DK200301947A - Method for carrying out lane replacement on, in particular, a road bridge-iron concrete tire - Google Patents
Method for carrying out lane replacement on, in particular, a road bridge-iron concrete tire Download PDFInfo
- Publication number
- DK200301947A DK200301947A DK200301947A DKPA200301947A DK200301947A DK 200301947 A DK200301947 A DK 200301947A DK 200301947 A DK200301947 A DK 200301947A DK PA200301947 A DKPA200301947 A DK PA200301947A DK 200301947 A DK200301947 A DK 200301947A
- Authority
- DK
- Denmark
- Prior art keywords
- carrying
- road bridge
- out lane
- iron concrete
- lane replacement
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C7/00—Coherent pavings made in situ
- E01C7/08—Coherent pavings made in situ made of road-metal and binders
- E01C7/18—Coherent pavings made in situ made of road-metal and binders of road-metal and bituminous binders
- E01C7/187—Repairing bituminous covers, e.g. regeneration of the covering material in situ, application of a new bituminous topping
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C7/00—Coherent pavings made in situ
- E01C7/08—Coherent pavings made in situ made of road-metal and binders
- E01C7/18—Coherent pavings made in situ made of road-metal and binders of road-metal and bituminous binders
- E01C7/185—Isolating, separating or connecting intermediate layers, e.g. adhesive layers; Transmission of shearing force in horizontal intermediate planes, e.g. by protrusions
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/08—Damp-proof or other insulating layers; Drainage arrangements or devices ; Bridge deck surfacings
- E01D19/083—Waterproofing of bridge decks; Other insulations for bridges, e.g. thermal ; Bridge deck surfacings
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D22/00—Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Road Paving Structures (AREA)
- Bridges Or Land Bridges (AREA)
Description
Patentkrav: 1 Fremgangsmåde til udskiftning af en kørebane på et jernbetondæk, idet den eksisterende kørebane ophugges og fjernes, og en ny, der bør udføres uden at betondækket før eller under arbejdet tilføres vand eller vandige opløsninger, udlægges og fastgøres, kendetegnet ved at nævnte udskiftning foretages under en nedbørsafskærmende totalinddækning (f eks. presenninger oplagt og ophængt på et stillads af stænger og/eller rør eller f.eks. et oppustet telt.) 2 Fremgangsmåde ifølge krav 1 kendetegnet ved at den ny køre bane udføres efter DK/EP 0505359 Og DK/EP 0570373 3 Fremgangsmåde ifølge krav 1 kendetegnet ved at kørebaneudskiftningen udføres i mindre etaper. 4 Fremgangsmåde ifølge krav 3 kendetegnet ved at etaperne adskilles tidsmæssigt for at give plads på jernbetondækket til trafikafvikling mellem etapernePatent claims: 1 Procedure for replacing a roadway on a concrete concrete deck, the existing roadway being scrapped and removed and a new one that should be carried out without water or aqueous solutions being applied before or during the work, laid out and fixed, characterized by said replacement is carried out under a rain-covered total cover (eg tarpaulins laid and hung on a scaffold of rods and / or pipes or eg an inflated tent.) 2 A method according to claim 1 characterized in that the new runway is carried out according to DK / EP 0505359 And according to claim 1, characterized in that the lane replacement is carried out in smaller stages. Method according to claim 3, characterized in that the stages are separated in time to allow space on the concrete deck for traffic flow between the stages.
Priority Applications (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| DK200301947A DK200301947A (en) | 2003-12-30 | 2003-12-30 | Method for carrying out lane replacement on, in particular, a road bridge-iron concrete tire |
| PCT/DK2004/000928 WO2005064083A1 (en) | 2003-12-30 | 2004-12-30 | Layered construction |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| DK200301947A DK200301947A (en) | 2003-12-30 | 2003-12-30 | Method for carrying out lane replacement on, in particular, a road bridge-iron concrete tire |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| DK200301947A true DK200301947A (en) | 2004-01-09 |
Family
ID=30129153
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| DK200301947A DK200301947A (en) | 2003-12-30 | 2003-12-30 | Method for carrying out lane replacement on, in particular, a road bridge-iron concrete tire |
Country Status (2)
| Country | Link |
|---|---|
| DK (1) | DK200301947A (en) |
| WO (1) | WO2005064083A1 (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108797397B (en) * | 2018-09-11 | 2019-10-18 | 安徽建筑大学 | A repair construction method suitable for long longitudinal slope bridge deck |
Family Cites Families (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE8204892U1 (en) | 1982-02-22 | 1982-07-01 | F. Happel Tief- und Straßenbau GmbH, 5142 Baal | MOVABLE PROTECTIVE TENT SCAFFOLDING |
| DE3244413A1 (en) * | 1982-12-01 | 1984-07-12 | Rhein-Lippe Straßen- und Tiefbau GmbH, 4300 Essen | Method for constructing or renewing the roadway surface of reinforced-concrete bridges |
| DE3476902D1 (en) * | 1984-10-18 | 1989-04-06 | Deutsche Asphalt Gmbh | Surfacing for bridges with prestressed, reinforced or composite concrete decks |
| DE69019165T2 (en) | 1989-08-21 | 1996-01-11 | Soren Thygesen | CONSTRUCTION STRUCTURE, ESPECIALLY A STREET BRIDGE STRUCTURE AND METHOD FOR THE PRODUCTION THEREOF. |
| DK238690D0 (en) * | 1990-10-03 | 1990-10-03 | Soeren Thygesen | COURSE CONSTRUCTION |
| JP3586338B2 (en) * | 1996-06-10 | 2004-11-10 | 新日本製鐵株式会社 | Reinforcement method of asphalt laid concrete structure |
| DE19724294C1 (en) | 1997-06-09 | 1999-04-15 | Roeder Zelt Und Veranstaltungs | Movable tent for providing protection to surfaces exposed to the weather |
-
2003
- 2003-12-30 DK DK200301947A patent/DK200301947A/en not_active Application Discontinuation
-
2004
- 2004-12-30 WO PCT/DK2004/000928 patent/WO2005064083A1/en not_active Ceased
Also Published As
| Publication number | Publication date |
|---|---|
| WO2005064083A1 (en) | 2005-07-14 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN102877418A (en) | Stentless urban bridge anti-collision guardrail construction method and cradle vehicle and gun carrier thereof | |
| CN102747694A (en) | Construction method for dismantling small-size river-crossing rigid frame arch bridge by floating crane method | |
| DE50012287D1 (en) | Method for lining walls of a tunnel and formwork for carrying out the method | |
| CN101418629B (en) | Regenerated composite reinforced concrete beam and construction method thereof | |
| KR100885119B1 (en) | Non-powered watering device | |
| DK200301947A (en) | Method for carrying out lane replacement on, in particular, a road bridge-iron concrete tire | |
| CN106906996B (en) | reusable embedded ring | |
| CN104480931A (en) | Fast file head removing method for mechanical pore forming pouring pile | |
| KR20100021511A (en) | A drain of separation assembly type | |
| CN107042186A (en) | A kind of bridge railing production pipe mopping device | |
| CN202450780U (en) | Combined threaded rod | |
| WO2003024883A3 (en) | System and method for removal and replacement of rigid pavement slabs | |
| CN202849954U (en) | Small-span masonry arch bridge reinforcing structure | |
| CN103498436B (en) | A kind of interchangeable bridge pier anti-collision protective device and mounting method thereof | |
| CN106284982A (en) | A kind of reinforced concrete floor alter-pouring strips mould plate method for supporting | |
| CN206254306U (en) | A kind of small-sized water conservancy project prefabricated components Demoding auxiliary device | |
| CN210315999U (en) | Detachable steel construction factory building roof | |
| CN204097929U (en) | A kind of interchangeable bridge pier anti-collision protective device | |
| CN216809575U (en) | Bridge template separating mechanism | |
| CN209873833U (en) | A sliding launching device and system for a large steel cofferdam | |
| CN207363233U (en) | Safe operation platform for column top | |
| CN207362706U (en) | Load carrying type hanging basket operating platform | |
| CN105839533A (en) | Repairing trolley for anti-collision wall | |
| KR20030031462A (en) | Boundery stone between sidewalk and roadway | |
| CN105421186A (en) | Pavement repairing method |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| AHS | Application shelved for other reasons than non-payment |
