EP0004985B1 - Train de renouvellement d'une voie de chemin de fer - Google Patents
Train de renouvellement d'une voie de chemin de fer Download PDFInfo
- Publication number
- EP0004985B1 EP0004985B1 EP79200154A EP79200154A EP0004985B1 EP 0004985 B1 EP0004985 B1 EP 0004985B1 EP 79200154 A EP79200154 A EP 79200154A EP 79200154 A EP79200154 A EP 79200154A EP 0004985 B1 EP0004985 B1 EP 0004985B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- ballast
- sleepers
- track
- wagon
- train
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
- 239000000463 material Substances 0.000 claims description 14
- 238000003860 storage Methods 0.000 claims description 8
- 241001669679 Eleotris Species 0.000 claims description 6
- 230000001172 regenerating effect Effects 0.000 claims 1
- 238000012421 spiking Methods 0.000 claims 1
- 238000012216 screening Methods 0.000 description 11
- 239000000969 carrier Substances 0.000 description 7
- 238000009412 basement excavation Methods 0.000 description 5
- 238000009434 installation Methods 0.000 description 5
- 239000010813 municipal solid waste Substances 0.000 description 3
- 238000005096 rolling process Methods 0.000 description 3
- 230000003028 elevating effect Effects 0.000 description 2
- 238000011084 recovery Methods 0.000 description 2
- 230000001105 regulatory effect Effects 0.000 description 2
- 238000006467 substitution reaction Methods 0.000 description 2
- 238000007792 addition Methods 0.000 description 1
- 230000008021 deposition Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005265 energy consumption Methods 0.000 description 1
- 238000012432 intermediate storage Methods 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000035699 permeability Effects 0.000 description 1
- 230000033764 rhythmic process Effects 0.000 description 1
- 239000000523 sample Substances 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B29/00—Laying, rebuilding, or taking-up tracks; Tools or machines therefor
- E01B29/05—Transporting, laying, removing, or renewing both rails and sleepers
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B27/00—Placing, renewing, working, cleaning, or taking-up the ballast, with or without concurrent work on the track; Devices therefor; Packing sleepers
- E01B27/06—Renewing or cleaning the ballast in situ, with or without concurrent work on the track
- E01B27/11—Renewing or cleaning the ballast in situ, with or without concurrent work on the track combined with concurrent renewal of track components
Definitions
- the present invention relates to a train for renewing a railway track, consisting of at least one train of work wagons and wagons for the transport of new and old materials, allowing at one time, by replacement and recovery materials, to renew railway tracks made up of rails and sleepers with the possibility of carrying out simultaneously and continuously all the phases ensuring the substitution of the materials constituting the railway tracks, the ream of work wagons comprising a drop wagon, a wagon stripping, a laying wagon, a wagon, and transporters of spent ballast to a screening machine installed on a wagon placed outside the renewal area, transporters bringing the screened ballast to a storage and distribution silo comprising regulating means for the distribution of the screened ballast on the new track, as well as transporters of the sleepers, or the old spans and t new sleepers arranged above at least one of the ballast carriers.
- the renewal of a railroad includes, in addition to the replacement of rails and sleepers, the renewal of the ballast, because an old ballast, soiled with detritus and clogged no longer has the required elasticity and permeability properties.
- the successive additions of gravel during the operations of rectification and stuffing of the sleepers have the effect of raising the track, which has serious drawbacks mainly when passing engineering structures.
- stripping-screening of ballast is normally done before or after laying the new track. The duration of this operation is therefore added to that of the other renewal operations.
- defamation-screening requires the lifting of the whole track by means of powerful machines, at the risk of deforming the new rails. Since the machines for stripping and screening the ballast are very large machines, their implementation is accompanied by long and complicated operations, both as regards their starting up and as regards their stopping.
- patent CH - A - 583 822 which relates to a process for the complete renewal of a railway track, in which the course of the operations of removing the old track, stripping the screening of the ballast and laying the new track operates in a single pass of the complete renewal train, provided for this purpose.
- the same patent also includes a train for the complete renewal of a railway track, comprising, in addition to the wagons for transporting the rails, sleepers and fasteners, at least one laying and removal train equipped with gantries, and frame wagons, as known from patents CH - A - 549,692 and CH - A - 585,814 of the same holder.
- said renewal train are incorporated bodies for stripping and transporting the ballast to a screen installed on a wagon placed outside the renewal area.
- the patent FR - A - 1 303 437 describes a device for laying and / or removing railway tracks, which essentially comprises a machine equipped with a door arrow -overhang to lift the rails and a monorail for the installation and removal of sleepers.
- the machine runs on the part of the track not yet disassembled, when it comes to removing a track, or on the part of track already mounted, when it comes to laying a track.
- the monorail for laying and removing crosspieces is placed in the axis of the machine and makes it possible to take or deposit crosspieces on a longitudinal conveyor, but since the monorail is placed in the axis of the track, there is no there is no room at its sides for the passage of means of transport of the ballast.
- Patent DE-A-2 023 931 describes a track renewal train which works continuously, but in which the screening installation is placed in the area of the stripping itself. As a result, the length of the track replacement zone is extended by a length equal to the length of the screening plant. This is very unfavorable especially in hilly countries where the length of the site must be limited as much as possible.
- This machine evacuates the old material to the front, while the new material is brought in from behind the train. The screen is located in the middle of the machine, the trash can only be removed on the sides of the track which is a big drawback.
- the document FR - A - 1 602 279 describes a train consisting of a train of wagons for the transport of new and old materials, making it possible at one time, by replacement and recovery of materials, to renew railway tracks made up of rails and of sleepers with the possibility of carrying out simultaneously and continuously all the phases ensuring the subs titution of materials constituting the railways.
- This train comprises means of transporting the sleepers which are arranged above at least one of the means of transporting the ballast. During the removal operations, the old track is lifted with its cross members assembled. Then it is necessary to dismantle the sleepers before being able to evacuate them, from which it follows that the working rhythm is determined by the dismantling speed of the sleepers, which is a drawback.
- the object of the present invention is to eliminate the drawbacks which have just been listed, while retaining the advantage of transporting the excavated ballast to a screen installed on a wagon placed outside the work area, and to propose a renewal train improved in such a way that the removal operations of the old sleepers and the old rails or old spans, the excavation of the worn ballast, its screening, the laying of the new ballast, the new sleepers and the new rails are carried out continuously and simultaneously during the uninterrupted advance of the train.
- the main problem that had to be solved was how to superimpose the transport of the excavated ballast, the recovered ballast, and the old sleepers alone or mounted on rail spans, so as not to encroach on the authorized gauge.
- the present invention provides a renewal train which achieves the aim stated by the fact that to allow continuous renewal during the advance of the train, a train of working wagons, known per se, comprising a deposit wagon, a stripping wagon and a laying wagon, fitted with transporters for the old sleepers or spans, arranged above at least one of the ballast transporters, the deposit wagon comprising an elevating system which allows either to lift the old sleepers by pivoting them around a vertical axis in order to orient them in the longitudinal direction of the train to pass them at least next to the spent ballast transporter and place them transversely to the train on the old sleepers transporter located at - above this worn ballast transporter, either to lift and turn the old sleepers or a full span on a curved plane trajectory whose axis is parallel to the track, the axis of the sleepers remaining in a plane substantially perpendicular to the direction of the train, during rotation to place said sleepers or said span on a means of transport of the old sleepers
- the main advantage obtained thanks to this invention resides in the reduction of the length of the site because the screening is done outside the work area, the trash can be easily removed without involving the sides of the track, and that it is possible to lift the spans or crosspieces previously dismantled, to pass them next to the ballast transporters to place them on the transporters of sleepers or spans for their evacuation, without encroaching on the width of the template authorized.
- the renewal train consists of six main elements, shown schematically in the figure 1, or a screener, not shown, a deposit wagon 5, a stripping wagon 6, a laying wagon 7, a wagon of drawing and a gantry with transport beam, not shown.
- the screening machine and the wagon are normal wagons with two bogies.
- the deposit wagon 5, the stripping wagon 6 and the laying wagon 7 constitute an articulated train fitted with six bogies 12 to 17 and two tracked chassis 11 and 11 '.
- the screening machine and the first bogie 12 of the deposit wagon 5 roll on the old track 1.
- the central part of the train rests on the two track chassis 11 and 11 'which roll respectively on the ballast and on the excavated bench, or on the screened ballast.
- the rear bogie 17 of the laying wagon 7 as well as the dowelling wagon roll on the new track 4.
- the deposit wagon 5, FIGS. 1 and 2 is supported at the front on a bogie 12 and at the rear on a tracked chassis 11.
- the conveyors 18 for the excavated material consisting essentially of the spent ballast and, above, the conveyors 19 for the recovered and screened ballast.
- the removal and transport of the old sleepers is carried out using a hydraulic picker 20, chain conveyors 21, and a lifting system 22.
- roller clamps known per se and not shown, lift and move aside the old rails 1 which are then routed along the machine to be deposited at the rear on the bench or in the axis of the way.
- the hydraulic picker 20 takes out the old sleepers 32 one after the other from the ballast and places them on a chain conveyor 21 which brings them on a conveyor storage 21 '.
- the lifting system 22 then lifts the turned sleepers 33 next to the spent ballast transporter 18 above the level of the sleeper transporter 23
- the sleepers are then pivoted and turned forward 90 ° always parallel to the plane of the track, and they are then placed on the sleeper conveyor 23 to be routed to the transport gantries, not shown. After which the lifting system returns by the same path to its starting position.
- All movements of the work cycle can be controlled automatically or manually.
- the lifting system 22 may be arranged to lift and pivot, parallel to the plane of the track, the sleepers both around the spent ballast carriers 18 and the screened ballast carriers 19.
- a rotary lifting system 43 provided with hydraulic grippers 44 mounted on a lifting system takes three sleepers on the storage conveyor and raises them against the lifting system.
- the lifting system rotates the sleepers 180 ° on an axis parallel to the axis of the track around the spent ballast carriers 18 and screened ballast 19 and places them upside down on a transporter of the old sleepers, from where they are seized by a mobile conveyor 45 to be transported to the gantry cranes.
- the rotary lifting system 43 After which the rotary lifting system 43 returns to its starting position. All cycle movements are controlled automatically or manually.
- the rotary lifting system 43 can be provided for turning the sleepers only around the spent ballast conveyors 18 as in FIG. 3.
- the deposition wagon 5 comprises a central beam 24 in which is housed one of the conveyors 18 for the spent ballast and at above, one of the transporters 19 for the screened and recovered ballast.
- a rotary lifting system 26, equipped with a lifting system and a raceway 40 for lorrys 41 is suspended by means of rollers 27 on a central beam 24.
- the lifting system consists of two pairs of rolling clamps 28 fixed on articulated frames 29, and jacks for lifting and lateral movement of the clamps.
- the spans are rotated 180 ° on an axis parallel to the axis of the track and placed upside down on lorrys 41 which roll on the raceway 40.
- the deposit wagon can be provided with a rotary lifting system 26 arranged to lift and rotate the spans both around the spent ballast 18 and screened ballast conveyors 19.
- the dismantling of the spans can be carried out without interrupting the advance of the renewal train. While the next span is being taken, the one stored on the stripping wagon is advanced by another train of lorrys to the laying wagon where it is taken by gantry cranes and transported on loading wagons.
- the stripping wagon 6 (fig. 1) is equipped with two bogies 14 and 15, an excavator 30, a ballast metering device and transport elements for the ballast, the sleepers or the spans. This wagon is connected at the head to the laying wagon 5 and at the tail to the laying wagon 7. During work, the stripper relies on the two tracked chassis 11 and 11 'which run on the old ballast and the excavated bench, or on the screened ballast.
- the excavator 30 (fig. 7) consists of an excavation chain, and a leveling blade 25.
- the excavator is articulated to the chassis and suspended by hydraulic cylinders which allow the working depth to be adjusted the tilt of the platform.
- the blade 25 is provided with adjustable side flaps during work using the hydraulic cylinders. Behind the leveling blade can be placed groomers to compact the platform.
- the excavated material is brought by the excavation chains on the conveyors 18 to be conveyed to the screener.
- the recovered and screened ballast is then brought back by the transporters 19 to the rear of the train in the metered ballast doser which consists of a fixed silo and a metering element adjustable in height according to the layers of ballast required.
- the ballast is brought to the doser to form the first layer of ballast and the surplus is put on an intermediate conveyor to be evacuated to the ballast distributor on the laying wagon.
- Behind the dispenser a tamper is placed to compact the ballast before the installation of the sleepers.
- the present invention proposes a transport link established at will but, preferably automatically at each stop of the train. For this, is placed between the carriers of the screened ballast 19 and the spent ballast 18, a funnel 31 placed as close as possible to the excavator.
- the transport link which creates a closed circuit between the screened and spent ballast is carried out by moving one of the screened ballast transporters 19 'using a hydraulic cylinder 39 when the machine stops (fig. 7 ).
- the laying wagon 7 provided with two bogies 16 and 17 is equipped with members for laying sleepers with the transport elements, members for laying the rails and the ballast distributor.
- the wagon leans forward on the tracked chassis 11 'and back on the bogie 17 which rolls on the new track 4.
- the new rail laying members comprising roller clamps.
- the new sleepers, stored on transport wagons are transported by gantry cranes to the storage transporter of the hauling wagon.
- the intermediate transporter spreads the crosspieces and brings them to tweezers at the end of the laying wagon.
- the clamps lift and turn two crosspieces at the same time, place them on the longitudinal conveyor divided into several sections for intermediate storage.
- the longitudinal conveyor routes the sleepers to the laying device where they are centered, positioned and then laid on the ballast.
- the installation distance is regulated by a measuring system which allows the distance to be varied from cm to cm.
- the lateral positioning of the sleepers is carried out either by means of a probe which controls the distance between the axis of the sleepers and the parallel track, or by the measurement and control system on the work wagons.
- the train also includes a drawing wagon, not shown, equipped with a storage transporter for the new sleepers, and with drawing wrenches for mounting the fastenings of the new rails.
- a drawing wagon for gantry cranes.
- the wagon is dimensioned in such a way that, inside, the staff can mount the rail fasteners.
- the train also includes two self-propelled gantry cranes, according to patent CH - A - 549,692 which transport the old and new sleepers between the work wagons and the transport wagons.
- the two gantries are connected to each other by a central beam to which is suspended, by means of cables and hydraulic jacks, a beam for transporting the sleepers. It is fitted with hydraulically operated clamps for picking up sleepers or spans.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Machines For Laying And Maintaining Railways (AREA)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE8080200510T DE2966697D1 (en) | 1978-04-19 | 1979-04-02 | Train for the renewal of a railway track |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CH4178/78 | 1978-04-19 | ||
CH417878A CH620005A5 (et) | 1978-04-19 | 1978-04-19 |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP80200510.8 Division-Into | 1980-06-02 |
Publications (2)
Publication Number | Publication Date |
---|---|
EP0004985A1 EP0004985A1 (fr) | 1979-10-31 |
EP0004985B1 true EP0004985B1 (fr) | 1981-09-02 |
Family
ID=4271247
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP79200154A Expired EP0004985B1 (fr) | 1978-04-19 | 1979-04-02 | Train de renouvellement d'une voie de chemin de fer |
EP80200510A Expired EP0019984B1 (fr) | 1978-04-19 | 1979-04-02 | Train de renouvellement d'une voie de chemin de fer |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP80200510A Expired EP0019984B1 (fr) | 1978-04-19 | 1979-04-02 | Train de renouvellement d'une voie de chemin de fer |
Country Status (6)
Country | Link |
---|---|
US (2) | US4307667A (et) |
EP (2) | EP0004985B1 (et) |
AT (1) | AT363113B (et) |
CA (1) | CA1131502A (et) |
CH (1) | CH620005A5 (et) |
ES (1) | ES479737A1 (et) |
Families Citing this family (42)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AT370151B (de) * | 1981-03-04 | 1983-03-10 | Plasser Bahnbaumasch Franz | Schotterbett-reinigungsmaschine und hartschaumplatten-verlegung |
DE3265499D1 (en) * | 1982-02-09 | 1985-09-26 | Scheuchzer Fils Auguste | Railway track reconditioning train |
IT1179729B (it) * | 1984-07-10 | 1987-09-16 | Enrico Valditerra | Convoglio per il rinnovamento di strade ferrate |
US4571825A (en) * | 1984-07-20 | 1986-02-25 | Skibsted Eric T M | Railroad track removing apparatus |
US5793846A (en) | 1985-07-10 | 1998-08-11 | Ronald A. Katz Technology Licensing, Lp | Telephonic-interface game control system |
US5898762A (en) * | 1985-07-10 | 1999-04-27 | Ronald A. Katz Technology Licensing, L.P. | Telephonic-interface statistical analysis system |
US5828734A (en) | 1985-07-10 | 1998-10-27 | Ronald A. Katz Technology Licensing, Lp | Telephone interface call processing system with call selectivity |
US6678360B1 (en) | 1985-07-10 | 2004-01-13 | Ronald A. Katz Technology Licensing, L.P. | Telephonic-interface statistical analysis system |
GB8517409D0 (en) * | 1985-07-10 | 1985-08-14 | Trailer Train Ltd | Adapter |
US4845739A (en) * | 1985-07-10 | 1989-07-04 | Fdr Interactive Technologies | Telephonic-interface statistical analysis system |
US5359645A (en) | 1985-07-10 | 1994-10-25 | First Data Corporation Inc. | Voice-data telephonic interface control system |
US20020085692A1 (en) * | 1985-07-10 | 2002-07-04 | Ronald A. Katz Technology Licensing, L.P. | Voice-data telephonic interface control system |
US20020034283A1 (en) * | 1987-02-24 | 2002-03-21 | Ronald A. Katz Technology Licensing, L.P. | Voice-data telephonic interface control system |
US5012413A (en) * | 1988-07-27 | 1991-04-30 | Pandrol Jackson, Inc. | Railroad track curve lining apparatus and method |
EP0466651B1 (fr) * | 1990-07-13 | 1995-09-06 | Scheuchzer S.A. | Dispositif pour la substitution des rails des voies de chemins de fer |
CH686144A5 (fr) * | 1991-10-30 | 1996-01-15 | Matisa Materiel Ind Sa | Train de renouvellement d'une voie ferree. |
DE9305927U1 (de) * | 1993-04-20 | 1994-05-26 | Franz Plasser Bahnbaumaschinen-Industriegesellschaft M.B.H., Wien | Maschine zum Erneuern bzw. Verlegen eines Eisenbahngleises |
FR2757817B1 (fr) * | 1997-01-02 | 1999-02-26 | Gec Alsthom Transport Sa | Dispositif et procede de commande des dispositifs actionneurs pour la suspension active des vehicules, notamment ferroviaires |
DE10008986A1 (de) * | 2000-02-25 | 2001-08-30 | Gsg Knape Gleissanierung Gmbh | Verfahren zur Erneuerung oder zum Umbau einer Gleisanlage und Vorrichtung hierfür |
AT3919U3 (de) * | 2000-07-13 | 2001-08-27 | Plasser Bahnbaumasch Franz | Maschine zum abbau eines alten und verlegen eines neuen gleises |
US6546878B1 (en) | 2001-10-12 | 2003-04-15 | Gunderson, Inc. | Multi-unit railroad freight car for carrying cargo containers |
US6510800B1 (en) * | 2001-10-12 | 2003-01-28 | Gunderson, Inc. | Multi-unit railroad freight car for carrying cargo containers between container well units |
AT5769U3 (de) * | 2002-09-05 | 2003-09-25 | Plasser Bahnbaumasch Franz | Maschine zum abbau und verlegen eines gleises und verfahren |
US7350467B2 (en) | 2004-08-20 | 2008-04-01 | Loram Maintenance Of Way, Inc. | Long rail pick-up and delivery system |
US20060277093A1 (en) * | 2005-05-26 | 2006-12-07 | Barnhouse William Iii | System and method of automatic polling |
US20080053332A1 (en) * | 2006-08-30 | 2008-03-06 | John Roy | Apparatus for enabling an excavator to mount, demount and travel on railroad tracks |
US20090101042A1 (en) * | 2006-08-30 | 2009-04-23 | Glyde-Rail Licensing, Llc | Apparatus for enabling an excavator to mount, demount and travel on railroad tracks |
US7607396B2 (en) | 2007-11-14 | 2009-10-27 | Gunderson Llc | Container car side sills |
DE102008026873B4 (de) * | 2008-06-05 | 2012-02-02 | Ralf Zürcher | Arbeitswagen |
US7757610B2 (en) | 2008-07-30 | 2010-07-20 | Gunderson Llc | Shortened container well |
AT507333B1 (de) * | 2008-10-09 | 2011-09-15 | Hans Kuenz Ges M B H | Portalkran |
US8291592B2 (en) * | 2010-03-17 | 2012-10-23 | Gunderson Llc | Method of lengthening a container well of a railcar |
EP2374931B1 (de) * | 2010-03-31 | 2017-03-22 | Ralf Zürcher | Sanierverfahren für den mehrschichtigen Unterbau bei Bahnstrecken |
US8177461B2 (en) | 2010-04-09 | 2012-05-15 | Gunderson Llc | Transport and storage of wheelsets |
AT11972U1 (de) * | 2010-08-02 | 2011-08-15 | Plasser Bahnbaumasch Franz | Anlage zur reinigung einer schotterbettung |
DE102012017997A1 (de) * | 2012-09-12 | 2014-04-10 | Zürcher Holding GmbH | Verfahren zur Erstellung und/oder Sanierung einer Bahnstrecke |
DE102012220916A1 (de) * | 2012-11-15 | 2014-05-15 | K&K Maschinenentwicklungs GmbH & Co. KG | Verfahren zum Neuherstellen, Sanieren oder Rückbauen einer Schienenfahrbahn |
AT513248B1 (de) * | 2012-12-11 | 2014-03-15 | Plasser Bahnbaumasch Franz | Verfahren und Maschine zur Reinigung von Schotter eines Gleises |
FR3009724B1 (fr) * | 2013-08-19 | 2016-02-05 | Etf | Procede de remplacement de rails et engins ferroviaires associes. |
CH708506B1 (de) * | 2013-09-05 | 2017-11-30 | Matisa Matériel Ind Sa | Fahrzeugverband und Verfahren zur Erneuerung eines Gleises. |
AT516628B1 (de) * | 2015-02-06 | 2016-07-15 | Plasser & Theurer Export Von Bahnbaumaschinen Gmbh | Verfahren zur Erneuerung eines Gleises |
CN115056813B (zh) * | 2022-05-12 | 2023-06-09 | 中车唐山机车车辆有限公司 | 轨道车辆用柔性化工艺转向架托头微调机构及工艺转向架 |
Family Cites Families (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR655775A (fr) * | 1928-01-05 | 1929-04-23 | Procédé et appareillage pour la pose et la dépose des voies ferrées | |
US2036535A (en) * | 1933-02-21 | 1936-04-07 | Charles A Nelson | Method of and apparatus for transporting goods |
FR1003105A (fr) * | 1946-12-04 | 1952-03-14 | Perfectionnements apportés aux procédés et dispositifs mécaniques pour le renouvellement des voies ferrées | |
US2997001A (en) * | 1956-03-03 | 1961-08-22 | Andre Scheuchzer | Method of repairing railway tracks and an installation for carrying out the same |
AT239295B (de) * | 1960-10-27 | 1965-03-25 | Plasser Bahnbaumasch Franz | Verfahren und Einrichtung zum Erneuern von Gleisen |
FR1303502A (fr) * | 1961-07-07 | 1962-09-14 | S E C O | Machine perfectionnée pour la réfection des voies ferrées |
FR1303437A (fr) * | 1961-10-12 | 1962-09-07 | Plasser Bahnbaumasch Franz | Perfectionnements apportés aux dispositifs pour la pose ou l'enlèvement des voies ferrées |
DE1261155B (de) * | 1963-10-23 | 1968-02-15 | Talbot Waggonfab | Schienengebundene Zugeinheit zum Transport langer, schwerer Ladegueter, insbesonderevon Gleisjochen |
FR1602279A (et) * | 1968-01-08 | 1970-11-02 | ||
AU2109367A (en) * | 1968-06-03 | 1970-01-29 | Alfons Neumann Heinz | Improvements inthe laying of railway track |
AT313341B (de) * | 1969-10-07 | 1974-02-11 | Plasser Bahnbaumasch Franz | Fahrbare Einrichtung zum kontinuierlichen Auswechseln bzw. Erneuern eines Gleises |
CH528634A (fr) * | 1971-06-02 | 1972-09-30 | Matisa Materiel Ind Sa | Machine de chantier pour traiter le ballast des voies ferrées |
CH583822A5 (et) * | 1974-07-11 | 1977-01-14 | Scheuchzer Auguste Les Fils De | |
AT346887B (de) * | 1976-10-15 | 1978-04-15 | Plasser Bahnbaumasch Franz | Fahrbare einrichtung zum kontinuierlichen auswechseln eines aus schienen und quer- schwellen bestehenden gleises |
-
1978
- 1978-04-19 CH CH417878A patent/CH620005A5/fr not_active IP Right Cessation
-
1979
- 1979-04-02 EP EP79200154A patent/EP0004985B1/fr not_active Expired
- 1979-04-02 EP EP80200510A patent/EP0019984B1/fr not_active Expired
- 1979-04-17 US US06/030,818 patent/US4307667A/en not_active Expired - Lifetime
- 1979-04-17 CA CA325,764A patent/CA1131502A/fr not_active Expired
- 1979-04-19 AT AT0295279A patent/AT363113B/de not_active IP Right Cessation
- 1979-04-19 ES ES479737A patent/ES479737A1/es not_active Expired
-
1981
- 1981-08-04 US US06/289,902 patent/US4428296A/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
US4428296A (en) | 1984-01-31 |
EP0004985A1 (fr) | 1979-10-31 |
ATA295279A (de) | 1980-12-15 |
EP0019984B1 (fr) | 1984-02-15 |
EP0019984A1 (fr) | 1980-12-10 |
CH620005A5 (et) | 1980-10-31 |
CA1131502A (fr) | 1982-09-14 |
AT363113B (de) | 1981-07-10 |
ES479737A1 (es) | 1980-01-01 |
US4307667A (en) | 1981-12-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP0004985B1 (fr) | Train de renouvellement d'une voie de chemin de fer | |
FR2487394A1 (fr) | Installation mobile pour l'assainissement du soutenement des voies ferrees et procede d'assainissement obtenu avec une telle installation | |
FR2473575A1 (fr) | Installation mobile servant a l'assainissement de l'infrastructure des voies ferrees et procede d'execution de l'assainissement a l'aide d'une telle installation | |
EP3892776A1 (fr) | Mécanisme de déplacement en va-et-vient de piles de traverses et véhicule ferroviaire comprenant un tel mécanisme | |
EP0168103A2 (fr) | Rame ferroviaire pour le renouvellement de voies ferrées | |
FR2713679A1 (fr) | Train de travaux pour remplacer des traverses anciennes d'une voie ferrée par des traverses neuves et procédé pour la mise en Óoeuvre de celui-ci . | |
WO1990014470A1 (fr) | Procede pour le soudage en continu de tronçons de rail, et rame equipee pour sa mise en ×uvre | |
FR2519924A1 (fr) | Installation deplacable sur rails pour le transport de deblais | |
FR2480815A1 (fr) | Machine de construction des voies ferrees comprenant un dispositif pour deblayer et aplanir la couche de ballast | |
FR2780993A1 (fr) | Procede et dispositif de pose d'element de voie par des lorries a chenilles | |
EP2791421B1 (fr) | Wagon pousseur de rails et procédé de pose de rails | |
WO2013144489A1 (fr) | Wagon de transport de granulats double flux | |
EP0168101A2 (fr) | Rame ferroviaire pour le renouvellement de voies ferrées, pourvue de moyens de support et de guidage de l'avancement | |
EP0061227B1 (fr) | Régaleuse à ballast mobile sur voie | |
FR2535359A1 (fr) | Procede de remplacement de voies ferrees et cadre de manutention pour sa mise en oeuvre | |
FR2773345A1 (fr) | Systeme de deroulage et de pose de fils tels que notamment de cables d'alimentation catenaires | |
CH655333A5 (fr) | Machine roulante pour excaver le ballast des voies ferrees. | |
WO2015025092A1 (fr) | Procede de remplacement de rails et engins ferroviaires associes | |
EP3892775A1 (fr) | Wagon de transfert de traverses et véhicule ferroviaire associé | |
CH309855A (fr) | Wagon-crible pour l'épuration continue du ballast des voies ferrées. | |
EP0085790B1 (fr) | Train pour effectuer le renouvellement d'une voie de chemin de fer | |
CA2046868C (fr) | Dispositif de propulsion pour une rame pour le renouvellement de voies ferrees | |
FR2551781A1 (fr) | Procede et appareil pour le remodelage en continu d'un ballast de chemin de fer | |
FR2561275A1 (fr) | Procede de renouvellement des appareils de voie ferree et dispositif de mise en oeuvre | |
FR2564117A1 (fr) | Procede et appareillage de renouvellement d'appareils de voie ferree |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
AK | Designated contracting states |
Designated state(s): BE DE FR GB IT LU NL SE |
|
17P | Request for examination filed | ||
ITF | It: translation for a ep patent filed | ||
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Designated state(s): BE DE FR GB IT LU NL SE |
|
REF | Corresponds to: |
Ref document number: 2960719 Country of ref document: DE Date of ref document: 19811126 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 19820430 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 19890228 Year of fee payment: 11 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: SE Payment date: 19890410 Year of fee payment: 11 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: LU Payment date: 19890428 Year of fee payment: 11 Ref country code: BE Payment date: 19890428 Year of fee payment: 11 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: NL Payment date: 19890430 Year of fee payment: 11 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 19900303 Year of fee payment: 12 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Effective date: 19900402 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SE Effective date: 19900403 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 19900420 Year of fee payment: 12 |
|
ITTA | It: last paid annual fee | ||
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Effective date: 19900430 |
|
BERE | Be: lapsed |
Owner name: LES FILS D'AUGUSTE SCHEUCHZER S.A. Effective date: 19900430 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Effective date: 19901101 |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee | ||
NLV4 | Nl: lapsed or anulled due to non-payment of the annual fee | ||
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Effective date: 19911230 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Effective date: 19920201 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: ST |
|
EUG | Se: european patent has lapsed |
Ref document number: 79200154.7 Effective date: 19910110 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |