DE7731519U1 - BELT CONVEYOR - Google Patents
BELT CONVEYORInfo
- Publication number
- DE7731519U1 DE7731519U1 DE7731519U DE7731519U DE7731519U1 DE 7731519 U1 DE7731519 U1 DE 7731519U1 DE 7731519 U DE7731519 U DE 7731519U DE 7731519 U DE7731519 U DE 7731519U DE 7731519 U1 DE7731519 U1 DE 7731519U1
- Authority
- DE
- Germany
- Prior art keywords
- frame
- belt conveyor
- joint
- conveyor system
- belt
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G21/00—Supporting or protective framework or housings for endless load-carriers or traction elements of belt or chain conveyors
Description
• * · k ItIl• * · k ItIl
Bandförde ranlageBelt conveyor system
Die Erfindung betrifft eine Bandförderanlage, die im wesentlichen aus einem Gerüst und einem darin umlaufenden, endlosen Transportband besteht, das in de» Kopfteil um eine Antriebswelle und in dem Fußteil des Gerüstes um eine Umlenk- und Spannrolle herumgeführt und dazwischen mit Hilfe von Stützrollen abgestützt ist. Derartige Bandförderanlagen werden vorzugsweise auf Baustellen zur Förderung von Schüttgut jeglicher Art eingesetzt.The invention relates to a belt conveyor system, which essentially consists of a frame and an endless one rotating therein There is a conveyor belt, which in the head part around a drive shaft and in the foot part of the frame around a deflection and tension roller and is supported in between with the help of support rollers. Such belt conveyor systems are preferred used on construction sites for the conveyance of all types of bulk material.
Während kleinere Ausführungen dieser Bandförderanlagen fast immer einteilig ausgebildet sind und mit Hilfe eines fest installierten Radpaares zum Einsatzort gebracht und dort manövriert werden können, wird bei größeren Bauformen im allgemeinen eine mehrteilige Bauweise mit mindestens einem Kopfteil und einem Fußteil verwendet, die erst am Einsatzort miteinander verbunden und zu einer Bandförderanlage komplettiert werden. Dabei fallen umfangreiche Montagearbeiten an, die sehr zeitaufwendig sind. Neben der Installation der Stütz-, ümlank- und Antriebsrollen, des Antriebs usw. muß in vielen Fällen an Ort und Stelle das eigentliche Transportband in die Förderanlage eingezogen und mit SpezialWerkzeugen zu einem endlosen Band vulkanisiert werden. Im Zuge einer Demontage muß dann das Band wieder aufgetrennt werden, wobei eine Wiederverwendung des Förderbandes wegen der durch das Auftrennen bedingten, fehlenden Überlappung Schwierigkeiten bereitet.While smaller versions of these belt conveyor systems are almost always made in one piece and with the help of one permanently installed pair of wheels can be brought to the place of use and maneuvered there, is the case with larger designs generally a multi-part design with at least a head part and a foot part are used, which are only connected to one another at the point of use and become a belt conveyor system be completed. This involves extensive assembly work that is very time-consuming. In addition to the Installation of the support, overhang and drive rollers, the drive, etc. must in many cases on the spot The actual conveyor belt is drawn into the conveyor system and vulcanized into an endless belt using special tools will. In the course of dismantling, the belt must then be separated again, the conveyor belt being reused because of the lack of overlap caused by the separation.
7731519 16.01787731519 16.0178
Es ist demnach Aufgabe der Erfindung, eine Bandförderanlage zu schaffen, deren Montage und Demontage in sehr kurzer Zeit möglich ist und deren Wiederverwendung keine Schwierigkeiten bereitet.It is therefore the object of the invention to create a belt conveyor system, its assembly and disassembly in very is possible for a short time and cannot be reused Causes difficulties.
Die Erfindung besteht darin, daß das das Förderband tragende Gerüst an mindestens einer Stelle zwischen seinem Kopfende und seinem Fußende um ein einachsiges Gelenk um 180° klappbar ausgebildet ist, wobei die Gelenkachse quer zur Förderrichtung und parallel zur Ebene des Förderbandes verläuft.The invention consists in that the frame carrying the conveyor belt at at least one point between his The head end and its foot end are designed to be foldable around a uniaxial joint by 180 °, the joint axis being transverse to the conveying direction and parallel to the plane of the conveyor belt.
Mit Hilfe des Gelenkes zwischen beiden Teilen des Gerüstes ist gewissermaßen eine Vormontage geschaffen, mit der zwei Vorteile erzielt werden. Zum einen wird damit das mühsame Ausfluchten zweier Gerüstteile zueinander bei der Montage eingespart - zur Bildung der späteren, gestreckten Betriebslage des Gerüstes brauchen beide Gerüstteile nur auseinandergeklappt zu werden - und zum anderen bildet das Gerüst auch in zusammengelegtem Zustand stets eine Einheit, die es gestattet, das Förderband ein für alle Mal innerhalb des Gerüstes zu installieren, wobei im geklappten Zustand des Gerüstes lediglich die Spannung durch Verschieben der Spann- bzw. Umlenkrolle beseitigt werden muß.With the help of the joint between the two parts of the frame, a pre-assembly is created, so to speak, with of which two advantages can be achieved. On the one hand, it eliminates the laborious alignment of two scaffolding parts with one another Assembly saved - both parts of the scaffolding only need to be in the later, extended operating position of the scaffolding To be unfolded - and on the other hand that forms Even in the collapsed state, the frame is always a unit that allows the conveyor belt to be moved inside once and for all of the scaffolding, whereby in the folded state of the scaffolding only the tension by moving the Tension or deflection pulley must be removed.
Bei besonders langen Förderstrecken von 30 m und mehr kann zwischen dem Kopfteil und dem Fußteil ein Zwischenteil eingefügt sein, das jeweils mit Hilfe von einachsigen Gelenken an dem Kopfteil bzw. dem Fußteil befestigt ist. Bei extremen Förderlängen können auch mehrere solcher Zwischen-!In the case of particularly long conveyor routes of 30 m and more, an intermediate part can be placed between the head section and the foot section be inserted, which is fastened in each case with the help of uniaxial joints on the head part and the foot part. In the case of extreme conveyor lengths, several such intermediate!
7731519 16.01787731519 16.0178
teile, die dann untereinander gelenkig verbunden sind, vorgesehen sein. Wegen der leichteren Handhabung sind dreiteilige Gerüste jedoch im allgemeinen vorteilhafter.parts, which are then hinged to one another, are provided being. However, three-part scaffolds are generally more advantageous because of their ease of handling.
Bei solchen dreiteiligen Gerüsten ist es besonders zweckmäßig, die beiden Gelenke auf einer Seite des Gerüstes anzuordnen, wobei die Gelenkachse des einen Gelenkes unmittelbar außerhalb der Gerüstseite und die Gelenkachse des anderen Gelenkes in einem Abstand von dieser Seite angeordnet ist, die mindestens der halben Seitehöhe des Gerüstes entspricht. Mit einer solchen Anordnung können die beiden Aussenteile, also das Fuß- und das Kopfteil, übereinander auf das Zwischenteil geklappt werden. Im geklappten Zustand weist dann das Gerüst die Form eines großen G in lateinischer Schreibweise auf. Dies hat den Vorteil, daß bei der Errichtung einer derartigen Bandförderanlage sowohl das Kopfteil als auch das Pußteil durch einfaches Aufklappen in die gestreckte Gerüstlage gebracht werden können. Das Zwischenstück braucht dabei nicht gehandhabt zu werden, sondern es liegt während des gesamten Klappvorgangs einfach auf dem Boden auf.With such three-part scaffolding, it is particularly useful to arrange the two joints on one side of the scaffolding, the hinge axis of one hinge immediately outside the frame side and the hinge axis of the other Joint is arranged at a distance from this side, which corresponds to at least half the side height of the frame. With such an arrangement, the two outer parts, so the foot and the head part, can be superimposed on one another be folded onto the intermediate part. When folded, the frame then has the shape of a capital G in Latin Notation on. This has the advantage that when setting up such a belt conveyor system, both the head part as well as the puss part can be brought into the stretched scaffolding position by simply opening it. The Intermediate piece does not need to be handled, it simply lies during the entire folding process on the floor.
Nachfolgend wird die Erfindung anhand von Ausführungsbeispielen, die in der Zeichnung dargestellt s'nd, näher erläutert; es bedeutenThe invention is explained in more detail below with the aid of exemplary embodiments which are shown in the drawing; it mean
Fig. 1 eine schematische Seitenansicht des zusammengefalteten Gerüstes mit angedeutetem Klappschema, Pig. 2 eine Seitenansicht gemäß !"ig. 1 in vergrößertem Maßstab,Fig. 1 is a schematic side view of the folded Scaffolding with indicated folding scheme, Pig. FIG. 2 shows an enlarged side view according to FIG. 1 Scale,
Pig. 3 eine Seitenansicht der Enden zweier gelenkig miteinander verbundenen Gerüstteile undPig. 3 is a side view of the ends of two articulated together connected scaffolding parts and
7731519 16.02.787731519 02/16/78
FIg. 4 eine Querschnittsansicht durch ein·Gerüstteil mit anklappbarem Laufsteg einschließlich Geländer. -FIg. 4 shows a cross-sectional view through a framework part with folding walkway including railings. -
In Pig. 1 ist im wesentlichen das Klappschema des den wesentlichen Bestandteil einer Bandförderanlage ausmachenden Gerüstes 1 dargestellt. Die dargestellte Ausfuhrungaform weist eine G-Formation auf, d.h., auf ein Zwischenteil 4 ist in zusammengelegtem Zustand zunächst ein Fußte il 2 aufgeklappt, wobei auf das Fußteil ein Kopfteil 3 aufgelegt ist. Eine solche .G-Formation weist den Vorteil auf, daß nach Absetzen des geklappten Gerüstes 1 auf den Boden zur Herbeiführung der gestreckten Lage jeweils nur ein Gerüstteil, nämlich einmal das Kopfteil 3 und danach das Fußteil 2 z.B. mit Hilfe eines Kranes aufgeklappt werden müssen.In Pig. 1 is essentially the folding diagram of the making up the essential part of a belt conveyor system Scaffold 1 shown. The illustrated embodiment has a G-formation, i.e., on an intermediate part 4, in the collapsed state, there is initially a foot il 2 unfolded, with a head part 3 on the foot part is hung up. Such a .G formation has the advantage on that after setting down the folded frame 1 on the ground to bring about the stretched position in each case only a frame part, namely the head part 3 and then the foot part 2, e.g. with the help of a crane Need to become.
Eine derartige Formation wird dadurch erreicht, daß die Gelenkachsen der die Gerüstteile 2*..3 und 4 verbindenden Gelenke 6 außerhalb der Oberseite des Gerüstes liegen. Dabei weist die Gelenkachse des Gelenkes 6 zwischen dem Fußteil 2 und dem Zwischenteil 4 nur einen sehr geringen Abstand zur Oberseite des Gerüstes 1 auf, während die Gelenkachse des Gelenkes 6 zwischen dem Kopfteil 3 und dem Zwischenteil 4 in einem Abstand angeordnet ist, der annähernd der halben Höhe einer Gerüstseite entspricht. Dadurch wird für das Kopfteil 3 in geklapptem Zustand der für die Unterbringung des Fußteils 2 notwendige Abstand zu dem Zwischenteil 4 bewirkt.Such a formation is achieved in that the joint axes the frame parts 2 * .. 3 and 4 connecting Joints 6 lie outside the top of the frame. The hinge axis of the joint 6 between the Foot part 2 and the intermediate part 4 only a very small distance from the top of the frame 1, while the hinge axis of the joint 6 is arranged between the head part 3 and the intermediate part 4 at a distance which is approximately corresponds to half the height of one side of the scaffolding. This is for the head part 3 in the folded state For accommodating the foot part 2, the distance from the intermediate part 4 is necessary.
7731519 16.01787731519 16.0178
Selbstverständlich können auch die Gelenkächsen der Gelenke 6 jeweils auf unterschiedlichen Seiten des Gerüstes angeordnet sein, also z.B. das Gelenk 6 zwischen dem Fußteil 2 und dem Zwischenteil 4 auf der Oberseite und das zwischen dem Kopfteil 3 und dem Zwischenteil 4 auf der Unterseite des Gerüstes 1. Es ergibt sich dann ein Klappschema in Form des Großbuchstaben Z, das ohne weiteres anwendbar ist, jedoch beim Au3 ein anderklappen größere Schwierigkeiten bereitet, da nach dem Aufklappen, des einen Gerüstteiles dieses mit dem Zwischenteil zusammen aufgeklappt werden muß oder das zur Hälfte aufgeklappte Gerüst um seine Längsachse umgedreht werden muß, bevor das andere äußere Gerüstteil aufgeklappt werden kann.Of course, the joint axes of the joints 6 can be arranged on different sides of the frame, e.g. the joint 6 between the foot part 2 and the intermediate part 4 on the top and that between the head part 3 and the intermediate part 4 on the Underside of the scaffolding 1. The result is a folding diagram in the form of the capital letter Z, which can be used without further ado is, however, with the Au3, another fold greater difficulty prepares, because after opening, the one frame part, this part is opened together with the intermediate part must be or the half-unfolded scaffolding must be turned around its longitudinal axis before the other outer frame part can be opened.
In Pig. 2 sind Einzelheiten der erfindungsgemäß aneinander gelagerten Gerüstteile dargestellt. Jedes Gerüstteil 2, 3 und 4 besteht in an sich bekannter Weise aus einem Fachwerk, wobei in dem Kopfteil 3 die mit einem schematisch dargestellten Antrieb integrierte Antriebsrolle 8 und im Fußteil 2 eine Spann- bzw. Umlenkrolle untergebracht sind. Zur Stützung des das Schüttgut tragenden Teiles eines Förderbandes 7 (Fig. 4 )sind Rollenstationen vorgesehen, die aus jeweils einer horizontalen angeordneten Stützrolle 12 und zwei geneigt angeordneten Stützrollen 12'bestehen. Im Bereich des unteren Endes des Fußteiles, wo die Aufgabe des Schüttgutes auf die Bandförderanlage erfolgt, sind zum Abfangen der dadurch bedingten besonderen Belastungen die Rollonstationen in dichteren Abständen angeordnet. Zur Stützung des rück-In Pig. 2 are details of the invention to one another stored scaffolding parts shown. Each frame part 2, 3 and 4 consists in a known manner a framework, with the drive roller integrated with a schematically illustrated drive in the head part 3 8 and a tension or pulley are housed in the foot part 2. To support the bulk material carrying Part of a conveyor belt 7 (Fig. 4) roller stations are provided, each of which consists of a horizontal arranged support roller 12 and two inclined support rollers 12 'exist. In the area of the lower end of the Foot section, where the bulk material is fed onto the belt conveyor the roll-on stations in more closely spaced. To support the back
7731519 16.02.787731519 02/16/78
laufenden, leeren Förderbandteiles sind Untergurtrollen 14 in regelmäßigen Abständen innerhalb des Faehwerkes' untergebracht. running, empty conveyor belt part, lower belt rollers 14 are housed at regular intervals within the carriages'.
Bei dem in Fig. 2 dargestellten Ausführungsbeispiel werden die Hälften der Gelenke b mit Hilfe von Gelenkstützen 16 gebildet, die jeweils an den Stirnseiten der Gerüstteile angeschraubt sind. Nach dem Aufklappen, des Gerüstes 1 und nach dem Zusammenfügen der Gerüstteile werden diese Gelenkstützen entfernt. Dabei ist ihre Befestigung so vorgesehen, daß sie die gestreckte Lage des Gerüstes 1 nicht behindern, sondern ihre Montage bzw. Demontage in jedem Pail in der gestreckten Gerüstlage gewährleistet ist.In the exemplary embodiment shown in FIG. 2, the halves of the joints b are secured with the aid of joint supports 16 formed, which are each screwed to the end faces of the frame parts. After opening the scaffolding 1 and After the framework parts have been joined together, these articulated supports are removed. It is intended to be attached in such a way that that they do not hinder the stretched position of the frame 1, but their assembly or disassembly in each Pail in the stretched scaffolding is guaranteed.
Obwohl in Pig. 2 kein Förderband 7 dargestellt ist, ist es von Anfang an in dem Gerüst 1 untergebracht. Es liegt vor dem Auseinanderklappend.es Gerüstes in lockerer Formation zwischen den einzelnen Rollenstationen, wobei die Spannrolle 10 soweit nachgelassen ist, daß das Förderband auch den z.B. zwischen dem Kopfteil 3 und dem Zwischenteil 4 vorhandenen Abstand überbrücken kann. Es ist also keinerlei Vulkanisierarbeit auf der Baustelle nötig, auch braucht das Förderband 7 nach einer Demontage nicht aufgetrennt zu werden.Though in Pig. 2, no conveyor belt 7 is shown, it is housed in the framework 1 from the start. It lies in a loose formation in front of the unfolding between the individual roller stations, the tensioning roller 10 having slackened to such an extent that the conveyor belt also can bridge the gap between the head part 3 and the intermediate part 4, for example. So it's not Vulcanization work is necessary on the construction site, and the conveyor belt 7 does not need to be separated after dismantling will.
In zusammengeklapptem Zustand kann das Gerüst 1 zu Transportzwecken besonders gut in einer Kiste 15 (Fig. 2) untergebracht werden, wobei die einzelnen Gerüstteile mit Hilfe von Distanzklötzen 17 gegeneinander abgestützt werden. DurchIn the folded state, the frame 1 can be used for transport purposes can be housed particularly well in a box 15 (Fig. 2), the individual frame parts with the help are supported by spacer blocks 17 against each other. Through
7731519 16.02.787731519 02/16/78
den Zusammenhalt, den die Kiste 15 gewährt, "braucht das zusammengeklappte Gerüst 1 nicht zusätzlich gesichert zu werden. Die Kiste ist wiederverwendbar und dient neben der Anlieferung zu der entsprechenden Baustelle auch zur Aufbewahrung in nutzungsfreien Perioden.the cohesion that box 15 provides "needs that folded scaffolding 1 not to be additionally secured. The crate is reusable and serves alongside the delivery to the corresponding construction site also for storage in idle periods.
In Pig. 3 ist ein weiteres Ausführungsbeispiel des Gelenkes 6 zwischen zwei Gerüstteileo, in diesem Pail zwischen dem Fußteil 2 und dem Zwischenteil 4 dargestellt. Jede Gelenkhälfte wird mit Hilfe eines Bockes 18 gebildet, der unlösbar an der Oberseite jedes Gerüstteiles befestigt ist. In der Mhe der Unterseite der Gerüstteile befinden sich Laschen 20, die mit Durchgangslöchern 21 versehen sind. In der gestreckten Lage beider Gerüstteile zueinander sind die Durchgangslöcher 21 ausgefluchtet, durch die dann ein Bolzen z.B. in Form einer Stange für die Laschen 20 beider Gerüstseiten hindurchgesteckt werden kann. Auf diese Weise wird die gestreckte Lage des Gerüstes 1 in sehr einfacher Weise ohne große Hontagearbeiten gesichert.In Pig. 3 is another embodiment of the joint 6 between two scaffolding parts, in this pail between the foot part 2 and the intermediate part 4 shown. Each joint half is formed with the help of a bracket 18, the is inextricably attached to the top of each frame part. At the bottom of the scaffolding parts are located Lugs 20 which are provided with through holes 21. In the extended position of both frame parts to each other the through holes 21 are aligned, through which a bolt e.g. in the form of a rod for the tabs 20 can be inserted through both sides of the scaffold. In this way, the stretched position of the frame 1 in secured very easily without major honing work.
In Fig. 4 ist in einer Querschnittsansicht die Bandförderanlage in betriebsfertigem Zustand dargestellt, allerdings ohne die das Gerüst 1 tragenden Stützen, die zur Aufstellung benötigt werden. Auf der einen Seite des Gerüstes 1 ist ein Laufsteg 24 an Lagern 22 gelenkig befestigt, der an seiner freien Längskante mit einem Geländer 26 versehen ist. Ein derartiger Laufsteg e nschließlich Geländer ist bei großen Bandförderanlagen durchaus üblich, um Wartungsarbeiten ausführen zu können oder um im Falle einer Störung eine schnelle Beseitigung bewirken zu können.In Fig. 4 is a cross-sectional view of the belt conveyor shown in a ready-to-use condition, but without the supports supporting the frame 1 that are necessary for installation are needed. On one side of the frame 1, a catwalk 24 is hinged to bearings 22, the is provided with a railing 26 on its free longitudinal edge. Such a catwalk including railings is quite common with large belt conveyor systems in order to be able to carry out maintenance work or in order to be able to carry out maintenance work to be able to remedy a fault quickly.
• · * · t t• · * · t t
• c · ( ■ » · «it• c · (■ »·« It
- 11 -- 11 -
Der Laufeteg 24 einschließlich Geländer 26 können nach-' träglich an dem Gerüst 1 "befestigt werden, zweckmäßiger ist es jedoch, dieses Zubehör ebenfalls an jedem 'Gerüstteil klappbar zu gestalten, was in Fig. 4 gestrichelt angedeutet ist.The walkway 24 including the railing 26 can be can later be attached to the frame 1 ″, but it is more expedient to also attach this accessory to each 'frame part to make foldable, which is indicated in Fig. 4 by dashed lines.
Der Laufsteg 24 und das Geländer 26 sind gerade so bemessen, daß nach einer Schwenkbewegung um 90° nach links das Geländer 26 an der Oberseite des Gerüstes und der Laufsteg 24 an der rechten Seite des Gerüstes anliegen. Es ist dabei zu beachten, daß das Transportband 7 das Geländer 26 dabei nicht behindert, da es im geklappten Zustand des Gerüstes in diesem in lockerer Formation untergebracht ist. Die Abstände der Geländerstützen sind dabei so zu wählen, daß sie in keinem Fall mit den schrägstehenden Stützrollen kollidieren« The catwalk 24 and the railing 26 are just dimensioned so that after a pivoting movement of 90 ° to the left the railing 26 rest on the top of the scaffolding and the catwalk 24 on the right side of the scaffolding. It should be noted that the conveyor belt 7 does not interfere with the railing 26, since it is folded State of the scaffolding in this is housed in a loose formation. The distances between the handrail supports are to be chosen in such a way that they in no case collide with the inclined support rollers «
Der Platzbedarf äes angeklappten Laufsteges 24 einschließ-.lich des Geländers 26 ist so gering, daß das Zusammenklappen des Gerüstes dadurch nicht beeinträchtigt wird.The space requirement of the folded-in catwalk 24 including of the railing 26 is so small that the folding of the scaffolding is not impaired.
Das restliche, üblicherweise zu einer Bandförderanlage zugehörige Zubehör, wie z.B. Abstreifer, Stützen, Aufgabetrichter und dergl. sind nicht weiter dargestellt. Ein Teil davon kann ohne weiteres vormontiert sein, wie z.B. der Abstreifer und die Stützen, die dann an die Unterseite des Gerüstes 1 anklappbar sind.The rest, usually associated with a belt conveyor system Accessories such as scrapers, supports, feed funnels and the like are not shown any further. A Part of it can easily be pre-assembled, such as the scraper and the supports that are then attached to the underside of the frame 1 are foldable.
7731519 16.02.787731519 02/16/78
Claims (9)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE7731519U DE7731519U1 (en) | 1977-10-12 | 1977-10-12 | BELT CONVEYOR |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE7731519U DE7731519U1 (en) | 1977-10-12 | 1977-10-12 | BELT CONVEYOR |
Publications (1)
Publication Number | Publication Date |
---|---|
DE7731519U1 true DE7731519U1 (en) | 1978-02-16 |
Family
ID=6683491
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE7731519U Expired DE7731519U1 (en) | 1977-10-12 | 1977-10-12 | BELT CONVEYOR |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE7731519U1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE202006010059U1 (en) * | 2006-06-28 | 2007-11-08 | Owr Ag | Mobile system for treating people |
-
1977
- 1977-10-12 DE DE7731519U patent/DE7731519U1/en not_active Expired
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE202006010059U1 (en) * | 2006-06-28 | 2007-11-08 | Owr Ag | Mobile system for treating people |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE4201309C2 (en) | Hose belt conveyor | |
EP0122573B1 (en) | Kit for the construction of belt conveyor arrangements | |
DE3738973C1 (en) | Device for changing elastic supercalender rolls | |
DE1207948B (en) | Dismountable bridge, especially a moat bridge | |
EP0178462B1 (en) | Roll stand with a disconnectible upright for roll changing purposes | |
DE7731519U1 (en) | BELT CONVEYOR | |
DE833923C (en) | Chain conveyor | |
EP0121920B1 (en) | Belt conveyor arrangement | |
DE3502002A1 (en) | Lifting platform | |
DE2123132C2 (en) | Conveying device on scaffolding, in particular metal scaffolding | |
EP0857521A1 (en) | Rolling mill | |
EP0074648B1 (en) | Frame for belt conveyor devices | |
DE2313458A1 (en) | METHOD FOR MANUFACTURING MULTIPLE CHARGING PLATFORMS OF DIFFERENT DIMENSIONS AND DESIGNING SUCH A CHARGING PLATFORM | |
DE1171814B (en) | Vertical circulating elevator | |
DE2803702A1 (en) | PROCEDURE FOR PRE-ASSEMBLY AND INSTALLATION OF EXTENSION BOWS AND SUPPORTING ORGAN FOR PERFORMING THE PROCEDURE | |
DE2228353C3 (en) | Device for the sectional production of reinforced concrete superstructures of bridges or the like supported at large distances | |
DE2134631C3 (en) | Collapsible shoring, especially for tents | |
DE872026C (en) | Belt conveyor | |
DE967336C (en) | Device for feeding material to be conveyed on conveyor belt lines | |
DE2056100C3 (en) | Emergency bridge | |
DE2308954C2 (en) | Quick assembly hall | |
DE832573C (en) | Foldable conveyor belt | |
DE3124361C2 (en) | Horizontal circulation warehouse | |
DE2708719A1 (en) | Mine support with overlapping channel clamp - has hydraulic cylinder between two brackets, one with locating finger | |