DEP0025470DA - Method for erecting transportable domed structures, in particular for circuses - Google Patents

Method for erecting transportable domed structures, in particular for circuses

Info

Publication number
DEP0025470DA
DEP0025470DA DEP0025470DA DE P0025470D A DEP0025470D A DE P0025470DA DE P0025470D A DEP0025470D A DE P0025470DA
Authority
DE
Germany
Prior art keywords
dome
ring
supports
binder
building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
Other languages
German (de)
Inventor
Hermann Dipl.-Ing. Hacker
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Maschinenfabrik Esslingen AG
Original Assignee
Maschinenfabrik Esslingen AG
Publication date

Links

Description

28930 MBA5B28930 MBA5B

aschinenfabrik Seslisgen infssliagen a,Heckaraschinenfabrik Seslisgen infssliagen a, Heckar

n yarffahren gum Aufstellen., tob transportablen, Kutrpalbautan. insbesondere für %.irkuB.aa * n yarffahren gum Aufstell., tob transportable, Kutrpalbautan. especially for% .irkuB.aa *

Die Irfinoung betrifft eines wetterfesten, transportafelen Bau aus Stahl in der I'orm eines Kuppelbauea usd dißssa KoBßtruktion in Verbindung mit einer sehr tinfaeiuss Aufstellung* Durßh eine beßondere Ausbildung und Anordnung dar delanksj mit wichen die eingebauten Bsuglieckr zuBQmme gahelten werd®n8 ist die Arbeit der Aufstellung sehr vereinfacht woräaceThe Irfinoung concerns a weatherproof, transport board construction made of steel in the form of a dome structure a usd this KoBßtruktion in connection with a very tinfaeiuss erection * by a special training and arrangement that delanksj with which the built-in parts will be disguised 8 is the work the list is very simplified woräace

Die tragenden Teile ear HuppeIkonEtrufetion sind der Druükring s
die iiuppa!binder b
die SLugriBgteile e
die Kuppelstützea ά
die Saitenbinöer β
die äussereo Zugringteil© f
der Terbanci g ia der Daehebene und
The main parts of the HuppeIkonEtrufetion are the pressure rings
the iiuppa! binder b
the SLugriBgteile e
the dome supports a ά
the string binary β
the outer pull ring part © f
the Terbanci g ia of the Dae Plain and

die Handstützen h ait ihren ?erbändsne (Siehe Blatt 48 Bild 8}e ait hand supports her h? erbändsn e (See page 4 8 picture 8} e

Sämtliche Teile sind miteinander durch Gelenkbogen verbunden*All parts are interconnected by articulated arches connected*

Ber Zueemaenbau geschieht auf dem Boden und das Hochziehen mit einem einzigen Aufstellungsmast in der iüitte dee Baues in drei Ab schnittes, deren iolf?© öureh ien js^ailigen Stand dss ibueaonanbeuec gegeben ist«, Der noehstebend im einzelnen ba8chrieben· Montege?org8ng ist in umgekehrter Reihenfolge auch für aen Abbruch durchführbar·The construction is done on the ground and the erection is done with a single mast in the middle of the building in three sections, the iolf? reverse feasible for demolition ate ·

In der kitt© des Baues wirct aunächet der Druckring aufgelegts in seinem Mttelpunkt ein laontagemsEt 1 mit sei Spannaeilea errichtet und der Druckring mit einemIn the putty of the building, the pressure ring acts aunächet s in its center a laontagemsEt 1 with a tensioning device and the pressure ring with a

- 2 - 3- 2 - 3

g© an dieses Mast angehängt * Bann Serien sternförmig um diese sämtliche am King anzuaehlieeisenden Kuppelbinder b auf· gelegt« (Blett I9 Bild 15« Di© Binder haben auf d®r Seite ies Bruekringe di« BolzsaangehlüsBe i und k und d@r Brttekring ©ntspreebunde Lageratt&aohnitta a und η (Blatt I8 Bild Z)· Bolzen i wird eofort nach dem Zuß8®m©nfuhren des Bolsenloeheß mit der Legeraussparung a iurehgegtöekt*g © attached to this mast * Bann series star-shaped in order to place all of the dome trusses to be attached to the King b on «(sheet I 9 Fig. 15« Di © binders have on their side these bridges di «BolzsaangehlüBe i and k and d @ r Brttekring © ntspreebunde Lageratt & aohnitta a and η (Sheet I 8 Fig. Z) Bolzen i is immediately after the Zuß8®m © introducing the Bolsenloeheß with the laying recess a iurehgegtöekt *

Hun vird der Druekring a fe©ehg®z©g«u Die an ihm aageeohloaaenes Binderenden werden mithoehgehoben« während, die freien Snöen der Bisöer am Boden gegen die Kingaitt® sm gleiten« Dies geschieht so langes bie ßie Bols;@n k in die LegerBehlitze ß eingeklinkt sind und die Binder eiefa im Druekring festklemmen (Blatt I1 Bild 3}* In di@e@mHun vird the Druekring a fe © ehg®z © g "u aageeohloaaenes him tie ends mithoehgehoben" during the free Snöen the Bisöer on the ground against the Kingaitt® sm slide "This continues bie s sYou Bols; @nk in the LegerBehlitze ß are latched and clamp the ties eiefa in the compression ring (sheet I 1 Fig. 3} * In di @ e @ m

heben die Binder di® Kuppelform erreicht und fön d© ab im ganzen hoehgezogen*lift the Binder di® dome shape and Fön d © from the whole lifted *

Sobald die Konßtriaktion iieit genug torn Boäss abgehoben iet, werden öie Tertikaien ο und die feile c Zugringes zusammengeaetzt und mit den Bolses q (Blatt 2S Bild 4 und 5), Die folgende Verbindung der Kuppel· binder b mit den fertikalen wird mit den Bolzen ρ hergestellt (Blatt S, Bild 5hOnce the Konßtriaktion iieit torn enough Boäss iet lifted ÖIE Tertikaien be ο and zusammengeaetzt the file c pull ring and with the Bolses q (Sheet 2 S Figure 4 and 5) The following compound of the dome · binder b with the fertikalen is with the bolt ρ (Sheet S, Fig. 5h

Eie Tertikalem ο haben noch die drei Amsehlueabolzen r # s und t » lit den Bolzen r weräes di© Seitenbinder © angeschlossen und, mit den Bolaen s die Haupt» stützen d angehängt« Mit ibr@n freien Enden liegen di® Seitenbinder und Hauptstützen auf dem Bod€n@ erster® rsäiaj neeh suseeiii letstere rsdiel nach ixuießeEie Tertikalem ο still have the three Amsehluebolzen r # s and t »lit the bolt r weräes di © side ties © and, with the bolts s, the main“ supports ”with free ends, the side ties and main supports lie on the Bod € n @ first® rsäiaj neeh suseeiii last rsdiel after ixuieße

Nun beginnt öer zweite Abschnitt des Hubvorgänge. Seiienbinder und Stützen werden an ihren Aaeehlueßpunkteii r unß t mithoehgehoben; ihre freiea Baden gleiten auf dem BoöeB nach Ösr Mitte ßes Baues su bezv» Ton Öieeer ■weg« Sobald die Ssitenbinö^r ihre ©nügiiltige Schräglage eiTticht heben« decken sicfe die Bolzenlöcher ti i@r Seitenbinder mit ä@n BolaeElöchern ε dir Vertikalen ο und die Belses t können durchgeeteekt werden· Bie Seitenbinäar sind ienn starr mit dem Bueamnengebautcn Teil der Kuppel» Terbtindea (Blatt 3g Bild 6 una 7),The second section of the lifting process now begins. Trusses and supports are lifted at their joint points; their free bathing slide on the boöeB to Ösr middle of the building su bezv "Ton Öieeer ■ weg" As soon as the site binö ^ r lift their right incline "cover the bolt holes on the side ties with vertical bole holes be and can Belses t durchgeeteekt · Bie Seitenbinäar IENN are rigidly connected to the part of the dome Bueamnengebautcn "Terbtindea (sheet 3 g Figure 6 una 7)

Claims (1)

26930 Ml 4.5026930 Ml 4.50 Sech Siitbau der Ttile f des fingseren Zugring® undSix construction of the parts of the finger pull ring® and eier ferfesndsEt&be g in der Dechebene beginnt der lets te Üubabeohnitt, Di© Stützan d richten eich dab^i weiter euf und weTüBtis sobald sie frei bangen, Eenkreeht gestellt und auf ihres Auflagern w abgesetzt (Blatt 4# Bild β)· Sehlues folgt d@r linbau dsr li&ndetütees mit äeaeier ferfesndsEt & be g in the dech plane begins the lets te Üubabeohnitt, Di © Stützan d straighten eich dab ^ i further euf and weTüBti s as soon as they are free to worry, Eenkreeht and placed on their supports w (sheet 4 # picture β) Sehlues follows d @r linbau dsr li & ndetütees with äea e Di® luppelkonstrißlction wird daäurch etabilv der lest kenn vo® Bruckring gelöst und entfernt werden.e DI® luppelkonstrißlction is daäurch etabil v of the read mark vo® Bruck ring dissolved and removed. Soll der Bau an ©iße andere Stelle versetzt uma zu diesem Zweck abgebrochen weröeB8 öans wird in gleieli@r nur in umgekehrter ReihenfolgeIf the building to another location © ISSE uma added for this purpose canceled weröeB 8 öans is in gleieli @ r only in reverse order IatentaηSprüche:Iatentaη sayings: ferf&feren zum Aufstellen ^on Kferf & feren to set up ^ on K gekeimsei ebnet, daee die em Boden zus8mm©iigelee;tsn Suppelbinder mittels ©ineß in der litte dee Druckringes stehenden AufBtellungemaetee big zur Irreiehung der Kiippelforia hocfcgezogan lind von da naeh Anhäufung der rsßtlichsE Bauteil® euf die Hdhe des fertigen Baues gebracht «erden» Die in dsr Druekrisgkonßtruktion für jedsn Etappe !binder (b) vorgesehenen znei Lagereusßehiiit te (a) und (n) zueammes mit den Bolzen (i) und (k) stellen während dee Anhebene ä@r Kuppel zunächst sin© um den Bolzen (i) drehbare und nach Anliegen von Bolzen (k) neeh dem Erreichen der Xiuppelfora die feste ferbindung snrieehea Kuppelbinder (b) und Druckring (β) hBT9 filhreöd zut Verbindung für die ©m Zugring m©sk©ffimead@n Bauteile der Kuppel besonder® (o) mit je acht Bolsen vorgesehen eind für des Schluss der Lugringglieder Ce)9 der ILuppelbiinüer (b) , iBT SeiteufeInder (e) und aer BauptetUtzen (d)· Iseh Sinbau dsr k^ugringglieder und Anhängung der Seiten binder usö LeuptetUtzen wird dann weiter gehoben biß die Seitesbinder ihre endgültig® leigung erreichtsprouted so that the ground is collapsed; tsn suppelbinder by means of an arrangement standing in the middle of the pressure ring in order to confuse the Kiippelforia hocfcfcfczan and from then on the accumulation of the "rearmost component" is brought to the height of the building The pressure structure for each stage! binder (b) provided two bearing parts (a) and (n) toeammes with the bolts (i) and (k) during the lifting of the dome initially rotatable around the bolt (i) and after bolt (k) neeh reaching the Xiuppelfora the fixed connection snrieehea dome girder (b) and pressure ring (β) hBT 9 filhreöd to connection for the © m pulling ring m © sk © ffimead @ n components of the dome especial® (o ) with eight bolts each and for the end of the lug ring links Ce) 9 of the dome bins (b), iBT side armor (e) and aer main supports (d) Iseh Sinbau dsr k ^ ugringglieder and attachment of the side binder usö lever supports is then raised further en bit the side ties reached their final® position • 4 -• 4 - haben UEÖ in dieser Lag® di© zweiten (β) der Seitenbinder (e) eingesogen and di© ämesiren Zugringtaile msö BecbT^rbänäe eingebaut waröen Hierauf wird die Ettppelkoßstruktion vollständig sogen uuä äie siefe a« Ende der Eubbewegung eisetellenden Stützen {&) auf den Lagern (w) abgesetzt und die WsndkonBtruktiozi rait Stutzen unä angebaut, worauf Ms hoehgezogen© SuppeIkonetruktion tom Aufetellungsmast gelöst und der last mit Hilfe der Kuppel abgebaut fitrdeß kann»have UEÖ second in this Lag® di © is (β) of the side binder (s) drawn and di © ämesiren Zugringtaile MSOE BecbT ^ rbänäe installed waröen Then the Ettppelkoßstruktion completely absorbed uuä AEIE siefe a "late Eubbewegung eisetellenden supports {&) on the bearings (w) be discontinued and WsndkonBtruktiozi rait neck UNAE cultivated what Ms hoehgezogen © SuppeIkonetruktion tom Aufetellungsmast released and the load can fitrdeß mined using the dome " Verfahren zmw, Aufstellen von Kuppelbauten nach Ansprueh I8 dsdiirch gekennzeichnet, dase d©s Verfahren in umge* kelirter Reihenfolge such zuia Abbau der Konstruktion anwendbar ist. ZMW method, positioning of domed according Ansprueh I 8 dsdiirch in dase d © s process in the reverse order * kelirter examined zuia degradation of the construction is applicable.

Family

ID=

Similar Documents

Publication Publication Date Title
DE803566C (en) Method for erecting transportable domed structures, especially for circuses
DE2053412A1 (en) Building structures and procedures for their erection
DE102008038391A1 (en) Drilling rig and assembly process for this
DE2644260A1 (en) METHOD OF BUILDING A BOTTOM FURNACE
DE2850990A1 (en) FORMWORK FOR CONCRETE LINING FOR TUNNEL
DE202005016815U1 (en) Vehicle crane with ballast
DEP0025470DA (en) Method for erecting transportable domed structures, in particular for circuses
DE2504967B2 (en) Pre-press device for pipe pre-press operation, especially for the construction of a pipe umbrella ceiling in tunnel construction
DE2749349A1 (en) COOLING TOWER
DE102008048356A1 (en) Prefabricated lining installing device for e.g. underground station, has vertical supports with telescopic links attached with hydraulic cylinder and impellers to change height of telescopic link
WO2005097661A1 (en) Mobile crane having a stationary counterweight
DE301562C (en)
DE2460742A1 (en) FORMWORK FOR THE PRODUCTION OF CONE AND CONE-SHAPED BUILDING PARTS
EP0320855B1 (en) Wrecking arrangement for chimneys, particularly for convergent chimneys
AT306314B (en) Device for increasing the load-bearing capacity of a girder built into an existing structure
CH378519A (en) Tent hall construction
DE833552C (en) Procedure for erecting halls
DE1434492A1 (en) Construction site roofing
DE263869C (en)
DE202024001692U1 (en) Temporary modular shelter and use of the temporary modular shelter
DE302781C (en)
DE442793C (en) Arched roof
DE2064511A1 (en) Method for erecting a mast structure or the like
AT154298B (en) Sheet metal formwork from individual parts with a circular arc cross-section for the production of upright cast, conical concrete masts with a circular cross-section.
DE1434730A1 (en) Process for the production of steel or prestressed concrete masts consisting of several detachably connected parts and multi-part concrete mast produced according to this process