DE931521C - Process, installation and devices for the wet processing of coal sludge deposited in ponds - Google Patents

Process, installation and devices for the wet processing of coal sludge deposited in ponds

Info

Publication number
DE931521C
DE931521C DEB22974A DEB0022974A DE931521C DE 931521 C DE931521 C DE 931521C DE B22974 A DEB22974 A DE B22974A DE B0022974 A DEB0022974 A DE B0022974A DE 931521 C DE931521 C DE 931521C
Authority
DE
Germany
Prior art keywords
sludge
coal
ponds
desludging
lumps
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DEB22974A
Other languages
German (de)
Inventor
Heinrich Schreiner
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BHS Bayerische Berg Hutten und Salzwerke AG
Original Assignee
BHS Bayerische Berg Hutten und Salzwerke AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BHS Bayerische Berg Hutten und Salzwerke AG filed Critical BHS Bayerische Berg Hutten und Salzwerke AG
Priority to DEB22974A priority Critical patent/DE931521C/en
Application granted granted Critical
Publication of DE931521C publication Critical patent/DE931521C/en
Expired legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B03SEPARATION OF SOLID MATERIALS USING LIQUIDS OR USING PNEUMATIC TABLES OR JIGS; MAGNETIC OR ELECTROSTATIC SEPARATION OF SOLID MATERIALS FROM SOLID MATERIALS OR FLUIDS; SEPARATION BY HIGH-VOLTAGE ELECTRIC FIELDS
    • B03BSEPARATING SOLID MATERIALS USING LIQUIDS OR USING PNEUMATIC TABLES OR JIGS
    • B03B9/00General arrangement of separating plant, e.g. flow sheets
    • B03B9/005General arrangement of separating plant, e.g. flow sheets specially adapted for coal

Description

Verfahren, Anlage und Vorrichtungen zur Naßaufbereitung von in Teichen abgelagerten Kohleschlämmen Falls in Kohleaufbereitungsanlagen keine Einrichtung zur Abscheidung des Kohlefeinstkornes aus der zunächst in Klärbehältern eingedickten Schlammtrübe vorhanden ist, enthält die darauf in Teiche abgeführte Trübe ein feinkörniges Feststoffgemenge aus Kohle und aus Stoffen hohen Aschengehaltes. In den Teichen setzt sich dieses Gemenge ab, wobei sich dieFeststoffe entsprechend ihren unterschiedlichen Wichten trennen und schließlich eine schichtenförmige Ablagerung von Kohle und Aschenträgern, z. B. Lette und Stinkstein, bilden.Process, system and devices for the wet treatment of ponds Deposited coal slurries If there is no facility in coal preparation plants for the separation of the finest coal grains from the initially thickened in clarification tanks If sludge is present, the sludge discharged into ponds contains a fine-grained sludge Solid mixture of coal and substances with a high ash content. In the ponds This mixture settles, whereby the solids according to their different Separate weights and finally a layered deposit of coal and ash trays, z. B. Lette and Stinkstein form.

Vorliegende Erfindung setzt sich zum Ziel, die im abgelagerten Teichschlamm enthaltene Kohle zu gewinnen. Hierzu wird ein Verfahren vorgeschlagen, das dadurch gekennzeichnet ist, daß der Reihe nach folgende Arbeitsgänge durchgeführt werden schichtenmäßiges Zerteilen der aus den Teichen geförderten Schlämme, Losspülen der hierdurch freigelegten Kohle von den dabei entstehenden Klumpen, Vorabscheiden der anfallenden Bergeklumpen, Eindicken der kohlereichen Schlammtrübe, Nachentschlämmen der konzentrierten Schlammtrübe und Entwässern derselben.The present invention aims to remove those in the deposited pond sludge contained coal. For this purpose, a method is proposed that thereby is characterized in that the following operations are carried out in sequence dividing the sludge from the ponds in layers, rinsing the thereby exposed coal from the resulting lumps, pre-separation of the Accruing clumps of mountains, thickening of the carbon-rich sludge, subsequent desludging the concentrated sludge pulp and dewatering the same.

Eine in ununterbrochenem Zuge arbeitende Anlage zur Durchführung des Verfahrens ist in der Zeichnung schematisch wiedergegeben.An uninterrupted installation to carry out the The method is shown schematically in the drawing.

Der geschichtet vorliegende Teichschlamm wird von der Halde z mittels eines Förderbandes 2 zur Aufreißvorrichtung 3 gebracht. Letztere hat einen von einem Blechmantel 4. umschlossenen senkrechten Durchgangsschacht. In diesem Schacht i-st eine ebenfalls senkrechte Welle 5 angeordnet, die durch den regelbaren Antrieb 6 in Umlauf gehalten wird. An der Welle 5 sind in unterschiedlicher Höhe Gruppen von Reißarmen 7 angebracht. Zwischen diesen rotierenden Reißarmgruppen 7 befinden sich Gruppen von ortsfesten Reißarmen 8, die am Blechgehäuse q. befestigt sind. Am oberen Ende des Durchgangsschachtes ist eine Ringbrause an seinem unteren Ende oder nahe diesem eine Ringbrause io vorgesehen. Beide Brausen werden gemeinsam durch die Leitung i i gespeist. Im Betrieb trennen die Reißarme 7 und 8 die Schichten des. Aufgabegutes auf und zerkleinern die zäheren Letteschichten zu z. B. faustgroßen Klumpen oder Knollen. Die hierdurch freigelegten Kohleschichten werden mittels der Brausen 9 unil io losgespült. Als besonders wirksam erweist sich die untere Brause io. Durch entspechende Einstellung des Wasserdruckes der Brausen wird erreicht, daß sich bei diesem Vorgang die Bergeklumpen nicht auflösen, sondern in Grobform erhalten bleiben.The layered pond sludge is from the stockpile z means a conveyor belt 2 brought to the ripping device 3. The latter has one of one Sheet metal jacket 4th enclosed vertical through shaft. In this shaft i-st one also arranged vertical shaft 5, which is controlled by the Drive 6 is kept in circulation. On the shaft 5 are at different heights Groups of tear arms 7 attached. Between these rotating ripping arm groups 7 there are groups of fixed tear arms 8, which q on the sheet metal housing. attached are. At the upper end of the through shaft is a ring shower on its lower one At the end of or near this a ring shower io is provided. Both showers become common fed by line i i. In operation, the tear arms 7 and 8 separate the layers des. Feed on and crush the tougher Letteschichten to z. B. fist-sized Lumps or bulbs. The carbon layers exposed in this way are by means of the Showers 9 unil io rinsed off. The lower shower proves to be particularly effective ok By setting the shower water pressure accordingly, it is possible to that during this process the lumps of mountain do not dissolve, but rather in a coarse form remain.

Da-s. aus der Aufreißvorrichtung 3 austretende Gut - Bergeklumpen und mit Kohle angereicherte Schlammtrübe - fällt in die darunter angeordnete Siebvorrichtung i-. Der Siebboden 13 dieser Vorrichtung läßt nur die Schlammtrübe durch, nicht dagegen die Bergeklumpen und allenfallsige Festbestandteile des Rohschlammes, wie Wurzeln, Gestrüpp u. dgl., die durch den langsam umlaufenden Räumarmsatz 1q. in die Auswurföffnung 15 des Siebbodens 13 geschoben werden, von wo sie in den zu ihrem Abtransport bereitstehenden Rollwagen 16 fallen.That. Material emerging from the ripping device 3 - mountain lumps and sludge sludge enriched with coal - falls into the sieving device i- arranged below. The sieve bottom 13 of this device only lets through the sludge sludge, but not the mountain lumps and any solid constituents of the raw sludge, such as roots, scrub and the like. are pushed into the ejection opening 1 5 of the sieve bottom 13 , from where they fall into the trolley 16 ready for their removal.

Die dieSiebvorrichtung i2 verlassende Schlammtrübe läuft in den darunter befindlichen Sammeltrichter 17, gelangt dann in die Rohrleitung 18 und wird in dieser durch die Pumpe i9 zum Hydrozyklon 2o befördert, der das feinere, hoch aschehaltige Korn über die Leitung 21 im Überlauf austrägt, während er das ,gröbere, überwiegend kohlehaltige Korn im Durchlauf unten abscheidet und auf das mit den Brausen 22 ausgerüstete, die Nachentschlämmung bewirkende Schüttelsieb 23 strahlt. Die Nachentschlämmung dient dazu, wenigstens den größten Teil der mit dem Kohlekorn austretenden feinen Tontrübe abzuscheiden, .die sonst den Gesamtaschengehalt des Endproduktes erhöht und dieses unansehnlich macht.The sludge sludge leaving the screening device i2 runs into the collecting funnel 17 below, then enters the pipeline 18 and is conveyed in this by the pump i9 to the hydrocyclone 2o, which discharges the finer, high-ash grain via the line 21 in the overflow while it , coarser, predominantly carbonaceous grain separates in the passage below and radiates onto the shaking sieve 23, which is equipped with the showers 22 and which effects the subsequent desludging. The subsequent desludging is used to separate at least the largest part of the fine clay pulp that escapes with the grain of coal, which otherwise increases the total ash content of the end product and makes it unsightly.

Zur Verbesserung der Nachenttonung sowie zu ihrer Beschleunigung erweist es sich als vorteilhaft, den aus dem Hydrozyklon 2o austretenden Dickstoffstrahl, noch bevor er auf das Entschlämmungssieb 23 gelangt, durch geeignete Wasserzuführung zu einem breiten Schleier zu zersprühen. Hierzu ist der Strahlzersprüher 24 vorgesehen, der aus einer den Dickstofstrahl umgebenden, durch die Leitung 25 mit Druckwasser gespeisten Ringkammer mit innenseitigen, d. h. zum Dickstoffstrahl hin gerichteten Brauselöchern besteht. Die aus diesen Löchern austretenden Brausestrahlen dringen von allen Seiten her, am besten in etwas schräg nach oben verlaufender Richtung, in den Dickstoffstrahl ein, zersprühen ihn und leiten so die Nachenttonung ein, wodurch auf dem nachgeschalteten Sieb 23 eine wirksamere Entschlämmung erreicht wird. Die zur Auflösung von Dickstoffstrahlen schon angewandten Prallbretter wären im vorliegenden Falle nicht genügend wirksam, da sie keinen direkten Einfluß auf die Entschlämmung auszuüben vermögen. Das Wesentliche des erfindungsgemäßen Strahlzersprühers ist der .intensive Zusatz von Wasser unmittelbar beim Strahlaustritt,wodurch die aschehaltige Feintrübe bereits vor dem Auftreffen auf das EntschlämmungsSieb 23 weitgehend vom Kohlekorn gelöst und so eine raschere und bessere Abscheidung der Tontrübe erzielt wird. Vom Entschlämmungssieb23 gelangt das Gut zur weiteren Nachenttonung und zur Entwässerung in die Siebschleuder 26.It turns out to improve the Nachenttonung as well as to accelerate it it is advantageous to remove the thick matter jet emerging from the hydrocyclone 2o, even before it reaches the desludging sieve 23, through a suitable water supply to spray into a wide veil. The jet sprayer 24 is provided for this purpose, from a surrounding the thick matter jet, through line 25 with pressurized water fed ring chamber with inside, d. H. directed towards the thick matter jet There are shower holes. The shower jets emerging from these holes penetrate from all sides, preferably in a slightly sloping upward direction, into the thick substance jet, spray it and thus initiate the subsequent detoning, whereby a more effective desludging is achieved on the downstream sieve 23 will. The baffles already used to break up high-viscosity jets would be in the present case not sufficiently effective as they have no direct influence on able to perform the desludging. The essentials of the jet sprayer according to the invention is the .intensive addition of water immediately at the exit of the jet, whereby the Ash-containing fine pulp before it hits the desludging sieve 23 largely detached from the grain of coal and so a faster and better separation of the Clay turbidity is achieved. From the desludging sieve23, the material arrives for further de-toning and into the centrifugal sieve 26 for dewatering.

Das Prinzip des beschriebenen Strahlzersprühers läßt sich auch bei sonstigen aus Hydrozyklonen od. dgl. als Dickstoff strahl austretenden Dispersionen zwecks Verbesserung der Nachentschlämmung mit Erfolg anwenden.The principle of the jet sprayer described can also be used in other dispersions emerging from hydrocyclones or the like as thick matter Use with success to improve post-desludging.

Claims (6)

PATENTANSPRÜCHE: i. Verfahren zur Naßaufbereitung von in Teichen geschichtet abgelagerten Kohlenschlämmen hohen Aschengehaltes zwecks Gewinnung der in ihnen enthaltenen Kohle, dadurch gekennzeichnet, daß der Reihe nach folgende Arbeitsgänge durchgeführt werden: schichtenmäßiges Zerteilen der aus den Teichen geförderten Schlämme, Losspülen der hierdurch freigelegten Kohle von den dabei entstehenden Klumpen, Vorabscheiden der anfallenden Bergeklumpen, Eindicken der kohlenreichen Schlammtrübe, Nachentschlämmen der konzentrierten Schlammtrübe und Entwässern derselben. PATENT CLAIMS: i. Process for the wet processing of coal sludge with a high ash content deposited in layers in ponds for the purpose of extracting the coal contained in them, characterized in that the following operations are carried out in sequence: dividing the sludge conveyed from the ponds into layers, rinsing the coal exposed thereby from the resulting lumps , Pre-separation of the resulting lumps of rock, thickening of the coal-rich sludge sludge, subsequent desludging of the concentrated sludge sludge and dewatering of the same. 2. Verfahren nach Anspruch i, dadurch gekennzeichnet, daß die Überführung der eingedickten Schlammtrübe auf die Nachentschlämmungseinrichtung im freien ,Strahl erfolgt und daß dieser Strahl durch seitliches, vorzugsweise etwas nach oben gerichtetes und am besten allseitiges Zubrausen von Druckwasser zersprüht wird. 2. The method according to claim i, characterized in that the transfer of the thickened Sludge slurry on the post-desludging device in the open, jet takes place and that this beam through lateral, preferably something directed upwards and it is best to spray pressurized water from all sides. 3. Anlage zur Durchführung des Verfahrens nach Anspruch i, gekennzeichnet durch folgende in fortlaufendem Zuge hintereinander arbeitende Vorrichtungen: eine mit Druckwasserbrausen ausgerüstete Vorrichtung (3) zum Aufreißen und schichtenmäßigen Zerteilen des Aufbereitungsgutes zu Klumpen, eine Siebvorrichtung (i2), die die entstehende Schlammtrübe durchläßt, die ausgespülten Bergeklumpen dagegen zurückhält und auswirft, ein Sammelbecken (i7) für die Schlammtrübe mit anschließender Pumpleitung (i8), die die Trübe einem sie eindickenden Hydrozyklon (zo) zuführt, ferner ein die Nachentschlämmung bewirkendes Schüttelsieb (23) mit Brausen (22) und eine Entwässerungsschleuder (26). q.. 3. Implementation facility of the method according to claim i, characterized by the following in progress devices working one after the other: one equipped with pressurized water showers Device (3) for tearing open and dividing the material to be processed in layers to lumps, a sieve device (i2), which lets the sludge slurry through, on the other hand, holds back and ejects the washed-out lumps of mountain, a collecting basin (i7) for the sludge sludge with subsequent pump line (i8), which the sludge a it supplies a thickening hydrocyclone (zo), and also a subsequent desludging Vibrating sieve (23) with showers (22) and a centrifugal dewatering device (26). q .. Auf reißvorrichtung nach Anspruch 3, dadurch gekennzeichnet, daß in einem durch einen Blechmantel (q.) od. dgl. gebildeten senkrechten Durchgangsschacht durch eine gemeinsame Welle (5) antreibbare, in unterschiedlicher Höhe liegende Gruppen von Reißarmen (7) angeordnet sind, zwischen denen sich Gruppen von ortsfesten, z. B. am Blechmantel befestigten Reißarmen (8) befinden, und daß am oberen Ende des Schachtes und an seinem unteren Ende oder nahe diesem Brauseeinrichtungen (9, io) vorgesehen sind. Ripping device according to claim 3, characterized in that in one through a sheet metal jacket (q.) or the like. formed vertical through shaft through a common shaft (5) drivable groups of at different heights Tear arms (7) are arranged, between which groups of stationary, z. B. on the sheet metal jacket attached tear arms (8) are, and that at the upper end of the shaft and shower devices (9, io) provided at its lower end or near it are. 5. Siebvorrichtung nach Anspruch 3, gekennzeichnet durch eine in dem Siebboden (i3) vorgesehene Auswurföffnung (i5) und einen rotierenden Räumarmsatz (i4), der die Bergeklumpen in die Auswurföffnung (i5) schiebt. 5. Sieve device according to claim 3, characterized by one in the sieve bottom (i3) provided ejection opening (i5) and a rotating Räumarmsatz (i4), the pushes the lump into the ejection opening (i5). 6. Mittel zur Durchführung des Verfahrens nach Anspruch 2, insbesondere in der Anlage nach Anspruch 3, gekennzeichnet durch eine Druckwasser führende, auf der Innenseite mit Brauselöchern versehene Ringkammer (24) zum Zersprühen des aus dem Hydrozyklon (2o) austretenden Dickstoffstrahles.6. Means of implementation of the method according to claim 2, in particular in the system according to claim 3, characterized through a pressurized water, provided with shower holes on the inside Annular chamber (24) for spraying the jet of thick matter emerging from the hydrocyclone (2o).
DEB22974A 1952-11-18 1952-11-18 Process, installation and devices for the wet processing of coal sludge deposited in ponds Expired DE931521C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DEB22974A DE931521C (en) 1952-11-18 1952-11-18 Process, installation and devices for the wet processing of coal sludge deposited in ponds

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DEB22974A DE931521C (en) 1952-11-18 1952-11-18 Process, installation and devices for the wet processing of coal sludge deposited in ponds

Publications (1)

Publication Number Publication Date
DE931521C true DE931521C (en) 1955-08-11

Family

ID=6961051

Family Applications (1)

Application Number Title Priority Date Filing Date
DEB22974A Expired DE931521C (en) 1952-11-18 1952-11-18 Process, installation and devices for the wet processing of coal sludge deposited in ponds

Country Status (1)

Country Link
DE (1) DE931521C (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3833054A1 (en) * 1988-09-29 1990-04-05 Heinz Hoelter METHOD FOR TREATING POND SLUDGE (FLOTATION DISPENSER) AND TREATMENT SYSTEM

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3833054A1 (en) * 1988-09-29 1990-04-05 Heinz Hoelter METHOD FOR TREATING POND SLUDGE (FLOTATION DISPENSER) AND TREATMENT SYSTEM

Similar Documents

Publication Publication Date Title
EP2463058B1 (en) Blasting nozzle for a device for blasting-machine or abrasive blasting objects
DE931521C (en) Process, installation and devices for the wet processing of coal sludge deposited in ponds
DE1667880B2 (en) METHOD AND DEVICE FOR SEPARATING A MIXTURE OF CHEESE BROKEN AND WHEY INTO ITS COMPONENTS
EP1516672A1 (en) Apparatus for separating of organic from inorganic material
DE851483C (en) Device for separating or thickening solid-liquid mixtures, such as coal or ore slurries
DE2133802A1 (en) Separating granulates by density - using liquid flowing upward through perforated vibrating trough
DE842420C (en) Process for the treatment of objects of approximately the same shape and size, such as. B. Pitting and / or cutting of fruits
DE2711528A1 (en) DEVICE FOR CONTINUOUS DRAINAGE IN THE HYDROMECHANICAL AND MECHANICAL PROCESSING OF FLOCKED SLURES
DE902601C (en) Separating container for the preparation of grainy mixtures of different densities in low fluidity
DE3739708C1 (en) Apparatus for deashing firing boilers and the like
DE891082C (en) Method and device for cleaning carbon dioxide from water, solids such as dust or the like, and asphalt materials
DE742640C (en) Device for separating solid materials using the floating and sinking method
DE836157C (en) Device for the continuous removal of lime
DE974631C (en) Process and device for ash removal and dewatering of raw material containing hard coal or lignite
DE1045931B (en) Device for desludging of solid-liquid mixtures, preferably coal
DE2651393C3 (en) Device for processing residual concrete and other similar suspensions
DE76261C (en) Device for continuing the foam generated on wool washes and the like
DE928160C (en) Method for removing gray starch and amniotic fluid from starch
DE945621C (en) Device for the discharge of sediment during floating and sinking separation
AT42165B (en) Method and device for the preparation and enrichment of ores or the like by means of a liquid flow increasing on inclined guide surfaces.
DE1061711B (en) Method and device for dewatering a fine to finely grained solid-liquid mixture
DE11571C (en) Innovations to coal washers
DE928076C (en) Method and device for sorting bulk goods, primarily grains in liquids
DE258068C (en)
DE574719C (en) Yeast washer