EA200802116A1 - METHOD OF OPTIMIZING A PRODUCTION FROM A WANPET BAR - Google Patents

METHOD OF OPTIMIZING A PRODUCTION FROM A WANPET BAR

Info

Publication number
EA200802116A1
EA200802116A1 EA200802116A EA200802116A EA200802116A1 EA 200802116 A1 EA200802116 A1 EA 200802116A1 EA 200802116 A EA200802116 A EA 200802116A EA 200802116 A EA200802116 A EA 200802116A EA 200802116 A1 EA200802116 A1 EA 200802116A1
Authority
EA
Eurasian Patent Office
Prior art keywords
wells
production
cluster
wanpet
optimizing
Prior art date
Application number
EA200802116A
Other languages
Russian (ru)
Inventor
Жан Йозеф Мария Бриер
Кеат-Хоон Го
Чарлз Эдвард Монкур
Петер Оверсхе
Original Assignee
Шелл Интернэшнл Рисерч Маатсхаппий Б.В.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Шелл Интернэшнл Рисерч Маатсхаппий Б.В. filed Critical Шелл Интернэшнл Рисерч Маатсхаппий Б.В.
Publication of EA200802116A1 publication Critical patent/EA200802116A1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B41/0092
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B49/00Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
    • E21B49/08Obtaining fluid samples or testing fluids, in boreholes or wells

Landscapes

  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Fluid Mechanics (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Physics & Mathematics (AREA)
  • General Engineering & Computer Science (AREA)
  • Operations Research (AREA)
  • Physical Or Chemical Processes And Apparatus (AREA)
  • Feedback Control In General (AREA)
  • Steroid Compounds (AREA)
  • Geophysics And Detection Of Objects (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Heat Treatment Of Steel (AREA)
  • Forging (AREA)
  • Production Of Liquid Hydrocarbon Mixture For Refining Petroleum (AREA)

Abstract

The present invention relates to a method to optimise production of a cluster of wells on the basis of an estimation of the contributions of individual wells to the production of the cluster of wells, tailored to the particular constraints and requirements of the oil and gas production environment. The wells in the cluster may differ in terms of nature and flux of its effluents, and/or mode of operation, stimulation and/or manipulation. The wells may also produce from multiple subsurface zones or branches. The wellheads of the wells in the cluster may be located on land or offshore, above the surface of the sea or on the seabed. The method according to the invention may be used to generate one or more optimisation models, taking into account only significantly relevant well and production syatem characeristics and effects.
EA200802116A 2006-04-07 2007-04-05 METHOD OF OPTIMIZING A PRODUCTION FROM A WANPET BAR EA200802116A1 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
EP06112401 2006-04-07
EP06112440 2006-04-10
PCT/EP2007/053348 WO2007116008A1 (en) 2006-04-07 2007-04-05 Method for optimising the production of a cluster of wells

Publications (1)

Publication Number Publication Date
EA200802116A1 true EA200802116A1 (en) 2009-04-28

Family

ID=38110150

Family Applications (1)

Application Number Title Priority Date Filing Date
EA200802116A EA200802116A1 (en) 2006-04-07 2007-04-05 METHOD OF OPTIMIZING A PRODUCTION FROM A WANPET BAR

Country Status (10)

Country Link
EP (1) EP2004953B1 (en)
AT (1) ATE445083T1 (en)
AU (1) AU2007235959B2 (en)
BR (1) BRPI0708835B1 (en)
CA (1) CA2645902C (en)
DE (1) DE602007002702D1 (en)
EA (1) EA200802116A1 (en)
NO (1) NO341307B1 (en)
NZ (1) NZ571278A (en)
WO (1) WO2007116008A1 (en)

Families Citing this family (44)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2692996C (en) 2007-08-17 2016-01-12 Shell Internationale Research Maatschappij B.V. Method for controlling production and downhole pressures of a well with multiple subsurface zones and/or branches
CA2694014C (en) 2007-08-17 2016-06-14 Shell Internationale Research Maatschappij B.V. Method for virtual metering of injection wells and allocation and control of multi-zonal injection wells
US8768672B2 (en) 2007-08-24 2014-07-01 ExxonMobil. Upstream Research Company Method for predicting time-lapse seismic timeshifts by computer simulation
US8548782B2 (en) 2007-08-24 2013-10-01 Exxonmobil Upstream Research Company Method for modeling deformation in subsurface strata
CA2690992C (en) 2007-08-24 2014-07-29 Exxonmobil Upstream Research Company Method for predicting well reliability by computer simulation
US8423337B2 (en) 2007-08-24 2013-04-16 Exxonmobil Upstream Research Company Method for multi-scale geomechanical model analysis by computer simulation
AU2008323932B2 (en) 2007-11-10 2013-06-20 Landmark Graphics Corporation, A Halliburton Company Systems and methods for workflow automation, adaptation and integration
WO2011066021A1 (en) 2009-11-30 2011-06-03 Exxonmobil Upstream Research Company Adaptive newton's method for reservoir simulation
US9134454B2 (en) 2010-04-30 2015-09-15 Exxonmobil Upstream Research Company Method and system for finite volume simulation of flow
CA2801382C (en) 2010-06-29 2018-12-18 Exxonmobil Upstream Research Company Method and system for parallel simulation models
EP2599032A4 (en) 2010-07-29 2018-01-17 Exxonmobil Upstream Research Company Method and system for reservoir modeling
EP2599029A4 (en) 2010-07-29 2014-01-08 Exxonmobil Upstream Res Co Methods and systems for machine-learning based simulation of flow
WO2012015518A2 (en) 2010-07-29 2012-02-02 Exxonmobil Upstream Research Company Methods and systems for machine-learning based simulation of flow
BR112013002114A2 (en) 2010-09-20 2016-05-17 Exxonmobil Upstream Res Co flexible and adaptable formulations for complex reservoir simulations
RU2457320C1 (en) * 2011-03-29 2012-07-27 Общество С Ограниченной Ответственностью "Дискрит" Well operation method
CN103959233B (en) 2011-09-15 2017-05-17 埃克森美孚上游研究公司 Optimized matrix and vector operations in instruction limited algorithms that perform eos calculations
AU2013324162B2 (en) 2012-09-28 2018-08-09 Exxonmobil Upstream Research Company Fault removal in geological models
AU2013366520B2 (en) * 2012-12-21 2017-10-26 Seabed Separation As Inclined tubular separator for separating oil well substances
MX358404B (en) * 2013-06-28 2018-08-15 Sitepp Sist Y Tecnologia Para El Petroleo S A De C V System and method for enhancing the production levels of wells.
US9702243B2 (en) 2013-10-04 2017-07-11 Baker Hughes Incorporated Systems and methods for monitoring temperature using a magnetostrictive probe
US9957781B2 (en) 2014-03-31 2018-05-01 Hitachi, Ltd. Oil and gas rig data aggregation and modeling system
EP3175265A1 (en) 2014-07-30 2017-06-07 ExxonMobil Upstream Research Company Method for volumetric grid generation in a domain with heterogeneous material properties
WO2016028409A1 (en) 2014-08-21 2016-02-25 Exxonmobil Upstream Research Company Gas lift optimization employing data obtained from surface mounted sensors
EA038623B1 (en) * 2014-09-25 2021-09-23 Тоталь С.А. Production of hydrocarbons with metric counter
EA036893B1 (en) * 2014-09-25 2021-01-12 Тоталь С.А. Production of hydrocarbons with test separator
WO2016069170A1 (en) 2014-10-31 2016-05-06 Exxonmobil Upstream Research Company Methods to handle discontinuity in constructing design space for faulted subsurface model using moving least squares
WO2016069171A1 (en) 2014-10-31 2016-05-06 Exxonmobil Upstream Research Company Handling domain discontinuity in a subsurface grid model with the help of grid optimization techniques
US10101194B2 (en) 2015-12-31 2018-10-16 General Electric Company System and method for identifying and recovering from a temporary sensor failure
US10401207B2 (en) 2016-09-14 2019-09-03 GE Oil & Gas UK, Ltd. Method for assessing and managing sensor uncertainties in a virtual flow meter
US11940318B2 (en) 2016-09-27 2024-03-26 Baker Hughes Energy Technology UK Limited Method for detection and isolation of faulty sensors
EP3559401B1 (en) 2016-12-23 2023-10-18 ExxonMobil Technology and Engineering Company Method and system for stable and efficient reservoir simulation using stability proxies
US10364655B2 (en) 2017-01-20 2019-07-30 Saudi Arabian Oil Company Automatic control of production and injection wells in a hydrocarbon field
US11041976B2 (en) 2017-05-30 2021-06-22 Exxonmobil Upstream Research Company Method and system for creating and using a subsurface model in hydrocarbon operations
US20190093474A1 (en) * 2017-09-22 2019-03-28 General Electric Company System and method for determining production from a plurality of wells
RU2020126259A (en) * 2018-01-26 2022-02-07 Уэйгейт Текнолоджиз Ю-Эс-Эй, Лп DETERMINATION OF VIRTUAL PROCESS PARAMETERS
US11180976B2 (en) 2018-12-21 2021-11-23 Exxonmobil Upstream Research Company Method and system for unconventional gas lift optimization
US20200240259A1 (en) * 2019-01-25 2020-07-30 Ge Inspection Technologies, Lp Flow network model analysis
US11591936B2 (en) 2019-09-04 2023-02-28 Saudi Arabian Oil Company Systems and methods for proactive operation of process facilities based on historical operations data
CN113898323B (en) * 2020-06-22 2024-02-23 中国石油化工股份有限公司 Marine oil and gas field underwater production system and design method thereof
CN112580851B (en) * 2020-11-17 2024-06-18 西安中控天地科技开发有限公司 Method for scheduling pumping operation between cluster type well field pumping unit well group peak shifting and well opening
CN113153281A (en) * 2021-03-29 2021-07-23 中国地质大学(北京) Optimization model for realizing offshore platform oil-gas well collaborative production
KR102599460B1 (en) * 2021-09-15 2023-11-07 광성지엠(주) Test method for esp and tubing monitoring system reflecting production conditions and obstacle elements in oil and gas wells(tubing leakage)
KR102599305B1 (en) * 2021-09-15 2023-11-07 광성지엠(주) Test method for esp and tubing monitoring system reflecting production conditions and obstacle elements in oil and gas wells(esp mapping and surging)
WO2023154808A1 (en) * 2022-02-09 2023-08-17 Schlumberger Technology Corporation Integrated asset modeling for energy consumption and emission

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6434435B1 (en) * 1997-02-21 2002-08-13 Baker Hughes Incorporated Application of adaptive object-oriented optimization software to an automatic optimization oilfield hydrocarbon production management system
US7062420B2 (en) * 2000-10-04 2006-06-13 Schlumberger Technology Corp. Production optimization methodology for multilayer commingled reservoirs using commingled reservoir production performance data and production logging information

Also Published As

Publication number Publication date
AU2007235959B2 (en) 2010-11-11
DE602007002702D1 (en) 2009-11-19
BRPI0708835B1 (en) 2017-09-26
AU2007235959A1 (en) 2007-10-18
CA2645902A1 (en) 2007-10-18
NO20084606L (en) 2008-10-30
WO2007116008A1 (en) 2007-10-18
BRPI0708835A2 (en) 2011-06-14
NO341307B1 (en) 2017-10-02
EP2004953A1 (en) 2008-12-24
NZ571278A (en) 2011-08-26
ATE445083T1 (en) 2009-10-15
CA2645902C (en) 2014-05-20
EP2004953B1 (en) 2009-10-07

Similar Documents

Publication Publication Date Title
EA200802116A1 (en) METHOD OF OPTIMIZING A PRODUCTION FROM A WANPET BAR
MX346613B (en) Method and system for pore pressure prediction.
GB2445305A (en) Method and system for integrated asset management utilizing multi-level modeling of oil field assets
NO20076611L (en) Methods and devices for analyzing and controlling the propagation of holes in a borehole, generated with a water hammer
EA201070207A1 (en) METHOD OF MANAGING THE PRODUCTION OF OIL AND GAS MANIFOLD IN REAL TIME
GB2456925A (en) System and method for performing oilfield simulation operations
EA200970017A1 (en) METHOD AND SYSTEM FOR DESIGNING AND OPTIMIZING DRILLING AND FINISHING OPERATIONS IN HYDROCARBONS - COLLECTORS
WO2011008544A3 (en) Wellbore laser operations
WO2009126376A3 (en) System and method for drilling multilateral wells using magnetic ranging while drilling
MY152889A (en) Subsea well control system and method
ATE554261T1 (en) STIMULATION THROUGH GAP FORMATION DURING DRILLING
NO20100029L (en) Method, program and computer system for harmonizing hydrocarbon reservoir model data
GB2462227A (en) System and method for performing a drilling operation in an oilfield
GB2467655A (en) In situ oxidation of subsurface formations
NO20073424L (en) A method for facilitating a wellbore operation
NO20100603L (en) System and method for carrying out oilfield operations
WO2007018858A3 (en) Well modeling associated with extraction of hydrocarbons from subsurface formations
WO2008157706A3 (en) System and method for performing oilfield simulation operations
NO20070381L (en) Deployment of underground sensors in feeding rudder
NO20092740L (en) Design of drilling samples for drilling rock spaces
NO20025417D0 (en) Fuel cell for downhole and underwater power systems
GB2509268A (en) Modeling and simulation of complete drill strings
WO2012064626A3 (en) Apparatus and method for automated drilling of a borehole in a subsurface formation
NO20053897L (en) Sustem and automated platform generation method
WO2009032924A3 (en) Method and system for increasing production of a reservoir using lateral wells