DK2886723T3 - Ribbed foundation for superstructures and method of making the foundation. - Google Patents

Ribbed foundation for superstructures and method of making the foundation. Download PDF

Info

Publication number
DK2886723T3
DK2886723T3 DK13800718.2T DK13800718T DK2886723T3 DK 2886723 T3 DK2886723 T3 DK 2886723T3 DK 13800718 T DK13800718 T DK 13800718T DK 2886723 T3 DK2886723 T3 DK 2886723T3
Authority
DK
Denmark
Prior art keywords
foundation
ribs
superstructures
concrete
ribbed
Prior art date
Application number
DK13800718.2T
Other languages
Danish (da)
Inventor
Cesar Abad Huber
Jorge Franco Rey
Original Assignee
Gestamp Hybrid Towers S L
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from ES201230877A external-priority patent/ES2388161B1/en
Priority claimed from ES201330083A external-priority patent/ES2406390B1/en
Application filed by Gestamp Hybrid Towers S L filed Critical Gestamp Hybrid Towers S L
Application granted granted Critical
Publication of DK2886723T3 publication Critical patent/DK2886723T3/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/01Flat foundations
    • E02D27/016Flat foundations made mainly from prefabricated concrete elements
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/01Flat foundations
    • E02D27/02Flat foundations without substantial excavation
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/01Flat foundations
    • E02D27/08Reinforcements for flat foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • E02D27/425Foundations for poles, masts or chimneys specially adapted for wind motors masts

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Foundations (AREA)
  • Moulds, Cores, Or Mandrels (AREA)

Description

DESCRIPTION
Object of the Invention [0001] The present invention relates to a reinforced-concrete foundation system for erecting superstructures that transmit high axial loads, shearing forces and/or bending moments at individual points, such as wind turbines.
[0002] The foundation object of the present invention is formed by an upper reinforced-concrete slab poured "in situ", having a polygonal or circular footprint, and which is made rigid at the bottom by means of reinforced-concrete ribs of a rectangular or trapezial cross-section which are arranged radially. The method envisages said ribs being made with concrete "in situ", or alternatively by means of prefabricated elements, always working integrally with the upper slab.
[0003] This new foundation seeks to considerably reduce costs for building conventional foundations for such superstructures by considerably improving completion deadlines.
Background of the Invention [0004] The type of foundation most frequently used today for superstructures such as wind turbines is a foundation slab having different footprint configurations: they can be square, circular, hexagonal, octagonal, etc. The edge of the slab can be constant or variable for the purpose of optimizing the use of concrete.
[0005] The applicant is aware of the existence of other foundation systems which attempt to minimize the volume of steel and concrete, such as in the following publications:
European patent application EP1074663 is known, for example, which discloses an example of a foundation with three stabilizing members arranged symmetrically around a central support, with the drawback of having very little surface for contacting with the terrain, with the subsequent increase in stress applied on the terrain and in settlements.
[0006] Patent application PCT W02004/101898 describes a circular foundation based on prefabricated triangular sections. This solution requires completely emptying out the excavated cavity, resulting in an inverted T-shaped concrete section that does not involve any structural advantage because the width of the compressed concrete head is very small. This means that when calculating bending, the neutral axis will be lower and there will be a smaller mechanical arm, the need for reinforcement increasing and sectional ductility considerably dropping.
[0007] Finally, Spanish patent application ES-2347742 describes a cone-shaped foundation together with a lower planar ring-shaped slab. It is a very complex solution to implement and presents serious questions concerning its structural performance.
[0008] The type of foundation for these superstructures is a very well-known and easy to calculate and design technical solution, and the simplicity thereof further simplifies the formwork and construction. However, such foundations have the drawback of being quite large, so the use of steel and concrete as well as the volume of earth that is removed is extraordinarily high, all of which noticeably increases the economic cost of the structure. The impact of the cost of the foundation on the cost of the structure is higher the larger the superstructure is; for example, in the case of wind turbines, an increase in shaft height from 80 m to 120 m (50%) produces a 300% foundation cost increment. This problem is very real due to the tendency to building more and more high-powered wind turbines with a shaft height of 120 m, which produces a cost increment for producing the foundation, making it a weak competitor for all these conventional systems of producing reinforced-concrete foundations.
Description of the Invention [0009] In an attempt to overcome the mentioned problems in the state of the art, the present invention presents a solution formed by an upper reinforced-concrete slab poured "in situ" having a polygonal or circular footprint and which is made rigid at the bottom by means of reinforced-concrete ribs of a rectangular or trapezial cross-section which are arranged radially stemming from a central core. The concrete for the ribs is poured directly on the previously excavated terrain, whereas the slab rests on the terrain that has not been removed, acting as permanent formwork.
[0010] The solution consisting of an upper slab and ribs making the slab rigid at the bottom refers to the arrangement of both elements with respect to the surface of the ground where the foundation is built, where the slab is arranged first and the stiffening ribs would be arranged below the slab.
[0011] The advantages of this foundation are: • The volume of concrete used is much less than in the conventional solutions described above. • The excavation cost is reduced, with the subsequent reducing of hauling to a dump. • Formwork is reduced and simplified. • Unmatched T-shaped resistant section efficiency is obtained because compressions are absorbed by the slab.
[0012] The stiffening ribs can be made with concrete "in situ" or can be prefabricated, always working integrally with the upper slab, and they can have a constant or variable edge, either a stepped edge or an edge having a constant slope, the section thereof decreasing as it moves away from the central core of the slab.
[0013] In the case of using stiffening ribs that are entirely prefabricated, said ribs will be provided with projecting reinforcement for connection with the slab built "in situ". The stiffening ribs could also be made by means of semi-prefabricated elements, such as double-walled parts, for example, which remain embedded when the concrete is poured to form the foundation.
[0014] The foundation object of the present invention is formed by an upper reinforced-concrete slab poured "in situ" having a circular or polygonal footprint and which is made rigid at the bottom by means of reinforced-concrete ribs of a rectangular or trapezial cross-section which are arranged radially. When the reinforced-concrete ribs are of a trapezial cross-section, the ribs will be wider in the upper part thereof in contact with the slab, in order to make use of the excavation embankments as permanent formwork, increasing the resistant concrete section.
[0015] Said foundation is obtained by pouring the concrete "in situ" directly on the terrain that has not been removed and acts as permanent formwork. All the reinforcement necessary for the slab and ribs is put in place prior to pouring the concrete.
[0016] A T-shaped resistant section having high structural efficiency is generated because compressions are absorbed by the upper slab and tensions are resolved by reinforcements housed in the bottom part of the inside of the stiffening ribs.
[0017] To further optimize the use of concrete and the volume of earth that is excavated without jeopardizing the bearing qualities of the foundation, stepping can be made in the excavation of the ribs, thereby varying the edge thereof, which decreases as it moves away from the center of the slab.
[0018] Said ribs can be made with concrete "in situ", or they can be entirely or partially prefabricated, always working integrally with the upper slab.
[0019] In terrains having very little bearing capacity, piles can be made under the stiffening ribs, the structural design of the footing therefore being suitable for both superficial and deep foundations.
[0020] The terrain is improved by means of columns of gravel under the stiffening ribs.
[0021] Furthermore, the upper slab does not necessarily have to be formed by a single part entirely covering the stiffening ribs from their inner end to their outer end, rather said upper slab can be formed by several portions, a first portion covering the central core of the stiffening ribs. In this context, it is understood that the term "portion" refers to a part of the central slab which is physically separated from other possible portions of said slab. On the other hand, the central core is where the inner ends of the different stiffening ribs are joined to one another, and it is therefore considered to be an integral part of said stiffening ribs.
[0022] Therefore, the simplest configuration of the upper slab of the invention coincides with a single portion of upper slab covering only the inner ends of the stiffening ribs, i.e., covering only the central core. However, in another preferred embodiment of the invention the central slab is formed by two portions: a first portion covering the central core, and also a perimetral ring-shaped second portion separated from the first portion and connecting the outer ends of the ribs. The amount of concrete used is therefore reduced while at the same time maintaining good foundation performance because the second portion of the slab connecting the outer ends of the ribs makes the assembly rigid.
[0023] In yet another preferred embodiment of the invention, the central core furthermore has a hollow cylinder shape, thereby saving even more concrete and making the foundation more lightweight.
Brief Description of the Drawings [0024] To complete the description that is being made and for the purpose of aiding to better understand the features of the invention, a set of drawings is attached to the present specification in which the following is depicted with an illustrative and non-limiting character:
Figure 1 shows a perspective view of the system as a whole.
Figure 2 shows a perspective view of the foundation with ribs having a stepped variable section.
Figure 3 shows a longitudinal section view taken along one of the ribs.
Figure 4 shows a cross-section view.
Figure 5 shows a perspective view of the foundation with ribs of a trapezial cross-section.
Figure 6 shows the T-shaped resistant section object of the foundation of the present invention, as well as the stress-strain diagrams to calculate bending.
Figure 7 shows the inverted T-shaped resistant section as well as the corresponding stress-strain diagrams to calculate bending.
Figure 8 shows a top perspective view of an improved foundation according to the present invention where the upper slab covers only the central core.
Figure 9 shows a top perspective view of another improved foundation according to the present invention where the upper slab comprises a first portion covering the central core and a second portion connecting the outer ends of the ribs.
Figure 10 shows a bottom perspective view of another improved foundation according to the present invention where the central core is more lightweight as it has a hollow cylinder shape.
Preferred Embodiment of the Invention [0025] Figure 1 shows a perspective view of the system as a whole, formed by a foundation (3) and a shaft (4) in a construction for a wind turbine.
[0026] In the embodiment shown in Figures 1 to 5, a foundation can be seen which is formed by an upper reinforced-concrete slab (1) poured "in situ" having a polygonal footprint, although it could be of any other shape, such as circular, for example, and which is made rigid at the bottom by means of reinforcing ribs (2) of a rectangular cross-section made by means reinforced-concrete and arranged radially.
[0027] Figures 6 and 7 show a calculation example. In the case of Figure 6, the calculations are for a T-shaped section, and an ultimate resisting moment of 33,600 KNm and an x/h ratio of 0.16 are obtained. In the case of Figure 7, the calculations are for an inverted T-shaped section, and an ultimate moment of 27,900 KNm and an x/d ratio of 0.62 are obtained.
[0028] It can therefore be seen that with the same reinforcement and volume of concrete, the T-shaped section (object of the foundation of the present invention) is structurally more efficient for the type of forces to which the foundations object of this patent will be subjected, providing a 20% higher bending strength.
[0029] Sectional equilibrium requires that the resultant of tensions withstood by the reinforcement to be equal to the volume of compressions withstood by the concrete. The T-shaped section has a much wider compression head, which allows the neutral axis to remain high, and the mechanical arm to be noticeably larger than in the case of the inverted T-shaped section.
[0030] Additionally, as can be determined by the x/h ratio indicating the depth of the neutral axis with respect to the edge of the section, ductility is much greater in the T-shaped section, which allows for the plastic redistribution of forces in plastic regime.
[0031] Despite the fact that the inverted T-shaped section shown has the same amount of reinforcement and concrete, it is much less ductile, so it will not have any capacity for the plastic redistribution of forces, behaving in a fragile manner.
[0032] Therefore, the proposed T-shaped section has a dual advantage: • Greater bearing capacity and structural efficiency, i.e., greater resistance is obtained with the same reinforcement and volume of concrete (20% higher in the analyzed example, and even higher the higher the levels of requirement). • Greater ductility and capacity for the plastic redistribution of forces, which makes it much more suitable for dynamic requirements, such as those produced by an earthquake.
[0033] Figures 8-10 show embodiments where the concrete slab (1) does not cover the stiffening ribs in their entirety, rather only a part of them. Specifically, Figure 8 shows an example of a foundation comprising an upper slab (1) formed by a single portion covering the central core (7) of the stiffening ribs (2).
[0034] Figure 9 shows another example of a foundation where the upper slab (1) is formed by two portions: a first portion (1) similar to that shown in Figure 8 covering only the central core (7) of the stiffening ribs (2), and a perimetral ring-shaped second portion (6) connecting the outer ends of all the stiffening ribs (2). This allows reducing the total volume of concrete used while at the same time maintaining assembly rigidity.
[0035] Figure 10 shows another example of a foundation having an upper slab (1) similar to the one in Figure 8, covering only the central core (7) of the stiffening ribs (2), and where the central core (7) furthermore has a hollow cylinder shape. The weight of the assembly and the amount of material are doubly reduced in comparison with other embodiments of the invention where the slab (1) entirely covers the ribs (2) and the central core (7) is solid.
[0036] Finally, for a description of the method as the foundation (3) is produced, the mentioned foundation is obtained by pouring the concrete "in situ" directly on the terrain that has not been removed, acting as permanent formwork. As seen in Figure 5, the natural embankments of the terrain that are generated when excavating the radial ribs are what provide the trapezial section of said ribs, noticeably improving their bearing capacity.
[0037] Therefore, the method for producing the foundation could comprise the following steps: • Excavating terrain to form a cavity with a shape that is complementary to the foundation element. • Building a reinforcement in the excavated cavity which covers the opening of the slab (1) and the reinforcing ribs (2). • Pouring concrete into said excavated cavity in the terrain and in which the reinforcement has been arranged.
[0038] To further optimize the use of concrete and the volume of earth that is excavated without jeopardizing the bearing qualities of the foundation, stepping (5) can be made in the excavation of the ribs, as shown in Figure 2, thereby varying the edge thereof, which decreases as it moves away from the center of the slab.
[0039] Said ribs can be made with concrete "in situ" or can be completely or partially prefabricated (such as with double-walled semi-prefabricated elements, for example), always working integrally with the upper slab.
REFERENCES CITED IN THE DESCRIPTION
This list of references cited by the applicant is for the reader's convenience only. It does not form part of the European patent document. Even though great care has been taken in compiling the references, errors or omissions cannot be excluded and the EPO disclaims all liability in this regard.
Patent documents cited in the description • EP1074663A [0005| • W02004101898A Γ09061 • £$2347742 jQ.Q.Qlj

Claims (12)

PATENTKRAYPATENTKRAY 1. Ribbe-forsynet fundament for superstrukturer, kendetegnet ved,at det er dannet af en øvre stålbetonplade (1) med en polygonal eller cirkulær standflade, der på undersiden er gjort stiv ved hjælp af radiale stålbetonribber (2) med rektangulært tværsnit, og som udgår fra en central kærne (7).1. Ribbed foundation for superstructures, characterized in that it is formed by an upper steel concrete plate (1) having a polygonal or circular base which is stiffened on the underside by means of radial steel concrete ribs (2) of rectangular cross-section, and which starting from a central core (7). 2. Ribbe-forsynet fundament for superstrukturer ifølge det foregående krav, hvorved stålbetonribberne (2) har trapezformet tværsnit og ydermere i deres øvre område er i kontakt med stålbetonpladen (1) med henblik på at gøre brug af udgravningsvolde som permanent forskalling, hvilket gør det modstandsdygtige betonområde større.2. Ribbed foundation for superstructures according to the preceding claim, wherein the steel concrete ribs (2) have trapezoidal cross sections and furthermore in their upper area contact the steel concrete plate (1) for use of excavation walls as permanent formwork, which makes it resistant concrete area greater. 3. Ribbe-forsynet fundament for superstrukturer ifølge krav 1 eller krav 2, hvorved stålbetonribberne (2) har en konstant eller variabel kant, enten en trindelt kant (5) eller en kant med en konstant hældning, hvilken hældning aftager i voksende afstand fra pladens (1) midte.Ribbed foundation for superstructures according to claim 1 or claim 2, wherein the steel concrete ribs (2) have a constant or variable edge, either a stepwise edge (5) or a edge with a constant slope, which slope decreases with increasing distance from the plate. (1) center. 4. Ribbe-forsynet fundament for superstrukturer ifølge et hvilket som helst af de foregående krav, ydermere omfattende en række piller under de afstivede ribber (2).Ribbed foundation for superstructures according to any one of the preceding claims, further comprising a series of pellets under the stiffened ribs (2). 5. Ribbe-forsynet fundament for superstrukturer ifølge et hvilket som helst af de foregående krav, ydermere omfattende søjler af grus under afstivningsribberne med henblik på forbedring af terrænet.5. Ribbed foundation for superstructures according to any one of the preceding claims, further comprising columns of gravel under the stiffening ribs for the purpose of improving the terrain. 6. Ribbe-forsynet fundament for superstrukturer ifølge et hvilket som helst af de foregående krav, hvorved afstivningsribberne (2) helt er præfabrikerede, idet de er forsynet med fremstående forstærkning med henblik på forbindelse til pladen (1), som bygges på stedet.Ribbed foundation for superstructures according to any one of the preceding claims, wherein the stiffening ribs (2) are completely prefabricated, provided with prominent reinforcement for connection to the plate (1) being built on site. 7. Ribbe-forsynet fundament for superstrukturer ifølge et hvilket som helst af de foregående krav, hvorved afstivningsribbeme (2) er fremstillet ved hjælp af halvfabrikerede elementer, såsom for eksempel dobbelt-væggede dele.Ribbed foundation for superstructures according to any one of the preceding claims, wherein the stiffening ribs (2) are made by means of semi-fabricated elements, such as, for example, double-walled parts. 8. Ribbe-forsynet fundament for superstrukturer ifølge et hvilket som helst af de foregående krav, hvorved den øvre betonplade (1) omfatter et første område, der dækker ribbernes (2) centrale kærne (7).The ribbed foundation for superstructures according to any one of the preceding claims, wherein the upper concrete slab (1) comprises a first region covering the central core (7) of the ribs (2). 9. Ribbe-forsynet fundament for superstrukturer ifølge krav 8, hvorved den øvre betonplade (1) ydermere omfatter et perimetrisk, ringformet, andet område (6), som er adskilt i forhold til det første område og forbinder ribbemes (2) ydre ender.The ribbed foundation for superstructures according to claim 8, wherein the upper concrete slab (1) further comprises a perimetric annular second region (6) spaced from the first region and connecting the outer ends of the rib (2). 10. Ribbe-forsynet fundament for superstrukturer ifølge et hvilket som helst af de foregående krav, hvorved den centrale kærne (7) har hulcylindrisk form.Ribbed foundation for superstructures according to any one of the preceding claims, wherein the central core (7) has a hollow cylindrical shape. 11. Fremgangsmåde til fremstilling af superstrukturer, kendetegnet ved,at den omfatter trinnene: Udgravning af terræn, så der dannes et hulrum med en form, som er komplementær til fundamentelementerne ifølge et hvilket som helst af kravene 1 til 10; bygning af forstærkningen i det udgravede hulrum, og som dækker åbningen i pladen (1) og forstærkningsribberne (2); hældning af beton ind i hulrummet, som er udgravet i terrænet, og i hvilket forstærkningen er blevet indrettet.A method of fabricating superstructures, characterized in that it comprises the steps of: excavating terrain to form a cavity of a shape complementary to the foundation elements of any one of claims 1 to 10; building the reinforcement in the excavated cavity and covering the opening in the plate (1) and the reinforcing ribs (2); pouring concrete into the cavity which is excavated in the terrain and in which the reinforcement has been arranged. 12. Fremgangsmåde til fremstilling af fundamentet til superstrukturer ifølge krav 11, hvorved et antal søjler af gms eller piller anbringes i hulrummet, således at de placeres neden under forstærkningsribbeme i fundamentelementet.A method of fabricating the foundation for superstructures according to claim 11, wherein a plurality of columns of gms or pellets are placed in the cavity so as to be placed below the reinforcing ribs of the foundation element.
DK13800718.2T 2012-06-06 2013-06-06 Ribbed foundation for superstructures and method of making the foundation. DK2886723T3 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
ES201230877A ES2388161B1 (en) 2012-06-06 2012-06-06 Ribbed superstructure foundation and foundation completion procedure
ES201330083A ES2406390B1 (en) 2013-01-25 2013-01-25 Improvements in ribbed foundation superstructure and foundation completion procedure
PCT/ES2013/070367 WO2013182728A1 (en) 2012-06-06 2013-06-06 Ribbed foundation for superstructures and method for producing the foundation

Publications (1)

Publication Number Publication Date
DK2886723T3 true DK2886723T3 (en) 2017-06-19

Family

ID=49711456

Family Applications (1)

Application Number Title Priority Date Filing Date
DK13800718.2T DK2886723T3 (en) 2012-06-06 2013-06-06 Ribbed foundation for superstructures and method of making the foundation.

Country Status (13)

Country Link
US (1) US20150121784A1 (en)
EP (1) EP2886723B1 (en)
CN (1) CN104603367B (en)
AU (1) AU2013273463B2 (en)
CA (1) CA2875927A1 (en)
CL (1) CL2014003338A1 (en)
DK (1) DK2886723T3 (en)
HR (1) HRP20170901T1 (en)
MX (1) MX349972B (en)
PL (1) PL2886723T3 (en)
PT (1) PT2886723T (en)
WO (1) WO2013182728A1 (en)
ZA (1) ZA201409032B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6436256B1 (en) * 2017-07-04 2018-12-12 株式会社タケウチ建設 Building basic structure and construction method
US11283395B2 (en) 2018-03-23 2022-03-22 Nextracker Inc. Multiple actuator system for solar tracker
JP6685560B2 (en) * 2018-05-28 2020-04-22 中村物産有限会社 Foundation structure for wind power generator
US11387771B2 (en) 2018-06-07 2022-07-12 Nextracker Llc Helical actuator system for solar tracker
AT522250A1 (en) * 2019-02-28 2020-09-15 Holcim Technology Ltd Foundation for a wind turbine
US11050383B2 (en) 2019-05-21 2021-06-29 Nextracker Inc Radial cam helix with 0 degree stow for solar tracker
JP6868301B1 (en) * 2019-12-02 2021-05-12 株式会社タケウチ建設 Foundation structure of a building and its construction method

Family Cites Families (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1690259A (en) * 1922-12-30 1928-11-06 Joseph B Strauss Pavement
SE464477B (en) * 1989-01-05 1991-04-29 Erik Thelberg PREFABRICATED BUILDING ELEMENT
US5540524A (en) * 1994-06-07 1996-07-30 Gonsalves & Santucci, Inc. Concrete slab foundation and method of construction
US5816554C1 (en) * 1996-11-18 2001-07-31 Ronald G Mccracken Equipment support base
WO2000046452A1 (en) * 1999-02-05 2000-08-10 Northern Technologies, Inc. Support structure for elevating and supporting monopoles and associated equipment
EP1074663A1 (en) 1999-08-06 2001-02-07 Carl Bro as A foundation for supporting a building structure, in particular for the foundation of a tower structure, a wind turbine or the like
EP1116683B1 (en) * 2000-01-10 2005-09-21 Gottwald Port Technology GmbH Supporting structure for a crane
US6581352B1 (en) * 2000-08-17 2003-06-24 Kamran Amirsoleymani Concrete composite structural system
US20040226236A1 (en) * 2000-11-21 2004-11-18 Pidgeon John Terry Foundation structure
US6546685B2 (en) * 2001-01-03 2003-04-15 United States Filter Corporation Bracket for use in securing collector flight support tracks in a wastewater treatment tank
US7010891B1 (en) * 2002-04-02 2006-03-14 Ryan Clark Haunch assembly for supporting a concrete slab and method of making the haunch assembly
US7533505B2 (en) * 2003-01-06 2009-05-19 Henderson Allan P Pile anchor foundation
DE10321647A1 (en) 2003-05-13 2004-12-02 Wobben, Aloys, Dipl.-Ing. Foundation for a wind turbine
NZ538538A (en) * 2005-02-28 2005-06-24 David John Cook Improved method of laying a foundation
US20110061321A1 (en) * 2006-09-21 2011-03-17 Ahmed Phuly Fatigue reistant foundation system
US20080072511A1 (en) * 2006-09-21 2008-03-27 Ahmed Phuly Partially prefabricated modular foundation system
US8499513B2 (en) * 2007-12-21 2013-08-06 Tony Jolly Tower foundation
WO2009085187A1 (en) * 2007-12-21 2009-07-09 Tony Jolly Tower foundation
US8607517B2 (en) * 2007-12-21 2013-12-17 Tony Jolly Tower foundation
ES2347742A1 (en) 2008-03-18 2010-11-03 GAMESA INNOVATION & TECHNOLOGY S.L. Foundation for a wind turbine
CN101560774B (en) * 2009-05-20 2010-09-22 赵正义 Combination foundation of large-scale tower mast type mechanical equipment
CN201962691U (en) * 2011-02-17 2011-09-07 付俭 Mortise-tenon connection type tower crane foundation with concrete prefabricated component
EP2541059A2 (en) * 2011-06-28 2013-01-02 Gamesa Innovation & Technology, S.L. Footing for wind turbine towers
CN202187365U (en) * 2011-07-21 2012-04-11 胥传明 Detachable tower footing

Also Published As

Publication number Publication date
MX349972B (en) 2017-08-23
ZA201409032B (en) 2015-12-23
CN104603367A (en) 2015-05-06
PT2886723T (en) 2017-06-08
MX2014014991A (en) 2015-11-06
EP2886723A1 (en) 2015-06-24
EP2886723B1 (en) 2017-03-15
US20150121784A1 (en) 2015-05-07
AU2013273463A1 (en) 2015-01-22
HRP20170901T1 (en) 2017-10-20
PL2886723T3 (en) 2017-10-31
CL2014003338A1 (en) 2015-07-24
EP2886723A4 (en) 2016-11-16
AU2013273463B2 (en) 2017-06-15
CN104603367B (en) 2018-02-13
CA2875927A1 (en) 2013-12-12
WO2013182728A1 (en) 2013-12-12

Similar Documents

Publication Publication Date Title
DK2886723T3 (en) Ribbed foundation for superstructures and method of making the foundation.
DK2256338T3 (en) Foundation, especially for a wind turbine and wind turbine
US11976432B2 (en) Foundation for wind turbine towers
US20120003051A1 (en) Building construction method and system
EP3115513A1 (en) Prefabricated footing for wind turbines
CN204738307U (en) Part builds in board -like aerogenerator of type raft basis
CN203475289U (en) Pile type continuous rigid frame bridge
CN103510458B (en) Pile type continuous rigid frame bridge and construction method thereof
CN215483004U (en) Expansive soil stratum ultra-deep shaft supporting structure
EP3845712A1 (en) Precast foundation structure for a wind turbine, wind turbine and assembly method of a wind turbine
CN110792095B (en) Multi-pile bearing platform-spiral anchor composite foundation
CN212336079U (en) Suction bucket foundation with precast concrete pressing block
CN211816333U (en) Circular parallelly connected friction pile
CN210216477U (en) Open caisson structure with stiffening rib wall outside
CN105908759A (en) Device for reinforcing concrete sprayed in deep foundation pit and construction method
RU2794278C2 (en) Foundation for wind turbine towers
CN109750686A (en) A kind of tower crane is connected the construction method and structure of shared stand column pile with support
RU2325483C1 (en) Technique for erecting solid core foundation slab
CN214089901U (en) Double steel-pipe pile and construction road integration supporting construction
CN102936901A (en) Wind power tower foundation with inverted frustum and independent column combined
CN214940392U (en) Adopt reverse construction method to carry out basement supporting construction for construction
CN216552051U (en) Column-barrel combined bearing type fan foundation
CN115059188B (en) Steel column structure for corner of structural well, building and construction method
CN220927934U (en) Basement post roof shock insulation retaining wall structure
CN220117273U (en) Prefabricated assembled prestressing force retaining wall