DK2295638T3 - Method for creating a track body - Google Patents

Method for creating a track body Download PDF

Info

Publication number
DK2295638T3
DK2295638T3 DK10008649.5T DK10008649T DK2295638T3 DK 2295638 T3 DK2295638 T3 DK 2295638T3 DK 10008649 T DK10008649 T DK 10008649T DK 2295638 T3 DK2295638 T3 DK 2295638T3
Authority
DK
Denmark
Prior art keywords
track
work trolley
work
sleepers
rails
Prior art date
Application number
DK10008649.5T
Other languages
Danish (da)
Inventor
Ralf Zürcher
Original Assignee
Ralf Zürcher
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ralf Zürcher filed Critical Ralf Zürcher
Application granted granted Critical
Publication of DK2295638T3 publication Critical patent/DK2295638T3/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00Laying, rebuilding, or taking-up tracks; Tools or machines therefor
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B27/00Placing, renewing, working, cleaning, or taking-up the ballast, with or without concurrent work on the track; Devices therefor; Packing sleepers
    • E01B27/02Placing the ballast; Making ballastway; Redistributing ballasting material; Machines or devices therefor; Levelling means
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00Laying, rebuilding, or taking-up tracks; Tools or machines therefor
    • E01B29/05Transporting, laying, removing, or renewing both rails and sleepers

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Machines For Laying And Maintaining Railways (AREA)
  • Railway Tracks (AREA)

Description

METHOD FOR CREATING A TRACK BODY Description [0001] The invention relates to a method for creating a track body of a railroad line in the case of a track which is not present initially.
[0002] Track bodies of a railroad line consist fundamentally of a track bed as well as a track located on the track bed. The track bed is applied to a previously prepared line substructure and has in each case a gravel layer. A base grade protection layer and/or anti-freeze layer and/or a non-woven material can be located underneath the gravel layer. The track which is located on the track bed consists of sleepers and rails. See for example EP 2 071 077 A2.
[0003] Apart from the situation where an existing track body has to be renewed, there is also the situation where there is no track body present and thus the track body has to be created completely anew. The present invention proceeds from here. For this it is known first to create the track bed and then to apply the track in a following separate work process by using quite different machines. Since this involves two separate work processes this method is technically complicated and time-consuming.
[0004] Proceeding from this the invention is concerned with the problem of providing a rapid commercially viable method for creating a track body of a railroad line where a track has not previously existed.
[0005] The technical solution is characterized by the features of Claim 1.
[0006] A technically simple and thus economic method for creating a track body of a railroad line where a track was not present initially is thereby provided by using a track advancing machine with the simultaneous installation of the track bed as well as the track. The core idea of the invention lies in providing a method which uses a specially designed machine which in the case of a track not present initially, and a non-existent gravel layer as well as where applicable a non-existent support layer (base grade protection layer and/or anti-freeze layer), enables the implementation of various different work processes in one continuous working procedure just in the front, namely the installation of a gravel layer underneath the track including where applicable the installation of substructure layers as well as an anti-freeze layer and/or base grade protection layer, furthermore where applicable the installation of a non-woven material as the separating layer between the line substructure and the installation layers as well as finally the installation of the track. This is achieved by means of a machine working just in the front which enables a continuous introduction of the aforementioned materials. For this purpose the work car is equipped with corresponding installation finishers as well as installation appliances. A number of finishers is provided corresponding to the number of layers to be applied. The materials are thus installed continuously in succession with the installation appliances and are compacted where necessary. This initially applies in each case for the gravel layer as well as where applicable for the base grade protection layer and/or anti-freeze layer as well as for the non-woven material where the latter are likewise installed. The rails are initially laid down on the line substructure in the preliminary stage of the working process. They are threaded into the machine during operation. The sleepers are installed underneath the work car in the rear area of the machine, viewed in the operating direction. The sleepers are then supplied to the machine in the operating direction. After installation of the sleepers the rails threaded into the machine are finally applied to the sleepers below the machine and are fastened. By means of the method according to the invention with the work car associated therewith it is possible to install the track bed as well as the track in one continuous work process. It is thereby possible to build a new track body without an already existent track. Thus in the case of line new builds the aforementioned work steps can take place by machine in one continuous work process. Compared with the prior art this results in a significantly faster construction time since discontinuous or separate work steps are avoided. The supply of the track building materials for the said work steps can then take place entirely by rail. A supply with road vehicles is thereby avoided.
[0007] The further development according to Claim 2 proposes that when necessary a base grade protection layer and/or anti-freeze layer is still applied underneath the gravel. This is also carried out by means of one and the same work car and only represents one additional work station inside this work car.
[0008] Furthermore according to the further development in Claim 3 it can be proposed that a non-woven material is initially applied to the line substructure. This non-woven material serves as a separating layer between the line substructure and the installation layers located above same. The corresponding appliance for applying this non-woven material is a constituent part of the work car and then defines the foremost station.
[0009] The rear area of the work car according to the invention, seen in the operating direction, can travel on the already laid track by means of a corresponding chassis. The front area of the work car is however loaded in the area where the track body has still not yet been created. For this purpose according to the further development in Claim 4 the work car is supported in this area on the substructure by means of a specially powered crawler car. These crawler cars thus enable driving forward on the substructure.
[0010] Furthermore according to the further development in Claim 5 it can be proposed that the front top end of the work car is supported on the line substructure by means of a crawler car. This crawler car is preferably also driven. The arrangement of the chain vehicles described previously can be varied in dimension and position.
[0011] Finally the further development according to Claim 6 proposes that separate material cars are coupled to the work car according to the invention. The materials to be installed can be supplied to the front work car according to the invention by means of suitable conveying devices, in particular conveyor belts. The flow of materials is thereby in the operating direction of the machine.
[0012] An exemplary embodiment of a work car according to the invention for continuously creating a track body of an installation stretch where a track was not initially present will now be described below with reference to the drawings. In the drawings:
Figure 1 shows a schematic view of the work car;
Figure 2 shows a section along the line A-A in Figure 1;
Figure 3 shows a section along the line B-B in Figure 1.
[0013] The starting situation is that in order to create a track body 1 a prepared line substructure 2 is present. The track body 1 is to be applied to this line substructure 2.
[0014] The track body 1 consists initially of a track bed 3 which is located on the line substructure 2. This track bed 3 consists initially of a non-woven material 4 as the separating layer from the layers located above same, a base grade protection layer, and/or an anti-freeze layer 5 as well as a layer of gravel 6.
[0015] The track 7 consisting of sleepers 8 and rails 9 is placed on the track bed 3.
[0016] In order to create the track body 1 a work car 10 is provided. This has three chassis, namely a crawler car 11 at the front top end of the work car 10. This crawler car 11 travels on the line substructure 2. It is basically conceivable that this crawler car 11 can also be omitted. A crawler car 12 is likewise located in the middle area. This crawler car travels on the gravel layer 6. At the end there is finally a chassis 13 which is movable on the rails 9. The configuration and arrangement of the aforesaid different chassis can be different and can be adapted to the relevant conditions.
[0017] The work car 10 has at the front an installation device 14 for the non-woven material 4, behind this an installation device 15 for the base grade protection layer and/or anti-freeze layer 5, behind this an installation device 16 for the gravel layer 6, and behind this an installation device 17 for the sleepers. The supply of the corresponding materials takes place via conveyor belts 18 from corresponding material wagons which are coupled at the back of the work car 10, viewed in the operating direction.
[0018] Finally a threading device 19, shown only schematically, is provided for the rails and sets and fastens the rails 9 on the sleepers 8.
[0019] The functional procedure is as follows:
First the rails 9 are deposited on the line substructure 2.
[0020] Furthermore an initial piece of the track body 1 is installed virtually by hand so that the rear chassis 13 of the work car 10 can be placed on the rails 9.
[0021] Finally it is possible to start the work process by means of the work car 10 whereby the corresponding materials are installed continuously by means of the devices 14 to 17, and finally after applying the sleepers 8 the threaded-in rails 9 are placed and fastened on the sleepers 8.
[0022] It is thereby important that all the work steps are carried out continuously in one and the same work car 10 without a track already being previously present. REFERENCE NUMERAL LIST [0023] 1 Track body 2 Line substructure 3 Track bed 4 Non-woven material 5 Base grade protection layer and/or anti-freeze layer 6 Gravel layer 7 Track 8 Sleeper 9 Rail 10 Work car 11 Crawler car 12 Crawler car 13 Chassis 14 Installation device for non-woven material 15 Installation device for base grade protection layer and/or anti-freeze layer 16 Installation device for gravel 17 Installation device for sleepers 18 Conveyor belts 19 Threading device for rails

Claims (7)

1. Fremgangsmåde til fremstilling af et sporlegeme (1) til en jernbanestrækning, når der som udgangspunkt ikke foreligger noget spor (7), hvorved sporlegemet (1) består af et sporleje (3), som er anbragt på en linje-understruktur (2), og som i det mindste omfatter skærver (ballast) (6) såvel som et på sporlejet (3) anbragt spor (7) af sveller (8) og skinner (9), hvorved der ifølge fremgangsmåden først sker nedlægning af skinnerne (9) på linje-understrukturen (2), og hvorved der dernæst under anvendelse af en arbejdsvogn (10), som delvist kan bevæges på det allerede færdiggjorte sporlegeme (1), ved en kontinuerlig arbejdsmetode sker anbringelse af skærver (6) på linje-understrukturen (2), svellerne (8) dernæst anbringes på skærverne (6), og de tidligere placerede skinner (9) , som er trådet ind i arbejdsvognen (10), til sidst anbringes på svellerne (8), hvorved svellerne (8), som tilføres til maskinen i arbejdsretningen, indbygges i et, set i arbejdsretningen, bageste område af maskinen, neden under arbejdsvognen (10).Method for manufacturing a track body (1) for a railway line, when there is basically no track (7), wherein the track body (1) consists of a track bearing (3), which is arranged on a line substructure (2). ), and which comprises at least shards (ballast) (6) as well as a track (7) of sleepers (8) and rails (9) arranged on the track bearing (3), whereby according to the method the rails (9 are first laid down). ) on the line substructure (2), and then, using a work trolley (10) which can be partially moved on the already completed track body (1), shears (6) are placed on the line substructure by a continuous working method. (2), the sleepers (8) are then placed on the shards (6), and the previously placed rails (9), which are threaded into the work trolley (10), are finally placed on the sleepers (8), whereby the sleepers (8), which is supplied to the machine in the working direction, is built into a, seen in the working direction, rear area of the machine , below the work trolley (10). 2. Fremgangsmåde ifølge krav 1, kendetegnet ved, at der ved hjælp af arbejdsvognen (10) neden under skærverne (6) først anbringes et planum-beskyttelseslag og/eller frostbeskyttelseslag (5).Method according to Claim 1, characterized in that a planum protective layer and / or frost protection layer (5) is first applied by means of the work trolley (10) below the shards (6). 3. Fremgangsmåde ifølge et af de foregående krav, kendetegnet ved, at der ved hjælp af arbejdsvognen (10) neden under skærverne (6) eller i givet fald neden under planum-beskyttelseslaget og/eller frost-beskyttelseslaget (5) er anbragt et ikke-vævet materiale (4).Method according to one of the preceding claims, characterized in that by means of the work trolley (10) below the shards (6) or, where appropriate, below the planum protection layer and / or the frost protection layer (5), a non -woven fabric (4). 4. Fremgangsmåde ifølge et hvilket som helst af de foregående krav, kendetegnet ved, at arbejdsvognen (10) i området, hvor sporet (7) endnu ikke er færdigfremstillet, ved hjælp af et navnlig drevet bæltechassis (12) i området, hvor sporet (7) endnu ikke er blevet færdiggjort, understøttes på undergrunden.Method according to any one of the preceding claims, characterized in that the work trolley (10) in the area where the track (7) has not yet been completed, by means of a particularly driven belt chassis (12) in the area where the track ( 7) has not yet been completed, supported on the subsoil. 5. Fremgangsmåde ifølge et hvilket som helst af de foregående krav, kendetegnet ved, at arbejdsvognens (10) forreste hovedende understøttes af et bæltechassis (11), der kan bevæges på linje-understrukturen (2), og som er drevet på en særlig måde.Method according to any one of the preceding claims, characterized in that the front head end of the work trolley (10) is supported by a belt chassis (11) which can be moved on the line substructure (2) and which is driven in a special way . 6. Fremgangsmåde ifølge et hvilket som helst af de foregående krav, kendetegnet ved, at, set i arbejdsretningen, separate materialevogne, hvorfra materialerne tilføres til arbejdsvognen (10), for materialerne, som skal bearbejdes, bliver koblet til enden af arbejdsvognen (10).Method according to any one of the preceding claims, characterized in that, seen in the working direction, separate material carriages, from which the materials are fed to the work carriage (10), for the materials to be machined, are coupled to the end of the work carriage (10). . 7. Arbejdsvogn (10) til dannelse af et sporlegeme (1) til en jernbanestrækning, idet der som udgangspunkt ikke forefindes et spor (7), hvorved arbejdsvognen (10) omfatter et bæltechassis (12), som kan bevæges på skærver (6), og et chassis (13), der kan bevæges på skinner (9), og som er anbragt på arbejdsvognens (10) bagende, og hvorved arbejdsvognen (10) omfatter en indfletningsindretning (19) for skinner (9) og en indbygningsindretning (17) for sveller (8), kendetegnet ved, at arbejdsvognen (10) omfatter en installationsindretning (16) for skærver (6) foran bæltekøretøjet (12) i forhold til arbejdsretningen, og installationsindretningen (17) for sveller (8) er placeret i maskinens bageste område, set i arbejdsretningen, foran det skinnebundne chassis (13).Work trolley (10) for forming a track body (1) for a railway line, in principle there is no track (7), the work trolley (10) comprising a belt chassis (12) which can be moved on shards (6) , and a chassis (13) which can be moved on rails (9) and which is arranged on the rear of the work trolley (10), and wherein the work trolley (10) comprises a braiding device (19) for rails (9) and a built-in device (17). ) for sleepers (8), characterized in that the work trolley (10) comprises an installation device (16) for shards (6) in front of the tracked vehicle (12) in relation to the working direction, and the installation device (17) for sleepers (8) is located in the machine rear area, seen in the working direction, in front of the rail-mounted chassis (13).
DK10008649.5T 2009-08-28 2010-08-19 Method for creating a track body DK2295638T3 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE102009039230A DE102009039230A1 (en) 2009-08-28 2009-08-28 Method for creating a track body

Publications (1)

Publication Number Publication Date
DK2295638T3 true DK2295638T3 (en) 2016-07-18

Family

ID=43037145

Family Applications (1)

Application Number Title Priority Date Filing Date
DK10008649.5T DK2295638T3 (en) 2009-08-28 2010-08-19 Method for creating a track body

Country Status (7)

Country Link
EP (1) EP2295638B1 (en)
DE (1) DE102009039230A1 (en)
DK (1) DK2295638T3 (en)
ES (1) ES2578611T3 (en)
HU (1) HUE028476T2 (en)
PL (1) PL2295638T3 (en)
PT (1) PT2295638T (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102012017997A1 (en) * 2012-09-12 2014-04-10 Zürcher Holding GmbH Method for creating and / or rehabilitating a railway line
PL3636834T3 (en) 2018-10-08 2021-12-20 Zürcher Holding GmbH Method for creating a new building line layout for a stretch of track

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CH594105A5 (en) * 1976-07-27 1977-12-30 Matisa Materiel Ind Sa
EP0056497A1 (en) * 1981-01-15 1982-07-28 Les Fils D'auguste Scheuchzer S.A. Frame wagon in a train for the subsoil stabilization of railway tracks
AT400339B (en) * 1991-09-10 1995-12-27 Plasser Bahnbaumasch Franz MACHINE ARRANGEMENT FOR RENEWING A TRACK
DE9218109U1 (en) * 1991-11-13 1993-08-26 Plasser Bahnbaumasch Franz Plant for the production of a formation protection layer
DE9305927U1 (en) * 1993-04-20 1994-05-26 Plasser Bahnbaumasch Franz Machine for renewing or laying a railroad track
IT1283554B1 (en) * 1995-04-18 1998-04-22 Plasser Bahnbaumasch Franz SYSTEM FOR THE CONTINUOUS RENEWAL OF A TRACK
AT3879U3 (en) * 2000-06-09 2001-03-26 Plasser Bahnbaumasch Franz MACHINE FOR RENEWING A TRACK
DE202008003997U1 (en) * 2007-12-14 2008-06-05 Zürcher, Ralf Device for renewing the multi-layer substructure of tracks

Also Published As

Publication number Publication date
HUE028476T2 (en) 2016-12-28
PL2295638T3 (en) 2016-12-30
EP2295638A3 (en) 2014-03-12
PT2295638T (en) 2016-07-11
EP2295638B1 (en) 2016-03-30
EP2295638A2 (en) 2011-03-16
DE102009039230A1 (en) 2011-03-17
ES2578611T3 (en) 2016-07-28

Similar Documents

Publication Publication Date Title
AU2013346824B2 (en) Rail-bound transportation system for a track building machine
US4004524A (en) Method of renewal of a railroad track and train therefor
GB1587802A (en) Travelling machine for laying sleepers
CN102002897A (en) Long rail laying device and method
JP4713017B2 (en) Orbit changer
DK2295638T3 (en) Method for creating a track body
US20130206031A1 (en) Railway track construction method
CN109944121A (en) Ballast track sleeper paving is changed trains and Ballast track sleeper paving changes method
US10385517B2 (en) Method for track renewal
PL1841919T3 (en) Method for cleaning the ballast of a track
CA1287261C (en) Mobile track renewal installation
KR20100010549A (en) Railroad way concrete other opinion system and the method which are space-time on the tunnel inside
EP2708648B1 (en) Device for construction and/or renovation of a railway track
EP2431522B1 (en) Method and device for manufacturing or renovating a railway track and device for same
RU2634059C1 (en) Frontal type machine for cutting out soil surface layer
CN108368679B (en) Method for renewing the ties of a track consisting of rails and ties and track-laying machine
US20230279616A1 (en) Initial and final methods for laying long rails
CN201933371U (en) Long rail laying device
CN105401495A (en) Method for rapidly and directly paving 100 m long rail of ballast track of newly-built railway
CN110983878A (en) Screen scarifier for continuous track lifting operation in turnout zone and operation method thereof
CN110373965A (en) A kind of turnout tamping operational method and tamping car
EP2848736B1 (en) Railway track working train for removing and installing ballast and portable track sections
EP2374931A2 (en) Refurbishment method for multi-layer substructure of rail sections
EP3636834B1 (en) Method for creating a new building line layout for a stretch of track
CN207312423U (en) A kind of device for transporting objects