US20150121784A1 - Ribbed foundation for superstructures and method for producing the foundation - Google Patents

Ribbed foundation for superstructures and method for producing the foundation Download PDF

Info

Publication number
US20150121784A1
US20150121784A1 US14/406,114 US201314406114A US2015121784A1 US 20150121784 A1 US20150121784 A1 US 20150121784A1 US 201314406114 A US201314406114 A US 201314406114A US 2015121784 A1 US2015121784 A1 US 2015121784A1
Authority
US
United States
Prior art keywords
foundation
concrete
ribs
slab
superstructures
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US14/406,114
Inventor
Cesar Abad Huber
Jorge Franco Rey
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gestamp Hybrid Towers SL
Original Assignee
Gestamp Hybrid Towers SL
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from ES201230877A external-priority patent/ES2388161B1/en
Priority claimed from ES201330083A external-priority patent/ES2406390B1/en
Application filed by Gestamp Hybrid Towers SL filed Critical Gestamp Hybrid Towers SL
Assigned to GESTAMP HYBRID TOWERS, S.L. reassignment GESTAMP HYBRID TOWERS, S.L. ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: ABAD HUBER, CESAR, FRANCO REY, JORGE
Publication of US20150121784A1 publication Critical patent/US20150121784A1/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/01Flat foundations
    • E02D27/016Flat foundations made mainly from prefabricated concrete elements
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/01Flat foundations
    • E02D27/02Flat foundations without substantial excavation
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/01Flat foundations
    • E02D27/08Reinforcements for flat foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • E02D27/425Foundations for poles, masts or chimneys specially adapted for wind motors masts

Definitions

  • the present invention relates to a reinforced-concrete foundation system for erecting superstructures that transmit high axial loads, shearing forces and/or bending moments at individual points, such as wind turbines.
  • the foundation object of the present invention is formed by an upper reinforced-concrete slab poured “in situ”, having a polygonal or circular footprint, and which is made rigid at the bottom by means of reinforced-concrete ribs of a rectangular or trapezial cross-section which are arranged radially.
  • the method envisages said ribs being made with concrete “in situ”, or alternatively by means of prefabricated elements, always working integrally with the upper slab.
  • This new foundation seeks to considerably reduce costs for building conventional foundations for such superstructures by considerably improving completion deadlines.
  • the type of foundation most frequently used today for superstructures such as wind turbines is a foundation slab having different footprint configurations: they can be square, circular, hexagonal, octagonal, etc.
  • the edge of the slab can be constant or variable for the purpose of optimizing the use of concrete.
  • European patent application EP1074663 is known, for example, which discloses an example of a foundation with three stabilizing members arranged symmetrically around a central support, with the drawback of having very little surface for contacting with the terrain, with the subsequent increase in stress applied on the terrain and in settlements.
  • Patent application PCT WO20041101898 describes a circular foundation based on prefabricated triangular sections. This solution requires completely emptying out the excavated cavity, resulting in an inverted T-shaped concrete section that does not involve any structural advantage because the width of the compressed concrete head is very small. This means that when calculating bending, the neutral axis will be lower and there will be a smaller mechanical arm, the need for reinforcement increasing and sectional ductility considerably dropping.
  • Spanish patent application ES-2347742 describes a cone-shaped foundation together with a lower planar ring-shaped slab. It is a very complex solution to implement and presents serious questions concerning its structural performance.
  • the type of foundation for these superstructures is a very well-known and easy to calculate and design technical solution, and the simplicity thereof further simplifies the formwork and construction.
  • such foundations have the drawback of being quite large, so the use of steel and concrete as well as the volume of earth that is removed is extraordinarily high, all of which noticeably increases the economic cost of the structure.
  • the impact of the cost of the foundation on the cost of the structure is higher the larger the superstructure is; for example, in the case of wind turbines, an increase in shaft height from 80 m to 120 m (50%) produces a 300% foundation cost increment.
  • This problem is very real due to the tendency to building more and more high-powered wind turbines with a shaft height of 120 m, which produces a cost increment for producing the foundation, making it a weak competitor for all these conventional systems of producing reinforced-concrete foundations.
  • the present invention presents a solution formed by an upper reinforced-concrete slab poured “in situ” having a polygonal or circular footprint and which is made rigid at the bottom by means of reinforced-concrete ribs of a rectangular or trapezial cross-section which are arranged radially stemming from a central core.
  • the concrete for the ribs is poured directly on the previously excavated terrain, whereas the slab rests on the terrain that has not been removed, acting as permanent formwork.
  • the solution consisting of an upper slab and ribs making the slab rigid at the bottom refers to the arrangement of both elements with respect to the surface of the ground where the foundation is built, where the slab is arranged first and the stiffening ribs would be arranged below the slab.
  • the stiffening ribs can be made with concrete “in situ” or can be prefabricated, always working integrally with the upper slab, and they can have a constant or variable edge, either a stepped edge or an edge having a constant slope, the section thereof decreasing as it moves away from the central core of the slab.
  • stiffening ribs that are entirely prefabricated, said ribs will be provided with projecting reinforcement for connection with the slab built “in situ”.
  • the stiffening ribs could also be made by means of semi-prefabricated elements, such as double-walled parts, for example, which remain embedded when the concrete is poured to form the foundation.
  • the foundation object of the present invention is formed by an upper reinforced-concrete slab poured in “situ” having a circular or polygonal footprint and which is made rigid at the bottom by means of reinforced-concrete ribs of a rectangular or trapezial cross-section which are arranged radially.
  • the reinforced-concrete ribs are of a trapezial cross-section, the ribs will be wider in the upper part thereof in contact with the slab, in order to make use of the excavation embankments as permanent formwork, increasing the resistant concrete section.
  • Said foundation is obtained by pouring the concrete “in situ” directly on the terrain that has not been removed and acts as permanent formwork. All the reinforcement necessary for the slab and ribs is put in place prior to pouring the concrete.
  • a T-shaped resistant section having high structural efficiency is generated because compressions are absorbed by the upper slab and tensions are resolved by reinforcements housed in the bottom part of the inside of the stiffening ribs.
  • stepping can be made in the excavation of the ribs, thereby varying the edge thereof, which decreases as it moves away from the center of the slab.
  • Said ribs can be made with concrete “in situ”, or they can be entirely or partially prefabricated, always working integrally with the upper slab.
  • piles can be made under the stiffening ribs, the structural design of the footing therefore being suitable for both superficial and deep foundations.
  • the terrain is improved by means of columns of gravel under the stiffening ribs.
  • the upper slab does not necessarily have to be formed by a single part entirely covering the stiffening ribs from their inner end to their outer end, rather said upper slab can be formed by several portions, a first portion covering the central core of the stiffening ribs.
  • portion refers to a part of the central slab which is physically separated from other possible portions of said slab.
  • the central core is where the inner ends of the different stiffening ribs are joined to one another, and it is therefore considered to be an integral part of said stiffening ribs.
  • the simplest configuration of the upper slab of the invention coincides with a single portion of upper slab covering only the inner ends of the stiffening ribs, i.e., covering only the central core.
  • the central slab is formed by two portions: a first portion covering the central core, and also a perimetral ring-shaped second portion separated from the first portion and connecting the outer ends of the ribs. The amount of concrete used is therefore reduced while at the same time maintaining good foundation performance because the second portion of the slab connecting the outer ends of the ribs makes the assembly rigid.
  • the central core furthermore has a hollow cylinder shape, thereby saving even more concrete and making the foundation more lightweight.
  • FIG. 1 shows a perspective view of the system as a whole.
  • FIG. 2 shows a perspective view of the foundation with ribs having a stepped variable section.
  • FIG. 3 shows a longitudinal section view taken along one of the ribs.
  • FIG. 4 shows a cross-section view
  • FIG. 5 shows a perspective view of the foundation with ribs of a trapezial cross-section.
  • FIG. 6 shows the T-shaped resistant section object of the foundation of the present invention, as well as the stress-strain diagrams to calculate bending.
  • FIG. 7 shows the inverted T-shaped resistant section as well as the corresponding stress-strain diagrams to calculate bending.
  • FIG. 8 shows a top perspective view of an improved foundation according to the present invention where the upper slab covers only the central core.
  • FIG. 9 shows a top perspective view of another improved foundation according to the present invention where the upper slab comprises a first portion covering the central core and a second portion connecting the outer ends of the ribs.
  • FIG. 10 shows a bottom perspective view of another improved foundation according to the present invention where the central core is more lightweight as it has a hollow cylinder shape
  • FIG. 1 shows a perspective view of the system as a whole, formed by a foundation ( 3 ) and a shaft ( 4 ) in a construction for a wind turbine.
  • a foundation can be seen which is formed by an upper reinforced-concrete slab ( 1 ) poured “in situ” having a polygonal footprint, although it could be of any other shape, such as circular, for example, and which is made rigid at the bottom by means of reinforcing ribs ( 2 ) of a rectangular cross-section made by means reinforced-concrete and arranged radially.
  • FIGS. 6 and 7 show a calculation example.
  • the calculations are for a T-shaped section, and an ultimate resisting moment of 33,600 KNm and an x/h ratio of 0.16 are obtained.
  • the calculations are for an inverted. T-shaped section, and an ultimate moment of 27,900 KNm and an x/d ratio of 0.62 are obtained.
  • the T-shaped section (object of the foundation of the present invention) is structurally more efficient for the type of forces to which the foundations object of this patent will be subjected, providing a 20% higher bending strength.
  • Sectional equilibrium requires that the resultant of tensions withstood by the reinforcement to be equal to the volume of compressions withstood by the concrete.
  • the T-shaped section has a much wider compression head, which allows the neutral axis to remain high, and the mechanical arm to be noticeably larger than in the case of the inverted T-shaped section.
  • ductility is much greater in the T-shaped section, which allows for the plastic redistribution of forces in plastic regime.
  • inverted T-shaped section shown has the same amount of reinforcement and concrete, it is much less ductile, so it will not have any capacity for the plastic redistribution of forces, behaving in a fragile manner.
  • the proposed T-shaped section has a dual advantage:
  • FIGS. 8-10 show embodiments where the concrete slab ( 1 ) does not cover the stiffening ribs in their entirety, rather only a part of them.
  • FIG. 8 shows an example of a foundation comprising an upper slab ( 1 ) formed by a single portion covering the central core ( 7 ) of the stiffening ribs ( 2 ).
  • FIG. 9 shows another example of a foundation where the upper slab ( 1 ) is formed by two portions: a first portion ( 1 ) similar to that shown in FIG. 8 covering only the central core ( 7 ) of the stiffening ribs ( 2 ), and a perimetral ring-shaped second portion ( 6 ) connecting the outer ends of all the stiffening ribs ( 2 ). This allows reducing the total volume of concrete used while at the same time maintaining assembly rigidity.
  • FIG. 10 shows another example of a foundation having an upper slab ( 1 ) similar to the one in FIG. 8 , covering only the central core ( 7 ) of the stiffening ribs ( 2 ), and where the central core ( 7 ) furthermore has a hollow cylinder shape.
  • the weight of the assembly and the amount of material are doubly reduced in comparison with other embodiments of the invention where the slab ( 1 ) entirely covers the ribs ( 2 ) and the central core ( 7 ) is solid.
  • the mentioned foundation is obtained by pouring the concrete “in situ” directly on the terrain that has not been removed, acting as permanent formwork.
  • the natural embankments of the terrain that are generated when excavating the radial ribs are what provide the trapezial section of said ribs, noticeably improving their bearing capacity.
  • the method for producing the foundation could comprise the following steps:
  • stepping ( 5 ) can be made in the excavation of the ribs, as shown in FIG. 2 , thereby varying the edge thereof, which decreases as it moves away from the center of the slab.
  • Said ribs can be made with concrete “in situ” or can be completely or partially prefabricated (such as with double-walled semi-prefabricated elements, for example), always working integrally with the upper slab.

Abstract

The present invention relates to a reinforced-concrete foundation system for erecting superstructures that transmit high axial loads, shearing forces and/or flexural moments at individual points, such as, for example, wind turbines. The foundation that is the subject matter of the present invention is formed by an upper reinforced-concrete slab poured “in situ”, of polygonal or circular footprint, and which is made rigid at the bottom by means of reinforced-concrete ribs of rectangular or trapezial cross section which are arranged radially. The method makes provision for said ribs to be produced from concrete “in situ” or, alternatively, by means of prefabricated elements, always working, jointly with the upper slab. This new foundation considerably reduces the costs of forming traditional foundations for this type of superstructure, by considerably improving completion deadlines.

Description

    OBJECT OF THE INVENTION
  • The present invention relates to a reinforced-concrete foundation system for erecting superstructures that transmit high axial loads, shearing forces and/or bending moments at individual points, such as wind turbines.
  • The foundation object of the present invention is formed by an upper reinforced-concrete slab poured “in situ”, having a polygonal or circular footprint, and which is made rigid at the bottom by means of reinforced-concrete ribs of a rectangular or trapezial cross-section which are arranged radially. The method envisages said ribs being made with concrete “in situ”, or alternatively by means of prefabricated elements, always working integrally with the upper slab.
  • This new foundation seeks to considerably reduce costs for building conventional foundations for such superstructures by considerably improving completion deadlines.
  • BACKGROUND OF THE INVENTION
  • The type of foundation most frequently used today for superstructures such as wind turbines is a foundation slab having different footprint configurations: they can be square, circular, hexagonal, octagonal, etc. The edge of the slab can be constant or variable for the purpose of optimizing the use of concrete.
  • The applicant is aware of the existence of other foundation systems which attempt to minimize the volume of steel and concrete, such as in the following publications:
  • European patent application EP1074663 is known, for example, which discloses an example of a foundation with three stabilizing members arranged symmetrically around a central support, with the drawback of having very little surface for contacting with the terrain, with the subsequent increase in stress applied on the terrain and in settlements.
  • Patent application PCT WO20041101898 describes a circular foundation based on prefabricated triangular sections. This solution requires completely emptying out the excavated cavity, resulting in an inverted T-shaped concrete section that does not involve any structural advantage because the width of the compressed concrete head is very small. This means that when calculating bending, the neutral axis will be lower and there will be a smaller mechanical arm, the need for reinforcement increasing and sectional ductility considerably dropping.
  • Finally, Spanish patent application ES-2347742 describes a cone-shaped foundation together with a lower planar ring-shaped slab. It is a very complex solution to implement and presents serious questions concerning its structural performance.
  • The type of foundation for these superstructures is a very well-known and easy to calculate and design technical solution, and the simplicity thereof further simplifies the formwork and construction. However, such foundations have the drawback of being quite large, so the use of steel and concrete as well as the volume of earth that is removed is extraordinarily high, all of which noticeably increases the economic cost of the structure. The impact of the cost of the foundation on the cost of the structure is higher the larger the superstructure is; for example, in the case of wind turbines, an increase in shaft height from 80 m to 120 m (50%) produces a 300% foundation cost increment. This problem is very real due to the tendency to building more and more high-powered wind turbines with a shaft height of 120 m, which produces a cost increment for producing the foundation, making it a weak competitor for all these conventional systems of producing reinforced-concrete foundations.
  • DESCRIPTION OF THE INVENTION
  • In an attempt to overcome the mentioned problems in the state of the art, the present invention presents a solution formed by an upper reinforced-concrete slab poured “in situ” having a polygonal or circular footprint and which is made rigid at the bottom by means of reinforced-concrete ribs of a rectangular or trapezial cross-section which are arranged radially stemming from a central core. The concrete for the ribs is poured directly on the previously excavated terrain, whereas the slab rests on the terrain that has not been removed, acting as permanent formwork.
  • The solution consisting of an upper slab and ribs making the slab rigid at the bottom refers to the arrangement of both elements with respect to the surface of the ground where the foundation is built, where the slab is arranged first and the stiffening ribs would be arranged below the slab.
  • The advantages of this foundation are
      • The volume of concrete used is much less than in the conventional solutions described above.
      • The excavation cost is reduced, with the subsequent reducing of hauling to a dump.
      • Formwork is reduced and simplified.
      • Unmatched T-shaped resistant section efficiency is obtained because compressions are absorbed by the slab.
  • The stiffening ribs can be made with concrete “in situ” or can be prefabricated, always working integrally with the upper slab, and they can have a constant or variable edge, either a stepped edge or an edge having a constant slope, the section thereof decreasing as it moves away from the central core of the slab.
  • In the case of using stiffening ribs that are entirely prefabricated, said ribs will be provided with projecting reinforcement for connection with the slab built “in situ”. The stiffening ribs could also be made by means of semi-prefabricated elements, such as double-walled parts, for example, which remain embedded when the concrete is poured to form the foundation.
  • The foundation object of the present invention is formed by an upper reinforced-concrete slab poured in “situ” having a circular or polygonal footprint and which is made rigid at the bottom by means of reinforced-concrete ribs of a rectangular or trapezial cross-section which are arranged radially. When the reinforced-concrete ribs are of a trapezial cross-section, the ribs will be wider in the upper part thereof in contact with the slab, in order to make use of the excavation embankments as permanent formwork, increasing the resistant concrete section.
  • Said foundation is obtained by pouring the concrete “in situ” directly on the terrain that has not been removed and acts as permanent formwork. All the reinforcement necessary for the slab and ribs is put in place prior to pouring the concrete.
  • A T-shaped resistant section having high structural efficiency is generated because compressions are absorbed by the upper slab and tensions are resolved by reinforcements housed in the bottom part of the inside of the stiffening ribs.
  • To further optimize the use of concrete and the volume of earth that is excavated without jeopardizing the bearing qualities of the foundation, stepping can be made in the excavation of the ribs, thereby varying the edge thereof, which decreases as it moves away from the center of the slab.
  • Said ribs can be made with concrete “in situ”, or they can be entirely or partially prefabricated, always working integrally with the upper slab.
  • In terrains having very little bearing capacity, piles can be made under the stiffening ribs, the structural design of the footing therefore being suitable for both superficial and deep foundations.
  • The terrain is improved by means of columns of gravel under the stiffening ribs.
  • Furthermore, the upper slab does not necessarily have to be formed by a single part entirely covering the stiffening ribs from their inner end to their outer end, rather said upper slab can be formed by several portions, a first portion covering the central core of the stiffening ribs. In this context, it is understood that the term “portion” refers to a part of the central slab which is physically separated from other possible portions of said slab. On the other hand, the central core is where the inner ends of the different stiffening ribs are joined to one another, and it is therefore considered to be an integral part of said stiffening ribs.
  • Therefore, the simplest configuration of the upper slab of the invention coincides with a single portion of upper slab covering only the inner ends of the stiffening ribs, i.e., covering only the central core. However, in another preferred embodiment of the invention the central slab is formed by two portions: a first portion covering the central core, and also a perimetral ring-shaped second portion separated from the first portion and connecting the outer ends of the ribs. The amount of concrete used is therefore reduced while at the same time maintaining good foundation performance because the second portion of the slab connecting the outer ends of the ribs makes the assembly rigid.
  • In yet another preferred, embodiment of the invention, the central core furthermore has a hollow cylinder shape, thereby saving even more concrete and making the foundation more lightweight.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • To complete the description that is being made and for the purpose of aiding to better understand the features of the invention, a set of drawings is attached to the present specification in which the following is depicted with an illustrative and non-limiting character:
  • FIG. 1 shows a perspective view of the system as a whole.
  • FIG. 2 shows a perspective view of the foundation with ribs having a stepped variable section.
  • FIG. 3 shows a longitudinal section view taken along one of the ribs.
  • FIG. 4 shows a cross-section view.
  • FIG. 5 shows a perspective view of the foundation with ribs of a trapezial cross-section.
  • FIG. 6 shows the T-shaped resistant section object of the foundation of the present invention, as well as the stress-strain diagrams to calculate bending.
  • FIG. 7 shows the inverted T-shaped resistant section as well as the corresponding stress-strain diagrams to calculate bending.
  • FIG. 8 shows a top perspective view of an improved foundation according to the present invention where the upper slab covers only the central core.
  • FIG. 9 shows a top perspective view of another improved foundation according to the present invention where the upper slab comprises a first portion covering the central core and a second portion connecting the outer ends of the ribs.
  • FIG. 10 shows a bottom perspective view of another improved foundation according to the present invention where the central core is more lightweight as it has a hollow cylinder shape,
  • PREFERRED EMBODIMENT OF THE INVENTION
  • FIG. 1 shows a perspective view of the system as a whole, formed by a foundation (3) and a shaft (4) in a construction for a wind turbine.
  • In the embodiment shown in FIGS. 1 to 5, a foundation can be seen which is formed by an upper reinforced-concrete slab (1) poured “in situ” having a polygonal footprint, although it could be of any other shape, such as circular, for example, and which is made rigid at the bottom by means of reinforcing ribs (2) of a rectangular cross-section made by means reinforced-concrete and arranged radially.
  • FIGS. 6 and 7 show a calculation example. In the case of FIG. 6, the calculations are for a T-shaped section, and an ultimate resisting moment of 33,600 KNm and an x/h ratio of 0.16 are obtained. In the case of FIG. 7, the calculations are for an inverted. T-shaped section, and an ultimate moment of 27,900 KNm and an x/d ratio of 0.62 are obtained.
  • It can therefore be seen that with the same reinforcement and volume of concrete, the T-shaped section (object of the foundation of the present invention) is structurally more efficient for the type of forces to which the foundations object of this patent will be subjected, providing a 20% higher bending strength.
  • Sectional equilibrium requires that the resultant of tensions withstood by the reinforcement to be equal to the volume of compressions withstood by the concrete. The T-shaped section has a much wider compression head, which allows the neutral axis to remain high, and the mechanical arm to be noticeably larger than in the case of the inverted T-shaped section.
  • Additionally, as can be determined by the x/h ratio indicating the depth of the neutral axis with respect to the edge of the section, ductility is much greater in the T-shaped section, which allows for the plastic redistribution of forces in plastic regime.
  • Despite the fact that the inverted T-shaped section shown has the same amount of reinforcement and concrete, it is much less ductile, so it will not have any capacity for the plastic redistribution of forces, behaving in a fragile manner.
  • Therefore, the proposed T-shaped section has a dual advantage:
      • Greater bearing capacity and structural efficiency, i.e., greater resistance is obtained with the same reinforcement and volume of concrete (20% higher in the analyzed example, and even higher the higher the levels of requirement).
      • Greater ductility and capacity for the plastic redistribution of forces, which makes it much more suitable for dynamic requirements, such as those produced by an earthquake.
  • FIGS. 8-10 show embodiments where the concrete slab (1) does not cover the stiffening ribs in their entirety, rather only a part of them. Specifically, FIG. 8 shows an example of a foundation comprising an upper slab (1) formed by a single portion covering the central core (7) of the stiffening ribs (2).
  • FIG. 9 shows another example of a foundation where the upper slab (1) is formed by two portions: a first portion (1) similar to that shown in FIG. 8 covering only the central core (7) of the stiffening ribs (2), and a perimetral ring-shaped second portion (6) connecting the outer ends of all the stiffening ribs (2). This allows reducing the total volume of concrete used while at the same time maintaining assembly rigidity.
  • FIG. 10 shows another example of a foundation having an upper slab (1) similar to the one in FIG. 8, covering only the central core (7) of the stiffening ribs (2), and where the central core (7) furthermore has a hollow cylinder shape. The weight of the assembly and the amount of material are doubly reduced in comparison with other embodiments of the invention where the slab (1) entirely covers the ribs (2) and the central core (7) is solid.
  • Finally, for a description of the method as the foundation (3) is produced, the mentioned foundation is obtained by pouring the concrete “in situ” directly on the terrain that has not been removed, acting as permanent formwork. As seen in FIG. 5, the natural embankments of the terrain that are generated when excavating the radial ribs are what provide the trapezial section of said ribs, noticeably improving their bearing capacity.
  • Therefore, the method for producing the foundation could comprise the following steps:
      • Excavating terrain to form a cavity with a shape that is complementary to the foundation element.
      • Building a reinforcement in the excavated cavity which covers the opening of the slab (1) and the reinforcing ribs (2).
      • Pouring concrete into said excavated cavity in the terrain and in which the reinforcement has been arranged.
  • To further optimize the use of concrete and the volume of earth that is excavated without jeopardizing the bearing qualities of the foundation, stepping (5) can be made in the excavation of the ribs, as shown in FIG. 2, thereby varying the edge thereof, which decreases as it moves away from the center of the slab.
  • Said ribs can be made with concrete “in situ” or can be completely or partially prefabricated (such as with double-walled semi-prefabricated elements, for example), always working integrally with the upper slab.

Claims (12)

1. Ribbed foundation for superstructures, characterized in that it is formed by an upper reinforced-concrete slab (1) having a polygonal or circular footprint and which is made rigid at the bottom by means of radial reinforced-concrete ribs (2) of a rectangular cross-section stemming from a central core (7).
2. Ribbed foundation for superstructures according to the preceding claim, where the reinforced-concrete ribs (2) are of a trapezoidal cross-section and wider in the upper portion thereof in contact with the slab (1) in order to make use of excavation embankments as permanent formwork, increasing the resistant concrete section.
3. Ribbed foundation for superstructures according to claim 1 or 2, where the reinforced-concrete ribs (2) have a constant or variable edge, either a stepped edge (5) or an edge having a constant slope, said slope decreasing as it moves away from the center of the slab (1).
4. Ribbed foundation for superstructures according to any of the preceding claims, further comprising a series of piles under the stiffening ribs (2).
5. Ribbed foundation for superstructures according to any of the preceding claims, further comprising columns of gravel under the stiffening ribs to improve the terrain.
6. Ribbed foundation for superstructures according to any of the preceding claims, where the stiffening ribs (2) are entirely prefabricated, being provided with projecting reinforcement for connection with the slab (1) built “in situ”.
7. Ribbed foundation for superstructures according to any of the preceding claims, where the stiffening ribs (2) are made by means of semi-prefabricated elements, such as double-walled parts, for example.
8. Ribbed foundation for superstructures according to any of the preceding claims, where the upper concrete slab (1) comprises a first portion covering the central core (7) of the ribs (2).
9. Ribbed foundation for superstructures according to claim 8, where the upper concrete slab (1) further comprises a perimetral ring-shaped second portion (6) separated from said first portion and connecting the outer ends of the ribs (2).
10. Ribbed foundation for superstructures according to any of the preceding claims, where the central core (7) has a hollow cylinder shape.
11. Method for producing the foundation for superstructures, characterized in that it comprises the steps of:
excavating terrain to form a cavity with a shape that is complementary to the foundation element according to any one of claims 1 to 10.
building the reinforcement in the excavated cavity which covers the opening of the slab (1) and of the reinforcing ribs (2)
pouring concrete into said cavity excavated in the terrain and in which the reinforcement has been arranged.
12. Method for producing the foundation for superstructures according to claim 11, wherein a plurality of columns of gravel or piles are arranged in said cavity such that they are arranged below the reinforcing ribs of the foundation element.
US14/406,114 2012-06-06 2013-06-06 Ribbed foundation for superstructures and method for producing the foundation Abandoned US20150121784A1 (en)

Applications Claiming Priority (5)

Application Number Priority Date Filing Date Title
ES201230877A ES2388161B1 (en) 2012-06-06 2012-06-06 Ribbed superstructure foundation and foundation completion procedure
ESP201230877 2012-06-06
ESP201330083 2013-01-25
ES201330083A ES2406390B1 (en) 2013-01-25 2013-01-25 Improvements in ribbed foundation superstructure and foundation completion procedure
PCT/ES2013/070367 WO2013182728A1 (en) 2012-06-06 2013-06-06 Ribbed foundation for superstructures and method for producing the foundation

Publications (1)

Publication Number Publication Date
US20150121784A1 true US20150121784A1 (en) 2015-05-07

Family

ID=49711456

Family Applications (1)

Application Number Title Priority Date Filing Date
US14/406,114 Abandoned US20150121784A1 (en) 2012-06-06 2013-06-06 Ribbed foundation for superstructures and method for producing the foundation

Country Status (13)

Country Link
US (1) US20150121784A1 (en)
EP (1) EP2886723B1 (en)
CN (1) CN104603367B (en)
AU (1) AU2013273463B2 (en)
CA (1) CA2875927A1 (en)
CL (1) CL2014003338A1 (en)
DK (1) DK2886723T3 (en)
HR (1) HRP20170901T1 (en)
MX (1) MX349972B (en)
PL (1) PL2886723T3 (en)
PT (1) PT2886723T (en)
WO (1) WO2013182728A1 (en)
ZA (1) ZA201409032B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2019015164A (en) * 2017-07-04 2019-01-31 株式会社タケウチ建設 Building foundation structure and construction method of the same
JP2019206803A (en) * 2018-05-28 2019-12-05 中村物産有限会社 Foundation structure for wind power generator
AT522250A1 (en) * 2019-02-28 2020-09-15 Holcim Technology Ltd Foundation for a wind turbine
US11050383B2 (en) 2019-05-21 2021-06-29 Nextracker Inc Radial cam helix with 0 degree stow for solar tracker
US11159120B2 (en) 2018-03-23 2021-10-26 Nextracker Inc. Multiple actuator system for solar tracker
US11387771B2 (en) 2018-06-07 2022-07-12 Nextracker Llc Helical actuator system for solar tracker
US11566394B2 (en) * 2019-12-02 2023-01-31 Takeuchi Construction Co., Ltd. Building foundation structure, and construction method therefor

Citations (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1690259A (en) * 1922-12-30 1928-11-06 Joseph B Strauss Pavement
US5433049A (en) * 1989-01-05 1995-07-18 Karlsson; Goeran Prefabricated building foundation element
US5540524A (en) * 1994-06-07 1996-07-30 Gonsalves & Santucci, Inc. Concrete slab foundation and method of construction
US5816554A (en) * 1996-11-18 1998-10-06 Mccracken; Ronald G. Equipment support base
US6546685B2 (en) * 2001-01-03 2003-04-15 United States Filter Corporation Bracket for use in securing collector flight support tracks in a wastewater treatment tank
US6581352B1 (en) * 2000-08-17 2003-06-24 Kamran Amirsoleymani Concrete composite structural system
US20040226236A1 (en) * 2000-11-21 2004-11-18 Pidgeon John Terry Foundation structure
US7010891B1 (en) * 2002-04-02 2006-03-14 Ryan Clark Haunch assembly for supporting a concrete slab and method of making the haunch assembly
US7066094B2 (en) * 2000-01-10 2006-06-27 Gottwald Port Technology Gmbh Supporting framework for a craneway
US20080072511A1 (en) * 2006-09-21 2008-03-27 Ahmed Phuly Partially prefabricated modular foundation system
US20080141615A1 (en) * 2005-02-28 2008-06-19 David John Cook Method of Laying a Foundation
US20090158680A1 (en) * 2007-12-21 2009-06-25 Tony Jolly Tower foundation
US7707797B2 (en) * 2003-12-15 2010-05-04 Henderson Allan P Pile anchor foundation
US20130000236A1 (en) * 2011-06-28 2013-01-03 Gamesa Innovation & Technology, S.L. Footing for wind turbine towers
US20130139453A1 (en) * 2007-12-21 2013-06-06 Tony Jolly Tower foundation
US8607517B2 (en) * 2007-12-21 2013-12-17 Tony Jolly Tower foundation

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU3589000A (en) * 1999-02-05 2000-08-25 Northern Technologies, Inc. Support structure for elevating and supporting monopoles and associated equipment
EP1074663A1 (en) 1999-08-06 2001-02-07 Carl Bro as A foundation for supporting a building structure, in particular for the foundation of a tower structure, a wind turbine or the like
DE10321647A1 (en) 2003-05-13 2004-12-02 Wobben, Aloys, Dipl.-Ing. Foundation for a wind turbine
US20110061321A1 (en) * 2006-09-21 2011-03-17 Ahmed Phuly Fatigue reistant foundation system
ES2347742A1 (en) 2008-03-18 2010-11-03 GAMESA INNOVATION & TECHNOLOGY S.L. Foundation for a wind turbine
CN101560774B (en) * 2009-05-20 2010-09-22 赵正义 Combination foundation of large-scale tower mast type mechanical equipment
CN201962691U (en) * 2011-02-17 2011-09-07 付俭 Mortise-tenon connection type tower crane foundation with concrete prefabricated component
CN202187365U (en) * 2011-07-21 2012-04-11 胥传明 Detachable tower footing

Patent Citations (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1690259A (en) * 1922-12-30 1928-11-06 Joseph B Strauss Pavement
US5433049A (en) * 1989-01-05 1995-07-18 Karlsson; Goeran Prefabricated building foundation element
US5540524A (en) * 1994-06-07 1996-07-30 Gonsalves & Santucci, Inc. Concrete slab foundation and method of construction
US5816554A (en) * 1996-11-18 1998-10-06 Mccracken; Ronald G. Equipment support base
US5816554C1 (en) * 1996-11-18 2001-07-31 Ronald G Mccracken Equipment support base
US7066094B2 (en) * 2000-01-10 2006-06-27 Gottwald Port Technology Gmbh Supporting framework for a craneway
US6581352B1 (en) * 2000-08-17 2003-06-24 Kamran Amirsoleymani Concrete composite structural system
US20040226236A1 (en) * 2000-11-21 2004-11-18 Pidgeon John Terry Foundation structure
US6546685B2 (en) * 2001-01-03 2003-04-15 United States Filter Corporation Bracket for use in securing collector flight support tracks in a wastewater treatment tank
US7010891B1 (en) * 2002-04-02 2006-03-14 Ryan Clark Haunch assembly for supporting a concrete slab and method of making the haunch assembly
US7707797B2 (en) * 2003-12-15 2010-05-04 Henderson Allan P Pile anchor foundation
US20080141615A1 (en) * 2005-02-28 2008-06-19 David John Cook Method of Laying a Foundation
US20080072511A1 (en) * 2006-09-21 2008-03-27 Ahmed Phuly Partially prefabricated modular foundation system
US20090158680A1 (en) * 2007-12-21 2009-06-25 Tony Jolly Tower foundation
US20130139453A1 (en) * 2007-12-21 2013-06-06 Tony Jolly Tower foundation
US8607517B2 (en) * 2007-12-21 2013-12-17 Tony Jolly Tower foundation
US20130000236A1 (en) * 2011-06-28 2013-01-03 Gamesa Innovation & Technology, S.L. Footing for wind turbine towers

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2019015164A (en) * 2017-07-04 2019-01-31 株式会社タケウチ建設 Building foundation structure and construction method of the same
US10954647B2 (en) * 2017-07-04 2021-03-23 Takeuchi Construction Co., Ltd. Foundation structure for building, and construction method therefor
US11159120B2 (en) 2018-03-23 2021-10-26 Nextracker Inc. Multiple actuator system for solar tracker
US11283395B2 (en) 2018-03-23 2022-03-22 Nextracker Inc. Multiple actuator system for solar tracker
US11711051B2 (en) 2018-03-23 2023-07-25 Nextracker Llc Multiple actuator system for solar tracker
JP2019206803A (en) * 2018-05-28 2019-12-05 中村物産有限会社 Foundation structure for wind power generator
US11387771B2 (en) 2018-06-07 2022-07-12 Nextracker Llc Helical actuator system for solar tracker
AT522250A1 (en) * 2019-02-28 2020-09-15 Holcim Technology Ltd Foundation for a wind turbine
US20220145573A1 (en) * 2019-02-28 2022-05-12 Holcim Technology Ltd Foundation for a wind power plant
US11050383B2 (en) 2019-05-21 2021-06-29 Nextracker Inc Radial cam helix with 0 degree stow for solar tracker
US11705859B2 (en) 2019-05-21 2023-07-18 Nextracker Llc Radial cam helix with 0 degree stow for solar tracker
US11566394B2 (en) * 2019-12-02 2023-01-31 Takeuchi Construction Co., Ltd. Building foundation structure, and construction method therefor

Also Published As

Publication number Publication date
CN104603367B (en) 2018-02-13
ZA201409032B (en) 2015-12-23
MX2014014991A (en) 2015-11-06
CN104603367A (en) 2015-05-06
DK2886723T3 (en) 2017-06-19
PL2886723T3 (en) 2017-10-31
PT2886723T (en) 2017-06-08
AU2013273463A1 (en) 2015-01-22
AU2013273463B2 (en) 2017-06-15
EP2886723B1 (en) 2017-03-15
EP2886723A1 (en) 2015-06-24
CA2875927A1 (en) 2013-12-12
EP2886723A4 (en) 2016-11-16
HRP20170901T1 (en) 2017-10-20
CL2014003338A1 (en) 2015-07-24
WO2013182728A1 (en) 2013-12-12
MX349972B (en) 2017-08-23

Similar Documents

Publication Publication Date Title
AU2013273463B2 (en) Ribbed foundation for superstructures and method for producing the foundation
CN113195835B (en) Foundation element for a wind turbine tower
CN105220697A (en) Shaped steel and prestressed reinforced concrete combining structure support and construction method
CN201605594U (en) Self-balancing cross base of iron tower for power transmission line
CN202730749U (en) Prefabricated reinforced concrete H-shaped support pile
CN204738307U (en) Part builds in board -like aerogenerator of type raft basis
CN101985835A (en) Supporting structure for separated pile sheet wall of side slope
CN103510458B (en) Pile type continuous rigid frame bridge and construction method thereof
CN203475289U (en) Pile type continuous rigid frame bridge
CN211200437U (en) Oblique vertical bracing combined type foundation structure of arch bridge
CN103061334B (en) I-section prestressed reinforced concrete support pile by centrifugal pouring
CN102828503A (en) H-shaped supporting pile made of prefabricated reinforced concrete
ES2388161B1 (en) Ribbed superstructure foundation and foundation completion procedure
CN110792095B (en) Multi-pile bearing platform-spiral anchor composite foundation
CN212336079U (en) Suction bucket foundation with precast concrete pressing block
CN211816333U (en) Circular parallelly connected friction pile
CN211113674U (en) Double-row column supporting structure of foundation pit
EP3845712A1 (en) Precast foundation structure for a wind turbine, wind turbine and assembly method of a wind turbine
CN210439324U (en) Prefabricated pier plate beam type foundation of lattice type concrete wind power tower
CN203129133U (en) Centrifugal poured prestressed steel bar concrete H-shaped section support pile
CN202969406U (en) Wind power generation tower foundation combining reverse frustum with free-standing column
CN102936901A (en) Wind power tower foundation with inverted frustum and independent column combined
CN109235444A (en) A kind of prismatic prestressing force support pile, piling wall and its construction method
CN214089901U (en) Double steel-pipe pile and construction road integration supporting construction
CN212671008U (en) Pile column structure for reverse construction method construction

Legal Events

Date Code Title Description
AS Assignment

Owner name: GESTAMP HYBRID TOWERS, S.L., SPAIN

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:ABAD HUBER, CESAR;FRANCO REY, JORGE;REEL/FRAME:035093/0004

Effective date: 20150215

STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION