DE872395C - Large tent - Google Patents

Large tent

Info

Publication number
DE872395C
DE872395C DEST4197A DEST004197A DE872395C DE 872395 C DE872395 C DE 872395C DE ST4197 A DEST4197 A DE ST4197A DE ST004197 A DEST004197 A DE ST004197A DE 872395 C DE872395 C DE 872395C
Authority
DE
Germany
Prior art keywords
tent
masts
roof
tent according
boom
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DEST4197A
Other languages
German (de)
Inventor
Karl Rebernigg
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
L Stromeyer and Co GmbH
Original Assignee
L Stromeyer and Co GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by L Stromeyer and Co GmbH filed Critical L Stromeyer and Co GmbH
Priority to DEST4197A priority Critical patent/DE872395C/en
Application granted granted Critical
Publication of DE872395C publication Critical patent/DE872395C/en
Expired legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H15/00Tents or canopies, in general
    • E04H15/02Tents combined or specially associated with other devices
    • E04H15/04Tents combined or specially associated with other devices suspended type, e.g. from trees or from cantilever supports

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Tents Or Canopies (AREA)

Description

Bisher würde zur Errichtung eines Großraum= zeltes, z. B. Zirkuszeltes, u. a. in der Weise verfahren, d-aß über eine Gruppe z. B. im Kreis stehender Masten eine kreisscheibenförmige Plane mittels ihrer entsprechend angeordneten Ösen übergestreift und in ihrem Mittelpunkt von Zugseilen ergriffen wurde, die, über an den oberen Enden der Masten befindliche Leitrollen laufend-, mittels am unteren Ende der Masten befindlicher Windwerke aufgehaspelt wurden, so daß sie die Plane anheben.So far, to set up a large space tent, z. B. circus tents, i.a. proceed in such a way that d-aß via a group z. B. in a circle standing masts slipped over a circular disc-shaped tarpaulin by means of its appropriately arranged eyelets and at its center it was gripped by pulling ropes, which, over to the upper ones Guide rollers located at the ends of the masts, by means of the lower end of the masts any winches located there have been reeled up so that they raise the tarpaulin.

Jener Ausführung gegenüber besitzt die Bauart gemäß der Erfindung, deren Grundgedanken in der Einfügung eines Daches in das Hubwerk besteht, wesentliche Vorzüge.Opposite that version, the type according to the invention, whose basic idea is to insert a roof into the hoist, essential Benefits.

Ein Zelt gemäß der Erfindung.ist in der Zeichnung in einem Ausführungs ibeispiel dargestellt. Es Ist Fig. i ein Querschnitt nach Linie I-I der Fig. 2, Fig. 2 ein halber Grundriß .des Zeltes.A tent according to the invention is shown in one embodiment in the drawing shown as an example. It is Fig. I a cross section along line I-I of Fig. 2, Fig. 2 is a half plan of the tent.

Die Aufstellung des Zeltes beginnt mit der Absteckung seiner Bodenfläche durch Einschlagen der Pflöcke g und 9a in den Erdboden. Dann werden ,die Masten 3 aufgerichtet und das Dach 7 (Ausleger vi und Spannseile i4) zwischen .den Masten am Boden zusammengesetzt. Die aus mehreren Teilen zusammengesetzte Zelthaut 2 wird am Boden rings um die Masten und über das Dach 7 ausgelegt. Dann werden ihre Teile miteinander verknüpft, worauf das Hochziehen der Dachhaut mittels der Zugseile 6 durch zwei Winden ¢ an jedem Mast vorgenommen wird, wobei je eine Winde über einen Flaschenzug am Mast selbst am Mastring i angreift, während die zweite Winde über die Rolle 5 an der Mastspitze das Ende der -Dachkonstruktion hochwindet.The erection of the tent begins with the staking out of its floor area by hammering the pegs g and 9a into the ground. Then, the masts 3 erected and the roof 7 (boom vi and tensioning cables i4) between the masts assembled on the ground. The tent skin 2, which is composed of several parts laid out on the ground around the masts and over the roof 7. Then their parts linked to one another, whereupon the roof skin is pulled up by means of the pull cords 6 is made by two winches ¢ on each mast, with one winch over one Pulley on the mast itself attacks the mast ring i, while the second winch over the roller 5 at the top of the mast winds up the end of the roof structure.

Bei der obenerwähnten früheren Bauart verlief dieser zweite Zug von der Mastspitze aus zur Spitze des Zeltes.In the earlier design mentioned above, this second train ran from the top of the mast out to the top of the tent.

Nachdem das Dach 7 die in Fig. zi gezeigte Höhenlage erreicht. hat, werden die üblichen weiteren Arbeiten ausgeführt, wie Aufrichten der Rondcllstangen io usw. -.Die dargestellte und beschriebene Bauweise gemäß der Erfindung unterscheidet sich grundsätzlich von der eingangs erwähnten dadurch, daßbeim Erfindungsgegenstand der Winkel a, den das am Dach 7 angreifende Trum des Zugseiles 6 mit seinem lotrechten Schenkel bildet, klein, und zwar sogar bis zur Größe Null, gehalten werden kann, je nachdem wie nahe der Konstrukteur den Angriffspunkt .dieses Trums am Dach an den Mast heran legt, wogegen bei jener bekannten Methode ,des Erfassens -der Zelthaut in ihrem Mittelpunkt dieser Winkel in jeder Höhenlage der Zelthawtspitze groß ausfällt und infolgedessen jenes Seiltrum stets nur -eine, geringe Zugkraftkomponente aufweist. Um diesen Mangel zu verringern,, also -den Winkel kleiner zu machen, ist. man dort genötigt, die Masten weit über die Angriffspunkte jenes Seiltrums am Dach? hinaus emporragen zu lassen, also sehr lange Masten aufzustellen.After the roof 7 has reached the altitude shown in FIG. Has, the usual further work is carried out, such as erecting the Rondcllstangen io etc. -The illustrated and described construction according to the invention differs basically differs from the one mentioned at the beginning in that the subject matter of the invention the angle a, which the attacking on the roof 7 strand of the pull rope 6 with its perpendicular Leg forms, can be kept small, even down to size zero, depending on how close the designer is to the point of application of this strand on the roof lays the mast close, whereas with that known method of grasping the tent skin in its center this angle turns out to be large in every altitude of the Zelthawtspitze and consequently that strand of the rope always has only one, low tensile force component. To reduce this deficiency, that is, to make the angle smaller is. one there Do you need the masts far beyond the points of application of that rope strand on the roof? out to let them soar, so to erect very long masts.

Somit bestehen die Vorteile der neuen Bauart in der günstigen Zugbeanspruchung,der Zugseile 6 und -daher leichten Haspelarbeit, der Zulässigkeit geringeren Zugseilquerschnitts, schwächerer Seilwinden und geringerer Biegungsbeanspruchung der Masten, die daher ebenfalls schwächer gewählt werden können, ferner in der geringen Mastlänge, der Kuppelform; dlie die Bildung einer Zeltspitze vermeidet, keine Bildung von Wassersäcken zuläßt, dem Wind keinen Angriffspunkt bietet und, daher kein Flattern der oberen Partie der Zelthaut zuläßt und das Zelt breit abdeckt, so daß die Masten in weiterem Abstand als bisher auseinandergerückt werden können, wodurch unter Umständen Sturmstangeri eingespart werden.Thus, the advantages of the new design are the favorable tensile stress, the Pull ropes 6 and therefore light reel work, the admissibility of smaller pull rope cross-sections, weaker winches and less bending stress on the masts, which is why can also be chosen weaker, furthermore in the short mast length, the Dome shape; dlie avoids the formation of a tent tip, no formation of water sacs allows, the wind offers no point of attack and, therefore, no fluttering of the upper Part of the tent skin allows and covers the tent broadly, so that the masts in further Distance can be moved apart than before, which may lead to Sturmstangeri can be saved.

Die sternförmig ausstrahlenden Ausleger läßt man vorteilhaft mit ihrem Innenende mittels Scharniere i2 an einer Buckelplatte 13 angreifen, so daß die Ausleger mittels der durch Spannschrauben verstellbaren Drahtseilunterspannung 14 in die jeweils gewünschte bzw. notwendige Dachneigung gebracht werden können.The star-shaped radiating arms are advantageously left with their Attack the inner end by means of hinges i2 on a hump plate 13 so that the boom into the each desired or necessary roof pitch can be brought.

Die Ausführung kann natürlich von dem in der Zeichnung dargestellten Beispiel in vielen Punkten abweichen. So kann der Angriff der Zugseile 6 statt an den Außenenden von Auslegern an einem Ring stattfinden.The execution can of course be different from that shown in the drawing Example differ in many respects. So the attack of the pull cords 6 instead of the outer ends of booms take place on a ring.

Claims (5)

PATENTANSPRÜCHE: i. Großraumzelt mit an Masten befindlichen Hubwerken zum Anheben oder an den Masten geführten Zelthaut, dadurch gekennzeichnet, daß die Zugseile (6) außen an einem in dem von den Masten (3) umgrenzten Raum befindlichen Dach (7) angreifen. PATENT CLAIMS: i. Large tent with lifting mechanisms on masts for lifting or on the masts guided tent skin, characterized in that the Pull ropes (6) on the outside of one in the space delimited by the masts (3) Attack the roof (7). 2. Zelt nach Anspruch i, dadurch gekennzeichnet, daß das Dach (7) eine nach oben gewölbte Oberfläche hat. 2. Tent according to claim i, characterized in that the roof (7) has an upwardly curved surface. 3. Zelt nach Anspruch i, dadurch. gekennzeichnet, daß das Dach (7) die Zelthaut (2) untergreifende, radiale Ausleger enthält. 3. tent according to claim i, characterized. marked, that the roof (7) contains the tent skin (2) reaching under, radial arms. 4. Zelt nach Anspruch i und 3, dadurch gekennzeichnet, -daß die Druckbelastung gegen die Außenenden der Ausleger von Drahtseilunterspannungen 0i4) aufgenommen wird. 4. tent according to claim i and 3, characterized in that the pressure load against the Outer ends of the boom is taken up by wire rope under-tensioning 0i4). 5. Zelt nach Anspruch .i, 3 und 4, dadurch gekennzeichnet, daß die Ausleger mit ihrem Innenende mittels Scharniere an einer Buckelplatte (i-3) angreifen, so daß sie mittels Spannschrauben in der Drahtseilunterspannung (i4) verstellbar sind.5. tent according to claim .i, 3 and 4, characterized in that the boom with its inner end Attack by means of hinges on a hump plate (i-3) so that they are secured by means of tensioning screws are adjustable in the wire rope tension (i4).
DEST4197A 1951-12-11 1951-12-11 Large tent Expired DE872395C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DEST4197A DE872395C (en) 1951-12-11 1951-12-11 Large tent

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DEST4197A DE872395C (en) 1951-12-11 1951-12-11 Large tent

Publications (1)

Publication Number Publication Date
DE872395C true DE872395C (en) 1953-03-30

Family

ID=7453493

Family Applications (1)

Application Number Title Priority Date Filing Date
DEST4197A Expired DE872395C (en) 1951-12-11 1951-12-11 Large tent

Country Status (1)

Country Link
DE (1) DE872395C (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3489156A (en) * 1965-02-05 1970-01-13 Stromeyer & Co Gmbh L Suspended roof construction

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3489156A (en) * 1965-02-05 1970-01-13 Stromeyer & Co Gmbh L Suspended roof construction

Similar Documents

Publication Publication Date Title
EP1640508B1 (en) Guide device for piles
DE2838239A1 (en) Guyed tower with raisable and lowerable head - has several guying cables linked to move up and down with head
DE1294497B (en) Logarithmic periodic dipole antenna
DE872395C (en) Large tent
DE202022103661U1 (en) Double machine lifting system for constructing the internal structure of a chimney
DE833556C (en) Process for the production of buildings
DE726964C (en) Large tent
DE263869C (en)
AT524042B1 (en) Cane tree tour
DE2102359A1 (en) Collapsible tent construction
DE438999C (en) Anchoring device for airships
DE297583C (en)
DE698186C (en) Suspension of the tent skin for large tents
DE953939C (en) Easy to set up and dismantle tower designed for drying parachutes
DE923269C (en) Windlass
DE1024231B (en) Procedure and assembly device for assembling large standing containers
DE923194C (en) Method for assembling a supporting structure
DE663900C (en) Luffing crane
DE213748C (en)
DE508854C (en) Device for anchoring airships on a mast using lateral guide ropes
CH322411A (en) Lifting device for increasing the individual pipe sections when building removable masts
DE102020113809A1 (en) Transport system for the vertical transport of goods and people on a building site
DE966198C (en) Hanger winch for ships
AT219246B (en) Bell tent
DE1038408B (en) Tower for drying parachutes