.
  • the cylinder body could be fixed to irons or anchor bars which will themselves be embedded in the concrete.
  • each reinforcement cage can carry a series of jacks at one of its ends and be provided with adequate free volumes at the other end to receive the rods of the jacks of the adjacent cage during their deployment.
  • one out of two reinforcement cages can carry a set of jacks at each of its ends, the adjacent cages being, for their part, provided with adequate free volumes.
  • the jacks provided at the two ends of the jacking cages can be connected two by two by a connecting member, such as a steel bar, ensuring their anchoring.
  • single acting or double acting cylinders can be used.
  • double-acting cylinders it is possible to exert a prestress, after hardening of the concrete, in order to put in tension the rod of the jack.
  • the durability of this prestressing will be ensured by the use as pressurizing fluid of the jack of a curable fluid, such as a cement grout without shrinkage, which will take hold in the cylinder of the jack.
  • a curable fluid can also be used in the case of a single-acting cylinder.
  • the anchoring zones of the body and of the rod of the jack may be reinforced transversely by steels provided for this purpose in the cages, so as to respect the uses in terms of concrete.
  • the cylinders can be of very ordinary quality, or even inferior, since they are intended to operate only once.
  • the jacks can be placed horizontally and parallel to the faces of the diaphragm wall or in any other direction desirable from the point of view of the transmission of forces.
  • the cylinders can be positioned in the middle plane of the panels if it is a question of transmitting a simple traction.
  • the rods of the cylinders will advantageously be protected from corrosion when crossing the joint. We could, for example, provide an anti-corrosion coating on the rod of each cylinder.
  • the cylinders will be sized according to the forces to which they will be subjected, as is obvious.
  • Figures la to le are schematic plan views illustrating the method of the invention.
  • Figure 2 is a schematic sectional view along line E-E of Figure 1e; and
  • Figure 3 is a schematic view illustrating a variant of the method of the invention.
  • FIGs 1a to 1e and 2 illustrate the implementation of the method of the invention.
  • Figure la we see an excavation In carried out in a conventional manner under bentonite mud, in which will be poured the panel n of the diaphragm wall.
  • a 2n profiled formwork is put in place.
  • excavation 1n a reinforcement cage 3m is put in place (very simplified) to which are fixed a plurality of single-acting cylinders 4n in the retracted position.
  • the jacks 4n comprise a body 5n and a rod 6n carrying at their opposite ends flanges or anchoring plates 7n and 8n, respectively.
  • the 4n cylinders are positioned at intervals, for example, regular over the height of the cage and in the region of the cage next to the formwork 2n.
  • the cylinders of the jacks are supplied with pressurized fluid through a conduit 9n.
  • the cage carrying the jacks being in place, a light blow of compressed air is sent into the jacks so that the plates 8n come into abutment against the formwork 2n, then we proceed to concreting the excavation 1n ( Figure 1b).
  • the cage 3n, the conduit 9n, the bodies 5n of the jacks and their plates 7n are embedded in the concrete, while only a small portion of the rods 6n is coated, the plates 8n flush with the concrete.
  • the formwork 2n is extracted (FIG. 1c).
  • the formwork could be extracted before digging the 1n + 1 excavation, provided that the concrete of the panel n has become firm enough to support itself.
  • FIG. 3 illustrates the variant of the method of the invention in which double-acting cylinders 14 are used instead of single-acting cylinders 4.
  • jacks are used, the cylinder of which has two chambers which can be pressurized by the conduits 9n and 11n respectively, and the procedure is as described with reference to FIGS. 1 and 2, except that in the sequence illustrated by FIG.
  • the rods are not fully deployed but a certain residual stroke is left, for example by providing a stop 12n on the rod of each cylinder, and that, after setting the concrete poured into the excavation n +1, the rod of each of the jacks is put in traction by injecting through the conduit 11n a hardenable fluid under pressure, such as a cement grout without shrinkage, the grip of which will ensure the durability of the traction force applied to the rod of each of the cylinders.
  • FIG. 3 illustrates the jacks after they have been pulled.

Abstract

L'invention concerne un procédé pour assurer la continuité mécanique et la transmission des efforts entre deux panneaux adjacents d'une paroi en béton armé moulée dans le sol, qui se caractérise par l'emploi d'une pluralité de vérins dont les corps (5n) sont noyés dans le béton du panneau (n) et les tiges (6n) sont noyées dans le béton du panneau (n + 1).The invention relates to a method for ensuring mechanical continuity and the transmission of forces between two adjacent panels of a wall of reinforced concrete molded in the ground, which is characterized by the use of a plurality of jacks whose bodies (5n ) are embedded in the concrete of the panel (n) and the rods (6n) are embedded in the concrete of the panel (n + 1).

Description

L'invention se rapporte au domaine du génie civil et concerne plus particulièrement un procédé pour assurer la continuité mécanique et la transmission des efforts entre deux panneaux adjacents d'une paroi en béton armé moulée dans le sul.The invention relates to the field of civil engineering and relates more particularly to a method for ensuring mechanical continuity and the transmission of forces between two adjacent panels of a reinforced concrete wall molded in the sul.

Les différents procédés étudiés jusqu'à présent reposent sur le principe de la transmission des efforts dans le béton par recouvrement des armatures horizontales des extrémités des cages des panneaux adjacents. A cette fin, l'extrémité de la cage d'un premier panneau n'est pas bétonnée grâce à la mise en place d'un système de cloisonnement séparant la partie bétonnée du panneau d'un espace laissé libre et mis ensuite en communication avec l'excavation d'un deuxième panneau voisin, afin de permettre la mise en place de la cage du deuxième panneau avec recouvrement avec la cage du premier panneau et d'assurer ainsi la continuité entre les deux panneaux après bétonnage.The various processes studied so far are based on the principle of the transmission of forces in concrete by covering the horizontal reinforcements of the ends of the cages of the adjacent panels. To this end, the end of the cage of a first panel is not concreted thanks to the installation of a partitioning system separating the concreted part of the panel from a space left free and then placed in communication with the excavation of a second neighboring panel, in order to allow the placement of the cage of the second panel with overlap with the cage of the first panel and thus to ensure continuity between the two panels after concreting.

La continuité entre panneaux ainsi créée est la même que dans le cas de la reprise de bétonnage d'un voile classique en béton, la difficulté étant de trouver un coffrage laissant passer les armatures dans les conditions d'exécution d'une paroi moulée, c'est-à-dire à plusieurs mètres de profondeur et sous boue bentonitique.The continuity between panels thus created is the same as in the case of resumption of concreting of a conventional concrete veil, the difficulty being to find a formwork allowing the reinforcements to pass under the conditions of execution of a diaphragm wall, that is to say several meters deep and under bentonite mud.

Mis à part le caractère complexe du coffrage nécessaire à la réalisation de cette continuité d'armatures et de sa difficulté de mise en oeuvre qui entraîne, en plus de l'incidence sur le coût de l'opération elle-même, un ralentissement de la cadence du chantier par rapport à une paroi classique, ces procédés présentent deux graves inconvénients dans la conception même du joint par recouvrement des armatures :

  • - les longueurs de recouvrement des armatures horizontales sont limitées par les dimensions du système mis en oeuvre et ne sont, en général, pas suffisantes si l'on veut utiliser des diamètres de barres intéressants; le strict respect des règles de béton armé entraînerait un surdimensionnement de ces systèmes qui leur ferait perdre beaucoup de leur intérêt;
  • - le procédé, de par sa nature, interdit la mise en place d'aciers transversaux de couture dans la zone de recouvrement des barres horizontales comme le réclament les règles de béton armé.
Aside from the complex nature of the formwork necessary for achieving this continuity of reinforcement and its difficulty of implementation which, in addition to the impact on the cost of the operation itself, slows down the rate of construction compared to a conventional wall, these methods have two serious drawbacks in the very design of the joint by covering the reinforcements:
  • the overlapping lengths of the horizontal reinforcements are limited by the dimensions of the system used and are not generally sufficient if it is desired to use interesting bar diameters; strict compliance with the rules of reinforced concrete would lead to oversizing of these systems which would make them lose much of their interest;
  • - the process, by its nature, prohibits the installation of transverse seam steels in the overlap area of the horizontal bars as required by the rules of reinforced concrete.

Au surplus, l'emploi d'un système de cloisonnement avec les moyens d'étanchéité nécessaires associés, renchérit considérablement les coûts et constitue une gêne d'un point de vue pratique du fait de son encombrement.In addition, the use of a partitioning system with the necessary sealing means associated, considerably increases costs and is a nuisance from a practical point of view because of its size.

Ces procédés antérieurs visant à assurer la transmission des efforts entre deux panneaux adjacents de paroi moulée par la réalisation d'une continuité des armatures horizontales par un dispositif basé sur le principe classique et bien connu en béton armé de recouvrement des barres de renforcement, n'apportent donc pas une solution entièrement satisfaisante au problème posé tant du point de vue de l'application des règles du béton armé que du point de vue de l'économie et des conditions de réalisation pratique.These prior methods aimed at ensuring the transmission of forces between two adjacent panels of molded wall by the realization of a continuity of the horizontal reinforcements by a device based on the classic principle and well known in reinforced concrete covering the bars. reinforcement, therefore do not provide a fully satisfactory solution to the problem posed both from the point of view of the application of the rules of reinforced concrete as from the point of view of economy and conditions of practical realization.

L'invention a pour objet de fournir un nouveau procédé pour assurer la continuité mécanique et la transmission des efforts entre deux panneaux adjacents d'une paroi en béton armé, moulée dans le sol, qui est exempt des défauts susmentionnés et constitue un progrès technique remarquable.The object of the invention is to provide a new method for ensuring mechanical continuity and the transmission of forces between two adjacent panels of a reinforced concrete wall, molded in the ground, which is free from the above-mentioned defects and constitutes remarkable technical progress. .

Selon l'invention, ce procédé consiste à noyer dans le béton d'un panneau n en cours de réalisation les corps d'une pluralité de vérins répartis à intervalle sur la hauteur du panneau et disposés à l'extrémité dudit panneau adjacente au panneau n + 1 suivant à réaliser, les tiges des vérins étant en position rétractée et leurs extrémités étant amenées au voisinage immédiat des moyens de coffrage de l'extrémité de l'excavation dans laquelle est coulé le panneau n, puis, après prise suffisante du béton de ce panneau, exécution de l'excavation du panneau n + 1 suivant et enlèvement des moyens de coffrage prévus à l'extrémité de l'excavation du panneau n, à déployer les tiges des vérins de manière qu'elles pénètrent dans l'excavation du panneau n + 1 suivant à réaliser et, enfin, à bétonner l'excavation dudit panneau n + 1 en noyant ainsi les tiges des vérins dans le béton.According to the invention, this method consists in drowning in the concrete of a panel n in progress the bodies of a plurality of jacks distributed at intervals over the height of the panel and arranged at the end of said panel adjacent to the panel n +1 next to be produced, the rods of the jacks being in the retracted position and their ends being brought in the immediate vicinity of the shuttering means of the end of the excavation in which the panel n is poured, then, after sufficient setting of the concrete of this panel, execution of the excavation of the next panel n + 1 and removal of the formwork means provided at the end of the excavation of the panel n, to deploy the rods of the jacks so that they penetrate into the excavation of the next n + 1 panel to be produced and, finally, to concretize the excavation of said n + 1 panel, thus embedding the rods of the jacks in the concrete.

Après durcissement du béton, les vérins déployés jouent le rôle d'armatures assurant la transmission des efforts d'un panneau à l'autre.After the concrete has hardened, the jacks deployed act as reinforcements ensuring the transmission of forces from one panel to another.

Afin d'obtenir le meilleur ancrage possible des vérins dans le béton, il est avantageux de munir le corps du vérin et la tige du vérin, à leurs extrémités opposées, de brides ou plaques d'extrémité. En variante, le corps du vérin pourrait être muni de protubérances destinées à améliorer l'adhérence entre le béton et le corps du vérin, la tige étant seule pourvue d'une bride ou plaque d'ancrage à son extrémité libre. Selon encore une autre variante, le corps du vérin pourrait être fixé à des fers ou barres d'ancrage qui seront eux-mêmes noyés dans le béton.In order to obtain the best possible anchoring of the cylinders in the concrete, it is advantageous to provide the cylinder body and the cylinder rod, at their opposite ends, with flanges or end plates. Alternatively, the body of the cylinder could be provided with protrusions intended to improve the adhesion between the concrete and the body of the cylinder, the rod being the only one provided with a flange or anchoring plate at its free end. According to yet another variant, the cylinder body could be fixed to irons or anchor bars which will themselves be embedded in the concrete.

Comme des cages d'armatures seront le plus souvent mises en place dans les excavations avant coulée du béton, il est commode d'attacher ou suspendre les corps des vérins à la cage d'armatures afin d'assurer leur répartition sur la hauteur du panneau à réaliser. Si la fixation du corps à l'une des barres de la cage est suffisamment solide, on peut assurer du même coup l'ancrage du corps au béton après coulée de ce dernier, sans nécessité de prévoir une bride ou plaque d'extrémité sur le corps du vérin.As reinforcement cages will most often be placed in excavations before pouring concrete, it is convenient to attach or suspend the bodies of the jacks to the reinforcement cage in order to ensure their distribution over the height of the panel to achieve. If the fixing of the body to one of the bars of the cage is sufficiently solid, it can at the same time ensure the anchoring of the body to the concrete after pouring of the latter, without the need to provide a flange or end plate on the cylinder body.

Bien entendu, dans le cas de l'emploi de cages d'armatures, il faut prévoir dans celles-ci des volumes libres destinés à recevoir les tiges des vérins lors de leur déploiement.Of course, in the case of the use of reinforcement cages, it is necessary to provide in these free volumes intended to receive the rods of the jacks during their deployment.

Ainsi chaque cage d'armatures peut porter une série de vérins à l'une de ses extrémités et être pourvue de volumes libres adéquats à l'autre extrémité pour recevoir les tiges des vérins de la cage adjacente lors de leur déploiement. En variante, une cage d'armatures sur deux peut être porteuse d'un jeu de vérins à chacune de ses extrémités, les cages adjacentes étant, de leur côté, pourvues des volumes libres adéquats. Dans ce dernier mode de réalisation, les vérins prévus aux deux extrémités des cages porteuses de vérins peuvent être reliés deux à deux par un organe de liaison, tel qu'une barre d'acier, assurant leur ancrage.Thus each reinforcement cage can carry a series of jacks at one of its ends and be provided with adequate free volumes at the other end to receive the rods of the jacks of the adjacent cage during their deployment. As a variant, one out of two reinforcement cages can carry a set of jacks at each of its ends, the adjacent cages being, for their part, provided with adequate free volumes. In this latter embodiment, the jacks provided at the two ends of the jacking cages can be connected two by two by a connecting member, such as a steel bar, ensuring their anchoring.

Comme vérins utilisables, on peut utiliser des vérins à simple effet ou à double effet. Dans le cas de vérins à simple effet, il faut veiller à ce que, lors du déploiement des tiges, par exemple sous l'effet d'une pression d'air comprimé ou d'un autre fluide sous pression, le piston de chaque vérin vienne bien en butée contre le fond du cylindre afin d'être certain que les efforts seront bien transmis de la tige au corps du vérin et vice-versa. Dans le cas de vérins à double effet, il est loisible d'exercer une précontrainte, après durcissement du béton, afin de mettre en traction la tige du vérin. La pérennité de cette précontrainte sera assurée par l'utilisation comme fluide de mise en pression du vérin d'un fluide durcissable, tel qu'un coulis de ciment sans retrait, qui fera prise dans le cylindre du vérin. Un tel fluide durcissable peut d'ailleurs aussi être employé dans le cas d'un vérin à simple effet. Les zones d'ancrage du corps et de la tige du vérin pourront être armées transversalement par des aciers prévus à cet effet dans les cages, de manière à respecter les usages en matière de béton.As usable cylinders, single acting or double acting cylinders can be used. In the case of single-acting cylinders, care must be taken that when deploying ment of the rods, for example under the effect of compressed air pressure or another pressurized fluid, the piston of each cylinder comes into abutment against the bottom of the cylinder in order to be certain that the forces will be well transmitted from the rod to the cylinder body and vice versa. In the case of double-acting cylinders, it is possible to exert a prestress, after hardening of the concrete, in order to put in tension the rod of the jack. The durability of this prestressing will be ensured by the use as pressurizing fluid of the jack of a curable fluid, such as a cement grout without shrinkage, which will take hold in the cylinder of the jack. Such a curable fluid can also be used in the case of a single-acting cylinder. The anchoring zones of the body and of the rod of the jack may be reinforced transversely by steels provided for this purpose in the cages, so as to respect the uses in terms of concrete.

Les vérins peuvent être de qualité très ordinaire, voire inférieure, étant donné qu'ils ne sont destinés à fonctionner qu'une seule fois.The cylinders can be of very ordinary quality, or even inferior, since they are intended to operate only once.

Les vérins peuvent être placés horizontalement et parallèlement aux faces de la paroi moulée ou dans toute autre direction désirable du point de vue de la transmission des efforts. Les vérins peuvent être positionnés dans le plan moyen des panneaux s'il s'agit de transmettre une simple traction. Dans le cas de la transmission d'un effort de flexion on pourra prévoir une série de vérins décalés par rapport au plan moyen des panneaux lorsque l'effort s'exerce toujours dans le même sens ou deux séries de vérins positionnées chacune de part et d'autre du plan moyen des panneaux lorsque l'effort s'exerce de façon alternée dans les deux sens.The jacks can be placed horizontally and parallel to the faces of the diaphragm wall or in any other direction desirable from the point of view of the transmission of forces. The cylinders can be positioned in the middle plane of the panels if it is a question of transmitting a simple traction. In the case of the transmission of a bending force, it is possible to provide a series of jacks offset relative to the mean plane of the panels when the force is always exerted in the same direction or two series of jacks each positioned on either side 'other of the average plane of the panels when the force is exerted alternately in both directions.

Les tiges des vérins seront avantageusement protégées de la corrosion au droit de la traversée du joint. On pourrait, par exemple, prévoir un revêtement anticorrosion sur la tige de chaque vérin.The rods of the cylinders will advantageously be protected from corrosion when crossing the joint. We could, for example, provide an anti-corrosion coating on the rod of each cylinder.

Les vérins seront dimensionnés en fonction des efforts auxquels ils seront soumis, ainsi que cela est évident.The cylinders will be sized according to the forces to which they will be subjected, as is obvious.

La description qui va suivre au regard du dessin annexé, donnée à titre d'exemple non limitatif, fera bien comprendre comment l'invention peut être réalisée, les particularités qui ressortent tant du dessin que du texte faisant bien entendu partie de ladite invention.The description which will follow with regard to the appended drawing, given by way of nonlimiting example, will make it clear how the invention can be implemented, the features which emerge both from the drawing and from the text of course forming part of said invention.

Les figures la à le sont des vues en plan schématiques illustrant le procédé de l'invention. La figure 2 est une vue schématique en coupe selon la ligne E-E de la figure 1e; et la figure 3 est une vue schématique illustrant une variante du procédé de l'invention.Figures la to le are schematic plan views illustrating the method of the invention. Figure 2 is a schematic sectional view along line E-E of Figure 1e; and Figure 3 is a schematic view illustrating a variant of the method of the invention.

Les figures 1a à 1e et 2 illustrent la mise en oeuvre du procédé de l'invention. Sur la figure la, on voit une excavation In réalisée de façon classique sous boue bentonitique, dans laquelle sera coulé le panneau n de la paroi moulée. A l'extrémité de cette excavation voisine du futur panneau n + 1, est mis en place un coffrage profilé 2n. Dans l'excavation 1n, on met en place une cage d'armatures 3m (représentée de façon très simplifiée) à laquelle sont fixés une pluralité de vérins 4n à simple effet en position rétractée.Figures 1a to 1e and 2 illustrate the implementation of the method of the invention. In Figure la, we see an excavation In carried out in a conventional manner under bentonite mud, in which will be poured the panel n of the diaphragm wall. At the end of this excavation next to the future n + 1 panel, a 2n profiled formwork is put in place. In excavation 1n, a reinforcement cage 3m is put in place (very simplified) to which are fixed a plurality of single-acting cylinders 4n in the retracted position.

Les vérins 4n comprennent un corps 5n et une tige 6n portant à leurs extrémités opposées des brides ou plaques d'ancrage 7n et 8n, respectivement. Les vérins 4n sont positionnés à intervalles, par exemple, réguliers sur la hauteur de la cage et dans la région de la cage voisine du coffrage 2n. Les cylindres des vérins sont alimentés en fluide sous pression par un conduit 9n. La cage portant les vérins étant en place, on envoie un léger coup d'air comprimé dans les vérins afin que les plaques 8n viennent en butée contre le coffrage 2n, puis on procède au bétonnage de l'excavation 1n (figure 1b).The jacks 4n comprise a body 5n and a rod 6n carrying at their opposite ends flanges or anchoring plates 7n and 8n, respectively. The 4n cylinders are positioned at intervals, for example, regular over the height of the cage and in the region of the cage next to the formwork 2n. The cylinders of the jacks are supplied with pressurized fluid through a conduit 9n. The cage carrying the jacks being in place, a light blow of compressed air is sent into the jacks so that the plates 8n come into abutment against the formwork 2n, then we proceed to concreting the excavation 1n (Figure 1b).

Au cours de ce bétonnage, la cage 3n, le conduit 9n, les corps 5n des vérins et leurs plaques 7n se trouvent enrobés dans le béton, tandis que seule une petite portion des tiges 6n est enrobée, les plaques 8n affleurant du béton.During this concreting, the cage 3n, the conduit 9n, the bodies 5n of the jacks and their plates 7n are embedded in the concrete, while only a small portion of the rods 6n is coated, the plates 8n flush with the concrete.

Après cela, on creuse, à la suite de l'excavation 1n, une excavation 1n + 1, dans laquelle sera moulé le panneau n + 1, puis on extrait le coffrage 2n (figure 1c). En variante, on pourrait extraire le coffrage avant de creuser l'excavation 1n + 1, à la condition que le béton du panneau n soit devenu assez ferme pour se soutenir de lui-même.After that, one digs, following the excavation 1n, an excavation 1n + 1, in which the panel n + 1 will be molded, then the formwork 2n is extracted (FIG. 1c). Alternatively, the formwork could be extracted before digging the 1n + 1 excavation, provided that the concrete of the panel n has become firm enough to support itself.

Dans l'étape suivante (figure 1d), on met en place dans l'excavation 1n + 1 une cage d'armatures 3n + 1 semblable à la cage 3n, dont l'extrémité voisine du panneau n est pourvue de volumes libres 10n + 1 correspondant à l'emplacement qu'occuperont les tiges 6n avec leurs plaques 8n une fois déployées, tandis que son extrémité opposée porte une pluralité de vérins 4n + 1 (non représentés).In the next step (Figure 1d), we put in the excavation 1n + 1 a reinforcement cage 3n + 1 similar to the cage 3n, whose end close to the panel n is provided with free volumes 10 n +1 corresponding to the location occupied by the rods 6n with their plates 8n once deployed, while its opposite end carries a plurality of cylinders 4n + 1 (not shown).

Enfin (figure 1e), on injecte un fluide sous pression dans le conduit 9n afin de libérer les tiges 6n de l'emprise du béton et de les déployer jusqu'à ce que la portion de chaque vérin vienne en butée, en fin de course, contre le fond du cylindre du vérin. Si désiré, on pourrait utiliser un tube d'injection à obturateur double classique inséré dans le conduit 9n et que l'on amènerait successivement en regard de chacune des dérivations desservant les vérins, afin d'être sûr que le déploiement des vérins est effectif. Il est à noter qu'il est assez facile de libérer les tiges de l'emprise du béton, ce dernier n'enserrant qu'un court tronçon lisse de chaque tige si on a pris bien soin d'appliquer les plaques 8n contre le coffrage d'extrémité. Après cela, il n'y a plus qu'à bétonner l'excavation 1n + 1. Bien entendu, on procèdera de façon analogue à ce qui vient d'être décrit pour réaliser la jonction entre les panneaux n + 1 et n + 2Finally (FIG. 1e), a fluid under pressure is injected into the conduit 9n in order to release the rods 6n from the grip of the concrete and deploy them until the portion of each jack comes into abutment, at the end of the stroke. , against the bottom of the cylinder. If desired, one could use a conventional double shutter injection tube inserted into the conduit 9n and which would be brought successively opposite each of the branches serving the jacks, in order to be sure that the deployment of the jacks is effective. It should be noted that it is fairly easy to release the rods from the concrete footprint, the latter enclosing only a short, smooth section of each rod if care has been taken to apply the 8n plates against the formwork end. After that, there is only to concrete the excavation 1n + 1. Of course, we will proceed in a similar manner to what has just been described to achieve the junction between the panels n + 1 and n + 2

Grâce à la présence des brides ou plaques ?n et 8n le corps et la tige des vérins sont solidement ancrés dans le béton, ce qui exclut tout risque de glissement.Thanks to the presence of the flanges or plates? N and 8n the body and the rod of the jacks are firmly anchored in the concrete, which excludes any risk of slipping.

La figure 3 illustre la variante du procédé de l'invention dans laquelle on utilise des vérins 14 à double effet à la place des vérins 4 à simple effet. Dans cette variante, on utilise des vérins dont le cylindre comporte deux chambres pouvant être mises en pression par les conduits 9n et 11n respectivement, et on procède comme décrit à propos des figures 1 et 2, si ce n'est que, dans la séquence illustrée par la figure 1e, on ne déploie pas les tiges totalement mais on laisse subsister une certaine course résiduelle, par exemple en prévoyant une butée 12n sur la tige de chaque vérin, et que, après la prise du béton coulé dans l'excavation n + 1, on met en traction la tige de chacun des vérins en injectant par le conduit 11n un fluide durcissable sous pression, tel qu'un coulis de ciment sans retrait, dont la prise assurera la pérennité de la force de traction appliquée à la tige de chacun des vérins. La figure 3 illustre les vérins après leur mise en traction.FIG. 3 illustrates the variant of the method of the invention in which double-acting cylinders 14 are used instead of single-acting cylinders 4. In this variant, jacks are used, the cylinder of which has two chambers which can be pressurized by the conduits 9n and 11n respectively, and the procedure is as described with reference to FIGS. 1 and 2, except that in the sequence illustrated by FIG. 1e, the rods are not fully deployed but a certain residual stroke is left, for example by providing a stop 12n on the rod of each cylinder, and that, after setting the concrete poured into the excavation n +1, the rod of each of the jacks is put in traction by injecting through the conduit 11n a hardenable fluid under pressure, such as a cement grout without shrinkage, the grip of which will ensure the durability of the traction force applied to the rod of each of the cylinders. FIG. 3 illustrates the jacks after they have been pulled.

Claims (9)

1. Procédé pour assurer la continuité mécanique et la transmission des efforts entre deux panneaux adjacents d'une paroi en béton armé, moulée dans le sol, caractérisé en ce qu'il consiste à noyer dans le béton d'un panneau n en cours de réalisation les corps (5n) d'une pluralité de vérins répartis à intervalle sur la hauteur du panneau et disposés à l'extrémité dudit panneau adjacente au panneau n + 1 suivant à réaliser, les tiges des vérins étant en position rétractée et leurs extrémités étant amenées au voisinage immédiat des moyens de coffrage(2n)de l'extrémité de l'excavation dans laquelle est coulé le panneau n, puis, après prise suffisante du béton de ce panneau, exécution de l'excavation du panneau n + 1 suivant et enlèvement des moyens de coffrage prévus à l'extrémité de l'excavation du panneau n, à déployer les tiges (6n) des vérins de manière qu'elles pénètrent dans l'excavation du panneau n + 1 suivant à réaliser et, enfin, à bétonner l'excavation dudit panneau n + 1 en noyant ainsi les tiges des vérins dans le béton.1. A method for ensuring mechanical continuity and the transmission of forces between two adjacent panels of a reinforced concrete wall, molded in the ground, characterized in that it consists in drowning in the concrete of a panel n being making the bodies (5n) of a plurality of jacks distributed at intervals over the height of the panel and arranged at the end of said panel adjacent to the next n + 1 panel to be produced, the rods of the jacks being in the retracted position and their ends being brought to the immediate vicinity of the formwork means (2n) of the end of the excavation into which the panel n is poured, then, after sufficient taking of the concrete from this panel, execution of the excavation of the next panel n + 1 and removal of the formwork means provided at the end of the excavation of the panel n, to deploy the rods (6n) of the jacks so that they penetrate into the excavation of the panel n + 1 according to be produced and, finally, to concreting the excavation of said n + 1 panel in a core ant the rods of the cylinders in the concrete. 2o Procédé selon la revendication 1, caractérisé en ce que les corps des vérins sont attachés à une cage d'armatures mise en place dans la tranchée n avant le bétonnage de l'excavation.2 o A method according to claim 1, characterized in that the cylinders bodies are attached to a frame cage placed in the trench n before concreting the excavation. 3. Procédé selon la revendication 1 ou 2, caractérisé en ce qu'on emploie des vérins dont le corps et la tige sont munis, à leurs extrémités opposées, de brides ou plaques.3. Method according to claim 1 or 2, characterized in that cylinders are used whose body and rod are provided, at their opposite ends, flanges or plates. 4. Procédé selon la revendication 1, 2 ou 3, caractérisé en ce qu'on utilise des vérins à simple effet.4. Method according to claim 1, 2 or 3, characterized in that single acting cylinders are used. 5. Procédé selon la revendication 1, 2 ou 3, caractérisé en ce qu'on utilise des vérins à double effet, et en ce qu'on met en traction les tiges des vérins après prise du béton coulé dans l'excavation n + 1, en injectant dans les vérins un fluide sous pression durcissable.5. Method according to claim 1, 2 or 3, characterized in that double-acting cylinders are used, and in that the rods of the cylinders are put in traction after setting of the concrete poured into the excavation n + 1 , by injecting a hardenable pressure fluid into the cylinders. 6. Procédé selon l'une quelconque des revendications 1 à 5, caractérisé en ce qu'il est prévu une pluralité de vérins à chacune des extrémités d'un panneau sur deux.6. Method according to any one of claims 1 to 5, characterized in that there is provided a plurality of jacks at each end of a panel on two. 7. Procédé selon la revendication 6, caractérisé en ce que les corps des vérins prévus aux deux extrémités d'un panneau sont reliés deux à deux par un organe de liaison.7. Method according to claim 6, characterized in that the bodies of the jacks provided at the two ends of a panel are connected in pairs by a connecting member. 8. Procédé selon l'une quelconque des revendications 1, 2, 4, 5 et 6, caractérisé en ce que les corps des vérins portent des protubérances.8. Method according to any one of claims 1, 2, 4, 5 and 6, characterized in that the bodies of the jacks carry protrusions. 9. Procédé selon l'une quelconque des revendications 1, 2, 4, 5 et 6, caractérisé en ce que les corps des vérins sont fixés à des fers ou barres d'ancrage noyés dans le béton.9. Method according to any one of claims 1, 2, 4, 5 and 6, characterized in that the cylinders bodies are fixed to irons or anchor bars embedded in the concrete.
EP82400579A 1981-05-22 1982-03-30 Method to assure the mechanical continuity between two adjoining panels of a reinforced concrete wall cast in the earth Expired EP0066478B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
FR8110223 1981-05-22
FR8110223A FR2506362A1 (en) 1981-05-22 1981-05-22 PROCESS FOR ENSURING MECHANICAL CONTINUITY BETWEEN TWO ADJACENT PANELS OF A REINFORCED CONCRETE WALL IN THE GROUND

Publications (2)

Publication Number Publication Date
EP0066478A1 true EP0066478A1 (en) 1982-12-08
EP0066478B1 EP0066478B1 (en) 1985-05-29

Family

ID=9258786

Family Applications (1)

Application Number Title Priority Date Filing Date
EP82400579A Expired EP0066478B1 (en) 1981-05-22 1982-03-30 Method to assure the mechanical continuity between two adjoining panels of a reinforced concrete wall cast in the earth

Country Status (7)

Country Link
US (1) US4453862A (en)
EP (1) EP0066478B1 (en)
JP (1) JPS57197317A (en)
AU (1) AU546032B2 (en)
DE (1) DE3263860D1 (en)
FR (1) FR2506362A1 (en)
PT (1) PT74933B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1997040233A1 (en) * 1996-04-19 1997-10-30 Compagnie Du Sol Continuously reinforced diaphragm wall, method of construction and formwork therefor

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4570409A (en) * 1983-12-07 1986-02-18 Palm Harbor Homes, Inc. Foundation system for modular and mobile housing
US4728226A (en) * 1984-04-10 1988-03-01 Finic, B.V. Method and apparatus for forming reinforced concrete walls with continuous steel reinforcement
US4582453A (en) * 1984-08-16 1986-04-15 Finic, B.V. Method and apparatus for in situ forming underground panelized concrete walls with improved joint structure
US4875807A (en) * 1988-05-17 1989-10-24 Liu Jen Jui Method and means for basement construction
FR3083250B1 (en) * 2018-06-27 2020-09-18 Soletanche Freyssinet FORMWORK ELEMENT PROVIDED WITH SACRIFICIAL PROFILES
CN111827265A (en) * 2020-07-21 2020-10-27 重鑫岩土技术(上海)有限公司 Construction method of steel reinforced concrete underground continuous wall

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3893302A (en) * 1973-10-25 1975-07-08 Rapidex Inc Machine and method for excavating trenches and for constructing walls in trenches

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3214919A (en) * 1961-08-23 1965-11-02 Kusatake Nobuichi Apparatus for constructing a wall
FR1402047A (en) * 1964-04-27 1965-06-11 Soletanche Process for the junction of the successive elements of walls and walls molded in the ground
GB1396877A (en) * 1971-07-29 1975-06-11
JPS5539548A (en) * 1978-09-14 1980-03-19 Taisei Corp Construction method for continuous underground concrete wall

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3893302A (en) * 1973-10-25 1975-07-08 Rapidex Inc Machine and method for excavating trenches and for constructing walls in trenches

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1997040233A1 (en) * 1996-04-19 1997-10-30 Compagnie Du Sol Continuously reinforced diaphragm wall, method of construction and formwork therefor
US6052963A (en) * 1996-04-19 2000-04-25 Compagnie Du Sol Continuously reinforced diaphragm wall, method of construction and formwork therefor

Also Published As

Publication number Publication date
PT74933B (en) 1983-12-02
FR2506362A1 (en) 1982-11-26
AU546032B2 (en) 1985-08-08
FR2506362B1 (en) 1983-12-02
US4453862A (en) 1984-06-12
PT74933A (en) 1982-06-01
AU8224882A (en) 1982-11-25
JPS6245367B2 (en) 1987-09-26
JPS57197317A (en) 1982-12-03
DE3263860D1 (en) 1985-07-04
EP0066478B1 (en) 1985-05-29

Similar Documents

Publication Publication Date Title
EP2964837B1 (en) Method of making a diaphragm wall in a soil and wall produced by this method
CA1217349A (en) Engineering of reinforced concrete structures, such as tunnels, underpasses and the like, and precast concrete elements used in said engineering processes
KR19990072472A (en) Method, member, and tendon for constructing an anchoring device
CH642416A5 (en) METHOD OF CONSTRUCTING UNDERGROUND WORKS WITH VERTICAL WALLS, DEVICE FOR EXECUTING THE METHOD AND UNDERGROUND WORK.
EP0066478B1 (en) Method to assure the mechanical continuity between two adjoining panels of a reinforced concrete wall cast in the earth
KR100934608B1 (en) A steel wire anchoring device and precast box, the method of assembling precast box using the same
JP2010090608A (en) Method for constructing underground space and structure of the underground space
KR101045038B1 (en) Connecting Apparatus and Connecting Method of Precast Concrete Elements and Precast Concrete Element comprising the Connecting Apparatus
KR100388078B1 (en) Apparatus to repair and reinforce bridge and thereof method
FR2604744A1 (en) METHOD AND DEVICE FOR ANCHORING UNDER STRAIN
KR100775757B1 (en) Connecting structure for precast concrete box culvert segments using steel pipe
KR101925828B1 (en) Underground structure pressing system for reducing friction and construction method using the same
KR20100090550A (en) Connecting apparatus and connecting method of precast concrete elements and precast concrete element comprising the connecting apparatus
JP4958044B2 (en) Installation structure and installation method for shield tunnel approach
JP4912839B2 (en) Multiple arc-shaped tunnel construction method and tunnel-joint connection structure
CA2298343A1 (en) Shoring process using reinforcing pillars for a structure with side panels and pillar to that end
FR2524030A1 (en) Anchor head for progressively contracted composite tie rod - has truncated anchoring pin wedged into anchoring ring orifice
KR102255360B1 (en) Prestressed steel pipe structure and non-crackable construction method using the same
JP2001140592A (en) Tunnel lining segment and its construction method
KR200420494Y1 (en) precast concrete culvert block
JP2000178990A (en) Flexible structure type immersed tunnel and construction method therefor
JPH0251040B2 (en)
JPS61216914A (en) Method of fitting steel tubular pile with diagonal member or beam
EP1407085B1 (en) Method and device for creating a reinforced concrete wall in the ground
BE864136A (en) METHOD AND DEVICE FOR CONSTRUCTION IN THE SOIL OF VERTICAL WALLS FROM AN UNDERGROUND DUCT

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Designated state(s): BE CH DE FR GB NL

17P Request for examination filed

Effective date: 19830503

RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: SONDAGES INJECTIONS FORAGES S.I.F. ENTREPRISE BA

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Designated state(s): BE CH DE FR GB LI NL

REF Corresponds to:

Ref document number: 3263860

Country of ref document: DE

Date of ref document: 19850704

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed
PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 19921228

Year of fee payment: 12

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 19930323

Year of fee payment: 12

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: CH

Payment date: 19930329

Year of fee payment: 12

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: NL

Payment date: 19930331

Year of fee payment: 12

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: BE

Payment date: 19930414

Year of fee payment: 12

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 19930518

Year of fee payment: 12

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Effective date: 19940330

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Effective date: 19940331

Ref country code: CH

Effective date: 19940331

Ref country code: BE

Effective date: 19940331

BERE Be: lapsed

Owner name: SONDAGES INJECTIONS FORAGES -S.I.F.- ENTREPRISE B

Effective date: 19940331

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Effective date: 19941001

NLV4 Nl: lapsed or anulled due to non-payment of the annual fee
GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 19940330

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Effective date: 19941130

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Effective date: 19941201

REG Reference to a national code

Ref country code: FR

Ref legal event code: ST