DEP0054095DA - Joint insert for structures made from concrete fields - Google Patents
Joint insert for structures made from concrete fieldsInfo
- Publication number
- DEP0054095DA DEP0054095DA DEP0054095DA DE P0054095D A DEP0054095D A DE P0054095DA DE P0054095D A DEP0054095D A DE P0054095DA
- Authority
- DE
- Germany
- Prior art keywords
- concrete
- structures made
- joint insert
- concrete fields
- fields
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 4
- 229910052742 iron Inorganic materials 0.000 description 2
- 241001136792 Alle Species 0.000 description 1
- 229920002522 Wood fibre Polymers 0.000 description 1
- 238000004140 cleaning Methods 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000001035 drying Methods 0.000 description 1
- 239000011521 glass Substances 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 239000002025 wood fiber Substances 0.000 description 1
Description
Manser Leitdsfesäs Wa = 217 ·*-ι λ -ir,„nManser Leitdsfesäs Wa = 217 · * -ι λ -ir, “n
31. iag. 1949*31. iag. 1949 *
VlDiS YSSEIIIGfE BACHPAEPEff-SÄBEIXEIT IKTIEFGESELXSCHiPTVlDiS YSSEIIIGfE BACHPAEPEff-SÄBEIXEIT IKTIEFGESELXSCHiPT
1 rankfart am Main1 rankfart on the Main
für aas betoniertenfor aas concreted
feldern hexgestellte Bauwerke"fields hexagonal buildings "
Betonstraßen oder sonstige aas betonierten feldern Jaergestellte Bauwerke, wie beispielsweise betonierte Bösehangen von f!anlaufen, Teichen usw.^ müssen durch Haumfugen in einzelne felder aufgeteilt wexden, da sonst die Betonsehalen willkürlich reißen umä dann darch fittemngseinflüssre in kurzer Zeit zerstört werden« Die Herstellung dieser Saumfagen erfolgt im Zuge des Betonierens darch Einstellen iron Brettern, Holzfaserplatten oder ähnlichem Material, die die spätere Page teilweis« füllen und zwischen den einzelnen, feldern verbleiben. Der darüber liegende Teil der IPuge wixä in der Weise hergestellt, daß vor dem Betonieren ein Brett oder fugeneisen auf die im Beton verbleibende fugeneinlage gesetzt und unmittelbar nach dem Betonieren "wieder gezogen wird. Es verbleibt dadurch zunächst eine offene JOge, die nach dem vollständigen Erhärten des Betons mit einer PugenverguBmasse ausgezogen und abgedichtet wird.Concrete roads or other areas concreted in concrete, such as concreted boules, ponds, etc., must be divided into individual fields by joints, otherwise the concrete halves will tear arbitrarily and then the influence of the fit will be destroyed in a short time Seamfagen takes place in the course of concreting and setting iron boards, wood fiber boards or similar material, which partially fill the later page and remain between the individual fields. The overlying part of the IPuge is manufactured in such a way that a board or joint iron is placed on the joint insert remaining in the concrete before concreting and is pulled back immediately after concreting. This initially leaves an open joint which after complete hardening of the concrete is drawn out and sealed with a PugenverguBmasse.
Diese Bauweise hat erhebliehe JTaehteile, die insbesondere darin liegen, daß bei dem Ziehen der fadeneinlagendie Kanten der betonierten Decken, leicht beschädigt werden und ausgebessert werden müssen. Derartige !Fehlstellen geben später als erstes Anlaß zu. Irostschäden oder sonstigen meeh.anisch.en Schäden beim Befahren. Das Ausgießen der Eaumfugen mit bituminösen Massen erfordert zunächst ein peinliches leinigen und Trocknen der fagen, sowie eine Vorbehandlung der fugenwandungen, damit dieThis construction has considerable parts, which are in particular that when the thread inserts are pulled, the edges of the concrete ceilings, easily damaged and in need of repair. Such! Flaws appear later first Occasion to. Irost damage or other mechanical damage when driving. Pouring the Eaumfugen with bituminous mass first requires an embarrassing cleaning and drying of the joints, as well as a pretreatment of the joint walls so that the
Ist.äi« BclttexiellIs.äi «Bclttexiell
aterater
sailsail
» 4a 41t T »4a 41t T
mit «# with «#
tete
^s liltef^ s liltef
«wsfcr ü*i^lft* ists |«#cre& 6«Wsfcr ü * i ^ lft * is s |« # cre & 6
fti,s* Kt^fefti, s * Kt ^ fe
glass ίglass ί
^e%0e"fet «eta^ e% 0e "fet" eta
-i':iÄ» 4«r ?täfeMi#fef4»g lir β wird -i ': iÄ »4« r? tafeMi # fef4 »g li r β becomes
Is i-; itttt 1» At^rW%&&mkltk,% i eisgtfeeirtat« « ist eia Is i- ; itttt 1 " At ^ r W% && mkltk,% i eisgtfeeirtat"" is eia
, 4 lift, 4 lift
i slöfe als bes&a&ei'ß Teari^ilhaft «sx»iepess i?euB sear eiitö*'ltig oder belderfieitlg «Itte kdttuä&ouae auflas«i slöfe als bes & a &ei'ß Teari ^ ilhaft «sx» iepes s i? euB sear eiitö * 'ltig or belderfieitlg «Itte kdttuä & ouae auflas«
b«st«fo«ti·' 'Anstelle voa x&ttuatea kma b «st« fo «ti · '' instead of voa x & ttuatea kma
sieryou
Pl&tte» talt tem ^
für iie .Biläs.sgPl & tte »talt tem ^
for iie .Biläs.sg
Bi&Blcfet gi?&S« ^urteile« I*ex ^e tall© tr elf «ä feszaa herbest&lit ^e^dtm, olsst teS beim iiLBi & Blcfet gi? & S «^ judgments« I * ex ^ e tall © tr elf «ä feszaa herbest & lit ^ e ^ dtm, olsst teS at the iiL
«ils nlciitcif üi*rig€'S i3ut iUs uea 'Ve^täM "uessifiac^^ getipiet«Ils nlciitcif üi * rig € 'S i3ut iUs uea' Ve ^ taM" uessifiac ^^ getipiet
sets iEit plaetlsöJiss i sets iEit plaetlsöJiss i
■»eil .Xm Se??;öi#«üis süöj F'a,£ ■ »eil .Xm Se ??; öi #« üis süöj F'a, £
fts ffts f
t Töll^oföfitea ©EffaXleri* &wah slrt&cteaftläeii gee-fefeeÄ .feietet £rJfl3Häiusg se^esuüuiy α«κ BtMaat««, ft-rtsiit» weil itts i5*tes4^reB. ieT, fseteafeider ®Xe I%gesaMicia.tsa^t Töll ^ oföfitea © EffaXleri * & wah slrt & cteaftläeii gee-fefeeÄ .feietet £ rJfl3Häiusg se ^ esuüuiy α «κ BtMaat« «, ft-rtsiit» because itts i5 * tes4 ^ reB. ieT, fseteafeider ®Xe I% gesaMicia.tsa ^
gtellt ist usi alle Iff fefmmrteitfrft im ?"©rtr^ll irpiame», ties©»gtellt is usi alle Iff fefmmrteitfrft im? "© rtr ^ ll irpiame», ties © »
Claims (1)
Family
ID=
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN209227833U (en) | Shear wall vertical insertion horizontal connection structure | |
| EP0960986A3 (en) | Process and device for the construction of tall, hollow, towerlike structures of two hundred meters height and more, specially wind generator towers | |
| DEP0054095DA (en) | Joint insert for structures made from concrete fields | |
| CN103790385B (en) | The construction method of prestressed structure stretch-draw | |
| DE1684200A1 (en) | Method and device for the production of a building | |
| DE573695C (en) | Device for producing double-reinforced T-shaped concrete beams | |
| DE806723C (en) | Concrete ceiling | |
| DE453139C (en) | Process for the production of iron-reinforced rammed walls without formwork | |
| DE807987C (en) | Large roof tiles | |
| AT157596B (en) | Process for the production of reinforced concrete. | |
| DE638584C (en) | A wall consisting of two wall shells reinforced by a wire mesh or reinforcement layers of any kind, as well as a method and device for producing the same | |
| DE2532964A1 (en) | Large framed wall block set in concrete - has tubes between glass blocks for rods and transport anchors | |
| AT23272B (en) | Concrete iron ceiling. | |
| DE931372C (en) | Grate for the production of hollow stone ceilings | |
| DE2060128A1 (en) | Prefabricated supporting,insulating ceilings - mfd from polystyrene foam and reinforced concrete | |
| DE806900C (en) | Formwork-free reinforced concrete rib ceiling with prefabricated beams, fillers and in-situ concrete | |
| AT319544B (en) | Prefabricated strips, preferably for ceilings and methods for producing a prefabricated strip | |
| DE365326C (en) | Half-timbered wall made of concrete or reinforced concrete | |
| AT331488B (en) | STAIRWAY | |
| DE3546728C2 (en) | Walling equipment for enclosing sloping ground | |
| AT143835B (en) | Method of making walls and ceilings from concrete. | |
| CH522093A (en) | Method of erecting a structure | |
| AT107302B (en) | Ceiling stone with reinforced pressure belt. | |
| AT238085B (en) | Process for the production of a prefabricated ceiling or a storey-high wall element and a prefabricated ceiling or storey-high wall element produced by the process | |
| DE231401C (en) |