EA200802116A1 - Способ оптимизации добычи из куста скважин - Google Patents
Способ оптимизации добычи из куста скважинInfo
- Publication number
- EA200802116A1 EA200802116A1 EA200802116A EA200802116A EA200802116A1 EA 200802116 A1 EA200802116 A1 EA 200802116A1 EA 200802116 A EA200802116 A EA 200802116A EA 200802116 A EA200802116 A EA 200802116A EA 200802116 A1 EA200802116 A1 EA 200802116A1
- Authority
- EA
- Eurasian Patent Office
- Prior art keywords
- wells
- production
- cluster
- wanpet
- optimizing
- Prior art date
Links
- 238000000034 method Methods 0.000 title abstract 3
- 230000004907 flux Effects 0.000 abstract 1
- 230000000638 stimulation Effects 0.000 abstract 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
-
- E21B41/0092—
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
- E21B49/08—Obtaining fluid samples or testing fluids, in boreholes or wells
Landscapes
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Geochemistry & Mineralogy (AREA)
- Fluid Mechanics (AREA)
- Environmental & Geological Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Physics & Mathematics (AREA)
- General Engineering & Computer Science (AREA)
- Operations Research (AREA)
- Physical Or Chemical Processes And Apparatus (AREA)
- Feedback Control In General (AREA)
- Steroid Compounds (AREA)
- Geophysics And Detection Of Objects (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Heat Treatment Of Steel (AREA)
- Forging (AREA)
- Production Of Liquid Hydrocarbon Mixture For Refining Petroleum (AREA)
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP06112401 | 2006-04-07 | ||
EP06112440 | 2006-04-10 | ||
PCT/EP2007/053348 WO2007116008A1 (en) | 2006-04-07 | 2007-04-05 | Method for optimising the production of a cluster of wells |
Publications (1)
Publication Number | Publication Date |
---|---|
EA200802116A1 true EA200802116A1 (ru) | 2009-04-28 |
Family
ID=38110150
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EA200802116A EA200802116A1 (ru) | 2006-04-07 | 2007-04-05 | Способ оптимизации добычи из куста скважин |
Country Status (10)
Country | Link |
---|---|
EP (1) | EP2004953B1 (pt) |
AT (1) | ATE445083T1 (pt) |
AU (1) | AU2007235959B2 (pt) |
BR (1) | BRPI0708835B1 (pt) |
CA (1) | CA2645902C (pt) |
DE (1) | DE602007002702D1 (pt) |
EA (1) | EA200802116A1 (pt) |
NO (1) | NO341307B1 (pt) |
NZ (1) | NZ571278A (pt) |
WO (1) | WO2007116008A1 (pt) |
Families Citing this family (44)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CA2692996C (en) | 2007-08-17 | 2016-01-12 | Shell Internationale Research Maatschappij B.V. | Method for controlling production and downhole pressures of a well with multiple subsurface zones and/or branches |
CA2694014C (en) | 2007-08-17 | 2016-06-14 | Shell Internationale Research Maatschappij B.V. | Method for virtual metering of injection wells and allocation and control of multi-zonal injection wells |
US8768672B2 (en) | 2007-08-24 | 2014-07-01 | ExxonMobil. Upstream Research Company | Method for predicting time-lapse seismic timeshifts by computer simulation |
US8548782B2 (en) | 2007-08-24 | 2013-10-01 | Exxonmobil Upstream Research Company | Method for modeling deformation in subsurface strata |
CA2690992C (en) | 2007-08-24 | 2014-07-29 | Exxonmobil Upstream Research Company | Method for predicting well reliability by computer simulation |
US8423337B2 (en) | 2007-08-24 | 2013-04-16 | Exxonmobil Upstream Research Company | Method for multi-scale geomechanical model analysis by computer simulation |
AU2008323932B2 (en) | 2007-11-10 | 2013-06-20 | Landmark Graphics Corporation, A Halliburton Company | Systems and methods for workflow automation, adaptation and integration |
WO2011066021A1 (en) | 2009-11-30 | 2011-06-03 | Exxonmobil Upstream Research Company | Adaptive newton's method for reservoir simulation |
US9134454B2 (en) | 2010-04-30 | 2015-09-15 | Exxonmobil Upstream Research Company | Method and system for finite volume simulation of flow |
CA2801382C (en) | 2010-06-29 | 2018-12-18 | Exxonmobil Upstream Research Company | Method and system for parallel simulation models |
EP2599032A4 (en) | 2010-07-29 | 2018-01-17 | Exxonmobil Upstream Research Company | Method and system for reservoir modeling |
EP2599029A4 (en) | 2010-07-29 | 2014-01-08 | Exxonmobil Upstream Res Co | METHODS AND SYSTEMS FOR AUTOMATIC LEARNING FLOW SIMULATION |
WO2012015518A2 (en) | 2010-07-29 | 2012-02-02 | Exxonmobil Upstream Research Company | Methods and systems for machine-learning based simulation of flow |
BR112013002114A2 (pt) | 2010-09-20 | 2016-05-17 | Exxonmobil Upstream Res Co | formulações flexíveis e adaptáveis para simulações de reservatório complexas |
RU2457320C1 (ru) * | 2011-03-29 | 2012-07-27 | Общество С Ограниченной Ответственностью "Дискрит" | Способ эксплуатации скважины |
CN103959233B (zh) | 2011-09-15 | 2017-05-17 | 埃克森美孚上游研究公司 | 在执行eos计算的指令受限算法中最优化矩阵和向量运算 |
AU2013324162B2 (en) | 2012-09-28 | 2018-08-09 | Exxonmobil Upstream Research Company | Fault removal in geological models |
AU2013366520B2 (en) * | 2012-12-21 | 2017-10-26 | Seabed Separation As | Inclined tubular separator for separating oil well substances |
MX358404B (es) * | 2013-06-28 | 2018-08-15 | Sitepp Sist Y Tecnologia Para El Petroleo S A De C V | Sistema y metodo para mejorar la produccion de los niveles de pozos. |
US9702243B2 (en) | 2013-10-04 | 2017-07-11 | Baker Hughes Incorporated | Systems and methods for monitoring temperature using a magnetostrictive probe |
US9957781B2 (en) | 2014-03-31 | 2018-05-01 | Hitachi, Ltd. | Oil and gas rig data aggregation and modeling system |
EP3175265A1 (en) | 2014-07-30 | 2017-06-07 | ExxonMobil Upstream Research Company | Method for volumetric grid generation in a domain with heterogeneous material properties |
WO2016028409A1 (en) | 2014-08-21 | 2016-02-25 | Exxonmobil Upstream Research Company | Gas lift optimization employing data obtained from surface mounted sensors |
EA038623B1 (ru) * | 2014-09-25 | 2021-09-23 | Тоталь С.А. | Добыча углеводородов с помощью метрического счетчика |
EA036893B1 (ru) * | 2014-09-25 | 2021-01-12 | Тоталь С.А. | Добыча углеводородов с помощью тестового сепаратора |
WO2016069170A1 (en) | 2014-10-31 | 2016-05-06 | Exxonmobil Upstream Research Company | Methods to handle discontinuity in constructing design space for faulted subsurface model using moving least squares |
WO2016069171A1 (en) | 2014-10-31 | 2016-05-06 | Exxonmobil Upstream Research Company | Handling domain discontinuity in a subsurface grid model with the help of grid optimization techniques |
US10101194B2 (en) | 2015-12-31 | 2018-10-16 | General Electric Company | System and method for identifying and recovering from a temporary sensor failure |
US10401207B2 (en) | 2016-09-14 | 2019-09-03 | GE Oil & Gas UK, Ltd. | Method for assessing and managing sensor uncertainties in a virtual flow meter |
US11940318B2 (en) | 2016-09-27 | 2024-03-26 | Baker Hughes Energy Technology UK Limited | Method for detection and isolation of faulty sensors |
EP3559401B1 (en) | 2016-12-23 | 2023-10-18 | ExxonMobil Technology and Engineering Company | Method and system for stable and efficient reservoir simulation using stability proxies |
US10364655B2 (en) | 2017-01-20 | 2019-07-30 | Saudi Arabian Oil Company | Automatic control of production and injection wells in a hydrocarbon field |
US11041976B2 (en) | 2017-05-30 | 2021-06-22 | Exxonmobil Upstream Research Company | Method and system for creating and using a subsurface model in hydrocarbon operations |
US20190093474A1 (en) * | 2017-09-22 | 2019-03-28 | General Electric Company | System and method for determining production from a plurality of wells |
RU2020126259A (ru) * | 2018-01-26 | 2022-02-07 | Уэйгейт Текнолоджиз Ю-Эс-Эй, Лп | Определение виртуальных параметров процесса |
US11180976B2 (en) | 2018-12-21 | 2021-11-23 | Exxonmobil Upstream Research Company | Method and system for unconventional gas lift optimization |
US20200240259A1 (en) * | 2019-01-25 | 2020-07-30 | Ge Inspection Technologies, Lp | Flow network model analysis |
US11591936B2 (en) | 2019-09-04 | 2023-02-28 | Saudi Arabian Oil Company | Systems and methods for proactive operation of process facilities based on historical operations data |
CN113898323B (zh) * | 2020-06-22 | 2024-02-23 | 中国石油化工股份有限公司 | 海上油气田水下生产系统及其设计方法 |
CN112580851B (zh) * | 2020-11-17 | 2024-06-18 | 西安中控天地科技开发有限公司 | 丛式井场抽油机井群错峰开井间抽运行调度方法 |
CN113153281A (zh) * | 2021-03-29 | 2021-07-23 | 中国地质大学(北京) | 一种实现海上平台油气井协同生产的优化模型 |
KR102599460B1 (ko) * | 2021-09-15 | 2023-11-07 | 광성지엠(주) | 유가스정 지중 생산 조건 및 장애 요소를 반영한 esp 및 튜빙 모니터링 시스템의 시험 방법(tubing leakage) |
KR102599305B1 (ko) * | 2021-09-15 | 2023-11-07 | 광성지엠(주) | 유가스정 지중 생산 조건 및 장애 요소를 반영한 esp 및 튜빙 모니터링 시스템의 시험 방법(esp mapping and surging) |
WO2023154808A1 (en) * | 2022-02-09 | 2023-08-17 | Schlumberger Technology Corporation | Integrated asset modeling for energy consumption and emission |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6434435B1 (en) * | 1997-02-21 | 2002-08-13 | Baker Hughes Incorporated | Application of adaptive object-oriented optimization software to an automatic optimization oilfield hydrocarbon production management system |
US7062420B2 (en) * | 2000-10-04 | 2006-06-13 | Schlumberger Technology Corp. | Production optimization methodology for multilayer commingled reservoirs using commingled reservoir production performance data and production logging information |
-
2007
- 2007-04-05 EP EP07727816A patent/EP2004953B1/en active Active
- 2007-04-05 AT AT07727816T patent/ATE445083T1/de not_active IP Right Cessation
- 2007-04-05 WO PCT/EP2007/053348 patent/WO2007116008A1/en active Application Filing
- 2007-04-05 AU AU2007235959A patent/AU2007235959B2/en active Active
- 2007-04-05 NZ NZ571278A patent/NZ571278A/en unknown
- 2007-04-05 BR BRPI0708835-3A patent/BRPI0708835B1/pt active IP Right Grant
- 2007-04-05 CA CA2645902A patent/CA2645902C/en active Active
- 2007-04-05 EA EA200802116A patent/EA200802116A1/ru unknown
- 2007-04-05 DE DE602007002702T patent/DE602007002702D1/de not_active Expired - Fee Related
-
2008
- 2008-10-30 NO NO20084606A patent/NO341307B1/no unknown
Also Published As
Publication number | Publication date |
---|---|
AU2007235959B2 (en) | 2010-11-11 |
DE602007002702D1 (de) | 2009-11-19 |
BRPI0708835B1 (pt) | 2017-09-26 |
AU2007235959A1 (en) | 2007-10-18 |
CA2645902A1 (en) | 2007-10-18 |
NO20084606L (no) | 2008-10-30 |
WO2007116008A1 (en) | 2007-10-18 |
BRPI0708835A2 (pt) | 2011-06-14 |
NO341307B1 (no) | 2017-10-02 |
EP2004953A1 (en) | 2008-12-24 |
NZ571278A (en) | 2011-08-26 |
ATE445083T1 (de) | 2009-10-15 |
CA2645902C (en) | 2014-05-20 |
EP2004953B1 (en) | 2009-10-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EA200802116A1 (ru) | Способ оптимизации добычи из куста скважин | |
MX346613B (es) | Metodo y sistema para producción de presión de poro. | |
GB2445305A (en) | Method and system for integrated asset management utilizing multi-level modeling of oil field assets | |
NO20076611L (no) | Fremgangsmater og anordninger for analysering og styring av forplantningen av bolger i et borehull, generert med vannhammer | |
EA201070207A1 (ru) | Способ управления добычей из нефтегазоносного коллектора в режиме реального времени | |
GB2456925A (en) | System and method for performing oilfield simulation operations | |
EA200970017A1 (ru) | Способ и система для проектирования и оптимизации операций бурения и заканчивания в углеводородных пластах - коллекторах | |
WO2011008544A3 (en) | Wellbore laser operations | |
WO2009126376A3 (en) | System and method for drilling multilateral wells using magnetic ranging while drilling | |
MY152889A (en) | Subsea well control system and method | |
ATE554261T1 (de) | Stimulation durch spaltenbildung beim bohren | |
NO20100029L (no) | Fremgangsmate, program og datasystem for a harmonisere modelldata for hydrokarbonreservoarer | |
GB2462227A (en) | System and method for performing a drilling operation in an oilfield | |
GB2467655A (en) | In situ oxidation of subsurface formations | |
NO20073424L (no) | A method for facilitating a wellbore operation | |
NO20100603L (no) | System og fremgangsmate for utforelse av oljefeltoperasjoner | |
WO2007018858A3 (en) | Well modeling associated with extraction of hydrocarbons from subsurface formations | |
WO2008157706A3 (en) | System and method for performing oilfield simulation operations | |
NO20070381L (no) | Utplassering av undergrunnssensorer i fôringsror | |
NO20092740L (no) | Utforming av boremonster for utboring av fjellrom | |
NO20025417D0 (no) | Brenselcelle for nedihulls og undervanns kraftsystemer | |
GB2509268A (en) | Modeling and simulation of complete drill strings | |
WO2012064626A3 (en) | Apparatus and method for automated drilling of a borehole in a subsurface formation | |
NO20053897L (no) | Sustem og fremgangsmate for automatisert plattformgenerering | |
WO2009032924A3 (en) | Method and system for increasing production of a reservoir using lateral wells |