EP0004985B1 - Train de renouvellement d'une voie de chemin de fer - Google Patents

Train de renouvellement d'une voie de chemin de fer Download PDF

Info

Publication number
EP0004985B1
EP0004985B1 EP79200154A EP79200154A EP0004985B1 EP 0004985 B1 EP0004985 B1 EP 0004985B1 EP 79200154 A EP79200154 A EP 79200154A EP 79200154 A EP79200154 A EP 79200154A EP 0004985 B1 EP0004985 B1 EP 0004985B1
Authority
EP
European Patent Office
Prior art keywords
ballast
sleepers
track
wagon
train
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
EP79200154A
Other languages
German (de)
English (en)
French (fr)
Other versions
EP0004985A1 (fr
Inventor
Fritz Buhler
Frédy Scheuchzer
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
LES FILS D'AUGUSTE SCHEUCHZER SA
Original Assignee
LES FILS D'AUGUSTE SCHEUCHZER SA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LES FILS D'AUGUSTE SCHEUCHZER SA filed Critical LES FILS D'AUGUSTE SCHEUCHZER SA
Priority to DE8080200510T priority Critical patent/DE2966697D1/de
Publication of EP0004985A1 publication Critical patent/EP0004985A1/fr
Application granted granted Critical
Publication of EP0004985B1 publication Critical patent/EP0004985B1/fr
Expired legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00Laying, rebuilding, or taking-up tracks; Tools or machines therefor
    • E01B29/05Transporting, laying, removing, or renewing both rails and sleepers
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B27/00Placing, renewing, working, cleaning, or taking-up the ballast, with or without concurrent work on the track; Devices therefor; Packing sleepers
    • E01B27/06Renewing or cleaning the ballast in situ, with or without concurrent work on the track
    • E01B27/11Renewing or cleaning the ballast in situ, with or without concurrent work on the track combined with concurrent renewal of track components

Definitions

  • the present invention relates to a train for renewing a railway track, consisting of at least one train of work wagons and wagons for the transport of new and old materials, allowing at one time, by replacement and recovery materials, to renew railway tracks made up of rails and sleepers with the possibility of carrying out simultaneously and continuously all the phases ensuring the substitution of the materials constituting the railway tracks, the ream of work wagons comprising a drop wagon, a wagon stripping, a laying wagon, a wagon, and transporters of spent ballast to a screening machine installed on a wagon placed outside the renewal area, transporters bringing the screened ballast to a storage and distribution silo comprising regulating means for the distribution of the screened ballast on the new track, as well as transporters of the sleepers, or the old spans and t new sleepers arranged above at least one of the ballast carriers.
  • the renewal of a railroad includes, in addition to the replacement of rails and sleepers, the renewal of the ballast, because an old ballast, soiled with detritus and clogged no longer has the required elasticity and permeability properties.
  • the successive additions of gravel during the operations of rectification and stuffing of the sleepers have the effect of raising the track, which has serious drawbacks mainly when passing engineering structures.
  • stripping-screening of ballast is normally done before or after laying the new track. The duration of this operation is therefore added to that of the other renewal operations.
  • defamation-screening requires the lifting of the whole track by means of powerful machines, at the risk of deforming the new rails. Since the machines for stripping and screening the ballast are very large machines, their implementation is accompanied by long and complicated operations, both as regards their starting up and as regards their stopping.
  • patent CH - A - 583 822 which relates to a process for the complete renewal of a railway track, in which the course of the operations of removing the old track, stripping the screening of the ballast and laying the new track operates in a single pass of the complete renewal train, provided for this purpose.
  • the same patent also includes a train for the complete renewal of a railway track, comprising, in addition to the wagons for transporting the rails, sleepers and fasteners, at least one laying and removal train equipped with gantries, and frame wagons, as known from patents CH - A - 549,692 and CH - A - 585,814 of the same holder.
  • said renewal train are incorporated bodies for stripping and transporting the ballast to a screen installed on a wagon placed outside the renewal area.
  • the patent FR - A - 1 303 437 describes a device for laying and / or removing railway tracks, which essentially comprises a machine equipped with a door arrow -overhang to lift the rails and a monorail for the installation and removal of sleepers.
  • the machine runs on the part of the track not yet disassembled, when it comes to removing a track, or on the part of track already mounted, when it comes to laying a track.
  • the monorail for laying and removing crosspieces is placed in the axis of the machine and makes it possible to take or deposit crosspieces on a longitudinal conveyor, but since the monorail is placed in the axis of the track, there is no there is no room at its sides for the passage of means of transport of the ballast.
  • Patent DE-A-2 023 931 describes a track renewal train which works continuously, but in which the screening installation is placed in the area of the stripping itself. As a result, the length of the track replacement zone is extended by a length equal to the length of the screening plant. This is very unfavorable especially in hilly countries where the length of the site must be limited as much as possible.
  • This machine evacuates the old material to the front, while the new material is brought in from behind the train. The screen is located in the middle of the machine, the trash can only be removed on the sides of the track which is a big drawback.
  • the document FR - A - 1 602 279 describes a train consisting of a train of wagons for the transport of new and old materials, making it possible at one time, by replacement and recovery of materials, to renew railway tracks made up of rails and of sleepers with the possibility of carrying out simultaneously and continuously all the phases ensuring the subs titution of materials constituting the railways.
  • This train comprises means of transporting the sleepers which are arranged above at least one of the means of transporting the ballast. During the removal operations, the old track is lifted with its cross members assembled. Then it is necessary to dismantle the sleepers before being able to evacuate them, from which it follows that the working rhythm is determined by the dismantling speed of the sleepers, which is a drawback.
  • the object of the present invention is to eliminate the drawbacks which have just been listed, while retaining the advantage of transporting the excavated ballast to a screen installed on a wagon placed outside the work area, and to propose a renewal train improved in such a way that the removal operations of the old sleepers and the old rails or old spans, the excavation of the worn ballast, its screening, the laying of the new ballast, the new sleepers and the new rails are carried out continuously and simultaneously during the uninterrupted advance of the train.
  • the main problem that had to be solved was how to superimpose the transport of the excavated ballast, the recovered ballast, and the old sleepers alone or mounted on rail spans, so as not to encroach on the authorized gauge.
  • the present invention provides a renewal train which achieves the aim stated by the fact that to allow continuous renewal during the advance of the train, a train of working wagons, known per se, comprising a deposit wagon, a stripping wagon and a laying wagon, fitted with transporters for the old sleepers or spans, arranged above at least one of the ballast transporters, the deposit wagon comprising an elevating system which allows either to lift the old sleepers by pivoting them around a vertical axis in order to orient them in the longitudinal direction of the train to pass them at least next to the spent ballast transporter and place them transversely to the train on the old sleepers transporter located at - above this worn ballast transporter, either to lift and turn the old sleepers or a full span on a curved plane trajectory whose axis is parallel to the track, the axis of the sleepers remaining in a plane substantially perpendicular to the direction of the train, during rotation to place said sleepers or said span on a means of transport of the old sleepers
  • the main advantage obtained thanks to this invention resides in the reduction of the length of the site because the screening is done outside the work area, the trash can be easily removed without involving the sides of the track, and that it is possible to lift the spans or crosspieces previously dismantled, to pass them next to the ballast transporters to place them on the transporters of sleepers or spans for their evacuation, without encroaching on the width of the template authorized.
  • the renewal train consists of six main elements, shown schematically in the figure 1, or a screener, not shown, a deposit wagon 5, a stripping wagon 6, a laying wagon 7, a wagon of drawing and a gantry with transport beam, not shown.
  • the screening machine and the wagon are normal wagons with two bogies.
  • the deposit wagon 5, the stripping wagon 6 and the laying wagon 7 constitute an articulated train fitted with six bogies 12 to 17 and two tracked chassis 11 and 11 '.
  • the screening machine and the first bogie 12 of the deposit wagon 5 roll on the old track 1.
  • the central part of the train rests on the two track chassis 11 and 11 'which roll respectively on the ballast and on the excavated bench, or on the screened ballast.
  • the rear bogie 17 of the laying wagon 7 as well as the dowelling wagon roll on the new track 4.
  • the deposit wagon 5, FIGS. 1 and 2 is supported at the front on a bogie 12 and at the rear on a tracked chassis 11.
  • the conveyors 18 for the excavated material consisting essentially of the spent ballast and, above, the conveyors 19 for the recovered and screened ballast.
  • the removal and transport of the old sleepers is carried out using a hydraulic picker 20, chain conveyors 21, and a lifting system 22.
  • roller clamps known per se and not shown, lift and move aside the old rails 1 which are then routed along the machine to be deposited at the rear on the bench or in the axis of the way.
  • the hydraulic picker 20 takes out the old sleepers 32 one after the other from the ballast and places them on a chain conveyor 21 which brings them on a conveyor storage 21 '.
  • the lifting system 22 then lifts the turned sleepers 33 next to the spent ballast transporter 18 above the level of the sleeper transporter 23
  • the sleepers are then pivoted and turned forward 90 ° always parallel to the plane of the track, and they are then placed on the sleeper conveyor 23 to be routed to the transport gantries, not shown. After which the lifting system returns by the same path to its starting position.
  • All movements of the work cycle can be controlled automatically or manually.
  • the lifting system 22 may be arranged to lift and pivot, parallel to the plane of the track, the sleepers both around the spent ballast carriers 18 and the screened ballast carriers 19.
  • a rotary lifting system 43 provided with hydraulic grippers 44 mounted on a lifting system takes three sleepers on the storage conveyor and raises them against the lifting system.
  • the lifting system rotates the sleepers 180 ° on an axis parallel to the axis of the track around the spent ballast carriers 18 and screened ballast 19 and places them upside down on a transporter of the old sleepers, from where they are seized by a mobile conveyor 45 to be transported to the gantry cranes.
  • the rotary lifting system 43 After which the rotary lifting system 43 returns to its starting position. All cycle movements are controlled automatically or manually.
  • the rotary lifting system 43 can be provided for turning the sleepers only around the spent ballast conveyors 18 as in FIG. 3.
  • the deposition wagon 5 comprises a central beam 24 in which is housed one of the conveyors 18 for the spent ballast and at above, one of the transporters 19 for the screened and recovered ballast.
  • a rotary lifting system 26, equipped with a lifting system and a raceway 40 for lorrys 41 is suspended by means of rollers 27 on a central beam 24.
  • the lifting system consists of two pairs of rolling clamps 28 fixed on articulated frames 29, and jacks for lifting and lateral movement of the clamps.
  • the spans are rotated 180 ° on an axis parallel to the axis of the track and placed upside down on lorrys 41 which roll on the raceway 40.
  • the deposit wagon can be provided with a rotary lifting system 26 arranged to lift and rotate the spans both around the spent ballast 18 and screened ballast conveyors 19.
  • the dismantling of the spans can be carried out without interrupting the advance of the renewal train. While the next span is being taken, the one stored on the stripping wagon is advanced by another train of lorrys to the laying wagon where it is taken by gantry cranes and transported on loading wagons.
  • the stripping wagon 6 (fig. 1) is equipped with two bogies 14 and 15, an excavator 30, a ballast metering device and transport elements for the ballast, the sleepers or the spans. This wagon is connected at the head to the laying wagon 5 and at the tail to the laying wagon 7. During work, the stripper relies on the two tracked chassis 11 and 11 'which run on the old ballast and the excavated bench, or on the screened ballast.
  • the excavator 30 (fig. 7) consists of an excavation chain, and a leveling blade 25.
  • the excavator is articulated to the chassis and suspended by hydraulic cylinders which allow the working depth to be adjusted the tilt of the platform.
  • the blade 25 is provided with adjustable side flaps during work using the hydraulic cylinders. Behind the leveling blade can be placed groomers to compact the platform.
  • the excavated material is brought by the excavation chains on the conveyors 18 to be conveyed to the screener.
  • the recovered and screened ballast is then brought back by the transporters 19 to the rear of the train in the metered ballast doser which consists of a fixed silo and a metering element adjustable in height according to the layers of ballast required.
  • the ballast is brought to the doser to form the first layer of ballast and the surplus is put on an intermediate conveyor to be evacuated to the ballast distributor on the laying wagon.
  • Behind the dispenser a tamper is placed to compact the ballast before the installation of the sleepers.
  • the present invention proposes a transport link established at will but, preferably automatically at each stop of the train. For this, is placed between the carriers of the screened ballast 19 and the spent ballast 18, a funnel 31 placed as close as possible to the excavator.
  • the transport link which creates a closed circuit between the screened and spent ballast is carried out by moving one of the screened ballast transporters 19 'using a hydraulic cylinder 39 when the machine stops (fig. 7 ).
  • the laying wagon 7 provided with two bogies 16 and 17 is equipped with members for laying sleepers with the transport elements, members for laying the rails and the ballast distributor.
  • the wagon leans forward on the tracked chassis 11 'and back on the bogie 17 which rolls on the new track 4.
  • the new rail laying members comprising roller clamps.
  • the new sleepers, stored on transport wagons are transported by gantry cranes to the storage transporter of the hauling wagon.
  • the intermediate transporter spreads the crosspieces and brings them to tweezers at the end of the laying wagon.
  • the clamps lift and turn two crosspieces at the same time, place them on the longitudinal conveyor divided into several sections for intermediate storage.
  • the longitudinal conveyor routes the sleepers to the laying device where they are centered, positioned and then laid on the ballast.
  • the installation distance is regulated by a measuring system which allows the distance to be varied from cm to cm.
  • the lateral positioning of the sleepers is carried out either by means of a probe which controls the distance between the axis of the sleepers and the parallel track, or by the measurement and control system on the work wagons.
  • the train also includes a drawing wagon, not shown, equipped with a storage transporter for the new sleepers, and with drawing wrenches for mounting the fastenings of the new rails.
  • a drawing wagon for gantry cranes.
  • the wagon is dimensioned in such a way that, inside, the staff can mount the rail fasteners.
  • the train also includes two self-propelled gantry cranes, according to patent CH - A - 549,692 which transport the old and new sleepers between the work wagons and the transport wagons.
  • the two gantries are connected to each other by a central beam to which is suspended, by means of cables and hydraulic jacks, a beam for transporting the sleepers. It is fitted with hydraulically operated clamps for picking up sleepers or spans.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Machines For Laying And Maintaining Railways (AREA)
EP79200154A 1978-04-19 1979-04-02 Train de renouvellement d'une voie de chemin de fer Expired EP0004985B1 (fr)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE8080200510T DE2966697D1 (en) 1978-04-19 1979-04-02 Train for the renewal of a railway track

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CH4178/78 1978-04-19
CH417878A CH620005A5 (et) 1978-04-19 1978-04-19

Related Child Applications (1)

Application Number Title Priority Date Filing Date
EP80200510.8 Division-Into 1980-06-02

Publications (2)

Publication Number Publication Date
EP0004985A1 EP0004985A1 (fr) 1979-10-31
EP0004985B1 true EP0004985B1 (fr) 1981-09-02

Family

ID=4271247

Family Applications (2)

Application Number Title Priority Date Filing Date
EP79200154A Expired EP0004985B1 (fr) 1978-04-19 1979-04-02 Train de renouvellement d'une voie de chemin de fer
EP80200510A Expired EP0019984B1 (fr) 1978-04-19 1979-04-02 Train de renouvellement d'une voie de chemin de fer

Family Applications After (1)

Application Number Title Priority Date Filing Date
EP80200510A Expired EP0019984B1 (fr) 1978-04-19 1979-04-02 Train de renouvellement d'une voie de chemin de fer

Country Status (6)

Country Link
US (2) US4307667A (et)
EP (2) EP0004985B1 (et)
AT (1) AT363113B (et)
CA (1) CA1131502A (et)
CH (1) CH620005A5 (et)
ES (1) ES479737A1 (et)

Families Citing this family (42)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT370151B (de) * 1981-03-04 1983-03-10 Plasser Bahnbaumasch Franz Schotterbett-reinigungsmaschine und hartschaumplatten-verlegung
DE3265499D1 (en) * 1982-02-09 1985-09-26 Scheuchzer Fils Auguste Railway track reconditioning train
IT1179729B (it) * 1984-07-10 1987-09-16 Enrico Valditerra Convoglio per il rinnovamento di strade ferrate
US4571825A (en) * 1984-07-20 1986-02-25 Skibsted Eric T M Railroad track removing apparatus
US5793846A (en) 1985-07-10 1998-08-11 Ronald A. Katz Technology Licensing, Lp Telephonic-interface game control system
US5898762A (en) * 1985-07-10 1999-04-27 Ronald A. Katz Technology Licensing, L.P. Telephonic-interface statistical analysis system
US5828734A (en) 1985-07-10 1998-10-27 Ronald A. Katz Technology Licensing, Lp Telephone interface call processing system with call selectivity
US6678360B1 (en) 1985-07-10 2004-01-13 Ronald A. Katz Technology Licensing, L.P. Telephonic-interface statistical analysis system
GB8517409D0 (en) * 1985-07-10 1985-08-14 Trailer Train Ltd Adapter
US4845739A (en) * 1985-07-10 1989-07-04 Fdr Interactive Technologies Telephonic-interface statistical analysis system
US5359645A (en) 1985-07-10 1994-10-25 First Data Corporation Inc. Voice-data telephonic interface control system
US20020085692A1 (en) * 1985-07-10 2002-07-04 Ronald A. Katz Technology Licensing, L.P. Voice-data telephonic interface control system
US20020034283A1 (en) * 1987-02-24 2002-03-21 Ronald A. Katz Technology Licensing, L.P. Voice-data telephonic interface control system
US5012413A (en) * 1988-07-27 1991-04-30 Pandrol Jackson, Inc. Railroad track curve lining apparatus and method
EP0466651B1 (fr) * 1990-07-13 1995-09-06 Scheuchzer S.A. Dispositif pour la substitution des rails des voies de chemins de fer
CH686144A5 (fr) * 1991-10-30 1996-01-15 Matisa Materiel Ind Sa Train de renouvellement d'une voie ferree.
DE9305927U1 (de) * 1993-04-20 1994-05-26 Franz Plasser Bahnbaumaschinen-Industriegesellschaft M.B.H., Wien Maschine zum Erneuern bzw. Verlegen eines Eisenbahngleises
FR2757817B1 (fr) * 1997-01-02 1999-02-26 Gec Alsthom Transport Sa Dispositif et procede de commande des dispositifs actionneurs pour la suspension active des vehicules, notamment ferroviaires
DE10008986A1 (de) * 2000-02-25 2001-08-30 Gsg Knape Gleissanierung Gmbh Verfahren zur Erneuerung oder zum Umbau einer Gleisanlage und Vorrichtung hierfür
AT3919U3 (de) * 2000-07-13 2001-08-27 Plasser Bahnbaumasch Franz Maschine zum abbau eines alten und verlegen eines neuen gleises
US6546878B1 (en) 2001-10-12 2003-04-15 Gunderson, Inc. Multi-unit railroad freight car for carrying cargo containers
US6510800B1 (en) * 2001-10-12 2003-01-28 Gunderson, Inc. Multi-unit railroad freight car for carrying cargo containers between container well units
AT5769U3 (de) * 2002-09-05 2003-09-25 Plasser Bahnbaumasch Franz Maschine zum abbau und verlegen eines gleises und verfahren
US7350467B2 (en) 2004-08-20 2008-04-01 Loram Maintenance Of Way, Inc. Long rail pick-up and delivery system
US20060277093A1 (en) * 2005-05-26 2006-12-07 Barnhouse William Iii System and method of automatic polling
US20080053332A1 (en) * 2006-08-30 2008-03-06 John Roy Apparatus for enabling an excavator to mount, demount and travel on railroad tracks
US20090101042A1 (en) * 2006-08-30 2009-04-23 Glyde-Rail Licensing, Llc Apparatus for enabling an excavator to mount, demount and travel on railroad tracks
US7607396B2 (en) 2007-11-14 2009-10-27 Gunderson Llc Container car side sills
DE102008026873B4 (de) * 2008-06-05 2012-02-02 Ralf Zürcher Arbeitswagen
US7757610B2 (en) 2008-07-30 2010-07-20 Gunderson Llc Shortened container well
AT507333B1 (de) * 2008-10-09 2011-09-15 Hans Kuenz Ges M B H Portalkran
US8291592B2 (en) * 2010-03-17 2012-10-23 Gunderson Llc Method of lengthening a container well of a railcar
EP2374931B1 (de) * 2010-03-31 2017-03-22 Ralf Zürcher Sanierverfahren für den mehrschichtigen Unterbau bei Bahnstrecken
US8177461B2 (en) 2010-04-09 2012-05-15 Gunderson Llc Transport and storage of wheelsets
AT11972U1 (de) * 2010-08-02 2011-08-15 Plasser Bahnbaumasch Franz Anlage zur reinigung einer schotterbettung
DE102012017997A1 (de) * 2012-09-12 2014-04-10 Zürcher Holding GmbH Verfahren zur Erstellung und/oder Sanierung einer Bahnstrecke
DE102012220916A1 (de) * 2012-11-15 2014-05-15 K&K Maschinenentwicklungs GmbH & Co. KG Verfahren zum Neuherstellen, Sanieren oder Rückbauen einer Schienenfahrbahn
AT513248B1 (de) * 2012-12-11 2014-03-15 Plasser Bahnbaumasch Franz Verfahren und Maschine zur Reinigung von Schotter eines Gleises
FR3009724B1 (fr) * 2013-08-19 2016-02-05 Etf Procede de remplacement de rails et engins ferroviaires associes.
CH708506B1 (de) * 2013-09-05 2017-11-30 Matisa Matériel Ind Sa Fahrzeugverband und Verfahren zur Erneuerung eines Gleises.
AT516628B1 (de) * 2015-02-06 2016-07-15 Plasser & Theurer Export Von Bahnbaumaschinen Gmbh Verfahren zur Erneuerung eines Gleises
CN115056813B (zh) * 2022-05-12 2023-06-09 中车唐山机车车辆有限公司 轨道车辆用柔性化工艺转向架托头微调机构及工艺转向架

Family Cites Families (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR655775A (fr) * 1928-01-05 1929-04-23 Procédé et appareillage pour la pose et la dépose des voies ferrées
US2036535A (en) * 1933-02-21 1936-04-07 Charles A Nelson Method of and apparatus for transporting goods
FR1003105A (fr) * 1946-12-04 1952-03-14 Perfectionnements apportés aux procédés et dispositifs mécaniques pour le renouvellement des voies ferrées
US2997001A (en) * 1956-03-03 1961-08-22 Andre Scheuchzer Method of repairing railway tracks and an installation for carrying out the same
AT239295B (de) * 1960-10-27 1965-03-25 Plasser Bahnbaumasch Franz Verfahren und Einrichtung zum Erneuern von Gleisen
FR1303502A (fr) * 1961-07-07 1962-09-14 S E C O Machine perfectionnée pour la réfection des voies ferrées
FR1303437A (fr) * 1961-10-12 1962-09-07 Plasser Bahnbaumasch Franz Perfectionnements apportés aux dispositifs pour la pose ou l'enlèvement des voies ferrées
DE1261155B (de) * 1963-10-23 1968-02-15 Talbot Waggonfab Schienengebundene Zugeinheit zum Transport langer, schwerer Ladegueter, insbesonderevon Gleisjochen
FR1602279A (et) * 1968-01-08 1970-11-02
AU2109367A (en) * 1968-06-03 1970-01-29 Alfons Neumann Heinz Improvements inthe laying of railway track
AT313341B (de) * 1969-10-07 1974-02-11 Plasser Bahnbaumasch Franz Fahrbare Einrichtung zum kontinuierlichen Auswechseln bzw. Erneuern eines Gleises
CH528634A (fr) * 1971-06-02 1972-09-30 Matisa Materiel Ind Sa Machine de chantier pour traiter le ballast des voies ferrées
CH583822A5 (et) * 1974-07-11 1977-01-14 Scheuchzer Auguste Les Fils De
AT346887B (de) * 1976-10-15 1978-04-15 Plasser Bahnbaumasch Franz Fahrbare einrichtung zum kontinuierlichen auswechseln eines aus schienen und quer- schwellen bestehenden gleises

Also Published As

Publication number Publication date
US4428296A (en) 1984-01-31
EP0004985A1 (fr) 1979-10-31
ATA295279A (de) 1980-12-15
EP0019984B1 (fr) 1984-02-15
EP0019984A1 (fr) 1980-12-10
CH620005A5 (et) 1980-10-31
CA1131502A (fr) 1982-09-14
AT363113B (de) 1981-07-10
ES479737A1 (es) 1980-01-01
US4307667A (en) 1981-12-29

Similar Documents

Publication Publication Date Title
EP0004985B1 (fr) Train de renouvellement d'une voie de chemin de fer
FR2487394A1 (fr) Installation mobile pour l'assainissement du soutenement des voies ferrees et procede d'assainissement obtenu avec une telle installation
FR2473575A1 (fr) Installation mobile servant a l'assainissement de l'infrastructure des voies ferrees et procede d'execution de l'assainissement a l'aide d'une telle installation
EP3892776A1 (fr) Mécanisme de déplacement en va-et-vient de piles de traverses et véhicule ferroviaire comprenant un tel mécanisme
EP0168103A2 (fr) Rame ferroviaire pour le renouvellement de voies ferrées
FR2713679A1 (fr) Train de travaux pour remplacer des traverses anciennes d'une voie ferrée par des traverses neuves et procédé pour la mise en Óoeuvre de celui-ci .
WO1990014470A1 (fr) Procede pour le soudage en continu de tronçons de rail, et rame equipee pour sa mise en ×uvre
FR2519924A1 (fr) Installation deplacable sur rails pour le transport de deblais
FR2480815A1 (fr) Machine de construction des voies ferrees comprenant un dispositif pour deblayer et aplanir la couche de ballast
FR2780993A1 (fr) Procede et dispositif de pose d'element de voie par des lorries a chenilles
EP2791421B1 (fr) Wagon pousseur de rails et procédé de pose de rails
WO2013144489A1 (fr) Wagon de transport de granulats double flux
EP0168101A2 (fr) Rame ferroviaire pour le renouvellement de voies ferrées, pourvue de moyens de support et de guidage de l'avancement
EP0061227B1 (fr) Régaleuse à ballast mobile sur voie
FR2535359A1 (fr) Procede de remplacement de voies ferrees et cadre de manutention pour sa mise en oeuvre
FR2773345A1 (fr) Systeme de deroulage et de pose de fils tels que notamment de cables d'alimentation catenaires
CH655333A5 (fr) Machine roulante pour excaver le ballast des voies ferrees.
WO2015025092A1 (fr) Procede de remplacement de rails et engins ferroviaires associes
EP3892775A1 (fr) Wagon de transfert de traverses et véhicule ferroviaire associé
CH309855A (fr) Wagon-crible pour l'épuration continue du ballast des voies ferrées.
EP0085790B1 (fr) Train pour effectuer le renouvellement d'une voie de chemin de fer
CA2046868C (fr) Dispositif de propulsion pour une rame pour le renouvellement de voies ferrees
FR2551781A1 (fr) Procede et appareil pour le remodelage en continu d'un ballast de chemin de fer
FR2561275A1 (fr) Procede de renouvellement des appareils de voie ferree et dispositif de mise en oeuvre
FR2564117A1 (fr) Procede et appareillage de renouvellement d'appareils de voie ferree

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Designated state(s): BE DE FR GB IT LU NL SE

17P Request for examination filed
ITF It: translation for a ep patent filed
GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Designated state(s): BE DE FR GB IT LU NL SE

REF Corresponds to:

Ref document number: 2960719

Country of ref document: DE

Date of ref document: 19811126

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 19820430

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 19890228

Year of fee payment: 11

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: SE

Payment date: 19890410

Year of fee payment: 11

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: LU

Payment date: 19890428

Year of fee payment: 11

Ref country code: BE

Payment date: 19890428

Year of fee payment: 11

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: NL

Payment date: 19890430

Year of fee payment: 11

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 19900303

Year of fee payment: 12

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Effective date: 19900402

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SE

Effective date: 19900403

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 19900420

Year of fee payment: 12

ITTA It: last paid annual fee
PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Effective date: 19900430

BERE Be: lapsed

Owner name: LES FILS D'AUGUSTE SCHEUCHZER S.A.

Effective date: 19900430

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Effective date: 19901101

GBPC Gb: european patent ceased through non-payment of renewal fee
NLV4 Nl: lapsed or anulled due to non-payment of the annual fee
PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Effective date: 19911230

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Effective date: 19920201

REG Reference to a national code

Ref country code: FR

Ref legal event code: ST

EUG Se: european patent has lapsed

Ref document number: 79200154.7

Effective date: 19910110

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT