EA200970305A1 - Способ для прогнозирования добычи нефтяного пласта-коллектора с использованием генетического программирования - Google Patents
Способ для прогнозирования добычи нефтяного пласта-коллектора с использованием генетического программированияInfo
- Publication number
- EA200970305A1 EA200970305A1 EA200970305A EA200970305A EA200970305A1 EA 200970305 A1 EA200970305 A1 EA 200970305A1 EA 200970305 A EA200970305 A EA 200970305A EA 200970305 A EA200970305 A EA 200970305A EA 200970305 A1 EA200970305 A1 EA 200970305A1
- Authority
- EA
- Eurasian Patent Office
- Prior art keywords
- genetic programming
- predicting
- manifold
- production
- oil layer
- Prior art date
Links
- 230000002068 genetic effect Effects 0.000 title abstract 3
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06N—COMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
- G06N3/00—Computing arrangements based on biological models
- G06N3/12—Computing arrangements based on biological models using genetic models
- G06N3/126—Evolutionary algorithms, e.g. genetic algorithms or genetic programming
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
- G01V20/00—Geomodelling in general
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
- G01V2210/00—Details of seismic processing or analysis
- G01V2210/60—Analysis
- G01V2210/66—Subsurface modeling
- G01V2210/663—Modeling production-induced effects
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Physics & Mathematics (AREA)
- Mining & Mineral Resources (AREA)
- Geology (AREA)
- Biophysics (AREA)
- Health & Medical Sciences (AREA)
- Theoretical Computer Science (AREA)
- Evolutionary Biology (AREA)
- Geochemistry & Mineralogy (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Bioinformatics & Computational Biology (AREA)
- Bioinformatics & Cheminformatics (AREA)
- Fluid Mechanics (AREA)
- Environmental & Geological Engineering (AREA)
- Evolutionary Computation (AREA)
- Molecular Biology (AREA)
- Computing Systems (AREA)
- General Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Mathematical Physics (AREA)
- Software Systems (AREA)
- General Health & Medical Sciences (AREA)
- Data Mining & Analysis (AREA)
- Computational Linguistics (AREA)
- Biomedical Technology (AREA)
- Artificial Intelligence (AREA)
- Genetics & Genomics (AREA)
- Physiology (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Способ, использующий генетическое программирование для создания вспомогательных заместителей прогнозирования воспроизведения истории (фиг.1, В1 16 & Bl 18) для имитаторов пласта-коллектора. Действуя в качестве заменителей для компьютерных имитаторов, заместители генетического программирования оценивают большое количество моделей пласта-коллектора (фиг.1, В124) и предсказывают прогнозы будущей добычи для нефтяных пластов-коллекторов (фиг.1, Bl 30).
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US11/533,550 US7657494B2 (en) | 2006-09-20 | 2006-09-20 | Method for forecasting the production of a petroleum reservoir utilizing genetic programming |
PCT/US2007/078772 WO2008036664A2 (en) | 2006-09-20 | 2007-09-18 | Forecasting petroleum reservoir production using genetic algorithms |
Publications (1)
Publication Number | Publication Date |
---|---|
EA200970305A1 true EA200970305A1 (ru) | 2009-10-30 |
Family
ID=39201204
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EA200970305A EA200970305A1 (ru) | 2006-09-20 | 2007-09-18 | Способ для прогнозирования добычи нефтяного пласта-коллектора с использованием генетического программирования |
Country Status (9)
Country | Link |
---|---|
US (1) | US7657494B2 (ru) |
EP (1) | EP2064630A4 (ru) |
CN (1) | CN101517560A (ru) |
AU (1) | AU2007299906A1 (ru) |
BR (1) | BRPI0716865A2 (ru) |
CA (1) | CA2662245A1 (ru) |
EA (1) | EA200970305A1 (ru) |
NO (1) | NO20091536L (ru) |
WO (1) | WO2008036664A2 (ru) |
Families Citing this family (72)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7584165B2 (en) * | 2003-01-30 | 2009-09-01 | Landmark Graphics Corporation | Support apparatus, method and system for real time operations and maintenance |
US7725302B2 (en) * | 2003-12-02 | 2010-05-25 | Schlumberger Technology Corporation | Method and system and program storage device for generating an SWPM-MDT workflow in response to a user objective and executing the workflow to produce a reservoir response model |
AU2007207497B8 (en) * | 2006-01-20 | 2013-05-16 | Landmark Graphics Corporation | Dynamic production system management |
WO2008033439A2 (en) | 2006-09-13 | 2008-03-20 | Aurilab, Llc | Robust pattern recognition system and method using socratic agents |
US8437996B2 (en) | 2007-12-13 | 2013-05-07 | Exxonmobil Upstream Research Company | Parallel adaptive data partitioning on a reservoir simulation using an unstructured grid |
US9043189B2 (en) * | 2009-07-29 | 2015-05-26 | ExxonMobil Upstream Research—Law Department | Space-time surrogate models of subterranean regions |
WO2011037580A1 (en) | 2009-09-25 | 2011-03-31 | Landmark Graphics Corporation | Systems and methods for the quantitative estimate of production-forecast uncertainty |
CN102741855B (zh) | 2010-02-12 | 2016-10-26 | 埃克森美孚上游研究公司 | 用于将并行模拟模型分区的方法和系统 |
CN102754105B (zh) * | 2010-02-12 | 2016-05-25 | 埃克森美孚上游研究公司 | 用于创建历史匹配模拟模型的方法和系统 |
US8731872B2 (en) | 2010-03-08 | 2014-05-20 | Exxonmobil Upstream Research Company | System and method for providing data corresponding to physical objects |
WO2011112221A1 (en) | 2010-03-12 | 2011-09-15 | Exxonmobil Upstream Research Company | Dynamic grouping of domain objects via smart groups |
US8731887B2 (en) | 2010-04-12 | 2014-05-20 | Exxonmobile Upstream Research Company | System and method for obtaining a model of data describing a physical structure |
US8727017B2 (en) | 2010-04-22 | 2014-05-20 | Exxonmobil Upstream Research Company | System and method for obtaining data on an unstructured grid |
US8731873B2 (en) | 2010-04-26 | 2014-05-20 | Exxonmobil Upstream Research Company | System and method for providing data corresponding to physical objects |
CN102870087B (zh) | 2010-04-30 | 2016-11-09 | 埃克森美孚上游研究公司 | 流体有限体积仿真的方法和系统 |
CN102279852B (zh) * | 2010-06-12 | 2013-11-06 | 中国石油化工股份有限公司 | 一种基于遗传算法的油藏自动历史拟合系统及其拟合方法 |
US10083254B2 (en) | 2010-06-15 | 2018-09-25 | Exxonmobil Upstream Research Company | Method and system for stabilizing formulation methods |
US8532968B2 (en) * | 2010-06-16 | 2013-09-10 | Foroil | Method of improving the production of a mature gas or oil field |
CA2803068C (en) | 2010-07-29 | 2016-10-11 | Exxonmobil Upstream Research Company | Method and system for reservoir modeling |
US10087721B2 (en) | 2010-07-29 | 2018-10-02 | Exxonmobil Upstream Research Company | Methods and systems for machine—learning based simulation of flow |
EP2599023B1 (en) | 2010-07-29 | 2019-10-23 | Exxonmobil Upstream Research Company | Methods and systems for machine-learning based simulation of flow |
US8731875B2 (en) | 2010-08-13 | 2014-05-20 | Exxonmobil Upstream Research Company | System and method for providing data corresponding to physical objects |
US8855986B2 (en) | 2010-09-03 | 2014-10-07 | Chevron U.S.A. Inc. | Iterative method and system to construct robust proxy models for reservoir simulation |
CA2807300C (en) | 2010-09-20 | 2017-01-03 | Exxonmobil Upstream Research Company | Flexible and adaptive formulations for complex reservoir simulations |
CA2823017A1 (en) | 2011-01-26 | 2012-08-02 | Exxonmobil Upstream Research Company | Method of reservoir compartment analysis using topological structure in 3d earth model |
EP2678718A2 (en) * | 2011-02-23 | 2014-01-01 | Total SA | Computerized method for the estimation of a value for at least a parameter of a hydrocarbon-producing region, for planning the operation and operating the region |
US10545260B2 (en) | 2011-04-15 | 2020-01-28 | Conocophillips Company | Updating geological facies models using the Ensemble Kalman filter |
EP2756382A4 (en) | 2011-09-15 | 2015-07-29 | Exxonmobil Upstream Res Co | MATRIX AND VECTOR OPERATIONS OPTIMIZED IN LIMITED INSTRUCTION ALGORITHMS THAT COMPLETE EOS CALCULATIONS |
WO2013059079A1 (en) * | 2011-10-20 | 2013-04-25 | Schlumberger Canada Limited | Optimization of a multi-period model for valuation applied to flow control valves |
WO2013077876A1 (en) * | 2011-11-22 | 2013-05-30 | Soft Machines, Inc. | A microprocessor accelerated code optimizer |
EP2850467B1 (en) * | 2012-05-14 | 2018-06-20 | Landmark Graphics Corporation | Method and system of predicting future hydrocarbon production |
WO2013172813A1 (en) * | 2012-05-14 | 2013-11-21 | Landmark Graphics Corporation | Modeling stress around a wellbore |
AU2013274731B2 (en) * | 2012-06-15 | 2016-08-25 | Landmark Graphics Corporation | Systems and methods for optimizing facility limited production and injection in an integrated reservoir and gathering network |
CN102880903B (zh) * | 2012-07-13 | 2013-10-09 | 刘立峰 | 混沌量子粒子群模糊神经网络叠前非线性流体识别方法 |
US9460403B2 (en) * | 2012-07-31 | 2016-10-04 | Landmark Graphics Corporation | Methods and systems related to hydrocarbon recovery strategy development |
US9260948B2 (en) * | 2012-07-31 | 2016-02-16 | Landmark Graphics Corporation | Multi-level reservoir history matching |
CN102865059B (zh) * | 2012-09-26 | 2015-01-21 | 中国石油天然气股份有限公司 | 一种对裂缝-孔隙型油藏产能进行预测的方法及装置 |
EP2901363A4 (en) | 2012-09-28 | 2016-06-01 | Exxonmobil Upstream Res Co | ERROR REMOVAL IN GEOLOGICAL MODELS |
US10531251B2 (en) | 2012-10-22 | 2020-01-07 | United States Cellular Corporation | Detecting and processing anomalous parameter data points by a mobile wireless data network forecasting system |
CN105247484B (zh) | 2013-03-15 | 2021-02-23 | 英特尔公司 | 利用本地分布式标志体系架构来仿真访客集中式标志体系架构的方法 |
EP2811107A1 (en) * | 2013-06-06 | 2014-12-10 | Repsol, S.A. | Method for selecting and optimizing oil field controls for production plateau |
ES2660432T3 (es) | 2013-06-06 | 2018-03-22 | Repsol, S.A. | Método para evaluar planes de estrategia de producción |
WO2014200685A2 (en) | 2013-06-10 | 2014-12-18 | Exxonmobil Upstream Research Company | Interactively planning a well site |
US20140372041A1 (en) * | 2013-06-14 | 2014-12-18 | Baker Hughes Incorporated | Validation of physical and mechanical rock properties for geomechanical analysis |
US10689965B2 (en) * | 2013-08-26 | 2020-06-23 | Repsol, S.A. | Field development plan selection system, method and program product |
US9864098B2 (en) | 2013-09-30 | 2018-01-09 | Exxonmobil Upstream Research Company | Method and system of interactive drill center and well planning evaluation and optimization |
GB2520558A (en) * | 2013-11-26 | 2015-05-27 | Total E & P Uk Ltd | Method of subsurface modelling |
US11047232B2 (en) * | 2013-12-31 | 2021-06-29 | Biota Technology, Inc | Microbiome based systems, apparatus and methods for the exploration and production of hydrocarbons |
US11028449B2 (en) | 2013-12-31 | 2021-06-08 | Biota Technology, Inc. | Microbiome based systems, apparatus and methods for monitoring and controlling industrial processes and systems |
EP3074913B1 (en) * | 2014-01-02 | 2023-09-27 | Landmark Graphics Corporation | History matching multi-porosity solutions |
MX2016008634A (es) | 2014-01-24 | 2016-09-26 | Landmark Graphics Corp | Determinacion de ubicaciones de evaluacion en un sistema de yacimiento. |
US9689245B2 (en) | 2014-01-24 | 2017-06-27 | King Fahd University Of Petroleum And Minerals | Quantification of skin in hydraulic fracturing of low and tight reservoirs |
CN103869783B (zh) * | 2014-03-18 | 2016-07-13 | 东北大学 | 一种精矿产量在线预测方法 |
CN105095981A (zh) * | 2014-05-23 | 2015-11-25 | 中国石油化工股份有限公司 | 一种基于人机交互的油气藏规模序列资源评价方法 |
AU2015298233B2 (en) | 2014-07-30 | 2018-02-22 | Exxonmobil Upstream Research Company | Method for volumetric grid generation in a domain with heterogeneous material properties |
EP3213125A1 (en) | 2014-10-31 | 2017-09-06 | Exxonmobil Upstream Research Company Corp-urc-e2. 4A.296 | Methods to handle discontinuity in constructing design space for faulted subsurface model using moving least squares |
WO2016069171A1 (en) | 2014-10-31 | 2016-05-06 | Exxonmobil Upstream Research Company | Handling domain discontinuity in a subsurface grid model with the help of grid optimization techniques |
CN104481502A (zh) * | 2014-11-13 | 2015-04-01 | 克拉玛依红有软件有限责任公司 | 一种利用油藏结构递减法预测原油产量的方法 |
WO2017111964A1 (en) * | 2015-12-22 | 2017-06-29 | Landmark Graphics Corporation | Method for improving reservoir performance by using data science |
CN105631754B (zh) * | 2015-12-29 | 2019-03-15 | 中国石油天然气股份有限公司 | 一种确定海外油田的产量剖面数据的方法和装置 |
CA3010283C (en) * | 2015-12-29 | 2024-02-13 | Schlumberger Canada Limited | Machine learning for production prediction |
EP3559401B1 (en) | 2016-12-23 | 2023-10-18 | ExxonMobil Technology and Engineering Company | Method and system for stable and efficient reservoir simulation using stability proxies |
US11087221B2 (en) * | 2017-02-20 | 2021-08-10 | Saudi Arabian Oil Company | Well performance classification using artificial intelligence and pattern recognition |
US10738599B2 (en) * | 2017-03-10 | 2020-08-11 | International Business Machines Corporation | System and tool with increased forecast accuracy to configure well settings in mature oil fields |
AU2017424316A1 (en) * | 2017-07-21 | 2020-01-02 | Landmark Graphics Corporation | Deep learning based reservoir modeling |
CN108533247B (zh) * | 2017-12-19 | 2021-05-14 | 中国地质大学(武汉) | 一种确定机抽生产油井产状的方法 |
CN109446538B (zh) * | 2018-06-21 | 2021-08-17 | 北京国双科技有限公司 | 注水与采油井关系模型获得方法及产量和注水量确定方法 |
CN110400006B (zh) * | 2019-07-02 | 2022-06-03 | 中国石油化工股份有限公司 | 基于深度学习算法的油井产量预测方法 |
JP7242590B2 (ja) * | 2020-02-05 | 2023-03-20 | 株式会社東芝 | 機械学習モデル圧縮システム、プルーニング方法及びプログラム |
CN113158470B (zh) * | 2020-11-25 | 2022-09-23 | 中国石油大学(华东) | 基于迁移学习的油藏自动历史拟合系统与方法 |
US20220381130A1 (en) * | 2021-05-27 | 2022-12-01 | Halliburton Energy Services, Inc. | Formation and reservoir rock modeling using symbolic regression |
US20230237225A1 (en) * | 2022-01-24 | 2023-07-27 | Conocophillips Company | Machine learning based reservoir modeling |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6101447A (en) * | 1998-02-12 | 2000-08-08 | Schlumberger Technology Corporation | Oil and gas reservoir production analysis apparatus and method |
US20030036890A1 (en) * | 2001-04-30 | 2003-02-20 | Billet Bradford E. | Predictive method |
US7778715B2 (en) * | 2005-01-31 | 2010-08-17 | Hewlett-Packard Development Company | Methods and systems for a prediction model |
US7516016B2 (en) * | 2006-06-09 | 2009-04-07 | Demartini David C | Method for improving prediction of the viability of potential petroleum reservoirs |
-
2006
- 2006-09-20 US US11/533,550 patent/US7657494B2/en not_active Expired - Fee Related
-
2007
- 2007-09-18 WO PCT/US2007/078772 patent/WO2008036664A2/en active Application Filing
- 2007-09-18 EP EP07842693A patent/EP2064630A4/en not_active Withdrawn
- 2007-09-18 AU AU2007299906A patent/AU2007299906A1/en not_active Abandoned
- 2007-09-18 CN CNA2007800348554A patent/CN101517560A/zh active Pending
- 2007-09-18 EA EA200970305A patent/EA200970305A1/ru unknown
- 2007-09-18 CA CA002662245A patent/CA2662245A1/en not_active Abandoned
- 2007-09-18 BR BRPI0716865-9A patent/BRPI0716865A2/pt not_active IP Right Cessation
-
2009
- 2009-04-17 NO NO20091536A patent/NO20091536L/no not_active Application Discontinuation
Also Published As
Publication number | Publication date |
---|---|
EP2064630A4 (en) | 2010-08-25 |
BRPI0716865A2 (pt) | 2013-10-15 |
WO2008036664A2 (en) | 2008-03-27 |
AU2007299906A1 (en) | 2008-03-27 |
WO2008036664A3 (en) | 2008-11-20 |
CN101517560A (zh) | 2009-08-26 |
NO20091536L (no) | 2009-06-19 |
CA2662245A1 (en) | 2008-03-27 |
US7657494B2 (en) | 2010-02-02 |
US20080082469A1 (en) | 2008-04-03 |
EP2064630A2 (en) | 2009-06-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EA200970305A1 (ru) | Способ для прогнозирования добычи нефтяного пласта-коллектора с использованием генетического программирования | |
WO2007022352A3 (en) | Method and system for integrated asset management utilizing multi-level modeling of oil field assets | |
BRPI0806149A2 (pt) | Sistema para realizar uma operação de perfuração em um campo de petróleo, método de realizar uma operação de perfuração para um campo de petróleo, e meio de armazenamento legível por computador que armazena instruções para realizar uma operação de perfuração para um campo de petróleo | |
GB2447820A (en) | Well control systems and associated methods | |
DE602007013530D1 (de) | Verfahren, systeme und computerlesbare medien zur öl- und gasfeldproduktionsoptimierung in echtzeit mit einem proxy-simulator | |
EA200702234A1 (ru) | Способ и устройство для оценки загрязнения флюида в скважине | |
ATE528816T1 (de) | Brennstoffpatrone fur brennstofzelle | |
ATE459985T1 (de) | Verfahren und struktur für einen peltier- gesteuerten phasenwechselspeicher | |
ATE486297T1 (de) | Mehrstufige schicht | |
GB201217271D0 (en) | Traffic sensor management | |
NO20093384L (no) | Sykdomsmarkorer | |
BRPI0812761A2 (pt) | Método de simulação de operações de um campo petrolífero possuindo pelo menos uma instalação de poço, e mídia passível de leitura por computador | |
DE602007001906D1 (de) | System zur Vorhersage biologischer Reaktionen, Verfahren zur Vorhersage biologischer Reaktionen und Computerprogramm | |
ATE519145T1 (de) | Verfahren zum parametrieren von betriebsmitteln | |
DE602006005624D1 (de) | Metaboliten für nk-i-antagonisten zur emesis | |
Liu et al. | Nonlinear network traffic prediction based on BP neural network. | |
AR063847A1 (es) | Generacion de plantas con alteraciones en el contenido de proteina fibras o aceite | |
AR064373A1 (es) | Generacion de plantas con alteraciones en el contenido de aceite, proteinas o fibras | |
AR064371A1 (es) | Generacion de plantas con alteraciones en el contenido de aceite, proteinas, o fibras | |
UA34641U (ru) | Способ прогнозирования риска возникновения и особенностей течения сахарного диабета в зависимости от фенотипических признаков и генетических маркеров | |
Guerritore et al. | Manifold Façades A grammar-based approach for the adaptation of office buildings into housing | |
Shin et al. | Daylight and energy performance of a light pipe system in an underground carpark | |
Klaar et al. | Modelling the sensitivity of river reaches to water abstraction: RAPHSA-a hydroecology tool for environmental managers | |
Walsh et al. | Effect of future climate change on hydrological regimes: inferences for catchment flow management and atlantic salmon | |
Niemeyer et al. | Incorporating a simple two-layer reservoir into a coupled land surface and river routing model to improve river temperature simulations in the Tennessee River Basin |