EP0029044B1 - A method of carrying out slip form casting of concrete structures under water and apparatus for carrying out the method - Google Patents
A method of carrying out slip form casting of concrete structures under water and apparatus for carrying out the method Download PDFInfo
- Publication number
- EP0029044B1 EP0029044B1 EP80900972A EP80900972A EP0029044B1 EP 0029044 B1 EP0029044 B1 EP 0029044B1 EP 80900972 A EP80900972 A EP 80900972A EP 80900972 A EP80900972 A EP 80900972A EP 0029044 B1 EP0029044 B1 EP 0029044B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- slip form
- casting
- concrete
- form unit
- accordance
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
- 238000005266 casting Methods 0.000 title claims abstract description 81
- 238000000034 method Methods 0.000 title claims abstract description 24
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title claims abstract description 24
- 238000010276 construction Methods 0.000 claims abstract description 12
- 239000000725 suspension Substances 0.000 claims abstract description 9
- 230000003014 reinforcing effect Effects 0.000 claims description 13
- 230000002787 reinforcement Effects 0.000 claims description 11
- 239000004033 plastic Substances 0.000 claims description 3
- 230000003628 erosive effect Effects 0.000 claims description 2
- 239000004744 fabric Substances 0.000 claims 1
- 238000005406 washing Methods 0.000 claims 1
- 238000009751 slip forming Methods 0.000 description 10
- 238000009416 shuttering Methods 0.000 description 9
- 229910000831 Steel Inorganic materials 0.000 description 8
- 239000010959 steel Substances 0.000 description 8
- 230000002146 bilateral effect Effects 0.000 description 6
- 230000009194 climbing Effects 0.000 description 3
- 239000007787 solid Substances 0.000 description 3
- 229910001294 Reinforcing steel Inorganic materials 0.000 description 2
- 238000004873 anchoring Methods 0.000 description 2
- 230000000284 resting effect Effects 0.000 description 2
- 238000011109 contamination Methods 0.000 description 1
- 238000005260 corrosion Methods 0.000 description 1
- 230000007797 corrosion Effects 0.000 description 1
- 230000009189 diving Effects 0.000 description 1
- 238000009415 formwork Methods 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 238000011065 in-situ storage Methods 0.000 description 1
- 230000000977 initiatory effect Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 239000002990 reinforced plastic Substances 0.000 description 1
- 230000000630 rising effect Effects 0.000 description 1
- 239000013535 sea water Substances 0.000 description 1
- 230000003068 static effect Effects 0.000 description 1
- 239000002023 wood Substances 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D15/00—Handling building or like materials for hydraulic engineering or foundations
- E02D15/02—Handling of bulk concrete specially for foundation or hydraulic engineering purposes
- E02D15/06—Placing concrete under water
Definitions
- the present invention relates to a method and apparatus for performing underwater casting of concrete structures.
- Underwater casting of concrete structures such as foundations for piers, bridges, etc. conventionally is carried out with stationary shuttering which is fixed to the sea bottom or to a ready-made portion of the structure. Initially is usually cast a foundation bed on the sea bottom, subsequent to a suitable levelling thereof, whereafter the shuttering is mounted onto the foundation bed. In this fashion is carried out underwater casting of solid foundations such as columns and the like, with a shuttering which is exposed to external concrete pressure only, as well as wall structures and the like, whereby the shuttering must be formed for sustaining bilateral concrete pressures. Required reinforcement of the concrete structures must usually take place, at least partly, with the help of diving operators.
- poured concrete is usually brought down to the working location by means of so-called casting tubes conveying the poured concrete from a suitable source in position above water down into the shuttering.
- the reinforcement work is costly and cumbersome because the reinforcing elements, such as steel rods or mats, must be positioned downwards between cross-bracing elements which are interconnecting the shuttering elements.
- it is difficult to avoid that the reinforcing elements subsequent to positioning are displaced, for instance onto the shuttering boards, so that the reinforcing elements are subseqently exposed to seawater resulting in heavy corrosion. It would therefore be of great importance if a better and more dependable method for reinforcing such underwater concrete works could be developed.
- the principal object of the present invention is to provide a more effective method for carrying out casting of concrete structures below water.
- a further object for the invention is to provide better means and apparatus for carrying out various types of underwater concrete work.
- a particular object of the invention is to provide a method and apparatus which can make it easier and with less danger for the workers to carry out reinforcing of underwater concrete works.
- the slip forming equipment is usually moved as a unit which is supported and raised on so-called climbing steel elements which are located and in some cases embedded in the concrete structure.
- the climbing steel elements may consist of reinforcement steel rods or rods which are embedded in the concrete, or alternatively rods which are positioned loosely in piping which is embedded in the concrete.
- the reinforcing of concrete structures in connection with slip forming may be comparatively cumbersome, particularly if the work concerns slip form with bilateral concrete pressure, that is concrete walls or the like, since then one will have a number of cross-bracers above the casting between the slip form walls on either side. These cross-bracers interconnect and position the slip form boards, while they simultaneously serve as supporting elements for jack-up means which stand in engagement with the steel elements positioned in the concrete work.
- the reinforcing must then, under the concrete pouring, be positioned one after the other down into the concrete as poured between and below the superimposed cross-bracers.
- Vertically extending reinforcing is comparatively simple while horizontally extending reinforcement and the positioning of mats may be difficult and interconnection of the reinforcement elements must frequently be carried out in situ.
- Underwater casting of concrete by means of slip forming is, as far as is known, not hitherto carried out, at least not in full normal scale. This may be due to several reasons. Firstly, the development of underwater slip forming equipment requires the existence of equipment which is operable under water. Secondly, the reinforcement of underwater concrete works in connection with slip forming may of course be very difficult. The reinforcing of underwater concrete works must be mentioned usually be carried out by divers which in itself is expensive and dangerous, particularly due to very poor sight in the water due to water contamination in the vicinity of the working site.
- a method carrying out slip form casting of concrete structures, under water at a casting site on the sea bottom, wherein a unitary slip form unit surrounding the object to be cast is moved upwards in correspondence with the casting and the hardening velocity of the concrete mass while additional concrete is supplied from an above water supply through supply tubes or the like is characterized by the steps of initially suspending the slip form unit by means of a number of mutually spaced suspension stays each of which is connected to a support- and hoisting system positioned above water level above the casting site and thereafter lowering the slip form unit to the casting site, whereafter the slip form unit is hoisted upwards by means of the stays in correspondence with the supply of poured concrete and the hardening of same, which concrete is supplied continuously and at the same time as the slip form unit is raised, the slip form unit being directionally controlled and if necessary adjusted as to angular position during the casting by individual, coordinated adjustment of each of the suspension stays.
- Apparatus for carrying out such a method comprises a slip form unit, characterized in that the slip form unit is suspended from a number of individually adjustable and hoistable stays in the form of cables, pipe sections or the like, and which are connected to support- and hoisting systems positioned on an above water support construction, which support construction is immovably positioned in an above water position directly above the casting site.
- the slip form unit may be supported by an overhanging rigid horizontally extending structure which again is suspended in at least three vertical hangers or stays which each are connected to a separate power jack or the like.
- the slip form unit may not only be raised, but may be guided and directionally controlled by carrying out individual adjustment of one or more of the hangers by means of the raising jacks.
- This method makes it possible to carry out a far more effective underwater casting of concrete structures. Furthermore, it will make it far more simple to carry out reinforcement of the concrete works, because the slip form unit may, in an upward direction, remain more or less open without obstructions, disregarding some very few horizontally extending elements which, however, may be positioned well above the casting or pouring site, and in some cases horizontally extending supporting elements may be entirely avoided.
- the support structure in a position above the sea surface for supporting the slip form equipment may be of various types depending upon the kind of work involved, the sea depth, etc.
- the support structure may thus consist of a working platform of the jack-up type with legs, a centilevered structure mounted onto an existing foundation, or possibly also to a floating vessel, then preferably a vessel of semi-submersible type.
- the casting scaffolding or frame comprises a horizontal support or platform with a frame 2, in the shown embodiment comprising two side by side parallel hollow beams 4, 6, made as buoyancy elements. These beams are mutually connected with transverse hollow beams 8, 10.
- This platform structure is provided with four jackable supporting legs 12, 14, 16, 18, enabling same to be moved vertically down for support on the sea bottom for subsequent lifting of the platform structure to a position above the water surface directly above the working site.
- slip form unit 20 which in the shown embodiment consists of a square slip form frame 19 for singular or one-sided, internal concrete pressure (solid column) and which on the inside is furnished with slip form boards 25, which are positioned with a downward outward slip to facilitate the raising of the form work and prevent damage to the concrete surface.
- the slip form unit 20 is suspended on a rigid truss frame 22 which in the shown embodiment consists of two pairs of mutually crossing steel beam sections 23a and 23b, respectively.
- This design is aimed at obtaining large span widths between the sections 23 in the frame and plenty of height below the frame, that is the height h down to the casting site in order to facilitate the equipment for easy positioning of necessary reinforcements in the concrete, such as steel rods or steel mats.
- the entire slip from unit 20 is, at anchoring points 24, suspended in the number of vertical stays, in the shown embodiment comprising four pipe strings 27a-d, each preferably consisting of inter- threaded sections.
- these suspension stays are firmly engaged by so-called climbing jacks 30a-d (hydraulic/pneu- matic/electrical) which are operationally connected to a not shown control system, such that the stays can be raised at equal or/and different speeds in order to allow for individual adjustment in one or more of the stay suspension.
- climbing jacks 30a-d hydroaulic/pneu- matic/electrical
- This gear comprises a crane boom 38 with a travelling winch crane 40 to carry a concrete container 42 for delivery of ready-made poured concrete to a number of hoppers 44a, b, c, d, e, f, which are suspended in trolleys 45 from a transverse beam 47.
- Each of the hoppers carries a downwardly pointing so-called casting tube or hose 46a-f, respectively, which lead directly down to the casting site in the slip form unit 20.
- the above described aggregate or plant composes the main elements in an embodiment for an apparatus in order to carry out a method in accordance with the invention.
- the technical equipment involved can thus be conventional and should not be necessary to describe in detail.
- on the working platform 2 can be arranged a mixing plant for making ready-made poured concrete.
- the casting tubes or hoses 46a-f are suitably supplied in detachable sections in order to adjust the length of these tubes to the need at any stage of the casting operation.
- Figure 2 illustrates the entire aggregate in working position in order to initiate the casting job utilizing a method in accordance with the invention.
- the platform etc. is in advance floated out to the working site.
- the slip form unit 20 is raised up to a position between the hollow beams 8 and 10.
- the casting tubes 46 are obviously raised up.
- the jack-up legs 12, 14, 16, 18, are by means of the jack system moved down to resting locations 31, 31 on the sea bottom circumferentially around the casting site, and the platform 2 has been raised up to the above water position as shown.
- the sea bottom on the casting site is usually prepared, for instance levelled, and if necessary, a special bottom foundation of concrete is made, in such case preferably including a number of free-standing upwardly pointing reinforcing steel rods, firmly embedded into the bottom concrete foundation.
- the slip form unit has been sunk down onto the casting site. During this operation further sections of suspension stays are supplied as necessary.
- the slip form unit is in this fashion sunk down and positioned on the casting site. Simultaneously or subsequently the required number of casting tubes are sunk down and positioned as shown.
- the casting tubes can consist of rigid tubing or in part or wholly of flexible hosing, for instance reinforced plastic hosing.
- the slip form boards 25 are initially resting on the sea bottom or on the foundation 50 and may be firmly positioned utilizing upstanding reinforcing rods 52. This initial position is shown in Figure 2 (and 3a).
- the casting tubes 46a-f are filled with poured concrete from the hoppers on the platform deck 2. The poured concrete will, due to its gravity, fill out the tubing and initially flow out of the bottom openings of the tubes and will thereby soon fill up the surrounding slip form unit space until the pressure around the tubing openings equalizes the present static pressure in the tubings, cf. Figure 2b.
- the casting tubes may, if desired, in the bottom section be provided with remotely controlled check valves 33, among other things to prevent incidental, uncontrolled flow-out of poured concrete.
- Figure 3c illustrates a second stage during the casting procedure. At this stage the casting tubes 46 have been lifted up to a certain level corresponding approximately to half of the height of the form boards 25. The poured concrete in the casting tubes will in this position again flow out until the described automatic or internal locking takes place due to the pressure equalization. Reinforcing of the casting preferably takes place at intervals or rests in the supply of concrete. A supply of reinforcing rods or the like can be placed in a rack 53 mounted on the supporting beams 23, and these may also serve as working platform for divers during the work for positioning reinforcement 54 in the concrete as poured. When the concrete as poured has solidified or hardened to a sufficient degree one can initiate the raising of the slip form unit via the suspension stays by means of the jacks 30 positioned on the platform 2.
- skirt means 55 may be used boards made of wood or steel and they consist preferably of flexible material such as plastic sheeting or the like and the skirts are positioned as downwardly pointing extensions of the form plate boards.
- the required height of such skirt means will depend upon several factors, such as the hardening speed of the concrete, the flow conditions in the water, etc.
- Figures 3a-c is illustrated an embodiment for a such skirt means 55 wherein is used flexible curtains of plastic sheeting provided in the shape of one or more rolls 56.
- Figures 4 and 5 show a plan view and an elevation, respectively, illustrating schematically a slip form unit for carrying out bilateral concrete casting.
- the slip form unit comprises an internal and an external support structure 60, 62 to which is attached the slip form boards in the same fashion as shown in Figures 1 and 2.
- the slip form unit is here suspended on two horizontal support means 64 and 66, which are suitably further suspended by four vertical stays 68 in anchoring points 70. Also in this embodiment it will likewise be suitable to utilize a protection skirt or curtain (not shown) on the outside of the casting, but not on the inside.
- a suitable number of casting tubes 72, 72 are directed down between the slip form walls.
- a slip form unit with bilateral concrete pressure as shown can without particular difficulty be designed such that it has full opening in direction upwards, disregarding the shown port beams, and the positioning of reinforcements in the casting during the pouring of the concrete will fall relatively simple.
- Figure 6 shows an elevational view of an alternative set-up for carrying out the method, wherein the slip form unit and the lifting jacks 82 which otherwise can be similar to the equipment shown in Figures 1 and 2, are supported on a cantilever support 84 with a support foundation 86 which is anchored to an existing rigid foundation structure 88.
- the casting method otherwise will be identical to the one already described.
- the new foundation column or object can serve as foundation for a next casting work, etc.
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
- Curing Cements, Concrete, And Artificial Stone (AREA)
- Orthopedics, Nursing, And Contraception (AREA)
- Preparation Of Clay, And Manufacture Of Mixtures Containing Clay Or Cement (AREA)
- Producing Shaped Articles From Materials (AREA)
- Floor Finish (AREA)
Abstract
Description
- The present invention relates to a method and apparatus for performing underwater casting of concrete structures.
- Underwater casting of concrete structures, such as foundations for piers, bridges, etc. conventionally is carried out with stationary shuttering which is fixed to the sea bottom or to a ready-made portion of the structure. Initially is usually cast a foundation bed on the sea bottom, subsequent to a suitable levelling thereof, whereafter the shuttering is mounted onto the foundation bed. In this fashion is carried out underwater casting of solid foundations such as columns and the like, with a shuttering which is exposed to external concrete pressure only, as well as wall structures and the like, whereby the shuttering must be formed for sustaining bilateral concrete pressures. Required reinforcement of the concrete structures must usually take place, at least partly, with the help of diving operators. Poured concrete is usually brought down to the working location by means of so-called casting tubes conveying the poured concrete from a suitable source in position above water down into the shuttering. Particularly in connection with the casting of structures requiring bilateral concrete pressures on the shuttering, the reinforcement work is costly and cumbersome because the reinforcing elements, such as steel rods or mats, must be positioned downwards between cross-bracing elements which are interconnecting the shuttering elements. Frequently it is difficult to avoid that the reinforcing elements subsequent to positioning are displaced, for instance onto the shuttering boards, so that the reinforcing elements are subseqently exposed to seawater resulting in heavy corrosion. It would therefore be of great importance if a better and more dependable method for reinforcing such underwater concrete works could be developed.
- The principal object of the present invention is to provide a more effective method for carrying out casting of concrete structures below water.
- A further object for the invention is to provide better means and apparatus for carrying out various types of underwater concrete work.
- A particular object of the invention is to provide a method and apparatus which can make it easier and with less danger for the workers to carry out reinforcing of underwater concrete works.
- When forming concrete structures ashore it is today conventional to utilize the slip forming principle i.e. utilizing a slip form unit with a limited length or height which is moved continously in the casting direction parallel with the pouring and hardening of the supplied concrete. The slip forming equipment is usually moved as a unit which is supported and raised on so-called climbing steel elements which are located and in some cases embedded in the concrete structure. The climbing steel elements may consist of reinforcement steel rods or rods which are embedded in the concrete, or alternatively rods which are positioned loosely in piping which is embedded in the concrete. The reinforcing of concrete structures in connection with slip forming may be comparatively cumbersome, particularly if the work concerns slip form with bilateral concrete pressure, that is concrete walls or the like, since then one will have a number of cross-bracers above the casting between the slip form walls on either side. These cross-bracers interconnect and position the slip form boards, while they simultaneously serve as supporting elements for jack-up means which stand in engagement with the steel elements positioned in the concrete work. The reinforcing must then, under the concrete pouring, be positioned one after the other down into the concrete as poured between and below the superimposed cross-bracers. Vertically extending reinforcing is comparatively simple while horizontally extending reinforcement and the positioning of mats may be difficult and interconnection of the reinforcement elements must frequently be carried out in situ.
- Underwater casting of concrete by means of slip forming is, as far as is known, not hitherto carried out, at least not in full normal scale. This may be due to several reasons. Firstly, the development of underwater slip forming equipment requires the existence of equipment which is operable under water. Secondly, the reinforcement of underwater concrete works in connection with slip forming may of course be very difficult. The reinforcing of underwater concrete works must be mentioned usually be carried out by divers which in itself is expensive and dangerous, particularly due to very poor sight in the water due to water contamination in the vicinity of the working site.
- The casting of concrete structures under water is proposed in British patent specification No. 1,315,210. In this specification is shown a type of slip forming equipment with bilateral concrete pressure for the casting of hollow columns and which equipment is supported by a surface vessel by means of cables or the like. The lifting of the slip forming shall take place by means of special buoyancy tanks which are mounted between the shuttering walls and which provide suitable buoyancy force by supplying a controlled quantity of compressed air. As far as the applicants know, the method in accordance with this patent specification has hitherto not been carried out. The method apparently has several substantial shortcomings. Firstly, it is clear that the slip forming equipment may be subjected to incidental vertical movement in correspondence with the vertical movements of the floating vessel. Furthermore, it seems difficult to ensure that the slip forming equipment is given sufficiently secure and stable rising movements by means of the buoyancy equipment shown.
- In accordance with the present invention a method carrying out slip form casting of concrete structures, under water at a casting site on the sea bottom, wherein a unitary slip form unit surrounding the object to be cast is moved upwards in correspondence with the casting and the hardening velocity of the concrete mass while additional concrete is supplied from an above water supply through supply tubes or the like is characterized by the steps of initially suspending the slip form unit by means of a number of mutually spaced suspension stays each of which is connected to a support- and hoisting system positioned above water level above the casting site and thereafter lowering the slip form unit to the casting site, whereafter the slip form unit is hoisted upwards by means of the stays in correspondence with the supply of poured concrete and the hardening of same, which concrete is supplied continuously and at the same time as the slip form unit is raised, the slip form unit being directionally controlled and if necessary adjusted as to angular position during the casting by individual, coordinated adjustment of each of the suspension stays.
- Apparatus for carrying out such a method comprises a slip form unit, characterized in that the slip form unit is suspended from a number of individually adjustable and hoistable stays in the form of cables, pipe sections or the like, and which are connected to support- and hoisting systems positioned on an above water support construction, which support construction is immovably positioned in an above water position directly above the casting site.
- The slip form unit may be supported by an overhanging rigid horizontally extending structure which again is suspended in at least three vertical hangers or stays which each are connected to a separate power jack or the like. Thereby the exact position of the slip form unit will be, at any time, subject to full control, because in a lateral direction the slip form unit will be kept immovable by means of the below positioned hardened concrete still in contact with the slip form and vertically, the slip form unit may not only be raised, but may be guided and directionally controlled by carrying out individual adjustment of one or more of the hangers by means of the raising jacks.
- This method makes it possible to carry out a far more effective underwater casting of concrete structures. Furthermore, it will make it far more simple to carry out reinforcement of the concrete works, because the slip form unit may, in an upward direction, remain more or less open without obstructions, disregarding some very few horizontally extending elements which, however, may be positioned well above the casting or pouring site, and in some cases horizontally extending supporting elements may be entirely avoided.
- The support structure in a position above the sea surface for supporting the slip form equipment may be of various types depending upon the kind of work involved, the sea depth, etc. The support structure may thus consist of a working platform of the jack-up type with legs, a centilevered structure mounted onto an existing foundation, or possibly also to a floating vessel, then preferably a vessel of semi-submersible type.
- Examples of apparatus in accordance with the present invention will now be described with reference to the accompanying drawings, wherein:-
- Figures 1 and 2 are a schematic plan view and elevational view, respectively, showing a construction for carrying out the method according to the present invention, and Figure 2 showing the construction with the equipment in position for initiating the casting work;
- Figures 2a to 2e are simplified detail views illustrating the various steps in the procedure to carry out the casting work;
- Figures 3a to 3c are detail views, similar to Figures 2a to 2e, illustrating a method for protecting freshly poured concrete against erosion;
- Figures 4 and 5 show a schematic view and elevational view, respectively, of another example of a slip form unit; and,
- Figure 6 is an elevational view of a further example of the supporting construction including a cantilevered support from an existing foundation.
- The casting scaffolding or frame comprises a horizontal support or platform with a
frame 2, in the shown embodiment comprising two side by side parallelhollow beams 4, 6, made as buoyancy elements. These beams are mutually connected with transverse 8, 10. This platform structure is provided with fourhollow beams 12, 14, 16, 18, enabling same to be moved vertically down for support on the sea bottom for subsequent lifting of the platform structure to a position above the water surface directly above the working site. On the platform is installed the casting equipment, and the equipment for supporting and raising ajackable supporting legs slip form unit 20 which in the shown embodiment consists of a squareslip form frame 19 for singular or one-sided, internal concrete pressure (solid column) and which on the inside is furnished withslip form boards 25, which are positioned with a downward outward slip to facilitate the raising of the form work and prevent damage to the concrete surface. - The
slip form unit 20 is suspended on arigid truss frame 22 which in the shown embodiment consists of two pairs of mutually crossing 23a and 23b, respectively. This design is aimed at obtaining large span widths between the sections 23 in the frame and plenty of height below the frame, that is the height h down to the casting site in order to facilitate the equipment for easy positioning of necessary reinforcements in the concrete, such as steel rods or steel mats. The entire slip fromsteel beam sections unit 20 is, atanchoring points 24, suspended in the number of vertical stays, in the shown embodiment comprising four pipe strings 27a-d, each preferably consisting of inter- threaded sections. On theplatform 2 these suspension stays are firmly engaged by so-called climbing jacks 30a-d (hydraulic/pneu- matic/electrical) which are operationally connected to a not shown control system, such that the stays can be raised at equal or/and different speeds in order to allow for individual adjustment in one or more of the stay suspension. - On the
platform 2 is further installed acomplete casting gear 36. This gear comprises acrane boom 38 with atravelling winch crane 40 to carry aconcrete container 42 for delivery of ready-made poured concrete to a number of hoppers 44a, b, c, d, e, f, which are suspended introlleys 45 from atransverse beam 47. Each of the hoppers carries a downwardly pointing so-called casting tube or hose 46a-f, respectively, which lead directly down to the casting site in theslip form unit 20. - The above described aggregate or plant composes the main elements in an embodiment for an apparatus in order to carry out a method in accordance with the invention. The technical equipment involved can thus be conventional and should not be necessary to describe in detail. Thus, on the working
platform 2 can be arranged a mixing plant for making ready-made poured concrete. Furthermore, the casting tubes or hoses 46a-f are suitably supplied in detachable sections in order to adjust the length of these tubes to the need at any stage of the casting operation. - Figure 2 illustrates the entire aggregate in working position in order to initiate the casting job utilizing a method in accordance with the invention. The platform etc. is in advance floated out to the working site. Under the floating operation the
slip form unit 20 is raised up to a position between the 8 and 10. Furthermore, thehollow beams casting tubes 46 are obviously raised up. On the working site the jack-up 12, 14, 16, 18, are by means of the jack system moved down to restinglegs 31, 31 on the sea bottom circumferentially around the casting site, and thelocations platform 2 has been raised up to the above water position as shown. Of other preparatory works can be mentioned that the sea bottom on the casting site is usually prepared, for instance levelled, and if necessary, a special bottom foundation of concrete is made, in such case preferably including a number of free-standing upwardly pointing reinforcing steel rods, firmly embedded into the bottom concrete foundation. Thereafter the slip form unit has been sunk down onto the casting site. During this operation further sections of suspension stays are supplied as necessary. The slip form unit is in this fashion sunk down and positioned on the casting site. Simultaneously or subsequently the required number of casting tubes are sunk down and positioned as shown. The casting tubes can consist of rigid tubing or in part or wholly of flexible hosing, for instance reinforced plastic hosing. - The carrying out of the casting work shall now be described with reference to the detail views, Figures 2a-e, illustrating various stages during the casting operation. The
slip form boards 25 are initially resting on the sea bottom or on thefoundation 50 and may be firmly positioned utilizing upstanding reinforcingrods 52. This initial position is shown in Figure 2 (and 3a). The casting tubes 46a-f are filled with poured concrete from the hoppers on theplatform deck 2. The poured concrete will, due to its gravity, fill out the tubing and initially flow out of the bottom openings of the tubes and will thereby soon fill up the surrounding slip form unit space until the pressure around the tubing openings equalizes the present static pressure in the tubings, cf. Figure 2b. The casting tubes may, if desired, in the bottom section be provided with remotely controlledcheck valves 33, among other things to prevent incidental, uncontrolled flow-out of poured concrete. Figure 3c illustrates a second stage during the casting procedure. At this stage thecasting tubes 46 have been lifted up to a certain level corresponding approximately to half of the height of theform boards 25. The poured concrete in the casting tubes will in this position again flow out until the described automatic or internal locking takes place due to the pressure equalization. Reinforcing of the casting preferably takes place at intervals or rests in the supply of concrete. A supply of reinforcing rods or the like can be placed in arack 53 mounted on the supporting beams 23, and these may also serve as working platform for divers during the work for positioningreinforcement 54 in the concrete as poured. When the concrete as poured has solidified or hardened to a sufficient degree one can initiate the raising of the slip form unit via the suspension stays by means of thejacks 30 positioned on theplatform 2. - Partly to prevent leakages of poured concrete below the bottom edge of the slip form boards, and partly to protect the progressively exposed side surface of the cast concrete work, there is along the bottom edge of the slip form boards positioned downwardly pointing skirt means 55. As such protecting skirt means may be used boards made of wood or steel and they consist preferably of flexible material such as plastic sheeting or the like and the skirts are positioned as downwardly pointing extensions of the form plate boards. The required height of such skirt means will depend upon several factors, such as the hardening speed of the concrete, the flow conditions in the water, etc. In Figures 3a-c is illustrated an embodiment for a such skirt means 55 wherein is used flexible curtains of plastic sheeting provided in the shape of one or more rolls 56. The top edge of this sheeting is attached to the bottom edge of the
form boards 25. In correspondence with the raising of the slip form the curtain will roll off from the roll and position itself along the outside of the concrete as cast as is illustrated in Figures 3b and 3c. When the entire skirt or curtain has been rolled out one may at the lower edge of the curtain position a circumferentially running clamping frame or yoke or the like, such as indicated at thereference number 58. - Continued casting of the shown solid column may now take place more or less continously, since the slip form unit is raised in correspondence with the actual solidifying speed or hardening of the concrete as poured, simultaneously as poured concrete more or less continously is supplied to the slip form through the
casting tubes 46. - It is important to be able to supply poured concrete, and to raise the casting tubes as quickly as possible and also continously in order to avoid the danger of the casting pipes being more or less permanently embedded into the concrete as poured in the slip form. The same counts for the slip form unit, even though the slip form boards are positioned with a slip. Interruptions in the raising thereof may result in that the slip form boards adhere to the concrete mass and have in result a possibility of damage to the equipment and the casting work and other problems. In this method one may however utilize relatively large or high slip form boards normally without any risk of the boards adhering to the solidifying concrete surface. With regard to the skirt or
curtains 55, these are suitably given substantially the same height as the slip form boards. Otherwise, the vertical dimension of the slip form boards and the skirt will depend upon the dimensions of the casting work in question and other conditions. - It will be understood that this method can be carried out with various types of slip form unit and various types of casting equipment, etc.
- Figures 4 and 5 show a plan view and an elevation, respectively, illustrating schematically a slip form unit for carrying out bilateral concrete casting. The slip form unit comprises an internal and an
60, 62 to which is attached the slip form boards in the same fashion as shown in Figures 1 and 2. The slip form unit is here suspended on two horizontal support means 64 and 66, which are suitably further suspended by fourexternal support structure vertical stays 68 in anchoring points 70. Also in this embodiment it will likewise be suitable to utilize a protection skirt or curtain (not shown) on the outside of the casting, but not on the inside. A suitable number of 72, 72, are directed down between the slip form walls. A slip form unit with bilateral concrete pressure as shown can without particular difficulty be designed such that it has full opening in direction upwards, disregarding the shown port beams, and the positioning of reinforcements in the casting during the pouring of the concrete will fall relatively simple.casting tubes - Figure 6 shows an elevational view of an alternative set-up for carrying out the method, wherein the slip form unit and the lifting jacks 82 which otherwise can be similar to the equipment shown in Figures 1 and 2, are supported on a
cantilever support 84 with asupport foundation 86 which is anchored to an existingrigid foundation structure 88. The casting method otherwise will be identical to the one already described. When the casting work is completed up to height on level with the shown existingrigid foundation 88, the new foundation column or object can serve as foundation for a next casting work, etc.
Claims (13)
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| NO791798 | 1979-05-30 | ||
| NO791798A NO144361C (en) | 1979-05-30 | 1979-05-30 | PROCEDURE AND PLANT FOR EXECUTION OF SLIDE CASTING OF CONCRETE UNDER WATER |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| EP0029044A1 EP0029044A1 (en) | 1981-05-27 |
| EP0029044B1 true EP0029044B1 (en) | 1982-10-27 |
Family
ID=19884886
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| EP80900972A Expired EP0029044B1 (en) | 1979-05-30 | 1980-12-15 | A method of carrying out slip form casting of concrete structures under water and apparatus for carrying out the method |
Country Status (6)
| Country | Link |
|---|---|
| EP (1) | EP0029044B1 (en) |
| AT (1) | ATE1719T1 (en) |
| DE (1) | DE3060996D1 (en) |
| DK (1) | DK39481A (en) |
| NO (1) | NO144361C (en) |
| WO (1) | WO1980002708A1 (en) |
Families Citing this family (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB8328404D0 (en) * | 1983-10-24 | 1983-11-23 | Dixon R K | Concrete construction |
| FI94156C (en) * | 1993-12-08 | 1995-07-25 | Porvoon Vesirakennus Oy | A coating method utilized in a liquid medium and an apparatus for performing a coating in a liquid medium |
| SE516262C2 (en) * | 2000-04-11 | 2001-12-10 | Oyster Int Nv | Methods for making nuclear fuel storage containers and plant for carrying out the method |
| CN113152505B (en) * | 2021-02-19 | 2024-07-16 | 中交第二公路工程局有限公司 | Construction method of local bottom-sealing underwater super-large scale bearing platform combined box enclosure structure |
| CN114000525B (en) * | 2021-11-23 | 2023-08-22 | 中国二十二冶集团有限公司 | Construction method of underwater tie beam |
| CN117780276B (en) * | 2024-02-23 | 2024-05-24 | 山西一建集团有限公司 | Building pile foundation construction treatment device and operation method thereof |
| CN119640698B (en) * | 2025-01-20 | 2025-10-03 | 中交路桥建设有限公司 | Overwater pier stud pouring device and construction method thereof |
Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| FR1097630A (en) * | 1953-12-14 | 1955-07-07 | Entpr Fougerolle Pour Travaux | Method and device for placing concrete under water |
| US3611519A (en) * | 1968-06-17 | 1971-10-12 | Nils Folke Larsson | Machine for direct and continuous casting of concrete walls |
| GB1315210A (en) * | 1970-05-12 | 1973-05-02 | Simpson J | Casting concrete underwater |
Family Cites Families (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| SE33675C1 (en) * | 1912-10-16 | |||
| DE864146C (en) * | 1950-11-14 | 1953-01-22 | Bergwerks Und Huettenbau Ges M | Process for the production of piled walls |
| DK84819C (en) * | 1953-12-14 | 1958-05-05 | Entpr Fougerolle Pour Travaux | Method and plant for pouring concrete under water. |
| SE351885B (en) * | 1972-02-04 | 1972-12-11 | Interform Broedrene Pedersen A |
-
1979
- 1979-05-30 NO NO791798A patent/NO144361C/en unknown
-
1980
- 1980-05-30 DE DE8080900972T patent/DE3060996D1/en not_active Expired
- 1980-05-30 WO PCT/NO1980/000018 patent/WO1980002708A1/en not_active Ceased
- 1980-05-30 AT AT80900972T patent/ATE1719T1/en not_active IP Right Cessation
- 1980-12-15 EP EP80900972A patent/EP0029044B1/en not_active Expired
-
1981
- 1981-01-29 DK DK39481A patent/DK39481A/en not_active Application Discontinuation
Patent Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| FR1097630A (en) * | 1953-12-14 | 1955-07-07 | Entpr Fougerolle Pour Travaux | Method and device for placing concrete under water |
| US3611519A (en) * | 1968-06-17 | 1971-10-12 | Nils Folke Larsson | Machine for direct and continuous casting of concrete walls |
| GB1315210A (en) * | 1970-05-12 | 1973-05-02 | Simpson J | Casting concrete underwater |
Also Published As
| Publication number | Publication date |
|---|---|
| NO791798L (en) | 1980-12-02 |
| DK39481A (en) | 1981-01-29 |
| ATE1719T1 (en) | 1982-11-15 |
| WO1980002708A1 (en) | 1980-12-11 |
| DE3060996D1 (en) | 1982-12-02 |
| NO144361B (en) | 1981-05-04 |
| NO144361C (en) | 1981-08-12 |
| EP0029044A1 (en) | 1981-05-27 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN110397076B (en) | Construction method of deep-water large-diameter cast-in-place pile | |
| US4746245A (en) | Offshore drilling and/or production system | |
| CN113638417B (en) | Pile connection accurate positioning pouring system and construction method | |
| CN102251530A (en) | Construction process of double-wall steel cofferdam for construction of pier bearing platform in main river water of Yellow River | |
| CN113981961B (en) | Ship-type pile planting method for deepwater bare rock | |
| CN215562604U (en) | Pile connecting and pouring structure | |
| CN110644363A (en) | Construction method of underwater main tower of cross-river cable-stayed bridge of high-speed railway | |
| CN106812144A (en) | Double-wall steel cofferdam construction method | |
| CN212641437U (en) | Pile-forming orifice operation device for large-diameter ultra-deep cast-in-place pile | |
| CN110055984B (en) | Lowering construction method for double-wall deformed steel cofferdam | |
| CN109707002B (en) | Device and method for accurately positioning, sinking and installing large water intake head | |
| CN110952579A (en) | Double-wall steel hanging box cofferdam and construction method thereof | |
| CN111945714B (en) | Steel sleeve guiding method combined with steel upright column inserting construction method | |
| WO1980002708A1 (en) | A method for performing underwater casting of concrete structures,and an apparatus for carrying out the method | |
| CN112227369B (en) | Cover-excavation top-down construction permanent steel pipe stand column installation construction method | |
| CN210737541U (en) | Positioning device for lowering protective cylinder of underwater cast-in-place pile | |
| CN114000484A (en) | Self-anchored overwater operation platform and operation method | |
| CN212612381U (en) | Self-anchored overwater operation platform | |
| CN114016431B (en) | Positioning and mounting method for main pier support of steel truss arch | |
| JP2541897B2 (en) | Installation method of shallow water bowling turret and its turret device | |
| JP2741076B2 (en) | Construction method such as caisson | |
| CN111827262A (en) | Construction method of fold-line-shaped irregular underground continuous wall | |
| JP7050143B2 (en) | Sliding device and sliding support | |
| CN109706883B (en) | High pipe frame construction method for high-pile wharf | |
| CN119711495A (en) | Construction device and method for leveling support cushion concrete cushion block of underwater pouring structure |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
| 17P | Request for examination filed |
Effective date: 19810116 |
|
| AK | Designated contracting states |
Designated state(s): AT CH DE FR GB LU NL SE |
|
| GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
| AK | Designated contracting states |
Designated state(s): AT CH DE FR GB LU NL SE |
|
| REF | Corresponds to: |
Ref document number: 1719 Country of ref document: AT Date of ref document: 19821115 Kind code of ref document: T |
|
| REF | Corresponds to: |
Ref document number: 3060996 Country of ref document: DE Date of ref document: 19821202 |
|
| ET | Fr: translation filed | ||
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: LU Payment date: 19830525 Year of fee payment: 4 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 19830531 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: CH Payment date: 19840511 Year of fee payment: 5 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 19840530 Year of fee payment: 5 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 19840629 Year of fee payment: 5 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: SE Payment date: 19840630 Year of fee payment: 5 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: AT Payment date: 19860522 Year of fee payment: 7 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: NL Payment date: 19860531 Year of fee payment: 7 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AT Effective date: 19870530 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SE Effective date: 19870531 Ref country code: LI Effective date: 19870531 Ref country code: CH Effective date: 19870531 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Effective date: 19871201 |
|
| NLV4 | Nl: lapsed or anulled due to non-payment of the annual fee | ||
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 19880129 |
|
| REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Effective date: 19880202 |
|
| GBPC | Gb: european patent ceased through non-payment of renewal fee | ||
| REG | Reference to a national code |
Ref country code: FR Ref legal event code: ST |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 19881118 |
|
| EUG | Se: european patent has lapsed |
Ref document number: 80900972.3 Effective date: 19880601 |
|
| PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |